Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB3736 RCI- Emergency Urban Infrastructure (FY08) AFRICA Sector.

Size: px
Start display at page:

Download "Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB3736 RCI- Emergency Urban Infrastructure (FY08) AFRICA Sector."

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB3736 RCI- Emergency Urban Infrastructure (FY08) Region AFRICA Sector Water supply (30%);Roads and highways (30%);Solid waste management (15%);Sewerage (15%);Sub-national government administration (10%) Project ID P Borrower(s) REPUBLIC OF COTE D IVOIRE Implementing Agency Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD Date PID Prepared March 25, 2008 Date of Appraisal January 28, 2008 Authorization Date of Board Approval June 12, Country and Sector Background One of the largest economy in the West African sub-region, Cote d Ivoire was for many years a beacon of high economic per capita growth, dynamism and political stability. However, since the late 1990 s, Côte d Ivoire s political turmoil has brought the country in a politico-military crisis. President Houphouet-Boigny s death in 1993 was the tipping point after which a series of periodic constitutional and economic crises undermined the Ivorian model. The question of who is an Ivorian - the concept of Ivoirité - emerged as central to a whole range of socio-economic issues around civil and economic rights, land-ownership and national governance, and access to power. These underlying fissures resulted in the coup of December 1999 and then a brief period of open hostilities between September 2002 and January 2003, triggered by a rebellion led by the Forces Nouvelles (FN). The conflict in September 2002 interrupted the implementation of the previous Interim-CAS but the Bank stayed engaged in Côte d Ivoire during the past three years through PCF and LICUS grants. A breakthrough was achieved with the signing of the latest peace accord of Ouagadougou (March 4, 2007). While the signing of the first Peace Agreement (Linas-Marcoussis) in January 2003 ushered in the neither-war-nor-peace stalemate over the last four years, Ouagadougou resulted from direct dialogue between the two main protagonists, President Laurent Gbagbo and the leader of the rebel forces, Guillaume Soro. It led to the formation of another transitional government with a first time power-sharing arrangement between President Gbagbo and Guillaume Soro as Prime Minister. Recovery Strategy: Following progress on the peace process after Ouagadougou, the Bank started to support Côte d'ivoire with an emergency Post Conflict Assistance Project (PCAP) in August [Full re-engagement is now underway with a new Interim Strategy Note (ISN) prepared for FY08-09 and presented to the Board on April 1, 2008.] The ISN revolves around

2 three pillars to (i) support stabilization and peace-building, (ii) assist war-affected populations through provision of basic services, and (iii) encourage economic recovery and governance reform. The planned Bank program is expected to provide US$428 million to Côte d Ivoire in FY08, comprising (i) an Economic Governance and Recovery Grant (EGRG, US$308 million); (ii) an Emergency Urban Infrastructure Project of US$90 million; (iii) an HIV/AIDS project of US$20 million and (iv) a Governance and Institutions TA project of US$10 million. In addition, the existing portfolio of US$104 million in education, rural development and transport, which was suspended, would be reactivated in FY08 as well. In light of the still fragile post-conflict situation, all new projects would be processed pursuant to OP 8.0 Rapid Response to Crises and Emergencies. The FY09 indicative IDA post-conflict allocation is expected to be around US$100 million and would continue to support key governance reforms and emergency infrastructure needs. 2. Objectives The Project Development Objective (PDO) is to increase access to and quality of urban infrastructure and services in the two largest cities, Abidjan and Bouaké. The achievement of this objective would support GoCI s efforts to demonstrate visible and tangible improvements in the lives of its citizens, a critical step for sustaining social and political stability in the country. 3. Rationale for Bank Involvement The proposed Emergency Urban Infrastructure Project (US$ 90 million) would constitute a key pillar of the reengagement strategy. The financing is urgently required due to (a) lack of maintenance and new investments which have considerably hampered the delivery of basic municipal services and (b) dramatic increase in urbanization, largely due to crisis-led population displacement, and increasing pressure on existing infrastructure and services. 4. Description The Project is in the amount of US$90 million and consists of five main components totaling US$86.20 million, plus US$2 million for the project coordination and an additional US$1.80 million for contingencies. Component I: Urban Water Supply - US$28 Million The backlog of investments in renewal and expansion of water facilities throughout the country, combined with the influx of displaced persons into Abidjan has resulted in severe water shortages and the reduction of access to water services. The component aims at improving the quality and availability of water services in Abidjan and at providing increased access to water services in Abidjan and Bouaké. The activities under this component include: (i) increasing the water production capacity in Abidjan by (at least) 3,000 m3/hour by drilling and equipping production boreholes and expanding the capacity of some treatment plants; (ii) reinforcing primary distribution networks in selected areas of Abidjan (Djibi and Petit Bassam); (iii) expanding distribution networks in Bouaké; (iv) connecting some neighborhoods in Abidjan; (v) increasing access by installing 20,000 subsidized service connections, 65 standposts in Abidjan and 33 standposts in Bouaké; and (vi) providing water to 38 primary schools and 8 health centers in Abidjan that lack access to potable water services.

