Day. Defense Daily. Visit us at the SAS Show April Booth 117

Size: px
Start display at page:

Download "Day. Defense Daily. Visit us at the SAS Show April Booth 117"

Transcription

1 SAS Special Show Coverage Day 1 Defense Daily BAE Developing Smaller Version of AGS System For Arleigh Burke-Class Destroyers Program officials at BAE Systems are looking to shrink down the company's naval gun system designed for the Navy s Zumwalt-class destroyer (DDG-1000) and install the smaller version of the weapon system on board the sea service s Arleigh Burke-class warships (DDG-51). The Advanced Gun System-Lite (AGS-Lite) will trim 50 percent of the original AGS design and maintain the same 74 nautical-mile range as its larger counterpart on the DDG-100, while firing the same 155mm round, according to John Perry, manager of business development for advanced systems. A smaller magazine capacity and slower rate of fire are the only real tradeoffs between the AGS-Lite and the larger AGS, Perry said in an April 7 briefing in Arlington, Va. The range of fire provided by both AGS systems dwarfs the 13 nautical mile range of the legacy Mk45 deck gun on the DDG-51 ships, he said. That 74 nautical mile range provided by the AGS-Lite system matches that of the Tomahawk cruise missile, Perry said. At that range, the new deck gun could provide vital ship-to-shore fire support and supplement Tomahawk strikes against targets inland. Currently, program officials have only tested the gun s range up to 60 nautical miles, but are well on track to hit the 74 nautical mile threshold, according to Perry. The AGS-Lite system also features an automated loading system below deck, which replaces the six-man team normally required to load the Mk45 gun, according to the BAE official. While no program of record has been established for the AGS-Lite by the Navy, Perry noted that the Navy s stated requirements for precision fire support, coupled with its decision to truncate the number of DDG-1000s in the fleet, validated the need for the AGS-Lite. The initial AGS was expected to be the main deck gun for the Navy s future fleet of Zumwalt-class destroyers. But after serious cost overruns, the sea service opted to cut its DDG-1000 buy to three ships and fill the remainder of that destroyer requirement with more Arleigh-Burke class boats. Visit us at the SAS Show April Booth 117 Day 1 Monday April 11, 2011 Schedule Of Events 7:30am-5:00pm Attendee Registration Exhibit Hall Level (Hall E) 9:15am Complimentary Attendee Continental Breakfast 9:30am-9:45am Opening Ceremony Escalator Mezzanine 9:45am-5:00pm Exposition Open Exhibit Hall 10:00am-11:15am Service Chief s Panel: Seapower: International Security and America s Future Potomac Ballroom C Moderator: Vice Admiral Phillip M. Balisle, USN (Ret), DRS Technologies, Inc., Senior Vice President, Maritime Strategic Plans and Programs Speakers: Admiral Gary Roughead, USN, Chief of Naval Operations General James F. Amos, USMC, Commandant of the U.S. Marine Corps Admiral Robert J. Papp, Jr., USCG, Commandant of the U.S. Coast Guard The Honorable David T. Matsuda, MARAD, Maritime Administrator 11:00am-5:00pm International Maritime Tours Exhibit Hall 11:25am-11:55am Sea-Air-Space Floor Speaker Navy League of the United States Booth #242 Rear Admiral Jeffrey A. Lemmons, USN, Director for International Engagement Maritime Energy Pavilion Floor Speaker Maritime Energy Theater Booth #213 Mr. John P. Quinn, USN, Deputy Director, Chief of Naval Operations, Energy and Environmental Readiness Division Continued on page by Access Intelligence, LLC. Federal copyright law prohibits unauthorized reproduction by any means and imposes fines of up to $100,000 for violations.

2

3 April 11, 2011 Defense Daily 3 With that decision, it was clear that the current Mk 45 deck gun on board the DDG-51s would have to be replaced with a more advanced version, according to Perry. With millions already invested into the AGS for the DDG-1000, it made sense to simply leverage the lessons learned from the research, development and design work for that system, and move that into the Mk 45 replacement. BAE officials have already completed a successful ship integration study of the new deck gun for the DDG-51, Perry said. The results of that study showed the system to be compatible with the legacy destroyer, in terms of power load requirements, deck profile and below deck space, he said. That said, company officials are on pace to complete final system design and development in the near future, Perry added. n Raytheon Accelerates Deliveries of Sea Sparrow Missiles To Navy, U.S. Allies Missile manufacturer Raytheon [RTN] has ramped up production and deliveries of a key missile system to the U.S. Navy and various American allies in the past year, according to a company statement. The defense industry giant shipped 336 Evolved Sea Sparrow Missile (ESSM) systems to the U.S. military and other foreign armed forces in the past year, it said. That number, it added, nearly doubles the amount of ESSM systems shipped worldwide in The acceleration in ESSM deliveries by Raytheon was driven by customer demand, Rick Nelson, vice president of Naval Weapon Systems at Raytheon Missile Systems, said in the same statement. The ability to produce such quantities of Sea Sparrows to U.S. and international clients was a reflection of the company s robust manufacturing and engineering processes, as well as the ability to leverage its vast network of international partners on the program, Nelson said. That international cooperation comes in the form of the NATO Sea Sparrow Project. Including the United States, project participants include Australia, Belgium, Canada, Denmark, Germany, Greece, The Netherlands, Norway, Portugal, Spain and Turkey. ESSM protects the fleets of the world as a leading solution for layered defense, said Ed Roesly, Raytheon Missile Systems ESSM program director. The delivery milestone is the culmination of nearly four decades of technology and design improvements backed by the NATO partnership, Roesly said. That said, company officials continue to conduct studies to identify improvement opportunities required for ESSM to pace the threat with advanced capabilities, the statement added. ESSM is a medium-range, all-weather, semi-active radar-guided missile used in surface to air and surface to surface roles by the United States and currently deployed by more than 11 international customers. On the Navy side, the ESSM is primarily used for fleet protection on board the service s carrier and surface warfare ships. n Continued from page 1 12:00pm-1:30pm Secretary of the Navy Luncheon Potomac Ballroom A Keynote Speaker: The Honorable Ray Mabus, Secretary of the Navy Presentation of Safety Awards Admiral Vern Clark Safety Awards General James L. Jones Safety Awards 1:45pm-2:15pm Sea-Air-Space Floor Speaker Navy League of the United States Booth #242 Vice Admiral Adam M. Robinson, Jr., USN, United States Navy Surgeon General 2:30pm-4:00pm Professional Development Seminar: Foreign Military Sales, Maritime Security and the Future of International Partnerships Potomac Ballroom C Moderator: Commander Fred Latrash, USN (Ret), ALCOA Defense Vice President, Business Development, Navy & Air Force Programs Speakers: Mr. Richard A. Genaille, Jr., Deputy Director, Defense Security Cooperation Agency Rear Admiral Joseph W. Rixey, USN, Director, Navy International Programs Office Brigadier General Carl E. Mundy, III, USMC, Director, Strategy and Plans Division Mr. Michael Tangora, USCG, Deputy Assistant Commandant for Acquisition Dr. Jennifer Stewart, Ph.D., Chairman of the Foreign Procurement Group 2:45pm-3:15pm Sea-Air-Space Floor Speaker Navy League of the United States Booth #242 Mr. James H. Offut, Navy League of the United States, National Director and Chairman, Maritime Policy Committee 4:15pm-4:45pm Sea-Air-Space Floor Speaker Navy League of the United States Booth #242 Ms. Donna Hopkins, U.S. Department of State, Coordinator, Counter Piracy and Maritime Security, Bureau of Political- Military Affairs 5:00pm-6:30pm International Maritime Reception (Invitation only) 6:30pm-8:30pm SEAPOWER Magazine Reception (Invitation only)

