1 AGENDA GRP REVIEW COMMITTEE SPECIAL MEETING MONDAY, OCTOBER 28, :00 P.M. (NOON) EXECUTIVE BOARD ROOM SAN JACINTO RIVER AUTHORITY G&A BUILDING 1577 DAM SITE ROAD, CONROE, TEXAS CALL TO ORDER 2. APPROVAL OF MINUTES Regular meeting of September 23, 2013, and Special Meeting of October 1, GRP ITEMS FOR CONSIDERATION BY THE SJRA BOARD ON OCTOBER 31, 2013: a. Consider authorizing General Manager to execute Work Order No. 10 for Supplemental Field Investigations for Surface Water Transmission Line, Segment W2 for the GRP Program b. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line, Segment C1A for the GRP Program c. Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1A for the GRP Program d. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line, Segment C1B for the GRP Program e. Consider authorizing General Manager to execute Work Order No. 7 for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1B for the GRP Program f. Consider authorizing General Manager to execute Change Order No. 1 for Surface Water Transmission Line, Segment W2A for the GRP Program g. Consider authorizing General Manager to execute Amendment No. 1 to Work Order No. 2 for Construction Management and Inspection Services for Accelerated Construction of Surface Water Transmission System, Segment W2A for the GRP Program h. Consider authorizing General Manager to execute Work Order No. 3 for Additional Services during Construction for GRP Program
2 i. Authorize the General Manager, or his designee, to execute letter(s) of assurance to Lone Star Groundwater Conservation District as requested, and approve the GRP Contract as presented and authorize the execution of same by the General Manager 4. PRESENTATION REGARDING SJRA WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS 5. PRESENTATION REGARDING INITIAL TESTING, COMMISSIONING AND STARTUP CONCEPT FOR GRP SURFACE WATER FACILITY 6. UPDATE REGARDING GRP DIVISION 7. DISCUSSION REGARDING FUTURE AGENDA ITEMS 8. FUTURE MEETING SCHEDULE No scheduled meeting in November December 9, TOUR OF SURFACE WATER FACILITIES 10. ADJOURN Persons with disabilities who plan to attend this meeting and would like to request auxiliary aids or services are requested to contact Cynthia Bowman at (936) at least three business days prior to the meeting so that appropriate arrangements can be made.
3 GRP REVIEW COMMITTEE MINUTES OF REGULAR MEETING SEPTEMBER 23, 2013 A regular meeting of the San Jacinto River Authority GRP Review Committee was held at 12:00 p.m., September 23, 2013, at the San Jacinto River Authority G&A Building located at 1577 Dam Site Road, Conroe, Texas Chairman Troy Morris and committee members Jackie Chance, Jason Miller, Mike Mooney, Art Faiello and Al Newton were present. 1. CALL TO ORDER The meeting was called to order at 12:00 p.m. 2. APPROVAL OF MINUTES Committee member Mooney made a motion to approve the minutes of August 19, 2013, with two corrections as mentioned by Chairman Morris. The motion was seconded by Committee member Faiello, with all present voting aye, 3. GRP ITEMS FOR CONSIDERATION BY THE SJRA BOARD ON SEPTEMBER 26, 2013: GRP Division Manager Mark Smith presented information regarding items 3 a through 3 c. a. Consider authorizing General Manager to execute Amendment No. 3 to Work Order No. 2 for land/easement acquisition support services for the GRP Program b. Consider authorizing General Manager to approve additional expenditures for legal representation, including professional appraisal services, for land/easement acquisition for the GRP Program c. Consider authorizing General Manager to approve Amendment No. 4 to Professional Services Agreement for land/easement acquisition support for the GRP Program Committee member Newton made a motion to recommend approval of items 3 a through 3 c, with a second from Committee member Chance. The motion passed unanimously to recommend the items for approval by the SJRA Board of Directors. GRP Division Manager then presented information regarding items 3 d through 3 n. d. Consider authorizing General Manager to execute Work Order No. 9 for Preliminary and Final Design, Procurement, Topographic Survey, Metes and Bounds, and Geotechnical Investigation of Communications Conduit and Ground Boxes for GRP Program e. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line Segment C2 for the GRP Program f. Consider authorizing General Manager to execute Work Order No. 7 for Construction Phase Services during the Construction of Surface Water Transmission Line Segment C2 for the GRP Program
4 g. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line Segment C3 for the GRP Program h. Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services during the Construction of Surface Water Transmission Line Segment C3 for the GRP Program i. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line Segment C4 for the GRP Program j. Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services during the Construction of Surface Water Transmission Line Segment C4 for the GRP Program k. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission Line Segment W4 for the GRP Program l. Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services during the Construction of Surface Water Transmission Line Segment W4 for the GRP Program m. Consider authorizing General Manager to execute Construction Contract for Surface Water Transmission North Water Receiving Facilities for the GRP Program n. Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services during the Construction of Surface Water Transmission North Water Receiving Facilities for the GRP Program Committee member Faiello made a motion to recommend approval of items 3 d through 3 n. The motion was seconded by Committee member Mooney and passed unanimously to recommend the items for approval by the SJRA Board of Directors. Mr. Smith presented information with regard to item 3 o, stating that the consultant will develop a utility financial planning and rate model for the GRP Division. o. Consider authorizing General Manager to execute Professional Services Agreement and Work Order No. 1 for GRP Rate Study for the GRP Program Committee member Faiello moved to recommend approval with a second from Committee member Newton. The motion passed with all present voting aye to recommend the item for approval by the SJRA Board of Directors. 4. UPDATE REGARDING GRP DIVISION Construction Manager Phil Smith updated the committee on the current Surface Water Facilities construction project. Project Manager Doug Haude also updated the committee on the current Transmission Line System construction projects. Mr. Mark Smith gave an overview of the GRP Monthly Report for August. He also stated that SJRA staff continued to visit merchants informing them of upcoming construction in the area.