3 Component II: Urban Sanitation (Sewerage) - US$15.2 Million The lack of maintenance and timely renewal of pumping and treatment facilities combined with the backlog of investments in connecting neighborhood sewers to the main interceptor resulted in the continuous discharge of most of the uncollected wastewater (from about 600,000 people) in the Abidjan lagoon. This component aims at limiting this continuous flow of discharged wastewater in the lagoon and reducing therefore its pollution by organic wastes by connecting some secondary networks to the main interceptor and the ocean outfall. Activities under this component include: (i) rehabilitating two main pumping stations in Abobo and Marcory and the pumping station and pretreatment plant at Koumassi-digue; (ii) rehabilitating 5 to 18 (depending on the selected option) secondary pumping stations in Cocody, Koumassi, Marcory and Treichville; and (iii) connecting secondary sewers in Abobo, Adjamé and Treichville to the main interceptor. Component III: Solid Waste Management - US$12 Million The activities under this component include : (i) A Clean City Program with the aim to remove all unsanitary/informal solid waste disposal sites in the city of Abidjan and provide a clean start for private operators future interventions; (ii) Rehabilitation of the transfer station of Williamsville with the aim to make the transfer station operational and enable storage of solid waste and its transportation to the landfill site with appropriate means; (iii) Mass Media Campaign with the aim to sensitize communities about health and environmental risks associated with inappropriate management of solid waste. The campaign will focus on hygiene, but will also include a component on HIV-AIDS under the leadership of the HIC-AIDS focal point of the Ministry of Urban Affairs and Sanitation; (iv) Institutional support with the aim to improve the institutional environment and capacity building of all stakeholders including local governments for the supervision of the service performance in their respective jurisdictions; (v) Improvement of living conditions of neighboring communities living in the vicinity of the disposal site of AKOUEDO. The disposal site does not comply with sanitary landfill norms and odors, released gas, lixiviats and other nuisances have negative impacts on the health and the well-being of the neighboring communities. The project includes the construction of a health center and an extension of an existing school (6 classrooms) to improve the living conditions of the neighboring communities. Component IV: Urban Roads Rehabilitation - US$28 Million The activities under this component include: (i) Rehabilitation of roads bearing public transport services. The Project will finance road surface refurbishment and drainage networks on seven roads on which transportation lines have ceased operation due to their poor condition. In addition, appropriate treatment will be given to two particularly critical areas routinely flooded during the rainy season and inaccessible to vehicles for prolonged periods; (ii) Works improvement including (a) construction of a footbridge extending pedestrian walkways in two underserved neighborhoods, to ensure safe crossing over an expressway for numerous pedestrians in a location with a high rate of fatal accidents, (b) construction of a 120-meter bridge and a road to improve accessibility of new residential areas, thereby addressing

