Aeronautical Systems Center

Size: px
Start display at page:

Download "Aeronautical Systems Center"

Transcription

1 Aeronautical Systems Center Aeronautical Systems Center Aircraft & Weapons: Today & Tomorrow Lt Gen Tom Owen Commander AFPEO /AC

2 Overview ASC Snapshot Aircraft/Weapon Success Stories On The Horizon Way Ahead Warfighter Support ASC Imperatives 2

3 ASC Snapshot Aeronautical Systems Center Lt Gen Tom Owen, Commander Air Force Acquisition Programs FMS Programs - $29.8B DoD, $22.8B FMS, $6.7B other - Largest ABW in the USAF - Support for Airborne Laser Test Bed 88 ABW - 27K mil/civ, 60+ on-base/100+ off-base units - $391M wing annual budget (FY11) -- $121M Base Operations & Maintenance -- $132M Civilian Pay -- $135M Defense Health Program -- $ 3M Military Family Housing PEO/AC - F-22, F-35 LCSO, F-15SA, Rotary Wing, Future Systems, Special Programs - 7 AML Programs PEO/Agile Combat Support - Simulators, Propulsion, Combat Electronics, JPATS, Trainers, Human Systems - 23 AML Programs - 1,104 Assigned Personnel PEO/KC-46-1 AML Program Assigned Personnel PEO/ISR & SOF - Global Hawk, Predator/Reaper, CV AML Programs - 1,232 Assigned Personnel PEO/Fighters & Bombers - B-1, B-2, B-52, F-15, F-16, Avionics - 48 AML Programs - 1,155 Assigned Personnel PEO/ Mobility - C-5, C-17, C-27, C-130, LAIRCM - 14 AML Programs Assigned Personnel 3

4 Aircraft/Weapon Success Stories (Small Diameter Bomb (SDB)) GBU-39 (SDB I) IOC declared 6 months ahead of schedule F-15E integration completed in 2005 F-16 Block 40/ st successful SDB I released in Apr 2011 F-16 Block Nine successful SDB I drops completed to date F-22A -- SDB capability added under increments 3.1 and 3.2 BRU-61/A four-place carriage Increases platform combat capability Reduces aircraft weapons maintenance turn time GBU-53 (SDB II) in Engineering & Manufacturing Development Critical Design Review completed after only 6 months Control Test Vehicle (CTV-1) accomplished Weapon integration ongoing Guided Test Vehicle on track for FY12 Faring Overbody AFT Section Seeker Section Live Payload Dome Cover 4

5 Aircraft/Weapon Success Stories (AIM-9X/AIM-120) AIM-9X Block I operational on F-15C/D Suite 5 & F-16 Block 30/40/50 F-22A integration underway in increment 3.2 Block II MS C approval obtained in Jul 2011 AIM-120 F-15 C/D AIM-120C initial integration completed in 2005 F-22A/AIM-120C integration AIM-120D Initial Operational Capability (IOC) planned for

6 Aircraft/Weapon Success Stories Industry-Gov t team success (Universal Armament Interface (UAI)) F-15E/LJDAM out-of-cycle integration done in 3 months/$2.5m vice normal 3-5 years for OFP and $20-25M! Significant operational capability 100% F-15E Strike Eagles = UAI Within 3+ years, all F-16 40/50 (M6/6+) to include 287 EPAF/NATO jets = UAI JSF All JDAM variants = UAI JASSM: UAI fielding w/in year SDB I/II: UAI/to be UAI UAVs: Army testing UAI NATO/Coalition warfare game changer -- OSD $$ NATO weapons on U.S. jets Rapid deployment of capability through commonality! 6

7 Aircraft/Weapon Success Stories (Other Notable Achievements) F-16 Operational Flight Program M5/M5+ M5.2 released to field last year -- M5.2+ release anticipated in late Dec F-16 Combat Avionics Programmed Extension Suite All weather DEAD capability -- Enhanced air-to-air targeting Large High Res Display for SAR images & target pod video Streamlines multiple intel broadcasts -- A system of systems Single-point access -- Automated/Hands-on EW control 5th Gen Weapons Roadmap in development Documents current & future weapons programs Ensures synergy between weapons and aircraft 7

