Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports
|
|
- Randell Wiggins
- 5 years ago
- Views:
Transcription
1 PRESS RELEASES 2004 Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports General Dynamics Selected for Final-Design Stage of Littoral Combat Ship Program IAMAW Local S6 Ratifies New Four-year Labor Agreement Bath Iron Works Awarded $27 Million Contract for Destroyer Maintenance, Repair and Upgrades in Pacific Homeports General Dynamics Awarded $489 Million in Funding for Navy Destroyer
2 Bath Iron Works A GE NE RAL DY NA MI CS C O M PA NY 700 Washington Street February 3, 2004 Contact: Dirk Lesko Main Number: (207) Fax Number: (207) dirk.lesko@gdbiw.com Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports BATH, Maine The U.S. Navy has awarded Bath Iron Works, a subsidiary of General Dynamics (NYSE:GD), a $12.6 million cost-plus-award-fee contract to perform Post Shakedown Availability work for the USS CHAFEE (DDG 90). This contract contains options for additional availabilities that, if exercised, would bring the total cumulative contract value to $102.6 million. Bath Iron Works, as the prime contractor, leads a team consisting of Southwest Marine, Inc., San Diego Division; Todd Pacific Shipyards Corporation; and Honolulu Shipyard, Inc. The work will be performed in the ship s homeport of Pearl Harbor, HI. Bath Iron Works of Bath, Maine, is the lead designer and builder of the DDG 51 AEGIS destroyer and employs 6,700 people. General Dynamics, headquartered in Falls Church, Virginia, employs approximately 67,600 people worldwide and had 2003 revenue of $16.6 billion. The company has leading market positions in land and amphibious combat systems, mission critical information systems and technologies, shipbuilding and marine systems, and business aviation. More information about the company is available on the Internet at
3 Bath Iron Works A GE NE RAL DY NA MI CS C O M PA NY 700 Washington Street May 27, 2004 Contact: Dirk Lesko Main Number: (207) Fax Number: (207) dirk.lesko@gdbiw.com General Dynamics Selected for Final-Design Stage of Littoral Combat Ship Program BATH, Maine The U.S. Navy announced today that a team led by Bath Iron Works, a wholly owned subsidiary of General Dynamics (NYSE: GD), has been awarded a $79 million option to an existing contract to continue development of its proposed solution for the U.S. Navy s newest class of ships, the Littoral Combat Ship. The original contract was awarded in July, The General Dynamics approach features an innovative trimaran hull that enables the ship to reach sustainable speeds of nearly 50 knots and range as far as 10,000 nautical miles with an unmatched interior volume and payload. The ship is designed to allow a crew of fewer than 40 sailors to fully operate, maintain and defend it. Two teams, the General Dynamics team and one other, were selected from a field of three to proceed into this stage of development for the Littoral Combat Ship (LCS). Those three teams had previously been down-selected from a field of six. Dugan Shipway, president of General Dynamics Bath Iron Works, said, We re very pleased to have been selected by the Navy to continue development of the design for this next generation of surface combatants. Bath Iron Works is one of the Navy s longest-serving shipbuilding partners, and we are proud to have a role on the Littoral Combat Ship. The Littoral Combat Ship is a key element of the Navy s plan to address asymmetric threats. Intended to operate in coastal areas of the globe, the ship will be fast, highly maneuverable and geared to supporting mine detection/elimination, anti-submarine warfare and surface warfare, particularly against small surface craft. more
4 Key characteristics of the ship proposed by the General Dynamics team include: Capable of supporting several missions simultaneously. Open-architecture information systems enable over-the-horizon surveillance and reconnaissance, global networking and coordinated air, surface and undersea tactical picture. Incorporation of stealth technologies increases ship and crew survivability. Shallow draft allows operations near the shore. More payload per ton of displacement than any previous U.S. warship. Huge interior volume delivers enhanced mission capabilities and endurance. Supports concurrent and simultaneous operation of two large (H-60) helicopters. Bath Iron Works is the prime contractor on the program. Austal USA, of Mobile, Ala., a subsidiary of Australian shipbuilder Austal Ships, is supporting final design efforts for the team s aluminum and steel trimaran warship. General Dynamics Advanced Information Systems, of Arlington, Va., is leading the ship s open-architecture based Core Mission System design and integration from its Pittsfield, Mass. facility. Other team members include CAE of Leesburg, Va.; BAE Systems, Rockville, Md.; Maritime Applied Physics Corporation, Baltimore, Md.; Northrop Grumman Electronic Systems, Baltimore, Md.; and three other General Dynamics companies: Armament and Technical Products (Burlington, Vt.), Electric Boat (Groton, Conn.) and General Dynamics Canada (Ottawa, Ontario). Bath Iron Works of Bath, Maine, a leader in surface combatant design and construction, employs 6,700 people. General Dynamics, headquartered in Falls Church, Va., employs approximately 68,400 people worldwide and anticipates 2004 revenue of $19 billion. The company is a market leader in mission-critical information systems and technologies; land and expeditionary combat systems, armaments and munitions; shipbuilding and marine systems; and business aviation. More information about the company can be found at Note to Editors: High-resolution graphics of the General Dynamics team LCS ship concept are available at Click here for more information of the GD LCS Team design
5 Bath Iron Works A GE NE RAL DY NA MI CS C O M PA NY 700 Washington Street May 27, 2004 Contact: Dirk Lesko Main Number: (207) Fax Number: (207) dirk.lesko@gdbiw.com General Dynamics Selected for Final-Design Stage of Littoral Combat Ship Program BATH, Maine The U.S. Navy announced today that a team led by Bath Iron Works, a wholly owned subsidiary of General Dynamics (NYSE: GD), has been awarded a $79 million option to an existing contract to continue development of its proposed solution for the U.S. Navy s newest class of ships, the Littoral Combat Ship. The original contract was awarded in July, The General Dynamics approach features an innovative trimaran hull that enables the ship to reach sustainable speeds of nearly 50 knots and range as far as 10,000 nautical miles with an unmatched interior volume and payload. The ship is designed to allow a crew of fewer than 40 sailors to fully operate, maintain and defend it. Two teams, the General Dynamics team and one other, were selected from a field of three to proceed into this stage of development for the Littoral Combat Ship (LCS). Those three teams had previously been down-selected from a field of six. Dugan Shipway, president of General Dynamics Bath Iron Works, said, We re very pleased to have been selected by the Navy to continue development of the design for this next generation of surface combatants. Bath Iron Works is one of the Navy s longest-serving shipbuilding partners, and we are proud to have a role on the Littoral Combat Ship. The Littoral Combat Ship is a key element of the Navy s plan to address asymmetric threats. Intended to operate in coastal areas of the globe, the ship will be fast, highly maneuverable and geared to supporting mine detection/elimination, anti-submarine warfare and surface warfare, particularly against small surface craft. more
6 Key characteristics of the ship proposed by the General Dynamics team include: Capable of supporting several missions simultaneously. Open-architecture information systems enable over-the-horizon surveillance and reconnaissance, global networking and coordinated air, surface and undersea tactical picture. Incorporation of stealth technologies increases ship and crew survivability. Shallow draft allows operations near the shore. More payload per ton of displacement than any previous U.S. warship. Huge interior volume delivers enhanced mission capabilities and endurance. Supports concurrent and simultaneous operation of two large (H-60) helicopters. Bath Iron Works is the prime contractor on the program. Austal USA, of Mobile, Ala., a subsidiary of Australian shipbuilder Austal Ships, is supporting final design efforts for the team s aluminum and steel trimaran warship. General Dynamics Advanced Information Systems, of Arlington, Va., is leading the ship s open-architecture based Core Mission System design and integration from its Pittsfield, Mass. facility. Other team members include CAE of Leesburg, Va.; BAE Systems, Rockville, Md.; Maritime Applied Physics Corporation, Baltimore, Md.; Northrop Grumman Electronic Systems, Baltimore, Md.; and three other General Dynamics companies: Armament and Technical Products (Burlington, Vt.), Electric Boat (Groton, Conn.) and General Dynamics Canada (Ottawa, Ontario). Bath Iron Works of Bath, Maine, a leader in surface combatant design and construction, employs 6,700 people. General Dynamics, headquartered in Falls Church, Va., employs approximately 68,400 people worldwide and anticipates 2004 revenue of $19 billion. The company is a market leader in mission-critical information systems and technologies; land and expeditionary combat systems, armaments and munitions; shipbuilding and marine systems; and business aviation. More information about the company can be found at Note to Editors: High-resolution graphics of the General Dynamics team LCS ship concept are available at Click here for more information of the GD LCS Team design
