TRANSBAY TRANSIT CENTER
|
|
- Brittney Evans
- 5 years ago
- Views:
Transcription
1 TRANSBAY TRANSIT CENTER Package Pre-Proposal Conference Webcor/Obayashi Joint Venture Office 175 Beale St. San Francisco, CA 2:00pm January 16, 2014 Please sign in! AGENDA Welcome and Introductions Trade Package Overview SBE Participation Overview Proposal Submittal Requirements Questions and Answers Networking Job Walk for Prime Proposers Only 1
2 Project General Information Client: Transbay Joint Powers Authority (TJPA) General Contractor: Webcor/Obayashi Joint Venture Architect: Pelli Clark Pelli / Adamson Information and all RFP documentation is located on the TJPA website: > TJPA > Doing Business with the TJPA > Current Contract Opportunities > Temporary Facilities (RFP) 2
3 Request for Proposals (RFP) Exhibit A with Scope of Work Request for Proposals Manual with Attachments and Exhibits Project Specifications Available at Plan Rooms Shown on Website 3
4 Proposal Process Timeframe and Dates Questions/Requests for Clarifications Due: 2:00 pm Pacific Time on January 30, 2014 Use the editable QPD form from TJPA website Proposal Packages Due: 2:00 pm Pacific Time on February 20, 2014 Finalist Trade Subcontractors Notified: February 28, 2014 Finalist Interviews/Submissions (if necessary): 2:00 pm Pacific Time on March 10-21, 2014 TJPA Board Vote to Approve the Contract Award: Tentatively May 8, 2014 You are here! 4
5 TG05.10 General Scope 1. Temporary Toilets and Sanitary Facilities 2. Waste Management 3. Temporary Elevator Operators 4. Miscellaneous Labor 5
6 TG05.10 Key Construction Items 1. All toilets and sanitary facilities need to be easily movable. Toilets above ground level shall be equipped with lifting hooks for easy movement via crane. 2. Waste Management to comply with all LEED, CSF and specified requirements. All C&D documentation must be submitted electronically and match reports. No copies or scanning. 3. Mobilization will begin approximately second quarter of
7 7
8 Evaluation Process Evaluators: Webcor/Obayashi (CM/GC), TJPA (Client), PMPC (Project Controls), and Turner (CM/GC Oversight). Step 1 Proposal Min. 160 Points Qualifications and Experience of Trade Subcontractor Firm 130 points Proposed Staffing Plan 10 points References 10 points Fee Proposal 50 points Step 2 Interview (if necessary) Presentation 50 points Responses to Questions 50 points 8
9 Questions on Proposal Docs Submit ALL RFP Questions via editable QPD Form Deadline: Thursday, 01/30/2014, 2:00 pm 9
10 10
11 How to Submit a Responsive Proposal 1. Complete and include ALL forms! See Proposal Checklist. 2. Meet ALL Deadlines and Times! 3. Make sure your Proposal arrives by 2pm February 20, 2014! Webcor/Obayashi will use the clock at TRANSBAY TRANSIT CENTER SBE Program Overview TG05.10 Temporary Facilities Professional Services Thursday, January 16, :00pm 11
12 SBE PROGRAM OVERVIEW SBE Program Overview Agenda I. Overview of SBE Program II. Overview of SBE Goal for TG05.10 III. Participation Strategies to Meet the Goal SBE PROGRAM OVERVIEW Certification & Certifying Agencies DBE SBE LBE 12
13 SBE PROGRAM OVERVIEW Veteran Business & Workforce Participation SBE PROGRAM OVERVIEW Overall SBE Project Participation Goal: 17% 122 SBEs to date 13
14 SBE PROGRAM OVERVIEW Professional Services 70% SBE Participation Goal Focus on Trade Package Specific Information Includes SBE/DBE/LBE Certifications Certification Assistance Provided By Program Meets Commercially Useful Function Guidelines SBE PROGRAM OVERVIEW Commercially Useful Function (CUF) A business performing a CUF is one that does all of the following: Is responsible for the execution of a distinct element of the work of the contract. Carries out its obligation by actually performing managing or supervising the work involved. Performs work that is normal for its business, services and function. Is not further subcontracting a portion of the work that is greater than that expected to be subcontracted by normal industry practices. 14
15 SBE PROGRAM OVERVIEW CUF Evaluation TEST Is the supplier (whether it is the prime or a subcontractor) responsible for the execution of a distinct element of the resulting contract? Will the supplier actually be performing, managing, or supervising an element of the resulting contract? Will the supplier be performing work that is normal for its business, services and function? Is there further subcontracting that is greater than that expected to be subcontracted by normal industry practices? SBE PROGRAM OVERVIEW North American Industry Classification System The NAICS Code Materials/Equipment/Supplies (Examples) Construction equipment rental Welding equipment rental Rental equipment Construction materials/supplies Welding supplies 15
