API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT API RP14H 15 MAY 2011 TABLE OF CONTENTS

Size: px
Start display at page:

Download "API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT API RP14H 15 MAY 2011 TABLE OF CONTENTS"

Transcription

1 API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT API RP14H 15 MAY 2011 TABLE OF CONTENTS 1. SCOPE OF WORK & BACKGROUND PREVIOUS STATUS REPORT DATE MEMBERSHIP MAJOR ISSUES AND DATES FUTURE WORK PROGRAM FUTURE MEETINGS DATES RESOURCE NEEDS SCOPE OF WORK & BACKGROUND API RP 14H was last revised in According to S1, it is due for re-affirmation in The TG was convened to determine if changes should be made to the document prior to re-affirmation. The document is currently referenced in the CFR [30CFR (d) and 30CFR (a)(5)]; Design, installation, and operation of surface production-safety systems. (d) Use of SSV's and USV's. All SSVs and USVs must be inspected, installed, maintained, and tested in accordance with API RP 14H, Recommended Practice for Installation, Maintenance, and Repair of Surface Safety Valves and Underwater Safety Valves Offshore (incorporated by reference as specified in Sec ). If any SSV or USV does not operate properly or if any fluid flow is observed during the leakage test, the valve shall be repaired or replaced Production safety-system testing and records. (4) All SSV's and USV's shall be tested for operation and for leakage at least once each calendar month, but at no time shall more than 6 weeks elapse between tests. The testing shall be in accordance with the test procedures specified in API RP 14H. If the SSV or USV does not operate properly or if any fluid flow is observed during the leakage test, the valve shall be repaired or replaced Jun-07

2 2. PREVIOUS STATUS REPORT DATE None 3. MEMBERSHIP Name Company Austin Freeman (chair) Halliburton David Comeaux GE Henry Wong FMC Jim Brinkley WoodGroup Darine Aghnim Lamons Sterling Lewis* Exxon Mahesh Udipi* GE Oil & Gas Dennis Kaminski* BP David Pang* Doris, Inc *Not present at TG meeting 4. MAJOR ISSUES AND DATES The taskgroup met on May 11 hosted by Lamons. We reviewed the document including the reference in the CFR. Key findings and questions were the following: 1. Should the title of the document be changed from Recommended Practice (RP) to Standard for safety purposes to prevent confusion in application of the document? It was noted the API RP53 on Well Control was changed from RP to Standard at the last revision. 2. In the Scope section, rewording is suggested since there are several repetitions in 1.2 and The document does not have a Normative references section and 6A appears to be normatively referenced. 4. There are no references to the CFR. Should there be? 5. Many uses of the word should when what we really mean is shall in many cases. o Section 4 (Installation and Maintenance) o Section 5 (Repair) 6. Leakage rates mentioned are not consistent with CFR requirements. 7. Appendix A contains a typo on page 11; should be When two or more valves are present, some regulators (such as Norwegian PSA) require independent testing. Do we want to include this situation? 9. Repair may need distinction between field vs. shop repairs to be consistent with 6A. 10. In section 6 (Testing Procedures), suggest to have the operator go back to the operating manual and follow its procedures at every stage. Valve testing should be included in the operator manual and have acceptance criteria. Could consider adding ultrasonic leakage test option Jun-07

3 11. In section 7 (Failure Reporting) and 8 (Documentation Requirements) we questioned whether or not failure reporting actually happens and who does it. Forms were seen of little value. Web application might be more useful. 5. FUTURE WORK PROGRAM The TG recommends the document be opened for editing. An SR3 form is attached for SC6 voting. 6. FUTURE MEETINGS DATES None planned pending SC6 action on SR3. 7. RESOURCE NEEDS For the TG to function effectively, an operator presence is required. David Comeaux is willing to lead the TG if a re-write is required. Potential SR3 form below: Prepared by: Austin Freeman, D.E., P.E Jun-07

4 Document Information Standard Designation: Title: Edition: 14H Recommended Practice for Installation, Maintenance and Repair of Surface Safety Valves and Underwater Safety Valves Offshore 5 th edition Budget Year: Committee / Subcommittee: Priority Matrix Ranking: (to be completed by API) Proposed Action: SC2 SC5 SC6 X SC8 SC10 SC11 SC13 SC15 SC16 SC17 SC18 SC19 SC20 ECS Class 1 (Rank 11-15) Class 2 (Rank 6-10) Class 3 (Rank 1-5) New Standard X Revise Current Standard Withdraw Current Standard Research Only Proposed Funding Type: Budget Request Special Solicitation Total Funding Request (Parts A & B): Name of Submitter(s): Date: May 15, 2011 $ 0 none other than volunteer time from employees of API member companies working on the document preparation Austin Freeman Halliburton Part A Resource Plan I. Background and Information: 1. Explain the business need for the proposed action. Indicate potential cost savings to industry where possible. API RP14H (5 th edition) was issued August, It comes up for systematic review according to S1 in A TG was formed in SC6 to investigate whether or not changes to this document were required in light of recent events. The TG met and concluded changes were needed to obviate additional regulations. 14H is currently referenced in the CFR [30CFR (d) and 30CFR (a)(5)]. The document is currently written in the should vernacular and should be moved into shall language where appropriate. 2. What is the scope of the standard? Requirements (not guidance) for the installation, operation, maintenance, inspection and repair of Surface Safety Valves and Underwater Safety Valves. 3. Is this standard on the work program of another standards development organization (check all that apply)? ISO IADC ASME SAE Other, please provide: If yes, is the work being coordinated with the appropriate group? Are there special circumstances that would justify independent API initiation of the proposed action?

