UNCLASSIFIED FY 2005 BUDGET ESTIMATES BUDGET ACTIVITY 04 OTHER AIRCRAFT FEBRUARY 2004 UNCLASSIFIED

Size: px
Start display at page:

Download "UNCLASSIFIED FY 2005 BUDGET ESTIMATES BUDGET ACTIVITY 04 OTHER AIRCRAFT FEBRUARY 2004 UNCLASSIFIED"

Transcription

1 IFID FY 2005 D I D IIY 04 H IF FY 2004 IFID

2 IFID HI IIY F K IFID

3 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -22 (sprey) rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty ost ($ ) dvance roc ost ($ ) Weapon ystem ost ($ ) Initial pares ($ ) otal roc ost ($ ) Flyaway nit ost ($ ) / Wpn ys nit ost ($ ) Description he -22 is a pecial perations Forces (F) variant of the -22 vertical lift, multi-mission aircraft. he -22 will provide long-range, high speed infiltration, exfiltration, and resupply to special forces teams in hostile, denied, and politically sensitive areas. he avy is the lead service for the joint -22 program and is responsible for managing and funding the development of all -22 variants, including the -22. he program will procure and field aircraft and support equipment. he ir Force will fund the procurement of the basic aircraft (-22/ -22-common components), conduct I&, and provide ype I training. funds the procurement of F unique systems, e.g,. terrain following radar, electronic warfare suite, etc. he ir Force will fund 85 percent of the procurement cost for -22 training systems;, 15 percent. he ir Force and avy will utilize joint training facilities at ew iver, to conduct all maintenance training and initial -22 aircrew qualification training. -22 F-unique aircrew mission qualification training will be conducted at the pecial perations ission Qualification choolhouse at Kirtland F,. ote: wo roduction epresentative est ehicles were built using FY02 D&. hese two aircraft will be used operationally upon completion of I&. FY 2005 rogram ustification he FY05 budget includes $239.7 in flyaway costs to procure three -22 aircraft for delivery in FY07. he FY05 budget includes support elements required to support the three -22 aircraft being procured. he FY05 budget also includes support elements necessary for planning for follow-on support of training operations at Kirtland F and Hurlburt Field. hese support elements include: irframe ($9.85), ngine ($0.75), vionics ($9.3), eculiar raining quipment ($17.8), echnical ublications ($6.8), roduction ngineering upport ($2.0), ommon upport quipment ($11.4), and ther I ($23.2). total of $43.43 of Initial pares will also be procured this year. hese support elements have a lead time of 24 months or more and will be used to support initial F training operations at Kirkland F. he FY05 budget includes $ for dvanced rocurement of two -22 aircraft in FY06. : he -22 program was restructured in 4Q/FY03 to address program disconnects/shortfalls. he -22 FY06 buy quantity was reduced by one aircraft to fund program cost increases and other bills. Funds generated by the restructure were also used to fund -22 interoperability development (oint actical adio ystem, ink 16, -1 hopping ist Item o. 10 udget Item ustification xhibit -40, page 1 of 12 IFID 4-1

4 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -22 (sprey) FY 2005 rogram ustification ontinued etc.), -22 cost reduction initiatives as directed by D (8 ug 03 cquisition Decision emorandum). he -22 FY06 quantity reduction of one aircraft also addressed the D direction to reduce the -22 (-22/-22) buy quantity in FY06 from 20 to 17. he reduced their FY06 buy quantity by two aircraft. -1 hopping ist Item o. 10 udget Item ustification xhibit -40, page 2 of 12 IFID 4-2

5 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 anufacturer's ame/lant ity/tate ocation ubline Item -1 ine Item omenclature -22 (sprey) ell-oeing / marillo / X Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2003 FY 2004 FY 2005 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost otal ost ir Frame F ngines/ccessories F lectronics F lectronics ngineering hange rders () onrecurring ost arts bsolescence FYWY irframe ngine vionics eculiar raining quipment ublications/echnical Data ther I roduction ngr upport ommon upport /od ost eduction Initiatives ross -1 ost dvance rocurement (redit) et -1 ost dvance rocurement Weapon ystem ost Initial pares omments -1 hopping ist Item o. 10 Weapon ystem ost nalysis xhibit -5, page 3 of 12 IFID 4-3

6 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Weapon ystem -22 W ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod ontract ype ontractor and ocation -1 ine Item omenclature -22 (sprey) ward Date Date of First Delivery pecs vailable ow? Date evision vailable? emarks ircraft rocurement (FY04) ircraft rocurement (FY05) 2 I pr-03 FI ell-oeing, atuxent iver D 3 I pr-04 FI ell-oeing, atuxent iver, D un-04 Feb-06 Yes ar-05 Feb-07 Yes -1 hopping ist Item o. 10 rocurement History and lanning xhibit -5, page 4 of 12 IFID 4-4

7 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Y. QY. I D F ine Item omenclature -22 (sprey) FI Y 2003 FI Y D Y 2003 D Y 2004 D F D F Y Y 2001 F F F F F F F DI D I I HIF H DI D I I/F' I DY X ell-oeing atuxent iver, D I 1 F 1 K inimum sustaining rate includes -22 production; FY02: wo roduction epresentative est ehicles funded with FY02 D& age 9: Format does not allow display of FY08 and FY09 aircraft deliveries D F Y F I D F F 1 III D Y -1 hopping ist Item o. 10 roduction chedule xhibit -21, page 5 of 12 IFID 4-5

8 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Y. QY. I D F ine Item omenclature -22 (sprey) FI Y 2005 FI Y D Y 2005 D Y 2006 D F D F Y Y 2001 F F F F F F F DI D I I HIF H DI D I I/F' I DY X ell-oeing atuxent iver, D I 1 F 1 K inimum sustaining rate includes -22 production; FY02: wo roduction epresentative est ehicles funded with FY02 D& age 9: Format does not allow display of FY08 and FY09 aircraft deliveries D F Y F I D F F 1 III D Y -1 hopping ist Item o. 10 roduction chedule xhibit -21, page 6 of 12 IFID 4-6