16 SBE PROGRAM OVERVIEW Calculating Participation Values SBE Trade Subcontractor Work performed or services provided by the SBE s own work forces, including the cost of the materials and supplies 100% Work performed or services provided by the SBE s own forces, including the cost of materials and supplies obtained for work, except for materials and supplies purchased or leased from Prime. If work has been subcontracted to another SBE, it will be counted as SBE participation by that other SBE. SBE Materials Supplier Count 60% of the costs of the materials and supplies obtained from a SBE materials supplier. SBE PROGRAM OVERVIEW Calculating Participation Values Pass Thru/Broker Count the entire amount of the fees or commissions charged for assistance in procuring or delivering materials and supplies when purchased from a SBE that is not a manufacturer or regular dealer. Do not count the cost of the materials and supplies. 16
17 SBE PROGRAM OVERVIEW Participation Strategy #1 Utilization of CUF Approved Suppliers 60% Participation will be counted toward goal If the SBE is only a Broker then only the fees/commission will be counted SBE PROGRAM OVERVIEW Participation Strategy #2 Multiple SBEs utilized for a specific Scope of Work Equipment Rental Equipment Repair/Maintenance Licensed Transport 17
18 SBE PROGRAM OVERVIEW Participation Strategy #3 SBE supplies materials, fabricates and installs 100% Utilization is counted toward the goal SBE Furnish and Install a Portion Of The Work. SBE PROGRAM OVERVIEW TG05.10 Temporary Facilities Professional Services Potential SBE Opportunity Roster Materials Equipment Rental Equipment Maintenance and Repair Project Labor Licensed Transport Rigging On-Cal Emergency Services Supplies Tools 18
19 TRANSBAY TRANSIT CENTER TRADE PACKAGE CHECKLIST & SUBMITTAL RECAP 19
20 How to Submit a Responsive Proposal 1. Complete and include ALL forms! See Proposal Checklist. 2. Meet ALL Deadlines and Times! 3. Make sure your Proposal arrives by 2pm February 20, 2014! 20
21 Remember to sign all forms!! Questions? All questions regarding the RFP will need to be submitted and answered through the QPD process. Next, prime proposers will be available to discuss work with SBE representatives. Thank You! 21
Informational Workshop How to do Business with the City of Irvine March 31, 2011
Informational Workshop How to do Business with the City of Irvine March 31, 2011 Presented by Brian D. Brown, CPSM Buyer City of Irvine About the City of Irvine The City of Irvine has an annual budget
More informationAPPENDIX A. DBE Information to be submitted with Proposal
REQUEST FOR PROPOSALS TRANSPORTATION DEVELOPMENT ACT (TDA) TRIENNIAL PERFORMANCE AUDIT OF THE PUBLIC TRANSIT SYSTEMS AND THE COUNCIL OF GOVERNMENTS IN STANISLAUS COUNTY APPENDIX A DBE Information to be
More informationPre-Bid Conference RCC Employee Parking Lot Contract Number /22/18
Pre-Bid Conference RCC Employee Parking Lot Contract Number 9500599 02/22/18 1 Agenda Pre-Bid Conference Presentation Solicitation Logistics, RFB review, BDDD 1:00-1:30 Project Details 1:30-2:00 Q&A throughout
More informationDisadvantaged Business Enterprise Program and Triennial DBE Goal Setting Methodology and Rationale
Disadvantaged Business Enterprise Program and Triennial DBE Goal Setting Methodology and Rationale Kenn Hardin Senior Manager Civil Rights Division RTD Small Business Office August 14, 2013 Agenda Introductions
More informationSECTION II. Collection and Analysis of Metro Contract Data
SECTION II. Collection and Analysis of Metro Contract Data Section II describes the procurement areas and the relevant geographic market area defined for the Metro disparity study. BBC also identifies
More informationMembrane Pre-Selection Request For Proposal
Membrane Pre-Selection Request For Proposal City of San Luis Obispo Water Resource Recovery Facility Project Mandatory Pre-proposal Conference - July 7, 2017 Water Resource Recovery Facility Project Community
More informationSanta Clara Valley Transportation Authority Disadvantaged Business Enterprise (DBE) Program
Santa Clara Valley Transportation Authority Disadvantaged Business Enterprise (DBE) Program Three-Year Overall Goal and Methodology Report For Federal Fiscal Years 2017 2019 I. Goal Setting Methodology
More information681 Florida Housing Associates, L.P.: 681 Florida St SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS/PROPOSALS ( RFQ/P ) FOR GENERAL CONTRACTOR SERVICES