4 congestion problems at intersections, (c) the conversion of one of the worst trouble spots into an interchange; (iii) Horizontal and vertical signage (the current absence of horizontal and vertical signage on roads is considered a major factor in traffic disruptions and traffic accidents). The Project will finance the provision and installation of standing road signs and the painting of roadsurface markings on as many roads as possible and; (iv) Roads in Bouaké: The Project will rehabilitate six heavily degraded roads totaling 7 kilometers in the city of Bouaké, supplementing the 5-road, 11-kilometer rehabilitation program already funded by the European Union. Component V: Municipal Contracts - US$3 Million This component will address the medium- and long-term problems of cities and re-energize municipal functions that have largely been taken over by the central Government during the crisis. The following cities have been selected: in Abidjan, the municipalities of Port Bouet, Yopougon, Koumassi, Adjamé and Abobo, and in the interior of the country, the towns of Divo, Daloa, Korhogo, San Pedro and Bouaké. This first group of cities was chosen according to the following criteria: (1) an explicit desire on the part of the mayor to comply with the principles and rules of the Municipal Contract; (2) a more or less functional municipal team that is ready to work; (3) a population size and investment requirements that would yield a visible impact on as many people as possible; (4) the existence of planning tools and data that could be used as a basis for the audits; (5) consolidation of EU interventions. The activities under this component include: (i) Urban, organizational, and financial audits of the 10 selected municipalities with the aim to carry out a needs assessment in terms of services, infrastructure, management, organization and finances and determine, through a participatory process, a Priority Investment Program (PIP), a Priority Maintenance Program (PMP) and a Municipal Adjustment Program (MAP) and; (ii) Accompanying measures which will be largely identified during the audits and will serve to support and motivate local governments, as an adjunct to the preparation of the audits. 5. Financing Source: ($m.) BORROWER/RECIPIENT 0 IDA Grant 90 Total Implementation Project coordination and execution will rely upon three pillars: (i) the Monitoring and Steering Committee; (ii) the Coordination Unit; and (iii) the relevant technical Departments. (i) Monitoring and Steering Committee This committee was established to ensure ministerial coordination for project preparation. It is chaired by the Minister of Economic Infrastructure, and coordinates the project at the government level. It is made up of: (i) the Department for Human Hydraulics of the Ministry of Economic Infrastructure; (ii) the Roads Management Agency [Agence de gestion des routes] of the Ministry of Economic Infrastructure; (iii) the Ministry of Urban Affairs and Sanitation

5 [Ministère de la Ville et de la salubrité urbaine]; (iv) the Sanitation Department of the Ministry of Construction and Urban Planning; and (v) the Public Debt Department of the Ministry of Economy and Finance. The Department of Local Governments and the Association of Mayors (UVICOCI) are also expected to join the Committee, which will continue to ensure interministerial coordination and serve as a mediating entity. (ii) Coordination Unit This Unit would consist of a Project Coordinator, a Procurement Specialist, an Administrative and Financial Officer (AFO), and an Accountant, and would be placed within MACOM, which already has some experience in coordinating World Bank-financed projects (PACOM) and has a team in place. The Unit will monitor day-to-day project activities. The Unit is to be equipped with all the necessary fiduciary monitoring tools (see section on financial and accounting management, as well as with a manual of project implementation procedures). (iii) Technical Departments (responsible for specific components) These entities will implement their respective components as follow: Ministry of Economic Infrastructure, Department of Human Hydraulics (water supply); Ministry of Construction and Housing, Department of Sanitation [Sanitation (sewerage)]; Ministry of Urban Affairs and Sanitation, ANASUR (solid waste management); AGEROUTE (urban roads rehabilitation) and; Ministry of Interior, Ministry of Urban Affairs, local governments (municipal contracts). 7. Sustainability Increasing the availability and quality of water services would continue to ensure sustainability of supplying safe water to a larger proportion of population in the urban areas and set foundation of extending safe water in areas. In addition, combining water supply, sanitation (sewerage) and solid waste management would maximize health benefits and ensure a long term impact. The project sustainability will also be sought through an improved management capacity of local governments through the municipal contract. 8. Lessons Learned from Past Operations in the Country/Sector The project draws extensively from the Bank s cumulated experience of post-conflict operations and on best practices and lessons learned from similar interventions. 9. Safeguard Policies (including public consultation) The project is classified as Environmental Category B as the potential environmental and social impacts are not significant. They are likely to be small-scale, specific and thus easily manageable. The project triggers two safeguards policies: OP 4.01 on Environmental Assessment and OP 4.12 on Involuntary Resettlement. These triggered policies are applicable to the five components. The two safeguard instruments to be prepared are the Environmental and social Management Framework (ESMF) and the Resettlement Policy Framework (RPF). These instruments will be prepared, reviewed, approved and disclosed within six months of project effectiveness. The selected proposed works comply with the provisions of OP 8.00 and are considered to be addressed on an emergency basis. It is envisaged the general environmental