4 4 Defense Daily April 11, 2011 Raytheon Delivers First Phalanx Fleet Defense System To South Korean Navy The South Korean navy took the first steps toward fielding one of the U.S. Navy s premiere fleet defense systems on board their warships, taking delivery of the first Phalanx Close-In Weapon System last week. The Raytheon [RTN]-built Phalanx will allow South Korean ships to take out a myriad of short-range threats, ranging from small vessels to anti-ship missiles in the terminal phase, via a 20mm gun automated to fix, track and destroy such targets, according to a company statement. The first Phalanx gun system, a Block 1B variant, will be installed onto the lead ship of the South Korean navy s new frigate-class, known as the Ulsan-1 class FFX, the statement noted. The new FFX-ship class will replace the current Ulsan and other smaller frigates, and will be used primarily for anti-ship, anti-submarine and anti-aircraft warfare. This initial delivery is the first of six total that Raytheon plans to sell to the South Korean navy. The Block 1B version of the system is the same one on board U.S. Navy ships. Raytheon has yet to lock in the foreign military sale for the additional five Phalanx systems, which are planned to go on board the new FFX frigates, the company statement said. South Korea will join 25 other nations, including the United States, which currently field the Phalanx system., the statement added. Nearly 890 Phalanx systems have been deployed worldwide. The Phalanx system is fully capable of defending against all types of air and surface threats in the naval environment, Rick Nelson, vice president of Raytheon s Naval Weapons Systems, said in the statement. Coupled with the reliability and availability of this world-class system, the South Korean fleet will have the best possible ship self-defense available, he added. Currently, the Phalanx is the only close-in weapon system in the Navy s arsenal capable of autonomously performing its own search, detect, evaluation, track, engage and kill assessment functions, according to a service fact sheet. Additionally, the system can be tied into existing ship combat control systems to provide additional sensor and fire-control support to other installed ship weapon systems, the fact sheet said. n Huntington Ingalls Industries Taps Management Team Huntington Ingalls Industries [HII] last week announced three additions to the company s senior leadership team for its corporate business management and finance office functions. D.R. Wyatt has been promoted to corporate vice president, treasurer; Andy Green has joined the company as corporate vice president, investor relations; and Dwayne Blake has been promoted to corporate vice president internal audit. The three report to Barbara Niland, corporate vice president, business management, and chief financial officer. HII, previously known as Northrop Grumman Shipbuilding, started operating on March 31 as an independent, publicly traded company after being spun off from Northrop Grumman [NOC]. It designs, builds and maintains nuclear and non-nuclear ships for the U.S. Navy and Coast Guard and supplies after-market services for military ships worldwide. The company employs nearly 38,000 in Virginia, Mississippi, Louisiana and California. n DEFENSE DAILY (ISSN ) is published each business day in print and electronically by Access Intelligence, LLC Managing Editor: John Robinson, jrobinson@ accessintel.com Army/International: Ann Roosevelt, aroosevelt@accessintel.com Business: Calvin Biesecker, calvinb21@aol.com Congressional Reporter: Emelie Rutherford, erutherford@accessintel.com General Assignment: BC Kessner, bckessner@mac.com Navy/Marine Corps: Carlo Munoz, cmunoz@accessintel.com Pentagon: Marina Malenic, mmalenic@accessintel.com Editor Emeritus: Norman Baker Director, Production : Tracey Lilly Director of Marketing: Nat Parsons, nparsons@accessintel. com Publisher: Jennifer Green-Holmes, jgreenholmes@accessintel.com SVP & Group Publisher: Jennifer Schwartz, jschwartz@accessintel.com Divisional President: Heather Farley, hfarley@accessintel.com SVP Information Technology: Rob Paciorek President & CEO: Don Pazour To advertise in Defense Daily contact Daniel Chase at dchase@accessintel.com. To subscribe, contact clientservices@accessintel.com or 1(301)

5 Innovation... Delivered. ATK s rapid response systems are the best choice for the most time-critical missions. The AGM-88E Advanced Anti-Radiation Guided Missile (AARGM) and combat-proven AAR-47 missile warning system provide critical, game-changing capabilities for military aircrews.

