BCT Network Integration and Technology Insertion

Size: px
Start display at page:

Download "BCT Network Integration and Technology Insertion"

Transcription

1 BCT Network Integration and Technology Insertion Richard S. Cozby Associate Director for C4ISR Program Executive Officer for Integration - System of Systems Test and Evaluation ATTN: SFAE-INT-TE, Bldg 120, APG, MD Phone: Comm. (410) /DSN Fax: Comm. (410) /DSN rick.cozby@us.army.mil DISTRIBUTION STATEMENT A: Approved 3 for Jan public 2011 release; distribution is unlimited.

2 An Evolving Army Network Strategy Getting On The Same Road Future Combat System (15 FBCTs) FCS Termination Capability Set Management EIBCT (FCS Spin-Outs) (~9 EIBCTs) Ad Hoc Network Modernization (Everyone Else) Network Synch Workgroup (NSWG) One Army Network Approach Aligned to ARFORGEN Standards-Based Capability First.build the Network Built Back From Tactical Edge Repeatable Methodology Guided by current Network Imperatives Allows for Continuous Review of New Technologies Will Expand Scope to other Unit Formations 2 Use or disclosure of data contained on the page is subject to restrictions on title page

3 Network Integration Challenges 3. Enhanced Battle Command 4. Network Management 5. Network Engineering 1 2 Platform C2 Kit: Each Program of Record procures its own computer hardware resulting in multiple computers in a single platform (WIN-T, JBC-P, BCTM) with high procurement costs. Soldier Connectivity: The dismounted Soldier does not have access to a COP for SA or have other networked C2 capabilities. Nett Warrior program will provide SA & C2 within the small unit, but lacks connectivity to larger platform based network and sensors when BLOS. 3 Enhanced Battle Command: Two programs are developing platform Battle Command software (BCTM & JBC-P). Enhancements are required for JBC-P to improve situational awareness, understanding, integration of sensor data, planning and collaboration, file transfer, and logistics automation. 2. Soldier Connectivity 4 Network Management: Separate network management tools are being developed for JTRS, WIN-T, NIK, JBC-P, Sensors, BCTM applications with older legacy systems EPLRS, AKMS, TIMS, etc. overburdening the S6 and duplicating efforts. 1. Platform C2 Kit Company Command Post & Platform 5 Network Engineering: No single effort is responsible for the upfront developmental system engineering, SoS integrating, and testing of both the transport and application layer systems. 3 Use or disclosure of data contained on the page is subject to restrictions on title page

4 CS IBCT Company Command Post and Platform Integration Company CP Tasks Communicate by voice and data with higher, subordinate, and adjacent units Plan, prepare, execute and assess operations Share and display relevant information Receive, process, produce, and submit required reports Create and disseminate orders Organize command post personnel and equipment for continuous operations Infantry Center White Paper XO Company Command Post Command Post Core Ops NCO Signal Intel Fires NCO Ne MC ICD Company CP Systems Network SNAP OSRVT BFT2 NSWG 13/14Transport Applications CPOF JBC-P DCGS Mobile Basic TIGR FOS BATS/HIIDE Required Capabilities Ability to display and manipulate the COP Access to unclassified, classified, and coalition networks Incorporate rehearsal and training tools Conduct all source intelligence analysis and operations Transmit and receive voice, data and imagery (LOS and BLOS) Automatically transmit own PLI and receive and display auto transmitted friendly PLI Collaborate via voice, chat, and whiteboard with higher, adjacent, and subordinate units 4 Use or disclosure of data contained on the page is subject to restrictions on title page

5 Brigade Combat Team Integration Exercise July 2010 Digital Network Capabilities 50 km Range Extension Aerial SRW Network Extension Lower Tactical Network SRW EW & CC (Voice & Data) Company Command Post Increment I Network Integration Kit with Ground Mobile Radio (GMR) and Warfighter Information Network Tactical (WIN-T) 1,500 miles between command posts NCW (Voice & Data) Higher Tactical Network Nett Warrior Rifleman s Radio Soldier Radio Waveform Images Position Location Indicators Sensor Information Voice Inc 1 Robotics & Sensors Handheld & Man-portable Devices HMS Manpack Real-time Collaboration w/higher HQs SIPR access Documents Battle-tracking Robotics and Sensor Data Management Voice Crossbanding SRW to WNW to SRW Wideband Networking & NetCentric Waveforms w/ Blue Force Tracker Images Streaming Video Battle Space Objects Battle Command Applications Sensor Information Voice Battle Command Applications TIGR CPOF AFATDS TacWeb MS Outlook Web Access The Inc I NIK provides an integration hub for current and future network systems 5 Use or disclosure of data contained on the page is subject to restrictions on title page

