1 PROJECT: Arapahoe Ridge High School PROJECT NO: DATE: June 11, 2008 MEETING REPORT ATTENDANCE: Rex Hartman (BVSD), Joan Bludorn (ARHS), Dave Krassowsk (ARHS), Pat Z. (RTA), Doug Abernethy (RTA), Mike Riggs (RTA), Matt Hildreth (RTA). SUBJECT: Arapahoe Ridge DAT #5 Program 1. RTA distributed the Revised Second Draft of the Program. a. There not any major modifications to the Administration area b. Counseling - there is a need for 2 interventionists and 2 counselors. i. An additional counselor office should be added. c. ESL an additional ESL classroom was added per comments from DAT #4 d. Science the small group learning spaces were removed per comments from DAT #4 e. Instructional Area s total i. There subtotal of Instructional space is shown to grow by 11,028 sqft mostly due new office space and built space in lieu of portables. a. Collision Repair Auto Tech the areas of the these classes has been re-allocated, but the overall size of the Transportation Infrastructure Strand does not change. b. Construction Trades this space is shown to utilize the existing classroom space as part of the instructional lab i. The classroom space needed will be accommodated with the addition of the Flex classrooms shown in the Instructional areas total. c. Culinary Arts new information from the Longmont program is being gathered by Rex d. Banking program space is shown reduced per comments from DAT #4. e. Print Shop there are ongoing meetings within the district to determine what the space requirements for the existing print shop would be. i. There appears to be under utilized space in the print shop ii. Some machines are not being used iii. Dark rooms are not utilized iv. Potential to share a computer lab between Multi-media and Graphic Communications 19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax: Celebrating 30 YEARS of respect for the social, historical, and environmental context of Architecture C:\WINDOWS\Temporary Internet Files\OLKCB\08010C004mh-DAT5.doc Last printed 7/1/2008 1:21:00 PM

2 1. It was noted by Pat Z. that programs similar to Multmedia and graphics have been shared at other programs in the state. 2. Potential for a student of of 20 vs. 12 if the classes are shared. f. Nursing the space should be programmed for a capacity of 15 to 18 students vs. 7 to 9. g. Custodial this has been trimmed to reflect existing spaces that will be re-used. h. the size of the increase has been revised to reflect a more accurate assessment i. Teen Parenting i. The current thought in the district is that Teen Parenting will be moving to Arapahoe Ridge. ii. Additional budget money will be needed to add this scope to the project. j. Day Treatment this program relocation has not been determined. 2. Budget and Bond Scope a. It is hard to determine the exact scope of the bond scope due to numerous revisions to the final cost budget. b. Rex believes that the final construction budget will be 4.6 million. i. Dependant on contingency this may be able to raise up close to 5 million c. It is still hard to understand what portion of the 4.6 will be for new construction vs. renovation vs. facility infrastructure upgrades. i. The latest program suggests that the new construction could be accomplished with in the budget, but the cost of renovation would push the cost beyond the budget. d. There is not currently any money included in the bond for major renovations or additions. e. In order to clarify the total cost to implement the proposed program Rex would like to have the areas of renovation identified and cost estimated at $145 per square foot. i. An in depth walkthrough may be needed to assess how much renovation will be need to upgrade existing spaces. ii. Determine areas which require Minor, Moderate, and Major renovation. f. Culinary Arts this program is a high priority addition to the campus, however there is not any money earmarked in the bond budget description Addition/Renovation Options 1. Option B expanding to the west of the current Admin. a. Rex has discussed the proximity of this option to the Existing high voltage power lines with Jon Bollinger. It was recommended that the school not expand any closer to the power lines. There is a perception problem with 19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax: Celebrating 30 YEARS of respect for the social, historical, and environmental context of Architecture C:\WINDOWS\Temporary Internet Files\OLKCB\08010C004mh-DAT5.doc Last printed 7/1/2008 1:21:00 PM

3 respect to the power lines, however there isn t any conclusive evidence to prove it is safe or harmful. 2. A proposal to provide an addition to the north with teen parenting and classrooms was discussed a. The drop off area could be revised with the school wrapping the drop off loop. b. The existing entry would be enlarged and would allow a common entry for the school and the teen parenting program. c. If classrooms were included in the addition there is a possibility for a better view corridor and daylight. d. Potential for Addition in the Front, Common spaces in the middle and a renovation of the core buildings e. RTA will investigate this option further 3. Items that apply to multiple schemes were discussed a. Teen Parenting is preferred to be included in the ARHS project and not a separate stand alone element. i. There is economy in scale and multiple story option with Teen Parenting being combined with the other work b. Culinary Arts is not currently included in the bond and could be a phase item. i. Potential to phase it with flex classrooms on a second level at a later date. c. Science Labs could be best served by locating them into the core and also have the 2 lab adjacent to each other. i. Possibility to maintain existing ARHS lab and renovate a new lab in the existing landscape classroom ii. It was noted that the existing physical science lab is sufficient if not slightly under utilized. d. Auto Tech / Collision i. There may still be a desire by some teachers to start a diesel bay ii. RTA to investigate whether there is space adjacent to collision to the west for a small expansion e. CIS/Gaming/Multimedia/Print Shop i. It is important to keep the CIS/Forensics/Gaming group together. ii. Multimedia can combine with the print shop/graphics components. iii. and forensics has the potential of a joint partnerships if presented and overseen gently. 1. Work space sharing 2. apprenticeships f. Judy Scuppa will be conducting an analysis of the curriculum over the coming school year. There is concern over the program assessment that has been presented and discussed with the DAT versus what the curriculum needs may be after the assessment. i. After completion of the next round of revisions and schematic options, a meeting with Judy, as well as, the new principal and instructional directors should take place. ii. Rhoda may also be a potential person to aid in the development of the new program integration 19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax: Celebrating 30 YEARS of respect for the social, historical, and environmental context of Architecture C:\WINDOWS\Temporary Internet Files\OLKCB\08010C004mh-DAT5.doc Last printed 7/1/2008 1:21:00 PM