681 Florida Housing Associates, L.P.: 681 Florida St SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS/PROPOSALS ( RFQ/P ) FOR GENERAL CONTRACTOR SERVICES Issued by: Tenderloin Neighborhood Development Corporation
More informationSOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM REVISIONS TO MEASURE Q SMALL, LOCAL, AND DIVERSE BUSINESS PROGRAM PILOT PROGRAM
AGENDA ITEM MEETING DATE June 6, 2018 SOLANO COMMUNITY COLLEGE DISTRICT GOVERNING BOARD AGENDA ITEM TO: SUBJECT: Members of the Governing Board REVISIONS TO MEASURE Q SMALL, LOCAL, AND DIVERSE BUSINESS
More informationPRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018
The University of Texas Medical Branch RFP 18-053 CRYO EM RENOVATION PRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018 Working Together to Work Wonders 1 PRE-PROPOSAL MEETING AND TOUR 10:00 am Pre-Submittal
More informationNote to all City Departments
Note to all City Departments Request for Proposal (RFP) This boilerplate should be used on RFP projects. These projects seek proposals from firms that can perform a specific type of service with a defined
More informationREQUEST FOR QUALIFICATIONS
FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / OPM 100 TAMPA, FL 33620-7550 EDITION: NOVEMBER 1, 2016 PHONE: (813) 974-2845 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS PROJECT NAME: USF CPT REPLACE
More informationSUBCONSULTANT/SUBCONTRACTOR PROCUREMENT
Alameda County, General Services Agency Project No. R1-15042 HVAC and EMCS Harbor Bay Project DOCUMENT 00 62 30 SUBCONSULTANT/SUBCONTRACTOR PROCUREMENT 1. GENERAL. 1.1 Design Builder shall use only subconsultants
More informationTransbay Transit Center
Transbay Transit Center Transbay Newsletter - Spring 2012 TJPA Attends White House Celebration of Joining Forces On April 11, 2012, Maria Ayerdi-Kaplan, Executive Director of the Transbay Joint Powers
More informationAttention Design Firms
Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be
More informationREPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT
REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT FEBRUARY 2018 PURPOSE Staff requests that the Dulles
More informationMid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016
Mid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016 MID-COAST TRANSIT CONSTRUCTORS Clayton Gilliland, MCTC, Project Manager WELCOME! Mid-Coast Transit Constructors Construction
More informationRFP ADDENDUM NO. 1 DISTRICT RFP NO. SV EDUCATION, CLASSROOM, MISCELLANEOUS SUPPORT FURNITURE AND RELATED PRODUCTS AND SERVICES
Strategic Sourcing and Contracts Department 2351 Cardinal Lane, Bldg. M, San Diego, CA 92123 P - 858-522-5810 F - 619-542-5710 June 25, 2014 RFP ADDENDUM NO. 1 DISTRICT RFP NO. SV-15-0028-13 EDUCATION,
More informationNEXT NGA WEST (N2W) PROGRAM ACQUISITION INFORMATION BRIEF
NEXT NGA WEST (N2W) PROGRAM 1 ACQUISITION INFORMATION BRIEF 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130
More informationFort Bend Independent School District. Small Business Enterprise Program Procedures
Fort Bend Independent School District Small Business Enterprise Program Procedures Spring 2015 TABLE OF CONTENTS I. Summary Of Fort Bend Independent School District s Small Business Enterprise Program
More informationREQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services
Date: June 15, 2017 REQUEST FOR PROPOSALS For: As needed Plan Check and Building Inspection Services Submit Responses to: Building and Planning Department 1600 Floribunda Avenue Hillsborough, California
More informationOHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS
More informationLexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES
Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES Lexington Convention Center Renovation and Expansion I. Description of Project The Lexington Center Corporation
More informationUNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN
UNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN TABLE OF CONTENTS Definitions. 1 Responsibilities 3 Dispute Procedures... 7 Minority Business Construction Contract Provisions. 8 Minimum
More informationFood and Beverage Co-Packing RFP Information session. Pre-Proposal Information Session: June 25th, 2015 RFP Submission Deadline: July 31st, 2015
Food and Beverage Co-Packing RFP Information session Pre-Proposal Information Session: June 25th, 2015 RFP Submission Deadline: July 31st, 2015 Agenda Welcome & Introductions Project Background and Objectives
More informationDoing Business. with
Doing Business with SEPTEMBER 2016 CONTACTING VIA Procurement Department Equipment, Materials, Supplies, Professional Services, Rolling Stock, Construction, Engineering, and Architectural Design 800 W.