6 6 Defense Daily April 11, 2011 Raytheon To Begin LRIP Deliveries Of New Radar For P-8 Defense firm Raytheon [RTN] are set to begin low-rate initial production of its new maritime radar system for the Navy's next-generation intelligence, surveillance and reconnaissance aircraft by September. Production and deliveries of the LRIP versions of the company's APY-10 radar system will coincide with the delivery schedule set by the Navy for the Boeing [BA]-built P-8 Poseidon ISR aircraft, Brad Hopper, senior manager for strategy and business development in Raytheon's ISR division, said in an April 6 briefing. "When the Navy contracts Boeing for the [LRIP] aircraft...boeing will contract us," to begin APY-10 deliveries. Currently the Navy has Boeing on contract to produce six planes for LRIP-1 and seven planes for LRIP-2, Hopper said. Quantities and schedules for the future LRIP buys are still in the works, he added. The P-8 is the replacement for the Navy's legacy P-3 Orion ISR aircraft. Raytheon is a subcontractor to the Boeing-led P-8 effort. The APY-10 "is a brand new design, specifically to meet the maritime and over land surveillance requirements for the P-8 platform," with specific focus on anti-submarine and anti-surface warfare, Hopper said. Deliveries of the radar system will begin in September and run through July of next year, according to Hopper. The Navy granted the P-8 program milestone C clearance last August, clearing the way for the program to begin LRIP production. Live flight tests of the APY-10 are already underway at Naval Air Station-Paxtuxet River, Md., according to Hopper. He could not comment on the specifics of the ongoing tests, noting that Raytheon has yet to receive an official report on the flight test results. That said, Hopper noted that preliminary feedback from those tests have shown no major anomalies with the APY-10 test system. n Navy Defends Plans For Just 16 Missile Tubes On Next Boomer By Emelie Rutherford A top Navy official stood by the service's decision to outfit the next-generation ballistic-missile submarine with 16 missile tubes, amid reports that US. Strategic Command (STRATCOM) advocated for 20 tubes. Senate Armed Services Strategic Forces subcommittee Ranking Member Jeff Sessions (R-Ala.) questioned Navy Strategic Systems Programs (SSP) Director Rear Adm. Terry Benedict last week about news accounts that the sea service and STRATCOM clashed on the missile-carrying capability of the future SSBN(X) submarine. Benedict testified at a budget hearing that SSP provided the technical input that led to the decision to have 16 instead of 20 tubes for Trident D-5 ballistic missiles on the SSBN(X). Congress is keeping a close eye on the nascent program, which is slated to reach initial development in 2019, as senior Pentagon officials have warned could overwhelm the Navy's shipbuilding budget. Benedict said SSP supported analyses of the Navy, STRATCOM, and the Office of the Secretary of Defense leading up the SSBN(X) program's recent entry into the Milestone A phase. The Pentagon's Defense Acquisition Board permitted SSBN(X) to enter into this technology development phase on Jan. 10. In addition to SSP's technical input regarding the SSBN(X) missile tubes, Benedict said, "other factors were considered" when determining the number of tubes, and "cost was one of them." Still, he said he shares a viewpoint with Navy Secretary Ray Mabus, Chief of Naval Operations Adm. Gary Roughead, and STRATCOM Commander Air Force Gen. Robert Kehler: "Given the threats that we see today, given the mission that we see today, given the upload capability of the D-5, and given the environment as they saw today, all three of those leaders were comfortable with the decision to proceed forward with 16 tubes," Benedict said. SSP, he said, examined "the capability of the (D-5) missile itself" and its range. "Based on what we understand, the capability of the D-5, today,...as the director of SSP, I am comfortable with that decision." Meanwhile on Capitol Hill, House Republicans and Senate Democrats continued to spar yesterday over the Continued on page 8

7 Seaborne Dominance CARRIER-BASED STRIKE AND ISR UAS Please Visit us at booth G e n e r a l A t o m i c s A e r o n a u t i c a l S y s t e m s, I n c. w w w. g a - a s i. c o m L e a d i n g T h e S i t u a t i o n a l A w a r e n e s s R e v o l u t i o n

8 8 Defense Daily April 11, 2011 Continued from page 6 size of the federal budget for fiscal year 2011, which began last Oct. 1. Temporary government funding--within a continuing resolution (CR) with mainly FY '10 funding levels--is set to expire tomorrow at midnight. The House Rules Committee was slated to meet last night, after press time, to set the parameters of House floor debate for a new one-week CR that includes a complete FY '11 defense appropriations bill. However, President Barack Obama and some congressional Democrats have balked at that proposal. The White House has insisted lawmakers agree to a full FY '11 budget for all of the agencies, not just the Pentagon. n New Laser-Based Weapon For Navy Fleet Protection Operations In The Works Program officials at BAE Systems are fine-tuning a new directed energy-based concept designed to take out small, fast moving targets that could evade other defense systems on board Navy ships. The Tactical Laser System (TLS) demonstrator, as envisioned, will be a counterpart to the current Mk38 deck machine gun and provide a non-kinetic option to detect and engage small targets at various ranges, BAE Business Development Manager for Armament Systems John Perry said. The Navy awarded BAE last month a $2.8 million contract to develop a prototype of the TLS, according to a company statement. Boeing [BA] will provide the laser technology with BAE performing the integration work onto the Mk38. The design of the TLS incorporates two types of 10 kilowatt lasers that can be employed based on the distance and nature of the threat, Perry said. The "green" laser can be used as certain ranges as a sensor-type of capability, allowing the sailor manning the Mk 38 to identify the specifics of a given threat--from the presence of small arms to heavy machine guns and rocket-propelled grenades. Should a target advance closer to a Navy ship equipped with the TLS, the green laser can then be used to temporarily blind those on board, as a way to divert a pending attack non-kinetically or as a way to determine whether the target is an imminent threat, he said. For targets determined as threats, the TLS can then transition to a high-powered laser that can be used to disable a boat's radar and communication systems, outboard engines or ignite various munitions that may be on board, all before the boat could reach its intended target, Perry said. In cases of inflatable, Zodiac-styled small boats, the high-powered laser could puncture the vessel and sink it, he added. The transition between the green and high-power laser is instantaneous, with the disabling effects of the highpowered laser taking only a few seconds before a given target is incapacitated or neutralized. The 15-month long demonstration development contract will focus on maritime applications for the TLS, but Perry noted that if the concept proves successful, company officials are eyeing future applications for the system. Those options include mounting a TLS-type system on board an unmanned aerial vehicle, as well as increasing the kilowatt output to allow the system to engage anti-ship cruise missile threats, Perry noted. n MDA Awards Multiple Concept Development Deals For Next-Generation SM-3 The Missile Defense Agency has awarded a total of $127 million in three separate contracts to Boeing [BA], Lockheed Martin [LMT] and Raytheon [RTN] to begin conceptual design and development work on the agency s next-generation of SM-3 missiles. Lockheed Martin garnered the lion s share of the $127 million, with MDA awarding the company $43.3 million for the effort. Raytheon, which is the prime contractor on the SM-3 missile, netted $42.7 million toward its work on the follow-on system, with Boeing being awarded $41.1 million for their concept development program, according to the contracts issued on April 7.

