1 2016 Standard Plans U.S. & Canada Seminaries & Institutes of Religion Church Educational System Issued: 1 May 2016

2 Standard Plans for Seminaries and Institutes of Religion S&I Program Small Seminary Buildings Large Seminary Buildings Small Institute Buildings S&I Pods on Heritage 98, Legacy Mtghse 98 Heritage 09T. Prototype Designation SEM07-01 SEM07-02 SEM07-03 SEM07-04 SEM08-06 SEM07-08 INS05-02 INS05-03 SEM03-HL-02 SEM04-LA-02 SEM03-HL-03 SEM04-LA-03 INS08-HT-02 SEM11-HMAS-02 SEM11-HMCS- 03 Floor Plan Area (sq. ft.) Phaseable Plan Site (see notes below) Minimum site size Parking Requirements Classrooms Number of Classrooms Classroom Capacity Combination Classrooms capacity Program Capacity Administrative / Support Principal/Director (140 sf) Standard Office (120 sf) Support Specialist (Sec.) Workroom Combined Sec./Workroom Total Administrative Areas Other Spaces Serving Area Quiet Study Multi-Purpose Room (MP) 1,740 3,598 4,902 6,207 9,406 11,727 5,322 6,735 2,777 4,100 3,960 2,038 4,239 No Yes Yes No Yes No Yes No No No No No No (a) (b) (c) (d).30 acres.62 acres.62 acres.62 acres 1.05 acres 1.05 acres 1.00 acre 1.00 acre 55' additional 60' additional 55' additional 55' additional 60' additional 5 4 to 7 7 to 9 7 to varies varies no additional no additional no additional no additional no additional N/A MP 3 + MP N/A N/A N/A N/A N/A N/A N/A 1 1 N/A N/A No NA NA N/A N/A N/A N/A N/A N/A 1 1 N/A N/A No NA NA N/A N/A N/A N/A N/A N/A 1 1 N/A N/A 1 NA NA NOTES: (Consult with S&I-HQ Physical Facilities Representatives for decisions related to the following information based on future enrollment projections.) For required minimum property dimensions refer to Conceptual Site Plans located in the Document Library in conjunction with the following information. (a)- For 2 Classroom Seminary w/ only one anticipated classroom expansion, minimum property acreage may be reduced by adjusting required frontage by 24' from that indicated on concept site plans. (b)- For 2 Classroom Seminary with no anticipated future expansion, minimum property acreage may be reduced by adjusting required frontage by 48' from that indicated on concept site plans.. (c) - For 3 Classroom Seminary with no anticipated future expansion, minimum property acreage may be reduced by adjusting required frontage by 24' from that indicated on concept site plans. (d) - For 6 Classroom Seminary with no anticipated future expansion, minimum property acreage may be reduced by adjusting required property depth by 32' from that indicated on concept site plans.

3 Seminary Standard Plans Building Dev. No. Sq. Ft. Footprint (overall dims.) 1 C.R. SEM , x 32 2 C.R. SEM , x 75 3 C.R. SEM , x 75 4 C.R. SEM , x 75 6 C.R. SEM , x 96 8 C.R. SEM , x C.R. Pod SEM03-HL-02 2, x 50 3 C.R. Pod SEM03-HL-03 4, x 74 2 C.R. Pod SEM11-HMAS-02 2, x 85 3 C.R. Pod SEM11-HMCS-03 4, x 82

4 Church Educational System - One Classroom Seminary SEM07-01

5 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 1,734 Mech. Mezz.: None Classroom Areas No. of Classrooms: 1 Single C.R. Capacity: 36 max. 30 pref. Tot. Seminary C.R. capacity: 36 max. 30 pref. Administrative Areas No. of Instructor s Offices: 1 Secretary / Workroom: 1 Church Educational System - One Classroom Seminary SEM07-01

6 Sample Site Plan A Church Educational System - One Classroom Seminary SEM07-01 Sample Site Plan B Area: 0.30 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Area: 0.30 Acres min.

7 Church Educational System - Two Classroom Seminary SEMS07-02

8 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 3,598 Mech. Mezz.: 234 Classroom Areas No. of Classrooms: 2 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 2 Combined C.R. capacity: 98 Tot. Seminary C.R. capacity: 72 max. 60 pref. Church Educational System - Two Classroom Seminary SEM07-02 (w/ future phasing) Administrative Areas No. of Instructor s Offices: 2 Principal: 1 Total Private Offices: 3 Secretary / Workroom: 1

9 Sample Site Plan A Area: 0.65 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Sample Site Plan B Area: 0.62 Acres min. Church Educational System - Two Classroom Seminary SEM07-02 (w/ future phasing)

10 Church Educational System - Three Classroom Seminary SEMS07-03

11 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 4,902 Mech. Mezz.: 234 Classroom Areas No. of Classrooms: 3 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 2 Combined C.R. capacity: 98 Tot. Seminary C.R. capacity: 108 max. 90 pref. Church Educational System - Three Classroom Seminary SEM07-03 (w/ future phasing) Administrative Areas No. of Instructor s Offices: 4 Principal: 1 Total Private Offices: 5 Secretary / Workroom: 1

12 Sample Site Plan A Area: 0.65 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Sample Site Plan B Area: 0.62 Acres min. Church Educational System - Three Classroom Seminary SEM07-03 (w/ future phasing)

13 Church Educational System - Four Classroom Seminary SEMS07-04

14 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 6,207 Mech. Mezz.: 234 Classroom Areas No. of Classrooms: 4 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 2 Combined C.R. capacity: 98 Tot. Seminary C.R. capacity: 144 max. 120 pref. Church Educational System - Four Classroom Seminary SEM07-04 (full phasing) Administrative Areas No. of Instructor s Offices: 6 Principal: 1 Total Private Offices: 7 Secretary / Workroom: 1

15 Sample Site Plan A Area: 0.65 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Sample Site Plan B Area: 0.62 Acres min. Church Educational System Four Classroom Seminary SEM07-04 (full phasing)

16 Church Educational System - Six Classroom Seminary SEMS08-06

17 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 9,406 Mech. Mezz.: 1,865 Classroom Areas No. of Classrooms: 6 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 3 Combined C.R. capacity: 192 Tot. Seminary C.R. capacity: 216 max. 180 pref. Church Educational System - Six Classroom Seminary SEM08-06 (w/ future phasing) Administrative Areas No. of Instructor s Offices: 7 Principal: 1 Total Private Offices: 8 Secretary / Reception: 1 Workroom: 1

18 Sample Site Plan A Church Educational System Six Classroom Seminary SEM08-06 (w/ future phasing) Sample Site Plan B Area: 1.05 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Area: 1.06 Acres min.

