UWASA-MBEYA. Key Findings on Non-Compliance. 1. Establishment and composition of Tender Board

Size: px
Start display at page:

Download "UWASA-MBEYA. Key Findings on Non-Compliance. 1. Establishment and composition of Tender Board"

Transcription

1 UWASA-MBEYA The audit was conducted between April and August This audit covered procurement amounting to 1,287,133,144 which had been processed by the time of the audit. Overall compliance of UWASA-Mbeya was 75% using 13 indicators. The scores for the 13 indicators were as follows; Establishment and composition of TB (70%), Establishment and composition of Procurement Management Unit (PMU) (85%), Functioning of Accounting, Tender Board, Procurement Management Unit and User department (74%), Preparation and adherence to annual procurement plan (APP) (61%), Approvals (88%), Advertisement of bid opportunities (70%), Publications of awards (0%), Time for preparation of bids(1%), Method of procurement (1%), Use of standard tender/contract documents (85%), Record keeping (76%), Quality assurance (36%) and Contract implementation (81%). Key Findings on Non-Compliance 1. Establishment and composition of Tender Board TB was composed of eight (8) members in accordance with section 28 of PPA 2004 read together with paragraph (2) of second schedule of PPA However during the audit UWASA TB had 7 members only. One member died on August TB members had not attended training on PPA, 2004 and its Regulations except for the Secretary of Tender Board. Establishment of TB was communicated to PPRA. The establishment and composition of TB therefore complied with section 28 read together with section 1 (2) of the 2 nd schedule of the PPA 2004 The score on establishment and composition of TB is 70% 2. Establishment and composition of PMU The PMU appeared in the organization structure of UWASA with the Head of PMU reporting directly to the Accounting Officer (AO). The HPMU was a holder of CPSP (T), other PMU staff was qualified with ACSE and Foundation II. PMU was also established with one technical specialist in Water Engineering. PMU had a secretary, adequate office accommodation and one computer with its printer according to Section 34 of PPA HPMU had no appointment letter by AO pursuant to section 34 (4) of PPA The score on establishment and composition of PMU is 85% 1

2 3. Functioning of AO, TB and PMU and User Department It was observed that AO officer performed all responsibilities according to section 33 of the PPA, Tender Board also exercised powers and performed most of responsibilities pursuant to section 30 of PPA PMU also performed the responsibilities according to section 35 of PPA However, it was noted that there were some incidences of interferences between functions of Accounting Officer, Tender Board and Evaluation Committee contrary to Section 38 of PPA The score on Function of AO, TB and PMU is 70% 4. Preparation of Procurement Planning: It was observed that UWASA prepared the Annual Procurement Plan (APP) for financial year 2011/2012 using appropriate templates prepared and issued by Public Procurement Regulatory Authority (PPRA). However, numbering of packages/tenders was not prepared according to PPRA guidelines; Processing time was allocated in tendering section of the APP. However, tender processing time through NCB was given a total of 39 days from tender document preparation to contract signature date contrary to the tender processing time indicated in the 3 rd schedule of GN. No. 97 of There was no evidence of updating the plan at each stage of implementation so as to measure the performance of the PE in managing the procurement processes and time given in the actual implementation was not complying with the 3rd Schedule Part (a) of GN. No. 97 & 98 of The score on preparation of Annual Procurement Plan is 35% 5. Approvals. TB approved bidding documents and tender adverts. The lists of suppliers or services providers under framework contract were submitted to the TB for approval according to Sec. 68 of PPA of The score on approvals is 100% 6. Advertisement It was observed that one (1) planned tender through NCB was advertised in Tanzania Daima, Daily News pursuant to Reg. 80 (5) of GN. No.97 of Copy of advert was submitted to PPRA to be posted in its website and Procurement Journal. The score on Advertisement is 100%. 2

3 7. Publication of Awards. It was observed that contracts awarded under FWC were disclosed to the public pursuant to Regulation 21 of GN. No. 97 of UWASA notified PPRA through UWSA/MBY/F.197/VOL.II/100 of 20 th July 2011 on award of suppliers and service providers for publication in PPRA s website and Journal pursuant to Regulation 97 (12 & 13) of the GN. No. 97 of The score on Publications is 100% 8. Time for Preparation of Bids AT noted that UWSA used NCB to form FWC with suppliers and service providers. Bidders were given 30 days to prepare and submit their bids from 19 th May, 2011 to 20 th June, 2011 pursuant to Reg. 80 (6) read together with Paragraph (C) of the 3 rd schedule of GN. No. 97 of The score on Time for preparation of Bids is 100% 9. Methods of Procurement. UWSA procured 559 Call Off Order for Goods and Non consultancy services contracts under FWC as per contract and pursuant to 2 nd schedule of GN.No.97 & 98 of Score for Methods of Procurement is 100% 10. Use of Standard Bidding Documents: It was noted that PMU used Standard Bidding Document prepared and issued by PPRA pursuant to Regulation 83 (3) of GN. No. 97 of However, Data Sheet and Special Conditions of Contacts were not amended appropriately. That evaluation was performed using non standard evaluation forms contrary to PPRA Guidelines on standard Documents and procedural forms Section 7 (d) of PPA Score for Use of Standard Documents is 75% 11. Record Keeping: 3