9 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Y. QY. I D F ine Item omenclature -22 (sprey) FI Y 2007 FI Y D Y 2007 D Y 2008 D F D F Y Y 2002 F F F F F DI D I I HIF H DI D I I/F' I DY X ell-oeing atuxent iver, D I 1 F 1 K inimum sustaining rate includes -22 production; FY02: wo roduction epresentative est ehicles funded with FY02 D& age 9: Format does not allow display of FY08 and FY09 aircraft deliveries D F Y F I D F F 1 III D Y -1 hopping ist Item o. 10 roduction chedule xhibit -21, page 7 of 12 IFID 4-7

10 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Y. QY. I D F ine Item omenclature -22 (sprey) FI Y 2009 FI Y D Y 2009 D Y 2010 D F D F Y Y 2004 F F F F DI D I I HIF H DI D I I/F' I DY X ell-oeing atuxent iver, D I 1 F 1 K inimum sustaining rate includes -22 production; FY02: wo roduction epresentative est ehicles funded with FY02 D& age 9: Format does not allow display of FY08 and FY09 aircraft deliveries D F Y F I D F F 1 III D Y -1 hopping ist Item o. 10 roduction chedule xhibit -21, page 8 of 12 IFID 4-8

11 IFID xhibit -43 p.1, imulator and raining Device ustification ($ ) Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -22 (sprey) Weapon ystem -22 quipment omenclature: nit raining Device (D) Fin lan ($) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 otal Quantity roc II Y DII he ir Force and avy will conduct joint training at ew iver,, for all maintenance training and initial -22 aircrew qualification training. Development of the joint training facility is funded by the avy. -22 F-unique aircrew mission qualification training will be conducted at the pecial perations ission Qualification choolhouse at Kirtland F,. he -22 raining ystem consists of five components: - he -22 aircraft will be procured for unit level training at F bases - he -22 Weapon ystem rainer (W) will be a 6 degree-of-freedom, full flight simulator that includes day/night/dusk instrument conditions, terrain following/terrain avoidance radar, forward looking infrared sensor, night vision goggle compatibility, and electronic warfare simulation. It will be integrated with the other trainers in the F training complex at Kirtland F. W has a two year procurement lead-time. - he -22 perational Flight rainer (F) is a full fidelity, non-motion based simulator with the same capabilities as the W. Fs require two year procurement lead-time - he abin art-ask rainer () is a full scale mockup of the cabin to train flight engineers in loadmaster/crew chief duties (loading and unloading of aircraft, hoist operations, cabin rigging for airdrop and paratrooper operations). he requires two years procurement lead-time and is required to be in place, ready for training, when the schoolhouse opens in FY06. - he Intermediate ulti-media Instruction-perator (II-) is software to train flight crew personnel which runs on standard office computers. he II-aintenance (II-) is similar but trains maintenance personnel. ach of these II capabilities requires two years procurement lead-time. rocurement costs for the training systems will be split between (15%) and F (85%). -1 hopping ist Item o. 10 imulator and raining Device ustification ($ ) xhibit -43 p.1, page 9 of 12 IFID 4-9

12 IFID xhibit -43 p.2, imulator and raining Device ustification ($ ) Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Weapon ystem -22 quipment omenclature: nit raining Device (D) I Date II DI Y Y I DIY I DY II D D HH -1 ine Item omenclature -22 (sprey) ($ in illions) FY 2003 FY 2004 FY 2005 QY QY QY Weapon ystem rainer Kirtland ar-02 ep-04 (W) 41 perational Flight rainer Kirtland Dec-02 ep-04 (F) 41 F Hurlburt ov-04 ay Intermediate ulti-media Kirtland Feb-05 ay-05 Inst. -perator (II-) II -aintenance (II-) ew iver Feb-05 ay abin art ask rainer Kirtland Feb-06 ay-06 () W Kirtland Feb-07 ug aint. rng. ew iver an-09 un-09 uite (-) F ov-09 ar F Kirtland ov-07 ar F ov-10 ar F 2 ov-12 ar s & upport otal djustments hopping ist Item o. 10 imulator and raining Device ustification ($ ) xhibit -43 p.2, page 10 of 12 IFID 4-10

13 IFID xhibit -43 p.3, imulator and raining Device ustification ($ ) Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Weapon ystem -22 quipment omenclature: ircrew rainers Description: -1 ine Item omenclature -22 (sprey) FII ($) FY 2003 FY 2004 FY 2005 o omplete otal osts QY QY QY QY QY Hardware osts W F otal Hardware osts upport osts otal upport osts hopping ist Item o. 10 imulator and raining Device ustification ($ ) xhibit -43 p.3, page 11 of 12 IFID 4-11

14 IFID xhibit -43 p.4, imulator and raining Device ustification ($ ) Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 10 Weapon ystem -22 quipment omenclature: aintenance Description: -1 ine Item omenclature -22 (sprey) FII ($) FY 2003 FY 2004 FY 2005 o omplete otal osts QY QY QY QY QY Hardware osts II II otal Hardware osts upport osts pgrade/ aint Delta ourse otal upport osts hopping ist Item o. 10 imulator and raining Device ustification ($ ) xhibit -43 p.4, page 12 of 12 IFID 4-12