4 Next Meeting g. RTA is to proceed with the direction that Teen Parenting and Culinary Arts are to be included in the overall design of the program organization. i. Day treatment is not to be included unless directed by Rex. h. 1. The next meeting will be held on June 24, 2008 at 9 am 2. Over the summer Joan and Dave can be reached via their cell numbers a. Dave Krassowski (720) b. Joan Bludorn (303) REPORTED BY: Michael Riggs, RTA Signature 19 South Tejon Street, Suite Colorado Springs, CO Tel: Fax: Celebrating 30 YEARS of respect for the social, historical, and environmental context of Architecture C:\WINDOWS\Temporary Internet Files\OLKCB\08010C004mh-DAT5.doc Last printed 7/1/2008 1:21:00 PM

5 c COPYRIGHT RTA, INC. ENTRY ADD. PHASE 4 LOBBY MEDIA CENTER COUNSELING CENTER ACADEMY CIRCULATION COUNSELING MEDIA CENTER SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED SPACE PLAN OPTION A - LEVEL 1 EX05.1 SPACE PLAN OPTION A - LEVEL 1

6 c COPYRIGHT RTA, INC. 2 CR'S COSMELOGY MULTI-MEDIA /CIS /GAMING BANKING STUDENT COMMONS /KCHEN 3 CR'S AND 1 CR SCIENCE LAB PRINT SHOP /GRAPHICS CORRIDOR ADDION CONSTRUCTION TRADES CULINARY ARTS CR - P3 CR - P3 SCIENCE LAB P3 NURSING TEEN PARENTING LANDSCAPE /GREENHOUSE /VET TECH COLLISION COLLISION AU TECH AGRICULTURE & NATURAL RESOURCES CIRCULATION FINANCE AND BANKING SERVICES HEALTH SCIENCES & SUPPORTIVE SERVICES HUMAN SERVICES ACADEMY SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION A - LEVEL 2 EX05.2 SPACE PLAN OPTION A - LEVEL 2

7 c COPYRIGHT RTA, INC. 4 CR'S 8 CR'S TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION A - LEVEL 3 EX05.3 SPACE PLAN OPTION A - LEVEL 3

8 c COPYRIGHT RTA, INC. CORRIDOR ADDION PHASE 4 ENTRY ADD. PHASE 4 COUNSELING TEEN PARENTING LOBBY BANKING PHASE 4 FORENSICS CIRCULATION COUNSELING FINANCE AND BANKING SERVICES ACADEMY SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED SPACE PLAN OPTION B - LEVEL 1 EX06.1 SPACE PLAN OPTION B - LEVEL 1

9 c COPYRIGHT RTA, INC. ACACEMY +/-6 CLASSROOM AND 1 CR ADDION 2 CR'S COSMELOGY 3 CR'S 3 CR'S CORRIDOR ADDION CORRIDOR ADDION STUDENT COMMONS /KCHEN TEACHER OFFICES PRINT SHOP GRAPHICS /GAMING /CIS CORRIDOR ADDION COLLISION CONSTRUCTION TRADES COLLISION MULTI- MEDIA SCIENCE CR - P3 CR - P3 OPTION S SCIEN CE LAB - P3 NURSING AU TECH CULINARY ARTS LANDSCAPE /VET TECH LANDSCAPE /VET TECH ADDION AGRICULTURE & NATURAL RESOURCES CIRCULATION FINANCE AND BANKING SERVICES HEALTH SCIENCES & SUPPORTIVE SERVICES HUMAN SERVICES ACADEMY SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION B - LEVEL 2 EX06.2 SPACE PLAN OPTION B - LEVEL 2

10 c COPYRIGHT RTA, INC. MEDIA CENTER ADDION CORRIDOR 3-4 CR'S TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION B - LEVEL 3 EX06.3 SPACE PLAN OPTION B - LEVEL 3

11 c COPYRIGHT RTA, INC. CORRIDOR ADDION ENTRY ADD. PHASE 4 TEEN PARENTING 4 CR'S OR DAY TREATMENT COUNSELING CENTER LOBBY FORENSICS / SHARED WH CIRCULATION COUNSELING SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED ACADEMY SPACE PLAN OPTION C - LEVEL 1 EX07.1 SPACE PLAN OPTION C - LEVEL 1