4 It was noted that there was no proper procurement record keeping system in place with regard to consolidation of procurement records in single procurement file from initiation of procurement up to completion of the contract contrary to Section 56 of PPA 2004 read together with Reg. 19 (1) of GN. No. 97 of The current procedure did not consolidate procurement contracts records in a single file from initiation of procurement up to completion with updates of the contracts. Records of information were scattered in different files and it was difficult to get flow of the entire procurement cycle as required; The Examined LPOs contracts were all filed in one batch file. Each Call off Order contract consists of one LPO document with no other attachment. The score on record keeping is 21% 12. Quality Assurance and Control: It was confirmed that the PE did form some Inspection and Acceptance Committees for inspecting goods in accordance with Regulation 121 (2) of GN No. 97 of However it was observed that AO had formed permanent inspection and acceptance for inspecting services and goods contrary to Regulations 126 and 127 of GN. No. 97 of It was not evidenced that 559 Call Off Contracts were inspected by the appointed team in absence of Inspection and acceptance report. Either it was observed that Goods Received Note (GRN) was signed by one person, while non consultancy contracts were not inspected. However, there was no proper system in place for stores to verify quality of incoming goods; stores had no copy of LPO. Stores relied on GRN which had no enough details for goods quality verifications. The score on Quality Assurance and Control is 26% 13. Contract Management and Implementation: The Assessment of contract administration revealed that there was proper procurement contracts administration; there was inspection and acceptance team. However, there was no evidence that they carry out inspection of received goods. There was no inspection certificates availed as evidence of inspection done. Score on Contract Management and Implementation is 96% Recommendations 4

5 In view of the above observations, the provisions of the PPA 2004 and its Regulations made under it, the PE should adhere to and attention should be on the following recommendations:- 1) AO should ensure that TB members attend seminars/training on PPA and its Regulations so that they become competent in carrying out procurement responsibilities of Tender Board Pursuant to Section 30 of PPA ) AO should perform all the responsibilities as per section 33 of PPA, 2004 as well as Staffing PMU to appropriate level pursuant to Sec. 34 of ) Tender Board should perform their responsibilities pursuant to Section 30 of PPA ) PMU when preparing APP should assign tender numbers according to guidelines issued by PPRA and should Estimate Processing Time and allocate for prequalification and tendering stages pursuant to 3 rd Schedule of GN. No. 97 & 98 of ) PE should ensure that tenders are implemented according to APP. 6) PMU should amend/ modify standard tendering documents for all procurement appropriately. 7) PMU should file copies of individual procurement contracts starting with; APP, approved tender adverts, bidding and quotation documents, Minutes of tender opening; tender opening register; readout prices and tender opening checklist. 8) PMU should file Letters of appointment of evaluation committee, Evaluation report with Signed covenant form, Brief summary of Evaluation report for the TB members, Signed personal covenant forms for TB members. PMU should attach letters of acceptance in the specific contract files. PMU should attach Notification of unsuccessful bidders in the specific contract files. 9) There should be quality assurance plan in place for works contracts, checklists for testing for quality verification, either there should be qualification criteria of the inspector. 5

PROCUREMENT PLAN. Procurement of Goods and Works

PROCUREMENT PLAN. Procurement of Goods and Works PROCUREMENT PLAN Basic Data Project Name: CAREC Corridor 1 (Bishkek-Torugart Road) Project 2 Country: Kyrgystan Executing Agency: Ministry of Transport & Communication Loan Amount: SDR18.492 million/$22

More information

NYS HOME Local Program Section 3 Participation Policy

NYS HOME Local Program Section 3 Participation Policy NYS HOME Local Program Section 3 Participation Policy Background: The NYS HOME Local Program is funded by the federal U.S. Department of Housing and Urban Development s (HUD) HOME Investment Partnership

More information

STANDARD PROCEDURE Number: S410.10

STANDARD PROCEDURE Number: S410.10 Page: 1 of 8 PURPOSE: To establish procedures for the competitive procurement of goods and services utilizing an Invitation to Bid (ITB) or Invitation to Quote (ITQ) solicitation process or small purchase

More information

Contract Administration Policy

Contract Administration Policy Contract Administration Policy Guidelines for contract approval March 15, 2010 5420 Old Orchard Road Skokie, Illinois 60077-1083 847.966.6200 Fax 847.966.9781 www.cement.org Guidelines for Contract Approval

More information

KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12

KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12 KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12 Purpose These guidelines are intended to guide the procurement of goods and consultant services

More information

PROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev.

PROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev. PROCUREMENT PLAN Basic Data Project Name: Information and Communications Technology (ICT) Development Project Project : 38347-022 Approval : 0106 Country: Nepal Executing Agency: Office of the Prime Minister&Council

More information

OFFICIAL DOCUMENTS. Global Agriculture and Food Security Program Trust Fund Grant Agreement

OFFICIAL DOCUMENTS. Global Agriculture and Food Security Program Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS GAFSP GRANT NUMBER TF0A2869 Public Disclosure Authorized Public Disclosure Authorized Global Agriculture and Food Security Program Trust Fund Grant Agreement

More information

PROCUREMENT PLAN N/A. Date of First Procurement Plan: 31 May 2017 Date of this Procurement Plan: 3 September 2018, Version 2

PROCUREMENT PLAN N/A. Date of First Procurement Plan: 31 May 2017 Date of this Procurement Plan: 3 September 2018, Version 2 PROCUREMENT PLAN Basic Data Project Name: Northern Rural Infrastructure Development Sector Project - Additional Financing Project : 42203-025 Approval : 0534 Country: Lao People's Democratic Republic Executing