15 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -22 (sprey) dvance rocurement rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty 0 ost ($ ) dvance roc ost ($ ) Weapon ystem ost ($ ) Initial pares ($ ) otal roc ost ($ ) Flyaway nit ost ($ ) Wpn ys nit ost ($ ) Description he -22 is a pecial perations Forces (F) variant of the -22 vertical lift, multi-mission aircraft. he -22 will provide long-range, high speed infiltration, exfiltration, and resupply to special forces teams in hostile, denied, and politically sensitive areas. he avy is the lead service for the joint -22 program and is responsible for managing and funding the development of all -22 variants, including the -22. he avy will procure and field aircraft and support equipment. he ir Force will fund the procurement of the basic aircraft ( common components), conduct I&, and provide ype I training. funds the procurement of F unique systems, e.g. terrain following radar, electronic warfare suite, etc. he ir Force will fund 85 percent of the procurement cost for -22 training systems;, 15 percent. he ir Force and avy will utilize joint training facilities at ew iver, to conduct all maintenance training and initial -22 aircrew qualification training. -22 F-unique aircrew mission qualification training will be conducted at the pecial perations ission Qualification choolhouse at Kirtland F,. FY 2005 rogram ustification In FY05 the $ in dvanced rocurement will fund long lead items for two aircraft to be procured in FY06 for delivery in FY08. irframe/f requirements calculated on the basis of termination liability, reflecting the contractor's funding requirements for procurement of long-lead parts and material necessary to protect the production schedule. -1 hopping ist Item o. 11 udget Item ustification xhibit -40, page 1 of 3 IFID 4-13

16 xhibit -10 p.1, dvance rocurement equirements nalysis (age 1 - Funding) ppropriation (reasury) ode////item ontrol umber IFID ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature Date: February (sprey) dvance rocurement Weapon ystem First ystem ward Date First ystem ompletion Date 22 ar-03 Feb-06 ($ in illions) Description When qd rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal nd Item Qty F 38 Dec F Q Design erm iability F DF ntenna/rocessor 30 Feb-07 / () 15 ep-05 / adar ltimeter nt. 24 an-06 / xternal ower onitor 12 an-05 / Description ote: wo roduction epresentative est ehicles were developed and fabricated using F02 D& funds. hese two aircraft will be transfered to the operational fleet following completion of I&. his will bring the total number of operational to hopping ist Item o. 11 dvance rocurement equirements nalysis (age 1 - Funding) xhibit -10 p.1, page 2 of 3 IFID 4-14

17 xhibit -10 p.2, dvance rocurement equirements nalysis (age 2 - udget ustification) ppropriation (reasury) ode////item ontrol umber IFID ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 11 Weapon ystem 22 Description Q nit ost 2003 QY nd Item (, $ in illions) 2003 ontract Forecast Date 2003 otal ost equest 2004 QY -1 ine Item omenclature Date: February (sprey) dvance rocurement 2004 ontract Forecast Date 2004 otal ost equest 2005 QY 2005 ontract Forecast Date 2005 otal ost equest F F Q Design erm iability F DF ntenna/rocessor ul ul ul () un un un adar ltimeter nt an an an xternal ower onitor an an an Description -1 hopping ist Item o. 11 dvance rocurement equirements nalysis (age 2 - udget ustification) xhibit -10 p.2, page 3 of 3 IFID 4-15

18 HI IIY F K 4-16

19 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature arget Drones rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty 0 ost ($ ) / / / dvance roc ost ($ ) Weapon ystem ost ($ ) / / / Initial pares ($ ) otal roc ost ($ ) / / / Flyaway nit ost ($ ) Wpn ys nit ost ($ ) Description Full-scale and subscale targets assure warfighters that weapon systems will perform adequately against real-world enemy fighters and cruise missiles. erial targets help satisfy public law itle 10 "ive Fire/ethality" developmental/operational test requirements. arget drones are used to validate operational missile/weapon system effectiveness and fighter operational flight program (F) updates. arget drones are also essential for development testing/operational testing for all air-to-air and ground-to-air missiles, and for the F-22, F-16, F-15, etc., aircraft. he objective is to provide realistic targets for missile testing to enable the development of air defense systems capable of defeating changing airborne threats. his program provides funds for the procurement of full-scale (QF-4) and subscale - ir Force ubscale erial arget (F) target drones required for ongressionally mandated testing and ir Force development and operational testing. FY 2005 rogram ustification FY05 funds procure full-scale and subscale aerial targets required for development and operational testing requirements. rocurement funds are for full-scale (23 QF-4) and subscale (37 F) aerial targets for the dvanced Intercept issile (I) programs (I-120, I-9 and I-7), for the F/-22 aircraft test program, and for operational flight program (F) F-16/F-15 aircraft upgrades. -1 hopping ist Item o. 13 udget Item ustification xhibit -40, page 1 of 14 IFID 4-17

20 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature arget Drones anufacturer's ame/lant ity/tate ocation ubline Item Weapon ystem ost lements Ident ode otal ost in illions of Dollars FY 2003 FY 2004 FY 2005 otal otal nit ost ost Qty nit ost ost Qty nit ost Qty QF-4 F I FYWY QF-4 Hardware ecurring ircraft Drone od & integration F-4 In lant epairs ngineering hange rders Warranty ircraft Withdrawal/ estricted-nmanned nrestriced - anned II D II Q Fuel (hrough afe Flight) D rim Kits I FYWY Data/ech anuals ystem ngineering upport echnical yndall overnment upport I F I roduction et-p/integration re-production rticle roduction rticle / Data/ech anuals/raining hopping ist Item o. 13 Weapon ystem ost nalysis xhibit -5, page 2 of 14 IFID 4-18 otal ost

21 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature arget Drones Warranty Formal Qualification esting (FQ) overnment Furnished quipment rimary ission quipment () FYWY F upport osts overnment upport overnment /ntenna attern est omments -1 hopping ist Item o. 13 Weapon ystem ost nalysis xhibit -5, page 3 of 14 IFID 4-19

