PARTNERING GUIDELINES MANUAL FOR ALBERTA TRANSPORTATION PROJECTS

Size: px
Start display at page:

Download "PARTNERING GUIDELINES MANUAL FOR ALBERTA TRANSPORTATION PROJECTS"

Transcription

1 PARTNERING GUIDELINES MANUAL FOR ALBERTA TRANSPORTATION PROJECTS OCTOBER 2016

2 Partnering Guidelines Manual for Alberta Transportation Projects PARTNERING GUIDELINES MANUAL A GUIDE TO PARTNERING ON ALBERTA TRANSPORTATION PROJECTS This Partnering Guidelines Manual is written for Alberta Transportation (AT), Consulting Engineers of Alberta (CEA) members, and Alberta Roadbuilders & Heavy Construction Association (ARHCA) members working at the project level to convey AT, CEA, and ARHCA s commitment to working in a collaborative environment, and to provide information on completing AT projects using a construction partnering approach. A Partnering Toolkit that includes detailed information for the AT Project Sponsor, the AT Project Administrator, the Consultant, and the Contractor is also available to assist in administering and applying the construction partnering approach at the project level. This manual is available online in PDF format at COPYRIGHT, October 2016 The Crown in right of the Province of Alberta, as represented by the Minister of Alberta Transportation. Holders of this document in hard copy and/or electronic format are hereby given permission to reproduce all or a portion of this document without modifications. Executive Director, Project Delivery Branch Alberta Transportation ii

3 Partnering Guidelines Manual for Alberta Transportation Projects TABLE OF CONTENTS CONSTRUCTION PARTNERING WHAT IS IT AND WHY SHOULD I DO IT?... 1 WHAT IS PARTNERING?... 1 PARTNERING VALUES AND ATTRIBUTES... 2 HISTORY OF CONSTRUCTION PARTNERING IN NORTH AMERICA... 3 THE BENEFITS OF PARTNERING... 3 CONSTRUCTION INDUSTRY INSTITUTE (CII) RESEARCH... 3 JOURNAL OF MANAGEMENT IN ENGINEERING RESEARCH... 5 CALTRANS PARTNERING PROGRAM & ARBITRATION TRENDS... 5 BENEFITS OF PRE-CONSTRUCTION PARTNERING ON AT PROJECTS... 6 PARTNERING AT S WAY OF DOING BUSINESS... 8 COLLABORATION BETWEEN AT, CEA AND ARHCA... 8 STRATEGIC PRIORITIES GROUP (SPG)... 8 TRI-PARTY OPERATIONS COMMITTEE (OPS COMMITTEE)... 8 ANNUAL TRI-PARTY TRANSPORTATION CONFERENCE... 8 ABOUT THE PARTNERS... 9 ALBERTA TRANSPORTATION (AT)... 9 THE CONSULTING ENGINEERS OF ALBERTA (CEA)... 9 THE ALBERTA ROADBUILDERS & HEAVY CONSTRUCTION ASSOCIATION (ARHCA)... 9 TYPES OF PARTNERING PUBLIC PARTNERING STRATEGIC PARTNERING CONSTRUCTION PROJECT PARTNERING AT S PARTNERING PROGRAM THE 3 LEVELS OF PARTNERING ON AT PROJECTS THE PARTNERING PROCESS FOR AT CONSTRUCTION PROJECTS THE AT PROJECT RISK INDICATOR (PRI) RISK EVALUATION CATEGORIES AND SCORING POINT RANGES ASSIGNING THE LEVEL OF PARTNERING TEAM PARTNERING DISCUSSION LEVELS 1 & DEVELOPMENT OF PROJECT SCORECARDS LEVEL FORMAL PARTNERING SESSIONS LEVEL KEYS TO EFFECTIVE PARTNERING DETERMINING WORKSHOP PARTICIPANTS RESOLVING ISSUES THE ISSUE RESOLUTION LADDER THE ISSUE RESOLUTION PROCESS ISSUE RESOLUTION GROUND RULES CELEBRATIONS OF SUCCESS MONITORING THE PARTNERING RELATIONSHIP TOOLS TO ASSIST IN MAKING PARTNERING A SUCCESS REGULAR MEETINGS iii

4 Partnering Guidelines Manual for Alberta Transportation Projects COMMUNICATION FAIRNESS AND GOOD FAITH SEPARATING PEOPLE FROM THE PROBLEM FOLLOW-UP PARTNERING SESSION(S) TEAM BUILDING ACTIVITIES APPENDICES APPENDIX A: AT PROJECT RISK INDICATOR APPENDIX B: TEAM PARTNERING DISCUSSION AGENDA DETAILS APPENDIX C: TYPICAL PROJECT & PARTNERING SUCCESS GOAL STATEMENTS APPENDIX D: SAMPLE PROJECT SCORECARD SCREEN SHOT APPENDIX E: SAMPLE PROJECT SCORECARD REPORT PAGE APPENDIX F: PARTNERING TOOLKIT REFERENCES AND SOURCES This Partnering Guidelines Manual is intended to be a guideline manual, and is not intended to replace or supersede any legal documents including, but not limited, to contracts, specifications, and/or other construction documents. iv

5 CHAPTER 1 CONSTRUCTION PARTNERING WHAT IS IT AND WHY SHOULD I DO IT? WHAT IS PARTNERING? Three-fourths of the miseries and misunderstandings in the world will disappear if we step into the shoes of our adversaries and understand their view point. ~Gandhi Partnering is a commitment to a collaborative approach to construction rather than an adversarial approach. It is a way of conducting business in which two or more organizations make long-term commitments to achieve mutual goals. This requires team-based relationships with open communication among the participants based on trust, understanding, and teamwork. Partnering is a relationship in which: Trust and open communications are encouraged and expected from all participants. All parties address and resolve issues and problems promptly and at the lowest possible level. They strive to develop solutions that are agreeable and meet the needs of everyone involved (a winwin-win approach). All parties agree on mutually common goals for the partnering relationship, and at the same time are aware of and respect each others individual goals and values. Partners seek input from each other in an effort to find better solutions to issues and problems as they arise. This creates synergy in the relationship that fosters cooperation and improves the productivity of the partnering relationship. Partnering is not to be construed as a legal partnership with the associated joint liabilities. Partnering does not replace or supersede any legal documents including, but not limited, to contracts, specifications, and/or other construction documents. Who Wins Here? The resident engineer watched with arms folded as the contractor s crew began a complicated concrete pour. He shook his head and said, They ll never make their schedule with that equipment. The bucket is too small and they ll need another crane they ll spend all their time filling buckets instead of pouring concrete. He turned and walked back to the management office, mentally preparing to deny the request for a time extension that he knew would be coming. Why didn t he let the contractor s project manager know of his concerns? That s their responsibility. They ll find out soon enough! ~U.S. Army Corps of Engineers Pamphlet 91 ADR P 4 October 2016 Partnering Guidelines Manual for AT Projects 1

6 PARTNERING VALUES AND ATTRIBUTES Following is a list of partnering values and attributes that are important in a collaborative working environment: Open and honest communication Trust Respect Common Goals Fairness Cooperation Teamwork Joint problem solving Rapid issue resolution at the lowest possible level, using an Issue Resolution Ladder developed by the team The project team and the project greatly benefitted from the partnering workshops Alberta Transportation (AT) developed a new design-build (DB) project delivery framework to deliver a systems interchange at Anthony Henday Drive and Stony Plain Road/100 Avenue in Edmonton. The project team worked closely in partnership with the construction and consulting industry, carried out problem solving, and made improvements as a result of feedback received from the partners. The DB procurement process generated a lot of interest from the construction and consulting industry. The DB contract was awarded in March 2009 and the project was completed in November 2011, one year earlier than conventional delivery, and at a cost savings of more than $80m (compared to traditional design-bid-build delivery). Partnership workshops were held throughout the course of the project. The project team and the project greatly benefitted from those workshops. As a commitment to partnering, the project team worked together in a spirit of trust, respect, fairness and cooperation, which helped in successfully achieving the project goals. Aamer Shakoor, P. Eng. Urban Construction Engineer - Edmonton Major Capital Projects Branch Alberta Transportation Government of Alberta October 2016 Partnering Guidelines Manual for AT Projects 2

7 HISTORY OF CONSTRUCTION PARTNERING IN NORTH AMERICA Construction partnering is not a new concept. In 1987, largely in response to increasing litigation in the construction industry in the United States, the Construction Industry Institute (CII) established a task force on partnering to evaluate the feasibility of applying partnering to construction projects. After researching nearly 300 projects that used a partnering approach, the CII confirmed significant benefits to using the collaborative team approach (see CII Research results on next page.) The U.S. Army Corps of Engineers embraced the construction partnering concept on its projects, and in 1990 said Clearly, the best dispute resolution is dispute prevention By taking the time at the start of a project to identify common goals, common interests, lines of communication, and a commitment to cooperative problem solving, we encourage the will to resolve disputes and achieve project goals. In 1991, the Associated General Contractors of America (AGC) endorsed the Corps of Engineers concept of partnering, and in 1993 created the Marvin M. Black Excellence in Partnering Awards for construction projects that epitomized the principles of partnering. Formal construction partnering came to Canada in 1995 when the Department of National Defence and Defence Construction Canada adopted partnering in the delivery of the Department s facilities infrastructure program. The concept has spread across Canada, and is gaining acceptance as project owners, designers, engineers, architects and contractors come to understand the benefits to all parties of applying the principles of construction partnering. THE BENEFITS OF PARTNERING Much research has been conducted on the benefits of completing construction projects using a collaborative partnering approach. The following pages highlight some of the partnering research findings. CONSTRUCTION INDUSTRY INSTITUTE (CII) RESEARCH A Construction Industry Institute (CII) research team (November 1996) researched nearly 300 projects that were completed using the partnering approach, and found significant benefits: Area COST Total Project Cost (TPC) Construction administration Marketing Engineering Value Engineering Claims (% of TPC) Profitability Results 10% reduction 24% reduction 50% reduction $10/hour reduction 337% increase 87% reduction 25% increase Area SAFETY Hours without lost time accident Lost work days Number of cases requiring medical attention Safety rating Results 4 million vs. 48,000 industry standard 0 vs. 6.8% industry standard 74% reduction 5% of national average October 2016 Partnering Guidelines Manual for AT Projects 3

8 Overall project Schedule changes Schedule compliance SCHEDULE Area Results 20% reduction 48% reduction Increased from 85% to 100% Area Number of claims Projects with claims CLAIMS Claims costs as a % of total project costs Results 83% reduction 68% reduction 87% reduction Rework Change orders Direct work rate QUALITY Area Results 50% reduction 80% reduction 42% increase Area Personal job satisfaction OTHER Projects were less adversarial Improved resource planning Increased openness on projects Increased trust on projects Fewer errors Improved quality Engineering cost reduction Improved communication and teamwork Results 30% increase 85% of respondents 85% of respondents 82% of respondents 78% of respondents 82% of respondents 96% of respondents 10% of respondents 82% of respondents The CII research identified that partnering will significantly benefit owners, contractors, engineers, architects, designers, and other participant parties in the following areas: 1. Improved Ability to Respond to Changing Business Conditions 2. Improved Quality and Safety 3. Reduced Cost, Schedule and Improved Profit (Value) 4. More Effective Utilization of Resources As a result of the strong partnering environment, the barrier system was completed significantly under budget and schedule. When each party comes together with a sincere commitment to partnering, it has a real powerful impact on the project - either turning a good project into a fantastic one, or a train wreck of a project into something salvageable. One of the best examples of partnering for me was the construction of the cable barrier on Highway 2 between Red Deer and Calgary. This was the largest contract of its size in North America and we required all of the work to be done at night, which introduced a real challenge for the contractor. The strongest asset to the project was the strong spirit of partnering from beginning to end, which helped the team tap into a number of innovative ideas which were incorporated in the project. As a result of the strong partnering environment, the barrier system was completed significantly under budget and schedule. Mike Damberger, P.Eng Executive Director Project Delivery Branch Alberta Transportation Government of Alberta October 2016 Partnering Guidelines Manual for AT Projects 4

9 JOURNAL OF MANAGEMENT IN ENGINEERING RESEARCH In 1995, Dr. Erik Larson, Professor of Project Management at Oregon State University, researched 280 construction projects. The study compared the effectiveness of controlling costs, schedule, technical performance, customer satisfaction, avoiding litigation, and project team satisfaction rates under four different approaches to managing the owner-contractor relationship: adversarial, guarded adversarial, informal partnering, and formal partnering. Dr. Larson s findings showed that formally partnered construction projects produced superior results to all of the other approaches in every researched category. The success of formal partnering was found in projects regardless of whether the contract was awarded on a low-bid or nonlow-bid (i.e. negotiated) basis. CALTRANS PARTNERING PROGRAM & ARBITRATION TRENDS The California Department of Transportation* (Caltrans) has been partnering on its construction projects since before In 2006, Caltrans re-established their Caltrans Construction Partnering Steering Committee (CCPSC), and began developing a more robust Partnering Program to help make their construction partnering more effective. October 2016 Partnering Guidelines Manual for AT Projects 5