More information

World Bank Iraq Trust Fund Grant Agreement

World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized Conformed Copy GRANT NUMBER TF054052 Public Disclosure Authorized World Bank Iraq Trust Fund Grant Agreement Public Disclosure Authorized (Emergency Disabilities Project) between

More information

Overview of Operational Procurement. Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group June 2013

Overview of Operational Procurement. Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group June 2013 Overview of Operational Procurement Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group June 2013 1 AGENDA The Roles in Bank Financed Procurement Procurement of Goods, Works

More information

Construction Management (CM) Procedures

Construction Management (CM) Procedures Chapter 28. Construction Management (CM) Procedures Summary This chapter outlines the procedures to be followed by all departments, agencies, and institutions of the County (each of which is hereinafter

More information

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 49 EFFECTIVE DATE: JULY 1, 2018 REVISION #4: JULY 1, 2018

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 49 EFFECTIVE DATE: JULY 1, 2018 REVISION #4: JULY 1, 2018 SECTION 17.0 PAGE 1 OF 49 CONTRACT PROCUREMENT POLICY The Mississippi Department of Education s (Department) Contract Procurement Policy set forth herein applies to the procurement, management, and control

More information

SALARIES AND REMUNERATION COMMISSION STANDARD PROCUREMENT

SALARIES AND REMUNERATION COMMISSION STANDARD PROCUREMENT SALARIES AND REMUNERATION COMMISSION STANDARD PROCUREMENT CATEGORY B (OPEN TO ELIGIBLE BIDDERS) Tender No. SRC/IFQ/ 62/2016-2018 SUPPLY AND INSTALLATION OF SOFTWARE SECURE SOCKET LAYER CERTIFICATE APRIL,

More information

Request for Expression of Interest

Request for Expression of Interest INFRASTRUCTURE DEVELOPMENT AUTHORITY PUNJAB (IDAP) Government of Punjab Request for Expression of Interest For THE CONSULTANCY SERVICES FOR SURVEY, INVESTIGATIONS, PLANNING, DESIGN, DESIGN REVIEW, MODIFICATION

More information

Second Tamil Nadu Road Sector Project PROCUREMENT PLAN

Second Tamil Nadu Road Sector Project PROCUREMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General 1. Project information: Second Tamil Nadu Road Sector Project PROCUREMENT

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC WATER) REQUEST FOR QUOTE RFQ 18-PR-DIT-27

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC WATER) REQUEST FOR QUOTE RFQ 18-PR-DIT-27 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY (DC WATER) REQUEST FOR QUOTE RFQ 18-PR-DIT-27 RFQ Number: RFQ 18-PR-DIT-27 Date Issued: Monday, March 5, 2018 Description: Headquarters (HQO) IT Hardware

More information

KAREN E. RUSHING. Audit of the Vendor Selection Process

KAREN E. RUSHING. Audit of the Vendor Selection Process KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller Audit of the Vendor Selection Process Audit Services Karen E. Rushing Clerk of the Circuit Court and County Comptroller Jeanette L. Phillips,

More information

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement GPOBA GRANT NUMBER TF092629 DOCUMENTS Global Partnership on Output-based Aid Grant Agreement (Extending Telecommunications in Rural Indonesia Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK

More information

INVITATION FOR BID Notice to Prospective Bidders IFB # Date Stamp Equipment Preventative Maintenance and Repair Services

INVITATION FOR BID Notice to Prospective Bidders IFB # Date Stamp Equipment Preventative Maintenance and Repair Services INVITATION FOR BID Notice to Prospective Bidders Date Stamp Equipment Preventative Maintenance and Repair Services June 1, 2011 You are invited to review and respond to this Invitation for Bid (IFB), entitled

More information

Fort Bend Independent School District. Small Business Enterprise Program Procedures

Fort Bend Independent School District. Small Business Enterprise Program Procedures Fort Bend Independent School District Small Business Enterprise Program Procedures Spring 2015 TABLE OF CONTENTS I. Summary Of Fort Bend Independent School District s Small Business Enterprise Program

More information

PROCUREMENT REFORM: CHECKLIST FOR CONTRACTING AUTHORITIES

PROCUREMENT REFORM: CHECKLIST FOR CONTRACTING AUTHORITIES www.brodies.com PROCUREMENT REFORM: CHECKLIST FOR CONTRACTING AUTHORITIES Issue Action Required Deadline for Implementation Done? Public Contracts (Scotland) Regulations 2015 1 New thresholds and rules

More information

PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES

PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES CPF Financial Services Ltd CPF House, 7th Floor. Haile Selassie Avenue P. O. Box 28938, 00200 Nairobi Tel ; 2046901 05 SECTION III - LETTER OF APPLICATION

More information

(Ist Phase 18 months )

(Ist Phase 18 months ) World Bank Assisted National Agricultural Higher Education Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Education Division Indian Council of Agricultural

More information

Department of Defense Human Research Protection Program DOD INSTITUTIONAL AGREEMENT FOR INSTITUTIONAL REVIEW BOARD (IRB) REVIEW (IAIR)

Department of Defense Human Research Protection Program DOD INSTITUTIONAL AGREEMENT FOR INSTITUTIONAL REVIEW BOARD (IRB) REVIEW (IAIR) Department of Defense Human Research Protection Program DOD INSTITUTIONAL AGREEMENT FOR INSTITUTIONAL REVIEW BOARD (IRB) REVIEW (IAIR) General Instructions to Institutions and IRBs This form should be