22 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Weapon ystem D W ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod ontract ype ontractor and ocation -1 ine Item omenclature arget Drones ward Date Date of First Delivery pecs vailable ow? Date evision vailable? FY02 (QF-4) /Y FF Y,, FY03 (QF-4) /Y ption Y,, FY04 (QF-4) /Y FF Y,, FY05 (QF-4) /Y FF Y, FY02 (F) /Y F/F omposite ngineering Inc., acramento FY04 (F) /Y FF omposite ngineering Inc., acramento FY05 (F) /Y FF omposite ngineering Inc., acramento Dec-01 ug-03 Yes pr-03 ug-04 Yes pr-04 ug-05 Yes ar-05 ug-06 Yes ul-02 pr-04 Yes ep-04 ep-05 o ep-04 ep-05 ep-06 o ep-05 emarks FY04 F rocurement purchases two items for First rticle cceptance esting (F) with delivery of remaining quantities beginning 6 months after successful completion of F. -1 hopping ist Item o. 13 rocurement History and lanning xhibit -5, page 4 of 14 IFID 4-20

23 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2002 FI Y D Y 2002 D Y 2003 D F D F Y Y 2000 F F F F F F F F F F DI D I I HIF H DI D I I/F' I DY X QF-4/ ystems ojave I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 5 of 14 IFID 4-21

24 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2004 FI Y D Y 2004 D Y 2005 D F D F Y Y 2001 F F F F F F F F F DI D I I HIF H DI D I I/F' I DY X QF-4/ ystems ojave I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 6 of 14 IFID 4-22

25 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2006 FI Y D Y 2006 D Y 2007 D F D F Y Y 2003 F F F F F F F DI D I I HIF H DI D I I/F' I DY X QF-4/ ystems ojave I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 7 of 14 IFID 4-23

26 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2008 FI Y D Y 2008 D Y 2009 D F D F Y Y 2005 F F F F F DI D I I HIF H DI D I I/F' I DY X QF-4/ ystems ojave I 1 F 1 K. D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 8 of 14 IFID 4-24

27 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2010 FI Y D Y 2010 D Y 2011 D F D F Y Y 2007 F F F DI D I I HIF H DI D I I/F' I DY X QF-4/ ystems ojave I 1 F 1 K. D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 9 of 14 IFID 4-25

28 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2002 FI Y D Y 2002 D Y 2003 D F D F Y Y 2002 F F F F F F F F DI D I I HIF H DI D I I/F' I DY X F /omposite ngineering Inc. acramento, I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 10 of 14 IFID 4-26

29 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2004 FI Y D Y 2004 D Y 2005 D F D F Y Y 2002 F F F F F F F F DI D I I HIF H DI D I I/F' I DY X F /omposite ngineering Inc. acramento, I 1 F 1 K - D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 11 of 14 IFID 4-27

30 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2006 FI Y D Y 2006 D Y 2007 D F D F Y Y 2003 F F F F F F F DI D I I HIF H DI D I I/F' I DY X F /omposite ngineering Inc. acramento, I 1 F 1 D F III D K First two items delivered in ot 1 (FY04) production will be used for First rticle cceptance esting (F) which will take approximately 4-6 months. Delivery of remaining ot 1 production units will begin after successful F testing. otal time for ot 1 delivery will be approximately 16 months due to the first article test period. Y F I D F F 1 Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 12 of 14 IFID 4-28

31 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2008 FI Y D Y 2008 D Y 2009 D F D F Y Y 2004 F F F F F F DI D I I HIF H DI D I I/F' I DY X F /omposite ngineering Inc. acramento, I 1 F 1 K. D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 13 of 14 IFID 4-29

32 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 13 Y. QY. I D F ine Item omenclature arget Drones FI Y 2010 FI Y D Y 2010 D Y 2011 D F D F Y Y 2007 F F F DI D I I HIF H DI D I I/F' I DY X F /omposite ngineering Inc. acramento, I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 13 roduction chedule xhibit -21, page 14 of 14 IFID 4-30

33 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -40 rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty otal roc ost ($ ) Description his line item provides funding to purchase one -40 aircraft as directed by the FY01 ppropriations ct. he -40 is a military variant of the commercial oeing usiness et. he -40 provides improved reliability, reduced & cost, the latest navigation and safety features, and complies with international and F noise and emissions standards. his line item also provides funding to lease two additional -40 aircraft as provided for in the FY02 ppropriations ct. ircraft will be leased for six years begining in FY02. FY 2005 rogram ustification o activity -1 hopping ist Item o. 14 udget Item ustification xhibit -40, page 1 of 3 IFID 4-31

34 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -40 anufacturer's ame/lant ity/tate ocation ubline Item oeing erospace/eattle/w Weapon ystem Ident otal ost in illions of Dollars ost lements ode FY 2003 FY 2004 FY 2005 Qty nit ost otal ost Qty nit ost otal ost Qty nit ost ircraft eases FYWY omments otal ost -1 hopping ist Item o. 14 Weapon ystem ost nalysis xhibit -5, page 2 of 3 IFID 4-32

35 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 14 Y. QY. I 1 0 D F ine Item omenclature -40 FI Y 1 FI Y 2 0 D Y 1 D Y 2 D F D F Y Y 2001 F F DI D I I HIF H DI D I I/F' I DY X oeing erospace eattle, W 1 1 I 1 F 1 III D K ne purchased -40 to be delivered ul 05. wo leased -40s delivered ept D F Y F I D F F 1 Y -1 hopping ist Item o. 14 roduction chedule xhibit -21, page 3 of 3 IFID 4-33