10 Caltrans found that since 2006, even though contractors were bidding extremely aggressively on their projects (due to an extreme recession), Caltrans annual Arbitration totals have trended downward since the reinvigoration of their Partnering Program. Mark Leja, Caltrans Construction Division Chief, also stated that thousands of projects have been delivered by our twelve districts on budget and on time in spite of incredible challenges. The vast majority of those jobs did not apply for awards, but Partnering helps our project teams enjoy the work more and successfully deliver some REALLY tough projects. Source: *Partnering Pioneers, Partnering Magazine, May/June 2014, pp 10-13, International Partnering Institute (IPI), ( BENEFITS OF PRE-CONSTRUCTION PARTNERING ON AT PROJECTS Over 600 AT, CEA members and ARHCA members have participated in formal Pre-Construction Partnering Sessions on 34 projects since Following is a summary of the Partnering Session participants ratings of the effectiveness of these partnering sessions. EVALUATION STATEMENT SESSION RATING % SESSION RATING AVERAGE 1. The project will benefit from this partnering session 90.2% 4.51 / 5 2. My organization will benefit from this partnering session 87.1% 4.36 / 5 3. I benefitted from this partnering session 87.3% 4.37 / 5 4. The partnering session, overall, was 90.0% 4.50 / 5 October 2016 Partnering Guidelines Manual for AT Projects 6

11 A critical component to deliver a project on time and on budget A critical component to deliver a project on time and on budget is partnering. What is partnering and why is this critical? Partnering is a commitment to working together in a team environment in a trusting and open manner in order to get contractual work done effectively. Partnering is important because it focuses on achieving the shared goals of the team, and shares risks of the participants; therefore, it avoids or minimizes the number of contract claims. The team depends on its members for success. The project in which I was involved and partnering helped the most, was the Highway 4 realignment project at Milk River. This multi-year project included 12 kilometres of new fourlane roadway, relocation of the Canadian Pacific Railway line, two new highway bridges, and one new rail bridge over the Milk River. Many issues were faced by the delivery team, including utilities relocations, an archeological dig, environmental sensitivity of Milk River, Species at Risk, and service roads. There were multiple stakeholders on this project, including CPR, the Town of Milk River, the County of Warner, the local businesses, and the community. Partnering was vital to the success of the project, to bring it in on time and on budget. The team used the partnering charter to achieve the established goals in an open, honest, trustworthy, and respectful work environment. I can t even imagine to think what would have happened if the partnering approach was not used on this project. Nino De Laurentiis, P.Eng. Construction Manager Project Delivery Branch Alberta Transportation Government of Alberta October 2016 Partnering Guidelines Manual for AT Projects 7

12 CHAPTER 2 PARTNERING AT S WAY OF DOING BUSINESS COLLABORATION BETWEEN AT, CEA AND ARHCA I don t like that man. I must get to know him better. ~Abraham Lincoln AT, CEA, and ARHCA have practiced construction partnering on select projects since The collaborative approach between AT, CEA and ARHCA is supported and enhanced through many initiatives, as described below. STRATEGIC PRIORITIES GROUP (SPG) The SPG is comprised of ten members appointed by AT, CEA, and ARHCA. This group develops strategies to develop, review, and accomplish long range objectives and related tasks or actions. One of the SPG s main objectives is to work together to ensure a strong and sustainable industry by promoting an atmosphere of trust, respect, and open communication between the three organizations, and encouraging healthy, long-term relationships. TRI-PARTY OPERATIONS COMMITTEE (OPS COMMITTEE) The Operations Committee consists of up to eleven members appointed by AT, CEA, and ARHCA. This committee addresses technical and operational issues that affect any of the three partners, in the areas of planning, design, construction, and/or rehabilitation of Alberta highways and bridges. The Operations Committee is considered to be a primary body for bringing all issues with all partners to the table. This group receives direction from the SPG; as well, OPS Committee members also bring forward issues for the committee s consideration. ANNUAL TRI-PARTY TRANSPORTATION CONFERENCE An annual Tri-Party Transportation Conference is held each spring. Design, engineering and construction professionals from AT, CEA, and ARHCA attend this two-day event which includes keynote speakers, breakout forums, workshops, and a tradeshow. This large collaborative event is planned by an Organizing Committee with representatives from AT, CEA, and ARHCA, and is hosted and arranged by the CEA. October 2016 Partnering Guidelines Manual for AT Projects 8

13 ABOUT THE PARTNERS Following is information about AT, CEA, and ARHCA s commitments and contributions to a collaborative, partnering environment. ALBERTA TRANSPORTATION (AT) Alberta Transportation strives to provide a safe, innovative, and sustainable world-class transportation system that supports Alberta's economy and quality of life. The department leads the planning, construction, and preservation of our provincial highway network to connect Alberta s communities, and support the province s economic and social growth. As the owner of the infrastructure, AT strives to be a leader in construction partnering activities. THE CONSULTING ENGINEERS OF ALBERTA (CEA) The mission of CEA is CEA promotes a sustainable consulting engineering industry for the benefit of society. We provide exceptional value to our member firms and their clients. CEA is committed to enhancing a collaborative approach between its members, AT and ARHCA. Their initiatives towards a partnering approach include the following: Annual Tri-Party Transportation Conference CEA hosts and makes all arrangements for this major annual collaborative conference. Showcase Awards Gala CEA s annual Showcase Awards Gala recognizes excellence in the engineering sector of the province, including the projects owners and contractors. CEA/AT Annual Mixer CEA hosts this annual event that provides CEA and AT staff the opportunity to meet socially to discuss projects and issues affecting the industry. Transportation Committee CEA s Transportation Committee is focused on strengthening members relationships and addressing issues related to transportation in Alberta, mainly (but not exclusively) with AT. This group works closely with AT, and provides input into CEA s collaborative, partnering focused events. THE ALBERTA ROADBUILDERS & HEAVY CONSTRUCTION ASSOCIATION (ARHCA) The ARHCA is the largest heavy construction association in Canada. ARHCA s members include contractors, suppliers, and consulting engineering firms who work actively in Alberta s transportation industry (and other heavy construction sectors). ARHCA is also committed to fostering a partnering approach between its members, AT, and CEA. ARHCA s initiatives towards a collaborative approach include the following: Annual Convention and Expo ARHCA s annual Convention and Expo is a major industry networking event, including speakers, workshops, industry sector meetings (including Paving & Road Materials), and an industry expo. Paving & Road Materials Committee ARHCA s Paving & Road Materials Committee includes experts who focus on paving and road materials issues that may affect the industry. This committee works closely with AT. October 2016 Partnering Guidelines Manual for AT Projects 9

14 Highway Maintenance Committee ARHCA s Highway Maintenance Committee includes representatives from highway maintenance contractors. This committee also works closely with AT. TYPES OF PARTNERING AT s collaborative approach to partnering includes Public Partnering, Strategic Partnering, Project Partnering, and Highway Operations Partnering. PUBLIC PARTNERING Public partnering includes using a partnering approach to working with other levels of government or related agencies, including municipalities, counties, other provinces, First Nations, and other nongovernmental stakeholders. Public partnering may be used to achieve cooperation among multiple jurisdictions, to coordinate efforts of a variety of organizations, and to ensure mutual understanding and develop synergies when stakeholders share common involvement and/or interests in a project or initiative. STRATEGIC PARTNERING Strategic partnering includes working collaboratively with other stakeholder groups that share a common interest and whose inputs affect each organization. Strategic partnering may include partnering with utility providers, railways, and other industry organizations. Strategic partnering is an effective approach to share information and resources, identify challenges and issues that may be addressed proactively, and maintain ongoing collaborative relationships for the mutual benefit of all of the stakeholder organizations. The previously mentioned Strategic Priorities Group (SPG) and Tri-Party Operations Committee (OPS Committee) are examples of Strategic Partnering. There s no doubt that the partnering session helped contribute to a successful project The partnering session held between CP, AT, and the other project stakeholders for the Queen Elizabeth II & 41 Avenue SW Interchange Project was extremely helpful to start the project off on the right foot. Speaking on behalf of CP, I can say that the session fostered a constructive and professional environment where concerns and thoughts on the project could be shared openly between stakeholders. This positive atmosphere then continued throughout the life of the project. There s no doubt that the partnering session helped contribute to a successful project for all involved. Trevor Lenehan, P.Eng. Project Manager CP October 2016 Partnering Guidelines Manual for AT Projects 10

15 CONSTRUCTION PROJECT PARTNERING Construction project partnering involves developing and maintaining collaborative working relationships with all relevant stakeholders working on a specific project. Project partnering is beneficial on all projects, regardless of the size and delivery method of project delivery, including design-bid-build, design-build, and P3 projects. Construction project partnering is the most common partnering initiative undertaken by AT, CEA, and ARHCA, and is the main focus of this manual. The partnering session allowed you to interact with project team members in a neutral setting I have been involved in a few projects in which partnering was initiated and progressed throughout the project by Alberta Transportation. One thing that really stood out for me is that Alberta Transportation took the initiative to forge better relationships between Consultants, Clients, and Contractors, for a greater good. In all areas of our industry, there are people who are naturally good at partnering and people who aren t. But even taking the first step and saying that I want to partner already begins to break down some of the walls for all personality and industry types. It s like extending out a hand, and the other person can choose to shake it or not, and usually they will. It s a grand gesture. More recently, I was involved in partnering at Wolf Creek Bridge Replacements on Hwy 2 near Morningside. The project involved the removal and replacement of the north and southbound bridges. We attended a partnering session prior to the project beginning, continued doing Project Scorecards and progress reports throughout the project, and reviewing the results at the bi-weekly meetings. In a lot of projects, you get to know people during the project, and the communication strategy is not set up, nor do you have any knowledge of the person outside of this potentially stressful situation. When you first encounter project disagreements, you only see the other person as one dimensional, which makes it easy to be less considerate in your communication. The partnering session allowed you to interact with these people in a neutral setting, and then you get to know them on a more personal level, and realize that they are more than what they do. These people have families, hobbies, friends, and goals. In completing the Project Scorecard surveys and reviewing them at the meetings, the importance of partnering was reinforced throughout the project. Reviewing the Scorecard reports also highlighted issues and allowed them to be discussed openly and initiate a resolution, some of which were resolved right in the meeting. Disagreements and lack of clarity cost money, and the ability to speak openly and honestly between each other provided clarity of the issues, agreement, and timely resolution. The project flowed smoothly, was on budget, on schedule, and the goals of all parties was achieved. For particular individuals, partnering may not be successful; however, if the vast majority of the industry is open to partnering (and I think they are) and projects are better because of it, it s worth it. Laurie McCarron, P.Eng Bridge Engineer Stantec Red Deer AB October 2016 Partnering Guidelines Manual for AT Projects 11

16 HIGHWAY OPERATIONS PARTNERING The maintenance of Alberta s highways is carried out by private contractors. AT oversees all highway operations work to ensure that it meets contract specifications. Highway operations partnering between AT and the private contractors enables each organization to understand each others challenges and concerns, and can lead to improved relationships and more effective and efficient maintenance of Alberta s highways. The successes that both parties have achieved in our Partnering Relationship are a direct result of the level of commitment and hard work we have all dedicated to this important process It is truly great to share this success with Alberta Transportation, our Partners. The successes that both parties have achieved in our Partnering Relationship are a direct result of the level of commitment and hard work that we all have dedicated to this important process. As you know, both parties accepted the challenge to take on the necessary measures to improve our working relationship, and the execution of our work programs. We also recognized that through effective Partnering, we could accomplish those important, mutual goals. Over the last 3 4 years, we have continued to grow as a team, and are now to a point where it is difficult to tell the contractor from the government representative in the meeting room. We have achieved an enviable level of cooperation, and now our challenge is to continue maintaining those higher levels of achievement. I am very proud of our highway maintenance team and the leadership that our management and supervisory groups have given to cultivating our successful relationship with Alberta Transportation, and the accomplishments that have resulted from it. Well Done Everyone!! Kelly McManus President Transportation & Highway Operations LaPrairie Group of Companies Calgary AB October 2016 Partnering Guidelines Manual for AT Projects 12