8 The Budget Challenge The Federal Budget Defense Entitlements Interest Other 7% 42% 31% 20% 34% 11% 30% 20% 7% 40% 6% 52% 1970 $0.9 Trillion 2010 $3.5 Trillion Source: Air Force Magazine, Oct 2010, p. 28 (from Defense Business Board, July 22, 2010) 2040 (Projected) $12.3 Trillion 8

9 On The Horizon (The Budget Challenge) The time of great fiscal challenge is now! 2010, a year of AF efficiencies -- $33B identified , DoD spending further reduced by $450B Future impacts -- Budget Control Act of 2011 Joint Committee on Deficit Reduction -- Potential $1T in cuts Must still remain true to our service priorities The Air Force must not break faith with Airmen and families Ensure continued regional overseas presence Maintain air superiority -- The F-35 must succeed! Sustain ISR advances made over the past decade Commitment to Long Range Strike family of systems DoD s way ahead evolving -- impacts are still unknown 9

10 30 On The Horizon (Policies Issued by Month) New or Revised Acquisition Policies Issued by Month (January July 2011) Total 525 Policies (Does not include Federal Register entries) 10

11 FY93 FY94 FY95 FY96 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 Manpower & Contract Actions B 8.3K On The Horizon (ASC Acquisition Workforce) CIV MIL CME Funding Contract Actions 6133 Organic Authorizations in Organic Authorizations in % Cut in ASC Organic Strength! 52B 8.0K ? Funding Billions FY93-06 Data (Manpower Report); FY07-10 Data (Historical UMDs); FY11-15 Data (EOM Aug 2011 UMD) * Data includes FMS authorizations 11

12 Established in 1991 between ASC and AAC, ESC joined in 2010 Provide forcing function and streamlined decision-making Purpose: Ensure Integrated Weapon System Capabilities Are Delivered When Components Are Fielded Platforms, Weapons, Command and Control, Combat Support Programs, GPS, Mission Planning, UAVs, Miniature Munitions, Etc Battle rhythm Semi-annual forum hosted by ASC, ESC, & AAC Tri-chaired by CC or CA from ASC, ESC, & AAC WINTER -- AAC Lead SUMMER -- ASC / ESC Lead Way Ahead (Executive Weapons System Review) Cutting through bureaucracy, Speeding up resolution on tough issues! 12

13 Way Ahead Executive Weapons System Review Why EWSR Integration Seams -- Find & Fix Problems Identify and Mitigate Risks Strengthen Relationships Expected outcomes Increased Probability of On-Time, On-Cost Delivery of Integrated System Capabilities Stronger Teams and Better Communications VISION War-winning capabilities.on time, on cost The right folks, the right decisions on a way forward! 13

14 Way Ahead (High Velocity Acquisition) Right Solutions People Processes Right LC Support Tools & Training Right LC Strategies 14

15 Life Cycle Costs ($) Empirical LCC Analysis and Policy Effects Life Cycle Cost (LCC) Committed Life Cycle Cost Actual/ Expended CBA MDD AoA ASR M/S A SRR SFR PDR M/S B CDR TRR SVR M/S C PCA Concept & Material Solutions Analysis Technology Development Engineering & Manufacturing Development Production & Deployment Operations & Support Several Research Questions to Explain LCC changes (AFIT proposal) How can empirical data be used to characterize the concept of Committed LCC? How has new acquisition policy affected LCC (new Pre M/S B Estimated Costs)? What are the significant policy drivers/ factors which most influence LCC? How can early SE Reviews/Milestones be used to effect LCC (shape, schedule)? What tools/methods could be developed to aid decision makers with improved LCC estimates? 15

