Nuclear Operating Company

Size: px
Start display at page:

Download "Nuclear Operating Company"

Transcription

1 Nuclear Operating Company South Tws Pro/ccd Electric Generating Station P.. Box 289 Wadswort, Texs 77483, August 2, 2001 NOC-AE File No.: G G OCFR OCFR50.54(q) 1 OCFR50.34(f) U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC South Texas Project Units 1 and 2 Docket Nos. STN , STN Application for Amendment to Administrative Control Technical Specifications a, "Primary Coolant Sources Outside Containment," and d, "Post-Accident Samplingq" Pursuant to 10CFR50.90, the South Texas Project requests Nuclear Regulatory Commission approval of a proposed license amendment to the Unit 1 and Unit 2 Technical Specifications. The South Texas Project proposes to revise Technical Specification a, "Primary Coolant Sources Outside Containment," and d, "Post-Accident Sampling." The Post-Accident Sampling System is to be removed from service, with attendant changes to procedures and functions that depend upon input from the Post-Accident Sampling System. The changes are consistent with NRC-approved Industry/Technical Specification Task Force Standard Technical Specification Change Traveler TSTF-366, "Elimination of Requirements for a Post Accident Sampling System (PASS)." Attachment 1 describes the plant-specific changes proposed for the South Texas Project, as well as the bases and justification to support them. The South Texas Project submits this application as an applicant in the consolidated line item improvement process. This proposal is prepared in accordance with the model NRC Safety Evaluation relating to elimination of requirements for post-accident sampling as proposed by WCAP-14986, 'Westinghouse Owners Group Post Accident Sampling System Requirements: A Technical Basis." The Nuclear Regulatory Commission has reviewed and approved WCAP as indicated by the Safety Evaluation issued June 14, The South Texas Project Plant Operations Review Committee has reviewed the proposed amendment and recommended it for approval. The South Texas Project Nuclear Safety Review Board has reviewed and approved the proposed change. The required affidavit, the Description and Assessment of the proposed change, the proposed Technical Specification replacement pages, and commitments are included as attachments to this letter. In accordance with 1 OCFR50.91 (b), the South Texas Project is providing the State of Texas with a copy of this proposed amendment. The proposed changes will not have an adverse impact on the health and well-being of the public.

2 NOC-AE File No.: G G Page 2 The South Texas Project requests Nuclear Regulatory Commission approval of these proposed changes by January 31, If there are any questions, please contact either Mr. P. L. Walker at (361) or me at (361) J. J. Sheppard Vice President, Engineering & Technical Services PLW Attachments: 1) Affidavit 2) Description and Assessment 3) Proposed Technical Specification Changes 4) Revised Technical Specification Pages 5) List of Commitments

3 NOC-AE File No.: G G Page 3 cc: Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas John A. Nakoski Addressee Only U. S. Nuclear Regulatory Commission Project Manager, Mail Stop OWFN/7-D-1 Washington, DC Mohan C. Thadani Addressee Only U. S. Nuclear Regulatory Commission Project Manager, Mail Stop OWFN/7-D-1 Washington, DC Cornelius F. O'Keefe c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX A. H. Gutterman, Esquire Morgan, Lewis & Bockius 1800 M. Street, N.W. Washington, DC M. T. Hardt/W. C. Gunst City Public Service P. 0. Box 1771 San Antonio, TX Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, Texas Institute of Nuclear Power Operations - Records Center 700 Galleria Parkway Atlanta, GA Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX R. L. Balcom/D. G. Tees Houston Lighting & Power Co. P. 0. Box 1700 Houston, TX C. A. Johnson/R. P. Powers AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5012 Wadsworth, TX U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

4 ATTACHMENT 1 AFFIDAVIT

5 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of STP Nuclear Operating Company, et al., South Texas Project Units 1 and 2 ) ) ) ) ) ) Docket Nos AFFIDAVIT I, J. J. Sheppard, being duly sworn, hereby depose and say that I am Vice President, Engineering & Technical Services, of STP Nuclear Operating Company; that I am duly authorized to sign and file with the Nuclear Regulatory Commission the attached proposed license amendment; that I am familiar with the content thereof; and that the matters set forth therein are true and correct to the best of my knowledge and belief. Vice President, Engineering & Technical Services STATE OF TEXAS COUNTY OF MATAGORDA ) ) Subscribed and sworn to before me, a Notary Public in and for the State of Texas, this day of,&!e," LOIS J. MILLS! i" Notary Pubic, Slate of Texas ~~ My Cornmi~son Expess JULY 27,2003 ýc- Q--'ý ý* Notary Public in and for the State of Texas

6 ATTACHMENT 2 DESCRIPTION AND ASSESSMENT

7 Attachment 2 NOC-AE Page 1 of 4 SOUTH TEXAS PROJECT UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE TO REMOVE THE POST-ACCIDENT SAMPLING SYSTEM FROM SERVICE 1.0 INTRODUCTION 1.1 Proposed Change DESCRIPTION AND ASSESSMENT This proposed License Amendment Request is a request pursuant to 10CFR50.90 to revise Technical Specification a, "Primary Coolant Sources Outside Containment," and d, "Post-Accident Sampling," consistent with removing the Post-Accident Sampling System (PASS) from service. 1.2 Proposed Technical Specification Changes See Attachment Revised Technical Specifications See Attachment Updated Final Safety Analysis Report 2.0 BACKGROUND Implementation of the change proposed by this amendment request will require revision of the South Texas Project Updated Final Safety Analysis Report and the Emergency Plan. Westinghouse Owners Group (WOG) topical report WCAP A Rev. 2, "Post Accident Sampling System Requirements: A Technical Basis," evaluated the PASS requirements to determine their contribution to plant safety and accident recovery. The topical report considered the progression and consequences of core damage accidents and assessed the accident progression with respect to plant abnormal and emergency operating procedures, severe accident management guidance, and emergency plans. WCAP A, Rev. 2, concluded that the current PASS samples specified in NUREG 0737, "Clarification of TMI Action Plan Requirements," may be eliminated. 3.0 DESCRIPTION OF THE PROPOSED CHANGE South Texas Project Technical Specification a, "Primary Coolant Sources Outside Containment," states that a program shall be established, implemented, and maintained:... to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the containment spray, Safety Injection, containment hydrogen monitoring, post-accident sampling and primary sampling. The program shall include the following: 1) Preventive maintenance and periodic visual inspection requirements, and 2) Integrated leak test requirements for each system at refueling cycle intervals or less.