More information

Best-Value Procurement Manual. MnDOT Office of Construction and Innovative Contracting (OCIC)

Best-Value Procurement Manual. MnDOT Office of Construction and Innovative Contracting (OCIC) Best-Value Procurement Manual MnDOT Office of Construction and Innovative Contracting (OCIC) March, 2013 Table of Contents July 29, 2010 1 Preface... 1 1.1 Purpose of Manual... 1 1.2 What is Best Value

More information

TANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword

TANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword AERODROMES AND AIR NAVIGATION SERVICES Revision: 1 Title: ANS Inspector Handbook Page 1 of 62 Foreword The Civil Aviation safety oversight program has been implemented to promote and ensure conformance

More information

OFFICIAL TP DOCUM SNTS

OFFICIAL TP DOCUM SNTS Public Disclosure Authorized OFFICIAL TP DOCUM SNTS The World Bank 1818 H Street N.W. (202) 477-1234 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division DOING BUSINESS WITH THE Orange County Board of County Commissioners Orange County Procurement Division TABLE OF CONTENTS Preface... 1 How Can I Receive Copies Of Solicitations?... 2 Bidder s List... 2

More information

Schedule B New York Main Street (NYMS) Administrative Plan Awardee/LPA NAME Project Name

Schedule B New York Main Street (NYMS) Administrative Plan Awardee/LPA NAME Project Name Schedule B New York Main Street (NYMS) Administrative Plan Awardee/LPA NAME Project Name SHARS ID: # The term Local Program Administrator or LPA shall refer to Awardee Name, the recipient of the Housing

More information

FEDERAL REPUBLIC OF NIGERIA

FEDERAL REPUBLIC OF NIGERIA Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

PROCUREMENT PLAN. Consulting Services

PROCUREMENT PLAN. Consulting Services PROCUREMENT PLAN Basic Data Project Name: Greater Mekong Subregion Northern Power Transmission Project Project : 3868-0 Approval : 0195 Country: Lao People's Democratic Republic Project Financing Amount:

More information

CHIEF EXECUTIVE OFFICER ATHI WATER SERVICES BOARD P.O BOX NAIROBI

CHIEF EXECUTIVE OFFICER ATHI WATER SERVICES BOARD P.O BOX NAIROBI REGISTRATION DOCUMENT FOR PROVISION OF CONSULTANCY SERVICES TRAINING IN MANAGEMENT, HR, PROCUREMENT, FINANICIAL SERVICES, CUSTOMER CARE, ISO AND WORK ENVIRONMENT, CORRUPTION PERCEPTION AND EMPLOYEE SATISFACTION,

More information

20 STEPS FROM STUDY IDEA INCEPTION TO PUBLISHING RESEARCH/ Evidence-Based Practice

20 STEPS FROM STUDY IDEA INCEPTION TO PUBLISHING RESEARCH/ Evidence-Based Practice 20 STEPS FROM STUDY IDEA INCEPTION TO PUBLISHING RESEARCH/ Evidence-Based Practice Nursing Research/ Evidence-Based Practice Checklist (Version 31 January 2012) Specify the date in the left column when

More information

Request to Administer Project

Request to Administer Project To: District Office Local Liaison Request to Administer Project From: John Doe John.doe@city.va.us 540-123- 4567 (Printed Name of Responsible Local Official Issuing Request) (Email Address) (Phone) Signature

More information

Summarized Procurement Plan

Summarized Procurement Plan Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summarized Procurement Plan (This is only a sample with the minimum content that is required

More information

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017 Addendum No.3 to ITB 2017-33 Wakulla County Fire and EMS Station Issued: November 1, 2017 MANDATORY PRE-BID CONFERENCE RFI 1. ITB Section 2.0 Schedule of Events Bids are due November 20, 2017 @ 2:00 P.M.

More information

LCB File No. T015-98

LCB File No. T015-98 LCB File No. T015-98 TEMPORARY REGULATION OF THE STATE BOARD OF HEALTH NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that the State Health Division will hold public hearing and act on amendments to Nevada

More information

PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES

PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES PREQUALIFICATION DOCUMENT FOR VARIOUS CATEGORIES CPF Financial Services Ltd CPF House, 7th Floor. Haile Selassie Avenue P. O. Box 28938, 00200 Nairobi Tel ; 2046901 05 SECTION III - LETTER OF APPLICATION

More information

VADEMECUM FOR INSTITUTIONAL SUPPORT

VADEMECUM FOR INSTITUTIONAL SUPPORT VADEMECUM FOR INSTITUTIONAL SUPPORT Version created 16th of December 2014 ARES Académie de Recherche et d Enseignement supérieur Rue Royale 180 1000 Bruxelles Belgique T +32 2 225 45 11 www.ares-ac.be

More information

Faculty of Engineering and Technology Jadavpur University NATIONAL COMPETITIVE BIDDING FOR PROCUREMENT OF EQUIPMENT

Faculty of Engineering and Technology Jadavpur University NATIONAL COMPETITIVE BIDDING FOR PROCUREMENT OF EQUIPMENT Faculty of Engineering and Technology Jadavpur University 188, Raja S. C. Mallick Road, Kolkata- 700 032 TEQIP Cell Contact No. 033 2414 6154 Fax No. 033 2414 6154 BID REFERENCE NO: TEQIP-II/WB/WB2G02/71