12 c COPYRIGHT RTA, INC. 16 CR'S 2 CR'S COSMELOGY MULTI-MEDIA /CIS /GAMING BANKING STUDENT COMMONS /KCHEN CULINARY ARTS PRINT SHOP /GRAPHICS CORRIDOR ADDION CONSTRUCTION TRADES SCIENCE LAB -P4 SCIENCE LAB - P4 CR - P4 CR - P4 CR - P4 NURSING LANDSCAPE /GREENHOUSE /VET TECH PHASE 4 COLLISION COLLISION AU TECH AGRICULTURE & NATURAL RESOURCES CIRCULATION FINANCE AND BANKING SERVICES HEALTH SCIENCES & SUPPORTIVE SERVICES HUMAN SERVICES ACADEMY SCIENCE, TECHNOLOGY, ENGINEERING & MATH SHARED TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION C - LEVEL 2 EX07.2 SPACE PLAN OPTION C - LEVEL 2

13 c COPYRIGHT RTA, INC. MEDIA CENTER TRANSPORTAION SYSTEMS & INFRASTRUCTURE SPACE PLAN OPTION C - LEVEL 3 EX07.3 SPACE PLAN OPTION C - LEVEL 3

Regional Articulation Career and Technical Education

Regional Articulation Career and Technical Education Regional Articulation Career Technical Education (Career-Technical Education) A formal articulation agreement between Asheville-Buncombe Technical Community College Blue Ridge Community College Asheville

More information

REQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES

REQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES REQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES ACADEMIC BUILDINGS 2011-2013 September 2012 Project No. (CPB will obtain) TABLE OF CONTENTS PAGE Project Background and Purpose...2 Project Description...3

More information

General Qs and As for Applicants. Low Carbon Building Skills Training Fund Apprenticeship Enhancement Fund Stream

General Qs and As for Applicants. Low Carbon Building Skills Training Fund Apprenticeship Enhancement Fund Stream Q1. Why was the Low Carbon Building Skills initiative launched? A1. The purpose of this initiative is to improve training, and workforce and technical capacity to ensure that Ontario s workers have the

More information

Dallas County Community College District Bond Program. July 10, 2007

Dallas County Community College District Bond Program. July 10, 2007 Dallas County Community College District 2004 Bond Program July 10, 2007 1 2004 Bond Program Eastfield College 2 Industrial Technology Site Plan Workforce Development Eastfield College Learning Center

More information

Career, Technical, & Adult Education

Career, Technical, & Adult Education Career, Technical, & Adult Education Todd Bowden, Executive Director Sarasota County Schools CTE Snapshot 32 CTE Programs in High Schools & Middle Schools 39 CTE Programs offered at SCTI for High School

More information

Berne Knox Westerlo Central School District

Berne Knox Westerlo Central School District Berne Knox Westerlo Central School District Proposed Capital Project Progress Summary Report to the Board of Education May 8, 2017 Proposed Capital Project Background In 2015 the Board of Education and

More information

GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated

GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated 07.21.2015 1. Why is the Greene County School District considering a bond referendum? The Greene County School District is considering

More information

COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study. Meeting Date: June 17, 2010 Genentech Hall Mission Bay campus Subject: Community Meeting 1

COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study. Meeting Date: June 17, 2010 Genentech Hall Mission Bay campus Subject: Community Meeting 1 COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study Meeting Date: June 17, 2010 Location: Genentech Hall Mission Bay campus Subject: Community Meeting 1 Attendees: Neighbors UCSF staff San Francisco

More information

Bond Frequently Asked Questions

Bond Frequently Asked Questions Bond Frequently Asked Questions Q: This Bond program totals $680 million. How does that compare with prior BSD Bond programs? A: The proposed 2014 Bond is quite comparable with recent Bond programs considering

More information

Overview. Alaska Career and Technical Education Plan: A Call to Action

Overview. Alaska Career and Technical Education Plan: A Call to Action Overview Alaska Career and Technical Education Plan: A Call to Action Strategy 1.0: Make transitions planned and accountable for both successful student progress and systemic cooperation. 1.1. Ensure every

More information

New York University Campus Plan for Designation of Tax- Free NY Area

New York University Campus Plan for Designation of Tax- Free NY Area New York University Campus Plan for Designation of Tax- Free NY Area 1. Campus Name: New York University Contact Person: Jennifer Pautz Address: 25 West 4 th Street, 5 th Floor New York, NY 10012 2. Identification

More information

Humble ISD Career and Technology Course Flow Charts

Humble ISD Career and Technology Course Flow Charts Humble ISD Career and Technology Course Flow Charts 1 Humble ISD CTE Flow Charts-Revised 3.3.15 Middle School Courses... 3 Agriculture... 4 Architecture & Construction... 4 Arts and AV... 4 Business...

More information

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT: ADDENDUM NO. 1 Coast Community College District Purchasing Department PROJECT: Architectural Services for Orange Coast College Student Union Project RFP NO: 2076 NOTICE TO PROPOSERS ON THE ABOVE PROJECT:

More information

Educational Specifications Guidelines

Educational Specifications Guidelines JON. S. CORZINE Governor LUCILLE E. DAVY Commissioner Educational Specifications Guidelines Issued by the Office of School Facilities July 21, 2009 The following provides content guidelines for educational

More information

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT The Town of Cromwell is seeking written responses to a Request

More information

Bond Projects Update A. R. Rucker Middle

Bond Projects Update A. R. Rucker Middle Bond Projects Update A. R. Rucker Middle Sound system added in gym Doors & locks 10/28/16 Facilities being assessed for needs & sizes, developing replacement schedule for interior hardware & doors & for

More information

Grants Guide

Grants Guide Grants Guide 2016-2017 An advisory publication for school principals, central administrators, teachers and volunteers, containing information about writing grants in support of BVSD schools or programs.