19 Church Educational System - Eight Classroom Seminary SEMS07-08

20 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 11,727 Mech. Mezz.: 1,037 Classroom Areas No. of Classrooms: 8 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 3 Combined C.R. capacity: 148 Tot. Seminary C.R. capacity: 288 max. 240 pref. Administrative Areas No. of Instructor s Offices: 10 Principal: 1 Total Private Offices: 11 Secretary / Reception: 1 Workroom: 1 Church Educational System - Eight Classroom Seminary SEM07-08

21 Sample Site Plan A Area: 1.05 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Sample Site Plan B Area: 1.06 Acres min. Church Educational System Eight Classroom Seminary SEM07-08

22 PROGRAM Enrollment Qualification: periods: periods: periods: Bldg. Sq. Footage: 13,696 Mech. Mezz.: 1,037 Classroom Areas No. of Classrooms: 10 Single C.R. Capacity: 36 max. 30 pref. No. of Classrooms combined: 4 Combined C.R. capacity: 184 Tot. Seminary C.R. capacity: 360 max. 300 pref. Church Educational System - Ten Classroom Seminary SEM07-08 MODIFIED, COMPLETE DOCUMENTS NOT AVAILABLE Administrative Areas No. of Instructor s Offices: 11 Principal: 1 Total Private Offices: 12 Secretary / Reception: 1 Workroom: 1

23 Domestic Institute Standard Plans Building Dev. No. Sq. Ft. Footprint 1 C.R. (schematic only) INS02-01 (inactive plan) 3, x 59 2 C.R. INS , x 59 3 C.R. INS , x 59 2 C.R. Pod INS08-HT-02 3, x 54 6 C.R. (schematic only) INS02-06 (inactive plan) 31,929 includes ecclesiastical 245 x C.R. (schematic only) INS00-16 (inactive plan) 54,500 includes ecclesiastical 245 x 152 multi-story

24 Church Educational System - Two Classroom Institute INS05-02 (Phased Plan to INS05-03, Three Classroom Institute)

25 PROGRAM Enrollment Qualification: Consult S&I-HQ staff Bldg. Sq. Footage: 5,412 Classroom Areas No. of Classrooms: 2 Single C.R. Capacity: 45 max. 36 pref. No. of Classrooms combined: 2 Combined C.R. capacity: 90 Administrative Areas No. of Instructor s Offices: 2 Director: 1 Total Private Offices: 3 Secretary / Reception: 1 Workroom: 1 Church Educational System - Two Classroom Institute INS05-02 (Phased Plan)

26 Sample Site Plan A Area: 1.0 Acres min. Church Educational System - Two Classroom Institute INS05-02 (Phased Plan) Sample Site Plan B Area: 1.05 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required.

27 PROGRAM Enrollment Qualification: Consult S&I-HQ staff Bldg. Sq. Footage: 6,686 Classroom Areas No. of Classrooms: 3 Single C.R. Capacity: 45 max. 36 pref. No. of Classrooms combined: 3 Combined C.R. capacity: 132 Administrative Areas No. of Instructor s Offices: 3 Director: 1 Total Private Offices: 4 Secretary / Reception: 1 Workroom: 1 Church Educational System - Three Classroom Institute INS05-03

28 Sample Site Plan B Area: 1.05 Acres min. Sample Site Plan A Area: 1.0 Acres min. Site Size and Parking: Suggested minimums may need to address the following: site configuration; parking requirements which may be determined by local codes, ecclesiastical unit Sunday and Activity Night usage (parking indicated is for CES weekday use only), topography, water retention requirements, septic systems, future expansion plans, etc. If a seminary is also to accommodate evening Institute classes, more parking than the indicated amount may be required. Church Educational System - Three Classroom Institute INS05-03

29 Meetinghouse S&I Pods 2 Classroom Seminary Pods for Legacy or Heritage Meetinghouses 3 Classroom Seminary Pods for Legacy or Heritage Meetinghouses 2 Classroom Institute Pod for a Heritage 98 Meetinghouse Note: Current boundary statement indicates that joint-use projects involving another department are considered to be an exception except for standard CES [S&I] additions where funding is included in an approved annual plan. (In order to be in the annual plan, S&I-HQ would have to approve funds for the addition prior to submittal of the final annual plan.)

30 S&I SEMINARY POD SECRETARY/ WORKRM. CORRIDOR OFFICE OFFICE Church Educational System - Two Classroom Seminary Pod SEM03-HL-02 (Heritage 98 - shown) or SEM04-LA-02 (Legacy 98)

31 Standard Heritage With 2 Classroom Pod SEMINARY POD Plans Available

32 Standard Legacy With 2 Classroom Pod SEMINARY POD Plans Available

33 S&I SEMINARY POD Church Educational System - Three Classroom Seminary Pod SEM03-HL-03 (Heritage 98 - shown) or SEM04-LA-03 (Legacy 98)