6 Inc 1 & Beyond Network Architecture An Open-Architecture, Standards-Based Future Aerial SRW Network Extension Real-time Chat Softwareprogrammable GMR allows for reconfiguration of local terrestrial networks to accommodate current force data networks. Over-the-Air File Transfer Whiteboard Collaboration I I Higher Tactical Network I Geographically dispersed terrestrial WNW networks linked together with voice & data via WIN-T. Image Sharing & Video Streaming Sensor Data Full ABCS Connectivity NCW (Voice & Data) Lower Tactical Network MNIK Sensor Images FBCB2 BSOs Nett Warrior MNIK Unmanned Aerial Systems Sensors Common Nett Warrior Controller Plug-n-Play SRW network allows SRW X.X future sensors, (Voice & Data) Robotics robotics, and dismounted Networked radios Peripherals to & Subnets join the network. SINCGARS & Digital Voice Cross-banding Real-time Local & Streaming Video Networked Unmanned Aerial Systems dismounted SRW sub-networks, Common peripherals, and Controller robotics. Sensors SRW X.X (Voice & Data) Robotics Networked Peripherals & Subnets The Inc 1 Network Architecture Is The Foundation Of A Future Open-architected, Standards-based Broadband Digital Network With Robust, Plug-n-play Applications In Any Terrain, Any Environment, Anywhere 6 Use or disclosure of data contained on the page is subject to restrictions on title page

7 Company and Below Risk Reduction Architecture Apr 11 BN TOC TCN v1 WSMR BFTNOC BDE TOC SL NWS 1 RR 1 st Plt PL NWS 2 RR 1 st Platoon Net SRW Co Cdr SNE/NCW Manpack/SRW BFT2* 117G/ANW2 RTO (MNIK) HMS Manpack Company Net SRW CC 1 RR 1 Sensor Radio Team 1 x Leader: NWS: 1 RR ea 1 x Rifleman: 1 RR ea RR Co CDR NWS 2 RR Co CP Manpack/SRW BFT2* 117G/ANW2 HNR/HNW BDE simulated VM Server Stack 2 nd Plt PL NWS 2 RR FO RTO Manpack 2nd Platoon Net SRW 7 Use or disclosure of data contained on the page is subject to restrictions on title page SNAP Co CDR RTO Manpack RTO (MNIK) HMS Manpack SL NWS 1 RR Team 2 x Leader: NWS: 1 RR ea 1 x Rifleman: 1 RR ea RR Physical integration of Co CDR w/o vehicle at NSC Physical integration and operational Co CP w/o WIN-T Inc2 live radiation Configuration checkout on HW integrated to the platform Simulate connection to provide enterprise services w/ server stack Extend to NSC as BDE TOC with C2OTM NCW capability ESB/FAA will be simulate by SNAP terminal Emulate HNR at BDE since only 1 available at CoCP FO/LW 2 RR 1 PRC-152** Plt Net Co Net : For Voice* **Fires Net: For SINCGARS Voice SL NWS 1 RR *BFT will be used if BFT2 not available Possible alternate solutions 7 +2 spares manpacks 17+3 spares RRs

8 Company-and-Below Risk Reduction Build-Up (A Candidate for Distributed Integration & Test) January February March April Huntsville (Prototype Integration Facility) CECOM SEC NSC 3 Jan Jan Feb 11 3 Mar MAR Co CDR vehicle: SW Co CDR Co CP HW Procurement (Long-Lead) Development/Interop HW/SW 3 Jan Jan 11 Integration Co CP Initial via Design FF 15 days Emulation 17 Jan 11 PDR CECOM SEC 3 Jan Feb 11 C2 SW Package Integration and Prototype Development (Co CP/Co CDR) 7 Jan 11 7 Jan 11 SW Install/Build/Test Emulated BDE TOC Co CP Design Finalization 18 Jan 11 1 Feb Feb Feb 11 CDR 15 Feb 11 Define Incremental Build-up for BCTIE 11.2 and Soldier Product-Independent Verify/Test Dismount LW/CC/MNIK 15 Feb Mar 11 Co CP HW Fabrication APG (Bldg 120) SW Integration 16 Feb Feb 11 C2 SW package Co CP Co CDR TOC Dismount Systems Dismount Systems w/ Transport Co CP SW / HW Integration (Risk Reduction) Scottsdale MAR Huntsville MAR 4 Apr Apr 11 Field Integration at WSMR NSC 28 MAR-3 April Shipment to WSMR BCTIE 11.1 IOT Risk Reduction Event BCTIE Apr Legend: Co CDR Veh Co CP HW Dismount C2 /TOC Unit/Component System Testing/Verification SOS Testing/validation