5 5. DISCUSSION REGARDING FUTURE AGENDA ITEMS Mr. Smith stated that MUD 99/115 supplemental agreement will be coming before the committee possibly next month. Also mentioned was an upcoming request from MSEC to increase the daily rate of water supplied by SJRA in the near future. The upcoming election and next month s compliance report by Compliance Supervisor Matt Corley was also mentioned. 6. DISCUSSION REGARDING FUTURE MEETING SCHEDULE It was announced that the upcoming GRP Review Committee meetings would be held on the following dates: October 28, 2013, and December 9, ADJOURN With no objection, the meeting was adjourned at 1:10 p.m. Cynthia A. Bowman Executive Administrative Specialist Mark Smith GRP Program Administrator
6 GRP REVIEW COMMITTEE MINUTES OF SPECIAL MEETING OCTOBER 1, 2013 A special meeting of the San Jacinto River Authority GRP Review Committee was held at 10:00 a.m., October 1, 2013, at the San Jacinto River Authority G&A Building located at 1577 Dam Site Road, Conroe, Texas Chairman Troy Morris and committee members Jackie Chance, Jason Miller, Mike Mooney, Art Faiello and Al Newton were present. 1. CALL TO ORDER The meeting was called to order at 10:00 a.m. 2. GRP Division Manager Mark Smith presented information regarding options to accelerate construction of Water Transmission Segment W2A for the GRP Program from Shadowbend to Grogan's Mill Road, and the issuance of a work change directive in connection therewith. Jim Stinson with WJPA and Matt Beasley with Precinct Three were in attendance and commented on the item. Committee member Miller and Committee member Faiello stated that they were not prepared to vote on the recommendation today. They stated that they would have liked to have had time to consult with their constituents. Both stated that they are in favor of helping small business, but feel The Woodlands should have some financial responsibility. After further discussion, Committee member Chance made a motion to recommend approval of options to accelerate construction of Water Transmission Segment W2A for the GRP Program from Shadowbend to Grogans Mill Road, and the issuance of a work change directive in connection, therewith. Committee member Newton seconded the motion. The motion carried with 3 ayes (Committee members Chance, Newton, Mooney) and 2 nays (Committee members Faiello and Miller) to recommend the item for approval by the SJRA Board of Directors. 3. ADJOURN Without objection, the meeting was adjourned at 10:45 a.m. Cynthia A. Bowman Executive Administrative Specialist Mark Smith GRP Division Manager
7 GRP Review Committee Item 3a 5i. Consider authorizing General Manager to execute Work Order No. 10 for Supplemental Field Investigations for Surface Water Transmission Line, Segment W2 for the GRP Program 10/31/2013 Binkley & Barfield, Inc. Surface Water Transmission System, Segment W2 Professional Engineering Services Professional Services Work Order Agreement (Contract No ) Work Order No. 10 provides for all of the services required to perform field investigations and the preparation and submittal of a fault study report to supplement the Phase 1 Fault Study performed on Surface Water Transmission Line Segment W2. The need to perform this study was identified in conjunction with information that has recently become available regarding the potential location/extent of the Panther Branch fault. Key Deliverable(s): Due Date(s): Fault Study Documentation December 2, 2013 Type of Compensation (WO No. 10): Cost Plus Multiplier with Not-to-Exceed Total Amount: $4, Construction Cost: $31,450, Anticipated Completion Date: December 2, 2013 Authorize the General Manager to execute Work Order No. 10 for $4, with Binkley & Barfield, Inc., for Supplemental Field Investigations for Surface Water Transmission Line, Segment W2 for the GRP Program.
8 GRP Review Committee Item 3b 9a Consider authorizing General Manager to execute Construction Contract for 10/31/2013 Surface Water Transmission Line, Segment C1A for the GRP Program Garney Companies, Inc. Surface Water Transmission System, Segment C1A Water Line and Fiber Optic Conduit Construction Standard Construction Agreement (Contract No ) The construction contract provides for all of the labor, materials, and equipment required to construct the proposed Surface Water Transmission System, Segment C1A. Segment C1A includes approximately 10,300 L.F. of 42 transmission line and 3 fiber optic conduit to be installed from the Surface Water Facilities site, east along the GRP Surface Water Facilities access road and across Longmire Road, to Segment C2. (Note: The Competitive Sealed Proposal (CSP) procurement method was used for this project. A mandatory preproposal conference was held on May 21, Proposals were received and publicly opened on September 17, A selection committee evaluated the Proposals based on criteria detailed in the associated Request for Proposals [RFP] and recommended the Highest Ranked Offeror for award of the construction contract.) No. Proposals Received / Proposal Receipt Date: Three (3) / September 17, 2013 Highest Ranked Offeror / Proposed Cost: Second Ranked Offeror / Proposed Cost: Third Ranked Offeror / Proposed Cost: Engineer: Garney / $3,837, (95.06 Pts.) S.J. Louis / $3,753, (91.56 Pts.) E.P. Brady / $4,060, (89.25 Pts.) Dannenbaum Engineering Corporation Proposal Amount: $3,837, Engineer s Estimate: $6,911, Contract Days: 300 Calendar Days Authorize General Manager to execute Construction Contract for $3,837, with Garney Companies, Inc., for Surface Water Transmission Line, Segment C1A for the GRP Program and contract modifications up to $75,000. GRP REVIEW COMMITTEE ITEM NO. 3b
9 GRP Review Committee Item 3c 9b Consider authorizing General Manager to execute Work Order No. 6 for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1A for the GRP Program 10/31/2013 Dannenbaum Engineering Corporation Surface Water Transmission System, Segment C1A Professional Engineering Services Professional Services Work Order Agreement (Contract No ) Work Order No. 6 provides for professional engineering construction phase services (CPS) for the Surface Water Transmission System, Segment C1A. Work Order No. 6 services generally include the review and documentation of contractor and SJRA requests for information, baseline schedule, change proposals, shop drawings, and claims; attendance at scheduled and unscheduled meetings; and site observations. Work Order No. 6 also includes the preparation of record drawings. Key Deliverable(s): Site Visit Progress Reports Shop Drawing/Sample Submittals Requests for Information Crossing Permits to Contractor Record Drawings Substantial and Final Inspection Punch Lists Type of Compensation (WO No. 6): Due Date(s): Three (3) calendar days following visit Within 14 days of receipt Within three (3) days of receipt As required prior to Construction 45 calendar days after receipt Within seven (7) days after inspection Cost Plus Multiplier with Not-to-Exceed Total Amount: $90, Construction Cost: $3,837, Anticipated Completion Date: October 8, 2014 Authorize the General Manager to execute Work Order No. 6 for $90, with Dannenbaum Engineering Corporation for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1A for the GRP Program.