34 Standard Heritage With 3 Classroom Pod SEMINARY POD Plans Available

35 Standard Legacy With 3 Classroom Pod SEMINARY POD Plans Available

36 Church Educational System - Two Classroom Institute Pod INS08-HT-02 (on Heritage)

37 Standard Heritage 09T With 2 Classroom Pod Plans Available

38 Church Educational System - Two Classroom Seminary Pod SEM11-HMAS-02 (on Heritage 09T)

39 Church Educational System Three Classroom Seminary Pod SEM11-HMCS-03 (on Heritage 09T)

ADMINISTRATIVE VARIANCE APPLICATION PACKET

ADMINISTRATIVE VARIANCE APPLICATION PACKET ADMINISTRATIVE VARIANCE APPLICATION PACKET Relief from strict compliance with the following regulations of the UDO may be reviewed and approved by the Development Director: (1) Front yard or street side

More information

Subdivision Presubmittal Conference Submittal Package Cover Page

Subdivision Presubmittal Conference Submittal Package Cover Page Subdivision Presubmittal Conference Submittal Package Cover Page The Hillsborough County Development Services Department is pleased to offer a Presubmittal Conference to anyone seeking help in determining

More information

COMMUNITY MEETING 3 February 15, Mission Bay Phase Two

COMMUNITY MEETING 3 February 15, Mission Bay Phase Two COMMUNITY MEETING 3 February 15, 2011 Mission Bay Phase Two Agenda Welcome, Study Scope and Schedule Feedback Received Campus Environment Concepts Active Zones, Pedestrian Environment and Vehicular Circulation

More information

Outstanding Historical Wood Jr. College Campus 35 +/- Acres & Campus in Webster County, MS!

Outstanding Historical Wood Jr. College Campus 35 +/- Acres & Campus in Webster County, MS! David@TomSmithLand.com Office: 662-268-6333 Fax: 662-268-6224 www.got-land.com Outstanding Historical Wood Jr. College Campus 35 +/- Acres & Campus in Webster County, MS! $2.5 Million 35 +/- Acres in Webster

More information

REQUEST for INTEREST. Building & Parking Redevelopment Project. Travis Park United Methodist Church. TABLE of CONTENTS

REQUEST for INTEREST. Building & Parking Redevelopment Project. Travis Park United Methodist Church. TABLE of CONTENTS REQUEST for INTEREST & Parking Redevelopment Project TABLE of CONTENTS Overview... 2 The Sites... 3 a. Youth... 4 b. Children s... 5 c. Education... 6 d. Surface Parking Lot... 6 Special Considerations...

More information

REQUEST FOR DEVELOPER PROPOSALS (RFP)

REQUEST FOR DEVELOPER PROPOSALS (RFP) REQUEST FOR DEVELOPER PROPOSALS (RFP) SEEKING A SENIOR AFFORDABLE HOUSING DEVELOPMENT STATEMENTS DUE TO TACOMA COMMUNITY REDEVELOPMENT AUTHORITY SEPTEMBER 15, 2017 NO LATER THAN 5:00 PM TOD SITE ALONG

More information

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT: ADDENDUM NO. 1 Coast Community College District Purchasing Department PROJECT: Architectural Services for Orange Coast College Student Union Project RFP NO: 2076 NOTICE TO PROPOSERS ON THE ABOVE PROJECT:

More information

AMERICAN UNIVERSITY Agenda October 20, 2009

AMERICAN UNIVERSITY Agenda October 20, 2009 1 October 20, 2009 Agenda October 20, 2009 1. Introductions 2. University strategic direction 3. Site analysis 4. Historic inventory 2 Resources Community Relations web page http://www.american.edu/communityrelations/

More information

RESHAPING THE ECONOMIC FUTURE AED FY18 BUDGET PRESENTATION

RESHAPING THE ECONOMIC FUTURE AED FY18 BUDGET PRESENTATION RESHAPING THE ECONOMIC FUTURE AED FY18 BUDGET PRESENTATION 03.02.17 PRESENTATION OVERVIEW 1. AED Budget in Review 2. Way Forward Strategy Update 3. FY17 Key Department Outcomes 4. FY18 Proposed Budget

More information

Request for Proposals # P12-044A. Pre-Qualification - Purchase and. Development of Bloomfield Property

Request for Proposals # P12-044A. Pre-Qualification - Purchase and. Development of Bloomfield Property Request for Proposals # P12-044A Pre-Qualification - Purchase and Development of Bloomfield Property Bloomfield is a dynamic hub where community, cultural, social, and economic activities converge. Good

More information

Request for Qualifications for Architectural Services

Request for Qualifications for Architectural Services Request for Qualifications for Architectural Services Tacoma Community Redevelopment Authority (TCRA) Valhalla Hall (23 Residential Units and 2 Street-facing Retail Spaces) July 27, 2015 Tacoma Community

More information

Synopsis of Revised Changes to DCA s Rules for Developments of Regional Impact

Synopsis of Revised Changes to DCA s Rules for Developments of Regional Impact The Georgia Planning Act, passed by the General Assembly in 1989, charged the Georgia Department of Community Affairs with administering the State s comprehensive planning program. 1 That legislation assigned

More information

2011 SURVEY OF MUNICIPAL REGULATIONS AND FIRE CODE REGULATIONS AFFECTING CHILD CARE FACILITIES DEVELOPMENT IN SANTA CLARA COUNTY

2011 SURVEY OF MUNICIPAL REGULATIONS AND FIRE CODE REGULATIONS AFFECTING CHILD CARE FACILITIES DEVELOPMENT IN SANTA CLARA COUNTY 2011 Prepared for the Santa Clara County Early Learning Master Plan Facilities Committee Prepared by the Office of the Superintendent, Santa Clara County Office of Education 2011 SURVEY OF MUNICIPAL REGULATIONS

More information

General Professional Services Questionnaire Instructions

General Professional Services Questionnaire Instructions Instructions The General Professional Services Questionnaire shall be used for all professional services except outside legal services and architecture, engineering, or survey projects. The General Professional

More information

Saskatchewan LEAN Improvements in Manufacturing - Guidelines

Saskatchewan LEAN Improvements in Manufacturing - Guidelines Saskatchewan LEAN Improvements in Manufacturing - Guidelines General Program Parameters Proponents do not have to receive funding under the Lean Gap Analysis component of the program to receive Infrastructure