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Research Laboratory Renovations Response Deadline

More information

Career & Technical Education Coherent Sequences

Career & Technical Education Coherent Sequences Career Technical Education Coherent Sequences 2018-2019 School Year Comprehensive High Schools 2017 Northside ISD (San Antonio, TX) 2/26/2018 1 Business Industry 2017 Northside ISD (San Antonio, TX) 2/26/2018

More information

Grants Guide

Grants Guide Grants Guide 2016-2016 An advisory publication for school principals, central administrators, teachers and volunteers, containing information about writing grants in support of BVSD schools or programs.

More information

VIRGINIA COURSE DESCRIPTION

VIRGINIA COURSE DESCRIPTION VIRGINIA COURSE CODE VIRGINIA COURSE DESCRIPTION 6320 Accounting 6321 Advanced Accounting 6613 Advanced Computer Information Systems 6615 Advanced Computer Information Systems (18 Weeks) 6651 Advanced

More information

EMERGENCY PROCEDURES

EMERGENCY PROCEDURES EMERGENCY PROCEDURES GREEN TEAM EMERGENCY PROCEDURES Out of concern for students and school staff, the following emergency green team procedures were developed jointly by green team members and administration.

More information

FY 2013 Annual Capital Plan

FY 2013 Annual Capital Plan FY 2013 Annual Capital Plan DRAFT: FY 2013 Annual Capital Improvement Plan June 5th, 2012 (Dollars in millions) Capital Projects Estimated Budget Debt State Capital O & M Public Private Gifts Grants Deferred

More information

Authorizing Legislation: 2HB 1115 [2015], Sec /Pdf/Bills/Session%20Laws/House/1115.SL.pdf)

Authorizing Legislation: 2HB 1115 [2015], Sec /Pdf/Bills/Session%20Laws/House/1115.SL.pdf) REPORT TO THE LEGISLATURE STEM PILOT PROGRAM 2017 Authorizing Legislation: 2HB 1115 [2015], Sec. 5026 (http://lawfilesext.leg.wa.gov/biennium/2015-16/pdf/bills/session%20laws/house/1115.sl.pdf) ESHB 2380

More information

Troops to Teachers College of Education. Dr. Geralyn Stephens, Associate Professor Dr. Janet Haas, Adjunct Faculty

Troops to Teachers College of Education. Dr. Geralyn Stephens, Associate Professor Dr. Janet Haas, Adjunct Faculty Troops to Teachers College of Education Dr. Geralyn Stephens, Associate Professor Dr. Janet Haas, Adjunct Faculty Troops to Teachers is a U.S. Department of Defense program that helps eligible military

More information

Middle School Credit Only. Middle School for High School Credit. Touch Systems Data Entry (.5 credit) 8th. Career Portals (.5 credit) 7th or 8th

Middle School Credit Only. Middle School for High School Credit. Touch Systems Data Entry (.5 credit) 8th. Career Portals (.5 credit) 7th or 8th Middle School Credit Only Middle School for High School Credit Career Portals 7th or 8th Foods for Today 7th Intro to Keyboarding 6th or 7th Intro to Engineering & Tech 7th or 8th Touch Systems Data Entry

More information

Academic Program Review Cycle 2014 thru 2025

Academic Program Review Cycle 2014 thru 2025 Ferris State University Academic Program Review Cycle 2014 thru 2025 This cycle is reviewed annually and revised as needed by the Chair of the APRC in consultation with the Academic Senate President and

More information

FY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016

FY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016 FY 2016 Capital Development Plan Northern Arizona University Revised April 2016 Item #7 EXECUTIVE SUMMARY Page 4 of 11 Project Board Approval Status Gross Square Footage Project Cost Amount Financed Funding

More information

Parkway Proposed Initiative Form

Parkway Proposed Initiative Form Parkway Proposed Initiative Form The process Step 1 Complete Proposed Initiative Form as described in the directions on page 3. 1. The intent of this document is to begin to share ideas and clarify budget

More information

December 3, 2010 MEMORANDUM. Dr. Karan Watson Chair, Council for the Built Environment. Mr. Tom Taylor Chair, Council for the Built Environment

December 3, 2010 MEMORANDUM. Dr. Karan Watson Chair, Council for the Built Environment. Mr. Tom Taylor Chair, Council for the Built Environment Council for the Built Environment Facilities Utilization Review Sub-Council December 3, 2010 MEMORANDUM To: Dr. Karan Watson Chair, Council for the Built Environment Mr. Tom Taylor Chair, Council for the

More information

November 6 th REMEMBER TO TURN OVER THE BALLOT! DEAR COMMUNITY MEMBERS: QUESTION #1 QUESTION #2. IN this Newsletter: FACILITY NEEDS & SOLUTIONS

November 6 th REMEMBER TO TURN OVER THE BALLOT! DEAR COMMUNITY MEMBERS: QUESTION #1 QUESTION #2. IN this Newsletter: FACILITY NEEDS & SOLUTIONS EDGERTON SCHOOL DISTRICT REFERENDUM NOVEMBER 6 DEAR COMMUNITY MEMBERS: On August 13, 2018, the School Board unanimously approved placing two referendum questions on the November 6 th ballot. Their decision