17 AT S PARTNERING PROGRAM AT s partnering program has evolved since its formal inception in 1999, and will continue to evolve. Following are key components of AT s partnering program. PARTNERING GUIDELINES MANUAL AT developed the first Partnering Guidelines Manual in The manual was updated in 2012, and rewritten in 2016 to reflect the growth and updates in AT s partnering program. The Partnering Guidelines Manual is a living document, and will be updated regularly as AT s partnering program evolves. There is also a Partnering Toolkit available to assist in administering and applying the construction partnering approach at the project level. Note : The Partnering Toolkit (see Appendix F) includes detailed information for the AT Project Sponsor, the AT Project Administrator, the Consultant, and the Contractor to assist in administering and applying the construction partnering approach at the project level. CONSTRUCTION PARTNERING STEERING COMMITTEE (CPSC) To ensure that the collaborative approach between AT, CEA, and ARHCA is as effective as possible, AT is planning to establish a Construction Partnering Steering Committee (CPSC). The CPSC will include representatives from AT, CEA, and ARHCA. The mandate of the CPSC will be to maximize the effectiveness and benefits of partnering on behalf of all three organizations, and to make improvements regarding partnering within any or all three organizations if necessary. The CPSC will likely include representatives from the SPG and the Tri-Party Operations Committee, and other parties that can impact or may be impacted by AT s partnering program. While the roles of the CPSC may change or evolve over time, they may include bringing forward any partnering concerns of any of the organizations, review of the Partnering Guidelines Manual, partnering training, and AT s Partnering Recognition Program. PARTNERING TRAINING AT considers partnering training to be an important component of the partnering program. AT has recently developed partnering training for all AT Project Sponsors, Project Administrators and other key AT project delivery personnel, as well as Highway Operations and Major Capital Projects staff. Developing and offering partnering training for CEA and ARHCA team members on an ongoing basis is also planned, as AT s partnering program evolves. October 2016 Partnering Guidelines Manual for AT Projects 13

18 CHAPTER 3 THE 3 LEVELS OF PARTNERING ON AT PROJECTS Individual commitment to a group effort that is what makes a team work, a company work, a society work, a civilization work. ~Vince Lombardi THE PARTNERING PROCESS FOR AT CONSTRUCTION PROJECTS Every AT construction project will be completed using a partnering approach. The AT Project Sponsor and AT Project Administrator play key roles in all levels of successful partnering on AT projects. AT has developed and refined a Project Risk Indicator (PRI) to help evaluate the levels of risk on AT construction projects. The levels of risk identified on the PRI are then used as a guide to determine the appropriate level of partnering for each project. While the numerical ratings from the PRI provide strong indicators of the optimum level of partnering for each AT project, the AT Project Sponsor and AT Project Administrator have the discretion to assign a level of partnering different than that indicated by the PRI score. There are three potential levels of partnering on AT projects: LEVEL 1 TEAM PARTNERING DISCUSSION, conducted by the AT Project Sponsor or Project Administrator at the pre-construction meeting, for lower risk projects, OR LEVEL 2 DEVELOPMENT OF PROJECT SCORECARDS, through a Team Partnering Discussion, led by the AT Project Sponsor or Project Administrator at the pre-construction meeting, for medium risk projects, OR LEVEL 3 FORMAL PARTNERING SESSION, conducted by a qualified Partnering Facilitator, held prior to the pre-construction meeting, followed by Project Scorecards, for higher risk projects. In this chapter, we will look at the PRI and at each of the three levels of partnering on AT construction projects. October 2016 Partnering Guidelines Manual for AT Projects 14

19 Partnering has played an important role in delivering this project and keeping it on budget and on schedule The Northeast Anthony Henday Drive (NEAHD) project is the single largest highway construction project the province has undertaken to date. It is a Public-Private-Partnership (P3) contract worth $1.81 billion in 2012 dollars. It includes a 30-year maintenance period. With the completion of this project in fall of 2016, the Edmonton ring road will provide 80 kilometres of free-flow traffic around the entire Capital Region. Partnering has played an important role in delivering this project and keeping it on budget and on schedule. A partnering workshop was held, and all parties involved in this project agreed to work as partners in the delivery of the quality infrastructure for the final link of the ring road to facilitate economic and social benefits for the citizens of Alberta. A partnering charter was developed and signed off by all parties. As part of this charter, it is recognized by the project team that working together we will: Strive to bring a level of quality that meets or exceeds the contract requirements. Communicate the agreed on quality standards to all levels of the team, especially to the hands-on working level, and complete the construction to meet the quality standards. Collaboratively develop and support the project schedule to achieve traffic availability on or before October 1, 2016, and construction completion on or before October 1, Strive to achieve zero lost time incidents. Maintain public safety through the life of the project. Create and live by our common collaborative culture. Promote, use and abide by our issues resolution ladder. Communicate through the established adaptable structures, through which we will promote ongoing conversation throughout the duration of the project. Continuously develop ourselves personally, organizationally, and interorganizationally in order to upgrade our skills and knowledge. The project team is working together to achieve the common goal of delivering this project in the spirit of collaboration, trust and respect. Aamer Shakoor, P. Eng. Urban Construction Engineer - Edmonton Major Capital Projects Branch Alberta Transportation Government of Alberta October 2016 Partnering Guidelines Manual for AT Projects 15

20 The processes for partnering on AT construction projects are outlined in the chart below. October 2016 Partnering Guidelines Manual for AT Projects 16

21 THE AT PROJECT RISK INDICATOR (PRI) The AT Project Risk Indicator (PRI) is a tool to help evaluate the levels of risk on AT construction projects. The levels of risk identified on the PRI are then used as a guide to determine the optimum level of partnering for each AT project. The PRI is completed by the AT Project Administrator at the beginning of the tender preparation phase. The AT Project Sponsor reviews and signs off on the recommended level of partnering. The AT Administrator then advises the Engineering Consultant which Partnering Special Provision to include in their tender. If the AT Project Administrator and Project Sponsor assign a different level of partnering than what is indicated by the PRI score, they will outline their reasons for the variation in the comments section on the last page of the PRI form. Following is a description of the PRI process. Note: See Appendix A: AT Project Risk Indicator (PRI) Risk Analysis Tool RISK EVALUATION CATEGORIES AND SCORING POINT RANGES The AT PRI identifies Potential Risk categories which are evaluated for every AT construction project. AT has determined that some risk categories have the potential to impact the success of the project more than other risk categories. For this reason, some risk categories may be assigned more points than other risk categories, as outlined in the table below (e.g., Safety may be scored from 1 to 9 points, while the scoring range for Inclement Weather is from 1 to 3 points.) However, while the upper scoring range for some potential risks is higher than for others, a minimum score may be assigned for any risk category. The following table outlines the Potential Risk categories included in the PRI, and the scoring points range for each risk category. POTENTIAL RISKS & SCORING POINT RANGES Potential Risk Scoring Points Range Potential Risk Scoring Points Range Project Size 1 to 9 Traffic Management 1 to 6 Project Duration 1 to 9 Environmental 1 to 6 Safety 1 to 9 Future / Adjacent Projects 1 to 3 Project Complexity 1 to 9 Jurisdictional 1 to 3 Public / Community / Stakeholders 1 to 9 Resources 1 to 3 Utilities 1 to 9 Scope Creep 1 to 3 Schedule 1 to 6 Inclement Weather 1 to 3 October 2016 Partnering Guidelines Manual for AT Projects 17

22 In the PRI, each Potential Risk includes a description of the potential risk, and examples of applications on AT projects that may correspond to different scoring point levels. The evaluator may also include comments with each risk category. ASSIGNING THE LEVEL OF PARTNERING Once the AT Project Administrator has completed reviewing the Potential Risks and has assigned scoring points to each category, the next step is to compare the Total Score of the assigned points to the Potential Levels of Partnering, as outlined in the PRI Score Evaluation Table below. PRI SCORE EVALUATION TABLE Total Score Range Level of Partnering or higher 3 Description Team Partnering Discussion conducted by the AT Project Sponsor or Administrator at the pre-construction meeting Development of Project Scorecards, through a Team Partnering Discussion, led by the AT Project Sponsor or Administrator at the pre-construction meeting Formal Partnering Session, conducted by a qualified Partnering Facilitator, held prior to the pre-construction meeting. Followed by Project Scorecards As outlined previously, the AT Project Administrator and Project Sponsor have the discretion to assign a level of partnering for the project different than the level indicated in the PRI Score Evaluation Table. Once the AT Project Sponsor has confirmed the level of partnering for the project, the AT Project Administrator advises the Engineering Consultant which Partnering Special Provision to include in their tender. The completed PRI will also be discussed at the pre-construction meeting. Note: See Appendix A: AT Project Risk Indicator (PRI) Risk Analysis Tool TEAM PARTNERING DISCUSSION LEVELS 1 & 2 A Team Partnering Discussion conducted at the beginning of the pre-construction meeting and led by the AT Project Sponsor or Project Administrator is a requirement for AT construction projects rated as either Level 1or Level 2 Partnering projects. The difference between projects rated at Level 1 Partnering and Level 2 Partnering is that Level 1 Partnering projects are monitored using a Successful Partnering Checklist (see Chapter 4 Monitoring the Partnering Relationship for the Successful Partnerships Checklist) or holding discussions about partnering at Project Meetings, while Level 2 Partnering projects include the development of Project Scorecards to monitor the status of partnering. October 2016 Partnering Guidelines Manual for AT Projects 18

23 The following table outlines the Team Partnering Discussion agendas for Level 1 and Level 2 Partnering. AGENDAS Team Partnering Discussion Level 1 Partnering Level 2 Partnering 1. Introductions 1. Introductions 2. Partnering on AT Projects 2. Partnering on AT Projects 3. Ground Rules for Partnering 3. Ground Rules for Partnering 4. Partnering Concept 4. Partnering Concept 5. Review of completed PRI (optional) 5. Review of completed PRI (optional) 6. Identification of Partners Key Concerns on the project Requires Pre-Work 6. Identification of Partners Key Concerns on the project Requires Pre-Work 7. Identification of Key Project Risks 7. Identification of Key Project Risks 8. Issue Resolution Ladder and Process 8. Issue Resolution Ladder and Process 9. Celebrations 9. Celebrations 10. Project Team Member Staff Changes 10. Project Team Member Staff Changes 11. Partnering Evaluation using the Successful Partnering Checklist 11. Development of Project Scorecards to Evaluate Partnering 12. Agreement to Partnering Approach 12. Agreement to Partnering Approach Note: See Appendix B: Team Partnering Discussion Agenda Details Note : The Partnering Toolkit (see Appendix F) includes detailed information for the AT Project Sponsor, the AT Project Administrator, the Consultant, and the Contractor to assist in administering and applying the construction partnering approach at the project level. DEVELOPMENT OF PROJECT SCORECARDS LEVEL 2 The development of a Project Scorecard for Level 2 Partnering projects is conducted as part of the Team Partnering Discussion, led by the AT Project Sponsor or Project Administrator, at the preconstruction meeting. The process for developing and using Project Scorecards is outlined in the chart on the following page. October 2016 Partnering Guidelines Manual for AT Projects 19

24 October 2016 Partnering Guidelines Manual for AT Projects 20

25 What are Project Scorecards? Project Scorecards are on-line surveys conducted by a Qualified Facilitator on large complex construction projects while the projects are underway. On AT projects identified by the PRI as projects that will be completed using Level 2 Partnering, the AT Project Sponsor or Project Administrator will lead the development of the Project Scorecard s Evaluation Statements at the pre-construction meeting. A Qualified Facilitator will then conduct the on-line scorecard surveys, working closely with the AT Project Sponsor or Administrator, and issue the Project Scorecard Reports. Project Scorecards have been trialed and used on AT projects since Research conducted shows that 93% of AT Project Scorecard users found them to be helpful, and over 70% recommended their use on large, complex AT projects. What is measured on Project Scorecards? In developing the Project Scorecard at the pre-construction meeting, the AT Project Sponsor or Project Administrator distributes a Project Scorecard Preparation Package (included in the Partnering Toolkit). The AT leader then works closely with the pre-construction meeting attendees to develop the Project Scorecard s Evaluation Statements, which include Project and Partnering Success Goals, and mitigation strategies/actions to address identified Key Project Risks. Project and Partnering Success Goals, and Key Project Risks are outlined in the following tables. PROJECT SUCCESS GOALS Project Success Goals focus on project related performance measures that are key to the successful completion of the project. Typical Project Success Goals often include the following categories: Safety Quality Schedule Budget/Cost/Profit Environmental Stewardship Issue Resolution Scope Risk Management Traffic Management Communications - External Utility Coordination Inclement Weather Management October 2016 Partnering Guidelines Manual for AT Projects 21