More information

BAY PARK HOSPITAL. CLIENT: ProMedica

BAY PARK HOSPITAL. CLIENT: ProMedica ProMedica Master Planning and Functional Programming 240,000 SF BAY PARK HOSPITAL The ProMedica System is a major integrated healthcare delivery system located in Northern Ohio and Southern Michigan. The

More information

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018. Addendum Final Environmental Impact Report for North Campus Project to SCH#2016111038 California State University Los Angeles March 2018 Lead Agency The Board of Trustees of the California State University

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES FOR BARTOW COUNTY COURTHOUSE EXPANSION 1. INTRODUCTION April 24, 2017 Bartow County seeks consulting services from architecture (or A&E) firms relating

More information

Welcome, NYU Students October 16, 2015

Welcome, NYU Students October 16, 2015 Welcome, NYU Students October 16, 2015 FRISCO, TX Bring Your Dreams Frisco is Centrally Located in the U.S. All major cities in the continental U.S. are within a four hour flight time Centrally Located

More information

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES Sonoma County Office of Education 5340 Skylane Boulevard, Santa Rosa, California 95403-8246 March 19, 2007 REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES The Sonoma County Office of Education (SCOE)

More information

General Professional Services Questionnaire Instructions

General Professional Services Questionnaire Instructions Instructions The General Professional Services Questionnaire shall be used for all professional services except outside legal services and architecture, engineering, or survey projects. The General Professional

More information

DISCUSSION ITEM EXECUTIVE SUMMARY

DISCUSSION ITEM EXECUTIVE SUMMARY F4 Office of the President TO THE MEMBERS OF THE COMMITTEE ON FINANCE: For the Meeting of DISCUSSION ITEM UPDATE ON THE 2020 PROJECT, MERCED CAMPUS EXECUTIVE SUMMARY Twenty years ago, the Regents of the

More information

HOUGHTON PARK COMMUNITY CENTER OUTREACH MEETING - FILTER

HOUGHTON PARK COMMUNITY CENTER OUTREACH MEETING - FILTER HOUGHTON PARK COMMUNITY CENTER OUTREACH MEETING - FILTER NOVEMBER 9, 2015 C Workshop #1: Councilmember Rex Richardson City of COG Long Beach 1-year pla Workshop #1: Councilmember Rex Richardson Restoration

More information

FY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016

FY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016 FY 2016 Capital Development Plan Northern Arizona University Revised April 2016 Item #7 EXECUTIVE SUMMARY Page 4 of 11 Project Board Approval Status Gross Square Footage Project Cost Amount Financed Funding

More information

Selection of Private Player for Refurbishment, Operation & Maintenance of Fruit and Vegetable Market at Mohali, Punjab

Selection of Private Player for Refurbishment, Operation & Maintenance of Fruit and Vegetable Market at Mohali, Punjab Melbourne Wholesale Fruit, Vegetable & Flower Market, Australia Selection of Private Player for Refurbishment, Operation & Maintenance of Fruit and Vegetable Market at Mohali, Punjab Punjab Infrastructure

More information

Ranch Duplexes. Ranch Duplex A 1,560 Sq. Ft. Ranch Duplex B. 1,568 Sq. Ft. imodular.04.01

Ranch Duplexes. Ranch Duplex A 1,560 Sq. Ft. Ranch Duplex B. 1,568 Sq. Ft. imodular.04.01 Ranch Duplex A 1,560 Sq. Ft. Ranch Duplexes Ranch Duplex B 1,568 Sq. Ft. imodular.04.01 Ranch Duplex C 2,128 Sq. Ft. Ranch Duplexes All floorplans and exterior renderings are artist s or computer aided

More information

STATUS OF REVIEW: ENGINEER ACKNOWLEDGED INFO COMMENT

STATUS OF REVIEW: ENGINEER ACKNOWLEDGED INFO COMMENT PROJECT NAME: SOUTHERN PIG AND CATTLE COMPANY PROJECT NUMBER: 2011050008 APPLICATION: MAJOR SITE PLAN #14999 Met with staff 12/11/14, DRC on 12/15/14 1. DEPARTMENT: ENGDRN - STORMWATER REVIEW REVIEW ITEM:

More information

Richard Williams, Chairman of the Town of Peru Planning Board, called the meeting of Wednesday, June 13, 2018 at 7:00pm to order.

Richard Williams, Chairman of the Town of Peru Planning Board, called the meeting of Wednesday, June 13, 2018 at 7:00pm to order. Richard Williams, Chairman of the Town of Peru Planning Board, called the meeting of Wednesday, June 13, 2018 at 7:00pm to order. PLEDGE OF ALLEGIANCE. ROLL CALL: RICHARD WILLIAMS, CHAIR BENJAMIN WRIGHT,

More information

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017 SECTION I: SUMMARY REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER September 21, 2017 The University of Maine (UMaine), located in Orono, Maine, desires to procure

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Tacoma Community Redevelopment Authority (TCRA) Redevelopment Architectural Services 824 Martin Luther King Jr. Way October 21, 2016 REQUEST FOR QUALIFICATIONS: Tacoma Community

More information

PALMER RANCH INCREMENT II (PARCEL F) NOTICE OF PROPOSED CHANGE IN SARASOTA COUNTY

PALMER RANCH INCREMENT II (PARCEL F) NOTICE OF PROPOSED CHANGE IN SARASOTA COUNTY PALMER RANCH INCREMENT II (PARCEL F) NOTICE OF PROPOSED CHANGE IN SARASOTA COUNTY BACKGROUND The Palmer Ranch DRI was originally approved by the Sarasota Board of County Commissioners on December 18, 1984

More information

NAVY LEAGUE OF CANADA

NAVY LEAGUE OF CANADA NAVY LEAGUE OF CANADA OFFICER TRAINING STANDARDS NL(230)E NL(230)E 01 Sept 2004 Chapter 1 Introduction Objectives of Navy League Officer Training 1. The primary duty of all Navy League Cadet Officers and