More information

Arlington Public Schools Purchasing Office

Arlington Public Schools Purchasing Office Arlington Public Schools Purchasing Office NOTICE OF ADDENDUM NO. 1 Issued on October 7, 2016 TITLE: RFP NO.: ARCHITECTURE/ENGINEERING SERVICES FOR MULTIPHASE PROFESSIONAL SERVICES FOR EXPANSION AT THE

More information

LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE

LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE Presented to DBIA Western Pacific Region James D. O Reilly Chief Facilities Executive, LACCD Terri Mestas Program Director, PMO - AECOM June 3, 2014

More information

Q. What are we voting on? Q. How was the referendum developed?

Q. What are we voting on? Q. How was the referendum developed? Q. What are we voting on? A. On April 3rd, the voters of the Peshtigo School District will have the opportunity to vote on two referendum questions. The first question will approve $29,960,000 for the

More information

RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016

RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016 RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016 BUILDING YEAR BUILT (per OFCC audit) AGE (years old) BUILDING SQUARE FOOTAGE (per OFCC audit) Buckeye 1964 1994 52 22 28,512 sq. ft. Hadden 1932 1942 1952

More information

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE Update Report on the Capital Outlay Plan for 2018-2024 JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE August 1, 2017 Background: At its April 2017 meeting, the Board

More information

SPECIAL ISSUE CAPITAL PROJECT VOTE

SPECIAL ISSUE CAPITAL PROJECT VOTE Schuylerville CENTRAL SCHOOL DISTRICT SPECIAL ISSUE - 2016 CAPITAL PROJECT VOTE District capital project vote Dec. 6 O n Tuesday, Dec. 6, voters in the Schuylerville Central School District will decide

More information

INSTRUCTIONS FOR FILLING OUT THE REQUEST FOR ADDITIONAL SPACE OR LAND FORM:

INSTRUCTIONS FOR FILLING OUT THE REQUEST FOR ADDITIONAL SPACE OR LAND FORM: INSTRUCTIONS FOR FILLING OUT THE REQUEST FOR ADDITIONAL SPACE OR LAND FORM: EXISTING SPACE, NEW CONSTRUCTION, LEASE OR PURCHASE Space is a valuable asset, often requested or needed by competing interests

More information

EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY

EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY ES-1 1.0 EXECUTIVE SUMMARY The University of California, Riverside (UCR) retained Brailsford & Dunlavey (B&D) in association with Cannon Dworsky Architects (Cannon Dworsky) in November 2000, to complete

More information

MITCHELL COLLEGE. Master Plan Work Session

MITCHELL COLLEGE. Master Plan Work Session Master Plan Work Session Agenda Review Master Plan Process, Schedule, and Goals Space Analysis Summary Site Analysis Summary Alternatives #1 - #3 Composite Alternative Phasing Discussion Master Plan Process

More information

AHRB East Wing Offices

AHRB East Wing Offices AHRB East Wing Offices Existing 2nd Floor Offices Example: Partial floor plan New 2nd Floor Offices TOTAL PROJECT COST INCREASE Name of Project: Location of Project: Project Number: Arctic Health Lab Revitalization

More information

Southwest Florida Culinary Arts & Production Campus. Collier County Accelerators Economic Incubators, Inc. January 2017

Southwest Florida Culinary Arts & Production Campus. Collier County Accelerators Economic Incubators, Inc. January 2017 Southwest Florida Culinary Arts & Production Campus Collier County Accelerators Economic Incubators, Inc. January 2017 Culinary Arts & Production Campus Immokalee Food & Agribusiness Food Hub Mecca Expand

More information

LUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10

LUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10 LUTHER BURBANK HIGH SCHOOL ATHLETIC SPORTS CENTER Progress Meeting 2/4/10 Date: Time: Location: Attendees: CC: February 4, 2010 1:00 P.M. Luther Burbank High School Burbank Room Minutes taken by: Eric

More information

FAQ s HISTORY AND FEATURES. 1. What is on the May 8, 2018 ballot? 2. How was this bond program developed?

FAQ s HISTORY AND FEATURES. 1. What is on the May 8, 2018 ballot? 2. How was this bond program developed? FAQ s HISTORY AND FEATURES 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal to implement improvements and renovations

More information

2014 MHS LOCAL SCHOLARSHIP APPLICATION

2014 MHS LOCAL SCHOLARSHIP APPLICATION 2014 MHS LOCAL SCHOLARSHIP APPLICATION Completed Applications due by 3:30pm March 4, 2015 To Mrs. Bunnell, MHS Main Bldg room 135 Only seniors enrolled in the Coos Bay School District who receive a diploma

More information

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together The New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together This document printed Monday, 10/10/2016 Contracting Opportunity Title:

More information

Virginia Department of Planning and Budget Project Request Justification

Virginia Department of Planning and Budget Project Request Justification DPB Form CNJ June 2005 Virginia Department of Planning and Budget Project Request Justification 2006-2008 Biennium Date: July 22, 2005 A. General Information 1. Agency name: Virginia Tech 2. Agency code:

More information

The Loop Media Hub. Gigabit Economic Development Impact Statement. Prepared for: The Loop Media Hub Feasability Study. June 27, 2012.