More information

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments International Competitive Bidding (ICB) for Works $25,000,00

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments International Competitive Bidding (ICB) for Works $25,000,00 PROCUREMENT PLAN Basic Data Project Name: Metropolitan Sanitation Management Investment Project Project Number: 43251-025 Approval Number: 3123/8280 Country: INDONESIA Executing Agency: Directorate General

More information

NATIONAL LIBRARY OF SOUTH AFRICA. 228 Johannes Ramokhoase Street 5 Queen Victoria. Pretoria 8001

NATIONAL LIBRARY OF SOUTH AFRICA. 228 Johannes Ramokhoase Street 5 Queen Victoria. Pretoria 8001 NATIONAL LIBRARY OF SOUTH AFRICA 228 Johannes Ramokhoase Street 5 Queen Victoria Private Bag X397 Cape Town Pretoria 8001 0001 BID DESCRIPTION Expression of Interest (EOI) to render catering services at

More information

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM By Federal Highway Administration Virginia Division And Virginia Department of Transportation

More information

Standard Operating Procedure. Essential Documents: Setting Up a Trial Master File. SOP effective: 19 February 2016 Review date: 19 February 2018

Standard Operating Procedure. Essential Documents: Setting Up a Trial Master File. SOP effective: 19 February 2016 Review date: 19 February 2018 Standard Operating Procedure SOP number: SOP full title: SOP-JRO-06-003 Essential Documents: Setting Up a Trial Master File SOP effective: 19 February 2016 Review date: 19 February 2018 SOP author signature:

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF091937 ALB Global Environment Facility Trust Fund Grant Agreement (Lake Skadar-Shkoder Integrated Ecosystem Management Project) between ALBANIA and INTERNATIONAL

More information

Dated: 8/29/17. IFB No. B For Purchase & Installation of Manufactured Home

Dated: 8/29/17. IFB No. B For Purchase & Installation of Manufactured Home SOUTHERN NEVADA REGIONAL HOUSING AUTHORITY IFB No. B17031 DKMHP Purchase & Installation of Manufactured Home This addendum must be noted on the Bid Form, initialed and submitted under Tab 4 with the bid

More information

For Information, Issuance and Submission of EOI, please contact as follows:

For Information, Issuance and Submission of EOI, please contact as follows: TERMS OF REFERENCES (TORs) TECHNICAL BID FORM for Pre-qualification of Software House(s) / Software Engineering Company(s) For Revamping of ICMAP Website & Development of Mobile Application Name of Software

More information

REQUEST FOR PROPOSALS (RFP) AND GENERAL INSTRUCTION TO SERVICE PROVIDERS BID DATA SHEET (BDS)

REQUEST FOR PROPOSALS (RFP) AND GENERAL INSTRUCTION TO SERVICE PROVIDERS BID DATA SHEET (BDS) REQUEST FOR PROPOSALS (RFP) AND GENERAL INSTRUCTION TO SERVICE PROVIDERS BID DATA SHEET (BDS) The International Organization for Migration (IOM) is an intergovernmental humanitarian organization established

More information

Request for Information and Qualifications RFIQ No Facility Asset Management Consulting Services

Request for Information and Qualifications RFIQ No Facility Asset Management Consulting Services City of Coquitlam Request for Information and Qualifications RFIQ No. 17-11-04 Facility Asset Management Consulting Services Issue Date: November 24, 2017 File #: 03-1220-20/17-11-04/1 Doc #: 2764584.v4

More information

GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD

GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GOVERNMENT OF MAURITIUS MINISTRY OF BUSINESS, ENTERPRISES AND COOPERATIVES MANUFACTURING

More information

CITY OF WEST CHICAGO DOWNTOWN RETAIL & RESTAURANT BUSINESS GRANT PROGRAM

CITY OF WEST CHICAGO DOWNTOWN RETAIL & RESTAURANT BUSINESS GRANT PROGRAM CITY OF WEST CHICAGO DOWNTOWN RETAIL & RESTAURANT BUSINESS GRANT PROGRAM DESCRIPTION OF PROGRAM The Retail & Restaurant Business Grant Program ( Program ) is sponsored by the City of West Chicago for the

More information

MICHAEL N. FEUER CITY ATTORNEY REPORT RE:

MICHAEL N. FEUER CITY ATTORNEY REPORT RE: MICHAEL N. FEUER CITY ATTORNEY REPORT RE: R13-0351 REPORTNO.~~ ~ DEC 0 9 2013 DRAFT ORDINANCE FOR THE HAIWEE POWER PLANT PENSTOCK REPLACEMENT PROJECT REQUESTING THE LOS ANGELES CITY COUNCIL TO ESTABLISH

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 13 ST - P0000 - Initial Comments Title Initial Comments Statute or Rule Type Memo Tag ST - P0102 - Registration Changes Title Registration Changes Statute or Rule 400.980(2) FS; 59A-27.002(1)

More information

PROCUREMENT PLAN. Energy Efficiency Measures and Solar Photovoltaic Plant Project Executing Agency:

PROCUREMENT PLAN. Energy Efficiency Measures and Solar Photovoltaic Plant Project Executing Agency: PROCUREMENT PLAN I. General 1. Project Information: Country: Borrower: Project Name: SVG GOSVG Energy Efficiency Measures and Solar Photovoltaic Plant Project Executing Agency: VINLEC 2. Bank s Approval

More information

Uniform Bid Process and Contractor Relations

Uniform Bid Process and Contractor Relations 1. Contractors Registration Act 2. Small Business Bidder 3. Bid-Package Review Checklists and Other Required Bid Documents 4. Bidding Procedures 4.1 Posting 4.2 Bid Opening Procedures 4.3 Sole Bidder 5.