10 GRP Review Committee Item 3d 9c Consider authorizing General Manager to execute Construction Contract for 10/31/2013 Surface Water Transmission Line, Segment C1B for the GRP Program E.P. Brady, Ltd. Surface Water Transmission System, Segment C1B Water Line and Fiber Optic Conduit Construction Standard Construction Agreement (Contract No ) The construction contract provides for all of the labor, materials, and equipment required to construct the proposed Surface Water Transmission System, Segment C1B. Segment C1B includes approximately 2,500 L.F. of 16 transmission line and 3 fiber optic conduit to be installed along Longmire Road from Segment C1A at the GRP Surface Water Facilities access road entrance south to City of Conroe Water Plant No. 14. (Note: The Competitive Sealed Proposal (CSP) procurement method was used for this project. A mandatory preproposal conference was held on August 20, Proposals were received and publicly opened on September 3, A selection committee evaluated the Proposals based on criteria detailed in the associated Request for Proposals [RFP] and recommended the Highest Ranked Offeror for award of the construction contract.) No. Proposals Received / Proposal Receipt Date: Two (2) / September 3, 2013 Highest Ranked Offeror / Proposed Cost: Second Ranked Offeror / Proposed Cost: Third Ranked Offeror / Proposed Cost: Engineer: E.P. Brady / $683, (82.01 Pts.) American Site Builders / $540, (72.50 Pts.) N/A / N/A (N/A Pts.) Dannenbaum Engineering Corporation. Proposal Amount: $683, Engineer s Estimate: $703, Contract Days: 180 Calendar Days Authorize General Manager to execute Construction Contract for $683, with E.P. Brady, Ltd., for Surface Water Transmission Line, Segment C1B for the GRP Program and contract modifications up to $75,000.
11 GRP Review Committee Item 3e 9d Consider authorizing General Manager to execute Work Order No. 7 for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1B for the GRP Program 10/31/2013 Dannenbaum Engineering Corporation Surface Water Transmission System, Segment C1B Professional Engineering Services Professional Services Work Order Agreement (Contract No ) Work Order No. 7 provides for professional engineering construction phase services (CPS) for the Surface Water Transmission System, Segment C1B. Work Order No. 7 services generally include the review and documentation of contractor and SJRA requests for information, baseline schedule, change proposals, shop drawings, and claims; attendance at scheduled and unscheduled meetings; and site observations. Work Order No. 7 also includes the preparation of record drawings. Key Deliverable(s): Site Visit Progress Reports Shop Drawing/Sample Submittals Requests for Information Crossing Permits to Contractor Record Drawings Substantial and Final Inspection Punch Lists Type of Compensation (WO No. 7): Due Date(s): Three (3) calendar days following visit Within 14 days of receipt Within three (3) days of receipt As required prior to Construction 45 calendar days after receipt Within seven (7) days after inspection Cost Plus Multiplier with Not-to-Exceed Total Amount: $55, Construction Cost: $683, Anticipated Completion Date: June 11, 2014 Authorize the General Manager to execute Work Order No. 7 for $55, with Dannenbaum Engineering Corporation for Construction Phase Services by Design Consultant during Construction of Surface Water Transmission Line, Segment C1B for the GRP Program.
12 GRP Review Committee Item 3f 9e Consider authorizing General Manager to execute Change Order No. 1 for Surface 10/31/2013 Water Transmission Line, Segment W2A for the GRP Program Texas Sterling Construction Co. Surface Water Transmission System, Segment W2A Water Line and Fiber Optic Conduit Construction Standard Construction Agreement (Contract No ) The previously approved construction contract provides for all of the labor, materials, and equipment required to construct the indicated portion of Surface Water Transmission System, Segment W2A not later than October, Change Order No. 1 provides for all of the labor, materials, and equipment required to accelerate that portion of Surface Water Transmission Line, Segment W2A between Grogans Mill Road and Shadow Bend Place along Research Forest Drive. Change Order No. 1 accelerates planned work activities to complete by January 1, The work including the tunnel under Lake Woodlands, air relief valves, and transmission line testing and chlorination activities shall be exempt from the January 1, 2014 completion date requirement. Work Change Directive No. 1 for this work was approved by the SJRA Board on October 3, Original Contract Amount: $15,288, (Board Approved May 23, 2013) Change Order No. 1 Amount: $1,051, Revised Contract Amount: $16,340, Original Contract Days: Requested Additional Calendar Days: Revised Total Contract Days: 500 Calendar Days 0 Calendar Days 500 Calendar Days Authorize General Manager to execute Change Order No. 1 for $1,051, with Texas Sterling Construction Co. for Surface Water Transmission Line, Segment W2A for the GRP Program.
13 GRP Review Committee Item 3g 9f Consider authorizing General Manager to execute Amendment No. 1 to Work Order No. 2 for Construction Management and Inspection Services for Accelerated Construction of Surface Water Transmission System, Segment W2A for the GRP Program 10/31/2013 Kellogg Brown & Root Services, Inc. Surface Water Transmission System, Segment W2A Professional Engineering Services Professional Services Work Order No. 2 Agreement (Contract No ) Amendment No. 1 to Work Order No. 2 provides for non-normal work day/hour construction inspection services to coincide with the acceleration of Surface Water Transmission System, Segment W2A construction activities, along Research Forest Drive between Shadow Bend Place and Grogans Mill Road. The acceleration of construction activities to 24 hours a-day/7 days a-week, requires the provision of additional construction inspection oversight during the same extended working days/hours as the construction contractor. Key Deliverable(s): Daily Reports Type of Compensation (WO No. 2, AM No. 1): Due Date(s): Within 24 hours of activity Cost Plus Multiplier with Not Exceed Original Fee for Work Order No. 2: $7,590, (Board Approved January 24, 2013) Amendment No. 1 for Work Order No. 2: $ 134, (Recommended Action) Total Amount: $7,724, Construction Cost: Anticipated Completion Date: $165,000, (Est.) January 1, 2014 (This Amendment) Authorize the General Manager to execute Amendment No. 1 to Work Order No. 2 for $134, with Kellogg Brown & Root Services, Inc., for Construction Management and Inspection Services for Accelerated Construction of Surface Water Transmission System, Segment W2A for the GRP Program.