8 Attachment 2 NOC-AE Page 2 of 4 South Texas Project Technical Specification d, "Post-Accident Sampling," states that a program shall be established, implemented, and maintained:... which will ensure the capability to obtain and analyze reactor coolant, radioactive iodines and particulates in plant gaseous effluents, and containment atmosphere samples under accident conditions. The program shall include the following: 1) Training of personnel, 2) Procedures for sampling and analysis, and 3) Provisions for maintenance of sampling and analysis equipment. The reference to post-accident sampling is to be removed from a, and d is to be deleted altogether. The changes are consistent with NRC-approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-366 (Reference 1). Availability of this technical specification improvement was announced in Federal Register Volume 65, No. 211 (Reference 2), on October 31, 2000, as part of the Consolidated Line Item Improvement Process (CLIIP). 4.0 TECHNICAL ANALYSIS 4.1 Applicability of Published Safety Evaluation The South Texas Project has reviewed the safety evaluation published as part of the CLIIP. This verification included a review of the NRC staff's evaluation as well as the supporting information provided to support TSTF-366 (i.e., WCAP A, Rev. 2, "Post Accident Sampling System Requirements: A Technical Basis," submitted October 26, 1998, as supplemented by letters dated April 28, 1999, April 10, 2000, and May 22, 2000). The review included the NRC safety evaluation of WCAP The South Texas Project has concluded that the justifications presented in the TSTF proposal and the safety evaluation prepared by the NRC staff are applicable to the South Texas Project, and justify this amendment incorporating the proposed changes to the South Texas Project Technical Specifications. 4.2 Optional Changes and Variations The South Texas Project is not proposing any variations or deviations from the technical specification changes described in TSTF-366 or in the NRC staff's model safety evaluation published in the Federal Register October 31, The South Texas Project Technical Specifications include an administrative requirement for a program for those portions of systems outside containment which contain highly radioactive fluids to minimize leakage during a serious transient or accident. PASS is specifically listed in Technical Specification a as falling under the scope of this requirement. As described in the staff's model safety evaluation published on October 31, 2000, the South Texas Project proposes to implement the appropriate controls such that PASS will not be a potential leakage path for highly radioactive fluids outside containment. These controls will be applied during the implementation period for this amendment

9 Attachment 2 NOC-AE Page 3 of 4 such that it is appropriate to delete reference to PASS from Technical Specification a. 5.0 REGULATORY ANALYSIS 5.1 No Significant Hazards Determination The South Texas Project has reviewed the safety evaluation published as part of the CLIIP. The South Texas Project has concluded that the proposed determination presented in the notice is applicable to the South Texas Project and there are no significant hazards associated with this change. The determination is hereby incorporated by reference to satisfy the requirements of 1 OCFR50.91 (a). 5.2 Verification and Commitments Pursuant to the notice of availability published in the Federal Register (Reference 2) for this technical specification amendment request, the South Texas Project has addressed the following plant-specific verifications and commitments: 1. The South Texas Project will develop contingency plans for obtaining and analyzing highly radioactive samples of reactor coolant, containment sump, and containment atmosphere. The contingency plans will be maintained in the plant procedures. Maintaining the contingency plans is considered a regulatory commitment. Implementation is expected within six months following NRC approval of the proposed change. 2. The South Texas Project has developed a capability for classifying fuel damage events at the Alert level threshold for 2-5% core damage. This level of core damage is associated with radioactivity levels of 300 jici/ml dose equivalent iodine. This capability for the Alert classification will be maintained in emergency plan implementing procedures. Maintaining the capability of classifying fuel damage events is considered a regulatory commitment. Implementation is expected within six months following NRC approval of the proposed change. 3. The South Texas Project has established the capability to monitor radioactive iodines that have been released to offsite environs. This capability is maintained in the emergency plan implementing procedures. Maintaining the capability to monitor such radioactive iodines is considered a regulatory commitment. 5.3 Implementation The South Texas Project requests NRC approval of this proposed Technical Specification change by January 31, Implementation is expected within six months following NRC approval of the proposed change. 6.0 ENVIRONMENTAL EVALUATION The South Texas Project has reviewed the environmental evaluation included in the model safety evaluation published on October 31, 2000, as part of the CLIIP. The South

10 Attachment 2 NOC-AE Page 4 of 4 Texas Project has determined that the staff's findings presented in that evaluation are applicable to the South Texas Project and the evaluation is incorporated by reference. 7.0 REFERENCES 1. Westinghouse Owners Group (WOG) topical report WCAP A, Rev. 2, "Post Accident Sampling System Requirements: A Technical Basis, July Industry/TSTF Standard Technical Specification Change Traveler TSTF-366, "Elimination of Requirements for a Post Accident Sampling System (PASS)" 3. Federal Register, Volume 65, Number 211, "Notice of Availability for Referencing in License Amendment Applications Model Safety Evaluation on Technical Specification Improvement to Eliminate Requirements on Post Accident Sampling Systems Using the Consolidated Line Item Improvement Process," dated October 31,2000