7 Bath Iron Works A GE NE RAL DY NA MI CS C O M PA NY 700 Washington Street May 30, 2004 Contact: Dirk Lesko Main Number: (207) Fax Number: (207) dirk.lesko@gdbiw.com IAMAW Local S6 Ratifies New Four-year Labor Agreement BATH, Maine The rank and file of the International Association of Machinists and Aerospace Workers of America (IAMAW) Local S6, the largest of the four labor unions representing employees at Bath Iron Works (BIW), voted today to accept a new four year labor agreement with the company. A tentative labor agreement was reached last week after a three-week negotiating period and was presented to the membership with the recommendation of the union s negotiating committee. The new contract will go into effect on May 31, 2004 and will extend through May 18, Highlights of the new agreement include: increases in the company s contributions to the IAM Pension Plan from $.65 to $1.30 per hour over the life of the contract and a 3% general wage increase in each of the first three years of the contract followed by a 4% increase in the fourth year. Bath Iron Works of Bath, Maine, a leader in surface combatant design and construction, employs 6,700 people. General Dynamics, headquartered in Falls Church, Va., employs approximately 68,400 people worldwide. The company is a market leader in mission-critical information systems and technologies; land and expeditionary combat systems, armaments and munitions; shipbuilding and marine systems; and business aviation. More information about the company can be found at
8 700 Washington Street August 18, 2004 Contact: Dirk A. Lesko Tel: Fax: Bath Iron Works Awarded $27 Million Contract for Destroyer Maintenance, Repair and Upgrades in Pacific Homeports BATH, Maine The U.S. Navy on Monday awarded Bath Iron Works, a subsidiary of General Dynamics (NYSE: GD), a $26.6 million modification to a previously awarded contract to perform Post Shakedown Availability (PSA) maintenance, repair and upgrade work for Arleigh Burke-class Aegis destroyers homeported on the West Coast of the United States. Options for two additional PSA assignments are available under the existing contract, which was awarded in February PSA work will be performed on USS CHUNG HOON (DDG 93) by the Bath Iron Works-Southwest Marine PSA Team at Southwest s facilities in Pearl Harbor, Hawaii, and is expected to be completed by April A PSA for USS MOMSEN (DDG 92) will be performed by a Bath Iron Works-Todd Pacific Shipyards Corporation (NYSE: TOD) PSA Team at Todd s facilities in Seattle, Wash., and is expected to be completed by July Work will include engineering and management services; labor and procurement of material for system upgrades and to correct government-responsible deficiencies; performance of specified PSA work items, including tests and post-repair sea trials; and additional tasking to complete emergent repairs. Dugan Shipway, president of Bath Iron Works, said, This award reflects the Navy s confidence in Bath Iron Works ability to take our PSA Team wherever they needs us. Two other recent assignments USS MASON s (DDG 87) PSA in Norfolk, Va., and USS CHAFEE s (DDG 90) PSA in Pearl Harbor, Hawaii, which was just completed three weeks ahead of schedule and under budget are additional examples of the inherent flexibility Bath Iron Works and our teammates bring to the U.S. Navy for maintenance and modernization around the globe. more
9 Bath Iron Works (Bath, Maine), a leader in surface combatant design and construction, employs 6,500 people. General Dynamics, headquartered in Falls Church, Virginia, employs approximately 69,400 people worldwide and anticipates 2004 revenue of $19 billion. The company is a market leader in mission-critical information systems and technologies; land and expeditionary combat systems, armaments and munitions; shipbuilding and marine systems; and business aviation. More information about the company is available on the Internet at
10 700 Washington Street November 16, 2004 Contact: Dirk Lesko Tel: Fax: General Dynamics Awarded $489 Million in Funding for Navy Destroyer BATH, ME The U.S. Navy today announced that Bath Iron Works, a General Dynamics company, will receive $489 million in funding to construct an ARLEIGH BURKE Class AEGIS guided missile destroyer. The ship was part of the Navy s Fiscal Year Multi-Year Procurement contract awarded to Bath Iron Works in September DDG 111, which has yet to be named, will be the 33 rd AEGIS destroyer to be built at Bath Iron Works. The shipyard expects to deliver the ship in 2010 in accordance with the requirements of the contract. Bath Iron Works of Bath, Maine, is the lead designer and builder of the ARLEIGH BURKE Class and employs 6,400 people. General Dynamics, headquartered in Falls Church, Virginia, employs approximately 71,600 people worldwide and anticipates 2004 revenue in excess of $19 billion. The company is a market leader in mission-critical information systems and technologies; land and expeditionary combat systems, armaments and munitions; shipbuilding and marine systems; and business aviation. More information about the company can be found at
General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships
June 18, 2012 Contact: Dixie Stedman Tel: 207 442 1203 dixie.stedman@gdbiw.com General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships BATH, Maine The U. S. Navy has