14 GRP Review Committee Item 3h 9g Consider authorizing General Manager to execute Work Order No. 3 for Additional 10/31/2013 Services during Construction for the GRP Program Kellogg Brown & Root Services, Inc. Surface Water Transmission - GRP Program Professional Engineering Services Professional Services Work Order Agreement (Contract No ) Work Order No. 3 provides SJRA s GRP Division and SJRA s Public Relations Department with support personnel, dedicated to providing each with a clear understanding of the planned and actual day-to-day GRP Program Surface Water Transmission System (including Stand Pipe) and Water Receiving Facilities construction activities having an impact on the general public. More specifically, construction activity impacts to the traffic patterns and public events of the City of Conroe, The Woodlands, and other Montgomery County areas in-between. Such services require personnel who understand both construction processes and public relations, and strictly adhere to/follow through on given SJRA public relations related coordination and liaison tasks, internally and externally, as directed by the SJRA. Key Deliverable(s): Two (2) Week Look-Ahead Report Graphic Documents Schedule Interpretations Activity Reports Type of Compensation (WO No. 3 ): Due Date(s): Every Other Friday As Requested by SJRA As Requested by SJRA As Requested by SJRA Cost Plus Multiplier with Not-to-Exceed Total Amount: $398, Construction Cost: $163,000, (Est.) Anticipated Completion Date: September 6, 2015 Authorize the General Manager to execute Work Order No. 3 for $398, with Kellogg Brown & Root Services, Inc., for Additional Services during Construction for the GRP Program.
15 GRP Review Committee Item 3i 9h Authorize the General Manager, or his designee, to execute letter(s) of assurance to Lone Star Groundwater Conservation District as requested, and approve the GRP Contract as presented and authorize the execution of same by the General Manager 10/31/2013 If Lone Star Groundwater Conservation District ( Lone Star ) receives an application for a groundwater well that will withdraw more than 10 million gallons of water per year, the applicant is subject to Lone Star s groundwater reduction rules. When such an application is filed, Lone Star staff requires documentation demonstrating that the applicant will implement a groundwater reduction plan ( GRP ) or join an existing joint GRP. Each of the following has filed such an application with Lone Star and requested that SJRA issue a letter to Lone Star confirming that a contract will be prepared and completed such that the applicant will join SJRA s GRP. 1. Montgomery County MUD No Montgomery County MUD No. 96 (Available backup information is provided) In addition to the above, a contract to join SJRA s GRP (a GRP Contract ) has been prepared for each of the following and Board approval is now requested. Each GRP Contract is provided as backup. None this month. Authorize the General Manager, or his designee, to execute letter(s) of assurance to Lone Star Groundwater Conservation District as requested, and approve the GRP Contract as presented and authorize the execution of same by the General Manager.
San Jacinto River Authority. Board of Directors Meeting June 28, 2018
San Jacinto River Authority Board of Directors Meeting June 28, 2018 AGENDA SAN JACINTO RIVER AUTHORITY THURSDAY, JUNE 28, 2018-8:00 A.M. GENERAL AND ADMINISTRATION BUILDING 1577 DAM SITE ROAD, CONROE,
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019 June 23, 2016 Deadline for proposals is no later
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-7-4 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-7-4 PERMIT REQUIREMENTS AND PROCEDURES TABLE
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 17, 2016 Deadline for proposals is no
More informationTRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS
PIMA ASSOCIATION OF GOVERNMENTS 2014-2016 TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS Proposals may be obtained by contacting: Pima Association of Governments 1 E. Broadway Blvd, Ste.401 Tucson, AZ 85701
More informationMassachusetts School Building Authority. John K. McCarthy Executive Director. Deborah B. Goldberg Chairman, State Treasurer. Procurement Overview
Massachusetts School Building Authority Deborah B. Goldberg Chairman, State Treasurer John K. McCarthy Executive Director Procurement Overview February 5, 2015 Procurement Overview Agenda Introductions
More informationScope of Services The City is seeking consulting services for the following tasks:
REQUEST FOR PROPOSAL (RFP) FOR PROFESSIONAL SERVICES FOR AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES (ATSPM) AND ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS) DEPLOYMENT AND PROJECT MANAGEMENT May 11, 2018
More informationMINUTES OF THE OTTER TAIL COUNTY BOARD OF COMMISSIONERS 515 W.
MINUTES OF THE OTTER TAIL COUNTY BOARD OF COMMISSIONERS Government Services Center, Commissioners Room 515 W. Fir Avenue, Fergus Falls, MN 9:30 a.m. Call to Order The Otter Tail County Board of Commissioners
More informationKERN COUNTY WATER AGENCY CROSS VALLEY CANAL ADVISORY COMMITTEE P. O. Box 58, Bakersfield, California
KERN COUNTY WATER AGENCY CROSS VALLEY CANAL ADVISORY COMMITTEE P. O. Box 58, Bakersfield, California 93302-0058 1. Call to order 1:30 p.m. MEETING NOTICE & AGENDA Stuart T. Pyle Water Resources Center
More informationSAN JUAN COUNTY MARINE RESOURCES COMMITTEE AND CITIZEN S SALMON ADVISORY GROUP MEETING AGENDAS
SAN JUAN COUNTY MARINE RESOURCES COMMITTEE AND CITIZEN S SALMON ADVISORY GROUP MEETING AGENDAS Wednesday, August 3, 2016 Legislative Hearing Room 8:30-10:30 AM 55 Second Street - Friday Harbor, WA 8:30
More informationCITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS
CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design
More informationCall to order at 6:00 pm at the Cascade Town Hall Board Room. All in attendance recited the Pledge of Allegiance.