The Loop Media Hub. Gigabit Economic Development Impact Statement. Prepared for: The Loop Media Hub Feasability Study. June 27, 2012. Sandel & Associates The Loop Media Hub Gigabit Economic Development Impact Statement Prepared for: The Loop Media Hub Feasability Study June 27, 2012 Prepared by: Special Advisor Pat McKeehan 6900 Delmar

More information

PROGRAMS & FUNDING

PROGRAMS & FUNDING February 2017 PROGRAMS & FUNDING 2007 2008-2012 2013-2015 2016 + Community Education Enrichment courses Work Skill courses (Supervisory Academy, HR Certificate Program, etc.) Excursions Drivers Education

More information

GOVERNOR COOPER S PROPOSED BUDGET FOR

GOVERNOR COOPER S PROPOSED BUDGET FOR GOVERNOR COOPER S PROPOSED BUDGET FOR 2017-2019 On March 1, Governor Cooper announced his recommended budget for 2017-2019. His budget request calls for a pay raise for state employees and includes an

More information

BCPS 2017 Bond Issue Frequently Asked Questions

BCPS 2017 Bond Issue Frequently Asked Questions BCPS 2017 Bond Issue Frequently Asked Questions The Beal City Public Schools Board of Education formally approved the ballot language for a proposal to be put forward to the community for a bond issue

More information

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011 North Dakota State University Minard Hall Project Status Summary As of September 30, 2011 Overview Minard Hall is the largest academic facility located in the historical district on NDSU s campus. The

More information

STEM Pilot Project Grant Program

STEM Pilot Project Grant Program REPORT TO THE LEGISLATURE STEM Pilot Project Grant Program June 2016 Authorizing legislation: Capital Budget, Chapter 3, Laws of 2015, 3rd Special Session (http://des.wa.gov/sitecollectiondocuments/facilities/eas/2016-

More information

REASEHEATH COLLEGE BOARD

REASEHEATH COLLEGE BOARD REASEHEATH COLLEGE BOARD Minutes of the meeting held at 9.15am on Thursday, 17 July 2014, The Philip Leverhulme Centre, Reaseheath College Present: Emily Thrane (Chair) Colin Baxter Rachel Bailey Malcolm

More information

Land Development Code Update

Land Development Code Update Land Development Code Update Advisory Committee Meeting #1 September 14, 2017 We Dream Big and Deliver Agenda 1. Welcome and Introductions 2. Purpose and Objectives 3. Why Now? 4. Strategic Objectives

More information

REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS. Actions Requested: Consider recommending to the Board approval of the:

REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS. Actions Requested: Consider recommending to the Board approval of the: APRIL 20-21, 2016 Contact: Joan Racki/John Nash REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS Actions Requested: Consider recommending to the Board approval of the: 1. Following

More information

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name BGSU Ice Arena Space Study Response Deadline

More information

Frequently Asked Questions 2018 Bond Program

Frequently Asked Questions 2018 Bond Program HISTORY AND FEATURES Frequently Asked Questions 2018 Bond Program 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal

More information

OREGON DEPARTMENT OF EDUCATION. DIVISION 27 School Construction Matching Program

OREGON DEPARTMENT OF EDUCATION. DIVISION 27 School Construction Matching Program OAR 581-027-0005 Definitions OREGON DEPARTMENT OF EDUCATION DIVISION 27 School Construction Matching Program The following definitions and abbreviations apply to rules within OAR 581, Div 27: (1) Adjusted

More information

Nez Perce Education, Training and Business Development Center

Nez Perce Education, Training and Business Development Center Nez Perce Education, Training and Business Development Center Feasibility Study, Preliminary Design & Preliminary Cost Estimate: Prepared by Agnew: :Beck Castellaw Kom Architects Funded by U.S. Department

More information

Attachment FC 08 (REVISED 5/17/2018) SBCC 05/18/2018. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 18, 2018 FY

Attachment FC 08 (REVISED 5/17/2018) SBCC 05/18/2018. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 18, 2018 FY A. Approval - New (Non-State and Other Name (Other State) (Other State) 1 Central Piedmont Main Campus 2408 Parking Deck 3 Repairs 2 Edgecombe Tarboro Campus 2411 Tarboro Campus Loop Road Repairs will

More information

Finance Advanced Accounting Business Accounting Financial Services

Finance Advanced Accounting Business Accounting Financial Services Agriculture, Food, and Natural Resources Animal Production & Processing Animal/Mechanical Systems Agriculture Leadership in Animal Production Companion Animal Systems Veterinary Science Equine Science

More information

VALLEY TECHNICAL CENTER Career & Technical Education

VALLEY TECHNICAL CENTER Career & Technical Education VALLEY TECHNICAL CENTER Career & Technical Education Trade & Industrial Programs Agricultural Education Business & Information Technology Family & Consumer Sciences Health & Medical Services Automotive

More information

CHARLES COUNTY GOVERNMENT RFP NO SPACE ANALYSIS STUDY FOR GOVERNMENT SERVICES

CHARLES COUNTY GOVERNMENT RFP NO SPACE ANALYSIS STUDY FOR GOVERNMENT SERVICES CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services - Purchasing Division Telephone: 301-645-0656 RFP NO. 18-28 - SPACE ANALYSIS STUDY FOR GOVERNMENT SERVICES ADDENDUM NUMBER THREE

More information

ARLINGTON programs and incentives

ARLINGTON programs and incentives ARLINGTON programs and incentives Arlington Economic Development is committed to attracting and retaining high-quality businesses of all shapes and sizes. When it comes to assisting businesses, we don

More information

PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017

PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017 PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017 BROUGHT TO YOU BY: NATIONAL PINE FORGE ACADEMY ALUMNI ASSOCIATION A Student Center for Pine Forge Academy Students