More information

Attachment J-8 Contractor / Supplier Submittal Register

Attachment J-8 Contractor / Supplier Submittal Register Contractor / Supplier Register Number Title Technical Bid Package Subcontractor Request Form Labor Agreement Letter of Assent Proposal s L G 14 ACC Procurement s,,, Proc. File B H (7) 14 APP Proc. File

More information

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services PROCUREMENT PLAN Basic Data Project Name: Java-Bali 500-Kilovolt Power Transmission Crossing Project : 42362-013 Approval : 3083/8276 Country: Indonesia Executing Agency: P.T. Perusahaan Listrik Negara

More information

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project)

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project) Public Disclosure Authorized CONFORMED COPY Letter No. CD-490/UGM/XI/2010 November 15, 2010 Public Disclosure Authorized Prof. Ir. Sudjarwadi M.Eng, Phd Rector Universitas Gadjah Mada Bulaksumur Yogyakarta

More information

Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services

Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services Instructions Regarding the Invitation for Bid and Contract Process For the National School Lunch and School Breakfast Programs Vended Meal Services PLEASE READ THIS DOCUMENT THOROUGHLY All vended meal

More information

REQUEST FOR REGISTRATION AS SUPPLIER FOR THE PERIOD STARTING 1 ST JULY 2016 AND ENDING 30 TH JUNE 2018

REQUEST FOR REGISTRATION AS SUPPLIER FOR THE PERIOD STARTING 1 ST JULY 2016 AND ENDING 30 TH JUNE 2018 MMU/REC/316039-14(01) MASINDE MULIRO UNIVERSITY OF SCIENCE AND TECHNOLOGY (MMUST) Tel: 057250522/3 OR 0702597361/0 OR 0733120020/2 E-mail: vc@mmust.ac.ke Website: www.mmust.ac.ke P.O Box 190 Kakamega 50100

More information

QUALIFICATIONS RTP Registration Procedure - Staff and LTP Capacity Approval ACTVET_L3_Q_QMPRCDR001

QUALIFICATIONS RTP Registration Procedure - Staff and LTP Capacity Approval ACTVET_L3_Q_QMPRCDR001 QUALIFICATIONS RTP Registration Procedure - Staff and LTP Capacity Approval ACTVET_L3_Q_QMPRCDR001 ACTVET All Rights Reserved No part of these presents may be reproduced or transmitted in any form or by

More information

Non-Federal Cost Share Match Program Grant Implementation Checklist

Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Non-Federal Cost Share Match Program Grant Implementation Checklist Table of Contents 1.0 Introduction... 2.0 Grant Implementation Process

More information

Expression of Interest. Gas for Gaza Legal Feasibility Study REF: EOI G4G. April 2016

Expression of Interest. Gas for Gaza Legal Feasibility Study REF: EOI G4G. April 2016 Expression of Interest Gas for Gaza Legal Feasibility Study REF: EOI-2016-78 G4G April 2016 EMPLOYER: OFFICE OF THE QUARTET / UNITED NATIONS DEVELOPMENT PROGRAMME / PROGRAMME OF ASSISTANCE TO THE PALESTINIAN

More information

SOLICITATION FOR PARTICIPATION IN A REQUEST FOR PROPOSALS FOR CHIEF EXECUTIVE OFFICER (CEO) SEARCH SERVICES JACKSONVILLE, FL SOLICITATION NUMBER 94414

SOLICITATION FOR PARTICIPATION IN A REQUEST FOR PROPOSALS FOR CHIEF EXECUTIVE OFFICER (CEO) SEARCH SERVICES JACKSONVILLE, FL SOLICITATION NUMBER 94414 SOLICITATION FOR PARTICIPATION IN A REQUEST FOR PROPOSALS FOR CHIEF EXECUTIVE OFFICER (CEO) SEARCH SERVICES JACKSONVILLE, FL SOLICITATION NUMBER 94414 PROPOSALS ARE DUE ON APRIL 27, 2018 BY 12:00 PM EST

More information

Guide 2. Inspection and Command Self-Assessment Checklist

Guide 2. Inspection and Command Self-Assessment Checklist 2016 Guide 2 Inspection and Command Self-Assessment Checklist INSPECTION AND COMMAND SELF ASSESSMENT CHECKLIST Physical Fitness Assessment (PFA) 1. Has the command conducted 2 PFAs per year in the last

More information

CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING

CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING CARIBBEAN DEVELOPMENT BANK PROCEDURES FOR THE SELECTION AND ENGAGEMENT OF CONSULTANTS BY RECIPIENTS OF CDB FINANCING P.O. Box 408, Wildey, St. Michael BB11000 Barbados, West Indies Telex: WB 2287 Tel:

More information

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 38 EFFECTIVE DATE: MAY 1, 2017 REVISION #4: MARCH 1, 2017