5 4. Are a volunteer chair and group of experts available to perform the proposed action? Please include names and company affiliation and indicate chair, if available. See table below: Name Company Austin Freeman Halliburton austin.freeman@halliburton.com David Comeaux GE david.comeaux@ge.com Henry Wong FMC Henry.wong@fmcti.com Jim Brinkley WoodGroup Jim.brinkley@woodgroup.com Darine Aghnim Lamons Darine.aghnim@lamons.com Sterling Lewis Exxon sterling.f.lewis@exxonmobil.com Mahesh Udipi GE Oil & Gas mahesha.udipi@ge.com Dennis Kaminski BP Dennis.Kaminski@bp.com David Pang Doris, Inc davidpang2004@yahoo.com 5. Is there a need to commit resources to supplement the development of the draft? Would a paid content specialist accelerate progress on the development/revision? Is there a readily available content specialist? No. 6. Are there special format requirements for final document, i.e. knowledge of ISO template required), significant graphics, photos or equations) required that would need extraordinary resources? Yes No X If Yes, please provide details: 7. Please provide any other information that is pertinent to the proposed action. 8. What are the implications of not initiating the proposed action? Include potential safety, reliability, environmental and financial impacts that may arise. Safety valves of all types are at the forefront of attention in light of recent events. This standards action in advance of that required by API S1 normal operating procedures shows commitment from the industry to maintain our documents and to increase the diligence paid to our safety operating systems. 9. Is there research proposed to accomplish the proposed action? Yes No X If yes, complete Part B of this form. II. Project Timing Proposed start date: July 2011 TG/WG: (estimated number of volunteers needed) 10 Proposed date draft will be ready for letter ballot: Content Management: ($ amount "if needed" or volunteer) February 2011

6 PART B Research Plan I. Background and Information 1. Proposed Research Title: 2. Proposed Project Scope: 3. Research Amount: $ 4. What is the business need for the proposed research? 5. Is the proposed research edition-specific for a single standard or will it result in technology enhancement for multiple standards? Yes No If multiple standards, please cite the standards effected: 6. Research Timing: Research is necessary prior to scheduled revision. Research can be done concurrent with revision. 7. How does the research support the proposed action identified in Part A? 8. Is a joint industry project (JIP) a possibility? Yes No If Yes, with who? 9. Are there opportunities for leveraged research with other organizations? Yes No What organizations? 10. What are the implications of not performing the proposed research? II. Dates and Funding: Estimated Completion Date Prior Research Anticipated Future Research Funding Needs Funding Requested $ Year 2: $ Year 3: $ Year 4: $

7 PART C Proposal Feedback/Approval Information For API Use ONLY SC comments to Proposer/WG: Date approved by subcommittee: CSOEM comments: Date approved by CSOEM: Date entered into API Publications DB:

API 16 AR Specification for Drillthrough Equipment Remanufacturing

API 16 AR Specification for Drillthrough Equipment Remanufacturing API 16 AR Specification for Drillthrough Equipment Remanufacturing Workgroup Communication Jan van Wijk / Chris Johnson API-16AR chairman Janvanwijk@Shell.com / Chris.Johnson@nov.com May 17th, 2012 1 Purpose

More information

PHMSA Update. Kenneth Y. Lee API AGA Joint Committee Oil & Gas Pipeline Welding Practices. Engineering & Research Division

PHMSA Update. Kenneth Y. Lee API AGA Joint Committee Oil & Gas Pipeline Welding Practices. Engineering & Research Division PHMSA Update 2013 API AGA Joint Committee Oil & Gas Pipeline Welding Practices Kenneth Y. Lee Engineering & Research Division 202-366-2694 Office of Pipeline Safety kenneth.lee@dot.gov 2011 Pipeline Safety

More information

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014 2014 Oklahoma Seminar Tulsa, Oklahoma November 2014 Contact Information Wayne St. Germain Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email:

More information

Guidance for Industry ANDA Submissions Prior Approval Supplements Under GDUFA

Guidance for Industry ANDA Submissions Prior Approval Supplements Under GDUFA Guidance for Industry ANDA Submissions Prior Approval Supplements Under GDUFA DRAFT GUIDANCE This guidance document is being distributed for comment purposes only. Comments and suggestions regarding this

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Design Services.