9 April 11, 2011 Defense Daily 9 Under these contracts, each company will work with MDA on the concept definition and program planning toward the development of the Block IIB version of the [SM-3], including defining and assessing viable and affordable missile configurations with support from trade studies, ultimately leading to an executable development plan. Each company was also awarded $1.4 million in DOD research, development, test and evaluation (RDT&E) funds appropriated in the fiscal year 2011 defense spending bill to incrementally fund this effort, the contract notices state. The Block 1A version of the SM-3 is currently deployed on Navy warships and is the backbone of the service s sea-based Aegis ballistic missile defense system. Service and industry officials anticipate fielding the Block 1B variant of the weapon on a land-based version of the Aegis system in Eastern Europe. The Block IIA and eventual Block IIB versions of the missile will be developed in a block approach, based system technologies on board the IA and IB missiles. Both the Block IA and IB are key to the Pentagon s European Phased Adaptive Approach (EPAA) for missile defense, approved in September 2009 by Defense Secretary Robert Gates, Chairman of the Joint Chiefs of Staff Adm. Michael Mullen, and President Obama. However, former Missile Defense Agency (MDA) director Lt. Gen. Trey Obering said last week that problems with the Block IA system would likely find their way into the new Block IB variant of the weapon. Given the spiral approach for SM-3 development, those problems would tend to cycle through all current and future variants of the weapon--including the IIA and IIB versions (Defense Daily, April 6). Obering is currently an executive with Booz Allen Hamilton [BAH], served as director of MDA from Frank Wyatt, vice president of Raytheon Air and Missile Defense Systems, dismissed Obering s claims during an April 5 interview, noting the company has been and would continue to meet all the SM-3 development and deployment timelines set by the White House and DOD to comply with the EPAA. n