11 ATTACHMENT 3 PROPOSED TECHNICAL SPECIFICATION CHANGES

12 ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued) a. The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour. The President and Chief Executive Officer and the NSRB shall be notified within 24 hours; b. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PORC. This report shall describe: (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems, or structures, and (3) corrective action taken to prevent recurrence; c. The Safety Limit Violation Report shall be submitted to the Commission, the NSRB, and the President and Chief Executive Officer within 14 days of the violation; and d. Operation of the unit shall not be resumed until authorized by the Commission. 6.8 PROCEDURES AND PROGRAMS Written procedures shall be established, implemented, and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978; b. The emergency operating procedures required to implement the requirements of NUREG-0737 and Supplement 1 to NUREG-0737 as stated in Generic Letter No ; c. Security Plan implementation; d. Emergency Plan implementation; e. PROCESS CONTROL PROGRAM implementation; f. OFFSITE DOSE CALCULATION MANUAL implementation; g. Quality Assurance Program for effluent and environmental monitoring; and h. Fire Protection Program implementation Each procedure of Specification 6.8.1, and changes thereto, shall be reviewed and approved prior to implementation and reviewed periodically as set forth in Specification and administrative procedures The following programs shall be established, implemented, and maintained: a. Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the containment spray, Safety Injection, containment hydrogen monitoring, post accident sampling and primary sampling. The program shall include the following: SOUTH TEXAS - UNITS 1 & Unit 1 - Amendment No Unit 2 - Amendment No. 80

13 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 1) Preventive maintenance and periodic visual inspection requirements, and 2) Integrated leak test requirements for each system at refueling cycle intervals or less. b. In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following: 1) Training of personnel, 2) Procedures for monitoring, and 3) Provisions for maintenance of sampling and analysis equipment. c. Secondary Water Chemistry A program for monitoring of secondary water chemistry to inhibit steam generator tube degradation. This program shall include: 1) Identification of a sampling schedule for the critical variables and control points for these variables, 2) Identification of the procedures used to measure the values of the critical variables, 3) Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage, 4) Procedures for the recording and management of data, 5) Procedures defining corrective actions for all off-control point chemistry conditions, and 6) A procedure identifying: (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective action. d. DPos Annj n finmg;u Not used A proegr-am which will ensure the capability to obtain and analyze reactor- coolant, radioactive iodinies and pariciulates in plant gaseous effluents, and containment atmosphere samples under- accident oanditions. The pro.gr-armi shall include the following: 1) Training of personnel, 2) Proceedures for- sampling and analysis, and 3) Proevisions for- maintenance of sampling and analysis equipment. SOUTH TEXAS - UNITS 1 &

14 ATTACHMENT 4 REVISED TECHNICAL SPECIFICATION PAGES

15 ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued) a. The NRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour. The President and Chief Executive Officer and the NSRB shall be notified within 24 hours; b. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the PORC. This report shall describe: (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems, or structures, and (3) corrective action taken to prevent recurrence; c. The Safety Limit Violation Report shall be submitted to the Commission, the NSRB, and the President and Chief Executive Officer within 14 days of the violation; and d. Operation of the unit shall not be resumed until authorized by the Commission. 6.8 PROCEDURES AND PROGRAMS Written procedures shall be established, implemented, and maintained covering the activities referenced below: a. The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978; b. The emergency operating procedures required to implement the requirements of NUREG-0737 and Supplement 1 to NUREG-0737 as stated in Generic Letter No ; c. Security Plan implementation; d. Emergency Plan implementation; e. PROCESS CONTROL PROGRAM implementation; f. OFFSITE DOSE CALCULATION MANUAL implementation; g. Quality Assurance Program for effluent and environmental monitoring; and h. Fire Protection Program implementation Each procedure of Specification 6.8.1, and changes thereto, shall be reviewed and approved prior to implementation and reviewed periodically as set forth in Specification and administrative procedures The following programs shall be established, implemented, and maintained: a. Primary Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. The systems include the containment spray, Safety Injection, containment hydrogen monitoring, and primary sampling. The program shall include the following: SOUTH TEXAS - UNITS 1 & Unit 1 - Amendment No. 4,-93 Unit 2 - Amendment No. 80

16 ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) 1) Preventive maintenance and periodic visual inspection requirements, and 2) Integrated leak test requirements for each system at refueling cycle intervals or less. b. In-Plant Radiation Monitorinq A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following: 1) Training of personnel, 2) Procedures for monitoring, and 3) Provisions for maintenance of sampling and analysis equipment. c. Secondary Water Chemistry A program for monitoring of secondary water chemistry to inhibit steam generator tube degradation. This program shall include: 1 ) Identification of a sampling schedule for the critical variables and control points for these variables, 2) Identification of the procedures used to measure the values of the critical variables, 3) Identification of process sampling points, which shall include monitoring the discharge of the condensate pumps for evidence of condenser in-leakage, 4) Procedures for the recording and management of data, 5) Procedures defining corrective actions for all off-control point chemistry conditions, and 6) A procedure identifying: (a) the authority responsible for the interpretation of the data, and (b) the sequence and timing of administrative events required to initiate corrective action. d. Not used SOUTH TEXAS - UNITS 1 &

17 LIST OF COMMITMENTS The following table identifies those actions in this license amendment request that are required for the South Texas Project. Other statements in this submittal are provided for informational purposes and are not considered to be commitments. If there are any questions regarding these commitments, please contact Mr. P. L. Walker at (361) COMMITMENT The South Texas Project will develop contingency plans for obtaining and analyzing highly radioactive samples of reactor coolant, containment sump, and containment atmosphere. The contingency plans will be maintained in plant procedures. Maintaining the contingency plans is considered a regulatory commitment. The South Texas Project has developed a capability for classifying fuel damage events at the Alert level threshold for 2-5% core damage. This level of core damage is associated with radioactivity levels of 300 gci/ml dose equivalent iodine. The capability for the Alert classification will be described in emergency plan implementing procedures. Maintaining the capability to classify fuel damage events is considered a regulatory commitment. The South Texas Project has established the capability to monitor radioactive iodines that have been released to offsite environs. This capability is described in the emergency plan implementing procedures. Maintaining the capability to monitor radioactive iodines is considered a regulatory commitment. IMPLEMENTATION Within six months following NRC approval Within six months following NRC approval Completed

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation NRC UPDATE EP REGULATORY ACTIVITIES Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation National Radiological Emergency Preparedness Conference Nashville, Tennessee April 2, 2001

More information

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT THIS DOCUMENT IS THE PROPERTY OF PACIFIC GAS AND ELECTRIC COMPANY CONTROLLED COPY