More information

Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis

Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis The City of Burlington is seeking to procure consultants to provide on-call services

More information

Proposed Project The selected consultant will work closely with the project management team and the appointed committee for:

Proposed Project The selected consultant will work closely with the project management team and the appointed committee for: UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSALS PRE-DESIGN, ARCHITECTURAL PROGRAMMING AND FULL ARCHITECTURAL DESIGN SERVICES FOR A 600 BED DUNDEE RESIDENCE HALLS PROJECT Updated 3-17-09 Introduction

More information

Architectural/Design Services

Architectural/Design Services Architectural/Design Services Request for Proposal Number 10202017 [Responses Due November 6, 2017 by 3 pm ET] 1 P a g e M i c h i g a n V i r t u a l R F P # 1 0 202 0 1 7 I. INTRODUCTION The purpose

More information

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Courthouse & Administrative Building II. Goal Forsyth County requests responses from licensed

More information

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility 1 Borough of Kennett Square Request for Proposals (RFP) Feasibility Study

More information

Business and Finance Committee Meeting June 13, 2012 Agenda Item # EXECUTIVE SUMMARY Page 1 of 22. FY 2013 Capital Development Plan (NAU)

Business and Finance Committee Meeting June 13, 2012 Agenda Item # EXECUTIVE SUMMARY Page 1 of 22. FY 2013 Capital Development Plan (NAU) EXECUTIVE SUMMARY Page 1 of 22 Item Name: X FY 2013 Capital Development Plan (NAU) Action Item Discussion Item Information Item ISSUE: Northern Arizona University requests approval of the FY 2013 Capital

More information

Chronology of Facilities Improvements Initiative

Chronology of Facilities Improvements Initiative Chronology of Facilities Improvements Initiative The Beginning In the spring of 2012 Rev. Monsignor William Stumpf (Fr. Bill), our new pastor, initiated a weekend long Strategic Planning session for the

More information

Special Category Grant Application Application to be submitted via online system in Spring 2018

Special Category Grant Application Application to be submitted via online system in Spring 2018 Special Category Grant Application Application to be submitted via online system in Spring 2018 A - Organization Information a. Applicant Name (org or individual)

More information

Faculty Meeting Agenda: September 13 17, 2017

Faculty Meeting Agenda: September 13 17, 2017 September 13, 2017 Wednesday Assessment Committee Meeting. Chair Valerie Berg 6:00 pm Working Dinner Overview of 2018 RISI Basic SI Assessment beta test process Review of Assessment Question Bank and Holistic

More information

Orange County Public Schools WINNER. Site 84-E-W-4 Design Community Meeting March 30, 2016

Orange County Public Schools WINNER. Site 84-E-W-4 Design Community Meeting March 30, 2016 WIER Site 84-E-W-4 Design Community Meeting March 30, 2016 Site 84-E-W-4 Elementary School Meeting Agenda March 30, 2016: MetroWest Elementary School, 6:00 pm Welcome School Board Member Pam Gould Introductions

More information

MEETING MINUTES. Board Members Present: J. Loretta, Chair; B. Schilling, Vice Chair; T. Lee, Secretary; R. Caldera; C. Davisson; and C.

MEETING MINUTES. Board Members Present: J. Loretta, Chair; B. Schilling, Vice Chair; T. Lee, Secretary; R. Caldera; C. Davisson; and C. Downtown Development Review Board (DDRB) Ed Ball Building, 214 N. Hogan Street Suite 825, 8th Floor, Jacksonville, FL. 32202-2:00 p.m. MEETING MINUTES Board Members Present: J. Loretta, Chair; B. Schilling,

More information

Request for Qualifications & Proposal

Request for Qualifications & Proposal Town of Warner, NH Request for Qualifications & Proposal Architect Services for Municipal Fire Station Town of Warner, NH 1 August 11, 2016 Contents I.INTRODUCTION...4 *some dates may be subject to change

More information

Capital Projects Levy

Capital Projects Levy Bonds-vs-Levies Bond = Building Bond proceeds purchase new buildings, renovate existing buildings, add infrastructure, new equipment and technology Bonds require 60% + 1 vote to pass Levies = Learning

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

Sponsoring Training CME Policy 2017 to 2020

Sponsoring Training CME Policy 2017 to 2020 Charlie-Mike Enterprises, Inc. (CME) Tactical Training Consultants 1031 Cedar Trail Dr. Cedar Hill, Texas 75104 (972) 432-6660 fax (972) 896-3739 cell www.cmeswat.com Website Sponsoring Training CME Policy

More information

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below.

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below. ECONOMIC AND WORKFORCE DEVELOPMENT MICHAEL COHEN, DIRECTOR CITY AND COUNTY OF SAN FRANCISCO GAVIN NEWSOM, MAYOR M E M O R A N D U M TO: Members of the Health Commission FROM: Michael Cohen CC: Mitch Katz,

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / NOTICE OF PROJECT CHANGE

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / NOTICE OF PROJECT CHANGE HARVARD university INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / NOTICE OF PROJECT CHANGE For the Third Amendment to the 2013 Institutional Master Plan for Harvard University s Campus in Allston Science

More information

Morgan Hill Unified School District

Morgan Hill Unified School District Facilities Department 15600 Concord Circle, Morgan Hill, CA 95037 Phone: (408) 201-6087 Fax (408) 776-0175 REQUEST FOR ARCHITECTURAL SERVICES PROPOSALS for a New Britton MS Campus and Site Master Plan

More information

- CITY OF CLOVIS - REPORT TO THE CITY COUNCIL

- CITY OF CLOVIS - REPORT TO THE CITY COUNCIL AGENDA ITEM NO: CC-C-2 City Manager: Lb - CITY OF CLOVIS - REPORT TO THE CITY COUNCIL TO: FROM: DATE: SUBJECT: ATTACHMENTS: Mayor and City Council Community and Economic Development Department Receive

More information

Attachment FC 11 (Revised 5/16/2017) SBCC 05/19/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 19, 2017

Attachment FC 11 (Revised 5/16/2017) SBCC 05/19/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 19, 2017 A. Approval - New (Non-State and Other State Funds) Type of 1 Craven Main Campus 2326 2 Randolph Main Campus 2317 Name Description New Construction Student Center Building- Academic Success Center Machining

More information

Bowen Island Municipality. Bowen Island Community Centre. Project Briefing Note

Bowen Island Municipality. Bowen Island Community Centre. Project Briefing Note Bowen Island Municipality Bowen Island Community Centre Project Briefing Note Presented: October 11, 2016 Sam Collins 1 of 8 1 Recommendations 1.1 That Council receive this project Briefing Note for information.