10 10 Defense Daily April 11, 2011 Precision-Guided Version of Marine Hydra Rocket To Enter Theater By September Deliveries of a new, precision-guided version of the Marine Corps legacy air-to-ground Hydra rocket are set to begin this summer, with the weapon slated to hit the skies above Afghanistan and elsewhere by September, according to a senior industry official. Marine Corps rotary-wing units will begin getting the Advanced Precision Kill Weapon System (APKWS) in July, once the weapon clears initial operational testing and evaluation this summer, BAE Systems Business Development Manager for Electronic Solutions George Adamakos said. The APKWS is an advanced guidance system developed by BAE Systems that can be attached to the Marine Corps current stockpile of Hydra 70 rockets used on the service s AH-1 SuperCobra attack helicopters. Once attached, the APKWS will allow SuperCobra aircrews to precisely engage moving and stationary targets within a 40 degree field of view, utilizing the four-pronged sensor suite attached to the APKWS guidance system. Navy acquisition officials inked the initial low-rate initial production agreement for the advanced guidance platform with BAE Systems last year. That deal covered 325 guidance units for the Marine Corps. In January, service officials came to terms on the second LRIP tranche of APKWS weapons, this time acquiring 600 systems, Adamakos said. But in both LRIP deals, the Navy agreed to only buy the APKWS guidance system, opting to retrofit the Marine Corps backlog of Hydra 70 rockets already in the service arsenal. That said, company officials are also offering full-up APKWS missiles, including both the Hydra 70 munition and guidance system as a single package. To date, according to Adamakos, BAE Systems is close to completing a direct sale for 5,000 APKWS weapons to an undisclosed foreign military. The company official declined to comment on which country was acquiring the system, but he did note the sale would only be for the guidance system and not the complete weapon package. Aside from weapon sales, the company has also been contracted by the Air Force and Navy to develop a Joint Capability Technology Demonstrator that would allow a full-up APKWS to be mounted on a Marine Corps AV-8 Harrier and an Air Force A-10 Thunderbolt, according to Adamakos. The JCTD deal was signed in February, with BAE Systems agreeing to provide roughly 92 full missile units for the effort, he said. The program is still in the very preliminary phases, with company and military officials still trying to gauge the necessary capabilities and system attributes needed to fire a helicopter-based weapon from a much faster fixed-wing fighter. Even though the test demonstrator is focused only on the AV-8 and the A-10, company officials are already exploring possible applications for the weapon on board the Navy s F/A-18 and the Air Force s F-16 fighters. n Your Ad Could Be Here!!! Book your Ad in Defense Daily's 2011 Fall Show Issues before April 15, 2011 and Save 10% Modern Day Marine Military Expo, Quantico Marine Base, September 27-29, 2011 AUSA Annual Meeting, Walter E. Washington Convention Center, Washington, DC, October 10-12, 2011 Day 1 Tuesday September 28, 2010 Defense Daily Modern Day Marine Military Expo Daily Defense Daily PEO Land Systems: Industry Must Help Tighten Budget Belt 8:00am 3:00pm Registration 9:45am 10:00am Opening Ceremony The Marine Corps sole program executive officer (PEO) said the 10:00am 3:30pm weapon-system programs in his portfolio have all stabilized and he now Exhibit Area Open is focusing sharply on cost-savings measures with the defense industry. William Taylor, the program executive officer for Land Systems, oversees eight high-profile programs, including the Expeditionary Fighting Vehicle (EFV), Joint Light Tactical Vehicle (JLTV), Medium Tactical Vehicle Replacement (MTVR), and Ground/Air Task Oriented Radar (G/ATOR). Taylor started his current stint as the service s first-ever PEO in 2007 as a colonel, before retiring two years ago. I am at the point now where everything that we ve tried to focus on and invest our time and energy in, in terms of the infrastructure around which programs can flourish, has apparently paid off, Taylor told Defense Daily in September. I can very confidently tell you that we ve finally reached a point in time where across the entire PEO Land Systems portfolio all our programs are stable from a technical standpoint, they re adequately resourced, and they re executing superbly well. So that s something that I probably couldn t have said several years ago when we had various programs struggle. However, the U.S. economic crunch and Pentagon s multi-part efficiency initiative now are having major impacts PEO Land Systems, Taylor said in a wide-ranging interview. He said biggest acquisition challenges these days are driven primarily by fiscal constraints. Ashton Carter, the under secretary of defense for acquisition, technology, and logistics, outlined 23 significant changes to how the Pentagon contracts for goods and services in a Sept. 14 memo to the Defense Department s acquisition professionals and the defense industry (Defense Daily, Sept. 15). Going forward, affordability will be a firm requirement for each new weapon Sponsored By: By Emelie Rutherford Northrop Grumman s [NOC] Force XXI Battle Command Brigade and Below (FBCB2) is moving far beyond the original concept of a situational awareness tool toward a battle command system, a company official said. Recent advances include the next-generation software, called Joint Capabilities Release (JCR), that is undergoing formal Army testing. Our experiences in Iraq underscored the importance of creating a joint FBCB2/BFT solution acceptable to the Marine Corps and the Army, Joe Taylor, vice president of the Ground Combat Systems operating unit within Northrop Grumman s Information Systems sector, said. The services reached an agreement on a common set of requirements almost five years ago. To converge on JCR is a pretty big deal. Once they go through this fielding process then you ll have both organizations on the same system. JCR offers a significant increase in network bandwidth, allowing the system to move more information to more users within seconds rather Published than minutes. By: Visit us at the It is also compatible with all the FBCB2 BFT tracking equipment Modern Day Marine Expo that s out there, some 85,000 systems now worldwide. Sept Sept. 30 Booth 1503 The JCR will continue planned tests through 2010, fielding in conjunction with the newly-awarded production contract for an improved Blue Force Tracking 2 (BFT2) transceiver with full encryption and lower latency. Additionally, this summer, the Army awarded Northrop Grumman an $18 million increment of a potential $300 million contract to provide encryption devices to upgrade the communications security of FBCB2- BFT. The software is fully compatible with JCR. It s a new way of utilizing the satellite that allows much, much lower latency and much higher bandwidth, Taylor said. Defense Daily AUSA Special Show Coverage c Continued on page by Access Intelligence, LLC. Federal copyright law prohibits unauthorized reproduction by any means and imposes fines of up to $100,000 for violations. Schedule of Events FBCB2-BFT Evolving To Battle Command System By Ann Roosevelt 1 Day 1 Day Defense Daily SERGEANT MAJOR OF THE ARMY CONFERENCE Room 202 A & B (SFCs and above only) AUSA REGISTRATION DESK East Convention Registration Area AUSA TICKET PICKUP OPEN West Convention Registration Area MG ROBERT G. MOORHEAD GUARD/ RESERVE BREAKFAST Room 146 A, B & C (Ticket/ID badge required) PRESENTATION OF CHAPTER AWARDS EXHIBITS OPEN - Halls A, B & C INSTITUTE OF LAND WARFARE PUBLICATIONS AVAILABLE AUSA Pavilion, Booth 407, Exhibit Hall A OPENING CEREMONY Ballroom (ID badge required) PRELUDE 3rd United States Infantry (The Old Guard) The United States Army Band, Pershing s Own NATIONAL AWARD PRESENTATIONS GENERAL CREIGHTON W. ABRAMS MEDAL MAJOR GENERAL ANTHONY J. DREXEL BIDDLE MEDAL LIEUTENANT GENERAL RAYMOND S. MCLAIN MEDAL MAJOR GENERAL JAMES EARL RUDDER MEDAL SMA WILLIAM G. BAINBRIDGE NONCOMMISSIONED OFFICER MEDAL THE JOSEPH P. CRIBBINS AWARD THE AUSA VOLUNTEER FAMILY OF THE YEAR AWARD PRESENTATION OF CHAPTER AND DIVISION AWARDS 1200 DRAFT RESOLUTIONS AVAILABLE FOR PICKUP BY CHAPTER DELEGATES Room 154 B Visit us at AUSA booth Also check us out at for additional show coverage by Access Intelligence, LLC. Federal copyright law prohibits unauthorized reproduction by any means and imposes fines of up to $100,000 for violations. Day 1 Monday October 25, 2010 Schedule Of Events c continued on page 3 c continued on page 3 Contact Daniel Chase at or dchase@accessintel.com to reserve your space today!