More information

X STANDARD REVIEW PLAN

X STANDARD REVIEW PLAN NUREG-00 (Formerly NUREG-75/07) 0 01, U.S. NUCLEAR REGULATORY COMMISSION X STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION 13.2.2 TRAINING FOR NON-LICENSED PLANT STAFF REVIEW RESPONSIBILITIES

More information

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN 13.5.1.1 ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of human performance

More information

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC CProgress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 50.55a May 21, 2008 3F0508-06 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,

More information

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material I BACKGROUND Section 274 of the Atomic Energy Act (AEA) of 1954, as amended, provides

More information

DRAFT REGULATORY GUIDE

DRAFT REGULATORY GUIDE U.S. NUCLEAR REGULATORY COMMISSION August 2010 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 8 DRAFT REGULATORY GUIDE Contact: H. Karagiannis (301) 251-7477 DRAFT REGULATORY GUIDE DG-8035 (Proposed Revision

More information

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program NEI 15-04 [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program [THIS PAGE IS LEFT BLANK INTENTIONALLY] NEI 15-04 (Revision 0) NEI 15-04 [Revision 0] Nuclear Energy Institute

More information

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012) U.S. NUCLEAR REGULATORY COMMISSION Revision 3 May 2000 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012) QUALIFICATION AND TRAINING

More information

Emergency Preparedness Final Rule Implementation

Emergency Preparedness Final Rule Implementation Emergency Preparedness Final Rule Implementation Bob Kahler, Chief Division of Preparedness and Response Topics Emergency Preparedness Rule Background Emergency Preparedness Rule Topics Guidance Documents

More information

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. FENOC Perry Nuclear Power Plant 10 Center Road PO. Box 97 Perry, Ohio 44081 February 3, 2000 PY-CEI/NRR-2463L United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Perry

More information

Research and Test Reactor Licensing Actions and Lessons Learned

Research and Test Reactor Licensing Actions and Lessons Learned Research and Test Reactor Licensing Actions and Lessons Learned Duane A. Hardesty Research and Test Reactor Licensing Branch September 23, 2010 1 License Renewal General Overview Streamlined Process Outline

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 3.5.1.4 MISSILES GENERATED BY EXTREME WINDS REVIEW RESPONSIBILITIES Primary - Organization responsible for the review of plant design

More information

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant This document is scheduled to be published in the Federal Register on 12/16/2015 and available online at http://federalregister.gov/a/2015-31636, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. SOUTHERN CALIFORNIA AnJEDISON An EDISON INTERNA TIONAL& Company Richard C. Brabec Principal Manager, Nuclear Regulatory Affairs and Emergency Planning 10 CFR 50.75 10 CFR 50.82 March 31, 2015 ATTN: Document

More information

Life Extension of Nuclear Power Plants

Life Extension of Nuclear Power Plants Regulatory Document Life Extension of Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs

More information

NATIONAL NUCLEAR REGULATOR

NATIONAL NUCLEAR REGULATOR NATIONAL NUCLEAR REGULATOR For the protection of persons, property and the environment against nuclear damage REGULATORY GUIDE INTERIM GUIDANCE ON THE CONDUCT AND RE- REGISTRATION OF NUCLEAR POWER PLANT

More information

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS Appendix u June 15, 1982 Letter to All Licensees of Operating Plants, Applicants for an Operating License, and Holders of Construction Permits from Darrell G. Eisenhut, Director Division of Licensing Office

More information

NRC INSPECTION MANUAL STSB

NRC INSPECTION MANUAL STSB NRC INSPECTION MANUAL STSB MANUAL CHAPTER 0326 OPERABILITY DETERMINATIONS & FUNCTIONALITY ASSESSMENTS FOR CONDITIONS ADVERSE TO QUALITY OR SAFETY TABLE OF CONTENTS 0326-01 PURPOSE 0326-02 SCOPE AND APPLICABILITY

More information

Control Number: Item Number: 209. Addendum StartPage: 0

Control Number: Item Number: 209. Addendum StartPage: 0 Control Number: 40377 Item Number: 209 Addendum StartPage: 0 . (40 3, 7 7 Entergy.11111 12 N14 5: 31 PUBLIC UY COMMISSION FILIKG CLERK Entergy Operations, Inc. River Bend Station 5485 U.S. Highway 61N,

More information

Record of Proceedings, Including Reasons for Decision

Record of Proceedings, Including Reasons for Decision Record of Proceedings, Including Reasons for Decision In the Matter of Applicant Ontario Power Generation Inc. Subject Application to Amend the Pickering A Nuclear Generating Station Power Reactor Operating

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Site Vice President Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 250 Governor Hunt Road Vernon,

More information

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are: Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire REGULATORY GUIDE Emergency Planning at Class I Nuclear Facilities and Uranium Mines and Mills G-225 August 2001 REGULATORY DOCUMENTS

More information

May 23, Docket No License No. DPR-12

May 23, Docket No License No. DPR-12 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 23, 2018 Docket No. 05000171 License No. DPR-12 Mr. Bryan Hanson Senior Vice President,

More information

Emergency Preparedness Near Nuclear Power Plants

Emergency Preparedness Near Nuclear Power Plants Emergency Preparedness Near Nuclear Power Plants January 2009 Key Facts Federal law requires that energy companies develop and exercise sophisticated emergency response plans to protect public health and

More information

MINNESOTA DEPARTMENT OF HEALTH

MINNESOTA DEPARTMENT OF HEALTH MINNESOTA DEPARTMENT OF HEALTH REGULATORY GUIDE FOR GAS CHROMATOGRAPHS AND X-RAY FLUORESCENCE ANALYZERS Radioactive Materials Unit Minnesota Department of Health 625 Robert Street North P.O. Box 64975

More information

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years Clinton Illinois, IL Owner: Illinois Power Company Reactor type: Boiling water reactor Commercial operations began: November 24, 1987 Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years)