36 HI IIY F K 4-34

37 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -8 (oint tars) rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty ost ($ ) Interim tr upport ($ ) dvance roc ost ($ ) Weapon ystem ost ($ ) Initial pares ($ ) otal roc ost ($ ) Flyaway nit ost ($ ) Wpn ys nit ost ($ ) Description he oint urveillance arget ttack adar ystem (oint ) program produces the world's premier airborne ground surveillance platform, meeting joint combat capability requirements. he 707-based -8 oint aircraft provides radar-derived all-weather surveillance and targeting information on moving and stationary ground targets, slowly moving rotary and fixed wing aircraft, and rotating antennas. oint provides target information for matching direct attack aircraft, standoff weapons, and ground-based attack assets against selected targets, and can be cued by other intelligence, surveillance, and reconnaissance (I) and target acquisition systems. his capability enables air and ground commanders to effectively make and execute battle decisions. In response to the 1996 Quadrennial Defense eview's recommended -8 production profile revision, the ir Force reduced -8 production from 19 to 13 in anticipation of orth tlantic reaty rganization () participation in the program, which did not transpire. ince the budget identifies no funds for an 18th or 19th aircraft, the ir Force is now planning and conducting production shutdown activities. In addition, the ir Force is engaged in planning of potential -8 re-engining activities to maximize combatant capability. ngineering change proposals (s) have historically been funded from the program's ngineering hange rder line as aircraft moved through production. s the program matured, efforts shifted from production line assets to operational assets. ince an modification (F/11) line was not originally established, the ir Force will use its reprogramming flexibility to realign funds between production (F/10) and F/11 to support fleet modifications resulting from s. his required action will maintain fleet configuration commonality. FY 2005 rogram ustification -1 hopping ist Item o. 16 udget Item ustification xhibit -40, page 1 of 4 IFID 4-35

38 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature -8 (oint tars) anufacturer's ame/lant ity/tate ocation orthrop rumman orporation elbourne ystems Division elbourne, F Weapon ystem Ident ost lements ode ubline Item Qty irframe vionics onnectivity F (including / storage/demods) ngineering hange rders () onrecurring osts ther osts FYWY vionics eculiar raining quipment ublications/echnical Data gm gmt dmin () I (FY00 only) ther ess: rior Yr dv rocurement lus: urrent Yr dv rocurement et -1 otal omments otal ost in illions of Dollars FY 2003 FY 2004 FY 2005 otal otal nit ost ost Qty nit ost ost Qty nit ost otal ost -1 hopping ist Item o. 16 Weapon ystem ost nalysis xhibit -5, page 2 of 4 IFID 4-36

39 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 16 Weapon ystem -8 W ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod ontract ype ontractor and ocation -1 ine Item omenclature -8 (oint tars) ward Date Date of First Delivery pecs vailable ow? Date evision vailable? emarks. Weapon ystem FY /K FI. rumm/elbourne ar-02 ar-05 Yes upport FY03 / W/ F. rumm/elbourne ov-02 ar-05 Yes -1 hopping ist Item o. 16 rocurement History and lanning xhibit -5, page 3 of 4 IFID 4-37

40 IFID xhibit -21, roduction chedule Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 16 Y. QY. I 1 0 D F ine Item omenclature -8 (oint tars) FI Y 1 FI Y 2 0 D Y 1 D Y 2 D F D F Y Y 1992 F F F F F F F F F F F DI D I I HIF H DI D I I/F' I DY X orthrop rumman elbourne, Florida I 1 F 1 K D F Y F I D F F 1 III D Y -1 hopping ist Item o. 16 roduction chedule xhibit -21, page 4 of 4 IFID 4-38

41 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature High ltitude ndurance - rogram lement for ode Items: / ther elated rogram lements: ID ode rior Years FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 o omp otal roc Qty ost ($ ) D D dvance roc ost ($ ) D D Weapon ystem ost ($ ) D D Initial pares ($ ) otal roc ost ($ ) D D Flyaway nit ost ($ ) D D Wpn ys nit ost ($ ) D D Description he lobal Hawk ystem consists of the Q-4 nmanned erial ehicle (), the /Q-131 round egment (), and the support system. he aircraft is a fully autonomous, high altitude, long endurance unmanned aircraft designed as an Intelligence, urveillance and econnaissance (I) platform. he Q-4 is an imagery intelligence-collecting designed to carry 2,000 pounds of payload. Its payload includes an Integrated ensor uite (I) which contains ynthetic perture adar () with round oving arget Indicator (I) capability, along with an lectro-ptical ()/Infrared (I) camera. he Q-4 will be a multi-intelligence collecting with a payload capacity of 3,000 pounds. Its payload includes an I as well as a signals intelligence (II) payload providing both high-band and low-band II coverage. he consists of the ission ontrol lement () and the aunch and ecovery lement (). he lobal Hawk ystem will provide continuous, all-weather, day/night, wide area I and includes the interfaces with other theater systems required to support joint tactical warfighters at various levels of command. It is designed to provide up to 40,000 sq. nmi. of search radar imagery and or I imagery per mission. lobal Hawk is designed as a standoff imagery platform with the capability to operate in low-to-moderate air defense threat environments, and collect imagery while looking line of sight into high threat areas. It will collect intelligence for theater commanders' taskings, many of which currently go unmet due to lack of available assets. Initial spares for the lobal Hawk rogram are included in the weapon system cost line. he lobal Hawk rogram will not separately budget for initial spares. he program includes initial spares and support equipment in our production contracts as part of the eformed upply upport rogram (). hroughout the FYD, the program will continue spiral development to enhance the system to meet perational equirements Document (D) performance and capabilities. During this time, the user will determine the optimal payload configuration for each aircraft based on current operational requirements. o accommodate the concurrent development and production strategy, one of the aircraft procured in FY04 will initially be used for flight characterization test activity of the Q-4 configuration. In addition, two of the aircraft procured in FY05 may possibly be used initially for advanced payloads testing. he lobal Hawk rogram awarded a logistics support contract to fund Interim ontractor upport (I) in FY03. I will continue to be funded annually with ircraft rocurement, ir Force(F) funds through FY06. he lobal Hawk rogram received $18.3 in F from the FY03 upplemental 'Iraqi Freedom Fund' appropriation. hese funds were used to deploy aircraft to the Iraqi -1 hopping ist Item o. 17 udget Item ustification xhibit -40, page 1 of 19 IFID 4-39