16 Decision Framework Structured Assessment Concept Development Governing Core Enabling MDD Material Solution Analysis A B C Technology Development Engineering & Manufacturing Development Production & Deployment Minimum, programmatically aligned governing requirements Information (reviews) required by decision makers What are the critical exit criteria to address over time? Foundational Standardized tasks required to effectively manage & respond Processes required to provide decision makers with data required resulting in products Standard, efficient business practices Practices owned by functionals, that when consistently executed, result in consistent results IOC Right people, skills, training, and tools/environments Infrastructure to accomplish the mission FOC Operations & Support Timely communication of the intent of policy Define the work to meet intent of current policies Evaluate integrated flow-down impacts prior to implementation Understand intended and unintended consequences Adjust processes to implement changes Measure effectiveness over time Assess Within Maturing HVA Construct 16

17 Way Ahead (Integrated Life Cycle Management Focus) INTEGRATED LIFE CYCLE MANAGEMENT (ILCM) ENTERPRISE ILCM EXECUTIVE COUNCIL PORTFOLIO PLANNING SYSTEM DELIVERY PRODUCT SUPPORT Integration of the Materiel Enterprise through life cycle 17

18 Way Ahead (Integrated Life Cycle Management Focus) How do we measure ILCM status? Logistics Health Assessment (LHA) on 100% of ASC programs on the Master List Material Availability KPP for ACAT I programs Ensure SORA and DSOR completion prior to RFP ASC Process Guide updated for LHA requirement Enterprise Review Senior Steering Committee reviews metrics monthly Statistics 100% of ASC AML programs have an LHA 100% of new ACAT I programs have Material Availability KPP Since Apr 2011, SORA completed on 75% of new programs prior to RFP release Robust planning upfront = Reduced life cycle costs! 18

19 Warfighter Support Committed response to COCOM urgent operational needs 488 of 544 F-16 Secure Line of Sight mods complete 150+ in theater now 313 of 538 F-16 Beyond Line of Sight mods completed 170+ in theater now B-1 Laptop Controlled Targeting Pod -- Phase II on-track to deliver Laser JDAM! LAIRCM Next Gen MWS OT&E complete -- C-17 upgrades to begin in FY13 SNIPER Pod 3.5 operational -- Fielded w/ F-16 Blk 40/50 OFP M5.1+ in Sep C-27Js deployed! 378 sorties flown -- 92% mission capable in Sep 11 Achieved SECDEF-directed 50 MQ-1/MQ-9 CAPs 6 months ahead of schedule Gorgon Stare deployed to Afghan AOR -- Critical imagery at 90% MC rates B-2 headlines: 14 of 20 RMP mods complete -- Tail 0332 recovered 16 Aug 19

20 Warfighter Support HH-60 Op Loss -- Teamed w/ Army RDEC; surged delivery of two UH-60Ms Combat Rescue HELO RFI issued Aug Long-term fix for aging HH-60 F-22 fleet is back in the air! 174 / 188 jets delivered with zero defects C-5 RERP -- LRIP complete, 6 C-5M aircraft back to AMC Final C-5A inducted for Avionics Modernization Program C-130J production underway at a 15 year high aircraft per year! HC/MC-130J DT&E complete -- 1st HC/MC modified and delivered 8 of 27 Dyess AFB C-130Js delivered -- 1st squadron on ramp by end of 2011 KC-46 Gov/Boeing IBR completed 31 days ahead of schedule 20

21 ASC Imperatives Get technologically superior capability into the hands of the warfighter faster Launch high confidence programs Demands close partnership on requirements/development planning Implement Integrated Life Cycle Management (ILCM) into our program planning and execution Partner with Industry -- Create Better Business Deals Identify and use the best contract type with right incentives Reduce dependence on Undefinitized Contract Actions Reduce Acquisition Lead Time Comply with Core and 50/50 mandates Execute dollars in the year appropriated Promote real competition Invest in the future and our people Communicate Imperatives Win Ownership Internally! 21