6 management clauses for civil works will be inserted into the bidding documents and contracts. Detailed environmental assessments and Resettlement Action Plans (RAPs), if necessary, would be carried out for all project activities that will trigger them and disclosed in-country and at the Bank s Infoshop. As per required under OP 8.00, the Bank has prepared an Environmental and Social Screening and Assessment Framework, which outlines the approach to be taken during implementation. 10. Contact point Contact: Catherine D. Farvacque-Vitkovic Title: Lead Urban Specialist Tel: (202) Fax: (202) CFarvacque@worldbank.org 11. For more information contact: The InfoShop The World Bank 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) pic@worldbank.org Web:

Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)

Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020) Operation Name: RCI- Emergency

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB7702 Project Name System Enhancement for Health Action in Transition (SEHAT) - Additional Financing Region SOUTH ASIA Country Afghanistan

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE . Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDSPrepared/Updated: Date ISDS Approved/Disclosed I. BASIC INFORMATION 1. Basic

More information

NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report No.: LATIN AMERICA AND CARIBBEAN Country

NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report No.: LATIN AMERICA AND CARIBBEAN Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name 1 NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Bangladesh Padma Multipurpose

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3881 Project Name Regional Communications Infrastructure Program 3 (RCIP3) - APL 3 Region Sector Project ID Borrower(s) Implementing Agency

More information

INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name

INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name ID-National Roads Improvement Project Western Indonesia Region EAST

More information

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5401 General

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA109589

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA109589 Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA109589 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 13-Mar-2014

More information

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT PROJECT (PRODEPUR) ADDITIONAL FINANCING GRANT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT PROJECT (PRODEPUR) ADDITIONAL FINANCING GRANT Public Disclosure Authorized Document of The World Bank Report No: 64887-HT Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973. Project Name

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973 Project

More information

In accordance with Section 610(b)(2) of the Millennium Challenge Act of

In accordance with Section 610(b)(2) of the Millennium Challenge Act of This document is scheduled to be published in the Federal Register on 11/20/2017 and available online at https://federalregister.gov/d/2017-25198, and on FDsys.gov MILLENNIUM CHALLENGE CORPORATION [MCC

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name Leveraging

More information

Case study: System of households water use subsidies in Chile.

Case study: System of households water use subsidies in Chile. Case study: System of households water use subsidies in Chile. 1. Description In Chile the privatization of public water companies during the 70 s and 80 s resulted in increased tariffs. As a consequence,

More information

Economic Forum on Investment and Trade in Côte d'ivoire 15 September, 2017 London, United Kingdom

Economic Forum on Investment and Trade in Côte d'ivoire 15 September, 2017 London, United Kingdom NATIONAL STEERING COMMITTEE FOR PUBLIC-PRIVATE PARTNERSHIPS (CNP-PPP) Economic Forum on Investment and Trade in Côte d'ivoire 15 September, 2017 London, United Kingdom Noumory SIDIBE Chairperson CNP-PPP

More information

Key development issues and rationale for Bank involvement

Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB424 Project Name E-Lanka Development Region SOUTH ASIA Sector Information technology (70%);General industry and trade sector (30%) Project

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678 Project Name

More information

BE PART OF THE NEW ECONOMIC MOMENTUM INTERNATIONAL FORUM FOR INVESTMENTS IN CÔTE D IVOIRE JANUARY ABIDJAN

BE PART OF THE NEW ECONOMIC MOMENTUM INTERNATIONAL FORUM FOR INVESTMENTS IN CÔTE D IVOIRE JANUARY ABIDJAN BE PART OF THE NEW ECONOMIC MOMENTUM IN CÔTE D IVOIRE INTERNATIONAL FORUM FOR INVESTMENTS IN CÔTE D IVOIRE 29-31 JANUARY 2014 - ABIDJAN THE ACCELERATION OF ECONOMIC DEVELOPMENT IS OUR PRIORITY Alassane

More information

Rwanda-Rural Water Supply and Sanitation Project

Rwanda-Rural Water Supply and Sanitation Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY

Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY BACKGROUND TNSUDP: 1.0 The World Bank has had a long partnership with the

More information

United Nations Peace Building Fund Grant Agreement

United Nations Peace Building Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS Public Disclosure Authorized GRANT NUMBER TF018255 United Nations Peace Building Fund Grant Agreement (Additional Financing for the Productive Social Safety

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared Estimated Date of Appraisal Completion Estimated Date of Board

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA. Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4201-ET Public Disclosure Authorized Financing Agreement (Rural Capacity Building Project) Public Disclosure Authorized between FEDERAL DEMOCRATIC

More information

Telecommunications (60%); General information and communications sector (20%); General industry and trade sector (20%) Project ID

Telecommunications (60%); General information and communications sector (20%); General industry and trade sector (20%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) Report No.: AB2685 Regional Communications

More information

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/07/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4293-TA Public Disclosure Authorized Financing Agreement (Zanzibar Basic Education Improvement Project) between Public Disclosure Authorized THE

More information

United Nations Development Group Iraq Trust Fund Project #66992: C10-08 Date and Quarter Updated: June nd Quarter 2010

United Nations Development Group Iraq Trust Fund Project #66992: C10-08 Date and Quarter Updated: June nd Quarter 2010 United Nations Development Group Iraq Trust Fund Project #66992: C10-08 Date and Quarter Updated: June 2010 2 nd Quarter 2010 Participating UN Organisation: UNESCO (lead) and UNDP Sector: Economic Reform

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS

More information

Safe Drinking Water and Sanitation for School Children Zimbabwe Final Report to the Isle of Man Overseas Aid Committee July 2011-April 2012

Safe Drinking Water and Sanitation for School Children Zimbabwe Final Report to the Isle of Man Overseas Aid Committee July 2011-April 2012 Safe Drinking Water and Sanitation for School Children Zimbabwe Final Report to the Isle of Man Overseas Aid Committee July 2011-April 2012 Executive Summary The project was a community-based intervention

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Report No: AC556 Section I - Basic Information

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized North East Local Services Improvement [Project TABLE OF CONTENTS NORTH EAST LOCAL SERVICES

More information

Nepal: Small Towns Water Supply and Sanitation Sector Project

Nepal: Small Towns Water Supply and Sanitation Sector Project Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

EUROPEAN INVESTMENT BANK

EUROPEAN INVESTMENT BANK EUROPEAN INVESTMENT BANK Promoting European objectives ARLEM s Commission for Sustainable Development (SUDEV) Brussels, 2 July 2010 Jackie Church, Liaison Officer 1 The European Investment Bank (EIB) Long-term

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4516 Project Name. Threatened Species Partnership - Save Your Logo Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4516 Project Name. Threatened Species Partnership - Save Your Logo Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4516 Project Name Threatened Species Partnership - Save Your Logo Region OTHER Sector General agriculture, fishing and forestry sector (100%)

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project) Public Disclosure Authorized DOC8UMEW GRANT NUMBER TF0A2379 Public Disclosure Authorized Public Disclosure Authorized EU Grant Agreement (Access to Sustainable Energy Project) between INTERNATIONAL BANK

More information

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:

More information

State and Peace building Fund (SPF), Low Income Countries Under Stress (LICUS) Implementation Trust Fund, And Post Conflict Fund (PCF)

State and Peace building Fund (SPF), Low Income Countries Under Stress (LICUS) Implementation Trust Fund, And Post Conflict Fund (PCF) State and Peace building Fund (SPF), Low Income Countries Under Stress (LICUS) Implementation Trust Fund, And Post Conflict Fund (PCF) Monthly Report September 009 The World Bank Operational Policy Country

More information

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update November 12, 2013

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update November 12, 2013 Building our future, together Steering Committee Presentation for the Comprehensive Plan Update November 12, 2013 Introduction Welcome: Mayor Barbara Bass Prayer Business and Economy Update Susan Guthrie,

More information

Rajasthan Urban Sector Development Program

Rajasthan Urban Sector Development Program India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Précis WORLD BANK OPERATIONS EVALUATION DEPARTMENT WINTER 1999 N U M B E R 1 7 6