More informationCRS Report for Congress
Order Code RS21305 Updated January 3, 2006 CRS Report for Congress Received through the CRS Web Summary Navy Littoral Combat Ship (LCS): Background and Issues for Congress Ronald O Rourke Specialist in
More informationUS Navy Ships. Surface Warfare Officer First Tours
US Navy Ships Surface Warfare Officer First Tours CVN Carriers Nimitz Class: Class Size 10 ships Built 1975-2009 Cost - $8.5 Billion Crew Size 200 officers, 3,000 enlisted Air Wing - 500 officers, 2,300
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Order Code RS22595 Updated December 7, 2007 Summary Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs April 29, 2009 Congressional Research Service CRS Report for Congress Prepared
More informationApril 25, Dear Mr. Chairman:
CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Douglas Holtz-Eakin, Director April 25, 2005 Honorable Roscoe G. Bartlett Chairman Subcommittee on Projection Forces Committee on Armed Services
More informationNavy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs December 22, 2009 Congressional Research Service CRS Report for Congress Prepared
More informationFuture of MIW from the LCS Platform
Future of MIW from the LCS Platform 24 October 2011 RDML Jim Murdoch, USN PEO LCS Distribution Statement A: Approved for Public Release; Distribution Unlimited. (11/16/2011). This Brief is provided for
More informationShip Maintenance: Provider Perspective. VADM Paul Sullivan Naval Sea Systems Command
Ship Maintenance: Provider Perspective VADM Paul Sullivan Naval Sea Systems Command Desired Outcomes Understand NAVSEA role in the Navy Enterprise Understand ship maintenance requirements Understand ship
More informationCRS Report for Congress
CRS Report for Congress Received through the CRS Web Order Code RS21059 Updated May 31, 2005 Navy DD(X) and CG(X) Programs: Background and Issues for Congress Summary Ronald O Rourke Specialist in National
More informationDDG 1000 Class Destroyer
DDG 1000 Class Destroyer 10 April 2018 Sea Air Space (SAS) DDG 1000 October February 2016 2017 DDG 1001 July February 20162018 DDG 1000 Program Manager, PMS 500 DDG 1002 December October 2016 2017 CAPT
More informationSummary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157)
Top Line 1 Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) September 24, 2018 A. Total Appropriations: House: Total discretionary funding: $667.5 billion (an increase of $20.1
More informationLieutenant Commander, thank you so much. And thank you all for being here today. I
Remarks by the Secretary of the Navy Ray Mabus USS Washington (SSN 787) Shipnaming Ceremony Pier 69, Port of Seattle Headquarters Thursday, 07 February 2013 Lieutenant Commander, thank you so much. And
More informationNavy Shipbuilding Past Performance Provides Valuable Lessons for Future Investments
United States Government Accountability Office Navy Shipbuilding Past Performance Provides Valuable Lessons for Future Investments June 2018 A Report to Congressional Committees GAO-18-238SP TABLE OF CONTENTS
More informationUpdate: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4
Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4 In September 2015, the Secretary of the Navy Renamed Three Ship Classes, Creates Expeditionary Designator in Naming
More informationLITTORAL COMBAT SHIP. Need to Address Fundamental Weaknesses in LCS and Frigate Acquisition Strategies
United States Government Accountability Office Report to Congressional Committees June 2016 LITTORAL COMBAT SHIP Need to Address Fundamental Weaknesses in LCS and Frigate Acquisition Strategies GAO-16-356
More informationNavy Force Structure and Shipbuilding Plans: Background and Issues for Congress
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs August 17, 2010 Congressional Research Service CRS Report for Congress Prepared
More informationFISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK
FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK February 2018 Table of Contents The Fiscal Year 2019 Budget in Context 2 The President's Request 3 Nuclear Weapons and Non-Proliferation 6 State
More informationSTATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
More informationAEGIS Ballistic Missile Defense
AEGIS Ballistic Missile Defense 2 Cruisers and 1 Destroyer are Capable of Firing SM-3 Interceptors and Conducting Long Range Surveillance and Tracking Operations (LRS&T) 10 Destroyers are Capable of Conducting
More informationTHE NAVY TODAY AND TOMORROW
THE NAVY TODAY AND TOMORROW Secretary of the Navy Donald C. Winter speaks at a Briefing sponsored by the New York Council of the Navy League. Edited by Richard H. Wagner (Originally published in The Log,
More informationFreedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012
U.S. NAVY Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned 14-15 November 2012 Jimmy Johnson Lockheed Martin Senior Fellow Lockheed Martin Mission Systems & Sensors
More informationRecapitalizing Canada s Fleets. What is next for Canada s Shipbuilding Strategy?