More information

Exelkn. PSLTR: # U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Exelkn. PSLTR: # U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Exelkn. Exelon Generation Company, LLC www.exeloncorp.com Nuclear Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450-9765 February 2, 2001 1OCFR50.12 PSLTR: #01-0018 U.S. Nuclear Regulatory

More information

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA 1 st NNR Regulatory Information Conference October 2016 Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA William Bill M. Dean Director, Office of Nuclear Reactor

More information

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking This document is scheduled to be published in the Federal Register on 12/09/20 and available online at http://federalregister.gov/a/20-30578, and on FDsys.gov NUCLEAR REGULATORY COMMISSION 10 CFR Part

More information

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July RÉPUBLIQUE FRANÇAISE Decision No. 2013-DC-0437 by the French Nuclear Safety Authority of 7 May 2013 setting out requirements to be met by Électricité de France Société anonyme (EDF SA) at Flamanville nuclear

More information

Regulatory Guide 3.67 Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities

Regulatory Guide 3.67 Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities Regulatory Guide 3.67Standard Format and Cont... Page 1 of 22 January 1992 Regulatory Guide 3.67 Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities Publication Information

More information

EMERGENCY ARRANGEMENTS OF A NUCLEAR POWER PLANT

EMERGENCY ARRANGEMENTS OF A NUCLEAR POWER PLANT EMERGENCY ARRANGEMENTS OF A NUCLEAR POWER PLANT 1 Introduction 3 2 Scope of application 3 3 Emergency arrangement requirements 4 3.1 Emergency plan and its drafting 4 3.2 Emergency planning 4 3.3 The emergency

More information

Regulations on the Safety of Nuclear Power Plants Operation (PAK/913)

Regulations on the Safety of Nuclear Power Plants Operation (PAK/913) Regulations on the Safety of Nuclear Power Plants Operation (PAK/913) PART-II Statutory Notification (S.R.O) Government of Pakistan PAKISTAN NUCLEAR REGULATORY AUTHYORITY Notification Islamabad, the 14

More information

As amended upto 31 1st December 2015

As amended upto 31 1st December 2015 As amended upto 31 1st December 2015 PART II Statutory Notification (S.R.O) GOVERNMENT OF PAKISTAN PAKISTAN NUCLEAR REGULATORY AUTHORITY NOTIFICATION Islamabad, the14th December, 2004 S.R.O. 995(I)/2004.-

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO AMENDED APPLICATION

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO AMENDED APPLICATION BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF APOLLO ENERGY, LLC FOR AN ORDER ESTABLISHING SPACING AND WELL LOCATION RULES FOR THE WILLIAMS

More information

NRC REGULATORY ISSUE SUMMARY REQUIREMENTS FOR EXEMPT DISTRIBUTION LICENSEE ANNUAL TRANSFER REPORTS

NRC REGULATORY ISSUE SUMMARY REQUIREMENTS FOR EXEMPT DISTRIBUTION LICENSEE ANNUAL TRANSFER REPORTS ADDRESSEES UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF FEDERAL AND STATE MATERIALS AND ENVIRONMENTAL MANAGEMENT PROGRAMS WASHINGTON, DC 20555-0001 September 18, 2014 NRC REGULATORY ISSUE SUMMARY

More information

license AUTHORITY FILE CC Apv il., 1982

license AUTHORITY FILE CC Apv il., 1982 license AUTHORITY FILE CC -7 0 ~UNITED STA TES DO NOT I t EU lý;ii 0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Apv il., 1982 Dockets Nos. 50-269,60-270 Mr. William 0. Parker, Jr. Vice President

More information

DRAFT REGULATORY GUIDE

DRAFT REGULATORY GUIDE a U.S. NUCLEAR REGULATORY COMMISSION April 2014 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE DRAFT REGULATORY GUIDE DG-1310 (Proposed Revision 4 of Regulatory Guide 1.134, dated

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 6055.8 March 31, 1989 SUBJECT: Occupational Radiation Protection Program Administrative Reissuance Incorporating Change 1, May 6, 1996 USD(A&T) References: (a)

More information

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S))

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S)) REGULATED INDUSTRIAL WASTEWATER DISCHARGE PERMIT PERMIT NO. In compliance with the existing provisions of the City of Columbia Code of Ordinances, the Federal Clean Water Act (PL 95-217) and the General

More information

PMP-2080-EPP.107. Copies 3C IC 1C 1C 1C 1C 1U 1C 3C 1C 2C 2C 1C 1C 1C 1C 2C 4C 1C 1C 1C 1C 1C 1C 1C 1C 3C 2C 2C 1C. Comments Comme s. Revision.

PMP-2080-EPP.107. Copies 3C IC 1C 1C 1C 1C 1U 1C 3C 1C 2C 2C 1C 1C 1C 1C 2C 4C 1C 1C 1C 1C 1C 1C 1C 1C 3C 2C 2C 1C. Comments Comme s. Revision. CONTROLLED DOCUMENT TRANSMITTAL Transmittal#: 17550N Date: 06/12/2001 Initiator: JACQUELINE DAVIS Page: 1 0 Description: ISSUE OF 1 PMP EMERGENCY PLAN PROCEDURE Distribution Group(s): PMP-2080-EPP.107

More information

QUALITY MANAGEMENT PROGRAM FOR HUMAN RESEARCH SUBJECT UNIVERSITY OF CINCINNATI

QUALITY MANAGEMENT PROGRAM FOR HUMAN RESEARCH SUBJECT UNIVERSITY OF CINCINNATI Effective January 27, 1992 Modified: August 10, 1993; March 8, 1994; August 11, 1994; July 18, 1995; September 23, 1997, November 14, 2001, May 19, 2004, June 17, 2006 and (November 8, 2006) I. Purpose

More information

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA Appendix A contains temporary Enforcement Guidance Memorandums (EGMs). The NRC Enforcement Manual Change Notice Index, located in the front of the Manual, contains

More information

The following are the procedural steps required for a customer to apply for and receive a Steam Chiller Incentive payment:

The following are the procedural steps required for a customer to apply for and receive a Steam Chiller Incentive payment: Targeted Steam Air Conditioning Incentive Program PROGRAM GUIDELINES Steam Chiller Incentives To qualify for the Targeted Steam Air Conditioning Incentive Program ( Program or Incentive Program ), a signed

More information

REQUEST FOR PROPOSALS FOR COMMERICAL GENERATOR MAINTENANCE & REPAIR. Released February 3, 2017 Submissions Due February 28, 2017

REQUEST FOR PROPOSALS FOR COMMERICAL GENERATOR MAINTENANCE & REPAIR. Released February 3, 2017 Submissions Due February 28, 2017 PUBLIC SERVICES DEPARTMENT 15 School Street Rangeley, Maine 04970 207-864-2294 publicworks@rangeleyme.org REQUEST FOR PROPOSALS FOR COMMERICAL GENERATOR MAINTENANCE & REPAIR Released February 3, 2017 Submissions

More information

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012 As amended upto 31 1st December 2015 The Gazette of Pakistan EXTRAORDINARY PUBLISHED BY AUTHORITY ISLAMABAD, THURSDAY, March 1, 2012 PART II Statutory Notifications (S.R.O.) GOVERNMENT OF PAKISTAN PAKISTAN

More information

ANNEX Q HAZARDOUS MATERIALS EMERGENCY RESPONSE

ANNEX Q HAZARDOUS MATERIALS EMERGENCY RESPONSE ANNEX Q HAZARDOUS MATERIALS EMERGENCY RESPONSE PROMULGATION STATEMENT Annex Q: Hazardous Materials Emergency Response, and contents within, is a guide to how the University conducts a response specific

More information

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

Approaches and Methods to Conduct Regulatory Safety Review and Assessment Approaches and Methods to Conduct Regulatory Safety Review and Assessment 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with: Different regulatory

More information

July 29, 2009 WATTS BAR NUCLEAR PLANT NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT /

July 29, 2009 WATTS BAR NUCLEAR PLANT NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT / UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 July 29, 2009 Mr. Preston D. Swafford Chief Nuclear

More information

NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS

NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS GUIDE YVL 7.4 / 9 JANUARY 2002 NUCLEAR POWER PLANT EMERGENCY PREPAREDNESS 1 GENERAL 3 2 EMERGENCY RESPONSE REQUIREMENTS 3 2.1 Emergency plan 3 2.2 Emergency response planning 4 2.3 Emergency organisation

More information

February 13, 2013 EA

February 13, 2013 EA EA-12-222 February 13, 2013 Mr. Danny L. Pace President, GPU Nuclear, Inc. FirstEnergy Corporation Mail Stop: A-WAC-A3 341 White Pond Drive Akron, OH 44320 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT

More information

Planning and Preparedness for Radiological Emergencies at Nuclear Power Stations

Planning and Preparedness for Radiological Emergencies at Nuclear Power Stations Planning and Preparedness for Radiological Emergencies at Nuclear Power Stations Rebecca Thomson and Julie Muzzarelli Decision and Information Sciences Division Argonne National Laboratory The Radiological

More information

Qualifications for University Radiation Safety Officer

Qualifications for University Radiation Safety Officer Standards of Qualification and Practice (SQ/P) Qualifications for University Radiation Safety Officer RSO Section American Academy of Health Physics and Radiation Safety Operations Section of the Health

More information

February 12, Dear Mr. Griffin:

February 12, Dear Mr. Griffin: February 12, 2003 Michael L. Griffin Manager of Environmental and Regulatory Affairs Crow Butte Resources, Inc. 86 Crow Butte Road Post Office Box 169 Crawford, NE 69339-0169 SUBJECT: LICENSE AMENDMENT

More information

United States District Court

United States District Court Case 1:17-mj-00024-BKE Document 5 Filed 06/05/17 Page 1 of 1 A091(Rcv. 11/1 1) Criminal Complaint United States District Court for the Southern District of Georgia United States of America V. REALITY LEIGH

More information

NRC REGULATORY ISSUE SUMMARY RADIATION SAFETY OFFICERS FOR MEDICAL-USE LICENSES UNDER 10 CFR PART 35

NRC REGULATORY ISSUE SUMMARY RADIATION SAFETY OFFICERS FOR MEDICAL-USE LICENSES UNDER 10 CFR PART 35 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC 20555 [September 09, 2010] NRC REGULATORY ISSUE SUMMARY 2010-09 RADIATION SAFETY OFFICERS FOR

More information

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 12, June 19, 2017 -1.1 SUBCHAPTER 1. GENERAL PROVISIONS 5:12-1.1 Title and citation This regulation shall be known and may be cited as N.J.A.C. 5:12, Ski Lifts. Page 2 of 30 N.J.A.C. 5:12-1.2 SUBCHAPTER 1. GENERAL PROVISIONS

More information

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES CONDUCTED IN JAPAN

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES CONDUCTED IN JAPAN IAEA-2012 ORIGINAL: English IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES CONDUCTED IN JAPAN Tokyo and Ohi, Japan 23 31 January

More information

GAO NUCLEAR REGULATION. Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed

GAO NUCLEAR REGULATION. Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed GAO United States General Accounting Office Report to Congressional Requesters July 2001 NUCLEAR REGULATION Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed

More information

U.S. Nuclear Regulatory Commission

U.S. Nuclear Regulatory Commission NRC: Health Physics Questions and Answers Page 1 of 15 U.S. Nuclear Regulatory Commission [ Index of Health Physics Questions and Answers NRC Home Page ] Question 26 (a): There has been some confusion

More information

HEALTH P H Y S I C S SOCIETY

HEALTH P H Y S I C S SOCIETY HEALTH P H Y S I C S SOCIETY Specialists in Radiation Safety June 13, 2017 Cindy Bladey Office of Administration U.S. Nuclear Regulatory Commission Mail Stop: OWFN 12 H08 Washington, DC20555 0001 Eric

More information

April 4, 2001 SUBJECT: LICENSE AMENDMENT 10, ADMINISTRATIVE CHANGES, CROW BUTTE RESOURCES IN SITU LEACH FACILITY, LICENSE NO.