9 Proposed Process for Rapid Network Integration and Maturation Semi-Annual Process Rapid NW Integration & Maturation Process Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Current Baseline Network Capabilities Enter Process POR Technology Candidates Phase IV: Tech Assessment (PEOs/PMOs, TRADOC, G3/5/7, ATEC) (Across DOTMLPF) Phase 0: Bridge Operational Gaps to Technology Needs (TRADOC, RDECOM, G3/5/7) Network Summit DP2 Proven Technology Tech Gaps Phase I: Solicit Technology Candidates (CIO/G6, PEO I, ASA(ALT), RDECOM, PEOs/PMOs, Non-PORs (Govt, Industry & Academia) ) Proposed Technologies Tech Candidates DP1 Phase III: Cooperative Technology Maturation and Insertion CRADA (RDECOM, PEOs/PMOs, ATEC Viable Technologies Phase II: Technology Viability Review (RDECOM, PEOs/PMOs, G6, G8) Phase V: Technology Transfer (PMO s) Capability Gains in POR Baselines Network Summit Enhanced Baseline Network Capabilities Army Labs Support Entire Process 9 Use or disclosure of data contained on the page is subject to restrictions on title page

10 FY11 FY12 FY13 FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Reset Train/ Ready Available Train/ Ready Available Train/ Ready Available Reset Train/ Ready Available BCT HQ, MI Co & Sig Co NEF & NET AETF/ BCT Merge BCT HQ, MI Co, & Sig Co HW/SW Int, Technical Commex, Delta NET, Op Commex BN HQ NEF & NET BN HQ HW/SW Int, Technical Commex, Delta NET, Op Commex Company NEF & NET BCTIE 11.1 IOT Risk Reduction Event All: HW/SW Int, Technical Commex, Delta NET, Op Commex AETF BCT Evaluations 2/1 AD BCT Field OPS GMR LUT MSS LUT TEN-E LUT HMS MP LUT RR IOT Other Network Systems SPIDER WIN-T Inc 2. NEF/NET BCT HQ NEF & NET Evaluations GCSS-A IOTE 2/1AD gets WIN-T WIN-T FDTE Inc. 2 EDMs TCNs/ ONS Systems PoPs /SNEs BCTIE 12.1 WIN-T Inc. 2 IOTE Network Exercise BCT HQ HW/SW Int, Technical Commex, Delta NET, Op Commex BN HQ NEF & NET BN HQ HW/SW Int, Technical Commex, Delta NET, Op Commex Company NEF & NET All: HW/SW Int, Technical Commex, Delta NET, Op Commex Evaluations - Network Test Early Operational Assessment Using WIN-T Inc. 2 All Network Systems Full BCT test Capability Set 13/14 TPE Adaptive Capability insertions ONS Systems BCTIE 12.2 Network Exercise FY12 Network Evaluation CS 13/14 Bridge ONS Systems All BCT Network Systems NETT Warrior IOTE HMS MP MOTE GMR IOTE UAS ER/MP IOTE APMI LUT COIST UAS Collective Training Collective Training Collective Training Adaptive Capability Insertions Evals BCTIE Trng FOUO DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for Administrative or Operational Use (29 October 2003). Other requests for this document shall be referred to the Program Manager, Future Combat Systems (BCT), ATTN: SFAE-FCS-I / MS #515, 6501 East 11 Mile Road, Warren, MI Network Evals Capability Evals Aerial Tier Bridge FY11 Network Capability Solutions and Quantities Determined.Timing Undetermined As of 16 Jan 11 Shadow As of 16 Jan11

11 Build the Network First Fill It and then Rapidly Enhance It Identified Needs ATEC FOA FAST Teams JUONS/ ONS Proposed Capabilities PORs S&T (Govt, Ind, Acad) COTs/Non-PORs (US, Allies) Spring Summer Fall Rodeo Tighten To One Year Cycle Like? No ATEC and CTSF Continuous Evaluation Yes 804 Enabler Pass? A R F O R G E N F I E L D I N G 11 Use or disclosure of data contained on the page is subject to restrictions on title page

12 All Roads Lead to Ft. Bliss / WSMR Process People Organizations Systems Facilities APG, MD ATEC/FFID APG Partnership E-Date: N/A Auth: 3768 PAX TOE Model: G-Series X AETF CAV 1CAB 2CAB FIRES BSB BSTB HHC BSTB H HT HHC HHC HHB HHC HHC MI M7 77 E W FSC FSC 2-1 AD (AETF) Government and Industry Partnership is Key FSC FSC 12 Use or disclosure of data contained on the page is subject to restrictions on title page

13 Backup 13 Use or disclosure of data contained on the page is subject to restrictions on title page

14 Army BDE Modernization Plan Army's overarching strategy is to move from the E-IBCT Increment 1 & 2 construct to the integration and fielding of Capability Packages and Network Capability Sets. Capability Packages are prioritized solutions to meet Brigades highest risk gaps that are integrated with the Army s Network: TRADOC nominates systems HQDA approves the packages and integrates network recommendations into Capability Sets ARFORGEN demand sets the pace of fielding ASA(ALT) develops, tests, integrates and fields E-IBCT systems (Small Unmanned Ground Vehicle and Network Integration Kit (NIK)) fielded to 1 BCT in FY11 and 2 BCTs in FY12. Evaluations of these solutions and emerging technology will determine future solutions. This allows for establishment of a BCT Network Baseline And Then to Build On It Rapidly. Beginning in FY13 the Army plans to field Capability Package/Sets to Brigades in the Train and Ready phase based on ARFORGEN demand. 14 Use or disclosure of data contained on the page is subject to restrictions on title page