26 PARTNERING SUCCESS GOALS Partnering Success Goals focus on partnering related performance measures that are key to effective partnering with all stakeholders. Typical Partnering Success Goals often include the following categories: Teamwork Trust Communications Internal Health of Partnering Monitoring the Partnering Approach Recognize Achievements & Celebrate Successes Note: See Appendix C: Typical Project and Partnering Success Goal Statements KEY PROJECT RISKS Key Project Risks are risks that could prevent the team from achieving the Project and Partnering Success Goals. Typical Key Project Risk categories may include: Utility relocation On-site physical coordination Scheduling of specific items Minimizing impact of design and scope changes Weather mitigating negative results of inclement weather Safety site specific safety issues Human resources and/or materials availability Schedule and contractor coordination Environmental concerns site specific Once the Key Project Risks have been identified, the team proactively develops risk management strategies and/or actions to eliminate or reduce the likelihood of the risk occurring, or to mitigate the impact of each Key Project Risk if it does occur. These strategies and/or actions are then measured on each Project Scorecard. After the team has developed the Project and Partnering Success Goals, identified the Key Project Risks, and developed strategies/actions to address these risks, the next step is to create the Project Scorecard Participant List. October 2016 Partnering Guidelines Manual for AT Projects 22

27 Who participates in Project Scorecards? Two different groups of individuals often participate in Project Scorecards. The Project Scorecard Participant List includes Contributors and Recipients. Project Scorecard Contributors Project Scorecard Contributors are team members who are familiar with the on-site project activities. All Contributors are invited to participate in the online Project Scorecard survey, and will receive a copy of the completed Project Scorecard Report. Project Scorecard Contributors include representatives of the owner, the consultant(s), and the contractor(s), and possibly other stakeholders. These representatives should have a strong working knowledge of the project, and may include, but are not limited to: Owner Project Sponsor, Project Administrator, Field Support Technologist Consultant Corporate Support, Project Director, Project Manager, Technical Support Contractor Corporate Manager, Contract Manager, Site Superintendent, Foreman, Technical Support, Sub-Contractors Other key project stakeholders may also be invited to participate as Contributors to the Project Scorecard, including but not limited to: Municipal representatives Key suppliers Utility representatives Safety and environmental organizations Other AT staff (e.g. Regional Director, Regional Environmental Coordinator, Safety Officer, Aggregate Coordinator, Maintenance Contract Inspector, etc.) Project Scorecard Recipients Project Scorecard Recipients are generally senior project team members who are not actively involved in the day-to-day project activities, but have a strong interest in the project s activities and its successful execution. Recipients will not receive or complete the online surveys, but they will receive a copy of the completed Project Scorecard Report. Being included as a Project Scorecard Recipient enables senior project team members to monitor emerging project trends and allows for early identification and possibly proactive intervention on potential problem areas. It is intended that the AT Executive Director responsible for the project is included as a Project Scorecard Recipient for Project Scorecards conducted in their areas. Senior members of consulting and contracting companies may also be Recipients. October 2016 Partnering Guidelines Manual for AT Projects 23

28 How are the online Project Scorecard surveys conducted? Each Project Scorecard Contributor is sent a link to the online Project Scorecard survey. Each Contributor accesses the survey through the link, and provides their rating of the status of the Project and Partnering Success Goals, and the team s identified strategies to address the Key Project Risks. As well, the Contributors may provide any comments they wish in an anonymous environment; however, they have the option to identify themselves regarding their specific comments if they wish. The Contributors are also asked to identify any key concerns and/or issues they may have that may be coming up on the project during the next month, and may also add any additional comments they have about the project and/or the partnering approach. The online Project Scorecard survey link is typically left open for approximately one week, and Contributors are given reminders as required to keep the participation rate as high as possible. Note: See Appendix D: Sample Project Scorecard Screen Shot What is the Frequency of Project Scorecards? During the Team Partnering Discussion, the AT Sponsor or Administrator works with the project team to determine the optimum frequency of Project Scorecards for the project. Project Scorecard frequencies range between two weeks and bi-monthly, depending on the complexity of the project, the length, and the potential intensity and frequency of identified Key Project Risks. The most common frequency of Project Scorecards is either monthly or bi-monthly. For multiple season projects, Project Scorecards are often completed approximately one month prior to shut-down to assist the team with potential shut-down issues, and prepare for the following construction season. Project Scorecard participants find this to be a helpful proactive project management tool. What is done with the Project Scorecard Report? Within four days of the Project Scorecard survey closing, a Project Scorecard Report will be issued that includes a summary of the ratings and comments for each Evaluation Statement, and a graph showing the trends for each item (to identify progression or regression). Items that show a strong negative trend since the last report, or receive a Poor rating from any individual, are highlighted to identify potential problem areas that the team should focus on. Note: See Appendix E: Sample Project Scorecard Report Page The Project Scorecard Report should be thoroughly reviewed and discussed at the next project meeting. Based on their review of the Project Scorecard Report, Project Scorecard Recipients may also wish to attend the meeting, or may wish to provide input through others from their organization who will attend the project meeting. The review and discussion of the Project Scorecard Report, and the subsequent recognition of project successes and development of action plans to address any concerns, provide the most significant benefit of using Project Scorecards. October 2016 Partnering Guidelines Manual for AT Projects 24

29 FORMAL PARTNERING SESSIONS LEVEL 3 Level 3 Partnering, for higher risk projects, consists of a formal one-day partnering session led by a qualified Partnering Facilitator. The formal partnering session is held prior to the pre-construction meeting, and is followed by Project Scorecards for the duration of the project. Role of AT Project Sponsor or Project Administrator The AT Project Sponsor or Project Administrator contacts the Project Controls Engineer, Project Management Office (PMO), who arranges with the Partnering Facilitator to conduct the partnering session. Once the facilitator has been confirmed, the timing of the partnering session is determined and pre-session preparations for the workshop commence. Pre-Session Preparations Pre-Session preparations for the Level 3 Partnering Session can impact the success of the partnering session and the potential effectiveness of partnering on the project. Following are pre-session preparation considerations. Venue Arrangements A suitable venue is arranged for the expected number of partnering session attendees, including audio visual requirements, food and beverages, room setup, and other details. Determining Workshop Participants It is recommended that all project team members and stakeholders that have an influence over the success of the project, and stakeholders where key relationships need to be developed, be considered for invitation to the partnering session. (See Chapter 4 Keys to Effective Partnering for further information on Determining Workshop Participants) Participant Pre-Work Each invited stakeholder organization should be prepared to provide their organizations key challenges and concerns about the project, the key project risks from their perspective, and their organization s lines of authority and communication for the specific project. If an invited stakeholder is not able to attend the workshop, it is recommended that they provide their key challenges and what they feel are key project risks, in writing so their viewpoints will be known and can be considered by the other participants at the workshop. Partnering Session Agenda The agenda for every partnering session should be developed to ensure that the specific needs of each stakeholder are addressed, as well as any project specific considerations. Typical Level 3 Partnering Session agenda items include: Informal Networking and Refreshments Develop Project and Partnering Success Opening Comments Goals Partnering Overview Presentation Organizational Challenges and Concerns on Participant Introductions the Project* Overview of the Project Organizational Lines of Authority and Project Risk Indicator (PRI) Review Communication* Team Communication Flow October 2016 Partnering Guidelines Manual for AT Projects 25

30 Key Project Risk Identification* Risk Mitigation Strategy Development Issue Resolution Ladder Development Partnering Monitoring Celebrations of Success Partnering Champions Lessons Learned From Prior Projects Signing of the Partnering Agreement Partnering Session Adjournment * Requires Pre-Work Having adequate time to complete all workshop agenda items is always a concern at Level 3 Partnering Sessions. The facilitator must carefully monitor the timing of agenda items. If there are a large number of participants (e.g. 20 or more), and depending on the complexity of the project and the levels of stakeholders concerns (as determined during the Participant Pre-Work), the agenda may have to be shortened. Partnering Monitoring The success of the construction partnering approach is highly dependent on monitoring the status of the Project and Partnering Success Goals, the developed mitigation strategies/actions for identified Key Project Risks, and other feedback from the project team and other key stakeholders. Project Scorecards are used to monitor the status of partnering on Level 3 Partnering projects. At the partnering session, the AT Project Sponsor or Administrator and the project team members will determine the desired frequency of Project Scorecards for the project. Typically, Project Scorecards on Level 3 Partnering projects are completed monthly or bimonthly. If there are months when a Project Scorecard is not completed on a Level 3 Partnering project, it is recommended that Partnering be a project meeting agenda item during those months. The lack of formal follow-up is the primary cause of failed partnered projects The partnering process will only produce positive results if project team members are willing to commit themselves to it throughout the life of the project ~Dr. Sai On Cheung City University of Hong Kong Multiple Season Projects For complex projects that are completed during more than one construction season, Season Kick-Off Partnering Sessions may benefit the project and the team, especially if there have been challenges on the project during the previous construction season. As well, on multiple season projects, Project Scorecards are often completed approximately one month prior to shut-down to assist the team with potential shut-down issues, and prepare for the following construction season. October 2016 Partnering Guidelines Manual for AT Projects 26

31 CHAPTER 4 KEYS TO EFFECTIVE PARTNERING DETERMINING WORKSHOP PARTICIPANTS Alone we can do so little, together we can do so much. ~Helen Keller One of the most important contributors to successful partnering workshops is the invitation and attendance of all stakeholders that have an influence over the success of the project, including AT, consultants, contractors, and third party stakeholders. Feedback from successfully partnered AT projects is that third parties that are invited appreciate the recognition and opportunity to participate. Third party participants often report that the relationships developed during the partnering workshop usually carry on through the execution of the project. As well, specific challenges and concerns of all parties, including third parties, are identified and discussed, and strategies to address the concerns are developed. POTENTIAL PARTICIPANTS AT LEVEL 3 PARTNERING SESSIONS Consideration should be given to inviting the following to attend Level 3 Partnering Sessions: AT Consultant Contractor(s) Third Parties Project Sponsor Corporate Support Corporate Support Key Suppliers Project Administrator Project Director Project Manager Alberta One-Call Construction Engineer(s) Project Manager Project Superintendent Major Municipality Representatives Bridge Engineer(s) Construction Inspector Site Foreman Environment Officials Field Support Technologist Construction Surveyor Technical Support Safety Officials Safety Officer Key Sub-Consultants Key Sub-Contractors Environmental Coordinator Aggregate Coordinator Maintenance Contract Inspector Federal Department of Fisheries Utility Representatives October 2016 Partnering Guidelines Manual for AT Projects 27

32 RESOLVING ISSUES A timely issue resolution process is very important to maintaining a collaborative working environment on AT construction projects. THE ISSUE RESOLUTION LADDER One of the cornerstones of partnering is the Issue Resolution Ladder. An Issue Resolution Ladder helps to ensure that issues that inevitably arise on the project are addressed in a timely manner, and at the appropriate level. An issue may be defined as anything that requires discussion or resolution, in anyone s mind. If anyone feels that there is an issue, then there is an issue. SAMPLE ISSUE RESOLUTION LADDER (Note Assign names during creation of the ladder at the Partnering Session) Level AT Consultant Contractor Sample Max. Time D Project Sponsor Corporate Support Corporate Support 2 days C B Project Administrator Project Director Project Manager 2 days Project Manager Project Superintendent 1 day A Field Technologist Site Foreman 1 day On AT projects, it is expected that the maximum time an issue will remain in the ladder will be 6 days. This will ensure that the claimant may still file a Notice of Claim within the seven day limit set out in the General Specifications. The Issue Resolution Process As with Level 1 and 2 Partnering, the Issue Resolution Ladder is also created by the team during the Level 3 Partnering Session. At the top of the ladder are the three primary parties to the project, AT, the Consultant, and the Contractor. Sub-Consultants and Sub-Contractors are generally represented by the Consultant and the Contractor, per their contractual arrangements. When an issue arises on the project, it is important that each party clearly communicates their positions around the issue; inevitably, the positions of the different parties regarding the issue are different. In fact, these different positions about issues are often the cause of the issue in the first place. It is important that each party to an issue understands the other parties positions well enough that they can explain all parties positions to the others satisfaction. The Issue Resolution Ladder process simply consists of ensuring that each party understands the other parties positions around the issue, and then defining how long the issue can remain October 2016 Partnering Guidelines Manual for AT Projects 28