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Design Services. Request for Qualifications Information Architectural / Engineering Design Services For Airfield Pavement Panel Replacement 2011-2014 At Washington Dulles International Airport March, 2011 METROPOLITAN

More information

API Subcommittee 13 Meeting Minutes at the E&P Winter Standards Meeting January 28, 2015

API Subcommittee 13 Meeting Minutes at the E&P Winter Standards Meeting January 28, 2015 API Subcommittee 13 Meeting Minutes at the E&P Winter Standards Meeting January 28, 2015 Voting Members Present: Brent Estes, Saleh Al-Ammari, Carl Stouffer, Jim Berger, David Breeden, Ryen Caenn, David

More information

Appendix 5A. Organization Registration and Certification Manual. WORKING DRAFT-August 26, 2014

Appendix 5A. Organization Registration and Certification Manual. WORKING DRAFT-August 26, 2014 Appendix 5A Organization Registration and Certification Manual WORKING DRAFT-August 26, 2014 Effective: October 4, 2013TBD www.nerc.com Table of Contents Section I Executive Summary... 1 To Whom Does This

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-E Engineer Regulation 1110-2-401 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design OPERATION, MAINTENANCE, REPAIR, REPLACEMENT, AND REHABILITATION

More information

PART ENVIRONMENTAL IMPACT STATEMENT

PART ENVIRONMENTAL IMPACT STATEMENT Page 1 of 12 PART 1502--ENVIRONMENTAL IMPACT STATEMENT Sec. 1502.1 Purpose. 1502.2 Implementation. 1502.3 Statutory requirements for statements. 1502.4 Major Federal actions requiring the preparation of

More information

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM) DRAFT FOR REVIEW & COMMENT Last Updated 5/15/13 Note to reviewers: Links to NERC website and process flow charts will be finalized for the final review. Northeast Power Coordinating Council, Inc. Regional

More information

Appendix 5A. Organization Registration and Certification Manual

Appendix 5A. Organization Registration and Certification Manual Appendix 5A Organization Registration and Certification Manual Effective: October 4, 2013 www.nerc.com Table of Contents Section I Executive Summary... 1 Overview... 1 To Whom Does This Document Apply?...

More information

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM) Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM) Approved b y F ERC: December 23, 2014 App r oved by NER C B oard of Trustees: A u gust 14, 2014 App r oved by NPCC B

More information

AGENDA 3. GRP ITEMS FOR CONSIDERATION BY THE SJRA BOARD ON OCTOBER 31, 2013:

AGENDA 3. GRP ITEMS FOR CONSIDERATION BY THE SJRA BOARD ON OCTOBER 31, 2013: AGENDA GRP REVIEW COMMITTEE SPECIAL MEETING MONDAY, OCTOBER 28, 2013 12:00 P.M. (NOON) EXECUTIVE BOARD ROOM SAN JACINTO RIVER AUTHORITY G&A BUILDING 1577 DAM SITE ROAD, CONROE, TEXAS 77304 1. CALL TO ORDER

More information

Coast Guard NVIC Oct 1992

Coast Guard NVIC Oct 1992 United States COMDTPUB Pl67000-4 Coast Guard NVIC 11-92 23 Oct 1992 NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 11-92 Electronic Version For Distribution on the World Wide Web Subj: Guidance for Acceptance

More information

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003 June 4, 2003 Acquisition Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D-2003-097) Department of Defense Office of the Inspector General Quality Integrity Accountability

More information

ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES

ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES I. INTRODUCTION Performance-based contracting (PBC) is frequently used for implementing environmental cleanup work at federal

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office. Policy for Development and Publication of Technical Guidance

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office. Policy for Development and Publication of Technical Guidance DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office DOCUMENT NUMBER 012-0900-001 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Policy for Development and Publication of

More information

DOE N /29/95 Expires: [1 year after initiation]

DOE N /29/95 Expires: [1 year after initiation] DOE N 441.1 SUBJECT: RADIOLOGICAL PROTECTION FOR DOE ACTIVITIES 9/29/95 Expires: [1 year after initiation] The Department of Energy (DOE) undertook an initiative to reduce the burden of unnecessary, repetitive,

More information

FWD Calibration Center Operator Certification Program

FWD Calibration Center Operator Certification Program FWD Calibration Center Operator Certification Program Program Requirements January 2018, Revision 2 Table of Contents 1. Introduction... 4 Additional Information... 4 Process Workflow... 4 2. Certification

More information

DEPARTMENT OF TRANSPORTATION. AGENCY: Federal Highway Administration, U.S. Department of Transportation.