15 Network Strategy The Army s Network is continuously modernizing with a goal to build a comprehensive network. A prioritized effort is underway to incrementally modernize beginning with the tactical edge network. The tactical edge network should be seen as the Brigade Combat Team dismounted Soldier who represents today s most challenged and important network user. The Army s network priority is to first build the infrastructure and standards as the foundation to support our networked organizations and to set conditions for accelerated fielding of advanced network capabilities. We will establish a Common Operating Environment (COE) for common technical standards within distinct network environments; enhancing our interoperability and capacity to rapidly develop, test, certify and field applications to meet Warfighter needs. The Army s most important network task is synch with the maturing Army Force Generation (AFORGEN) process. 15 Use or disclosure of data contained on the page is subject to restrictions on title page

16 Enabling a New Network Acquisition Strategy Network Imperatives and an Integration Construct Network Integration Challenges and the Need for a New Acquisition Paradigm Establishing a Network Baseline and then Rapidly Build It Disciplined Engineering, Integration and Test/Assessment Cycles All Roads Lead to Fort Bliss and White Sands Missile Range (thru Aberdeen Proving Ground) Build the Network First Then Fill It. 1. Build Capacity 2. Enhanced Battle Command Army Network Imperatives 3. Edge Network Integration (NIK Capability) 4. Common Operating Environment (COE) Implementation 16 Use or disclosure of data contained on the page is subject to restrictions on title page

17 Network Capability Requirements Integration Concept Network Capability is comprised of four component capabilities: 1. Command Post Capability - including CJTF to company levels; requires mobility; SWaP-C engineered into a set footprint and rolling stock; 2. Platform Capability - including ground, air, (and waterborne); C2 OTM /MCOTM (mobile command group); SWaP engineered onto vehicle or AC; 3. Soldier (dismounted) Capability - SWaP engineered to hang off body armor or fit into a ruck; 4. Network Infrastructure Capability - 'enterprise' providing 'reach back for support and specific services; holds some levels of the 'cloud. Capability = a combination of Transport + Application/Service(s) + SWaP-C. TCM BC, 19 Nov Use or disclosure of data contained on the page is subject to restrictions on title page

18 BCTIE Risk Reduction Deploy Network Engineering and Integration Convergence FY11 FY12 FY13 BCTIE Annual Exercise BCTIE(s) PEO(s) AETF ATEC POR(s) LUT(s) FDTE Log DEMO BCTIE Annual Exercise IOT&E WIN-T Inc 1B/2 Nett Warrior JTRS MP/GMR UAS ER/MP Battle Command Collapse Army Software Blocking BCTIE Annual Exercise Network Test FY12Q4 EXORD DAMO-CI Forcing Function 3/1 AD IOT&E DEPLOY EXORD EXECUTION Disciplined Engineering, Integration and Test/Assessment Cycles are Key to Success 18 Use or disclosure of data contained on the page is subject to restrictions on title page

19 Cooperative Network Engineering and Integration Will Enable Rapid Capability Growth CS13-14 Current NIK INC2 Fully Company Post CS13-14 (Objective) Reduced SWAP-C Lower Cost and Better Transport POP/ SNE Integrate d Company Command Post Network Management Suite Common, Modular, Computing Environment JBC-P Better Platform Integration Soldiers and Sensors in the Network 19 Use or disclosure of data contained on the page is subject to restrictions on title page

Testing in a Distributed Environment

Testing in a Distributed Environment Testing in a Distributed Environment Mr. Stephen Kreider, SES Acting Deputy Program Executive Office Integration DISTRIBUTION STATEMENT: Approved for public release; distribution unlimited. Case 10-1069.