33 unresolved within each level of the Issue Resolution Ladder. If the issue cannot be resolved at a level of the ladder within the maximum assigned time, the issue is elevated to the next level of the ladder. The process continues until the issue reaches the top of the Issue Resolution Ladder. If the issue is elevated to the top of the ladder and remains unresolved within the ladder, the claim resolution mechanism defined in the contract and/or specifications is the next available step. On AT projects, it is the responsibility of the party who is in disagreement with the decision of the other party to file a Notice of Claim within the timelines set out in the contract documents, typically within seven (7) days of the circumstance giving rise to the claim. At any time in the issue resolution ladder, any party may begin the claim resolution process under the contract by submitting a Notice of Claim. Issue Resolution Ground Rules 1. Issues must be reported to all affected parties as soon as possible (ideally the day of noting the issue). 2. Resolve issues at the lowest possible level. 3. Unresolved issues will be elevated upwards without delay. 4. Elevating an issue is not a negative or bad thing; it is part of an efficient process. 5. Ignoring an issue or making no decision on an issue is unacceptable. 6. Any party can decide that it s time to elevate an issue. 7. No jumping levels on the ladder by any of the parties. 8. No one is expected to make a decision outside their authority (i.e. all partners are expected to act within their authority limits). 9. Responses at each level of elevation should be completed within the time limit for that level even if the decision is to elevate to the next level. Guidelines for Elevating Issues 1. Be clear if you are elevating an issue or just providing information 2. Identify and summarize the issue / problem 3. Identify potential impacts on schedule and costs If you re in an argument, try to see 4. Identify current positions / viewpoints the other point of view. If you don t 5. Identify investigations that have been done to date agree, you don t agree; just don t let 6. Identify potential options to resolve the issue, emotions get the best of you. including schedule and cost estimates ~Yogi Berra 7. Identify your recommendations If all parties agree, the timelines to resolve a specific issue can be extended, provided the impact to all parties is minimal, and critical path work can continue. The Issue Resolution Ladder process works if it is diligently used. One of the major benefits of diligently using the Issue Resolution Ladder is that it preserves relationships at the different levels. One of the main causes of relationship problems on projects is the festering of unresolved issues the Issue Resolution Ladder can help to avoid these relationship problems. October 2016 Partnering Guidelines Manual for AT Projects 29

34 CELEBRATIONS OF SUCCESS Things that get rewarded and appreciated get done! The success of a partnering approach depends very much on the commitment of all parties and team members involved in the project. Celebrations of success on the project and the partnering approach go a long ways towards keeping team members commitments and morale as high as possible. Even things as simple as saying Thank you! to other parties for something they have done well can go a long way towards promoting a healthy relationship. Celebrations should be conducted periodically throughout the project rather than waiting for the end of the project to recognize successes and build morale. The team should look for opportunities to celebrate the successes of a project. As well, celebrations are often held to recognize specific milestone achievements. Identifying the milestones at the pre-construction meeting or partnering session is a great way to ensure that the successes are recognized! A good option is to have each of the three parties alternate responsibilities for hosting/handling celebrations. A minimum recommended time between celebrations is one month, with celebrations of some sort held every second Friday being preferred. Some celebrations that work well on construction projects include: BBQ lunch on-site Order pizza for site lunch Hardhat stickers Host VIP tours of the jobsite Feature employee in newsletter Schedule a Finish one-hour early day Implement Partnering Excellence Awards Coffee mugs Letters of acknowledgement T-shirts with team logo October 2016 Partnering Guidelines Manual for AT Projects 30

35 MONITORING THE PARTNERING RELATIONSHIP It is recommended that the status of the partnering relationship be included as an agenda item at least monthly. The following Successful Partnering Checklist is adapted from a checklist developed by R.D. Huddleston, formerly of AT. It is an excellent checklist to use to monitor the health of construction partnering relationships. Statements can be modified, removed, or added to suit the project. SUCCESSFUL PARTNERING CHECKLIST The partners are committed to safety and successful traffic accommodation on this project. Senior members of all organizations demonstrate a leadership role in the promotion and support of the partnering approach. Partners refer to each other in positive terms when communicating with other partners, employees, divisions and the public. Partners utilize a consultative process in all areas that are exceptions to the defined contract procedures. Project employees of all partners meet on a periodic basis. Partners develop performance standards and monitor the progress of the relationship. Partners identify potential key issues, problems and concerns on the project (outside of the specifications and contract documents), and work together towards proactively addressing these potential issues, problems and concerns. Partners continue to work at maintaining shared values of trust, openness, and respect. The team is fulfilling the Partnering Charter. There have been adequate celebrations of successes in the partnering approach (initiated by management). Comments: Note: See Chapter 5: Tools to Assist in Making Partnering a Success October 2016 Partnering Guidelines Manual for AT Projects 31

36 CHAPTER 5 TOOLS TO ASSIST IN MAKING PARTNERING A SUCCESS REGULAR MEETINGS If everyone is moving forward together, then success takes care of itself. ~Henry Ford Regular project meetings can be one of the best partnering tools. Good communications and planning are critical to a successful project. A well-planned and run progress meeting provides the team with an opportunity to bring up issues, concerns, and ideas on a regular basis. A regularly scheduled project meeting can help everyone working on the job understand the schedule, coordinate work, identify and resolve issues, discuss the status of the project, and plan the week ahead. A good meeting has these attributes: Starts on time - A project meeting should always start on time; this will train everyone to be on time. Ends on time - There should be a set amount of time allotted for the meeting. Have an agenda - The Consultant s and the Contractor s on-site supervisors should jointly develop the agenda. The agenda, while fixed, should be flexible enough to discuss new issues as they occur. The agenda also must not "lose" old issues that are still open. A good agenda covers: The schedule (what work is planned) and how the team is going to accomplish it over the next week Unresolved or outstanding issues - so that you can either resolve them or elevate them up the Issue Resolution Ladder New issues which need resolution Action items and deadlines, so that each person knows what tasks they are responsible for, and when the tasks are to be completed Stubborn or particularly complex issues may need a separate meeting for their resolution. A record is made of agreements and outstanding issues (minutes) - Meeting minutes are required so that everyone knows what was agreed to and what is still unresolved (the minutes may be very helpful in the future when questions arise). The Consultant will take the minutes, and distribute the minutes to the entire project team. The people needed for discussion and to make decisions are at the meeting Be sure that the appropriate people are invited and attend the meeting. Attention is on the meeting, not elsewhere Interruptions from smart phones distract everyone. Make a rule to put them aside. If everyone stays focused on the meeting it can start on time and end on time. October 2016 Partnering Guidelines Manual for AT Projects 32

37 COMMUNICATION Good communication means that there are no surprises on the project. The project team should commit to not writing letters without talking to each other first. Talking first gives everyone an opportunity to make sure they understand the issue(s) and to try to work things out before positions are put in writing. If you do end up putting your position in writing, the recipient should know that the letter is coming, and what it will say. Experts tell us that 75-80% of good communication is listening so if you want to improve communications on your project, listen, listen, listen. Personality conflicts can get in the way of communications and can disrupt the project. Each person on the project brings a unique personality, and some accommodation should be made for these differences. Egos and personalities are present on every project; however, project issues should remain project issues, and not become personal issues. FAIRNESS AND GOOD FAITH It is your job to be fair, and to act in good faith while seeking resolution to project issues and problems. If you keep this objective in mind, you should never be too far from finding a solution. Even if all the parties cannot agree on what is fair, by using fairness as the benchmark you will know where you are heading, keep the dialogue open, and dramatically improve the chance for resolving the problem. Work together to come to an agreement on the definition of fairness, and then work together towards achieving that goal. Additionally, if all sides work to do what is in the best interest of the project, all sides interests will usually be satisfied, and everyone can walk away with a sense of accomplishment. These concepts, fairness and doing what is best for the project, are basic guidelines for partnering success. It takes discipline and perseverance to keep these two principles in mind in the heat of conflict, but it will pay off in more successful projects and improved working relationships. SEPARATING PEOPLE FROM THE PROBLEM Often, when conflict erupts on projects, people begin to look for who is to blame. It is easy to get caught up in the "fight", and in "winning", and not in getting the issue resolved while ensuring that relationships remain undamaged. Don t forget that everyone will still have to work together to complete the project. Because we sometimes become engaged in the fight over "winning" (and especially in not losing), we often don't take the time to really understand the problem - we make assumptions. Frequently the assumptions turn out to be only partially correct. They we find we can't come up with a good solution (or even a good "blaming") because we are working with false assumptions. Following are steps that can be taken to avoid being trapped in this vicious cycle: October 2016 Partnering Guidelines Manual for AT Projects 33

38 Step 1 - Seek to Understand the Problem Ask probing questions to try to determine all aspects of the problem - no matter how angry or hostile the other parties seem to be. Don't become defensive; you are trying to understand the problem and the assumptions each of the other stakeholders have. This will give you a clearer picture of what the real issues are. Step 2 - Don t Make It Personal Take an objective point of view - don't become engaged in the battle. Take the role of negotiator or fact finder. The more people get wrapped up in the battle and in trying to win, the more likely they are to start feeling that the issue is a personal matter. But remember, it's a project issue, and your success will depend on your ability to not take things personally. Step 3 - Don t Seek to Blame Don't seek to blame - instead, seek solutions and understanding. People generally act logically; your job is to find the logic behind their actions. It is almost always there, and often has nothing to do with the stated problem. Pointing fingers makes everyone defensive, stopping communication. Project problems are never solved by blaming someone. Everyone is in this project together - everyone will succeed or fail together. Step 4 - Agree on the Problem Work to gain agreement on what the problem is before you attempt to find solutions. If people don t agree on exactly what the problem is, it is not possible to reach the best solution. If we follow these four steps we will go a long way to having productive problem solving on our construction projects. FOLLOW-UP PARTNERING SESSION(S) Partnering requires an on-going commitment. Although Partnering Scorecard surveys are conducted on a regular basis, the need to reaffirm that commitment may be necessary. You may consider holding a followup partnering session when there is a significant change of personnel on the project, when issues remain unresolved, when the project enters a new phase of work, or when the project extends over multiple construction seasons. Holding a follow-up partnering workshop will help to keep the partnering relationship strong and the project on track. TEAM BUILDING ACTIVITIES Construction projects do not go well when the people working on them do not have a sense of enjoyment, or do not like coming to work. It is important to the success of the project that project personnel enjoy their work. Holding regular joint team events or celebrations can help increase project team members levels of satisfaction and enjoyment on the project. Management is responsible to monitor the status of the project team, and when necessary, to lead discussions with project team members regarding potential team activities that can increase team members appreciation of one another, and ensure that identified team activities are carried out. * Reference - UDOT Partnering Field Guide. (April 2015), Utah Department of Transportation October 2016 Partnering Guidelines Manual for AT Projects 34

39 APPENDICES October 2016 Partnering Guidelines Manual for AT Projects 35

40 APPENDIX A: AT PROJECT RISK INDICATOR Completing the AT Project Risk Indicator (PRI) is the first step in determining the optimum level of partnering for each AT construction project. October 2016 Partnering Guidelines Manual for AT Projects 36

41 October 2016 Partnering Guidelines Manual for AT Projects 37

42 October 2016 Partnering Guidelines Manual for AT Projects 38

43 October 2016 Partnering Guidelines Manual for AT Projects 39

44 October 2016 Partnering Guidelines Manual for AT Projects 40

45 October 2016 Partnering Guidelines Manual for AT Projects 41

46 October 2016 Partnering Guidelines Manual for AT Projects 42

47 October 2016 Partnering Guidelines Manual for AT Projects 43

48 October 2016 Partnering Guidelines Manual for AT Projects 44

49 October 2016 Partnering Guidelines Manual for AT Projects 45

50 APPENDIX B: TEAM PARTNERING DISCUSSION AGENDA DETAILS A Team Partnering Discussion is conducted for all AT Level 1 Partnering and Level 2 Partnering construction projects. Following are details on the Team Partnering Discussion conducted at the pre-construction meeting for AT construction projects identified as Levels 1or 2 Partnering projects. The Team Partnering Discussion is led by the AT Project Sponsor or Administrator. Note the Team Partnering Discussion agenda is the same for Level 1 and Level 2 Partnering projects, except for #11 Project Evaluation for Level 1 Partnering projects, or #11 Development of Project Scorecards to Evaluate Partnering for Level 2 Partnering projects. AGENDA Team Partnering Discussion 1. Introductions 2. Partnering on AT Projects Review the Partnering on AT Projects flow chart for Level 1 and Level 2 Partnering, and discuss as required. 3. Ground Rules for Partnering Respectable communication Everyone participates, no one dominates Listen and keep an open mind Agree if it makes sense Disagree or ask questions if it doesn t make sense 4. Partnering Concept Partnering helps to define common goals, improve communication, increase trust, and foster a problem-solving attitude among a group of individuals who will work together throughout contract performance. A central objective of partnering is to encourage contracting parties to use a cooperative, team-based approach that can help to prevent claims and disputes. It is about realizing that parties may all get what they want out of a situation, by each doing things in a slightly different way. 5. Review of Completed PRI (Optional) At the outset of the project, the AT Project Sponsor and AT Project Administrator completed a Project Risk Indicator (PRI) Risk Evaluation Tool for the project, as the first step in determining the optimum level of partnering. Using the PRI as a guide, they then assigned the level of partnering for the project. The Consultant was provided with a copy of the Completed PRI, and reviewed it prior to including the appropriate Partnering Special Provision in the tender for the project. The project team will review the completed PRI, and discuss as required. October 2016 Partnering Guidelines Manual for AT Projects 46