CASCADE TOWNSHIP OLMSTED COUNTY MINNESOTA BOARD MINUTES April 7, 2014 Call to order at 6:00 pm at the Cascade Town Hall Board Room. All in attendance recited the Pledge of Allegiance. Members present were:
More informationREQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY
More informationOffice of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES
2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but
More informationRegion 2000 Services Authority Campbell County Citizen Services Building 85 Carden Lane Rustburg, VA September 21, :00 p.m.
Region 2000 Services Authority Campbell County Citizen Services Building 85 Carden Lane Rustburg, VA September 21, 2015 2:00 p.m. Meeting Agenda, continued from 8/19/15 1. Welcome... Kim Payne, Chairman
More informationSA CONNECT: REQUEST FOR PROPOSAL (RFP) SCOPE OF SERVICES
I. BACKGROUND AND GENERAL INFORMATION SA CONNECT: REQUEST FOR PROPOSAL (RFP) SCOPE OF SERVICES Facilitated by the San Antonio Economic Development Foundation (SAEDF), SA Connect serves as an interactive
More informationRequest for Proposals for Construction Manager at Risk Watertown Community Center
Request for Proposals for Construction Manager at Risk Watertown Community Center October 29, 2014 City of Watertown, South Dakota Publish: Wednesday, October 29, 2014 Section 1 Advertisement for Proposals
More informationTown of Agawam Community Preservation Committee Application for Funding
Town of Agawam Community Preservation Committee 2015-2016 Application for Funding APPLICATION INSTRUCTIONS AND REVIEW PROCESS The following seven-step process describes the CPC s procedures for reviewing
More informationOkeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements
Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements Request for Qualifications/Proposals PART 1 1.1 PURPOSE The Okeechobee Utility Authority is requesting respondents
More informationTOWN AUDITING SERVICES
REQUEST FOR PROPOSAL TOWN AUDITING SERVICES TOWN OF LONGMEADOW MASSACHUSETTS Saved as: RPF Acct Auditing Services FY 12-14 03/1/11 TOWN OF LONGMEADOW REQUEST FOR PROPOSALS FOR AUDITING SERVICES The Town
More informationCity of Greenfield Arroyo Seco Groundwater Sustainability Agency. Meeting Agenda April 24, :00 P.M.
City of Greenfield Arroyo Seco Groundwater Sustainability Agency 599 El Camino Real Greenfield, CA 93927 Meeting Agenda April 24, 2018 4:00 P.M. Your courtesy is requested to help our meeting run smoothly.
More informationCity of Greenfield Arroyo Seco Groundwater Sustainability Agency. Meeting Agenda October 24, :00 P.M.
City of Greenfield Arroyo Seco Groundwater Sustainability Agency 599 El Camino Real Greenfield, CA 93927 Meeting Agenda October 24, 2017 4:00 P.M. Your courtesy is requested to help our meeting run smoothly.
More informationMaine Turnpike Authority Procurement Policy
I. Statement A. The goal of this policy is to ensure the Authority procures goods and services at the best value for the Authority. B. The Authority has established competitive procurement as the standard
More informationLyndon Township Broadband Implementation Committee Lyndon Township, Michigan
Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan Request for Proposal For Consulting Services For a Fiber-to-the-Home Network In Lyndon Township Proposals may be mailed or delivered
More informationD.R. Michel, Executive (509) or
Upper Columbia United Tribes 25 W. Main, Suite 434 Spokane, WA 99201 Phone: 509-838-1057 Fax: 509-209-2421 Spokane Description Coeur d Alene Colville Kalispel Kootenai Mural at Drumheller Springs Park
More informationArchitectural Services
Architectural Services 2015 Capital Improvement Program Request for Proposal Number: 16-30 Title of the Project: Replacement of Northeast High & Appling Middle School Operations Center - Procurement Office
More informationCOMMUNITY PRESERVATION ACT (CPA)
COMMUNITY PRESERVATION ACT (CPA) COMMUNITY PRESERVATION COMMITTEE (CPC) FREQUENTLY ASKED QUESTIONS AND ANSWERS ABOUT CPC PROCEDURES (As of April 23, 2016) When are meetings scheduled? Meetings are generally
More informationPRE-PROPOSAL CONFERENCE
PRE-PROPOSAL CONFERENCE RFP No. LRT-12-180-TPOT POTHOLING SERVICES FOR TEMPE STREETCAR PROJECT December 1, 2011 Agenda Introductions / Opening Remarks Loralei Poll Project Overview / Scope Roy Alvarado
More informationEXECUTIVE OFFICE FOR ADMINISTRATION AND FINANCE OPERATIONAL SERVICES DIVISION
THE COMMONWEALTH OF MASSACHUSETTS EECUTIVE OFFICE FOR ADMINISTRATION AND FINANCE OPERATIONAL SERVICES DIVISION 1 ASHBURTON PLACE, ROOM 1017 BOSTON, MA 02108 Request for Response (RFR) Document Title: IT
More informationMICHAEL N. FEUER CITY ATTORNEY REPORT RE:
MICHAEL N. FEUER CITY ATTORNEY REPORT RE: R13-0351 REPORTNO.~~ ~ DEC 0 9 2013 DRAFT ORDINANCE FOR THE HAIWEE POWER PLANT PENSTOCK REPLACEMENT PROJECT REQUESTING THE LOS ANGELES CITY COUNCIL TO ESTABLISH
More informationAutomated Airport Parking Project
Automated Airport Parking Project RFP 2017-03 I. INTRODUCTION This solicitation is being offered by Texarkana Airport Authority. The Airport is a public entity owned by the Cities of Texarkana, AR and
More informationSocial Media Management System
REQUEST FOR PROPOSAL No. DC177387P Social Media Management System PROPOSAL DUE DATE AND TIME August 25, 2015 (2:00 AM, PT) SUBMITTAL LOCATION Oregon State University Procurement, Contracts and Materials
More informationCITY OF ALHAMBRA CITY ARTS AND CULTURAL EVENTS COMMITTEE AGENDA
CITY OF ALHAMBRA CITY ARTS AND CULTURAL EVENTS COMMITTEE AGENDA Regular Meeting Wednesday, March 18, 2015, 7:00 pm Alhambra City Hall, 111 South First Street Conference Room A, Second Floor I. ROLL CALL
More informationCITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS
CITY OF BEVERLY HILLS PUBLIC WORKS & TRANSPORTATION DEPARTMENT CIVIL ENGINEERING DIVISION REQUEST FOR PROPOSALS WATER MAIN REPLACEMENT VARIOUS LOCATIONS PREPARED BY: Tristan D. Malabanan, P.E. City of
More informationTOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 38 EFFECTIVE DATE: MAY 1, 2017 REVISION #4: MARCH 1, 2017
SECTION 17.0 PAGE 1 OF 38 CONTRACT PROCUREMENT POLICY The Mississippi Department of Education (Department) Contract Procurement Policy set forth herein applies to the procurement, management, and control
More informationRequest for Proposal
Request for Proposal ************** Acquisition of Powered Air Purifying Respirators (PAPR) Emergency Medical Task Force Infectious Disease Response Unit May 16, 2016 Southwest Texas Regional Advisory
More informationRequest for Proposal
Request for Proposal ************** Acquisition of [16] Zoll AEV 731 Ventilators Texas Emergency Medical Task Force State Coordinating Office 6 April 2018 Southwest Texas Regional Advisory Council 7500
More informationVILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN
VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN Issuing Department: Community Development Department Village of Fox Crossing 2000 Municipal Dr. Project Officer: George L. Dearborn Jr.,
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 1 Date: May 12, 2015 To: All Proposers From: Procurement Office RE: Questions and Answers RFP-DOT-14/15-9030-GH-ReAd: EMERGENCY MANAGEMENT SERVICES Notice
More informationREQUEST FOR PROPOSAL (RFP) PROFESSIONAL AUDITING SERVICES
REQUEST FOR PROPOSAL (RFP) PROFESSIONAL AUDITING SERVICES Kathy Cortner Chief Financial Officer Mojave Water Agency 13846 Conference Center Drive Apple Valley, CA 92307 Issue Date: January 24, 2018 Deadline
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED BRIDGE INSPECTION AND LOAD RATING SERVICES FOR MOVEABLE BRIDGES AND FIXED RAILROAD BRIDGES
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED BRIDGE INSPECTION AND LOAD RATING SERVICES FOR MOVEABLE BRIDGES AND FIXED RAILROAD BRIDGES April 7, 2016 Deadline for
More informationRed River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services.
Red River Valley Water Supply Project Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services June 7, 2018 The Garrison Diversion Conservancy District (Garrison
More informationINSTRUMENTATION TECHNICIAN I/II/III
I/II/III I. Position Identification: A) Title: Instrumentation Technician I/II/III B) Bargaining Unit: Public Employees Union, Local #1 C) Customary Work Hours: Within the hours of 6:00am to 6:00pm D)
More informationNEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID
For DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building RFP # 779 DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building
More informationDOD INSTRUCTION DIRECTOR OF SMALL BUSINESS PROGRAMS (SBP)
DOD INSTRUCTION 5134.04 DIRECTOR OF SMALL BUSINESS PROGRAMS (SBP) Originating Component: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics Effective: December 4, 2017
More informationPRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY
PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY Meeting Overview Sign-In Sheets: Be sure to sign in. Sign-In sheets will be available on
More informationCITY OF CAMARILLO AND CAMARILLO SANITARY DISTRICT WATER AND SEWER RATE STUDIES REQUEST FOR PROPOSAL
CITY OF CAMARILLO AND CAMARILLO SANITARY DISTRICT WATER AND SEWER RATE STUDIES REQUEST FOR PROPOSAL 2011 PREPARED BY THE CITY OF CAMARILLO AND CAMARILLO SANITARY DISTRICT FINANCE DEPARTMENT Ronnie J. Campbell
More informationBUTTE COUNTY DEPARTMENT OF WATER AND RESOURCE CONSERVATION REQUEST FOR PROPOSALS TO
BUTTE COUNTY DEPARTMENT OF WATER AND RESOURCE CONSERVATION REQUEST FOR PROPOSALS TO DEVELOP AN INTEGRATED REGIONAL WATER MANAGEMENT PLAN UNDER THE DIRECTION OF THE NORTHERN SACRAMENTO VALLEY INTEGRATED
More informationRegular Meeting Minutes. Absent: Secretary Tom White, Commissioner Wanda Rentas, Commissioner Michael Harford, and Commissioner Todd Dantzler
I'ohiP 1135 14- r tothoriv% 4 951 Martin Luther King Boulevard, Kissimmee, FL i www. tohowater. com 407. 944. 5000 Present: Board of Supervisors Chairman Bruce Van Meter Executive Director Brian L Wheeler
More informationDesign Build Services Lake Shawnee Junior Pond Improvements
SHAWNEE COUNTY PARKS AND RECREATION REQUEST FOR PROPOSALS Design Build Services Lake Shawnee Junior Pond Improvements Proposal # 023-17 Lake Shawnee Shawnee County Topeka, KS. April 2017 1 PROPOSAL # 023-17
More informationFISCAL & COMPLIANCE AUDITS
REQUEST FOR PROPOSALS THE TRANSPORTATION AGENCY FOR MONTEREY COUNTY (TAMC) INVITES CONSULTANTS TO SUBMIT THEIR PROPOSALS FOR THE: FISCAL & COMPLIANCE AUDITS You are invited to submit your proposal for
More informationREQUEST FOR PROPOSALS: AUDIT SERVICES. Issue Date: February 13 th, Due Date: March 22 nd, 2017
REQUEST FOR PROPOSALS: AUDIT SERVICES Issue Date: February 13 th, 2017 Due Date: March 22 nd, 2017 In order to be considered, proposals must be signed and returned via email to rtan@wested.org by noon
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED SAFETY & TRAINING PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED SAFETY & TRAINING PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 December 7, 2016 Deadline for proposals is no later
More information1/8/2013. IMPORTANT Dates
Purpose Workforce Connections (WC) seeks a Construction Manager at Risk (CMAR) for preconstruction and potential future construction services for the Workforce Connections One Stop Career Center and Administrative
More informationCity of Georgetown, SC REQUEST FOR PROPOSAL
City of Georgetown, SC REQUEST FOR PROPOSAL Engineering Services For North Side Water Storage Tank with 250,000 Gallon Capacity Project # 1508 Due: August 15, 2016 at 3:00 PM EST Release Date: July 18,
More informationCity of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates
Request for Proposal On-Call Plan Check and Inspection Services Released: September 13, 2013 Important Dates Proposal Due: September 27, 2013 Award of Contract: October 2, 2013 Planning and Development
More informationCITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS
CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS ADDENDUM #1 ISSUSED ON May 13, 2005 REQUEST FOR PROPOSALS FOR A NEW VOTING SYSTEM RFP#NVS0305 1) Please add and substitute the following Addendum
More informationREQUEST FOR PROPOSALS FOR INFORMATION TECHNOLOGY SUPPORT SERVICES
REQUEST FOR PROPOSALS FOR INFORMATION TECHNOLOGY SUPPORT SERVICES ISSUE DATE: Bedford Township 8100 Jackman Rd. PO Box H Temperance, Michigan 48182 1 TABLE OF CONTENTS PAGE 1) Introduction 3 2) Sequence
More informationINVITATION TO BID (Request for Proposal)
INVITATION TO BID (Request for Proposal) August 30, 2016 PROJECT Annual Professional Auditing Services for Three Year Term PROJECT DESCRIPTION The Topeka and Shawnee County Public Library is a 21st-century,
More informationSubject: SRRA - DEP proposed rule to eliminate and delay mandatory timeframes inconsistent with legislative intent
October 24, 2010 Subject: SRRA - DEP proposed rule to eliminate and delay mandatory timeframes inconsistent with legislative intent Dear Senator Smith and Assemblyman McKeon: I am writing to you as sponsors
More informationREQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER
REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER For the UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF FACILITIES DESIGN & CONSTRUCTION Issue Date: August 24, 2016 Proposals due: Thursday,
More informationMeeting of the Operations and Oversight Committee Thursday, April 12, :00 a.m. 2nd Floor Board Room 509 E. 18 th Street, Norfolk, VA
Meeting of the Operations and Oversight Committee Thursday, April 12, 2018 10:00 a.m. 2nd Floor Board Room 509 E. 18 th Street, Norfolk, VA A meeting of the Operations and Oversight Committee will be held
More informationRequest for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17
Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17 Introduction: This Request for Proposals (RFP) solicitation is to provide to
More informationRequest for Proposal # SIM LPHA Stigma Reduction Messaging For Tri-County Health Department
Request for Proposal #2016-01-08 SIM LPHA Stigma Reduction Messaging For Tri-County Health Department Physical Address (mailing address): Tri-County Health Department 6162 South Willow Drive, Suite 100
More informationVista Ridge Project Technical Advisor
Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL REQUESTOR: 1134 North Fraser Street Georgetown, SC 29440 Contact: Daniella Howard, Purchasing Agent Email: dhoward@cogsc.com Phone: 843.545.4043 PROJECT: Kaminski Street Proj #1511
More informationSTATE FUNDS AND FISCAL COMPLIANCE POLICIES
STATE FUNDS AND FISCAL COMPLIANCE POLICIES 100.040. USE OF STATE FUNDS The governing body of the A.W. Brown-Fellowship Leadership Academy adopts the following policy which shall be effective on the date
More informationMassachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016
Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority
More informationRequest for Proposals To Provide Engineering Services for the Wastewater Treatment Facility Improvements Project
Request for Proposals To Provide Engineering Services for the Wastewater Treatment Facility Improvements Project City of Dixon City Engineer/ Public Works Department December 2013 The City of Dixon (CITY)
More informationMarshall County Board of Supervisors Regular Session February 6, 2018 at 9:00 a.m. AGENDA
Marshall County Board of Supervisors Regular Session at 9:00 a.m. AGENDA The Board will meet in regular session on Tuesday,, at 9:00 a.m. in the Courthouse, meeting room #2, NE corner, 3 rd floor with
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Public relations support and outreach services for Advanced Water Purification Program PROPOSALS DUE: Friday, December 19, 2014 12:00 p.m. SUBMIT PROPOSALS TO: Melissa McChesney Padre
More informationEL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS January 17, 2017
EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 2-17 January 17, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water-Public Service Board (EPWater) Statement of Work Professional
More informationREQUEST FOR PROPOSALS RFP NO.:
REQUEST FOR PROPOSALS RFP NO.: 11-019 Sealed proposals for a CONSULTANT SERVICES FOR THE HAZARDOUS MATERIALS & CHEMICAL RESPONSE (HAZMAT & CR) PLAN for the Sheriff s Office will be received by Contracts
More informationRequest for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017
Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Attention: Purchasing Agent Address: City School District of Albany 1 Academy
More informationMontgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama REQUEST FOR PROPOSALS RFP WEBSITE DEVELOPMENT AND REDESIGN
Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 REQUEST FOR PROPOSALS RFP 2017-04 WEBSITE DEVELOPMENT AND REDESIGN DATE ISSUED: September 29, 2017 TYPE OF PROJECT: CONTACT
More informationCECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater
PROJECT DESCRIPTION CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater Cecil County Department of Public Works is seeking
More informationRESOLUTION NUMBER 2877
RESOLUTION NUMBER 2877 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PERRIS, STATE OF CALIFORNIA SETTING FORTH POLICIES INTENDED TO OBTAIN CONSISTENCY AND UNIFORMITY IN THE ADMINISTRATION OF THE FEDERALLY
More informationHow to do Business with HISD
EDGAR laws: PART 200--UNIFORM ADMINISTRATIVE REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS Agency: Executive Office of the President, Office of Management and Budget Action:
More informationRequest for Proposal Engineering Consultant for City of Ingleside
Request for Proposal Engineering Consultant for Public Works and Building Services Departments Melissa Byrne Vossmer City Manager August 21, 2017 MAYOR AND CITY COUNCIL Luis Lamas, Mayor Oscar Adame, Mayor