April 4, 2001 SUBJECT: LICENSE AMENDMENT 10, ADMINISTRATIVE CHANGES, CROW BUTTE RESOURCES IN SITU LEACH FACILITY, LICENSE NO. April 4, 2001 Mr. Micheal Griffin, Manager Crow Butte Resources, Inc. 1670 Broadway Suite 3450 Denver, CO 80202 SUBJECT: LICENSE AMENDMENT 10, ADMINISTRATIVE CHANGES, CROW BUTTE RESOURCES IN SITU LEACH

More information

CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL

CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL February 2017 1 TRANSPORTATION, ENGINEERING, & DEVELOPMENT (TED) BUSINESS GROUP Use this

More information

DOE N /29/95 Expires: [1 year after initiation]

DOE N /29/95 Expires: [1 year after initiation] DOE N 441.1 SUBJECT: RADIOLOGICAL PROTECTION FOR DOE ACTIVITIES 9/29/95 Expires: [1 year after initiation] The Department of Energy (DOE) undertook an initiative to reduce the burden of unnecessary, repetitive,

More information

OVERVIEW OF THE NRC'S CONSOLIDATED NMSS DECOMMISSIONING GUIDANCE

OVERVIEW OF THE NRC'S CONSOLIDATED NMSS DECOMMISSIONING GUIDANCE OVERVIEW OF THE NRC'S CONSOLIDATED NMSS DECOMMISSIONING GUIDANCE D. W. Schmidt, K. L. Banovac, T. L. Fredrichs, J. C. Shepherd, T. B. Smith U.S. Nuclear Regulatory Commission Washington, DC 20555, U.S.A.

More information

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations This document is scheduled to be published in the Federal Register on 02/13/2017 and available online at https://federalregister.gov/d/2017-02885, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

Nuclear Safety Charter

Nuclear Safety Charter Nuclear Safety Charter NUCLEAR SAFETY: AN ABSOLUTE REQUIREMENT The preservation of the highest safety level always constituted for AREVA an absolute requirement: this is the case for the safety of our

More information

Clinical Implementation of a High Dose Rate Brachytherapy Program. Hania Al Hallaq, Ph.D. Jacqueline Esthappan, Ph.D. Joann Prisciandaro, Ph.D.

Clinical Implementation of a High Dose Rate Brachytherapy Program. Hania Al Hallaq, Ph.D. Jacqueline Esthappan, Ph.D. Joann Prisciandaro, Ph.D. Clinical Implementation of a High Dose Rate Brachytherapy Program Hania Al Hallaq, Ph.D. Jacqueline Esthappan, Ph.D. Joann Prisciandaro, Ph.D. Learning Objectives Summarize national and international safety

More information

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN I. STATE AUTHORITIES AND REFERENCES South Carolina Constitution South Carolina Code of Laws, Title 1, Chapter 9 (Emergency Interim Executive

More information

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services Request for Qualifications and Proposals (RFQ/P) #564 for Program and Construction Management Services OXNARD UNION HIGH SCHOOL DISTRICT NOTICE INVITING QUALIFICATIONS and PROPOSALS NOTICE IS HEREBY given

More information

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014 2014 Oklahoma Seminar Tulsa, Oklahoma November 2014 Contact Information Wayne St. Germain Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email:

More information

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES ORDER DOE O 425.1D Approved: VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 425.1D 1 VERIFICATION OF READINESS

More information

NRC INSPECTION MANUAL IRIB

NRC INSPECTION MANUAL IRIB NRC INSPECTION MANUAL IRIB MANUAL CHAPTER 2517 WATTS BAR UNIT 2 CONSTRUCTION INSPECTION PROGRAM 2517-01 PURPOSE...1 2517-02 OBJECTIVES...1 2517-03 APPLICABILITY...2 2517-04 DEFINITIONS...2 2517-05 RESPONSIBILITIES

More information

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM SAFEGUARDS INFORMATION-MODIFIED HANDLING UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NUCLEAR MATERIALS SAFETY AND SAFEGUARDS WASHINGTON. D.C. 20555-0001 July

More information

NUCLEAR REGULATORY UPDATE

NUCLEAR REGULATORY UPDATE NUCLEAR REGULATORY UPDATE Paul M. Bessette Grant W. Eskelsen Ryan K. Lighty July 25, 2017 2015 Morgan, Lewis & Bockius LLP AGENDA 1 2 3 4 5 6 7 Decommissioning Spotlight Enforcement Trends Severe Accident

More information

Current Situation of TEPCO s Nuclear Power Plants. February 7,2003 Tokyo Electric Power Company Katsutoshi Chikudate Managing Director

Current Situation of TEPCO s Nuclear Power Plants. February 7,2003 Tokyo Electric Power Company Katsutoshi Chikudate Managing Director Current Situation of TEPCO s Nuclear Power Plants February 7,2003 Tokyo Electric Power Company Katsutoshi Chikudate Managing Director Contents Events Leading to the Shutdown of Nuclear Power Plants Current

More information

PWROG Severe Accident Management Guidelines Development and Status

PWROG Severe Accident Management Guidelines Development and Status Westinghouse Non-Proprietary Class 3 2017 Westinghouse Electric Company LLC. All Rights Reserved. PWROG Severe Accident Management Guidelines Development and Status R. Prior RP Safety Consulting Consultant

More information

Brachytherapy-Radiopharmaceutical Therapy Quality Management Program. Rev Date: Feb

Brachytherapy-Radiopharmaceutical Therapy Quality Management Program. Rev Date: Feb Section I outlines definitions, reporting, auditing and general requirements of the QMP program while Section II describes the QMP implementation for each therapeutic modality. Recommendations are expressed

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF BONANZA CREEK ENERGY OPERATING COMPANY LLC FOR AN ORDER AUTHORIZING THE DRILLING OF UP TO TEN

More information

Incident Reporting, Notification, and Review Procedure

Incident Reporting, Notification, and Review Procedure Incident Reporting, Notification, and Review Procedure 1. Purpose and Scope 1.1. The purpose of this procedure is to require incident reporting and notification and to aid the University of Notre Dame