Précis WORLD BANK OPERATIONS EVALUATION DEPARTMENT WINTER 1999 N U M B E R 1 7 6 Précis WORLD BANK OPERATIONS EVALUATION DEPARTMENT WINTER 1999 N U M B E R 1 7 6 Meeting the Health Care Challenge in Zimbabwe HE WORLD BANK HAS USUALLY DONE THE RIGHT thing in the Zimbabwe health sector,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC647 Project Name Support

More information

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018. COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business

More information

Types of Eligible Projects

Types of Eligible Projects U.S. Department of Agriculture Rural Development, Rural Utilities Service Water and Environmental Programs UNC School of Government Environmental Finance Center 2018 Water & Wastewater Finance Workshop

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002. Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002. Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION. A. Basic Project Data Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002 Country: Indonesia Project ID: P101722 Project Name:

More information

Myanmar Country Partnership Framework (CPF) Background Material

Myanmar Country Partnership Framework (CPF) Background Material Myanmar Country Partnership Framework (CPF) Background Material June 2014 The World Bank Group What is the World Bank Group? The World Bank is a vital source of financial and technical assistance to developing

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 16-Mar-2016

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) (P128748) OTHER World

More information

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES Broward County Land Use Plan Amendment Requirements Amendments which are not within the rules of flexibility or more

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 18-Nov-2015

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5359. Date ISDS Prepared/Updated: 12/27/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5359. Date ISDS Prepared/Updated: 12/27/2010 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 12/27/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

PROJECT APPLICATION FORM GUIDELINE CANADA PRINCE EDWARD ISLAND MUNICIPAL RURAL INFRASTRUCTURE FUND

PROJECT APPLICATION FORM GUIDELINE CANADA PRINCE EDWARD ISLAND MUNICIPAL RURAL INFRASTRUCTURE FUND PROJECT APPLICATION FORM GUIDELINE CANADA PRINCE EDWARD ISLAND MUNICIPAL RURAL INFRASTRUCTURE FUND 2 Project Application Form Guideline 27 April 2005 GENERAL PROGRAM INFORMATION ABOUT THE PROGRAM The Municipal

More information

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC932 Project Name Maternal

More information

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR ACCF I Annual Report 2015 TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR 2016 12 VI. ANNEXES 14 1 ACCF I Annual Report

More information

Investments & Concessions

Investments & Concessions Investments & Concessions 1 Role of clusters in group 2 Investments and Concessions Construction Construction Materials Manufacturing Infrastructure Concessions Building & Housing Civil Engineering Aggregates

More information

FEDERAL GAS TAX FUND (FGTF)

FEDERAL GAS TAX FUND (FGTF) ADMINISTRATIVE PROCEDURES FOR THE FEDERAL GAS TAX FUND (Formerly New Deal for Cities and Communities) (FGTF) Revised: November 28, 2013 FEDERAL GAS TAX FUND - Administrative Procedures 1. Definitions Within

More information

Other social services (45%); Central government administration (35%); Sub-national government administration (20%)

Other social services (45%); Central government administration (35%); Sub-national government administration (20%) Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Report No. PID10755 TURKEY-Community Development & Heritage (@) Europe and Central Asia Region Other social services (45%);

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PID

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:PID0003464 Program

More information

Chapter 3: Business Continuity Management

Chapter 3: Business Continuity Management Chapter 3: Business Continuity Management GAO Why we did this audit: Nova Scotians rely on critical government programs and services Plans needed so critical services can continue Effective management

More information

Forest Investment Program. Second Joint Mission Terms of Reference for Investment Plan Preparation March 1-5, 2016

Forest Investment Program. Second Joint Mission Terms of Reference for Investment Plan Preparation March 1-5, 2016 REPUBLIQUE DE COTE D IVOIRE MINISTERE DE L ENVIRONNEMENT, DE LA SALUBRITE URBAINE ET DU DEVELOPPEMENT DURABLE Forest Investment Program Second Joint Mission Terms of Reference for Investment Plan Preparation

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 02/25/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

Company Profile Phillips & Jordan, Inc. Key Markets

Company Profile Phillips & Jordan, Inc. Key Markets Company Profile Phillips & Jordan, Inc. Key Markets Oil & Gas Power Water Resources Industrial & Commercial Solid Waste (Green Group Holdings) Disaster Management 1 APWA-NC Solid Waste Division Annual