Recapitalizing Canada s Fleets What is next for Canada s Shipbuilding Strategy? Kevin McCoy President, Irving Shipbuilding Inc. 20 October 2016 National Shipbuilding Strategy $520 million invested to create
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More information4 Aug 92. Encl: From: Commanding Officer, USS MICHIGAN (SSBN 727) To: Director of Naval History (0-09BH), Washington Navy Yard, Washington, DC 20374
DEPARTMENT THE A USS MICHIGAN (SSBN 727) FPO AP 96698-2096 5750 ser 41 288-92 4 Aug 92 From: Commanding Officer, USS MICHIGAN (SSBN 727) To: Director of Naval History (0-09BH), Washington Navy Yard, Washington,
More informationNavy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs February 3, 2012 CRS Report for Congress Prepared for Members and Committees
More informationCOLUMBIA Class Submarine Program
COLUMBIA Class Submarine Program Presented to the American Society of Naval Engineers in Hampton Roads RDML David A. Goggins COLUMBIA Program Director 13 December 2017 COLUMBIA COLUMBIA Class Class Sea
More informationBRAC Commissioner Turner Visit. Naval Submarine Base New London Wednesday 27 July 2005
DCN: 7335 BRAC Commissioner Turner Visit Naval Submarine Base New London Wednesday 27 July 2005 Time 0800 0805 Event Commissioner Turner arrives Welcome & Intros Group 2 Brief Presenter RDML Kenny RDML
More informationMEDIA CONTACTS. Mailing Address: Phone:
MEDIA CONTACTS Mailing Address: Defense Contract Management Agency Attn: Public Affairs Office 3901 A Avenue Bldg 10500 Fort Lee, VA 23801 Phone: Media Relations: (804) 734-1492 FOIA Requests: (804) 734-1466
More information-Ts& Ser ADMIN/ Feb 92
h d DEPARTMENT OF f i~ USS MONTEREY (CG 61) FLEET POST OFFICE AA 34092-1181 From: Commanding Officer USS MONTEREY (CG 61) To: Director of Naval History (OP-O9BH) Subj : COMMAND HISTORY FOR 1991 Ref: OPNAVINST
More informationprogression around the world. Abroad, the peoples of nations that were hosting the Fleet s port visits also waited with great enthusiasm and
Remarks by the Honorable Donald C. Winter Secretary of the Navy On the Occasion of the 100 th Anniversary of the Great White Fleet s Visit to Hawaii USS MISSOURI Ford Island, Pearl Harbor, HI Friday, July
More informationOpportunities for Enlisted Women in Submarines
Opportunities for Enlisted Women in Submarines Enlisted Women in Submarines Task Force 1 Modify SSGN/SSBNs NEWCON VACL starting with SSN-796 Integrate 14 OHIO crews total Integrate SSNs when VA submarines
More informationReady to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget
Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1 the FY 2018 Pentagon Budget William Hartung and Ari Rickman Arms and Security Project Center for International Policy May 2018 Introduction
More informationOverview of Navy Installations and Defense Economic Impact
Overview of Navy Installations and Defense Economic Impact April 9, 2018 Rear Admiral Bette Bolivar Commander, Navy Region Southeast Navy Region Southeast 70 Runways 60 Piers & Wharfs 6,106 Buildings 39
More informationExperience Our Past, Embrace Our Future. The ADAMS Class Naval Ship Museum
Experience Our Past, Embrace Our Future The ADAMS Class Naval Ship Museum Bring the Adams Home! MISSION STATEMENT Jacksonville Historic Naval Ship Association s mission statement is... To excite, inspire,
More informationGreat Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018
Great Decisions 2018 Paying for U.S. global engagement and the military Aaron Karp, 13 January 2018 I. Funding America s four militaries not as equal as they look Times Square Strategy wears a dollar sign*
More informationNavy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress
: Background, Issues, and Options for Congress Ronald O'Rourke Specialist in Naval Affairs October 22, 2009 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of
More informationThe Ship Acquisition Process: Status and Opportunities. NDIA Expeditionary Warfare Conference 24 October 07
The Ship Acquisition Process: Status and Opportunities NDIA Expeditionary Warfare Conference 24 October 07 RDML Chuck Goddard Program Executive Officer, Ships Distribution Statement A: Approved for Public
More informationNavy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress
Order Code RS22559 Updated June 13, 2007 Summary Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense,
More informationH. R. ll [Report No. 115 ll]
TH CONGRESS ST SESSION [FULL COMMITTEE PRINT] Union Calendar No. ll H. R. ll [Report No. ll] Making appropriations for the Department of Defense for the fiscal year ending September 0, 0, and for other
More informationDATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY
BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationCommand Overview Naval Surface Warfare Center, Carderock Division
Command Overview Naval Surface Warfare Center, Division CAPT Mark Vandroff Commanding Officer, NSWCCD February 2018 Dr. Paul Shang Technical Director (Acting), NSWCCD Distribution Statement A: Approved
More informationCAPT Tim Kelly Program Executive Office
CAPT Tim Kelly Program Executive Office Maritime 1 PEO Maritime Portfolio UNDERSEA SYSTEMS SURFACE SYSTEMS UOES 2 Combatant Craft Medium Mark 1 (CCM Mk 1) (Conceptual) UOES 3 Shallow Water Combat Submersible
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18
Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not
More informationNavy Littoral Combat Ship (LCS) Program: Background, Oversight Issues, and Options for Congress
Order Code RL33741 Navy Littoral Combat Ship (LCS) Program: Background, Oversight Issues, and Options for Congress Updated November 17, 2008 Ronald O Rourke Specialist in Naval Affairs Foreign Affairs,
More informationNaval Vessel Historical Evaluation FINAL DETERMINATION. This evaluation is unclassified. INACTSHIPMAINTO Pearl Harbor, HI
Naval Vessel Historical Evaluation FINAL DETERMINATION This evaluation is unclassified Name CURTS Vessel Class OLIVER HAZARD PERRY (FFG-7)-class guided missile frigate Vessel Location INACTSHIPMAINTO Pearl
More informationNavy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress
: Background, Issues, and Options for Congress Ronald O'Rourke Specialist in Naval Affairs January 20, 2011 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of
More informationShip Systems Overview
Ship Systems Overview 2005 Institutional Investor Conference March 24, 2005 Dr. Philip A. Dur President, Ship Systems Northrop Grumman Corporation Ship Systems at a Glance... $3.6B 2004 Sales 20,00 employees
More informationUs Navy Shipboard Electrical Tech Manuals READ ONLINE
Us Navy Shipboard Electrical Tech Manuals READ ONLINE Navy will deploy first ship with laser weapon - Mar 05, 2014 Technology Lab / Information Technology Navy will deploy first ship with laser weapon
More informationAmphibious Ships and Landing Craft Data Book
MCRP 3-31B Amphibious Ships and Landing Craft Data Book U.S. Marine Corps PCN 144 000103 00 To Our Readers Changes: Readers of this publication are encouraged to submit suggestions and changes that will
More informationNAVY SHIP MAINTENANCE
United States Government Accountability Office Report to Congressional Committees November 2016 NAVY SHIP MAINTENANCE Action Needed to Maximize New Contracting Strategy's Potential Benefits GAO-17-54 Highlights
More informationSTATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and
NOT FOR PUBLICATION UNTIL RELEASED BY THE SEAPOWER AND EXPEDITIONARY FORCES SUBCOMMITTEE STATEMENT OF MS. ALLISON STILLER DEPUTY ASSISTANT SECRETARY OF THE NAVY (SHIP PROGRAMS) and RDML WILLIAM HILARIDES
More informationIntroduction and Program Summary. Strategic Submarine Programs Perspective: Submarine Construction, Maintenance, and Modernization
Welcoming Remarks Rear Admiral John B. Padgett III, USN (Ret.) President and Chief Executive Officer Naval Submarine League Introduction and Program Summary Dr. David A. Rosenberg Seminar Chair and Moderator
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge
United States Government Accountability Office Report to Congressional Committees August 2016 ARLEIGH BURKE DESTROYERS Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design
More informationNavy Littoral Combat Ship/Frigate (LCS/FF) Program: Background and Issues for Congress
Navy Littoral Combat Ship/Frigate (LCS/FF) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs June 30, 2017 Congressional Research Service 7-5700 www.crs.gov RL33741
More informationMarch 23, Sincerely, Peter R. Orszag. Honorable Roscoe G. Bartlett, Ranking Member, Seapower and Expeditionary Forces Subcommittee
CONGRESSIONAL BUDGET OFFICE U.S. Congress Washington, DC 20515 Peter R. Orszag, Director March 23, 2007 Honorable Gene Taylor Chairman Subcommittee on Seapower and Expeditionary Forces Committee on Armed
More informationUNCLASSIFIED UNCLASSIFIED
: February Exhibit R, RDT&E Budget Item Justification: PB 119: Research, Development, Test & Evaluation, / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY R1 Program Element
More informationLittoral OpTech West Workshop
UNCLASSIFIED Littoral OpTech West Workshop 23-24 Sep 2014 D. Marcus Tepaske, D. Eng. Office of Naval Research Science Advisor II Marine Expeditionary Force Camp Lejeune, NC derrick.tepaske@usmc.mil 910-451-5628
More informationStatus of Unmanned Systems: EXECUTING!