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet 1 LandWarNet (LWN) Initial Capabilities Document (ICD) / Network Enabled Mission Command (NeMC) ICD LandISRNet Intel Appendices

More information

PEO C3T PD Cyber Operations & Defense

PEO C3T PD Cyber Operations & Defense PEO C3T PD Cyber Operations & Defense Jerry Cook CLASSIFICATION Designation Army Mission Command Network Vision Achieve distributed, uninterrupted mission command through a network comprised of intuitive,

More information

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 THE ARMY WILL FIELD A NETWORK THAT IS EASY TO USE, WORKS IN ALL ENVIRONMENTS,

More information

NETWORK INTEGRATION EVALUATION OPENING REMARKS

NETWORK INTEGRATION EVALUATION OPENING REMARKS NETWORK INTEGRATION EVALUATION OPENING REMARKS January 9, 2012 NIE 14.1 Industry Day Mr. Terry Edwards Director, SoSE&I NETWORK INTEGRATION EVALUATION AN ENDURING ARMY PROCESS January 9, 2012 NIE 14.1

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

Simulation and Emulation in Support of Operational Networks: ALWAYS ON

Simulation and Emulation in Support of Operational Networks: ALWAYS ON UNCLASSIFIED Simulation and Emulation in Support of Operational Networks: ALWAYS ON NDIA 15 th Annual Systems Engineering Conference 25 October 2012 Dr. Nancy Bucher ASA(ALT) OCSE/PoR nancy.bucher@us.army.mil

More information

Delivering the Tactical Network

Delivering the Tactical Network Delivering the Tactical Network BG Daniel P. Hughes Program Executive Officer AFCEA Aberdeen Technical Workshop Capable but Less Complex Network Simplify Streamline Realign Coalition the network for the

More information

COE. COE Snapshot APPLICATIONS & SERVICES CONNECTING OUR SOLDIERS EXAMPLE SERVICES. COE Enables. EcoSystem. Generating Force

COE. COE Snapshot APPLICATIONS & SERVICES CONNECTING OUR SOLDIERS EXAMPLE SERVICES. COE Enables. EcoSystem. Generating Force COE Snapshot APPLICATIONS & SERVICES Generating Force COE Enables Increased Capability Agility Reduced Life Cycle Costs Flexible Standards-based Infrastructure Enhanced Cyber Protection Command Post Data

More information

The Army Executes New Network Modernization Strategy

The Army Executes New Network Modernization Strategy The Army Executes New Network Modernization Strategy Lt. Col. Carlos Wiley, USA Scott Newman Vivek Agnish S tarting in October 2012, the Army began to equip brigade combat teams that will deploy in 2013

More information

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR FCS Update & Testing Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR 3/13/2009 10:36:11 AM 1 Army Leadership s View Future Combat Systems is the core of our modernization

More information

UNITED STATES ARMY. FCS - Sensors. LTG Stephen Speakes 14 Nov Army Strong 1

UNITED STATES ARMY. FCS - Sensors. LTG Stephen Speakes 14 Nov Army Strong 1 UNITED STATES ARMY FCS - Sensors Army Click Precision Modernization to add Strike Briefing Annual Strategy Review Title and April Approach 15, 2008 LTG Stephen Speakes 14 Nov 2007 Army Strong 1 AGENDA

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

Capability Set Production and Fielding

Capability Set Production and Fielding Association of the United States Army for the Army Support for the October 2012 Capability Set Production and Fielding: Enhancing the U.S. Army s Combat Effectiveness Capability Set Production and Fielding

More information

ASA(ALT) Office of the Chief Systems Engineer (OCSE) Info Brief Integrated SoS Architecture

ASA(ALT) Office of the Chief Systems Engineer (OCSE) Info Brief Integrated SoS Architecture ASA(ALT) Office of the Chief Systems Engineer (OCSE) Info Brief Integrated SoS Architecture 27 October 20 Mr David Poole Director of Architecture ASA(ALT) OCSE davidpoole@usarmymil Systems Architecture

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

Joint Program Executive Office Joint Tactical Radio System

Joint Program Executive Office Joint Tactical Radio System (24 APRIL 2006) Joint Program Executive Office Joint Tactical Radio System MIDS International Review Board JTRS Moving Forward JPEO JTRS 5 May 2006 Mr. Howard Pace Deputy JPEO JTRS 619-524-4498 Howard.Pace@navy.mil

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 24.648 42.347 68.325-68.325 66.869 4.46 -

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) # FY 2016

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Program Element (PE) 33993 38970 33420 37335 35713 23230 23441 Continuing Continuing

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Tactical Mission Command (TMC) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common Acronyms and Abbreviations

More information

COMMON OPERATING ENVIRONMENT COE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED. OCTOBER 2015

COMMON OPERATING ENVIRONMENT COE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED. OCTOBER 2015 COMMON OPERATING ENVIRONMENT COE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED. OCTOBER 2015 > COE: WHAT IT MEANS TO THE SOLDIER Ten years ago, chances are you had a calculator, a calendar and

More information

Tactical Edge Command and Control On-The-Move A New Paradigm

Tactical Edge Command and Control On-The-Move A New Paradigm Tactical Edge Command and Control On-The-Move A New Paradigm 16 th ICCRTS 22 June 2011 Paper ID 149 Mr. Ken Teske and Mr. Mike Tisdel FGM, Inc. C2OTM Focused Integration Team (FIT) 1 Agenda Define C2OTM