22 What it means to you Gov/Industry partnership is essential to continued success Re-evaluate the old ways of doing business Targeting affordability Balancing risk and opportunity Tighter cost control from program inception Reduce non-value-added overhead imposed on industry Closer scrutiny of cost -- Dissecting overheads and indirect costs Greater emphasis on tie between profit and performance Incentivizing industry -- Drive out COST; preserve PROFITABILITY FPIF in production contracts -- 50/50 share line & target cost Payments -- Improve cash flow as a win-win IRAD -- Improve return on investment Life Cycle Supportability -- Government rights to data Affordability & Efficiency in a Fiscally Constrained Environment 22

23 The Challenge Find Opportunities To communicate and share information Expand partnerships to reduce redundancy Identify technologies which are militarily useful and commercially lucrative Get technologically superior capability into the our warfighter hands -- Faster & for less Seek & suggest efficient ways to achieve cost reductions / affordable systems Help us to understand what incentivizes you! 23

24 AF MISSION Fly, Fight Birthplace, and Home Win in & Future Air, of Aerospace Space and Cyberspace 24

25 25

PROVIDING THE WARFIGHTER S EDGE

PROVIDING THE WARFIGHTER S EDGE MISSION OVERVIEW BRIEF Brig Gen Michael Schmidt PEO, Fighters and Bombers PROVIDING THE WARFIGHTER S EDGE Current as of 5 Apr 16 Air Force Materiel Command Center Mission Areas Continue to Strengthen AFMC

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 99.992 132.881 143.000-143.000

More information

PROVIDING THE WARFIGHTER S

PROVIDING THE WARFIGHTER S AFLCMC HOT TOPICS Lt Gen JT Thompson Commander, AFLCMC PROVIDING THE WARFIGHTER S EDGE Overview AFLCMC mission Product Support (PS) & hot topics Where We re Headed Aircraft Structural Integrity Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review Increment I (SDB I) Precision Strike Association Annual Program Review 19 April 2006 Col Dick Justice Commander, Miniature Munitions Systems Group richard.justice@eglin.af.mil 1 2 SDB Increment I GBU 39/B,

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Mission Planning System Increment 5 (MPS Inc 5) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common

More information

Armament Directorate

Armament Directorate Armament Directorate War-Winning Capabilities On Time, On Cost Schmooze and Snooze Weapons Lunch & Learn Maj Gen Ken Merchant AFPEO (Weapons) 13 November 2012 96ABW-2012-0496 Integrity! Service! Excellence

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

MAJ GEN PLETCHER 12 February 2018

MAJ GEN PLETCHER 12 February 2018 MAJ GEN PLETCHER 12 February 2018 Overview Strategic Environment FY19 Budget Priorities FY19 Budget Request FY19 by Appropriation Final Thoughts I n t e g r i t y - S e r v i c e - E x c e l l e n c e

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 17.754 16.197 13.610-13.610 14.019

More information

Impact of the War on Terrorism on the USAF

Impact of the War on Terrorism on the USAF Headquarters U.S. Air Force Impact of the War on Terrorism on the USAF Brig Gen Dutch Holland Director of Current Operations & Training DCS, Air, Space, & Information Operations, Plans, & Requirements

More information

Mission: Equip Warfighters By Acquiring and Supporting War-Winning Capabilities

Mission: Equip Warfighters By Acquiring and Supporting War-Winning Capabilities Armament Eglin AFB Mission: Equip Warfighters By Acquiring and Supporting War-Winning Capabilities Vision: I n t e g r i t y - S e r v i c e - E x c e l l e n c e Deliver Affordable World-Dominant Armament

More information

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow Department of the Navy FY 26/FY 27 President s Budget Winning Today Transforming to Win Tomorrow 4 February 25 1 1 Our budget resources are aligned to support both present responsibilities and future capabilities.