More informationThis request for qualifications seeks the following type of service providers:
ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,
More informationC (Procedure) Small, Minority, Women and Veteran Owned Business Enterprise Program PURPOSE DEFINITIONS
PURPOSE Alamo Colleges District encourages the use of Small, Minority, Women and/or Veteran Owned Business Enterprises (SMWVBEs) as herein below defined to assist in the implementation of this procedure
More informationENABLING CONSTRUCTION PROJECTS FOR THE SOUTH TERMINAL REDEVELOPMENT PROGRAM CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) CONTRACT NO.
D ENVER INTERNATIONAL AIRPORT ENABLING CONSTRUCTION PROJECTS FOR THE SOUTH TERMINAL REDEVELOPMENT PROGRAM CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) CONTRACT NO. CE 06010 ADDENDUM NUMBER ONE Scope
More informationREQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement
Request for Qualifications for Page 1 of 8 REQUEST FOR QUALIFICATIONS FOR For the RFQ Submittal Deadline: October 17, 2017 at 3:00 PM 1.1 INTRODUCTION: The is soliciting Statements of Qualifications (SOQ)
More informationPRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)
PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston
More informationPre-Proposal Conference
Pre-Proposal Conference RFP- Voluntary Benefits 6100043782 Timothy Pucino: Office of Administration: Friday, October 13, 2017 1 Bureau of Diversity, Inclusion and Small Business Curtis Burwell Procurement
More informationUC Berkeley Supplier Diversity Basics. Module 1: Policy and Regulatory Requirements
UC Berkeley Supplier Diversity Basics Module 1: Policy and Regulatory Requirements Supplier Diversity Basics Curriculum For UC Berkeley Employees What you need to know: Module 1: Policy and Regulatory
More informationDesign Build Phase II Service Center Project
Design Build Phase II Service Center Project Diana L. Woltersdorf Manager, Contract Administration Julie Valadez, AIA Project Manager, Vertical Construction September 30, 2016 Pre-Submittal Meeting Pre-Submittal
More informationRequest for Qualifications/Proposals Alameda County Redevelopment Agency Economic Development Strategic Plan
Alameda County Redevelopment Agency The, a department of the Alameda County Community Development Agency, requests Qualifications and Proposals for consultant services to assist in the development of an
More informationREQUEST FOR INFORMATION (RFI) Specification No FOR BART PLAZA FOOD VENDORS RESPONSES WILL NOT BE OPENED AND READ PUBLICLY
Finance Department General Services Division Dear Interested Party: REQUEST FOR INFORMATION (RFI) Specification No. 18-11214 FOR BART PLAZA FOOD VENDORS RESPONSES WILL NOT BE OPENED AND READ PUBLICLY The
More informationMEMORANDUM. July 7, 2016
MEMORANDUM July 7, 2016 TO: FROM: MEMBERS, PORT COMMISSION Hon. Willie Adams, President Hon. Kimberly Brandon, Vice President Hon. Leslie Katz Hon. Eleni Kounalakis Hon. Doreen Woo Ho Elaine Forbes Interim
More informationSmall Business Utilization, FY January Legislative Report
Small Business Utilization, FY 2010-11 January 2012 Legislative Report UNIVERSITY of CALIFORNIA Budget and Capital Resources January 2012 UNIVERSITY OF CALIFORNIA Small Business Utilization Report, FY
More informationADDENDUM NO. 1 TO CONTRACT DOCUMENTS FOR
ADDENDUM NO. 1 TO CONTRACT DOCUMENTS FOR Contract TCIS-28 Addendum No. 1 Page 1 of 4 SOUTHERLY WASTEWATER TREATMENT CENTER TESTING AND CONSTRUCTION INSPECTION SERVICES FOR THE RENEWABLE ENERGY FACILITY
More informationAutomated Airport Parking Project