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 38 EFFECTIVE DATE: MAY 1, 2017 REVISION #4: MARCH 1, 2017 SECTION 17.0 PAGE 1 OF 38 CONTRACT PROCUREMENT POLICY The Mississippi Department of Education (Department) Contract Procurement Policy set forth herein applies to the procurement, management, and control

More information

REQUEST FOR PROPOSALS NO TYPES 1 AND 3 CHARTER APPLICATIONS REVIEW

REQUEST FOR PROPOSALS NO TYPES 1 AND 3 CHARTER APPLICATIONS REVIEW ADVERTISEMENT REQUEST FOR PROPOSALS NO. 18-0029 TYPES 1 AND 3 CHARTER APPLICATIONS REVIEW Sealed proposals relative to the above will be received in the Purchasing Department for the Orleans Parish School

More information

PRE- QUALIFICATION OF SUPPLIERS FOR HOME AFRIKA LIMITED

PRE- QUALIFICATION OF SUPPLIERS FOR HOME AFRIKA LIMITED PRE- QUALIFICATION OF SUPPLIERS FOR HOME AFRIKA LIMITED 2018 2020 1 TABLE OF CONTENTS INTRODUCTION 3 SUBMISSION INSTRUCTIONS 3 IMPORTANT NOTES TO THE SUPPLIER..4 MANDATORY REQUIREMENTS 5 INFORMATION QUESTIONNAIRE..6

More information

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016 MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill

More information

NHS ENGLAND INVITATION TO TENDER STAGE TWO ITT NHS GENOMIC MEDICINE CENTRE SELECTION - WAVE 1

NHS ENGLAND INVITATION TO TENDER STAGE TWO ITT NHS GENOMIC MEDICINE CENTRE SELECTION - WAVE 1 NHS ENGLAND INVITATION TO TENDER STAGE TWO ITT NHS GENOMIC MEDICINE CENTRE SELECTION - WAVE 1 2 NHS England - Invitation to Tender Stage Two ITT: NHS Genomic Medicine Centre Selection - Wave 1 Version

More information

Registration and Inspection Service

Registration and Inspection Service Registration and Inspection Service Children s Residential Centre Centre ID number: 035 Year: 2018 Lead inspector: John Laste Registration and Inspection Services Tusla - Child and Family Agency Units

More information

The South African Council for the Project and Construction. Management Professions (SACPCMP)

The South African Council for the Project and Construction. Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Construction Health and Safety Officers in Terms of Section 18 (1) (c) of the Project

More information

DRAFT PROPOSAL REQUIREMENTS

DRAFT PROPOSAL REQUIREMENTS DRAFT PROPOSAL REQUIREMENTS 1. Purpose The is expected to be issued on June 28, 2017. The present document provides an overview of the Proposal submission process and draft Proposal requirements. These

More information

STENOGRAPHER REQUEST FOR QUALIFICATIONS (RFQ)

STENOGRAPHER REQUEST FOR QUALIFICATIONS (RFQ) STENOGRAPHER REQUEST FOR QUALIFICATIONS (RFQ) Los Angeles County Children and Families First Proposition 10 Commission (aka First 5 LA) RELEASE DATE: FEBRUARY 11, 2014 TABLE OF CONTENTS I. TIMELINE FOR

More information

Appendix 3 to AO/1-7094/12/NL/CO Page 1

Appendix 3 to AO/1-7094/12/NL/CO Page 1 Page 1 NOTE THE BIDDERS ATTENTION IS DRAWN TO THE FACT THAT THE GENERAL TENDER CONDITION PUBLISHED ON EMITS ARE NOT APPLICABLE TO THE PRESENT INVITATION TO TENDER. THE ONLY APPLICABLE TENDER CONDITIONS

More information

Western Australian Industry Participation Strategy (WAIPS)

Western Australian Industry Participation Strategy (WAIPS) Western Australian Industry Participation Strategy (WAIPS) Table of Contents Message from the Premier... 2 1. Overview... 3 2. Coverage... 3 3. Key Components of the WAIPS... 4 3.1 Procurement Related

More information

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects March 2010 Version 1.2 Contacting the National Authority for the CDM and JI For information about

More information

OFFICE OF INSPECTOR GENERAL PALM BEACH COUNTY

OFFICE OF INSPECTOR GENERAL PALM BEACH COUNTY PALM BEACH COUNTY CONTRACT OVERSIGHT NOTIFICATION () John A. Carey Inspector General ISSUE DATE: JULY 22, 2014 Enhancing Public Trust in Government Ion Exchange Resin Plant and East Water Treatment Plant

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

Workshop Synopses. Classes include:

Workshop Synopses. Classes include: Workshop Synopses Advanced Track This group of classes is designed for experienced primary and back-up agency designated procurement officers only. Offered on the first day of conference, this track is

More information

Registration prescribed information handbook

Registration prescribed information handbook Registration prescribed information handbook Guidance for registered providers submitting prescribed information as part of a registration pack or a registration notification form. October 2016 Page 2

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF SANTA ANA REQUEST FOR PROPOSALS RELOCATION OF TWO RESIDENTIAL STRUCTURES PROPOSALS DUE: Monday, May 9, 2011 at 11:00 AM 1. INTRODUCTION REQUEST FOR PROPOSALS

More information

PROCUREMENT PLAN. Date of First Procurement Plan: 17 May 2012 Date of this Procurement Plan: 21 September 2012

PROCUREMENT PLAN. Date of First Procurement Plan: 17 May 2012 Date of this Procurement Plan: 21 September 2012 PROCUREMENT PLAN APPENDIX 4 Basic Data Project Name: Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program tranche 2 Country: Viet Nam Executing Agency: HCMC Peoples Committee (HCMC PC).