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207133F F-16 SQUADRONS Cost ($ in Millions)

More information

F-35 Weapon System Overview

F-35 Weapon System Overview F-35 Weapon System Overview Doug Hayward Deputy Director F-35 Vehicle Systems Lockheed Martin Aeronautics 2010 Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A: A. Approved for public release;

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000

More information

Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command OVERVIEW Leadership Mission and Vision History SecDef Lines of Effort SecAF Priorities CSAF Focus Areas

More information

AAC Welcome & Perspective

AAC Welcome & Perspective 30 th Air Armament Symposium AAC Welcome & Perspective Robert Chedbob Chedister, Major General, USAF Program Executive Officer for for Weapons and and Commander, Air Air Armament Center Overview Why I

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program Air Armament Symposium 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program FOR OFFICIAL USE DISTRIBUTION ONLY // REL TO USA, STATEMENT GBR MOD, A. ITA Approved MOD, NLD

More information

Universal Armament Interface (UAI)

Universal Armament Interface (UAI) Universal Armament Interface (UAI) Oren Edwards USAF Aeronautical Systems Center Phone: +1 937-904-6060 Oren.Edwards@wpafb.af.mil DISTRIBUTION STATEMENT A: approved for public release; distribution is

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

I n t e g r i t y - S e r v i c e - E x c e l l e n c e UNCLASSIFIED

I n t e g r i t y - S e r v i c e - E x c e l l e n c e UNCLASSIFIED I n t e g r i t y - S e r v i c e - E x c e l l e n c e UNCLASSIFIED Today s Environment AF Engaged Globally Ended US military operations in Iraq; 17 Dec was the first day in 20 years with no air tasking

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767

More information

An Independent Perspective From a former PM & PEO. NDIA 13th Annual Systems Engineering Conference 26 Oct 10

An Independent Perspective From a former PM & PEO. NDIA 13th Annual Systems Engineering Conference 26 Oct 10 n Independent Perspective From a former PM & PEO NDI 13th nnual Systems Engineering Conference 26 Oct 10 Purpose To offer some thoughts on how System Engineering can (should) contribute as The DoD seeks

More information

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command A Unique Organization A Unified Combatant Command with Service, Military Department, and Defense Agency

More information

Overview. Vision Guiding Principles Across the FYDP FY15 President s Budget (PB) Request FY15 Opportunity, Growth and Security Initiatives

Overview. Vision Guiding Principles Across the FYDP FY15 President s Budget (PB) Request FY15 Opportunity, Growth and Security Initiatives Overview Vision Guiding Principles Across the FYDP FY15 President s Budget (PB) Request FY15 Opportunity, Growth and Security Initiatives I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 Vision

More information

Fighter/ Attack Inventory

Fighter/ Attack Inventory Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96 COST ($ in Millions) Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 Cost To Complete Total Program Element - 8.916 10.476 11.529 0.000 11.529 11.985

More information

The Role of T&E in the Systems Engineering Process Keynote Address

The Role of T&E in the Systems Engineering Process Keynote Address The Role of T&E in the Systems Engineering Process Keynote Address August 17, 2004 Glenn F. Lamartin Director, Defense Systems Top Priorities 1. 1. Successfully Successfully Pursue Pursue the the Global

More information

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command AIR FORCE RESERVE MISSION BRIEF Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command OVERVIEW Weapon of Choice video AF Reserve history Leadership and organizational

More information

Time Critical Targeting

Time Critical Targeting Headquarters U.S. Air Force Time Critical Targeting Brig Gen Jim Morehouse Director of Command & Control DCS, Air & Space Operations 1 Definition Performance Threshold The Kill Chain Closing the Seams

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research,, Test & Evaluation, Air Force / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

Innovation Across Industry Panel

Innovation Across Industry Panel Innovation Across Industry Panel AFLCMC Providing the Warfighter s Edge Panel Members: Ms. Kathy Watern Ms. Lynda Rutledge Mr. Jeffrey Jeff Stanley Mr. Jack Blackhurst Moderator: Lt Col Kirt Cassell Organization:

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #136

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #136 COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 11 R-1 Line #136 Cost To Complete Total Program Element - 155.152