More information

PM Mission Command AFCEA APG Chapter December 19, 2012

PM Mission Command AFCEA APG Chapter December 19, 2012 PM Mission Command AFCEA APG Chapter December 19, 2012 COL Jonas Vogelhut Project Manager, Mission Command VERSION XX The Command Post Challenge TAIS ISYSCON v4 AFATDS Warlock BFT/ FBCB2 SKL GBS DCGS-A

More information

DoD Analysis Update: Support to T&E in a Net-Centric World

DoD Analysis Update: Support to T&E in a Net-Centric World Session C: Past and Present T&E Lessons Learned 40 Years of Excellence in Analysis DoD Analysis Update: Support to T&E in a Net-Centric World 2 March 2010 Dr. Wm. Forrest Crain Director, U.S. Army Materiel

More information

UNCLASSIFIED. Any Mission, Anywhere UNCLASSIFIED

UNCLASSIFIED. Any Mission, Anywhere UNCLASSIFIED Presentation Outline Company Intelligence Support Team (CoIST) Battalion Level CoIST Training Programme Tactical Gaming and Simulations In Support of Battalion Level CoIST Training Results of Battalion

More information

Capabilities Development & Integration Directorate. Dismounted Mission Command

Capabilities Development & Integration Directorate. Dismounted Mission Command Capabilities Development & Integration Directorate Dismounted Mission Command 1 Dismounted Mission Command Transition to Mobile HH CE Incremental Modernization Capabilities Development & Integration Directorate

More information

Common Operating Environment, Interoperability, and Command Post Modernization (LOEs 2, 3, and 4)

Common Operating Environment, Interoperability, and Command Post Modernization (LOEs 2, 3, and 4) Common Operating Environment, Interoperability, and Command Post Modernization (LOEs 2, 3, and 4) 1 CSA s Principles, Characteristics and Requirements Principles (Why) Mission: The Army must fight and

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 68.421 62.044 71.300-71.300 27.600

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) Actual FY 2002 FY 2003 FY2004 FY 2005 to Force XXI Battle Command, Brigade & Below (FBCB2) 52003* 65176 63601 37699 29154 12179 0 0 264137 * Database presently shows 56328. Internal

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

Tactical Wheeled Vehicle Sustainment

Tactical Wheeled Vehicle Sustainment Tactical Wheeled Vehicle Sustainment NDIA TWV Conference 6 May 2014 LTG Raymond V. Mason Deputy Chief of Staff, G-4 Headquarters, Department of the Army Agenda Overarching Themes Minimizing Hardware Solutions

More information

Future Combat Systems Industry Day Briefing

Future Combat Systems Industry Day Briefing Future Future Industry Day Briefing MG Joseph L. Yakovac Program Executive Officer, Ground 11 February 2003 Program Manager s Intent: Field FCS-Equipped Units of Action With Threshold Objective Force Capability

More information

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346 Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October 2015 19 February 2016 Battle Lab Report # 346 DESTRUCTION NOTICE For classified documents, follow

More information

ACC/C2ISR Delivering Desired Effects on the Battlefield

ACC/C2ISR Delivering Desired Effects on the Battlefield Headquarters Air Combat Command ACC/C2ISR Delivering Desired Effects on the Battlefield Col Tom Wozniak ACC/A8C 25 July 2006 This Briefing is: UNCLASSIFIED Overview Tactical Level Programs TTNT, TACP,

More information

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.

More information

TECHNET. Integrated Tactical Networking Environment (ITNE)

TECHNET. Integrated Tactical Networking Environment (ITNE) TECHNET Integrated Tactical Networking Environment (ITNE) LTC Greg Grzybowski TRADOC Capability Manager Tactical Radios 9 September 2014 Purpose Provide an update on the progress of the Cyber Center of

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 3528A: Distributed Common Ground/ FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

The Army's Integration Team

The Army's Integration Team The Army's Integration Team NIE 14.2 Sources Sought Review and Timeline Kim Bowen Division Chief Integration Planning System of Systems Integration Directorate Agile Process Overview Decision Point 0 Approved

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 20.602 20.886 48.309-48.309 60.003 53.434

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 35.46 253.959 177.532-177.532 219.937

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM) Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

ABCA Armies CIS Update. MilCIS 2016

ABCA Armies CIS Update. MilCIS 2016 ABCA Armies CIS Update MilCIS 2016 1 Scope The America, British, Canadian, Australian and New Zealand (ABCA) Armies' Program mitigates interoperability gaps, leverages opportunities and informs modernization

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Army : February 2016 2035A: Other Procurement, Army / BA 02: Communications and Electronics Equipment / BSA 80: Elect Equip - Tact Int Rel Act (TIARA)

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

Blue on Blue: Tracking Blue Forces Across the MAGTF Contemporary Issue Paper Submitted by Captain D.R. Stengrim to: Major Shaw, CG February 2005