DEPARTMENT OF TRANSPORTATION. AGENCY: Federal Highway Administration, U.S. Department of Transportation. This document is scheduled to be published in the Federal Register on 10/26/2016 and available online at https://federalregister.gov/d/2016-25894, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is

More information

ADDENDUM # /JSW Professional Engineering Services to Test, Adjust, and Balance HVAC Systems

ADDENDUM # /JSW Professional Engineering Services to Test, Adjust, and Balance HVAC Systems ADDENDUM #2 537220/JSW Professional Engineering Services to Test, Adjust, and Balance HVAC Systems Bid Closing: 3/26/12 at 2:00 PM Date: March 19, 2012 BIDS MUST BE SUBMITTED ON OR ATTACHED TO THIS SIGNED

More information

Towing Vessel Inspection

Towing Vessel Inspection 1 I n l a n d R i v e r s a n d G u l f C o a s t 2 0 1 3 Section 8 Navigation Safety Panel Discussion 2 Moderator Coast Guard Perspective Industry Perspective Tava Foret LT Edward Ayoub MST1 Bryan Vitrano

More information

Policy and Guidelines for Conducting Educational Research in the Boston Public Schools

Policy and Guidelines for Conducting Educational Research in the Boston Public Schools Policy and Guidelines for Conducting Educational Research in the Boston Public Schools Updated October 1, 2017 Overview The basic purpose of the Boston Public Schools (BPS) is to educate children. BPS

More information

Accreditation Commission Policy and Procedure Manual

Accreditation Commission Policy and Procedure Manual Accreditation Commission Policy and Procedure Manual Association for Clinical Pastoral Education, Inc. One West Court Square, Suite 325 Decatur, Georgia 30030 (404) 320-1472 www.acpe.edu Revised March

More information

Research & Development Proposal Submission Guidelines

Research & Development Proposal Submission Guidelines Research & Development Proposal Submission Guidelines Revision February 2017 1.0 INTRODUCTION Petroleum Research Newfoundland and Labrador (PRNL) is a federally-incorporated, not-for-profit member-based

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ADMINISTRATIVE ORDER BY CONSENT

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ADMINISTRATIVE ORDER BY CONSENT BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATIER OF ALLEGED VIOLATIONS OF THE RULES } CAUSE N0.1V AND REGULATIONS OF THE COLORADO OIL AND GAS } CONSERVATION COMMISSION

More information

IFTSA Developing Solutions for Developing Countries Competition. Rules and Regulations

IFTSA Developing Solutions for Developing Countries Competition. Rules and Regulations IFTSA Developing Solutions for Developing Countries Competition Rules and Regulations Background: The Student Association is committed to engaging student members from around the world and utilizing their

More information

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates Request for Proposal On-Call Plan Check and Inspection Services Released: September 13, 2013 Important Dates Proposal Due: September 27, 2013 Award of Contract: October 2, 2013 Planning and Development

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY. June 2, 1997

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY. June 2, 1997 MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY INTEROFFICE COMMUNICATION REVISED OPERATIONAL MEMO 115-9 (641-9) TO: FROM: SUBJECT: All Waste Management Division Supervisors Jim Sygo, Chief, Waste Management

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-7-4 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-7-4 PERMIT REQUIREMENTS AND PROCEDURES TABLE

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Document Type: Procedure Effective Date: April 10, 2018 Refinery Wide Incident Investigation and Reporting Procedure Reference No.: SAF 058 Revision No.: 23 Owner: E. Myers Authorized

More information

Overview of the ALGA Peer Review Program

Overview of the ALGA Peer Review Program Overview of the ALGA Peer Review Program October 2018 Prepared By The ALGA Peer Review Committee Opening Remarks Moderator R. Kinney Poynter Executive Director NASACT Speaker Corrie Stokes City Auditor

More information

New European Union Clinical Trial Regulations

New European Union Clinical Trial Regulations New European Union Clinical Trial Regulations Incorporate Monitoring and Safety Reporting Techniques into U.S. and EU Clinical Trial SOPs Anita K. Murthy Deputy Director, Global Regulatory Affairs Bayer

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Safety Inspection QC/ Program SPECIFIC SUBJECT: Establishing Quality

More information

VIA ELECTRONIC FILING

VIA ELECTRONIC FILING January 21, 2015 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: Errata to the North American Electric Reliability

More information

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS Fire Protection Research Foundation Issued: 28 February 2011; Updated: 22 December

More information

Project Request and Approval Process

Project Request and Approval Process The University of the District of Columbia Information Technology Project Request and Approval Process Kia Xiong Information Technology Projects Manager 13 June 2017 Table of Contents Project Management

More information

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT Request for Proposal (RFP) Request for Proposals for Public Well Sealing Grant Grant application proposals will be accepted until 4:30 p.m. on Monday, October 16, 2017. September 15, 2017 Minnesota Department

More information

Questions and Answers during the Healthy Housing Grant RFP Period

Questions and Answers during the Healthy Housing Grant RFP Period Questions and Answers during the Healthy Housing Grant RFP Period Question 1: In past years our organization received MDH Lead Hazard Control Grants where the funds were used to cover lead remediation

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

Embodiment of Safety Management System (SMS) requirements into Commission Regulation (EC) No 2042/2003 Part-145