11

12 THE FUTURE OF SSGN STRIKE BULK DELIVERY ON DEMAND ON TIME ON TARGET See the GDEB Virginia Payload Module concept at Sea Air Space - Booth #900

Day. Defense Daily. Visit us at the SAS Show April Booth 117

Day. Defense Daily. Visit us at the SAS Show April Booth 117 SAS Special Show Coverage Day 2 Defense Daily Lockheed Martin: Navy Rules Out Design Flaws As Cause For LCS Cracks By Carlo Munoz Navy officials looking into an incident in which cracking developed on

More information

Defense Daily. SAS Special Show Coverage. Day 3 Wednesday May 6, Schedule Of Events

Defense Daily. SAS Special Show Coverage. Day 3 Wednesday May 6, Schedule Of Events Defense Daily Day 3 Wednesday May 6, 2009 Schedule Of Events SAS Special Show Coverage CNO Encouraged With LCS Progress, Pledges Vigilance On Cost Oversight By Emelie Rutherford The Navy s top officer

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

CRS Report for Congress

CRS Report for Congress CRS Report for Congress Received through the CRS Web Order Code RS21059 Updated May 31, 2005 Navy DD(X) and CG(X) Programs: Background and Issues for Congress Summary Ronald O Rourke Specialist in National

More information

Day. Defense Daily. Visit us at the SAS Show April 7-9 Booth 1900

Day. Defense Daily. Visit us at the SAS Show April 7-9 Booth 1900 SAS Special Show Coverage Day 3 Defense Daily Navy Looking At New Capabilities For Super Hornets, Growlers By Mike McCarthy NATIONAL HARBOR, Md. The Navy is reviewing various options to improve the capabilities

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

April 25, Dear Mr. Chairman:

April 25, Dear Mr. Chairman: CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Douglas Holtz-Eakin, Director April 25, 2005 Honorable Roscoe G. Bartlett Chairman Subcommittee on Projection Forces Committee on Armed Services

More information

CRS Report for Congress

CRS Report for Congress Order Code RS21305 Updated January 3, 2006 CRS Report for Congress Received through the CRS Web Summary Navy Littoral Combat Ship (LCS): Background and Issues for Congress Ronald O Rourke Specialist in

More information

Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget

Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1 the FY 2018 Pentagon Budget William Hartung and Ari Rickman Arms and Security Project Center for International Policy May 2018 Introduction

More information

First Announcement/Call For Papers

First Announcement/Call For Papers AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

SSC Pacific is making its mark as

SSC Pacific is making its mark as 5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in

More information

To THE DEFENSE ACQUISITION WORKFORCE

To THE DEFENSE ACQUISITION WORKFORCE To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition

More information

GROUND RADAR AND GUIDED MUNITIONS. Increased Oversight and Cooperation Can Help Avoid Duplication among the Services Programs

GROUND RADAR AND GUIDED MUNITIONS. Increased Oversight and Cooperation Can Help Avoid Duplication among the Services Programs United States Government Accountability Office Report to Congressional Committees December 2014 GROUND RADAR AND GUIDED MUNITIONS Increased Oversight and Cooperation Can Help Avoid Duplication among the

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs April 29, 2009 Congressional Research Service CRS Report for Congress Prepared

More information

NAVAIR Commander s Awards recognize teams for excellence

NAVAIR Commander s Awards recognize teams for excellence NAVAIR News Release NAVAIR Commander Vice Adm. David Architzel kicks of the 11th annual NAVAIR Commander's National Awards Ceremony at Patuxent River, Md., June 22. (U.S. Navy photo) PATUXENT RIVER, Md.

More information

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK February 2018 Table of Contents The Fiscal Year 2019 Budget in Context 2 The President's Request 3 Nuclear Weapons and Non-Proliferation 6 State

More information

Lieutenant Commander, thank you so much. And thank you all for being here today. I

Lieutenant Commander, thank you so much. And thank you all for being here today. I Remarks by the Secretary of the Navy Ray Mabus USS Washington (SSN 787) Shipnaming Ceremony Pier 69, Port of Seattle Headquarters Thursday, 07 February 2013 Lieutenant Commander, thank you so much. And

More information

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence OHIO Replacement Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence 1 Why Recapitalize Our SSBN Force? As long as these weapons exist, the United States will maintain a safe, secure,

More information

DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya

DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya Good morning and thank you for giving me the opportunity to speak with

More information

Arms Control Today. U.S. Missile Defense Programs at a Glance

Arms Control Today. U.S. Missile Defense Programs at a Glance U.S. Missile Defense Programs at a Glance Arms Control Today For the past five decades, the United States has debated, researched, and worked on the development of defenses to protect U.S. territory against

More information

Logbook Adm. Greenert and Gen. Amos: A New Naval Era Adm. Greenert and Gen. Welsh: Breaking the Kill Chain

Logbook Adm. Greenert and Gen. Amos: A New Naval Era Adm. Greenert and Gen. Welsh: Breaking the Kill Chain Adm. Greenert and Gen. Amos: A New Naval Era Date: June 2013 Description: Adm. Greenert and Gen. James Amos discuss how the Navy-Marine Corps team will adapt to the emerging fiscal and security world to

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

9 th Annual Disruptive Technologies Conference

9 th Annual Disruptive Technologies Conference 9 th Annual Disruptive Conference Navy IAMD Distribution Statement A: Approved for Public Release; Distribution Unlimited. (12/05/2012). This Brief is provided for Information Only and does not constitute

More information

Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157)

Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) Top Line 1 Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) September 24, 2018 A. Total Appropriations: House: Total discretionary funding: $667.5 billion (an increase of $20.1

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

The Integral TNO Approach to NAVY R&D

The Integral TNO Approach to NAVY R&D NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,

More information

STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and

STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and NOT FOR PUBLICATION UNTIL RELEASED BY THE SEAPOWER AND EXPEDITIONARY FORCES SUBCOMMITTEE STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and RDML WILLIAM HILARIDES

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Order Code RS22595 Updated December 7, 2007 Summary Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,

More information

WikiLeaks Document Release

WikiLeaks Document Release WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RS20557 Navy Network-Centric Warfare Concept: Key Programs and Issues for Congress Ronald O Rourke, Foreign Affairs, Defense,

More information

Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress

Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress Order Code RS22559 Updated June 13, 2007 Summary Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,

More information

March 23, Sincerely, Peter R. Orszag. Honorable Roscoe G. Bartlett, Ranking Member, Seapower and Expeditionary Forces Subcommittee

March 23, Sincerely, Peter R. Orszag. Honorable Roscoe G. Bartlett, Ranking Member, Seapower and Expeditionary Forces Subcommittee CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Peter R. Orszag, Director March 23, 2007 Honorable Gene Taylor Chairman Subcommittee on Seapower and Expeditionary Forces Committee on Armed

More information

BUDGET UNCERTAINTY AND MISSILE DEFENSE

BUDGET UNCERTAINTY AND MISSILE DEFENSE BUDGET UNCERTAINTY AND MISSILE DEFENSE MDAA ISSUE BRIEF OCTOBER 2015 WES RUMBAUGH & KRISTIN HORITSKI Missile defense programs require consistent investment and budget certainty to provide essential capabilities.