Automated Airport Parking Project RFP 2017-03 I. INTRODUCTION This solicitation is being offered by Texarkana Airport Authority. The Airport is a public entity owned by the Cities of Texarkana, AR and
More informationDecember, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport
December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport Dear Proposer: The Savannah Airport Commission is requesting proposals for
More informationREQUEST FOR PROPOSALS
COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF SANTA ANA REQUEST FOR PROPOSALS RELOCATION OF TWO RESIDENTIAL STRUCTURES PROPOSALS DUE: Monday, May 9, 2011 at 11:00 AM 1. INTRODUCTION REQUEST FOR PROPOSALS
More informationAUSTIN INDEPENDENT SCHOOL DISTRICT
Historically Underutilized Business (HUB) Program Compliance Guidelines NO GOALS PROJECT Project Number: 18RFQ064 Project Name: Professional Services Land Surveying Advertisement/Solicitation Date: November
More informationREQUEST FOR PROPOSAL DOWNTOWN RETAIL AND ENTERTAINMENT STRATEGY. For. The Redevelopment Agency of the City of Riverside. Issued: August 13, 2010
REQUEST FOR PROPOSAL DOWNTOWN RETAIL AND ENTERTAINMENT STRATEGY For The Redevelopment Agency of the City of Riverside Issued: August 13, 2010 Proposal Due: 12 p.m. on September 3, 2010 Issued by: Tricia
More informationUniversity of Houston Procurement Process for Non-Construction and Non- Renovation Contracts Costing More than $1 Million
1. UH System Board of Regents (BOR) approval must be obtained for the Chancellor to negotiate and execute a non-construction or non-renovation revenue or expense contract that is anticipated to cost (or
More informationREQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT
REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT PROPOSAL SUBMITTAL DEADLINE: DATE: April 15, 2016 TIME: 12:00 PM CITY OF PACIFICA 170 SANTA MARIA AVE. PACIFICA, CA 94044 (650)
More informationMEETING AGENDA. Meeting Time: 9:30 AM Project Name: Chicago Park District Group A
MEETING AGENDA Meeting Date: January 30, 2018 Meeting Subject: PRE-BID CONFERENCE Meeting Time: 9:30 AM Project Name: Chicago Park District Group A Meeting Location: Columbus Park Facility Name/ Project
More informationOn-Call Environmental Engineering Support Services Contract Number 8500362 05.09.18 1 2 Travis Sanderfer, Program Solicitations Manager Design, Code and Construction Solicitation Schedule Deadline for
More informationCITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS
CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS ADDENDUM #1 ISSUSED ON May 13, 2005 REQUEST FOR PROPOSALS FOR A NEW VOTING SYSTEM RFP#NVS0305 1) Please add and substitute the following Addendum
More informationAUSTIN INDEPENDENT SCHOOL DISTRICT
Historically Underutilized Business (HUB) Program Professional Services Compliance Guidelines Project Number: 18RFQ060 Project Name: Bond Program Management Full or Phase 1 Modernization Projects Advertisement/Solicitation
More informationTHE DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
888 17 th Street, NW, 11 th Floor Washington, DC 20006 Tel: (202) 857-1000 Fax: (202) 857-0200 THE DISADVANTAGED BUSINESS ENTERPRISE PROGRAM May 24, 2017 Presented by: Antonio R. Franco Jacqueline K. Unger
More informationEnergy Efficiency Programs Process and Impact Evaluation
Energy Efficiency Programs Process and Impact Evaluation Issued: 4/3/2018 Questions Due: 4/17/2018 Responses Due: 5/18/2018 RFP Coordinator: Rob Ward *This RFP process will be conducted via Idaho Power
More informationSalida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201
Request for Qualifications for Environmental Consulting Services at: Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications
More informationON-THE-JOB TRAINING REQUEST FOR PROPOSAL RESPONDENTS ORIENTATION/TECHNICAL ASSISTANCE SESSION QUESTIONS AND ANSWERS July 8, 2013
ON-THE-JOB TRAINING REQUEST FOR PROPOSAL RESPONDENTS ORIENTATION/TECHNICAL ASSISTANCE SESSION QUESTIONS AND ANSWERS July 8, 2013 1. Q: When you apply for the RFP can you apply for one particular funding
More informationREQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE ARCHITECT UNIVERSITY OF CALIFORNIA, SAN DIEGO. FD&C Project No. 4795
REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE ARCHITECT FOR REGIONAL TRANSPORTATION PROJECT INTEGRATION FROM VA PROPERTY TO VOIGT/GENESEE INTERSECTION FD&C Project No. 4795 Proposals due FRIDAY, APRIL
More informationJob Order Contract Contract Number
Job Order Contract Contract Number 9500635 04.03.18 1 2 Travis Sanderfer, Program Solicitations Manager Design, Code and Construction Solicitation Schedule Deadline for Questions April 12, 2018 Issue Addenda
More informationKnights Ferry Elementary School District
Knights Ferry Elementary School District REQUEST FOR PROPOSAL FOR THE IMPLEMENTATION OF ENERGY EFFICIENCY MEASURES FUNDED BY THE CLEAN ENERGY JOBS ACT - PROPOSITION 39 REQUEST FOR PROPOSAL SUBMITTAL DEADLINE
More informationRFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS
REQUEST FOR QUALIFICATIONS FOR FURNITURE, FIXTURES, & EQUIPMENT (FF&E) CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS (Chabot College, Las Positas College, District-Wide) RE:
More informationREQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION
REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT Table of Contents ADDENDUM NO. 2 March
More informationCAMPBELL UNION HIGH SCHOOL DISTRICT
CAMPBELL UNION HIGH SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS PROPOSITION 39 ENERGY CONSERVATION AND ENERGY EFFICIENCY SERVICES OWNER CAMPBELL UNION HIGH SCHOOL DISTRICT 3235 Union Avenue San Jose, CA
More informationA helpful tactic to achieve the strategy is to use Historically underutilized. Richmond based companies
1. UCB and LBNL shall set a goal of 25% local spend and adopt policies for increasing procurement from Richmond businesses in design and construction and through regular procurement: Local Definition includes
More informationRequest for Proposals Construction Services Workplace Excellence Project
Request for Proposals Construction Services Workplace Excellence Project December 5, 2014 INTRODUCTION Atlanta BeltLine, Inc. (ABI) invites you to submit a response to this Request for Proposals (RFP)
More informationREQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT CEDAR BAND TRAVEL PLAZA ENTERPRISE
REQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT CEDAR BAND TRAVEL PLAZA ENTERPRISE PAIUTE INDIAN TRIBE OF UTAH 440 NORTH PAIUTE DRIVE CEDAR CITY, UT 84721 OCTOBER 18, 2017 TABLE OF CONTENTS 1. SUMMARY AND
More informationRequest for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403
Request for Proposals On-Call General Engineering Services Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo is accepting proposals to
More informationRequest for Proposals for Construction Manager at Risk Watertown Community Center
Request for Proposals for Construction Manager at Risk Watertown Community Center October 29, 2014 City of Watertown, South Dakota Publish: Wednesday, October 29, 2014 Section 1 Advertisement for Proposals
More informationPROPOSAL. (Pages LBPP-1 through LBPP-7)
PROPOSAL (Pages LBPP-1 through LBPP-7) CITY OF LOS ANGELES REQUEST FOR PROPOSALS- LOCAL BUSINESS PREFERENCE PROGRAM (LBPP) City of Los Angeles Ordinance No. 181910, Article 21, Sections 10.47, et esq.
More informationMandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)
Request for Proposal for Construction Management (CM) Services for the Shelburne Community Center and Public Library Shelburne, Vermont. Request for Proposal Issued: Friday, Mandatory Site Visit: Thursday,
More informationCITY OF LOS ANGELES BUSINESS INCLUSION PROGRAM (BIP) OUTREACH DOCUMENTATION & PROCESS
CITY OF LOS ANGELES BUSINESS INCLUSION PROGRAM (BIP) OUTREACH DOCUMENTATION & PROCESS It is the policy of the City of Los Angeles to provide Minority Business Enterprises (MBEs), Women Business Enterprises
More informationRequest for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents
Project Name East Campus Quad Town Center Project Number C20182091 Project Location 4250 Richmond Road Project Manager Phillip Pallone City / County Highland Hills / Cuyahoga Owner Cuyahoga Community College
More informationMONTGOMERY COUNTY, OHIO SECTION 3 CONTRACTING POLICY & PROCEDURES
MONTGOMERY COUNTY, OHIO SECTION 3 CONTRACTING POLICY & PROCEDURES INTRODUCTION The purpose of Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) (Section 3) is to ensure that
More informationAugust 9, Re: DBE Program Triennial Goal Concurrence - Recipient ID #1674. Dear Mr. Smith:
U.S. Department of Transportation Federal Transit Administration REGION IX Arizona, California, Hawaii, Nevada, Guam American Samoa, Northern Mariana Islands 201 Mission Street Suite 1650 San Francisco,
More informationATTACHMENT 1 SECTION 3 - PROJECT SCHEDULE AND INSTRUCTIONS FOR PROPOSAL SUBMISSION
ATTACHMENT 1 SECTION 3 - PROJECT SCHEDULE AND INSTRUCTIONS FOR PROPOSAL SUBMISSION 3.1. Proposal Due Date and Submittal Process Proposers must submit one (1) original, three (3) additional copies, and
More informationREQUEST FOR PROPOSAL GRANT WRITING, ADMINISTRATION, AND IMPLEMENTATION OF HOUSING PROGRAMS
September 21, 2016 REQUEST FOR PROPOSAL GRANT WRITING, ADMINISTRATION, AND IMPLEMENTATION OF HOUSING PROGRAMS The City of Corcoran (hereinafter City ) is soliciting proposals from qualified housing consultants/administrative
More informationREQUEST FOR PROPOSAL Architectural Design and Engineering Services
REQUEST FOR PROPOSAL Architectural Design and Engineering Services April 30, 2018 Primary Request for Proposal Contact: Mark Walsh Facilities Manager North Country HealthCare 2920 N 4 th Street Flagstaff,
More informationRequest for Statements of Qualifications Construction Management and General Contractor at Risk San Mateo County Replacement Correctional Facility
Request for Statements of Qualifications Construction Management and General Contractor at Risk San Mateo County Replacement Correctional Facility San Mateo County Sheriff s Office Issued: December 21,
More informationWelcome to the City of Chicago. Department of Procurement Services
Welcome to the Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer Doing Business with the Mission Statement Laws Governing the Procurement Process Types of Procurement Certification Contract Monitoring
More informationSUBJECT: Request for Proposals (RFP) Emergency Operations Plan
AFFILIATED AGENCIES Orange County Transit District Local Transportation Authority Service Authority for Freeway Emergencies Consolidated Transportation Service Agency Congestion Management Agency Service
More informationPre-Proposal Conference
General Architectural and Engineering Consultant Services Program Management, Construction Management, and Engineering Support Services IDIQ. Pre-Proposal Conference General Architectural and Engineering
More informationNEW VOTING SYSTEM RFP# NVS0305
CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS REQUEST FOR PROPOSALS FOR A NEW VOTING SYSTEM RFP# NVS0305 Date: March 31, 2005 Pre-Proposal Conference: May 2, 2005 Deadline for Submission: June
More informationCITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT
CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT Residential Sound Insulation Program A. PROGRAM NARRATIVE The City of Fresno
More informationThe Section 3 Clause. HACSJ Section 3 Form and Explanation (Rev 2013,03.01) Page 1 of 7
The Section 3 Clause A. The work to be performed under this contract is subject to the requirements of section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (section 3).