Embodiment of Safety Management System (SMS) requirements into Commission Regulation (EC) No 2042/2003 Part-145 EASA Comment Response Tool You can save this page as HTML and then open it in Microsoft Word further editing. Title NPA Number Embodiment of Safety System (SMS) into Commission Regulation (EC) No 2042/2003

More information

Guidelines for the Myron Zucker Student-Faculty Grant Program

Guidelines for the Myron Zucker Student-Faculty Grant Program IEEE Industry Applications Society and the IEEE Foundation Guidelines for the Myron Zucker Student-Faculty Grant Program These Guidelines were first assembled for the Executive Board of the IEEE Industry

More information

ASSE International Seal Control Board Procedures

ASSE International Seal Control Board Procedures ASSE International Seal Control Board Procedures 2014 PREAMBLE Written operating procedures shall govern the methods used for maintaining the product listing program and shall be available to any interested

More information

7/31/2017. SPG: A Practical Subcommittee of the AAPM Professional Council. Origins. Origins

7/31/2017. SPG: A Practical Subcommittee of the AAPM Professional Council. Origins. Origins SPG: A Practical Subcommittee of the AAPM Professional Council Brent C. Parker, PhD Director, Division of Physics and Engineering The University of Texas Medical Branch Galveston, TX Origins Subcommittee

More information

Date SUBJECT: REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE WILMINGTON OIL FIELD. Dear Vendor:

Date SUBJECT: REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE WILMINGTON OIL FIELD. Dear Vendor: Date SUBJECT: REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE WILMINGTON OIL FIELD Dear Vendor: The Port of Los Angeles, America s Port and the premier gateway for international commerce, is located in San

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design

More information

matching gifts ultimate guide to https://doublethedonation.com ultimate guide to matching gifts

matching gifts ultimate guide to https://doublethedonation.com ultimate guide to matching gifts ultimate guide to matching gifts I want my employer to match my gift! We want your employer to match your gift! 2 Content: 4 7 10 14 17 19 21 23 26 The Basics of Matching Gifts The Details - Nonprofit

More information

Owner Verification Report Guide. August by Texas Department of Transportation 512/ All Rights Reserved

Owner Verification Report Guide. August by Texas Department of Transportation 512/ All Rights Reserved Owner Verification Report Guide August 2018 2018 by Texas Department of Transportation 512/506-5808 All Rights Reserved Table of Contents 1. Introduction... 1 2. Report Preparation... 3 Introduction...

More information

Bylaws Of the University of Virginia Health System Professional Nursing Staff Organization

Bylaws Of the University of Virginia Health System Professional Nursing Staff Organization 2017-2018 Bylaws Of the University of Virginia Health System Professional Nursing Staff Organization QUICK LINKS: Preamble Name Purpose Members Responsibilities & Right Terms & Vacancies Elected Officers

More information

Europass website activity report 2009 (Norway, Norwegian) Visits from Norway during 2009

Europass website activity report 2009 (Norway, Norwegian) Visits from Norway during 2009 Europass website activity report 2009 (Norway, Norwegian) State of play: 2009 Visits from Norway during 2009 Page 1 of 14 Month Visits 4,001 3,926 4,201 2,985 2,824 2,253 2,429 3,875 4,493 3,510 2,636

More information

Europass website activity report 2015 (Norway, Norwegian) Visits from Norway during 2015

Europass website activity report 2015 (Norway, Norwegian) Visits from Norway during 2015 Europass website activity report 2015 (Norway, Norwegian) State of play: 2015 Visits from Norway during 2015 Page 1 of 14 Month Visits 6,937 5,272 6,804 4,019 4,476 3,643 3,269 5,692 4,697 4,113 2,744

More information

Europass website activity report 2013 (Norway, Norwegian) Visits from Norway during 2013

Europass website activity report 2013 (Norway, Norwegian) Visits from Norway during 2013 Europass website activity report 2013 (Norway, Norwegian) Visits from Norway during 2013 Page 1 of 14 Month Visits 8,091 7,840 6,911 9,464 6,044 4,193 3,315 6,894 5,203 6,284 5,587 2,744 72,570 European

More information

ISO/IEC JTC1/SC7 /N3020

ISO/IEC JTC1/SC7 /N3020 ISO/IEC JTC1/SC7 Software and Systems Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 /N3020 2004-04-08 Document Type Title Source Liaison Vision Proposed Revisions to: Vision of Liaison Outcomes

More information

Agency Information Collection Activities; 30 CFR 550, Subpart B, Plans and. ACTION: Notice of Information Collection; request for comment.