42 IFID xhibit -40, udget Item ustification Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o ine Item omenclature High ltitude ndurance - Description ontinued theater, support equipment damaged in the war, and procure new capabilities that support lessons learned in the engagement. he funds modify aircraft with secure communications links, integrated air pictures, the International aritime atellite (I), etc to allow theater commanders to more fully realize the emerging concept of operations with the lobal Hawk. Funding supports replacement of prototype lobal Hawk support equipment including spares deployed in support of peration Iraqi Freedom (IF). In addition, the funding finances production line delays caused by the deployment of support and test equipment for the deployed in support of IF. In FY03 and FY04 lobal Hawk procurement funding is shown in F. In FY05 and out it is shown in F. FY 2005 rogram ustification In FY05, lobal Hawk procurement funding will procure four Q-4 aircraft and one (with advance procurement in FY04 and delivery starting in FY06). -1 hopping ist Item o. 17 udget Item ustification xhibit -40, page 2 of 19 IFID 4-40

43 IFID xhibit -5, Weapon ystem ost nalysis Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 17 anufacturer's ame/lant ity/tate ocation yan eronautical enter, almdale, Weapon ystem ost lements Ident ode ubline Item -1 ine Item omenclature High ltitude ndurance - otal ost in illions of Dollars FY 2003 FY 2004 FY 2005 otal otal nit ost ost Qty nit ost ost Qty nit ost Qty rocurement of 3 air vehicles and rocurement of 4 air vehicles and rocurement of 4 air vehicles and rocurement of 6 air vehicles and 1 rocurement of 7 air vehicles and 2 rocurement of 7 air vehicles and 2 rocurement of 6 air vehicles and 2 dv rocurement - redit dv rocurement - Debit omments n additional aircraft was added in both FY02 and FY03, from the FY02 upplemental and the FY03 ppropriations ct (transferred from DF). otal ost -1 hopping ist Item o. 17 Weapon ystem ost nalysis xhibit -5, page 3 of 19 IFID 4-41

44 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 17 Weapon ystem H W ost lements Qty nit ost ocation of F Issue Date ubline Item ontract ethod ontract ype ontractor and ocation -1 ine Item omenclature High ltitude ndurance - ward Date Date of First Delivery pecs vailable ow? Date evision vailable? FY2001 ong lead for 2 lobal /K FI orthrop rumman, un-01 / Yes Hawks (FY02) ancho ernardo, ong lead for 1 /K FI orthrop rumman, un-01 / Yes (FY02) ancho ernardo, FY2002 lobal Hawk 3 /K FI orthrop rumman, an-02 ep-03 Yes ancho ernardo, 1 /K FI orthrop rumman, ancho ernardo an-02 ug-03 Yes ong lead for 3 lobal /K FI orthrop rumman, ul-02 / o / Hawks (FY03) ancho ernardo, ong lead for 1 /K FI orthrop rumman, ul-02 / o / (FY03) ancho ernardo, FY2003 lobal Hawk 3 /K FI orthrop rumman, an-03 ep-04 o / ancho ernardo, 1 /K FI orthrop rumman, an-03 ay-04 o / ancho ernardo, ong lead for 4 lobal /K FI orthrop rumman, un-03 / o / Hawks (FY04) ancho ernardo, ong lead for 1 /K FI orthrop rumman, un-03 / o / (FY04) ancho ernardo, ong lead for 1 /K FI orthrop rumman, un-03 / o / (FY04) ancho ernardo, FY2004 lobal Hawk 4 /K FI orthrop rumman, ar-04 ov-05 o ancho ernardo, 1 /K FI orthrop rumman, ar-04 ov-05 o -1 hopping ist Item o. 17 rocurement History and lanning xhibit -5, page 4 of 19 IFID 4-42

45 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 17 Weapon ystem H ocation of F Issue Date ubline Item ontract ethod ontract ype W ost lements Qty nit ost ontractor and ocation ancho ernardo, 1 /K FI orthrop rumman, ancho ernardo, -1 ine Item omenclature High ltitude ndurance - ward Date Date of First Delivery ar-04 ep-05 o ong lead for 4 lobal /K FI orthrop rumman, ay-04 / o Hawks (FY05) ancho ernardo, ong lead for 1 /K FI orthrop rumman, ay-04 / o (FY05) ancho ernardo, ong lead for 1 /K FI orthrop rumman, ay-04 / o (FY05) ancho ernardo, FY2005 lobal Hawk 4 /K FI orthrop rumman, ov-04 ep-06 o ancho ernardo, 1 /K FI orthrop rumman, ov-04 ep-06 o ancho ernardo, 1 /K FI orthrop rumman, ov-04 ep-06 o ancho ernardo, ong lead for 6 lobal /K FI orthrop rumman, ar-05 / o Hawks (FY06) ancho ernardo, ong lead for 1 /K FI orthrop rumman, ar-05 / o (FY06) ancho ernardo, ong lead for 1 /K FI orthrop rumman, ar-05 / o (FY06) ancho ernardo, FY 2006 lobal Hawk 6 /K FI orthrop rumman, ov-05 ul-07 o ancho ernardo, 1 /K FI orthrop rumman, ov-05 Dec-06 o ancho ernardo, 1 /K FI orthrop rumman, ov-05 Dec-06 o ancho ernardo, ong lead for 7 lobal /K FI orthrop rumman, ar-06 / o pecs vailable ow? Date evision vailable? -1 hopping ist Item o. 17 rocurement History and lanning xhibit -5, page 5 of 19 IFID 4-43