More information

PPIAF Assistance in Nepal

PPIAF Assistance in Nepal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PPIAF Assistance in Nepal June 2012 The Federal Democratic Republic of Nepal (Nepal)

More information

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971)

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971) Public Disclosure Authorized AFRICA Madagascar Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 6 ARCHIVED on 27-Dec-2017 ISR30958 Implementing Agencies: Ministry

More information

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project

More information

CRS Report for Congress

CRS Report for Congress Order Code RS22162 June 9, 2005 CRS Report for Congress Received through the CRS Web Summary The World Bank: The International Development Association s 14 th Replenishment (2006-2008) Martin A. Weiss

More information

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009 Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009 This document is available at ielrc.org/content/e0925.pdf Note: This document is put online by the International Environmental Law

More information

E S F 8 : Public Health and Medical Servi c e s

E S F 8 : Public Health and Medical Servi c e s E S F 8 : Public Health and Medical Servi c e s Primary Agency Fire Agencies Pacific County Public Health & Human Services Pacific County Prosecutor s Office Pacific County Department of Community Development

More information

RESILIENT RECOVERY. 50+ countries received GFDRR support in quicker, more resilient recovery. What We Do

RESILIENT RECOVERY. 50+ countries received GFDRR support in quicker, more resilient recovery. What We Do Public Disclosure Authorized RESILIENT RECOVERY Quicker, more resilient recovery Public Disclosure Authorized Public Disclosure Authorized What We Do Help governments strengthen recovery systems prior

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK Public Disclosure Authorized Public Disclosure Authorized AFRICAN DEVELOPMENT BANK TANZANIA PROPOSAL FOR A GRANT OF US$ 1 MILLION FOR HUMANITARIAN EMERGENCY ASSISTANCE TO MITIGATE THE EFFECTS OF EARTHQUAKE

More information

European Union Food Crisis Rapid Response Facility Trust Fund Grant Agreement

European Union Food Crisis Rapid Response Facility Trust Fund Grant Agreement Public Disclosure Authorized CONFORMED COPY EU FCRR TF GRANT NUMBER TF097058 Public Disclosure Authorized European Union Food Crisis Rapid Response Facility Trust Fund Grant Agreement (Lao Uplands Food

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Sector Region Project ID Borrower Implementing Agencies Report No. PID6950

More information

Document of 'f I CO Y The World Bank FOR OFFICIAL USE ONLY

Document of 'f I CO Y The World Bank FOR OFFICIAL USE ONLY Document of 'f I CO Y The World Bank Public Disclosure Authorized FOR OFFICIAL USE ONLY Report No. 3236a-IVC Public Disclosure Authorized IVORY COAST SECOND URBAN PROJECT STAFF APPRAISAI REPORT July 7,

More information

The European Investment Bank in Africa, the Caribbean and Pacific Business Strategy

The European Investment Bank in Africa, the Caribbean and Pacific Business Strategy The European Investment Bank in Africa, the Caribbean and Pacific The EIB is committed to supporting EU Development Policies outside the European Union. Under the Cotonou Agreement, our priorities for

More information

Afghanistan Reconstruction Trust Fund Grant Agreement

Afghanistan Reconstruction Trust Fund Grant Agreement Public Disclosure Authorized OFFICIAL DOCUMENTS ARTF GRANT NUMBER TFOAO730 Public Disclosure Authorized Public Disclosure Authorized Afghanistan Reconstruction Trust Fund Grant Agreement (Higher Education

More information

Fifth progress report of the Secretary-General on the United Nations Operation in Côte d Ivoire I. Introduction

Fifth progress report of the Secretary-General on the United Nations Operation in Côte d Ivoire I. Introduction United Nations Security Council Distr.: General 17 June 2005 Original: English S/2005/398 Fifth progress report of the Secretary-General on the United Nations Operation in Côte d Ivoire I. Introduction

More information

SA GREEN FUND. OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013

SA GREEN FUND. OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013 SA GREEN FUND OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013 Presentation Outline Introduction Evolution of the Green Growth Policy Framework Establishment of the Green Fund Fund Objectives