More informationRequest for Proposal(s) Training Business Intelligence with Operational Integration Services
Request for Proposal(s) Training Business Intelligence with Operational Integration Services Statement of Need Kinexus is seeking proposals for a contractor to provide training and consulting on a business
More informationAboriginal Group Communication Plan Annual Report. Site C Clean Energy Project
Aboriginal Group Communication Plan 2015-2016 Annual Report Site C Clean Energy Project Reporting period: June 5, 2015 to May 31, 2016 Date: This page intentionally left blank. Table of Contents 1 2 3
More informationSTATE OF WASHINGTON Request for Quotes and Qualifications
Acquisition Title: Expected Results: Response Due Date: RFQQ Coordinator Information: Bid Submittal: Vendor Eligibility: RFQQ Components: RFQQ #03712 Lean Consultant Services Department of Enterprise Services
More informationREQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019
Board of Commissioners of the Port of New Orleans REQUEST FOR PROPOSALS FOR AS-NEEDED CIVIL ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019 June 30, 2016 Deadline for proposals is no
More informationREQUEST FOR PROPOSALDevelopment of a Local
2012 REQUEST FOR PROPOSALDevelopment of a Local Limits Study Terry Hagen, Director of Public Works City of El Centro 307 West Brighton Avenue El Centro, CA 92243 (760) 337-4505 Request for Proposals Development
More informationDepartment of Defense DIRECTIVE. SUBJECT: Assistant Secretary of Defense for Legislative Affairs (ASD(LA))
Department of Defense DIRECTIVE SUBJECT: Assistant Secretary of Defense for Legislative Affairs (ASD(LA)) NUMBER 5142.01 September 15, 2006 DA&M References: (a) Sections 113 and 138 of title 10, United
More informationTexas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No.
Page 1 of 8 Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. 582-11-13000 Quarter no. 15 From 3/1/2015 Through 5/31/2015.
More informationGOODWILL YOUTHBUILD GED/High School Education Instruction
REQUEST FOR PROPOSALS FOR GOODWILL YOUTHBUILD GED/High School Education Instruction Issued By: Goodwill of the Olympics and Rainier Region YouthBuild Program 714 S 27 th St Tacoma, WA 98372 November 13,
More informationSpecial Approval per TAC Part A - LG Qualifications Statement (Local Government Agency management of project development process elements)
Special Approval per TAC 15.52 Part A - LG Qualifications Statement (Local Government Agency management of project development process elements) Project CSJ: Local government (LG) agencies may manage elements
More informationPUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY
PUBLIC UTILITY DISTRICT NO. 1 OF LEWIS COUNTY Board of Commissioners Meeting March 6, 2018 Public Utility District No. 1 of Lewis County Date Time 3/6/2018 10:00 AM Meeting called by Commissioner Dahlin
More informationORLANDO, FLORIDA October 12, 2004
ORLANDO, FLORIDA October 12, 2004 NON CONSENT ITEM 2 The School Board of Orange County, Florida, met for an agenda review session on Tuesday, October 12, 2004, at 4:45 p.m. Present were: Timothy Shea,
More informationREQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1
REQUEST FOR PROPOSALS Design-Build of General Aviation Terminal Building RFP# AIR/17-012, page 1 RFP# AIR/17-012 REQUEST FOR PROPOSALS ISSUE DATE: November 22, 2017 TITLE: DUE: Design-Build of General
More informationTOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 49 EFFECTIVE DATE: JULY 1, 2018 REVISION #4: JULY 1, 2018
SECTION 17.0 PAGE 1 OF 49 CONTRACT PROCUREMENT POLICY The Mississippi Department of Education s (Department) Contract Procurement Policy set forth herein applies to the procurement, management, and control
More informationNOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING
NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING March 30, 2018 Issued by: X Rob Livick, PE/PLS Public Works Director/City Engineer City
More informationTexas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No.
Page 1 of 8 Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. 582-11-13000 Quarter no. 14 From 12/1/2014 Through
More informationCity of Gainesville State of Georgia
City of Gainesville State of Georgia Request for Proposals RFP No. 18037 Downtown Public Wireless Network Project Proposal Release: May 24, 2018 Pre-Proposal Meeting: June 8, 2018 at 2:30 p.m. EST Proposal
More information1. Request for Proposal Services
1. Request for Proposal Services DAI, implementer of the USAID funded Indonesia Urban Water, Sanitation and Hygiene Penyehatan Lingkungan Untuk Semua (IUWASH PLUS) Project, invites qualified vendors to
More informationTown of Conway, New Hampshire: Request for Proposals Recreation Trails Plan Marshall Conservation Area
Town of Conway, New Hampshire: Request for Proposals Recreation Trails Plan Marshall Conservation Area Project Overview The Town of Conway seeks proposals to prepare and present a comprehensive trails
More informationPurchasing and Support Services County Administration Building 44 N. San Joaquin Street, Suite 540 Stockton, CA 95202
April 19, 2012 TO: ALL PROSPECTIVE BIDDERS FROM: Re: REQUEST FOR PROPOSAL NO. 12-05 FOR SOLID WASTE FACILITIES Ladies and Gentlemen: Enclosed please find an invitation to bid with a bid form, a sample
More informationREQUEST FOR PROPOSALS
COLORADO 1868 REQUEST FOR PROPOSALS PROJECT: Lake Dredging Engineering/Design NOTICE: Wednesday, October 11, 2017 DEADLINE: October 30, 2017 at 4:00 pm PROJECT CONTACT: Alisha Reis, Interim Town Administrator,
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC WATER) REQUEST FOR QUOTE RFQ 18-PR-DIT-27
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC WATER) REQUEST FOR QUOTE RFQ 18-PR-DIT-27 RFQ Number: RFQ 18-PR-DIT-27 Date Issued: Monday, March 5, 2018 Description: Headquarters (HQO) IT Hardware
More information