51 6. Identification of Partners Key Concerns (from Pre-Work) Each partner (AT, Consultant, and Contractor) should identify their top three Key Concerns about the project. The goal is for each partner to understand the key areas of concern for each of the other partners on the project. 7. Identification of Key Project Risks The team discusses and agrees upon the top three Key Project Risks, i.e. the top three risks to the success of the project. These Key Project Risks are often, but not always, identified in the Partners Key Concerns. The team should discuss and agree upon any actions that can be taken to proactively reduce the likelihood of these risks occurring. 8. Issue Resolution Ladder and Process An Issue Resolution Ladder helps to ensure that issues that inevitably arise on the project are addressed in a timely manner, and at the appropriate level. An issue may be defined as anything that requires discussion or resolution, in anyone s mind. If anyone feels that there is an issue, then there is an issue. Level AT Consultant Contractor Max.Time Corporate Management Field Issue Resolution Process: a. Understand the other parties positions well enough to explain them to their satisfaction. b. For each specific issue, agree to a maximum timeframe for each level, before escalating the issue to the next level. c. Resolve issues at the lowest possible level. d. Escalate unresolved issues without delay once all the information is known and it is realized that a decision will not be reached within the maximum timeframe for that level. Any party can decide it is time to escalate an issue. e. It is not a bad thing to escalate an issue, it is just part of an efficient and effective process. f. Ignoring an issue is not acceptable. g. Do not jump levels on the ladder. h. No one is expected to make a decision outside of their authority. i. When escalating an issue, write down the agreed upon problem, the areas where the parties are stuck, and each party s best idea for resolving the issue. Also outline when cost or schedule will be impacted, and to what extent. 9. Celebrations Discussion on the type and frequency of celebrations of successes, or of milestones achieved, that could be done on this project (e.g. BBQ or pizza lunches, other items) October 2016 Partnering Guidelines Manual for AT Projects 47

52 10. Project Team Member Staff Changes If this project is of a long duration, there is a potential for staff changes. As the project progresses, it will benefit the project and the partnering to bring all new team members up to speed on the Team Partnering Discussions. Suggested procedure: o Review the minutes of this meeting with new team members when they join the project, and ensure that they understand the Team Partnering Discussions that took place. o Include new team members in ongoing partnering meetings and celebrations. 11. Partnering Evaluation (for Level 1 Partnering Projects) Use the Successful Partnering Checklist (see Chapter 4 Keys to Effective Partnering) A final evaluation of partnering will be done at the Post Construction Tri-Party Meeting OR 11. Development of Project Scorecards to Evaluate Partnering (for Level 2 Partnering Projects) Development of Project Scorecards is described in Chapter Agreement All parties accept the value of partnering, and agree to follow the above procedures, as discussed today, for partnering for this project. October 2016 Partnering Guidelines Manual for AT Projects 48

53 APPENDIX C: TYPICAL PROJECT & PARTNERING SUCCESS GOAL STATEMENTS Project Scorecards include the team s collaborative development of Project and Partnering Success Goals, and Goal Statements that describe each goal. These goals and goal statements are then measured at defined intervals during the completion of the project to help the team monitor the status of the project and the partnership, and take corrective actions as necessary. Following are examples of typical Project and Partnering Success Goal Statements. The Project and Partnering Success Goal Statements are measured on the Project Scorecards. PROJECT SUCCESS GOALS Goal Safety Quality Schedule Budget/Cost/Profit Environmental Stewardship Issue Resolution Scope Risk Management Traffic Management Communications - External Utility Coordination Inclement Weather Management Example Goal Statement All parties will place a high priority on safety for all workers and the public on the project. The quality of workmanship and materials will meet or exceed the specifications and the standards expected for this project. The project will be completed on schedule. The schedule will be reviewed at project meetings and updated as necessary. Costs and cost impactors will be managed to keep the project on budget, while providing value to the owner and profit to the other partners. The environment will be respected and protected during the construction of this project (e.g. erosion and sediment control, etc.). We will meet or exceed all regulatory requirements. Team members and their counterparts will identify and discuss issues as soon as they become apparent. When necessary, we will use the Issue Resolution Ladder to address issues. We will effectively monitor and manage changes to the scope of the project We will proactively identify and manage risks to minimize their impacts on all parties and the project. Traffic accommodation will ensure the safety of workers on the project and the safety and convenience of the travelling public. It will be monitored, reviewed, and updated on a regular basis. We will anticipate public and stakeholders concerns, and will provide timely communications to address them. We will proactively engage and openly communicate with utility representatives. We will coordinate their adjustments and relocations within an acceptable time frame. We will proactively plan the mitigation measures needed to minimize the negative impact of weather events. October 2016 Partnering Guidelines Manual for AT Projects 49

54 PARTNERING SUCCESS GOALS Goal Teamwork Trust Communications Internal Health of Partnering Monitoring the Partnering Approach Recognize Achievements & Celebrate Successes Example Goal Statement We will have a true team spirit characterized by respect, trust, and collaboration. We will strive to create an enjoyable work environment. We will strive to have an environment of trust between all parties on the project. We will have timely, open, honest, and clear communications among the team members. We will foster a healthy partnering relationship through incorporating all of the Project and Partnering Success Goals. We will monitor the health of the partnering approach at monthly intervals. We will recognize contributions and achievements of teams and individuals throughout the project, and will get together as a group to celebrate the successful progress of the project. October 2016 Partnering Guidelines Manual for AT Projects 50

55 APPENDIX D: SAMPLE PROJECT SCORECARD SCREEN SHOT Below is a sample of an online screen shot of a typical Project Scorecard survey. October 2016 Partnering Guidelines Manual for AT Projects 51

CALL FOR ENTRIES. Now Accepting 2015 Excellence in Partnering Award Entries in the following categories: Projects Over $50 Million

CALL FOR ENTRIES. Now Accepting 2015 Excellence in Partnering Award Entries in the following categories: Projects Over $50 Million CALL FOR ENTRIES Now Accepting 2015 Excellence in Partnering Award Entries in the following categories: Now Accepting 2015 Excellence in Partnering Award Entries in the following categories: Projects Under

More information

Nomination Guidelines and Form. Minister s Awards for Transportation Innovation

Nomination Guidelines and Form. Minister s Awards for Transportation Innovation Nomination Guidelines and Form 2017 Minister s Awards for Transportation Innovation Nomination Guidelines Innovation is central to supporting a diversified and prosperous economy. Alberta Transportation

More information

MINISTRY OF TRANSPORTATION QUALIFICATION COMMITTEE PROCEDURES

MINISTRY OF TRANSPORTATION QUALIFICATION COMMITTEE PROCEDURES MINISTRY OF TRANSPORTATION QUALIFICATION COMMITTEE PROCEDURES Qualification Committee September 2015 MINISTRY OF TRANSPORTATION ONTARIO QUALIFICATION COMMITTEE PROCEDURES Table of Contents 1. Purpose of

More information

REQUEST FOR PROPOSAL. The City of Oneida, NY

REQUEST FOR PROPOSAL. The City of Oneida, NY REQUEST FOR PROPOSAL FOR A PERFORMANCE BASED ENERGY EFFICIENCY IMPROVEMENT PROJECT STREET LIGHTING TRANSFER TO OWNERSHIP AND LED CONVERSION For The City of Oneida, NY Letter of Public Notice The City of

More information

INNOVATION SUPERCLUSTERS APPLICANT GUIDE

INNOVATION SUPERCLUSTERS APPLICANT GUIDE INNOVATION SUPERCLUSTERS APPLICANT GUIDE 1 To obtain a copy of this publication or an alternate format (Braille, large print, etc.), please contact: Permission to Reproduce Except as otherwise specifically

More information

Procurement Support Centre

Procurement Support Centre October 20 2014 Procurement Support Centre annual report 2013/14 Find us at: 101-104 Elliott Street, Whitehorse (867) 667-5385 contracts@gov.yk.ca http://www.gov.yk.ca/tenders/ Table of Contents Introduction.................................................

More information

Green Transit Incentives Program

Green Transit Incentives Program Green Transit Incentives Program (GreenTRIP) These guidelines provide a description of the Green Transit Incentives Program and describe the submission and administrative process. PLEASE READ THESE GUIDELINES

More information

Two Keys to Excellent Health Care for Canadians

Two Keys to Excellent Health Care for Canadians Two Keys to Excellent Health Care for Canadians Dated: 22/10/01 Two Keys to Excellent Health Care for Canadians: Provide Information and Support Competition A submission to the: Commission on the Future

More information

Guide to Partnering on NDOT Projects

Guide to Partnering on NDOT Projects Sept. 27, 2010 Guide to Partnering on NDOT Projects This Guide is written as a reference source for Nevada Department of Transportation (NDOT) team members working at the project level. It is also intended

More information

International Partnering Institute. John L. Martin Partnered Project of the Year Award Application

International Partnering Institute. John L. Martin Partnered Project of the Year Award Application International Partnering Institute John L. Martin Partnered Project of the Year Award 2014 Application For projects completed between January 1, 2013 and December 31, 2013 Application Deadline: February

More information

Aboriginal Community Capital Grants Program Guide

Aboriginal Community Capital Grants Program Guide APPLICATION GUIDE FOR THE ABORIGINAL COMMUNITY CAPITAL GRANTS PROGRAM WHAT YOU NEED TO KNOW BEFORE YOU APPLY Before completing your Aboriginal Community Capital Grants Program application, please read

More information

Alberta Health Services. Strategic Direction

Alberta Health Services. Strategic Direction Alberta Health Services Strategic Direction 2009 2012 PLEASE GO TO WWW.AHS-STRATEGY.COM TO PROVIDE FEEDBACK ON THIS DOCUMENT Defining Our Focus / Measuring Our Progress CONSULTATION DOCUMENT Introduction

More information

Request for Proposal. Study on Economic Impact of Calgary s Post-Secondary Sector. Reference Number:

Request for Proposal. Study on Economic Impact of Calgary s Post-Secondary Sector. Reference Number: Study on Economic Impact of Calgary s Post-Secondary Sector Reference Number: 1605-02 Issued: May 31, 2016 Responses Due: June 10, 2016 Calgary Economic Development Ltd. 731 1 st Street SE Calgary, AB

More information

Public Art Policy Markham Municipal Projects

Public Art Policy Markham Municipal Projects Appendix A Public Art Policy Markham Municipal Projects Policy Category: Public Realm Related Policy No.: 2012 CFS 02 Implementing Procedure No.: Approving Authority: Effective Date: Markham Council Approved

More information

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE Table of Contents Background... 1 Vision for our Future... 1 Purpose of Health System Transformation Council... 2 Accountability...

More information

Southern California Chapter 2017 Project Achievement Awards

Southern California Chapter 2017 Project Achievement Awards Southern California Chapter 2017 Project Achievement Awards Construction Management Association of America Southern California Chapter is pleased to announce its 15 th Annual Awards Program to recognize

More information

HUMAN SERVICES GRANTS REGULATION

HUMAN SERVICES GRANTS REGULATION Province of Alberta GOVERNMENT ORGANIZATION ACT HUMAN SERVICES GRANTS REGULATION Alberta Regulation 25/2016 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza 10611-98

More information

COMMUNITY DEVELOPMENT GRANTS REGULATION

COMMUNITY DEVELOPMENT GRANTS REGULATION Province of Alberta GOVERNMENT ORGANIZATION ACT COMMUNITY DEVELOPMENT GRANTS REGULATION Alberta Regulation 25/2013 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park

More information

Application for Funding

Application for Funding About this form This form enables you to make an application for funding under any of the three investment tiers for the Provincial Growth Fund: Regional Projects and Capability; Sector Investments; and

More information

Strategic Transportation Infrastructure Program

Strategic Transportation Infrastructure Program Strategic Transportation Infrastructure Program Guidelines Community Airport Program Local Road Bridge Program Resource Road Program Local Municipal Initiatives Updated: September 2017 Government STIP

More information

QUEEN ELIZABETH II AWARD AND SCHOLARSHIP REGULATION

QUEEN ELIZABETH II AWARD AND SCHOLARSHIP REGULATION Province of Alberta ALBERTA HERITAGE SCHOLARSHIP ACT QUEEN ELIZABETH II GOLDEN JUBILEE RECOGNITION ACT QUEEN ELIZABETH II AWARD AND SCHOLARSHIP REGULATION Alberta Regulation 71/2002 With amendments up

More information

4.07. Infrastructure Stimulus Spending. Chapter 4 Section. Background. Follow-up to VFM Section 3.07, 2010 Annual Report. Ministry of Infrastructure

4.07. Infrastructure Stimulus Spending. Chapter 4 Section. Background. Follow-up to VFM Section 3.07, 2010 Annual Report. Ministry of Infrastructure Chapter 4 Section 4.07 Ministry of Infrastructure Infrastructure Stimulus Spending Follow-up to VFM Section 3.07, 2010 Annual Report Background In January 2009, the federal government announced the Economic

More information

Table of Contents. C. Promote Institutional Awareness, Understanding and Coordination

Table of Contents. C. Promote Institutional Awareness, Understanding and Coordination 1 Table of Contents 1. Overview 2. The District s Mission 3. The Program Goals 4. Small, Local and Other Business Identification 5. Strategic Initiatives A. Provide Community Outreach and Education B.