More information

BOROUGH OF POOLE COUNCIL. 15 December 2015

BOROUGH OF POOLE COUNCIL. 15 December 2015 AGENDA ITEM 21 BOROUGH OF POOLE COUNCIL 15 December 2015 ACCESS STRATEGY FOR THE PORT OF POOLE & REGENERATION AREA GRAVEL HILL IMPROVEMENTS (INCLUDING DUNYEATS JUNCTION) REPORT OF THE HEAD OF TRANSPORTATION

More information

MANDALUYONG CITY, PHILIPPINES. Case Study (Public Buildings) Project Summary:

MANDALUYONG CITY, PHILIPPINES. Case Study (Public Buildings) Project Summary: MANDALUYONG CITY, PHILIPPINES Case Study (Public Buildings) Project Summary: Manila, the capital of the Republic of the Philippines, has the eighteenth largest metropolitan area in the world, which includes

More information

Global Environment Facility Trust Fund Grant Agreement

Global Environment Facility Trust Fund Grant Agreement CONFORMED COPY GEF TRUST FUND GRANT NUMBER TF099857 Global Environment Facility Trust Fund Grant Agreement (Nyika Transfrontier Conservation Area Project) between REPUBLIC OF MALAWI and INTERNATIONAL BANK

More information

Funding Sources for Downtown Revitalization Efforts

Funding Sources for Downtown Revitalization Efforts Funding Sources for Downtown Revitalization Efforts Downtown revitalization programs and activities are typically funded by a multitude of sources. This report provides a synopsis of popular public and

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 1-12-16 ITEM: 7.2 Memorandum FROM: Toni J. Taber, C City Clerk SUBJECT: SEE BELOW DATE: December 18, 2015

More information

Water and Environmental Programs

Water and Environmental Programs U.S. Department of Agriculture Rural Development, Rural Utilities Service Water and Environmental Programs UNC School of Government Environmental Finance Center 2016Water and Wastewater Finance Workshop

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,900,000.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,900,000.00 Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020652 Public Disclosure Authorized Public Disclosure Authorized Project ID P115564 Country World Project

More information

Financing Agreement CONFORMED COPY CREDIT NUMBER 4247-BO. (Urban Infrastructure Project) between REPUBLIC OF BOLIVIA. and

Financing Agreement CONFORMED COPY CREDIT NUMBER 4247-BO. (Urban Infrastructure Project) between REPUBLIC OF BOLIVIA. and Public Disclosure Authorized CONFORMED COPY CREDIT NUMBER 4247-BO Public Disclosure Authorized Financing Agreement (Urban Infrastructure Project) between Public Disclosure Authorized REPUBLIC OF BOLIVIA

More information

OFFICIAL r0 4 DOCUMENTS

OFFICIAL r0 4 DOCUMENTS Public Disclosure Authorized OFFICIAL r0 4 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD

More information

Summary of Terminal Evaluation

Summary of Terminal Evaluation Summary of Terminal Evaluation I. Outline of the Project Country: Islamic Republic of Afghanistan Issue/Sector: Infrastructure Division in Charge: Infrastructure and Peacebuilding Department Period of

More information

MOLDOVA FLOOD MANAGEMENT TECHNICAL ASSISTANCE AND INVESTMENT PROJECT

MOLDOVA FLOOD MANAGEMENT TECHNICAL ASSISTANCE AND INVESTMENT PROJECT MOLDOVA FLOOD MANAGEMENT TECHNICAL ASSISTANCE AND INVESTMENT PROJECT Marco Beros EUROPEAN INVESTMENT BANK SECTOR COORDINATION COUNCIL ENVIRONMENT, WATER AND SANITATION, Chisinau, May 4, 2012 1 CONTENTS

More information

MEMORANDUM AGENDA ITEM #6k

MEMORANDUM AGENDA ITEM #6k South Florida Regional Planning Council MEMORANDUM AGENDA ITEM #6k DATE: SEPTEMBER 8, 2008 TO: FROM: SUBJECT: COUNCIL MEMBERS STAFF TOWN OF MEDLEY PROPOSED COMPREHENSIVE PLAN AMENDMENT Introduction On

More information