Agency Information Collection Activities; 30 CFR 550, Subpart B, Plans and. ACTION: Notice of Information Collection; request for comment. This document is scheduled to be published in the Federal Register on 12/15/217 and available online at https://federalregister.gov/d/217-2751, and on FDsys.gov 431-MR DEPARTMENT OF THE INTERIOR Bureau

More information

The Maternal Fetal Triage Index Frequently Asked Questions (FAQs)

The Maternal Fetal Triage Index Frequently Asked Questions (FAQs) The Maternal Fetal Triage Index Frequently Asked Questions (FAQs) What is AWHONN s definition of obstetric triage? Obstetric triage is the brief, thorough and systematic maternal and fetal assessment performed

More information

ODOT s Planning Program Public Involvement Process

ODOT s Planning Program Public Involvement Process ODOT s Planning Program Public Involvement Process The Ohio Department of Transportation Table of Contents 1.0 Introduction to ODOT s Planning Program Public Involvement Process 3 1.1 Public Involvement

More information

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest PATHWAYS FOR STANDARDS DEVELOPMENT Developing internationally aligned Australian Standards in the national interest Updated: February 2016 2 provides multiple pathways for the development of Australian

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION North American Electric Reliability ) Corporation ) Docket No. PETITION OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION FOR

More information

F-35 Program Information Export Controlled Information (When Filled In)

F-35 Program Information Export Controlled Information (When Filled In) F-35 PHYSIOLOGICAL EVENT (PE) AIRCREW DATA SHEET PART B: Rev COMPLETE THIS FORM AND SUBMIT THROUGH THE CUSTOMER RELATIONSHIP MANAGER (CRM) TOOL The procedures below are the preliminary steps to inspect,

More information

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC CProgress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.55a May 21, 2008 3F0508-06 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,

More information

ENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM

ENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM This form is only for nominations in the Sustainability Innovations category This award category was created to recognize sustainability projects that do not fit into any of the other award categories.

More information

NRC INSPECTION MANUAL STSB

NRC INSPECTION MANUAL STSB NRC INSPECTION MANUAL STSB MANUAL CHAPTER 0326 OPERABILITY DETERMINATIONS & FUNCTIONALITY ASSESSMENTS FOR CONDITIONS ADVERSE TO QUALITY OR SAFETY TABLE OF CONTENTS 0326-01 PURPOSE 0326-02 SCOPE AND APPLICABILITY

More information

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN 55113-3174 Memo Date: April 24, 2017 To: METRO DISTRICT COUNTIES and CITIES From: Phillip Bergem Metro State Aid RE: MnDOT Fiscal

More information

Root Cause Analysis. Chris Bills Compliance Enforcement Attorney

Root Cause Analysis. Chris Bills Compliance Enforcement Attorney Root Cause Analysis Chris Bills Compliance Enforcement Attorney cbills.re@spp.org 501.482.2091 1 Root Cause An initiating cause of a causal chain which leads to a violation of NERC standards where an intervention

More information

WarmWise Business Custom Rebates Program Manual

WarmWise Business Custom Rebates Program Manual WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...

More information

MEMORANDUM FOR THE CHIEF OF STAFF

MEMORANDUM FOR THE CHIEF OF STAFF ? DEPARTMENT OF THE AIR FORCE WASHINGTON, DC Office of the Assistant Secretary AFBCMR 97-00286 MEMORANDUM FOR THE CHIEF OF STAFF Having received and considered the recommendation of the Air Force Board

More information

Migrant Education Comprehensive Needs Assessment Toolkit A Tool for State Migrant Directors. Summer 2012

Migrant Education Comprehensive Needs Assessment Toolkit A Tool for State Migrant Directors. Summer 2012 Migrant Education Comprehensive Needs Assessment Toolkit A Tool for State Migrant Directors Summer 2012 Developed by the U.S. Department of Education Office of Migrant Education through a contract with

More information

Red River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services.

Red River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services. Red River Valley Water Supply Project Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services June 7, 2018 The Garrison Diversion Conservancy District (Garrison

More information

IMPROVING YOUR CLINICAL TRIAL & ENHANCING THE PATIENT EXPERIENCE

IMPROVING YOUR CLINICAL TRIAL & ENHANCING THE PATIENT EXPERIENCE ebook IMPROVING YOUR CLINICAL TRIAL & ENHANCING THE PATIENT EXPERIENCE Applying a patient-centered approach to enhance clinical trial performance, improve data quality, and ensure safety and efficacy.

More information

The Conference of Radiation Control Program Directors (CRCPD) A Model for Networking, Cooperation, Information Exchange and Regulation Harmonization

The Conference of Radiation Control Program Directors (CRCPD) A Model for Networking, Cooperation, Information Exchange and Regulation Harmonization The Conference of Radiation Control Program Directors (CRCPD) A Model for Networking, Cooperation, Information Exchange and Regulation Harmonization D.B. Gilley Environmental Manager, Director of Training

More information

Administrative Policies and Procedures. Policy No.: N/A Title: Medical Equipment Management Plan

Administrative Policies and Procedures. Policy No.: N/A Title: Medical Equipment Management Plan Administrative Policies and Procedures Originating Venue: Environment of Care Title: Medical Equipment Management Plan Cross Reference: Date Issued: 11/14 Date Reviewed: Date: Revised: Attachment: Page