More information

Technical College of the Lowcountry Dr. Richard J. Gough, President

Technical College of the Lowcountry Dr. Richard J. Gough, President Dr. Richard J. Gough, President TCL Projects: Capital Sales Tax Commission 1. Health Sciences Expansion: Moor Hall Renovation & Building 6 Restoration $2.5 million dollar funding request 2. TCL Culinary

More information

Bond Projects Update A. R. Rucker Middle

Bond Projects Update A. R. Rucker Middle Bond Projects Update A. R. Rucker Middle Sound system added in gym Doors & locks 10/28/16 Facilities being assessed for needs & sizes, developing replacement schedule for interior hardware & doors & for

More information

Recreation Facilities Planning & Implementation

Recreation Facilities Planning & Implementation Northwestern University Athletics and Recreation Master Plan Recreation Facilities Planning & Implementation Presenters: Daniel M. Bulfin Director of Recreational Sports, Northwestern University Greg Wachalski

More information

Training Facility Use Policy

Training Facility Use Policy Phase 1 Training Facility Use Policy The Adams County Emergency Services Building and Training Facility opened for use in 2004. The first floor of this building houses the Adams County Emergency Services

More information

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017 Amendments to FY 2018-2021 Transportation Improvement of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017 The Transportation Improvement (TIP) is the MPO s short-range programming

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS WARNER AND SWASEY REDEVELOPMENT 5701 CARNEGIE AVENUE REQUEST FOR PROPOSALS 1. OVERVIEW AND INTRODUCTION The City of Cleveland s Department of Economic Development, is issuing a Request for Proposals (RFP)

More information

Raymond, New Hampshire

Raymond, New Hampshire REQUEST FOR PROPOSAL POLICE FACILITY SPACE NEEDS The Town of Raymond, New Hampshire is accepting Requests for Proposals (RFP) for a Police Building Feasibility Study and general site evaluation for a Police

More information

New St. Petersburg Police Headquarters. City Council Committee of The Whole Schematic Design Update July 21, 2016

New St. Petersburg Police Headquarters. City Council Committee of The Whole Schematic Design Update July 21, 2016 New St. Petersburg Police Headquarters City Council Committee of The Whole Schematic Design Update July 21, 2016 1 Harvard Jolly Architecture Contract Requirements August 20, 2015: Approval of amended

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 6 Support Facilities

FLORIDA STATE UNIVERSITY MASTER PLAN 6 Support Facilities SUPPORT FACILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well

More information

PROJECT: AUDIO VISUAL DESIGN/BUILD DATE: October 9, 2018 MERRIAM COMMUNITY CENTER

PROJECT: AUDIO VISUAL DESIGN/BUILD DATE: October 9, 2018 MERRIAM COMMUNITY CENTER PROJECT: AUDIO VISUAL DESIGN/BUILD DATE: October 9, 2018 MERRIAM COMMUNITY CENTER REQUEST FOR QUALIFICATIONS: The City of Merriam, in cooperation with its Owner s Representative, CBC Real Estate Group,

More information

RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016

RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016 RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016 BUILDING YEAR BUILT (per OFCC audit) AGE (years old) BUILDING SQUARE FOOTAGE (per OFCC audit) Buckeye 1964 1994 52 22 28,512 sq. ft. Hadden 1932 1942 1952

More information

TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM SUITABILITY DETERMINATION LISTING FOR 11/09/2017 SUITABLE / AVAILABLE PROPERTIES BUILDING ALABAMA

TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM SUITABILITY DETERMINATION LISTING FOR 11/09/2017 SUITABLE / AVAILABLE PROPERTIES BUILDING ALABAMA ALABAMA Building 1313; 187012 Fort Rucker Ft. Rucker AL 36362 Property Number: 21201740038 off-site removal only; no future agency need;10, 068 sf.; 5+ months vacant; difficult to relocated due to size;

More information

SOMERSET COUNTY, MARYLAND

SOMERSET COUNTY, MARYLAND SOMERSET COUNTY, MARYLAND REQUEST FOR PROPOSAL ***** ARMORY FEASIBILITY STUDY TO EVALUATE THE CURRENT CONDITIONS OF THE CRISFIELD ARMORY, LOCATED AT 8 EAST MAIN STREET IN THE CITY OF CRISFIELD, MD., INCLUDING

More information

Chaffey College Program Review Three Year Review 2011

Chaffey College Program Review Three Year Review 2011 PROGRAM OVERVIEW Program Title: Chaffey College Program Review Three Year Review 2011 Vocational Nursing Program Code: 1203 - NURSING: VN Review Type: Instructional Does this review contain any career

More information

ROYAL CANADIAN ARMY CADETS MASTER CADET INSTRUCTIONAL GUIDE. Cette publication est disponible en français sous le numéro A-CR-CCP-705/PF-002.

ROYAL CANADIAN ARMY CADETS MASTER CADET INSTRUCTIONAL GUIDE. Cette publication est disponible en français sous le numéro A-CR-CCP-705/PF-002. National Defence Défense nationale A-CR-CCP-705/PF-001 ROYAL CANADIAN ARMY CADETS MASTER CADET INSTRUCTIONAL GUIDE (ENGLISH) Cette publication est disponible en français sous le numéro A-CR-CCP-705/PF-002.