More information

Terma and F-35 Global supplier to the Joint Strike Fighter program

Terma and F-35 Global supplier to the Joint Strike Fighter program Terma and F-35 Global supplier to the Joint Strike Fighter program The world s largest defense industrial project The F-35 project is headed by Lockheed Martin, with Northrop Grumman and BAE Systems as

More information

Unmanned Systems. Northrop Grumman Today Annual Conference

Unmanned Systems. Northrop Grumman Today Annual Conference Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop

More information

A Ready, Modern Force!

A Ready, Modern Force! A Ready, Modern Force! READY FOR TODAY, PREPARED FOR TOMORROW! Jerry Hendrix, Paul Scharre, and Elbridge Colby! The Center for a New American Security does not! take institutional positions on policy issues.!!

More information

Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports

Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports PRESS RELEASES 2004 Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports General Dynamics Selected for Final-Design

More information

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 20 to December 31, 20 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers, jeff@armscontrol.org

More information

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited t or.t 19990818 181 YEAR 2000 COMPLIANCE OF THE STANDOFF LAND ATTACK MISSILE Report No. 99-157 May 14, 1999 DTIO QUr~ Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved

More information

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress

Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs February 14, 2013 CRS Report for Congress Prepared for Members and Committees

More information

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001 A udit R eport ACQUISITION OF THE FIREFINDER (AN/TPQ-47) RADAR Report No. D-2002-012 October 31, 2001 Office of the Inspector General Department of Defense Report Documentation Page Report Date 31Oct2001

More information

Logbook Navy Perspective on Joint Force Interdependence Navigating Rough Seas Forging a Global Network of Navies

Logbook Navy Perspective on Joint Force Interdependence Navigating Rough Seas Forging a Global Network of Navies Navy Perspective on Joint Force Interdependence Publication: National Defense University Press Date: January 2015 Description: Chief of Naval Operations Adm. Greenert discusses the fiscal and security

More information

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 FOR IMMEDIATE RELEASE No. 01-153 June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 Today, the Army announced details of its budget for Fiscal Year 2002, which runs from October 1, 2001 through September 30,

More information

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs August 17, 2010 Congressional Research Service CRS Report for Congress Prepared

More information

STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001

STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001 NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001 NOT FOR PUBLICATION

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

ARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge

ARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge United States Government Accountability Office Report to Congressional Committees August 2016 ARLEIGH BURKE DESTROYERS Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844

More information

MEDIA CONTACTS. Mailing Address: Phone:

MEDIA CONTACTS. Mailing Address: Phone: MEDIA CONTACTS Mailing Address: Defense Contract Management Agency Attn: Public Affairs Office 3901 A Avenue Bldg 10500 Fort Lee, VA 23801 Phone: Media Relations: (804) 734-1492 FOIA Requests: (804) 734-1466

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

Aegis International & BMD: A New Interoperability Network

Aegis International & BMD: A New Interoperability Network Aegis International & BMD: A New Interoperability Network Track 9: Networks and Networking Mr. Frank Anderson Mr. George Galdorisi Ms. Amanda George Ms. Rachel Volner May 14, 2010 2 My view is that technology

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

CRS Report for Congress Received through the CRS Web

CRS Report for Congress Received through the CRS Web CRS Report for Congress Received through the CRS Web Order Code RS20162 April 20, 1999 Cruise Missile Inventories and NATO Attacks on Yugoslavia: Background Information Ronald O Rourke Specialist in National

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910 TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.

More information

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS Professor of Practice Jeff Kline, Operations Research Captain, USN (ret) Naval Postgraduate School

More information

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM Report No. D-2001-066 February 28, 2001 Office of the Inspector General Department of Defense Form SF298 Citation Data Report Date ("DD MON YYYY") 28Feb2001

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11 Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun

More information

Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers,

More information

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text Challenges and opportunities Trends to address New concepts for: Offensive sea control Sea based AAW Weapons development Increasing offensive sea control capacity Addressing defensive and constabulary

More information

Navy-Marine Corps Strike-Fighter Shortfall: Background and Options for Congress

Navy-Marine Corps Strike-Fighter Shortfall: Background and Options for Congress Order Code RS22875 May 12, 2008 Navy-Marine Corps Strike-Fighter Shortfall: Background and Options for Congress Summary Ronald O Rourke Specialist in Naval Affairs Foreign Affairs, Defense, and Trade Division

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014 Navy ManTech Program ManTech Update Tom Hite CTC 15 October 2014 Navy ManTech Overview Agenda CNST Recompete Update Navy ManTech Support Recompete FY16 Investment Strategy Affordability Assessment Update

More information

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150% GAO United States General Accounting Office Testimony Before the Committee on Foreign Relations, U.S. Senate For Release on Delivery Expected at 10:00 a.m.,edt Tuesday May 3,1994 BALLISTIC MISSILE DEFENSE

More information

General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships

General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships June 18, 2012 Contact: Dixie Stedman Tel: 207 442 1203 dixie.stedman@gdbiw.com General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships BATH, Maine The U. S. Navy has

More information

Ladies and gentlemen, it is a pleasure to once again six years for me now to

Ladies and gentlemen, it is a pleasure to once again six years for me now to 062416 Air Force Association, Reserve Officers Association and National Defense Industrial Association Capitol Hill Forum Prepared Remarks by Admiral Terry Benedict, Director of the Navy s Strategic Systems

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Missile Defense Agency DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 286.142 306.185