More information

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan October 23rd, 2015 Attention: Qualified and Interested Consultants REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan The Posey County Economic Development Partnership, cooperatively

More information

a GAO GAO WEAPONS ACQUISITION DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems

a GAO GAO WEAPONS ACQUISITION DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems GAO United States Government Accountability Office Report to Congressional Committees July 2006 WEAPONS ACQUISITION DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems

More information

Purdue Animal Care and Use Committee

Purdue Animal Care and Use Committee Purdue Animal Care and Use Committee HANDBOOK Lisa D. Snider, CPIA IACUC Administrator ldsnider@purdue.edu (765) 494 7206 PACUC Handbook Organization and Function of the PACUC 1. Mission Statement The

More information

IEEE-SA Symposium on EDA Interoperability

IEEE-SA Symposium on EDA Interoperability IEEE-SA Symposium on EDA Interoperability Industry Connections Activity Initiation Document (ICAID) Version: 1.3, March 6 2015 IC13-001-03 Approved by the IEEE SASB 26 March 2015 Instructions Instructions

More information

Rebecca Trahan. Office of Sponsored Programs December 9, ORED Limited Submission Update

Rebecca Trahan. Office of Sponsored Programs December 9, ORED Limited Submission Update Rebecca Trahan Office of Sponsored Programs December 9, 2015 1 NSF Updates NIH Updates Uniform Guidance Updates and Reminders ORED Limited Submission Update OSP Updates Q & A 2 1 3 4 2 NSF 16-1 effective

More information

RP 4.0: INSPECTION AND CERTIFICATION OF OVERHEAD EQUIPMENT. A Recommended Practice (RP) for the Canadian Well Servicing Industry

RP 4.0: INSPECTION AND CERTIFICATION OF OVERHEAD EQUIPMENT. A Recommended Practice (RP) for the Canadian Well Servicing Industry RP 4.0: INSPECTION AND CERTIFICATION OF OVERHEAD EQUIPMENT A Recommended Practice (RP) for the Canadian Well Servicing Industry EDITION: 4 RELEASE DATE: October 2016 CANADIAN ASSOCIATION OF OILWELL DRILLING

More information

Identification and Protection of Unclassified Controlled Nuclear Information

Identification and Protection of Unclassified Controlled Nuclear Information ORDER DOE O 471.1B Approved: Identification and Protection of Unclassified Controlled Nuclear Information U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 471.1B 1 IDENTIFICATION

More information

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard Report No. D-2011-RAM-004 November 29, 2010 American Recovery and Reinvestment Act Projects--Georgia Army National Guard Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden

More information

SECTION 1 INTRODUCTION. A Guide to the SPCC Regulation

SECTION 1 INTRODUCTION. A Guide to the SPCC Regulation Section 1 Introduction SECTION 1 INTRODUCTION Section 1 Introduction INTRODUCTION Section 1 Table of Contents Title / Topic of Section Page Section 1 Table of Contents. i Purpose... 1 Background. 1 Organization

More information

Private Gas Well Policy and Incentive Program

Private Gas Well Policy and Incentive Program APPLICANT GUIDE Private Gas Well Policy and Incentive Program ontario.ca/privategaswells Ministry of Natural Resources Petroleum Operations Section Integration Branch Regional Operations Division 659

More information

RECORD OF PROCEEDINGS AIR FORCE BOARD FOR CORRECTION OF MILITARY RECORDS - DOCKET NUMBER: 97-h39

RECORD OF PROCEEDINGS AIR FORCE BOARD FOR CORRECTION OF MILITARY RECORDS - DOCKET NUMBER: 97-h39 IN THE MATTER OF: -.-- ------ - RECORD OF PROCEEDINGS AIR FORCE BOARD FOR CORRECTION OF MILITARY RECORDS - DOCKET NUMBER: 97-h39 COUNSEL: NONE HEARING DESIRED: YES 45 1938 APPLICANT REOUESTS THAT: His

More information

This document describes the purpose and functions of University Health and Safety Committees.

This document describes the purpose and functions of University Health and Safety Committees. UON Health and Safety Guideline: HSG 8.2 Health and Safety Committees 1. Purpose 2. Scope This document describes the purpose and functions of University Health and Safety Committees. This document applies

More information

Nuclear Operating Company

Nuclear Operating Company Nuclear Operating Company South Tws Pro/ccd Electric Generating Station P.. Box 289 Wadswort, Texs 77483, August 2, 2001 NOC-AE-01 000986 File No.: G20.01.01 G21.01.01 1 OCFR50.90 1 OCFR50.54(q) 1 OCFR50.34(f)