More information

Exhibit B - Office of Civil Rights - Good Faith Efforts Consolidated Form (Includes Parts A-I)

Exhibit B - Office of Civil Rights - Good Faith Efforts Consolidated Form (Includes Parts A-I) Exhibit B - Office of Civil Rights - Good Faith Efforts Consolidated Form (Includes Parts A-I) This form will assist you in demonstrating that you met the goal or made adequate good faith efforts to meet

More information

Chapter 2 DISCLOSURE OF ECONOMIC INTERESTS. Article 1

Chapter 2 DISCLOSURE OF ECONOMIC INTERESTS. Article 1 Chapter 2 DISCLOSURE OF ECONOMIC INTERESTS Article Conflict of Interest Code 7200 2 Designated Positions and Categories of Disclosure Index 720 Article Conflict of Interest Code Sec. 7200. Political Reform

More information

Office of the District of Columbia Auditor

Office of the District of Columbia Auditor 022:13:LP:cm Audit of the Department of General Services Fiscal Year 2012 Procurement of Snow and Ice Removal and Pretreatment Services A Report by the Yolanda Branche, District of Columbia Auditor Table

More information

Loan Credit No. : IDA Bank s Approval Date of the Procurement Plan : May 24, Date of General Procurement Notice : May 24, 2017

Loan Credit No. : IDA Bank s Approval Date of the Procurement Plan : May 24, Date of General Procurement Notice : May 24, 2017 Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : Development Response to Displacement Impacts Project Phase II Loan Credit No. : IDA 60210 2. Bank s Approval

More information

Le-Nor-Co Purchasing Cooperative. Joint Purchase Agreement. February 2017

Le-Nor-Co Purchasing Cooperative. Joint Purchase Agreement. February 2017 Le-Nor-Co Purchasing Cooperative Joint Purchase Agreement February 2017 Public School Districts and Career & Technical Institutes from Eastern Pennsylvania within 80 area miles of the outer city limits

More information

1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project

1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project A. Procurement Plan 39 1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project Country: Viet Nam Executing Agency: Ministry of Health

More information

HANDBOOK FOR THE INDIGENOUS ECONOMIC DEVELOPMENT FUND. January 2018

HANDBOOK FOR THE INDIGENOUS ECONOMIC DEVELOPMENT FUND. January 2018 HANDBOOK FOR THE INDIGENOUS ECONOMIC DEVELOPMENT FUND January 2018 (WHAT YOU NEED TO KNOW BEFORE YOU APPLY) Before completing an Indigenous Economic Development Fund (IEDF) application, please read the

More information

ENGAGE-TB. Operational Guidance M&E. Paris, 2 November ENGAGE-TB Operational Guidance November 2, 2013

ENGAGE-TB. Operational Guidance M&E. Paris, 2 November ENGAGE-TB Operational Guidance November 2, 2013 ENGAGE-TB Operational Guidance M&E Paris, 2 November 2013 1 2 3 Monitoring and evaluation Two indicators monitored: Referrals and new notifications: how many referred by CHWs and CHVs Treatment success

More information

Maintenance Review Board PR.MRB

Maintenance Review Board PR.MRB Name Validation Date Prepared by: Caroline RUGA Validated 08/06/2010 Verified by: Francis JOUVARD Validated 08/06/2010 Reviewed by: Véronique MAGNIER Validated 08/06/2010 Approved by: Evan NIELSEN Validated

More information

NATIONAL NUCLEAR REGULATOR

NATIONAL NUCLEAR REGULATOR NATIONAL NUCLEAR REGULATOR For the protection of persons, property and the environment against nuclear damage REGULATORY GUIDE INTERIM GUIDANCE ON THE CONDUCT AND RE- REGISTRATION OF NUCLEAR POWER PLANT

More information

The South African Council for the Project and Construction. Management Professions (SACPCMP)

The South African Council for the Project and Construction. Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Construction Health and Safety Managers in Terms of Section 18 (1) (c) of the Project

More information

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696 The World Bank INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H Street N.W. Washington, D.C. 20433 U.S.A. (202) 473-1000 Cable Address: INTBAFRAD Cable

More information

Owner s Project Manager Selection

Owner s Project Manager Selection Timothy P. Cahill Chairman, State Treasurer Katherine P. Craven Executive Director Owner s Project Manager Selection INTRODUCTION Selecting a qualified Owner s Project Manager is one of the most important

More information

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 49 - TRANSPORTATION SUBTITLE VI - MOTOR VEHICLE AND DRIVER PROGRAMS PART B - COMMERCIAL CHAPTER 311 - COMMERCIAL MOTOR VEHICLE SAFETY SUBCHAPTER I - GENERAL AUTHORITY AND STATE GRANTS 31100. Purpose

More information

2. Senior Procurement/Inventory Officers- REF: NTSA/04/2015/ Procurement/ Inventory Assistants-REF: NTSA/04/2015/03

2. Senior Procurement/Inventory Officers- REF: NTSA/04/2015/ Procurement/ Inventory Assistants-REF: NTSA/04/2015/03 The National Transport and Safety Authority (NTSA) is a State Corporation established under the National Transport and Safety Authority Act 2012. Its overall mandate is to implement policies relating to

More information