More information

RACINE COUNTY, WISCONSIN IN THE HEART OF THE CHICAGO-MILWAUKEE CORRIDOR

RACINE COUNTY, WISCONSIN IN THE HEART OF THE CHICAGO-MILWAUKEE CORRIDOR RACINE COUNTY, WISCONSIN IN THE HEART OF THE CHICAGO-MILWAUKEE CORRIDOR March 27, 2017 RCEDC: OVERVIEW Mission: Implement a Proactive Business Expansion and Business Recruitment Program that results in

More information

Space Allocation Committee. Meeting Minutes

Space Allocation Committee. Meeting Minutes Space Allocation Committee Meeting Minutes June 25, 2012, 8:30 10:00 Room: AH527 In Attendance: Thomas Chase Provost and Vice President (Academic) Dave Button Vice President (Administration) Nelson Wagner

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY CITY OF C7 S2 SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 05/09/17 ITEM: 4.1 Memorandum FROM: Kim Walesh Jim Ortbal SUBJECT: SEE BELOW DATE: COUNCIL DISTRICT:

More information

APPLICATION FOR PARCEL MAP

APPLICATION FOR PARCEL MAP Public Works Number: - / 3- APPLICATION FOR PARCEL MAP Department of Public Works Development Services 200 East Santa Clara Street San Jose, California 95113 (408) 535-7802 Applicant Phone Number Fax Number

More information

Fees for Healthcare Operators and Professionals Effective from 1 st April, 2012

Fees for Healthcare Operators and Professionals Effective from 1 st April, 2012 Fees for Healthcare Operators and Professionals Effective from 1 st April, 2012 Note: Fees are inclusive of all related & miscellaneous administrative services to form a package price. Initial Application

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER 911TH AIRLIFT WING 911TH AIRLIFT WING INSTRUCTION 91-201 8 MAY 2015 Safety HANGAR DOOR OPERATION COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publication is available

More information

TRINITY COUNTY. Board Item Request Form Phone

TRINITY COUNTY. Board Item Request Form Phone County Contract No. Department County Administrative Officer TRINITY COUNTY 4.02 Board Item Request Form 2014-02-25 Contact Monica Stygar Phone 623-1325 Requested Agenda Location County Matters Requested

More information

Q & A from November 1st Tour

Q & A from November 1st Tour State College of Florida Manatee-Sarasota Contracted Custodial Services ITN Question & Answer Questions and Answers originally posted on November 2, 2012, dates of changes and additions noted below Q &

More information

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study Conrad Grebel University College Request for Proposals For the Provision of Architectural Consulting Services Conrad Grebel University College invites eligible architects to submit a proposal for the provision

More information

REQUEST FOR PROPOSAL Artistic Signature Piece 1. Summary 2. Glazer Children s Museum 3. Project Goals & Requirements

REQUEST FOR PROPOSAL Artistic Signature Piece 1. Summary 2. Glazer Children s Museum 3. Project Goals & Requirements REQUEST FOR PROPOSAL Artistic Signature Piece Glazer Children s Museum Tampa, FL 1. Summary The Glazer Children s Museum seeks an innovative, creative and whimsical proposal for a long-term signature sculptural

More information

Request for Qualifications. Architectural Services for Conceptual Design. Maplewood Memorial Library 51 Baker Street Maplewood, NJ 07040

Request for Qualifications. Architectural Services for Conceptual Design. Maplewood Memorial Library 51 Baker Street Maplewood, NJ 07040 Request for Qualifications Architectural Services for Conceptual Design Maplewood Memorial Library 51 Baker Street Maplewood, NJ 07040 Issue Date: February 19, 2016 Due Date: April 4, 2016 Board of Trustees

More information

A G E N D A LEWISVILLE CITY COUNCIL MEETING JULY 2, 2018 LEWISVILLE CITY HALL 151 WEST CHURCH STREET LEWISVILLE, TEXAS 75057

A G E N D A LEWISVILLE CITY COUNCIL MEETING JULY 2, 2018 LEWISVILLE CITY HALL 151 WEST CHURCH STREET LEWISVILLE, TEXAS 75057 A G E N D A MEETING LEWISVILLE CITY HALL 151 WEST CHURCH STREET LEWISVILLE, TEXAS 75057 WORKSHOP SESSION - 6:30 P.M. REGULAR SESSION 7:00 P.M. Call to Order and Announce a Quorum is Present. WORKSHOP SESSION

More information

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR DETERMINING THE COST TO BUILD A LOWER PRICED HOME

REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR DETERMINING THE COST TO BUILD A LOWER PRICED HOME REQUEST FOR PROPOSALS NEW HAMPSHIRE HOUSING FINANCE AUTHORITY FOR DETERMINING THE COST TO BUILD A LOWER PRICED HOME (for the starter home or down-sizing market) About New Hampshire Housing Finance Authority

More information

Call for Artists RFQ + RFP Meridian Split Corridor Phase 2 Public Art Project

Call for Artists RFQ + RFP Meridian Split Corridor Phase 2 Public Art Project Call for Artists RFQ + RFP Meridian Split Corridor Phase 2 Public Art Project OVERVIEW: The Meridian Split Corridor Phase 2 Public Art Project intends to create vitality and a sense of place by placing

More information

Trans Co. ) ... RESERVE CENTER: MCRC TEXARKANA, TX CAPACITY ANALYSIS: DATA CALL 48 DATA CALL WORK SHEET FOR

Trans Co. ) ... RESERVE CENTER: MCRC TEXARKANA, TX CAPACITY ANALYSIS: DATA CALL 48 DATA CALL WORK SHEET FOR DCN 943 CAPACITY ANALYSIS: DATA CALL 48 DATA CALL WORK SHEET FOR RESERVE CENTER: MCRC TEXARKANA, TX ACTIVITY UIC:67614 (Bulk Fuel Transport, Plt, (REIN) Trans Co. ) Category... Personnel Support Sub-category