Status of Unmanned Systems: EXECUTING! CAPT Jon Rucker Program Manager PMS406 Jan 2018 Distribution Statement A: Approved for Public Release; Distribution Unlimited. This Brief is provided for Information
More informationARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast
Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived
More informationMQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy
MQ-8B FIRE SCOUT AEROSPACE SYSTEMS Ver tical Takeof f and Landing Tactical Unmanned Aerial Vehicle System MQ-8B Fire Scout Air Vehicle Specifications United States Navy Air Vehicle Fuselage Length (with
More informationNavy Littoral Combat Ship/Frigate (LCS/FFGX) Program: Background and Issues for Congress
Navy Littoral Combat Ship/Frigate (LCS/FFGX) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs September 22, 2017 Congressional Research Service 7-5700 www.crs.gov
More informationNavy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs February 14, 2013 CRS Report for Congress Prepared for Members and Committees
More informationNavy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress
: Background, Issues, and Options for Congress Ronald O'Rourke Specialist in Naval Affairs October 14, 2010 Congressional Research Service CRS Report for Congress Prepared for Members and Committees of
More informationLITTORAL COMBAT SHIP. Knowledge of Survivability and Lethality Capabilities Needed Prior to Making Major Funding Decisions
United States Government Accountability Office Report to Congressional Committees December 2015 LITTORAL COMBAT SHIP Knowledge of Survivability and Lethality Capabilities Needed Prior to Making Major Funding
More informationCONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. An Analysis of the Navy s Fiscal Year 2017 Shipbuilding Plan
CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE An Analysis of the Navy s Fiscal Year 2017 Shipbuilding Plan FEBRUARY 2017 Notes Unless otherwise indicated, all years referred to in this document
More informationThank you for the introduction Captain Little. I am very pleased to be able to join you
Remarks by the Honorable Richard. V. Spencer Secretary of the Navy National Association of Destroyers Veterans Dinner King of Prussia, PA 23 August 2017 Thank you for the introduction Captain Little. I
More informationR Z SEP 17 FM CMC CDI MEXWID WASHINGTON DC TO RUJIAAA/COMMARFORCOM RUJIAAA/COMMARFORCOM G FOUR RUJIAAA/COMMARFORCOM G THREE G FIVE G SEVEN
R 121434Z SEP 17 FM CMC CDI MEXWID WASHINGTON DC TO RUJIAAA/COMMARFORCOM RUJIAAA/COMMARFORCOM G FOUR RUJIAAA/COMMARFORCOM G THREE G FIVE G SEVEN RUJDAAA/COMMARFORPAC RUJDAAA/COMMARFORPAC G FIVE RUJDAAA/COMMARFORPAC
More informationNavy CVN-21 Aircraft Carrier Program: Background and Issues for Congress
Order Code RS20643 Updated January 17, 2007 Summary Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense, and
More informationSTATEMENT OF MR. JOHN J. YOUNG, JR. ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT, AND ACQUISITION) AND
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE SEAPOWER SUBCOMMITTEE STATEMENT OF MR. JOHN J. YOUNG, JR. ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT, AND ACQUISITION)
More informationDepartment of the Navy FY 2006/FY 2007 President s Budget. Winning Today Transforming to Win Tomorrow
Department of the Navy FY 26/FY 27 President s Budget Winning Today Transforming to Win Tomorrow 4 February 25 1 1 Our budget resources are aligned to support both present responsibilities and future capabilities.
More informationThe Integral TNO Approach to NAVY R&D
NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,
More informationNDIA 10 th Annual Expeditionary Warfare Conference: Ship Acquisition. Presented by RADM Charles Hamilton 26 October 2005
NDIA 10 th Annual Expeditionary Warfare Conference: Ship Acquisition Presented by RADM Charles Hamilton 26 October 2005 Ship Acquisition Issues, challenges and opportunities in the areas of platforms,
More informationDRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya
DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya Good morning and thank you for giving me the opportunity to speak with
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11
Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun
More informationGood afternoon Cherry Point, and happy birthday Marines. What the Navy and Marine Corp uniquely gives this country is
Secretary of the Navy Ray Mabus USS Frank E. Petersen Jr. Shipnaming MCAS Cherry Point, NC 09 November 2016 Good afternoon Cherry Point, and happy birthday Marines. What the Navy and Marine Corp uniquely
More informationNavy Littoral Combat Ship (LCS) Program: Background and Issues for Congress
Navy Littoral Combat Ship (LCS) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs November 30, 2017 Congressional Research Service 7-5700 www.crs.gov RL33741 Summary
More informationARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR
ARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR Navy ACAT IC Program Prime Contractor Total Number of Systems: 57 Bath Iron Works (Shipbuilder) Total Program Cost (TY$):