More information

Headquarters U.S. Air Force. Ensuring An Adequate Infrastructure To Execute Assigned Maintenance Workload

Headquarters U.S. Air Force. Ensuring An Adequate Infrastructure To Execute Assigned Maintenance Workload Headquarters U.S. Air Force Ensuring An Adequate Infrastructure To Execute Assigned Maintenance Workload Jan Mulligan, Deputy Chief Maintenance Management Division HQ USAF Logistics, Installations & Mission

More information

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Air Armament Center Air Force Precision Strike Weapons Development Status Richard D. Justice, Colonel, USAF Commander, 918 th Armament Systems Group Air Armament Center, Eglin AFB, FL I n t e g r i t y

More information

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force KC-46A Tanker DoD Budget FY2013-FY2017 RDT&E U.S. Air Force Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 FY 2013 FY 2013 FY 2013 Cost To COST ($ in Millions) FY 2011

More information

Ogden Air Logistics Center

Ogden Air Logistics Center Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Sherel L. Hardy, Squadron Director 507 ACSS, Hill AFB UT DSN 777-7823, 801-777-7823 sherel.hardy@hill.af.mil Training

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 24.963 76.760 30.948 0.000 30.948 20.563

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Deliberate and Crisis Action Planning and Execution Segments Increment 2A (DCAPES Inc 2A) Defense Acquisition Management Information Retrieval (DAMIR)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program

More information

2011 Ground Robotics Capability Conference. OSD Perspective

2011 Ground Robotics Capability Conference. OSD Perspective 2011 Ground Robotics Capability Conference OSD Perspective Jose M. Gonzalez OUSD (Acquisition, Technology & Logistics) Deputy Director, Portfolio Systems Acquisition, Land Warfare and Munitions Discussion

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

SOF Future Vertical Lift (FVL) COL Ramsey Bentley

SOF Future Vertical Lift (FVL) COL Ramsey Bentley SOF Future Vertical Lift (FVL) COL Ramsey Bentley SOCOM J8, FVL JCOC Bottom Line Up Front The Current Fleet Of DoD Rotorcraft Cannot Continue To Be Incrementally Improved To Meet Future Operational Requirements.

More information

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command AIR FORCE RESERVE MISSION BRIEF Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command AIR FORCE RESERVE MISSION BRIEF Major General Richard Scobee Deputy Commander,

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 0191 Initial Operational Test & Eval 32,550 26,483 34,646 26,896 27,866 28,399 33,656

More information

Air Armament Symposium All in Today Shaping Tomorrow

Air Armament Symposium All in Today Shaping Tomorrow Headquarters Air Combat Command Air Armament Symposium All in Today Shaping Tomorrow Maj Gen Tom Andersen HQ ACC/A8 14 Oct 09 This Briefing is: UNCLASSIFIED 1 Key Attributes for Today and Tomorrow ACC

More information

Ogden Air Logistics Center

Ogden Air Logistics Center Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Linda Y. Gay, Deputy Director 508 MASSG/GFMM, Hill AFB UT DSN 777-7823, 801-777-7823 Linda.Gay@hill.af.mil Training

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 19.165 18.599 22.654-22.654 24.342 24.422 24.571 25.715 Continuing

More information

UNCLASSIFIED FY 2019 OCO. FY 2019 Base

UNCLASSIFIED FY 2019 OCO. FY 2019 Base Exhibit R2, RDT&E Budget Item Justification: PB 2019 Navy : February 2018 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 2020

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

NDIA Ground Robotics Symposium

NDIA Ground Robotics Symposium NDIA Ground Robotics Symposium Mr. Tom Dee DASN ELM 703-614-4794 Pentagon 4C746 1 Agenda Context Current environment Robotics Way Ahead AAV MRAP Family of Vehicles 2 ELM Portfolio U.S. Marine Corps ground

More information

Capability Integration

Capability Integration SoS/Interoperability IPT Integrating Lockheed Martin Strengths Realizing Military Value Integration Framework for Developing C4ISTAR Solutions Dr David Sundstrom Director, Network Centric 21 September