More information

ASSEMBLY HEALTH AND SENIOR SERVICES COMMITTEE STATEMENT TO. ASSEMBLY, No STATE OF NEW JERSEY DATED: JUNE 13, 2011

ASSEMBLY HEALTH AND SENIOR SERVICES COMMITTEE STATEMENT TO. ASSEMBLY, No STATE OF NEW JERSEY DATED: JUNE 13, 2011 ASSEMBLY HEALTH AND SENIOR SERVICES COMMITTEE STATEMENT TO ASSEMBLY, No. 4098 STATE OF NEW JERSEY DATED: JUNE 13, 2011 The Assembly Health and Senior Services Committee reports favorably Assembly Bill

More information

ASPiRE INTERNAL GRANT PROGRAM JUNIOR FACULTY RESEARCH COMPETITION Information, Guidelines, and Grant Proposal Components (updated Summer 2018)

ASPiRE INTERNAL GRANT PROGRAM JUNIOR FACULTY RESEARCH COMPETITION Information, Guidelines, and Grant Proposal Components (updated Summer 2018) ASPiRE INTERNAL GRANT PROGRAM JUNIOR FACULTY RESEARCH COMPETITION Information, Guidelines, and Grant Proposal Components (updated Summer 2018) INTRODUCTION Ball State University's Internal Grants Program

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:

More information

NCDPI Licensure Review

NCDPI Licensure Review NCDPI Licensure Review Final Report 2017 TNTP 2017 Purpose Over the last few years, educators and their employers in North Carolina have raised concerns about how long it takes to issue a teaching license,

More information

FLOOD MITIGATION ASSISTANCE PROGRAM

FLOOD MITIGATION ASSISTANCE PROGRAM APRIL 2018 97.029 FLOOD MITIGATION ASSISTANCE PROGRAM State Project/Program: N.C. MITIGATION Federal Emergency Management Agency Federal Authorization: National Flood Insurance Reform Act of 1994 Section

More information

PC Chairs: Public Review Process

PC Chairs: Public Review Process PC Chairs: Public Review Process Training Covers: Publication Public Review and Advisory Public Review Intended Audience: PC Chairs, recommended for everyone Required Reading Material: PC MOP and PC Chairs

More information

University of Maryland Baltimore. Radiation Safety Procedure

University of Maryland Baltimore. Radiation Safety Procedure University of Maryland Baltimore Procedure Number: 1.1 Radiation Safety Procedure Title: Radiation Safety Program Organization and Administration Revision Number: 0 Technical Review and Approval: Radiation

More information

Academic Senate Faculty Research Grants Call For Proposals Deadline For Submission: March 2, 2018

Academic Senate Faculty Research Grants Call For Proposals Deadline For Submission: March 2, 2018 Academic Senate Faculty Research Grants Call For Proposals Deadline For Submission: March 2, 2018 PURPOSE The UC Merced Academic Senate Faculty Research Grants program is designed to support the research

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures

More information

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No.

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. Page 1 of 8 Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. 582-11-13000 Quarter no. 15 From 3/1/2015 Through 5/31/2015.

More information

Request to Administer Project

Request to Administer Project To: District Office Local Liaison Request to Administer Project From: John Doe John.doe@city.va.us 540-123- 4567 (Printed Name of Responsible Local Official Issuing Request) (Email Address) (Phone) Signature

More information

Petitioner's Guide for Recognition of a Pharmacy Practice Specialty

Petitioner's Guide for Recognition of a Pharmacy Practice Specialty Board of Pharmacy Specialties Petitioner's Guide for Recognition of a Pharmacy Practice Specialty I. Introduction II. III. IV. Criteria for Specialty Recognition BPS Procedures for Considering Petitions

More information

[FWS R4 ES 2018 N015; FVHC XXX FF04G01000] Notice of Availability; Florida Trustee Implementation Group Deepwater Horizon

[FWS R4 ES 2018 N015; FVHC XXX FF04G01000] Notice of Availability; Florida Trustee Implementation Group Deepwater Horizon This document is scheduled to be published in the Federal Register on 03/15/2018 and available online at https://federalregister.gov/d/2018-05137, and on FDsys.gov Billing Code 4333 15 DEPARTMENT OF THE

More information

TVC RECORDS. NOVEMBER 11, TGA TRANSMISSION ROUNDTABLE SAN ANTONIO John A. Jacobi, P.E., J.D

TVC RECORDS. NOVEMBER 11, TGA TRANSMISSION ROUNDTABLE SAN ANTONIO John A. Jacobi, P.E., J.D TVC RECORDS NOVEMBER 11, 2017 2017 TGA TRANSMISSION ROUNDTABLE SAN ANTONIO John A. Jacobi, P.E., J.D REGULATORY REQUIREMENT 192.13(a) No person may operate a segment of pipeline readied for service after

More information

Annual review of accreditation 2018/19

Annual review of accreditation 2018/19 Annual review of accreditation 2018/19 Play Therapy UK (PTUK) April 2018 Contents 1. Outcome... 3 2. Assessment against the Standards for Accredited Registers... 4 3. Share your experience... 10 4. Impact

More information