Blue on Blue: Tracking Blue Forces Across the MAGTF Contemporary Issue Paper Submitted by Captain D.R. Stengrim to: Major Shaw, CG February 2005 Blue on Blue: Tracking Blue Forces Across the MAGTF EWS 2005 Subject Area WArfighting Blue on Blue: Tracking Blue Forces Across the MAGTF Contemporary Issue Paper Submitted by Captain D.R. Stengrim to:

More information

US Army Combined Arms Center SOLDIERS AND LEADERS - OUR ASYMMETRIC ADVANTAGE. Synthetic Training Environment (STE) STE Update to PALT

US Army Combined Arms Center SOLDIERS AND LEADERS - OUR ASYMMETRIC ADVANTAGE. Synthetic Training Environment (STE) STE Update to PALT Synthetic Training Environment (STE) STE Update to PALT Forward to STE As Is 1980s technology limits ability to train Combined Arms operations 47 terrain formats Concurrency challenges and not designed

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0305208A Distributed Common Ground/Surface Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual to Total Total Program Element (PE) 128334 68662 188425 Continuing

More information

Maintaining the Information Flow: Signal Corps Manpower and Personnel Requirements for the Battlefield

Maintaining the Information Flow: Signal Corps Manpower and Personnel Requirements for the Battlefield Maintaining the Information Flow: Signal Corps Manpower and Personnel Requirements for the Battlefield B. Wayne Anderson U.S. Army Research Laboratory and Gerald S. Garfinkel U.S. Army Test and Evaluation

More information

Ground Combat Command and Control Family of Systems / ABCS SE&I

Ground Combat Command and Control Family of Systems / ABCS SE&I Ground Combat Command and Control Family of Systems / ABCS SE&I Mr. Randall Matura Chief, Business Management Division PM Ground Combat Command and Control (732) 427-3303 Randall.Matura@c3smail.monmouth.army.mil

More information

The Armed Forces Communications and Electronics Association (AFCEA)

The Armed Forces Communications and Electronics Association (AFCEA) U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

Executive Summary Linking Resourse Decisions to Army Strategy Army Fiscal Year 2012 Budget Objectives and Priorities...

Executive Summary Linking Resourse Decisions to Army Strategy Army Fiscal Year 2012 Budget Objectives and Priorities... Table of Contents Executive Summary... 1 Linking Resourse Decisions to Army Strategy... 2 Army Fiscal Year 2012 Budget Objectives and Priorities... 10 Equipment Portfolio Overviews... 13 Soldier...14 Mission

More information

AFCEA Mission Command Industry Engagement Symposium

AFCEA Mission Command Industry Engagement Symposium UNCLASSIFIED/ AFCEA Mission Command Industry Engagement Symposium MG Pete Gallagher Director, Network CFT 3 April 2018 Network CFT Collaboration, Fusion & Transparency WARFIGHTING REQUIREMENTS Army Warfighters

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE Sensor Tech COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Test and Evaluation Strategies for Network-Enabled Systems

Test and Evaluation Strategies for Network-Enabled Systems ITEA Journal 2009; 30: 111 116 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation Strategies for Network-Enabled Systems Stephen F. Conley U.S. Army Evaluation Center,

More information

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) Army ACAT ID Program Prime Contractor Total Number of Systems: 59,522 TRW Total Program Cost (TY$): $1.8B Average Unit Cost (TY$): $27K Full-rate production:

More information

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160427BB Mission Training and Preparation

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete F58 NON LINE OF SIGHT

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction Synthetic Training Environment (STE) White Paper Combined Arms Center - Training (CAC-T) The Army s future training capability is the Synthetic Training Environment (STE). The Synthetic Training Environment

More information

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability U.S. Army Research, Development and Engineering Command Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability NDIA Systems Engineering Conference

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE Communications Technology COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

AFCEA NOVA ARMY-IT DAY OVERALL CLASSIFICATION OF THIS BRIEFING: UNCLASSIFIED

AFCEA NOVA ARMY-IT DAY OVERALL CLASSIFICATION OF THIS BRIEFING: UNCLASSIFIED AFCEA NOVA ARMY-IT DAY OVERALL CLASSIFICATION OF THIS BRIEFING: Ms. Lynn Schnurr Department of the Army G-2, Chief Information Officer and Director Intelligence Community Information Management SECDEF

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 19.610 5.856 8.660-8.660 14.704 14.212

More information

Army Fiscal Programming For Equipment

Army Fiscal Programming For Equipment UNITED STATES ARMY Army Fiscal Programming For Equipment Organizations / Processes / Challenges & Priorities COL Frank M. Muth Director of Materiel, Force Development, Army 2 Agenda FOUO Agenda Organizations

More information

Single Integrated Ground Picture

Single Integrated Ground Picture Single Integrated Ground Picture 2003 Interoperability and System Integration Presented by: Anthony Lisuzzo Director, Intelligence and Information Directorate US ARMY CECOM 732-532-5557 Email: anthony.lisuzzo@mail1.monmouth.army.mil