More informationNavy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress
Order Code RS20643 Updated December 5, 2007 Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress Summary Ronald O Rourke Specialist in National Defense Foreign
More informationNavy Frigate (FFG[X]) Program: Background and Issues for Congress
Navy Frigate (FFG[X]) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs October 26, 2017 Congressional Research Service 7-5700 www.crs.gov R44972 Summary As part of
More informationEngaging U.S. Markets: Strategy and Programs
Engaging U.S. Markets: Strategy and Programs Ralph D. Crosby, Jr. CEO North America North America Investor Forum New York 7 th October 2003 1 EADS Accessing the U.S. Aerospace and Defense Market Executing
More informationUnmanned Systems. Northrop Grumman Today Annual Conference
Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop
More informationINTERNATIONAL NAVAL SHIPS DECEMBER 2014
Part : Conditions of Classification (Supplement to the ABS Rules for Conditions of Classification) GUIDE FOR BUILDING AND CLASSING INTERNATIONAL NAVAL SHIPS DECEMBER 204 PART CONDITIONS OF CLASSIFICATION
More informationInspector General FOR OFFICIAL USE ONLY
Report No. DODIG-2017-014 Inspector General U.S. Department of Defense NOVEMBER 8, 2016 Acquisition of the Navy Surface Mine Countermeasure Unmanned Undersea Vehicle (Knifefish) Needs Improvement INTEGRITY
More informationNavy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs July 3, 2018 Congressional Research Service 7-5700 www.crs.gov RL32109 Summary
More informationNavy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs March 24, 2015 Congressional Research Service 7-5700 www.crs.gov RL33741
More informationNaval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives
Inspector General U.S. Department of Defense Report No. DODIG-2016-063 MARCH 18, 2016 Naval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives Mission Our
More informationNavy Littoral Combat Ship (LCS) Program: Background, Oversight Issues, and Options for Congress
Order Code RL33741 Navy Littoral Combat Ship (LCS) Program: Background, Oversight Issues, and Options for Congress Updated November 2, 2007 Ronald O Rourke Specialist in National Defense Foreign Affairs,
More informationNavy Frigate (FFG[X]) Program: Background and Issues for Congress
Navy Frigate (FFG[X]) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs September 28, 2017 Congressional Research Service 7-5700 www.crs.gov R44972 Summary As part
More informationNaval Vessel Historical Evaluation FINAL DETERMINATION This evaluation is unclassified
Naval Vessel Historical Evaluation FINAL DETERMINATION This evaluation is unclassified Name Hull Number PAUL F. FOSTER EDD 964 Vessel Class Previous Vessel Designation (if any) Second SPRUANCE (DD 963)-class
More informationRebuilding Capabilities of Russian Navy to Be Long Process
Rebuilding Capabilities of Russian Navy to Be Long Process Defense-aerospace Russian shipyards have undertaken a substantial shipbuilding program to renew the Russian Navy s fleet, which had slowly grown
More informationLESSON 4: THE U.S. NAVY
LESSON 4: THE U.S. NAVY amphibious aweigh commerce frigates mobilization operational sea power strategic engages in actions such as carrying food and medical supplies to disaster areas and in assisting
More informationNavy Littoral Combat Ship (LCS) Program: Background and Issues for Congress
Navy Littoral Combat Ship (LCS) Program: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs June 25, 2014 Congressional Research Service 7-5700 www.crs.gov RL33741 Summary A
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7
CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles
More informationJoint Logistics Fireside Chat NDIA Logistics Conference 27 March Balancing Readiness and Resources
Joint Logistics Fireside Chat NDIA Logistics Conference 27 March 2012 Balancing Readiness and Resources LtGen Brooks Bash Director for Logistics, Joint Staff (J4) Vice Commander, Pacific Air Forces 321
More informationNavy Nuclear-Powered Surface Ships: Background, Issues, and Options for Congress
Navy Nuclear-Powered Surface Ships: Background, Issues, and Options for Congress Ronald O'Rourke Specialist in Naval Affairs December 23, 2009 Congressional Research Service CRS Report for Congress Prepared
More informationRear Admiral Joe Carnevale
249 Rear Admiral Joe Carnevale To begin, let me make a couple of observations, one at the microscopic level and one at the macroscopic level. I bought a new computer on Friday, and I have spent the whole
More informationNavy Community Service Environmental Stewardship Flagship Awards Past Award Winners and Honorable Mentions
Past Award Winners and Honorable Mentions 2015 NCS-ESF Award Winners and Honorable Mentions 2014 NCS-ESF Award Winners and Honorable Mentions 2013 NCS-ESF Award Winners and Honorable Mentions 2012 NCS-ESF
More informationREQUIREMENTS TO CAPABILITIES
Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military
More information