More informationREQUEST FOR PROPOSALS FOR THE FEASIBILITIY STUDY
REQUEST FOR PROPOSALS FOR THE FEASIBILITIY STUDY Double-tracking the section(s) of the Media Trolley Line from Woodland Avenue to the Blue Route (I-476) The Delaware Valley Regional Planning Commission
More informationGUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS
GUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS TITLE: Catering Services, Human Resources Services, Information Technology Services, Outreach Services, Printing Services, Program Evaluation
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FACILITIES MODERNIZATION PROJECTS LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION March 14, 2002 REQUEST FOR PROPOSALS FOR CONSTRUCTION
More informationDVBE Transmittal Form
THE TRUSTEES OF THE CALIFNIA STATE UNIVERSITY THE TRUSTEES OF THE CALIFNIA STATE UNIVERSITY Disabled Veteran Business Enterprise (DVBE) Participation Requirement STATEMENT OF DVBE PARTICIPATION GOAL REQUIREMENT
More informationNDOT Civil Rights DBE Program Small Business Element
NDOT Civil Rights DBE Program Small Business Element The DBE program improvements regulations that became effective on February 28, 2011, require federal funds recipients such as NDOT must include an SBE
More informationAttention Design Firms
Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be
More informationPRE-PROPOSAL CONFERENCE
PRE-PROPOSAL CONFERENCE RFP No. LRT-12-180-TPOT POTHOLING SERVICES FOR TEMPE STREETCAR PROJECT December 1, 2011 Agenda Introductions / Opening Remarks Loralei Poll Project Overview / Scope Roy Alvarado
More informationThe School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services
Selection Process for Architectural & Engineering Services TABLE OF CONTENTS PROJECT DESCRIPTION... 1 POLICY-COMPETITIVE SELECTION PROCESS... 1 REQUIREMENTS OF DESIGN PROFESSIONAL (DP)... 3 STATEMENT OF
More informationUNIVERSITY OF CALIFORNIA, SANTA BARBARA
SMALL BUSINESS MASTER SUBCONTRACTING PLAN (SUBMITTED IN Accordance with Public Law 95-507) THE REGENTS OF THE UNIVERSITY OF CALIFORNIA UCSB PROCUREMENT SERVICES, SAASB 3203 SANTA BARBARA, CA 93106-1150
More informationI. GENERAL INFORMATION
ADDENDUM Request For Proposals: Architectural Services for World Trade Center Cultural Program: Performing Arts Complex - North Building And Museum Complex - South Building I. GENERAL INFORMATION Architectural
More informationSolano County Transit (SolTrans) Overall Disadvantaged Business Enterprise (DBE) Goal FFY through FFY
Solano County Transit (SolTrans) Overall Disadvantaged Business Enterprise (DBE) Goal FFY 2016 17 through FFY 2018 19 Summary In accordance with the requirements of 49 C.F.R. Part 26 (Participation by
More informationCOUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES
COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services
More information2013 ANNUAL REPORT. Office of Economic Development Division of Small Business Opportunity. Revised edition, 11/24/14
2013 ANNUAL REPORT Office of Economic Development Division of Small Business Opportunity Revised edition, 11/24/14 A Message from the DSBO Director A series of challenges and victories for Denver s certification
More informationTRANSIT JOINT POWERS AUTHORITY FOR MERCED COUNTY
TRANSIT JOINT POWERS AUTHORITY FOR MERCED COUNTY Federal Transit Administration (FTA) Overall DBE Goal Setting Methodology FFY 2018 FFY 2020 Submitted in fulfillment of: Title 49 Code of Federal Regulations
More informationChabot-Las Positas Community College District
Chabot-Las Positas Community College District REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) ARCHITECTURAL/ENGINEERING DESIGN SERVICES FOR THE CHABOT AND LAS POSITAS COLLEGES RFQ C-14 Proposal Due: TUESDAY,
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. The purpose of this section is to specify the Division 26 responsibilities and participation in the commissioning process.
More informationACI-NA SMALL AIRPORTS CONFERENCE FAA CIVIL RIGHTS - DBE REGULATORY UPDATE. Federal Aviation Administration
ACI-NA SMALL AIRPORTS CONFERENCE FAA CIVIL RIGHTS - DBE REGULATORY UPDATE Presented to: 2011 Small Airports Conference By: Wilbur Barham Director, National Airports Civil Rights Policy and Compliance Date:
More informationARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES
REQUEST FOR QUALIFICATIONS # 1206-18/19 FOR ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES Issue Date: June 26, 2018 Pre-Bid July 9, 2018 at 10:00 A.M. Conference: 1515 West Mission Road,
More informationOffice of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES
2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but
More information