More information

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division UNCLASSIFIED //FOR FOR OFFICIAL OFFICIAL USE USE ONLY ONLY Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technology) 31 March 2016. Other

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0603008A Electronic Warfare Advanced Technology ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element

More information

MC Network Modernization Implementation Plan

MC Network Modernization Implementation Plan MC Network Modernization Implementation Plan Mission Command Center of Excellence 1 Principles (Why) Warfighting Requirements CSA s Mission, Principles, Characteristics of the Network & Requirements Network

More information

Chief of Signal s Message

Chief of Signal s Message Chief of Signal s Message The members of the Signal Regiment today, through implementation of communications networks, are enabling combat and support operations at levels never imagined in the history

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 205 Exhibit R2, RDT&E Budget Item Justification: PB 2040: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) R Program Element (Number/Name)

More information

Speaking with One Voice

Speaking with One Voice Roadmap to Army Networks in 2025 Speaking with One Voice By Kyle D. Barrett 2 Spring - 2016 The Network Modernization Roadmap illustrates our Army leaders strategy to fill capability gaps and make necessary

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 24: Research,, Test & Evaluation, Army BA 5: System & Demonstration (SDD) COST ($ in Millions) Years FY 212 FY 213 # PE 64746A:

More information

UNCLASSIFIED. FY 2011 Total Estimate

UNCLASSIFIED. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 The Joint Staff DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 for the Warrior (C4IFTW) FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 9.334 6.602 - - - - - - - 0.000 15.936 9.334 6.602 - - - - - -

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE 5 - System Development and Demonstration 0604817A - Combat Identification COST (In Thousands) FY 2003 FY 2004 FY 2005

More information

Army Team C4ISR BRAC Update

Army Team C4ISR BRAC Update Army Team C4ISR BRAC Update Presented By: COL Kent T. Woods, Dep Cdr Ops, Plans, BRAC Mr. Raoul Cordeaux, G3/5 CECOM Life Cycle Management Command 15 September 2009 BRAC 2005: Background 15 Sept 2005 President

More information

Mr. Vincent Grizio Program Manager MISSION SUPPORT SYSTEMS (MSS)

Mr. Vincent Grizio Program Manager MISSION SUPPORT SYSTEMS (MSS) RSC SPECIAL OPERATIONS FORCES INDUSTRY CONFERENCE Win Transform People Mr. Vincent Grizio Program Manager MISSION SUPPORT SYSTEMS (MSS) DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE Program Manager Mission

More information

FCS Embedded Training: An Overview

FCS Embedded Training: An Overview FCS Embedded Training: An Overview Chuck Moler FCS LSI Training Systems IPT 12/13/2005 Training is THE factor in determining the victor. - DSB Task Force on Training Superiority and Training Surprise Approved

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

Army IAMD Modular Open Systems Approach

Army IAMD Modular Open Systems Approach Army IAMD Modular Open Systems Approach Presented to the Defense Daily OA Summit The Power of Modularity and New Open Business Models Panel Presented by Mr. Charley Robinson, Director, System Engineering,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

Joint Tactical Radio System (JTRS)

Joint Tactical Radio System (JTRS) C4I - Command, Control, Communications, Computers & Intelligence Forecast Outlook On September 30, 2012, the Joint Tactical Radio System program was officially closed Forecast International expects "residual"

More information

Directorate of Training and Doctrine Industry Day Break out Session

Directorate of Training and Doctrine Industry Day Break out Session Directorate of Training and Doctrine Industry Day 2018 Break out Session Mr. Chris K. Jaques Chief, Individual and Systems Training Division, DOTD (706) 545-5209 Mr. Richard C. Bell Chief, Simulations

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 13 P-1 Line #25

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 13 P-1 Line #25 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR

More information

2018 Army Signal Conference

2018 Army Signal Conference 2018 Army Signal Conference March 8 2018 Springfield, VA This briefing is: Ronald Ronald W. W. Pontius Pontius Deputy to the Commanding General Deputy U.S. to Army the Cyber Command & Second Army Commanding

More information

Yemen ISR CONOPS and Capabilities

Yemen ISR CONOPS and Capabilities Yemen ISR CONOPS and Capabilities THIS INFORMATION WAS APPROVED FOR PUBLISHING PER THE ITAR AS BASIC MARKETING INFORMATION OF DEFENSE ARTICLES OR PER THE EAR AS ADVERTISING PRINTED MATTER. harris.com Yemen

More information

T&E in a Time of Risk and Change

T&E in a Time of Risk and Change Enhancing our Competitive Edge: T&E in a Time of Risk and Change Maj Gen Matt Zap Molloy Commander, Air Force Operational Test and Evaluation Center Albuquerque, NM Distribution A: Approved for public

More information