More information

ICANN Complaints Office Semi-Annual Report

ICANN Complaints Office Semi-Annual Report ICANN Complaints Office Semi-Annual Report 15 March 2017 31 December 2017 Krista Papac 7 March 2018 ICANN ICANN Complaints Office Semi-Annual Report March 2018 1 TABLE OF CONTENTS ABOUT THE ICANN ORGANIZATION

More information

Borrower Guidance for Change Orders

Borrower Guidance for Change Orders Bureau of Clean Water CHANGE ORDER SUBMISSION Borrower Guidance for Change Orders After loan approval, any changes to the originally contemplated work must be addressed through the contract change order

More information

HIGHWAY CONSTRUCTION PROGRAM. N. C. Department of Transportation (Research and Development) (Construction and Maintenance)

HIGHWAY CONSTRUCTION PROGRAM. N. C. Department of Transportation (Research and Development) (Construction and Maintenance) APRIL 2018 HIGHWAY CONSTRUCTION PROGRAM State Authorization: N.C.G.S. Chapter 136 N. C. Department of Transportation (Research and Development) (Construction and Maintenance) Agency Contact Person Program

More information

PROGRAM GUIDE: THE ALBERTA SMALL BUSINESS INNOVATION AND RESEARCH INITIATIVE (ASBIRI)

PROGRAM GUIDE: THE ALBERTA SMALL BUSINESS INNOVATION AND RESEARCH INITIATIVE (ASBIRI) PROGRAM GUIDE: THE ALBERTA SMALL BUSINESS INNOVATION AND RESEARCH INITIATIVE (ASBIRI) PROGRAM OVERVIEW Background Innovation both the creation of new products and the leveraging of innovation into the

More information

Façade Improvement Program and Development Incentive Program Review

Façade Improvement Program and Development Incentive Program Review 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Façade Improvement Program and Development Incentive Program Review January 30, 2017 The conducted this project

More information

SECTION 3 GUIDEBOOK: POLICIES AND PROCEDURES

SECTION 3 GUIDEBOOK: POLICIES AND PROCEDURES SECTION 3 GUIDEBOOK: POLICIES AND PROCEDURES 1 TABLE OF CONTENTS WHAT IS SECTION 3?... 5 WHY IS SECTION 3 IMPORTANT TO THE CITY?... 5 THE CITY S POLICIES REGARDING SECTION 3... 5 Section 3 Plan... 6 What

More information

UNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN

UNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN UNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN TABLE OF CONTENTS Definitions. 1 Responsibilities 3 Dispute Procedures... 7 Minority Business Construction Contract Provisions. 8 Minimum

More information

Strategic Plan

Strategic Plan 2018-2021 Strategic Plan TOWN OF STONY PLAIN Strategic Plan 2018-2021 As your Town Council, we work with you, for you and in the spirit of our community. We consider our work as true servant leadership.

More information

EMPLOYMENT AND IMMIGRATION GRANT REGULATION

EMPLOYMENT AND IMMIGRATION GRANT REGULATION Province of Alberta GOVERNMENT ORGANIZATION ACT EMPLOYMENT AND IMMIGRATION GRANT REGULATION Alberta Regulation 94/2009 With amendments up to and including Alberta Regulation 32/2018 Office Consolidation

More information

Province of Alberta ALBERTA HEALTH ACT. Statutes of Alberta, 2010 Chapter A Current as of January 1, Published by Alberta Queen s Printer

Province of Alberta ALBERTA HEALTH ACT. Statutes of Alberta, 2010 Chapter A Current as of January 1, Published by Alberta Queen s Printer Province of Alberta Statutes of Alberta, Current as of January 1, 2014 Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza 10611-98 Avenue Edmonton, AB T5K 2P7 Phone: 780-427-4952

More information

Chapter 3: Business Continuity Management

Chapter 3: Business Continuity Management Chapter 3: Business Continuity Management GAO Why we did this audit: Nova Scotians rely on critical government programs and services Plans needed so critical services can continue Effective management

More information

NOVEMBER 2017 SOUTH TERMINAL UPDATE FEATURED STORIES. Leadership Profile: Mike Patterson, Director of Construction

NOVEMBER 2017 SOUTH TERMINAL UPDATE FEATURED STORIES. Leadership Profile: Mike Patterson, Director of Construction NOVEMBER 2017 SOUTH TERMINAL UPDATE FEATURED STORIES Leadership Profile: Mike Patterson, Director of Construction Keynote Speaker Announced for December 7th Event SBDD Hosts Roundtable Discussion for Small

More information

Family and Community Support Services (FCSS) Program Review

Family and Community Support Services (FCSS) Program Review Family and Community Support Services (FCSS) Program Review Judy Smith, Director Community Investment Community Services Department City of Edmonton 1100, CN Tower, 10004 104 Avenue Edmonton, Alberta,

More information

COUNTY OF LOS ANGELES

COUNTY OF LOS ANGELES COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS 900 SOUTH FREMONT AVENUE ALHAMBRA, CALIFORNIA 91803-1331 Telephone: (626) 458-5100 JAMES A. NOYES, Director www.ladpw.org ADDRESS ALL CORRESPONDENCE TO:

More information

Embassy of the United States of America Ottawa, August 29, 1988 No. 364

Embassy of the United States of America Ottawa, August 29, 1988 No. 364 Exchange of Notes between the Government of Canada and the Government of the United States of America constituting an Agreement concerning the Construction of a Joint Ring Levee Embassy of the United States

More information

2014 Construction Management Project Achievement Awards

2014 Construction Management Project Achievement Awards 2014 Construction Management Project Achievement Awards Construction Management Association of America Southern California Chapter is pleased to announce its 12 th Annual Awards Program to recognize outstanding

More information

A review of the Gamma Knife Neurosurgery Program administered by Alberta Health

A review of the Gamma Knife Neurosurgery Program administered by Alberta Health A review of the Gamma Knife Neurosurgery Program administered by Alberta Health CASE REPORT JUNE 2016 If you have any questions about the Alberta Ombudsman, or wish to file a complaint with our office,

More information

Professional Ethics Self-Assessment Tool

Professional Ethics Self-Assessment Tool LEADERSHIP I take courageous, consistent and appropriate actions to overcome barriers to achieving my organization s mission. I place community, organization and patient benefit over my personal gain.

More information

Getting and Managing a Construction Grant. By Henry Flood

Getting and Managing a Construction Grant. By Henry Flood Getting and Managing a Construction Grant Even if your project qualifies for funding, are you ready to take on the challenges? By Henry Flood Your clinic's facilities are 60 years old and no longer meet

More information

CLEAN WATER WASTEWATER FUND (CWWF) APPLICATION GUIDE FOR PROJECTS For the period of 2016/17 to 2017/18*

CLEAN WATER WASTEWATER FUND (CWWF) APPLICATION GUIDE FOR PROJECTS For the period of 2016/17 to 2017/18* CLEAN WATER WASTEWATER FUND (CWWF) APPLICATION GUIDE FOR PROJECTS For the period of 2016/17 to 2017/18* 1.0 PURPOSE The Federal Government Budget 2016 announced new infrastructure programs that will be

More information

ATI Annual Report. Report on the Access to Information Act AECL's Access to Information and Privacy Office UNRESTRICTED

ATI Annual Report. Report on the Access to Information Act AECL's Access to Information and Privacy Office UNRESTRICTED ATI Annual Report Report on the Access to Information Act 2013-2014 AECL's Access to Information and Privacy Office 177-511600-041-009 2014 June UNRESTRICTED juin 2014 ILLIMITÉ Atomic Energy of Canada

More information

Minister s Monitoring Committee On Workers Compensation

Minister s Monitoring Committee On Workers Compensation Minister s Monitoring Committee On Workers Compensation Final Report of the Committee February 2006 Background The Minister s Monitoring Committee on Workers Compensation (the Committee) was created in

More information

Terms and Conditions

Terms and Conditions Terms and Conditions Program Name: Settlement Program Category: Contribution Department: Citizenship and Immigration Canada Last Updated: May 11, 2018 Note: These Terms and Conditions apply to all agreements/arrangements

More information

State Project No. XXXXXX City Project No. c401807

State Project No. XXXXXX City Project No. c401807 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad

More information

CAP FARM WATER SUPPLY PROGRAM Terms and Conditions

CAP FARM WATER SUPPLY PROGRAM Terms and Conditions 1.0 PURPOSE CAP FARM WATER SUPPLY PROGRAM Terms and Conditions The objective of the Farm Water Supply Program is to provide technical assistance and incentive for the creation of a Long Term Water Management

More information

8/30/ American Public Works Association (APWA) International Congress and Exposition. August 30, 2015

8/30/ American Public Works Association (APWA) International Congress and Exposition. August 30, 2015 The Louisiana Department of Transportation and Development s Submerged Roads and Paths to Progress Programs: A Model for Future Disaster Recovery Efforts 2015 American Public Works Association (APWA) International

More information

Guidance For Health Care Staff Within NHS Grampian On Working With The Pharmaceutical Industry And Suppliers Of Prescribable Health Care Products

Guidance For Health Care Staff Within NHS Grampian On Working With The Pharmaceutical Industry And Suppliers Of Prescribable Health Care Products Title: Identifier: Guidance For Health Care Staff Within NHS Grampian On Working With The Pharmaceutical Industry And Suppliers Of Prescribable Health Care Products NHSG/guid/PharmInd/GMMG/738 Replaces:

More information

3sHealth Supports the Flow of Services to the Patient

3sHealth Supports the Flow of Services to the Patient report Summer 2013 card The seven flows of medicine centred around the flow of the patient. 3sHealth Supports the Flow of Services to the Patient When most people think of patient care in a medical setting,

More information

Regina Community Grants Program

Regina Community Grants Program Regina Community Grants Program DATE: April 25, 2012 SUBMITTED TO: Community Services Department City of Regina 2476 Victoria Avenue Regina, SK S4P 3C8 www.regina.ca PREPARED BY: Stratos Inc. 1404-1 Nicholas

More information

Mid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016

Mid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016 Mid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016 MID-COAST TRANSIT CONSTRUCTORS Clayton Gilliland, MCTC, Project Manager WELCOME! Mid-Coast Transit Constructors Construction

More information

ASX CLEAR (FUTURES) OPERATING RULES Guidance Note 9

ASX CLEAR (FUTURES) OPERATING RULES Guidance Note 9 OFFSHORING AND OUTSOURCING The purpose of this Guidance Note The main points it covers To provide guidance to participants on some of the issues they need to address when offshoring or outsourcing their

More information

The Vaughan Advantage

The Vaughan Advantage The Vaughan Advantage An Address by The Hon. Maurizio Bevilacqua, P.C. Mayor, City of Vaughan To the Vaughan Chamber of Commerce February 16, 2011 As I look around the room, I see many of the people who

More information

REQUEST FOR PROPOSALS SASKATCHEWAN NONPROFIT PARTNERSHIP

REQUEST FOR PROPOSALS SASKATCHEWAN NONPROFIT PARTNERSHIP REQUEST FOR PROPOSALS SASKATCHEWAN NONPROFIT PARTNERSHIP The Saskatchewan Nonprofit Partnership (SNP) is an unincorporated partnership of six nonprofit organizations whose vision is a nonprofit sector

More information

Tahoe Truckee Community Foundation (TTCF) President and CEO Position Description

Tahoe Truckee Community Foundation (TTCF) President and CEO Position Description Tahoe Truckee Community Foundation (TTCF) President and CEO Position Description The Tahoe Truckee Community Foundation is seeking a seasoned leader to engage the community and build the leadership and

More information

A Dialogue with Alberta s Nonprofit/Voluntary Sector. A Dialogue With Alberta s Nonprofit/Voluntary Sector

A Dialogue with Alberta s Nonprofit/Voluntary Sector. A Dialogue With Alberta s Nonprofit/Voluntary Sector A Dialogue With Alberta s Nonprofit/Voluntary Sector This page left blank for printing purposes. Table of Contents Executive Summary 1 Capacity of Sector Organizations 2 Promoting the Value of the Sector