46 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 17 Weapon ystem H ocation of F Issue Date ubline Item ontract ethod ontract ype W ost lements Qty nit ost ontractor and ocation Hawks (FY07) ancho ernardo, ong lead for 2 s /K FI orthrop rumman, (FY07) ancho ernardo, ong lead for 2 s /K FI orthrop rumman, (FY07) ancho rumman, FY2007 lobal Hawk 7 /K D orthrop rumman, ancho ernardo, -1 ine Item omenclature High ltitude ndurance - ward Date Date of First Delivery ar-06 / o ar-06 / o ov-06 ul-08 o 2 /K D orthrop rumman, ov-06 Dec-07 o ancho ernardo, 2 /K D orthrop rumman, ov-06 Dec-07 o ancho ernardo, ong lead for 7 lobal /K D orthrop rumman, ar-07 / o Hawks(FY08) ancho ernardo, ong lead for 2 s /K D orthrop rumman, ar-07 / o (FY08) ancho ernardo, ong lead for 2 s /K D orthrop rumman, ar-07 / o (FY08) ancho ernardo, FY2008 lobal Hawk 7 /K D orthrop rumman, ov-07 ug-09 o ancho ernardo, 2 /K D orthrop rumman, ov-07 an-09 o ancho ernardo, 2 /K D orthrop rumman, ov-07 an-09 o ancho ernardo, ong lead for 6 lobal /K D orthrop rumman, ar-08 / o Hawks (FY09) ancho ernardo, ong lead for 2 s /K D orthrop rumman, ar-08 / o (FY09) ancho ernardo, ong lead for 2 s /K D orthrup rumman, ar-08 / o pecs vailable ow? Date evision vailable? -1 hopping ist Item o. 17 rocurement History and lanning xhibit -5, page 6 of 19 IFID 4-44

47 IFID xhibit -5, rocurement History and lanning Date: February 2004 ppropriation (reasury) ode////item ontrol umber ircraft rocurement, ir Force, udget ctivity 04, ther ircraft, Item o. 17 Weapon ystem H ocation of F Issue Date ubline Item ontract ethod ontract ype W ost lements Qty nit ost ontractor and ocation (FY09) ancho ernardo, FY2009 lobal Hawk 6 /K D orthrop rumman, ancho ernardo, 2 /K D orthrop rumman, ancho ernardo, 2 /K D orthrop rumman, ancho ernardo, ong lead for 6 lobal /K D orthrop rumman, Hawks (FY10) ancho ernardo, -1 ine Item omenclature High ltitude ndurance - ward Date Date of First Delivery ov-08 ct-10 o ov-08 an-10 o ov-08 an-10 o ar-09 / o pecs vailable ow? Date evision vailable? emarks otal lead time for aircraft and ground stations is 25 months from advance procurement contract award; 6-8 months for long lead of air vehicles or ground station component, months for long lead of payloads components, and months for fabrication and assembly (estimate). n additional aircraft was added in both FY02 and FY03, from the FY02 upplemental ppropriations ct and the FY03 ppropriations ct (ransferred from DF). -1 hopping ist Item o. 17 rocurement History and lanning xhibit -5, page 7 of 19 IFID 4-45

UNCLASSIFIED. Program Element for Code B Items N/A Other Related Program Elements F (RDT&E AF) FY 2012 OCO

UNCLASSIFIED. Program Element for Code B Items N/A Other Related Program Elements F (RDT&E AF) FY 2012 OCO II xhibit -40, udget Item ustification ate: ebruary 2011 ppropriation (reasury) ode////item ontrol umber issile rocurement, ir orce, udget ctivity 05, ther upport, Item o. 23-1 ine Item omenclature volved

More information

Missile Defense Agency. THAAD Procurement

Missile Defense Agency. THAAD Procurement issile efense gency H rocurement , -WI issile efense gency rogram verview ($ in illions) 2010 stimate: 419.004 2011 stimate: 858.870 2012 stimate: 833.150 he erminal High ltitude rea efense (H) is an element

More information

P-1 Item Nomenclature:

P-1 Item Nomenclature: xhibit -40, udget Item ustification heet ppropriation / udget ctivity/erial o: rocurement, arine orps (1109) / 02 Weapons and ombat ehicles /2212 rogram lements: ode: 0206211 () / 0502511 ivisions () -1

More information

Committee Staff Procurement Backup Book FY 2009 Budget Estimates. February 2008 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB

Committee Staff Procurement Backup Book FY 2009 Budget Estimates. February 2008 AIRCRAFT PROCUREMENT, AIR FORCE VOLUME I OPR: SAF/FMB ommittee taff rocurement ackup ook 2009 udget stimates ebruary 2008 I, I I : / II olume 1 2009 udget stimates I, I (3010) I 1 ~ II 3 I 2 ~ /IZI/ 7 I 3 ~ 2009 rocurement rogram, 3010 ircraft, xhibit -1

More information

BUDGET ITEM JUSTIFICATION SHEET. WEAPONS PROCUREMENT, NAVY/ BA 2 - Other Missiles CLASSIFICATION: UNCLASSIFIED. DATE: P-40 February 2011

BUDGET ITEM JUSTIFICATION SHEET. WEAPONS PROCUREMENT, NAVY/ BA 2 - Other Missiles CLASSIFICATION: UNCLASSIFIED. DATE: P-40 February 2011 III: II I III H : -40 ebruary 2011 II/ II -1 I W, / 2 - ther issiles rogram lement for ode Items: ther elated rogram lements 210100, HWK rior I ase otal o ears ode 2010 2011 2012 2012 2012 2013 2014 2015

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY H rocurement rograms ommittee taff rocurement ackup ook 2001 udget stimate II, ebruary 2000 II Index for II, lin omenclature ilename age umber -1 XHII 1-1 1, 5.56, 00700 40132159.01 1 3, 7.62, 02000 40612159.01

More information

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2005 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2004 WEAPONS PROCUREMENT, NAVY

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2005 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2004 WEAPONS PROCUREMENT, NAVY H I () 2005 I III I 2004 W, II epartment of the avy 2005 rocurement rogram xhibit -1 : ebruary 2004 ($ I II) ppropriation: Weapons rocurement, avy II 03 04 05 -------- ----- ----- ----- 1. allistic issiles

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY DTT F TH Y rocurement rograms ommittee Staff rocurement Backup Book FY 2001 Budget stimate IFT T, Y February 2000 ITI Index for IFT T, Y Blin omenclature SS Filename age umber -1 XHIBIT 1-1 -1 XHIBIT 1-1

More information

Procurement, Marine Corps (1109) / Communications and Electronics Equipment (4)