More information

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

Armed Unmanned Systems

Armed Unmanned Systems Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time

More information

Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress

Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress Order Code RS21195 Updated December 11, 2006 Summary Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress Gary J. Pagliano and Ronald O Rourke Specialists in National

More information

Day. Defense Daily. Visit us at the SAS Show May 3-5 Booth 1401

Day. Defense Daily. Visit us at the SAS Show May 3-5 Booth 1401 SAS Special Show Coverage Day 2 Defense Daily Roughead: Frigates Must Go By Emelie Rutherford The Navy s top officer said yesterday the service must proceed with plans to retire frigates so it can pay

More information

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 8010.13E N96 OPNAV INSTRUCTION 8010.13E From: Chief of Naval Operations Subj: DEPARTMENT

More information

U.S. Army representatives used the venue of the 2012

U.S. Army representatives used the venue of the 2012 By Scott R. Gourley U.S. Army representatives used the venue of the 2012 AUSA Annual Meeting and Exposition to outline a wide range of fielding, modernization and sustainment activities for its fleet of

More information

U.S. Air Force Electronic Systems Center

U.S. Air Force Electronic Systems Center U.S. Air Force Electronic Systems Center A Leader in Command and Control Systems By Kevin Gilmartin Electronic Systems Center The Electronic Systems Center (ESC) is a world leader in developing and fielding

More information

Great Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018

Great Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018 Great Decisions 2018 Paying for U.S. global engagement and the military Aaron Karp, 13 January 2018 I. Funding America s four militaries not as equal as they look Times Square Strategy wears a dollar sign*

More information

BUDGET BRIEF Senator McCain and Outlining the FY18 Defense Budget

BUDGET BRIEF Senator McCain and Outlining the FY18 Defense Budget BUDGET BRIEF Senator McCain and Outlining the FY18 Defense Budget January 25, 2017 l Katherine Blakeley Author Date President Trump has promised a swift expansion in American military strength: adding

More information

ROBUST NATO BALLISTIC MISSILE DEFENSE

ROBUST NATO BALLISTIC MISSILE DEFENSE ROBUST NATO BALLISTIC MISSILE DEFENSE Dr. Mitch Stevison Vice President Air and Missile Defense Systems Raytheon Missile Systems April 2016 Copyright 2016 Raytheon Company. All rights reserved. Missile

More information

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow

Department of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow Department of the Navy FY 26/FY 27 President s Budget Winning Today Transforming to Win Tomorrow 4 February 25 1 1 Our budget resources are aligned to support both present responsibilities and future capabilities.

More information

VADM David C. Johnson. Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017

VADM David C. Johnson. Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017 DAU's Acquisition Training Symposium VADM David C. Johnson Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017 Defense Acquisition Organization

More information

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved United States Government Accountability Office Report to Congressional Committees June 2018 F-35 JOINT STRIKE FIGHTER Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

More information

SERIES 1300 DIRECTOR, DEFENSE RESEARCH AND ENGINEERING (DDR&E) DEFENSE RESEARCH AND ENGINEERING (NC )

SERIES 1300 DIRECTOR, DEFENSE RESEARCH AND ENGINEERING (DDR&E) DEFENSE RESEARCH AND ENGINEERING (NC ) SERIES 1300 DIRECTOR, DEFENSE RESEARCH AND ENGINEERING (DDR&E) 1300. DEFENSE RESEARCH AND ENGINEERING (NC1-330-77-15) These files relate to research and engineering (R&E) and pertain to: Scientific and

More information

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress Order Code RS21195 Updated April 8, 2004 Summary Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress Gary J. Pagliano and Ronald O'Rourke Specialists in National Defense

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6454N: Air Control FY 213 FY 214 FY 215 FY 216 To Complete Program Element 6.373 5.665

More information

6 th Annual DoD Unmanned Systems Summit

6 th Annual DoD Unmanned Systems Summit Defense Strategies Institute professional educational forum: 6 th Annual DoD Unmanned Systems Summit March 14-15, 2018 Mary M. Gates Learning Center 701 N. Fairfax St. Alexandria, VA 22314 Program Design

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited.

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited. NAWCWD Long Range Acquisition Forecast (LRAF) Requirements Distribution Statement A - Approved for public release, distribution is unlimited. 1 Weapons Systems Integration and Software Support (WSISS)

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

Navy Affairs Committee Minutes BOD Meeting - 23 May 2008

Navy Affairs Committee Minutes BOD Meeting - 23 May 2008 Navy Affairs Committee Minutes BOD Meeting - May 008 - Meeting Report- The Navy Affairs Committee meeting was called to order at 9:0am by Chairman, RADM Robert Sutton (USN, Ret.) Chairman Sutton presented

More information

snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive.

snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive. Snapshots of Space M D ata sheets that follow are snapshots of 17 key Air Force space programs experiments, development, production, sustainment, and upgrades. The list is not allinclusive. It is based

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

OVERSEAS CONTINGENCY OPERATIONS (OCO)

OVERSEAS CONTINGENCY OPERATIONS (OCO) OVERSEAS CONTINGENCY OPERATIONS (OCO) OVERVIEW submitted to the Congress in June 2014. The Navy and Marine Corps approach to support the comprehensive strategy to degrade, and ultimately, defeat, the Islamic

More information

Prepared Remarks for the Honorable Richard V. Spencer Secretary of the Navy Defense Science Board Arlington, VA 01 November 2017

Prepared Remarks for the Honorable Richard V. Spencer Secretary of the Navy Defense Science Board Arlington, VA 01 November 2017 Prepared Remarks for the Honorable Richard V. Spencer Secretary of the Navy Defense Science Board Arlington, VA 01 November 2017 Thank you for the invitation to speak to you today. It s a real pleasure

More information

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs December 22, 2009 Congressional Research Service CRS Report for Congress Prepared

More information

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress Order Code RS20643 Updated November 20, 2008 Summary Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress Ronald O Rourke Specialist in Naval Affairs Foreign Affairs, Defense,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information