More information

Classroom Grant Process & Application

Classroom Grant Process & Application Project Title Innovative or Essentials School: Grade Level(s): Project Leader: Amount Requested*: ($1000 maximum Elementary/ $2000 maximum Secondary) Project Leader Contact: District Mail Address Primary

More information

Construction 2016 SECTOR SPOTLIGHT NAICS 23. Report Contents. What is this industry sector? STATISTICS CANADA DEFINITION SECTOR STRUCTURE

Construction 2016 SECTOR SPOTLIGHT NAICS 23. Report Contents. What is this industry sector? STATISTICS CANADA DEFINITION SECTOR STRUCTURE 2016 SECTOR SPOTLIGHT NAICS 23 Construction Report Contents What is this industry sector? STATISTICS CANADA DEFINITION SECTOR STRUCTURE How does this sector stack up in Ottawa? OTTAWA DASHBOARD HIGHLIGHTS

More information

REGULAR MEETING OF THE CITIZENS OVERSIGHT COMMITTEE

REGULAR MEETING OF THE CITIZENS OVERSIGHT COMMITTEE Mt. SAN ANTONIO COLLEGE REGULAR MEETING OF THE CITIZENS OVERSIGHT COMMITTEE Tuesday, November 18, 2003 MINUTES Prior to the regular meeting, Gary Nellesen, Director, Facilities Planning & Management, Randy

More information

Los Angeles Unified School District Page 1 of 5

Los Angeles Unified School District Page 1 of 5 Los Angeles Unified School District 333 South Beaudry Ave, Los Angeles, CA 90017 Board of Education Report File #: Rep-341-15/16, Version: 1 Amendment to the Facilities Services Division Strategic Execution

More information

Business Affairs Priorities

Business Affairs Priorities Division of Business and Finance Business Affairs Priorities North Carolina Agricultural and Technical State University UNIVERSITY STUDENT SUCCESS NONTRADITIONAL STUDENTS FUNDRAISING, MARKETING, AND COMMUNICATIONS

More information

PROGRAM APPROVALS

PROGRAM APPROVALS 2007-2008 FRIDAY, SEPTEMBER 14, 2007 Motorcycle Maintenance Technician Program (Cert & AS) 1st Read Mira Costa College Personal Fitness Trainer (Cert) Action Approved Radiation Protection Technician (RPT)

More information

County & MA Site Administration

County & MA Site Administration County & MA Site Administration County Incentives Program and County Grant Program County Relations: Joshua Montoya and Crestina Martinez January 13, 2016 1 Our Mission Improving health care access and

More information

FY 2018 Capital Development Plan Northern Arizona University

FY 2018 Capital Development Plan Northern Arizona University FY 2018 Capital Development Plan Northern Arizona University EXECUTIVE SUMMARY Page 1 of 11 Item Name: FY 2018 Capital Development Plan (NAU) Action Item Committee Recommendation to Full Board First Read

More information

UAA Master Plan Update

UAA Master Plan Update UAA Master Plan Update Draft Master Plan June 2013 ECI/Hyer Architecture ZGF Architects CRW Engineering Corvus Design Landscape Architecture Kittelson & Associates Ira Fink & Associates Key Themes Consolidation

More information

Marion Local Facility Expansion. Marion Local School District April 30, 2018

Marion Local Facility Expansion. Marion Local School District April 30, 2018 Marion Local Facility Expansion Marion Local School District April 30, 2018 1 Meeting Goals An opportunity to share information: Factual information about the proposed facility Rationale for design choices

More information

Foothill Education Foundation Dedicated to Funding Educational Excellence

Foothill Education Foundation Dedicated to Funding Educational Excellence Foothill Education Foundation Dedicated to Funding Educational Excellence Click here to view videos showing your money at work... The following represents teacher requests granted so far this year. Allocations

More information

ACTION ITEM #3 WSU Pullman, Gateway Improvement Project Phase 1, Design and Construction (Patterson/Yang)

ACTION ITEM #3 WSU Pullman, Gateway Improvement Project Phase 1, Design and Construction (Patterson/Yang) ACTION ITEM #3 WSU Pullman, Gateway Improvement Project Phase 1, Design and Construction (Patterson/Yang) TO ALL MEMBERS OF THE BOARD OF REGENTS SUBJECT: WSU Pullman, Gateway Improvement Project Phase

More information

Final Fall Counts (SIRIS)

Final Fall Counts (SIRIS) Final Fall Counts (SIRIS) Full-Time ( 8,426 0 7,931-495 -5.87 7,490-441 -5.56 Part-Time 4,370 0 4,123-247 -5.65 3,819-304 -7.37 Total 12,796 0 12,054-742 -5.80 11,309-745 -6.18 Final Fall Totals (SIRIS)

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815

More information

METHODOLOGY - Scope of Work

METHODOLOGY - Scope of Work The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:

More information

CLUSTER UPDATE PLAN ACADEMIC YR

CLUSTER UPDATE PLAN ACADEMIC YR CLUSTER UPDATE PLAN ACADEMIC YR 2011-2012 Cluster Update Plan The purpose of the Cluster Update Plan is to help Clusters: 1) utilize department/unit plans to develop priorities within each cluster; 2)

More information

WWCC SERVICES & ACTIVITIES FEE Budget

WWCC SERVICES & ACTIVITIES FEE Budget WWCC SERVICES & ACTIVITIES FEE 2016-17 Budget As forwarded by the S & A Fee Budget Committee to the WWCC Senate Senate will vote on this budget on Thursday, May 5 th SUMMARY Estimated Revenue on Walla

More information

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER Issued On: February 1, 2018 Date Due: February 23, 2018-2:00 pm CST At: 545 Academy Drive Northbrook, IL 60062 Northbrook Activity Center 180 Anets Drive

More information

Career Clusters, Pathways, and Courses North Carolina Career and Technical Education. Please see the FAQ worksheet tab for Frequently Asked Questions.