Procurement, Marine Corps (1109) / Communications and Electronics Equipment (4) xhibit -40, udget Item ustification heet ate: ebruary 2006 ppropriation / udget ctivity/erial o: -1 Item omenclature: rocurement, arine orps (1109) / ommunications and lectronics quipment (4) II I rogram

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY H rocurement rograms ommittee taff rocurement ackup ook 2001 udget stimate H, III 3/4, H QI III ebruary 2000 II Index for H, - ctivities 3 & 4 lin omenclature ilename age umber -1 XHII 1-1 114 K H:Z 56

More information

P-1 Item Nomenclature: Other Related Program Elements: A Base FY 2012 OCO FY Reserves

P-1 Item Nomenclature: Other Related Program Elements: A Base FY 2012 OCO FY Reserves xhibit -40, udget Item ustification heet ppropriation / udget ctivity / erial o: rocurement, arine orps (1109) / 06 ngineer and ther quipment / 6520 rogram lements: 0206211 ivisions (arine) ode: 0206315

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0604261F PE TITLE: Personnel Recovery Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

More information

DOT&E s Targets Overview. Dennis Mischel (Josh Messner) DOT&E - Targets

DOT&E s Targets Overview. Dennis Mischel (Josh Messner) DOT&E - Targets D&E s argets verview Dennis Mischel (Josh Messner) D&E - argets arget rogram Status - hreat Realism - rocurement - ther Submerged Seaborne Ballistic Missile Scoring Anti Radiation Missile Rotary Information

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 2.885

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Preparation (MTPS) Total FY 2014 FY 2015 FY 2016

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 13.134 13.87 13.942-13.942 13.82 14.48 14.827

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 10 R-1 Line Item #116 To Complete

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Army Joint STARS (TIARA) 5316 25676 17898 17713 12833 14372 11527 Continuing Continuing A. Mission Description and Justification: The

More information

AMRDEC. Core Technical Competencies (CTC)

AMRDEC. Core Technical Competencies (CTC) AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 242.669 68.656 70.614 82.195-82.195

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 FOR IMMEDIATE RELEASE No. 01-153 June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 Today, the Army announced details of its budget for Fiscal Year 2002, which runs from October 1, 2001 through September 30,

More information

DISTRIBUTION STATEMENT A

DISTRIBUTION STATEMENT A IFPC Inc 2-I DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 31 IFPC Inc 2-I Mission Mission: Primary Indirect Fire Protection Capability Increment 2 Intercept (IFPC Inc

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justif ication Exhibit R-2 0603460A Joint A ir-to-ground Missile (JAGM) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to JOINT AIR-TO-GROUND

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Mission Planning System Increment 5 (MPS Inc 5) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of Contents Common

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305192N - JOINT MILITARY INTELLIGENCE PROGRAM Prior

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 1.604 1.584 1.536-1.536 1.626

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

Data Collection & Field Exercises: Lessons from History. John McCarthy

Data Collection & Field Exercises: Lessons from History. John McCarthy Data Collection & Field Exercises: Lessons from History John McCarthy jmccarthy@aberdeen.srs.com Testing and Training Objectives Testing Training Prepare for Combat Understand Critical Issues Analyst/Evaluator

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 41318F PE TITLE: CV-22 Exhibit R-2, RDT&E Budget Item Justification February 28 5 System Development and Demonstration (SDD) 41318F CV-22 ($ in Millions) 413 Total Program Element (PE) CV-22

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016 Presented to: SPACE AND MISSILE DEFENSE WORKING GROUP WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0401318F PE TITLE: CV-22 Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 05 System Development and Demonstration (SDD) 0401318F CV-22 Cost ($ in Millions) FY

More information

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force KC-46A Tanker DoD Budget FY2013-FY2017 RDT&E U.S. Air Force Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 FY 2013 FY 2013 FY 2013 Cost To COST ($ in Millions) FY 2011

More information

U.S. Air Force Electronic Systems Center

U.S. Air Force Electronic Systems Center U.S. Air Force Electronic Systems Center A Leader in Command and Control Systems By Kevin Gilmartin Electronic Systems Center The Electronic Systems Center (ESC) is a world leader in developing and fielding

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 13 P-1 Line #25

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 13 P-1 Line #25 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Army Page 1 of 14 R-1 Line #167 To Program Element - 52.811 20.733

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0101113F PE TITLE: B-52 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0101113F B-52 SQUADRONS ($ in Millions) FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 4.208 2.245 5.830 0.000 5.830 17.932 35.734

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY Quantity of RDT&E Articles COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 Program Element (PE) No. and Name: 0604218N Air/Ocean

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total Program Element 0.912 2.292 2.095-2.095 3.633 4.555 - - Continuing Continuing 671325: HH-60G

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

AUSA BACKGROUND BRIEF

AUSA BACKGROUND BRIEF AUSA BACKGROUND BRIEF No. 46 January 1993 FORCE PROJECTION ARMY COMMAND AND CONTROL C2) Recently, the AUSA Institute of Land Watfare staff was briefed on the Army's command and control modernization plans.

More information

Regular Air Force Selective Retention Bonus Listing Effective: 1 Oct 2018 Total: 115

Regular Air Force Selective Retention Bonus Listing Effective: 1 Oct 2018 Total: 115 Regular ir Force Selective Retention onus Listing ffective: 1 Oct 2018 Total: 115 IR FOR SPILTY OD 10X1 SKILL LVL OR HIF NLISTD MNGR OD (5, 7, 9, or In-Flight Refueling 3 3 2 3 1000) 11X1 (3, 5, 7) Flight

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160404BB Special Operations (SO) Tactical

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 0.051-3.926-3.926 4.036 4.155 4.236 4.316 Continuing Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification February 2004 PE NUMBER: 11122F PE TITLE: AIR LAUNCHED CRUISE Exhibit R-2, RDT&E Budget Item Justification Cost ($ in Millions) 4797 Total Program Element (PE) Cost Flight Testing & Navigation 23 Actual 19.4 24 25 26

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information