More information

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning Regulatory Activities Related to Power Reactors Transitioning to Decommissioning Category 2 Public Meeting with NEI/Industry Representatives April 23, 2015 1 Agenda 13:00 Meeting Kickoff - Bill Huffman

More information

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants NAVSEA STANDARD ITEM ITEM NO: 009-01 DATE: 01 OCT 2017 CATEGORY: I 1. SCOPE: 1.1 Title: General Criteria; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 40 CFR Part 61, National Emission Standards for

More information

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants NUREG-0654/FEMA-REP-1, Rev. 2 (Draft) May 2015 NUREG-0654/FEMA-REP-1,

More information

Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval

Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval Committed to Nudcea r : NMC Praire Island Nuclear Generating Plant Operated by Nuclear Management Company, LLC L-PI-04-044 MAR 3 0 203 10 CFR 50.55a U S Nuclear Regulatory Commission ATTN: Document Control

More information

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE NUCLEAR REGULATORY COMMISSION

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE NUCLEAR REGULATORY COMMISSION UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE NUCLEAR REGULATORY COMMISSION In the Matter of Docket Nos. 52-025-COL & Southern Nuclear Operating Company, Inc. 52-026-COL Combined License

More information

Department of Defense INSTRUCTION. Occupational Ionizing Radiation Protection Program

Department of Defense INSTRUCTION. Occupational Ionizing Radiation Protection Program Department of Defense INSTRUCTION NUMBER 6055.08 December 15, 2009 Incorporating Change 1, November 17, 2017 USD(AT&L) SUBJECT: Occupational Ionizing Radiation Protection Program References: See Enclosure

More information

Radiation protection and public health of nuclear professionals and the public living in the vicinity of radiation hazardous facilities in Russia

Radiation protection and public health of nuclear professionals and the public living in the vicinity of radiation hazardous facilities in Russia Federal Medical Biological Agency Radiation protection and public health of nuclear professionals and the public living in the vicinity of radiation hazardous facilities in Russia Vladimir Romanov 1 Table

More information

Topical Peer Reviews, ARTEMIS and other Approaches to Peer Review

Topical Peer Reviews, ARTEMIS and other Approaches to Peer Review 2015 European Nuclear Safety Conference Topical Peer Reviews, ARTEMIS and other Approaches to Peer Review 29 June 2015 Kun-Woo Cho kwcho@kins.re.kr Senior Advisor Korea Institute of Nuclear Safety Contents

More information

Regulatory framework and safety requirements for new (gen III) reactors

Regulatory framework and safety requirements for new (gen III) reactors Regulatory framework and safety requirements for new (gen III) reactors Sophie MOURLON Deputy director general Autorité de sûreté nucléaire (ASN) France Oct 2014 ASN - Atoms for the Future 2014 1 ASN Nuclear

More information

DELAWARE STATE HOUSING AUTHORITY (DSHA) FY18 DELAWARE CDBG APPLICATION FORM. A. Name, address, phone number, DUNS number, and EIN number of Applicant:

DELAWARE STATE HOUSING AUTHORITY (DSHA) FY18 DELAWARE CDBG APPLICATION FORM. A. Name, address, phone number, DUNS number, and EIN number of Applicant: I. General Application Information DELAWARE STATE HOUSING AUTHORITY (DSHA) FY18 DELAWARE CDBG APPLICATION FORM A. Name, address, phone number, DUNS number, and EIN number of Applicant: B. Name, position

More information

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN I. STATE AUTHORITIES AND REFERENCES South Carolina Constitution South Carolina Code of Laws, Title 1, Chapter 9 (Emergency Interim Executive

More information

NRC REGULATORY ISSUE SUMMARY CONTROL OF RADIATION DOSE TO VISITORS OF HOSPITAL PATIENTS

NRC REGULATORY ISSUE SUMMARY CONTROL OF RADIATION DOSE TO VISITORS OF HOSPITAL PATIENTS UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, D.C. 20555 November 23, 2005 NRC REGULATORY ISSUE SUMMARY 2005-24 CONTROL OF RADIATION DOSE TO VISITORS

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 0001 July 7, 2011 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT:

More information

NOMINATING PETITION FOR NOVEMBER SCHOOL ELECTION

NOMINATING PETITION FOR NOVEMBER SCHOOL ELECTION NOMINATING PETITION FOR NOVEMBER SCHOOL ELECTION PETITION MUST BE FILED WITH COUNTY CLERK S OFFICE ELECTIONS DIVISION One Bergen County Plaza Room 130, Hackensack, NJ 07601 On or before 4:00 PM on the

More information

NUCLEAR REGULATORY COMMISSION [NRC ] Dry Storage and Transportation of High Burnup Spent Nuclear Fuel

NUCLEAR REGULATORY COMMISSION [NRC ] Dry Storage and Transportation of High Burnup Spent Nuclear Fuel This document is scheduled to be published in the Federal Register on 08/09/2018 and available online at https://federalregister.gov/d/2018-16994, and on govinfo.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

University of Maryland Baltimore. Radiation Safety Procedure

University of Maryland Baltimore. Radiation Safety Procedure University of Maryland Baltimore Procedure Number: 1.1 Radiation Safety Procedure Title: Radiation Safety Program Organization and Administration Revision Number: 0 Technical Review and Approval: Radiation

More information

Fundamental Principles

Fundamental Principles Title of document ONR GUIDE Fundamental Principles Document Type: Unique Document ID and Revision No: Nuclear Safety Technical Assessment Guide NS-TAST-GD-004 Revision 5 Date Issued: April 2016 Review

More information

REGISTERED DIETITIAN

REGISTERED DIETITIAN REQUEST FOR PROPOSAL (RFP) BID #HS-018-03 REGISTERED DIETITIAN FOR MOBILE COMMUNITY ACTION, INC. 461 Donald Street Mobile, Alabama 36617 Phone: 251-457-5700 Fax: 251-456-4239 DEADLINE FOR RESPONSES: 4:00pm

More information