Career Clusters, Pathways, and Courses North Carolina Career and Technical Education. Please see the FAQ worksheet tab for Frequently Asked Questions. Career Clusters, Pathways, and Courses North Carolina Career and Technical Education Please see the FAQ worksheet tab for Frequently Asked Questions. September 26, 2017 Frequently Asked Questions How do

More information

WRIGHT STATE UNIVERSITY BOARD OF TRUSTEES

WRIGHT STATE UNIVERSITY BOARD OF TRUSTEES WRIGHT STATE UNIVERSITY BOARD OF TRUSTEES Advancement Committee Report November 2017 1. Alumni Relations Report 2. Wright State Foundation Financial Report 3. Development Report 4. Discover Your Story:

More information

UNIVERSITY OF CENTRAL FLORIDA STAFF CLASSIFICATION TITLES

UNIVERSITY OF CENTRAL FLORIDA STAFF CLASSIFICATION TITLES UNIVERSITY OF CENTRAL FLORIDA STAFF CLASSIFICATION TITLES Below are the UCF staff classification titles grouped in job family order UCF Human Resources website: http://hr.ucf.edu Title (Job Code) Art Senior

More information

Ballot Measures-J Section

Ballot Measures-J Section J, Anaheim Elementary Schools Repair/Improvement Measure To repair and modernize classrooms and older neighborhood schools to support reading, math, science, technology, arts, replace deteriorating roofs,

More information

2020 Project Update. Merced City Council August Chancellor Dorothy Leland

2020 Project Update. Merced City Council August Chancellor Dorothy Leland 2020 Project Update Merced City Council August 2016 Chancellor Dorothy Leland UC Merced Today 1.4 million gross square feet, 2,000 beds and 6,700 students Academic Residential Student Life/Athletics Campus

More information

Florida Job Growth Grant Fund Workforce Training Grant Proposal

Florida Job Growth Grant Fund Workforce Training Grant Proposal Florida Job Growth Grant Fund Workforce Training Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed and signed by an authorized representative

More information

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655 Request for Proposals 2018 2019 School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655 Notice to Bidders Notice is hereby given to interested bidders that the Lafayette

More information

Capital Projects Levy

Capital Projects Levy Bonds-vs-Levies Bond = Building Bond proceeds purchase new buildings, renovate existing buildings, add infrastructure, new equipment and technology Bonds require 60% + 1 vote to pass Levies = Learning

More information

Easy Bay Green Corridor Partnership: Leveraging Berkeley s Regional Strengths

Easy Bay Green Corridor Partnership: Leveraging Berkeley s Regional Strengths Easy Bay Green Corridor Partnership: Leveraging Berkeley s Regional Strengths Michael Caplan City of Berkeley Office of Economic Development mcaplan@ci.berkeley.ca.us 510-981-2490 Statement of Principles

More information

2014 was yet another great year!

2014 was yet another great year! 215 216 Forecast for Ottawa County 214 was yet another great year! George A. Erickcek Brian Pittelko W.E. Upjohn Institute for Employment Research February 3, 215 1 Outline The national economy is speeding

More information

Florida Job Growth Grant Fund Workforce Training Grant Proposal

Florida Job Growth Grant Fund Workforce Training Grant Proposal Florida Job Growth Grant Fund Workforce Training Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed and signed by an authorized representative

More information

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers MINUTES CAPITAL COMMITTEE February 3, 2014 Black Hawk Room 2:00 p.m. Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers 1. Core Value: Responsibility

More information

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017 SECTION I: SUMMARY REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER September 21, 2017 The University of Maine (UMaine), located in Orono, Maine, desires to procure

More information

Morgan Hill Unified School District

Morgan Hill Unified School District Facilities Department 15600 Concord Circle, Morgan Hill, CA 95037 Phone: (408) 201-6087 Fax (408) 776-0175 REQUEST FOR ARCHITECTURAL SERVICES PROPOSALS for a New Britton MS Campus and Site Master Plan

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT BACKGROUND INFORMATION FOR AGENDA ITEMS FOR 7/22/15, BOARD MEETING

SEQUOIA UNION HIGH SCHOOL DISTRICT BACKGROUND INFORMATION FOR AGENDA ITEMS FOR 7/22/15, BOARD MEETING SEQUOIA UNION HIGH SCHOOL DISTRICT BACKGROUND INFORMATION FOR AGENDA ITEMS FOR 7/22/15, BOARD MEETING 1. CALL TO ORDER Anyone wishing to address the Board on closed session matters may do so at this time.

More information

Physical Plant records 015.PP

Physical Plant records 015.PP Physical Plant records 015.PP Finding aid prepared by Natalie Morath This finding aid was produced using the Archivists' Toolkit November 26, 2012 Describing Archives: A Content Standard Eastern Michigan

More information