More information

Quarterly Progress Report on Corporate Strategic Initiatives

Quarterly Progress Report on Corporate Strategic Initiatives Quarterly Progress Report on Corporate Strategic Initiatives April to June 2012 Table of Contents A. Executive Summary...3 B. Initiatives and at a Glance...4 C. Initiative Summaries...5 1. Make Continuous

More information

Health. Business Plan to Accountability Statement

Health. Business Plan to Accountability Statement Health Business Plan 1997-1998 to 1999-2000 Accountability Statement This Business Plan for the three years commencing April 1, 1997 was prepared under my direction in accordance with the Government Accountability

More information

BDC s Annual Public Meeting September 7, Remarks by Sam Duboc, Chairperson of the Board, BDC, and Michael Denham, President and CEO, BDC

BDC s Annual Public Meeting September 7, Remarks by Sam Duboc, Chairperson of the Board, BDC, and Michael Denham, President and CEO, BDC BDC s Annual Public Meeting September 7, 2017 Remarks by Sam Duboc, Chairperson of the Board, BDC, and Michael Denham, President and CEO, BDC CHECK AGAINST DELIVERY Sam Duboc, Chairperson of the Board,

More information

VALUE ENGINEERING PROGRAM

VALUE ENGINEERING PROGRAM Approved: Effective: May 17, 2017 Review: March 30, 2017 Office: Production Support Office Topic No.: 625-030-002-i Department of Transportation PURPOSE: VALUE ENGINEERING PROGRAM To provide a consistent

More information

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016 MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill

More information

Biosolids Forest Fertilization Program

Biosolids Forest Fertilization Program Request for Expressions of Interest (RFEI) Biosolids Forest Fertilization Program Issue Date: June 20, 2017 Closing: 3 complete hard copies plus 1 electronic copy (CD, DVD, or USB flash drive) in.pdf format

More information

Annual application deadlines First working day of February and September

Annual application deadlines First working day of February and September ALBERTA HISTORICAL RESOURCES FOUNDATION HERITAGE PRESERVATION PARTNERSHIP PROGRAM Guidelines GRANTS FOR CONSERVATION PROJECTS Historic Resource Conservation Grants Transportation/Industrial Artifact Conservation

More information

Federal Budget Firmly Establishes Manufacturing as Central to Innovation and Growth Closely Mirrors CME Member Recommendations to Federal Government

Federal Budget Firmly Establishes Manufacturing as Central to Innovation and Growth Closely Mirrors CME Member Recommendations to Federal Government Federal Budget Firmly Establishes Manufacturing as Central to Innovation and Growth Closely Mirrors CME Member Recommendations to Federal Government March 22, 2017 Today the Government tabled the 2017/2018

More information

Traffic Control Device Challenge. Sponsored by

Traffic Control Device Challenge. Sponsored by 2018 Traffic Control Device Challenge Sponsored by 2018 Traffic Control Device Challenge OVERVIEW The objective of the Traffic Control Device Challenge (TCDC) is to promote innovation and stimulate ideas

More information

Appendix B Review Matrix Text & Table Footnotes

Appendix B Review Matrix Text & Table Footnotes Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix

More information

REQUEST FOR LETTERS OF INTEREST

REQUEST FOR LETTERS OF INTEREST REQUEST FOR LETTERS OF INTEREST THE MUNICIPALITY OF WADESBORO DESIRES TO ENGAGE A QUALIFIED PRIVATE ENGINEERING FIRM (PEF) FOR CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES FOR THE FOLLOWING PROJECT..

More information

3 Member of JSCE, Professor, Crisis & Security Management Research Center, Kagawa University

3 Member of JSCE, Professor, Crisis & Security Management Research Center, Kagawa University Journal of JSCE, Vol. 1, 353-359, 2013 Special Topic - 2011 Great East Japan Earthquake (Originally published in Journal of Japan Society of Civil Engineers, Ser. F6, Vol. 67, No. 2, I_59-I_64, 2011 in

More information

Growing Forward. Growing Canadian Agri-Innovations Program. Developing Innovative Agri-Products Initiative. Proposal Guide

Growing Forward. Growing Canadian Agri-Innovations Program. Developing Innovative Agri-Products Initiative. Proposal Guide Growing Forward Growing Canadian Agri-Innovations Program Developing Innovative Agri-Products Initiative Proposal Guide Her Majesty the Queen in Right of Canada, 2009 Cat. No. A22-488/2009E-PDF ISBN 978-1-100-12535-0

More information

Destination Calgary video, b-roll and photo assets for Calgary Economic Development, Tourism Calgary and other promotional partners

Destination Calgary video, b-roll and photo assets for Calgary Economic Development, Tourism Calgary and other promotional partners Destination Calgary video, b-roll and photo assets for Calgary Economic Development, Tourism Calgary and other promotional partners Reference Number: 1205-01 Issued: May 24, 2012 Responses Due: June 7,

More information

Managed Care Organization Hospital Access Program Hospital Participation Agreement

Managed Care Organization Hospital Access Program Hospital Participation Agreement Managed Care Organization Hospital Access Program Hospital Participation Agreement The undersigned hospital ( Hospital ) and the undersigned Medicaid Managed Care Organization ( MCO ) hereby agree to participate

More information

Finance Committee October 18, 2011

Finance Committee October 18, 2011 10.13.11 Finance Committee October 18, 2011 Finance Committee: Commissioners Mar (Chair), Elsbernd (Vice Chair), Cohen, Farrell, Kim and Mirkarimi (Ex Officio) Leroy Saage Deputy Director for Capital Projects

More information

Request for Proposal. Soul of the City Neighbour Grant Documentary Video. Reference Number:

Request for Proposal. Soul of the City Neighbour Grant Documentary Video. Reference Number: Soul of the City Neighbour Grant Documentary Video Reference Number: 1402-01 Issued: February 3, 2014 Responses Due: February 28, 2014 Calgary Economic Development Ltd. 731 1 st Street SE Calgary, AB T2G

More information

AGRICULTURE AND RURAL DEVELOPMENT GRANT REGULATION

AGRICULTURE AND RURAL DEVELOPMENT GRANT REGULATION Province of Alberta GOVERNMENT ORGANIZATION ACT AGRICULTURE AND RURAL DEVELOPMENT GRANT REGULATION Alberta Regulation 58/1998 With amendments up to and including Alberta Regulation 62/2013 Office Consolidation

More information

EDUCATION GRANTS REGULATION

EDUCATION GRANTS REGULATION Province of Alberta GOVERNMENT ORGANIZATION ACT EDUCATION GRANTS REGULATION Alberta Regulation 120/2008 Extract Published by Alberta Queen s Printer Alberta Queen s Printer 7 th Floor, Park Plaza 10611-98

More information

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT) Request for Proposal for Construction Management (CM) Services for the Shelburne Community Center and Public Library Shelburne, Vermont. Request for Proposal Issued: Friday, Mandatory Site Visit: Thursday,

More information

City of Malibu Request for Proposal

City of Malibu Request for Proposal Request for Proposal North Santa Monica Bay Coastal Watersheds Monitoring Services Date Issued: April 26, 2016 Date Due: May 17, 2016, 4:00 P.M. The Qualifications Proposal and Cost Proposal must be submitted

More information

ASX CLEAR OPERATING RULES Guidance Note 9

ASX CLEAR OPERATING RULES Guidance Note 9 OFFSHORING AND OUTSOURCING The purpose of this Guidance Note The main points it covers To provide guidance to participants on some of the issues they need to address when offshoring or outsourcing their

More information

Project Proposal Project A7-2009

Project Proposal Project A7-2009 B.C.- Alberta Social Economy Research Alliance (BALTA) Project Proposal Project A7-2009 A. Title of project: Co-op Housing Futures: A Spatial Design Research Approach B. With which BALTA SERC Is this project

More information

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY

More information

CLINICAL AND CARE GOVERNANCE STRATEGY

CLINICAL AND CARE GOVERNANCE STRATEGY CLINICAL AND CARE GOVERNANCE STRATEGY Clinical and Care Governance is the corporate responsibility for the quality of care Date: April 2016 2020 Next Formal Review: April 2020 Draft version: April 2016

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR THE NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER CITY PROJECT NO. PW1724 City of Stockton Public Works Department 22 E. Weber Avenue,

More information

SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway!

SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway! Connect2DOT Colorado Small Business Development Center Network (SBDC) program funded by CDOT Free training, consulting, and resources for small

More information

APPLICATION FOR CITY OF BELLINGHAM COMMUNITY HOUSING DEVELOPMENT ORGANIZATION (CHDO) CERTIFICATION

APPLICATION FOR CITY OF BELLINGHAM COMMUNITY HOUSING DEVELOPMENT ORGANIZATION (CHDO) CERTIFICATION APPLICATION FOR CITY OF BELLINGHAM COMMUNITY HOUSING DEVELOPMENT ORGANIZATION (CHDO) CERTIFICATION City of Bellingham Planning & Community Development Department 210 Lottie Street Bellingham, WA 98225

More information

Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018

Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018 Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018 The Alberta Occupational Health and Safety (OHS) Act establishes minimum standards for healthy and safe practices

More information

APPENDIX D CHECKLIST FOR PROPOSALS

APPENDIX D CHECKLIST FOR PROPOSALS APPENDIX D CHECKLIST FOR PROPOSALS Is proposal content complete, clear, and concise? Proposals should include a comprehensive scope of work, and have enough detail to permit the responsible public entity

More information

Mental Health Accountability Framework

Mental Health Accountability Framework Mental Health Accountability Framework 2002 Chief Medical Officer of Health Report Injury: Predictable and Preventable Contents 3 Executive Summary 4 I Introduction 6 1) Why is accountability necessary?

More information

Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018

Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018 Alberta Occupational Health and Safety Act Highlights of changes effective June 1, 2018 The Alberta Occupational Health and Safety (OHS) Act establishes minimum standards for healthy and safe practices

More information

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS An Overview of the Public- Private Partnership Model in Québec June 6th, 2016 Agenda Introduction The P3 Approach

More information

Updated August Metro State Aid Payment Guide

Updated August Metro State Aid Payment Guide Updated August 2016 Metro State Aid Payment Guide Table of Contents First Partial State Aid Payment Request........ 2 Subsequent Partial State Aid Payment Requests....2 Final State Aid Payment Request.....2

More information

Town of Orange Park, Florida. Financial Auditing Services

Town of Orange Park, Florida. Financial Auditing Services , Florida Financial Auditing Services Request for Proposal TOWN OF ORANGE PARK, FLORIDA REQUEST FOR FINANCIAL AUDIT SERVICES The Town of Orange Park, Florida is requesting proposals from qualified firms

More information

GENERAL CONTRACTING / CONSTRUCTION MANAGEMENT

GENERAL CONTRACTING / CONSTRUCTION MANAGEMENT GENERAL CONTRACTING / CONSTRUCTION MANAGEMENT Mac s Construction Company, Inc. has been in the building industry for over 45 years. Our resumé includes K-12 Schools, Worship Centers, Government Buildings,

More information

COLLECTIVE IMPACT: VENTURING ON AN UNFAMILIAR ROAD

COLLECTIVE IMPACT: VENTURING ON AN UNFAMILIAR ROAD COLLECTIVE IMPACT: VENTURING ON AN UNFAMILIAR ROAD Hilary Pearson Summary In 2010 Hilary Pearson wrote in about the emerging trend of creating Funder Collaboratives to address the challenges of the 2008/2009

More information

Request for Proposals

Request for Proposals Request for Proposals One-Stop Operator PA CareerLink Pittsburgh/Allegheny County Proposals Due: May 5, 2017 Partner4Work 650 Smithfield Street, Suite 2600 Pittsburgh, PA 15222 Operator@partner4work.org

More information

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN REQUEST FOR PROPOSAL (RFP) #1314-15 CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN Request for Proposal must be received no later than January 3, 2014 at 2:00 pm CARRI MATSUMOTO

More information

Call for proposals (CFP) Ref No. TLIU 001/RIS01/2018

Call for proposals (CFP) Ref No. TLIU 001/RIS01/2018 Call for proposals (CFP) REGIONAL INNOVATION SUPPORT (RIS) PROGRAMME Ref No. TLIU 001/RIS01/2018 Date of Issue Monday, 22 January 2018 Closing Date Wednesday, 28 February 2018 Place rnchabeleng@csir.co.za

More information

2017 Construction Management Project Achievement Awards

2017 Construction Management Project Achievement Awards 2017 Construction Management Project Achievement Awards The Construction Management Association of America Northern California Chapter is pleased to announce its 2017 Project Achievement Awards Program

More information

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS 2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..

More information