More information

Ogden Air Logistics Center

Ogden Air Logistics Center Ogden Air Logistics Center Munitions Executive Summit STEVEN G. LAVOYE, COL, USAF AF/A4LW (Pentagon) 4 Feb 09 Overview Air Force Key Points Air Force Armament Enterprise Current Focus Areas AF Requirements

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #216 To Program Element

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

COL John Vannoy Program Executive Officer

COL John Vannoy Program Executive Officer COL John Vannoy Program Executive Officer ROTARY WING DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE Schedule of Presentations Day 1 Wednesday 25 May 2016 Day 2 Thursday 26 May 2016 11:30-12:30 PEO RW Strategic

More information

Agenda. DoD as an Energy Consumer. Defense Energy Challenges. Adapting to a New Environment. DoD Operational Energy Strategy. Current Initiatives

Agenda. DoD as an Energy Consumer. Defense Energy Challenges. Adapting to a New Environment. DoD Operational Energy Strategy. Current Initiatives UNCLASSIFIED 2 Agenda DoD as an Energy Consumer Defense Energy Challenges Adapting to a New Environment DoD Operational Energy Strategy Current Initiatives (Trillions of BTUs) (Billions of Dollars) DoD

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justif ication Exhibit R-2 0603460A Joint A ir-to-ground Missile (JAGM) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to JOINT AIR-TO-GROUND

More information

We acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan

We acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan The Naval Research, Development & Acquisition Team 1999-2004 Strategic Plan Surface Ships Aircraft Submarines Marine Corps Materiel Surveillance Systems Weapon Systems Command Control & Communications

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research,, Test & Evaluation, Air Force / BA 7: Operational Systems COST ($ in Millions) FY 2018 FY 2019 FY 2020 FY

More information

Systems Engineering & LRASM

Systems Engineering & LRASM Systems Engineering & LRASM FOR 19 TH ANNUAL NDIA SYSTEMS ENGINEERING CONFERENCE 25 October 2016 LRASM Deployment Office (LDO) CAPT Tim Octa Hill, Former Director DISTRIBUTION STATEMENT A. Approved for

More information

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 752.328 704.475 722.071-722.071 701.000 702.979 716.873 725.979

More information

DEPARTMENT OF THE AIR FORCE

DEPARTMENT OF THE AIR FORCE OPERATION AND MAINTENANCE, AIR FORCE RESERVE VOLUME I February 2015 TABLE OF CONTENTS Section I PBA-19 Introductory Statement (Appropriation Highlights)... 1 CRR Exhibit Congressional Reporting Requirement...

More information

UNCLASSIFIED. FY 2018 Base FY 2018 OCO

UNCLASSIFIED. FY 2018 Base FY 2018 OCO Exhibit R-2, RDT&E Budget Item Justification: Air Force : May 2017 3600: Research,, Test & Evaluation, Air Force / BA 5: System & Demonstration (SDD) COST ($ in Millions) Years FY 2019 FY 2020 FY 2021

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

DoD Instruction dated 8 December Operation of the Defense Acquisition System Statutory and Regulatory Changes

DoD Instruction dated 8 December Operation of the Defense Acquisition System Statutory and Regulatory Changes DoD Instruction 5000.02 dated 8 December 2008 Operation of the Defense Acquisition System Statutory and Regulatory Changes Karen Byrd Learning Capabilities Integration Center April 2009 Changes to the

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000

More information

PMA-201 Program Manager Phone:

PMA-201 Program Manager   Phone: 17 March 2015 Presented by: CAPT Jaime Engdahl PMA-201 Program Manager Email: jaime.engdahl@navy.mil Phone: 301-757-7477 SDB II / JMM BRU JSOW-A JSOW-C JSOW C-1 BRU-33 M299 AERO-7B LAU-115 BRU-55 BRU-41

More information

Air Force Reserve Mission Brief

Air Force Reserve Mission Brief Air Force Reserve Mission Brief May 2017 Air Force Reserve Mission Provide Combat-Ready Forces to Fly, Fight & Win Weapon of Choice Video AF Reserve s Guiding Principles The AF Reserve is a: Combat-ready,

More information

FORWARD, READY, NOW!