More information

REQUEST FOR QUALIFICATIONS FOR THE DEVELOPMENT OF CLASSROOMS, HOUSING AND PARKING TO REPLACE UPPER HEARST PARKING LOTS

REQUEST FOR QUALIFICATIONS FOR THE DEVELOPMENT OF CLASSROOMS, HOUSING AND PARKING TO REPLACE UPPER HEARST PARKING LOTS REQUEST FOR QUALIFICATIONS FOR THE DEVELOPMENT OF CLASSROOMS, HOUSING AND PARKING TO REPLACE UPPER HEARST PARKING LOTS March 20, 2017 Goldman School of Public Policy and Office of the Vice Chancellor Real

More information

Project number: Project Title: Recreation Center Expansion and Student Wellness Center

Project number: Project Title: Recreation Center Expansion and Student Wellness Center STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING CONSTRUCTION MANAGEMENT/GENERAL CONTRACTING SERVICES FOR

More information

TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM SUITABILITY DETERMINATION LISTING FOR 08/25/2017 SUITABLE / AVAILABLE PROPERTIES BUILDING ALABAMA

TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM SUITABILITY DETERMINATION LISTING FOR 08/25/2017 SUITABLE / AVAILABLE PROPERTIES BUILDING ALABAMA 1 TITLE V, FEDERAL SURPLUS PROPERTY PROGRAM SUITABILITY DETERMINATION LISTING FOR 08/25/2017 SUITABLE / AVAILABLE PROPERTIES ALABAMA Building 6035 RPUID:187109 Fort Rucker Fort Rucker AL 36362 Property

More information

Innovative Nursing Unit Designs Evaluated Over Time

Innovative Nursing Unit Designs Evaluated Over Time Innovative Nursing Unit Designs Evaluated Over Time A Post-Occupancy Review of Mercy Heart Hospital Nursing Unit Presenters: Jeff Johnston, President, Mercy Hospital, St Louis John Reeve AIA, Principal,

More information

Volunteer Application

Volunteer Application Page 1 of 5 Volunteer Application Contact Information (all information is required) Full Date Home / Cell Date of Birth Social Security Number E-Mail Address (Note: All volunteers must have a valid driver

More information

500 EL CAMINO REAL PROJECT. City Council Tuesday, April 16, 2013

500 EL CAMINO REAL PROJECT. City Council Tuesday, April 16, 2013 500 EL CAMINO REAL PROJECT City Council Tuesday, April 16, 2013 Background Proposal Project Review Process Summary Background Vision Plan (2007-2008) 12 overarching goals Established foundation for the

More information

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES Owner s Representative: 541 East Garden Drive, Unit S Windsor, Colorado 80550 970-686-5695

More information

Evergreen Valley College Campus Forum. April 7, :00 p.m. to 4:00 p.m. Gullo II

Evergreen Valley College Campus Forum. April 7, :00 p.m. to 4:00 p.m. Gullo II Evergreen Valley College Campus Forum April 7, 2015 2:00 p.m. to 4:00 p.m. Gullo II 1 Forum Presenters: Dr. Rita M. Cepeda Chancellor, San José-Evergreen Community College District Doug R. Smith Vice Chancellor

More information

Travel Fellowship Application Applications due January 26, 2018

Travel Fellowship Application Applications due January 26, 2018 2018 Hart Howerton Travel Fellowship Application Applications due January 26, 2018 HART HOWERTON Hart Howerton is a team of planners, architects, landscape architects and interior designers headquartered

More information

2017 Hart Howerton Travel Fellowship

2017 Hart Howerton Travel Fellowship 2017 Hart Howerton Travel Fellowship APPLICATION due January 27, 2017 places HART HOWERTON Hart Howerton is a team of planners, architects, landscape architects and interior designers headquartered in

More information

Request for Proposals

Request for Proposals Request for Proposals Big Bethel AME Church Campus Development Strategy October 21, 2013 Big Bethel AME Church 220 Auburn Avenue NE Atlanta, Georgia 30303 Introduction Big Bethel AME Church and Bethel

More information

UNIVERSITY STUDENT UNION STRATEGIC PRIORITIES

UNIVERSITY STUDENT UNION STRATEGIC PRIORITIES STATUS REPORT 06/09/14 UNIVERSITY STUDENT UNION 2013 2014 STRATEGIC PRIORITIES SA Priority 1: - Business, Operational Practices, and Facilities: - Grounded in the philosophy of continuous quality improvement

More information

Ogden City Request for Proposals to Provide Market Study and Site Assessment Services

Ogden City Request for Proposals to Provide Market Study and Site Assessment Services Ogden City Request for Proposals to Provide Market Study and Site Assessment Services Ogden City is requesting proposals for market study and site assessment services to investigate the potential of developing

More information

PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017

PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017 PAUL R. JONES STUDENT CENTER STATEMENT OF NEED and DETAILED FUNDRAISING PLAN, April 2017 BROUGHT TO YOU BY: NATIONAL PINE FORGE ACADEMY ALUMNI ASSOCIATION A Student Center for Pine Forge Academy Students

More information

Future Land Use Supporting Data

Future Land Use Supporting Data 4 Supporting Data The purpose of the Land Use Element is to describe the existing and future land use patterns to be developed on the University and to address how this land use pattern will be coordinated

More information

Public Art RFQ. California Air Resources Board. Request for Qualifications Public Art. California Air Resources Board

Public Art RFQ. California Air Resources Board. Request for Qualifications Public Art. California Air Resources Board Public Art RFQ California Air Resources Board Request for Qualifications Public Art California Air Resources Board Southern California Consolidation Project - #140769 4001 Iowa Avenue Riverside, Riverside

More information

Sectional Map Amendment Appendices (1 5)

Sectional Map Amendment Appendices (1 5) and Approved Master Plan & Sectional Map Amendment BOWIE VICINITY Sectional Map Amendment Appendices (1 5) Approved Bowie and Vicinity Master Plan and Sectional Map Amendment 147 148 Approved Bowie and

More information