FORWARD, READY, NOW! FORWARD, READY, NOW! The United States Air Force (USAF) is the World s Greatest Air Force Powered by Airmen, Fueled by Innovation. USAFE-AFAFRICA is America s forward-based combat airpower, delivering

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base

More information

Cryptologic and Cyber Systems Division

Cryptologic and Cyber Systems Division Cryptologic and Cyber Systems Division AFLCMC Cryptologic & Cyber Systems Division Supporting Multi-Domain Warfighting Colonel Gary Salmans Senior Material Leader December 2016 DISTRIBUTION STATEMENT A.

More information

Air Force Research Laboratory

Air Force Research Laboratory Air Force Research Laboratory Innovation in the Weapons Enterprise November 2013 Integrity Service Excellence Major General Thomas J. Masiello Commander Air Force Research Laboratory AFRL Mission Better

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

Anti-Access/Area Denial Challenges

Anti-Access/Area Denial Challenges Headquarters U.S. Air Force Anti-Access/Area Denial Challenges Maj Gen Dave Scott AF/A5R 6 Oct 10 1 Flight Path What is A2/AD? Requirements and Challenges Munitions Investment Strategy Planning for Future

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total

More information

The Five Myths of a Non-Developmental Item (NDI) Acquisition Program and. Implications for the T-X Program

The Five Myths of a Non-Developmental Item (NDI) Acquisition Program and. Implications for the T-X Program The Five Myths of a Non-Developmental Item (NDI) Acquisition Program and Implications for the T-X Program After 45 years of Government and Industry experience in the operations, acquisition and sustainment

More information

A Ready, Modern Force!

A Ready, Modern Force! A Ready, Modern Force! READY FOR TODAY, PREPARED FOR TOMORROW! Jerry Hendrix, Paul Scharre, and Elbridge Colby! The Center for a New American Security does not! take institutional positions on policy issues.!!

More information

James T. Conway General, U.S. Marine Corps, Commandant of the Marine Corps

James T. Conway General, U.S. Marine Corps, Commandant of the Marine Corps MISSION To serve as the Commandant's agent for acquisition and sustainment of systems and equipment used to accomplish the Marine Corps' warfighting mission. 1 It is our obligation to subsequent generations

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

It s All about the Money!

It s All about the Money! 2011 DOD Maintenance Symposium Breakout Session: It s All about the Money! Chien Huo, Ph.D. Force and Infrastructure Analysis Division (FIAD) Cost Assessment and Program Evaluation (CAPE) Office of the

More information

USAF Tankers: Critical Assumptions for Comparing Competitive Dual Procurement with Sole Source Award

USAF Tankers: Critical Assumptions for Comparing Competitive Dual Procurement with Sole Source Award USAF Tankers: Critical Assumptions for Comparing Competitive Dual Procurement with Sole Source Award The Congress has expressed interest in better understanding the costs associated with competitive dual

More information

Ogden Air Logistics Center

Ogden Air Logistics Center Ogden Air Logistics Center TRAINING SYSTEMS MANAGEMENT DIRECTORATE ADVANCED PLANNING INFORMATION Col Robert C. Halbert, Director OO-ALC/YW, Hill AFB UT DSN 777-4721, 801-777-4721 Robert.Halbert@hill.af.mil

More information

Strategic Cost Reduction

Strategic Cost Reduction Strategic Cost Reduction American Society of Military Comptrollers May 29, 2014 Agenda Cost Assessment and Program Evaluation Budget Uncertainty Efficiencies History Specific Efficiency Examples 2 Cost

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Global Combat Support System-Marine Corps Logistics Chain Management Increment 1 (GCSS-MC LCM Inc 1) Defense Acquisition Management Information Retrieval

More information