State Project No. XXXXXX City Project No. c401807
|
|
- Hugh McCarthy
- 5 years ago
- Views:
Transcription
1 June 29, 2017 Request for Qualifications Design and Environmental Services for the SLR Parkway Phase III Project also known as a portion of the MBSST (Rail Trail) Segment 8 (San Lorenzo River Railroad Trestle Bridge Trail Widening) Project. State Project No. XXXXXX City Project No. c The City of Santa Cruz is soliciting Statement of Qualifications (SOQ s) from qualified firms that will perform the design, engineering, final plans, specifications, estimate, and environmental review and permitting for the SLR Parkway Phase III Project which is a portion of the Monterey Bay Sanctuary Scenic Trail (MBSST) Segment 8 (San Lorenzo River Railroad Trestle Trail Widening) herein called Project. The Santa Cruz County Regional Transportation Commission (RTC) adopted the MBSST Network Master Plan and certified the Final Environmental Impact Report (EIR) on November 7, 2013 (revised in February 6, 2014). The main focus of the Master Plan is on a continuous alignment, connecting spur trails, and design standards for the Coastal Rail Trail spine, a proposed 32-mile-long paved multi-use pathway for bicyclists and pedestrians. The RTC owns the existing railroad right-of-way for Coastal Rail Trail and the MBSST project is divided into 20 segments with the intent that each segment will be funded, designed, and constructed in part or as a whole. The design and environmental services, construction, construction engineering and management, and permitting for Project is state and locally funded. The project is being initiated in collaboration with the RTC. The specific information to be submitted for this project is listed on the attached Statement of Qualifications Information Sheet. PROJECT DESCRIPTION: The Project is located near the mouth of the San Lorenzo River in the City of Santa Cruz and entails replacing the existing 4-foot wide walkway on the SLR Railroad Trestle Bridge (MP 19.43) with a new multi-use trail that is feet wide. The structure is approximately 306 feet long and connects to the existing access ramps at each end of the bridge. The western
2 ramp was constructed approximately two years ago and no modifications are anticipated. The eastern ramp was constructed approximately 28 years ago and it is anticipated to be modified with this project to maintain the connection to East Cliff Drive above and to connect under the East Cliff Drive overcrossing for the future Segment 9 rail trail. The RTC-MP SLR Bridge Walkway Widening Feasibility Report (see attached) was completed by Jacobs on May 19, This feasibility report forms the basis for the Project development. The railroad tracks currently allow for recreational passenger and freight train service operated by Santa Cruz & Monterey Bay Railway (Iowa Pacific Holdings) and Roaring Camp and Big Trees. A study was completed by the RTC to assess the feasibility of providing more passenger rail service in the future. Visit SCCRTC.org to see this document and other documents associated with the MBSST (rail trail) project. The City seeks environmental and construction bid documents to comply with the design guidelines and standards of the Master Plan; however it may also seek realignment and/or design standard exceptions to avoid and minimize potential construction and/or environmental impacts. These changes, should they occur, will be addressed after award of this RFQ. The RTC s Master Plan Final EIR covers California Environmental Quality Act (CEQA) compliance for Segment 8 at a program-level, however project-level CEQA compliance will be required. This project is not federally funded, therefore does not require National Environmental Protection Act (NEPA) compliance. Assistance to the City with permitting from various agencies will be included in the scope of work. The entire project budget, from start to finish is $1.55 million and is funded from the State Resource Agency and the newly approved Measure D transportation sales tax. Design and environmental services contract is estimated at $150,000 with final plans, specifications, and environmental clearance anticipated to be complete in early Construction is expected to be initiated in the summer of 2018, and complete by early QUALIFICATIONS: The City of Santa Cruz is seeking a highly qualified and experienced engineering and environmental consulting team to design and obtain environmental clearance with the following experience: State funded projects, including compliance and constraints. State forms, contract administration, invoicing procedures, and audits. U.S. Army Corps of Engineers, California Department of Fish &Wildlife, Coastal Commission, Regional Water Quality Control Board, and other permit compliance. Technical studies and CEQA documentation and compliance. Railroad operation and facilities. Standards from the California Manual on Uniform Traffic Control Devices (CA MUTCD), Highway Design Manual (HDM), American Association of State Highway and
3 Transportation Officials (AASHTO), and National Association of City Transportation Officials (NACTO). Bridge and retaining wall construction work over and adjacent to sensitive waterways and habitats. Coordination of multiple agencies and jurisdictions (City, County, RTC, California Public Utilities Commission, Railroad, Utilities, etc.) and the public. Addressing local concerns and reaching community consensus. Presenting at commissions and city council meetings. Maintaining project schedule and cost effectiveness. Interested engineering consulting firms are invited to submit Statement of Qualifications (SOQ) for said work. Five (5) copies of the Statement of Qualifications for this project shall be delivered by 2:00 p.m. on July 31, 2017 to: Attention: Chris Schneiter, City Engineer City of Santa Cruz Public Works Department, 809 Center Street, Room 201 Santa Cruz, CA Statements of Qualifications (including resumes) shall be no more than 80 pages in length and printed on double-sided recycled paper (i.e. 40 sheets maximum). Do not provide plastic inserts, covers, or binding. If you have any questions or need additional information, please contact Chris Schneiter, City Engineer at (831) or Chris Schneiter, P.E. City Engineer Engineer Attachments: 1. SOQ Information Sheet 2. SCCRTC-MP SLR Bridge Walkway Widening Feasibility Report (Jacobs) 3. Adopted MBSST Master Plan and EIR by reference: 4. SOQ Information Sheet 5. City of Santa Cruz Sample Professional Services Agreement 6. City of Santa Cruz Insurance Requirements for Consultants 7. Sample Insurance Certificate
4 STATEMENT OF QUALIFICATIONS INFORMATION SHEET Selection Process All Statement of Qualifications will be reviewed by a Selection Committee. Based on the evaluation of the Statement of Qualifications received, a short list of the most qualified firms will be developed. The Selection Committee may interview three to five short listed firms. The final rankings of firms will be based on the final scores. Negotiation will then proceed with the top ranked firm. Evaluation Process Evaluation factors used to select the consultant shall include, but not be limited to the following: The firm's reputation for professional integrity, competence, and financial responsibility, the firm's previous experience with similar projects, the ability of the firm to provide the required services, the firm's understanding of the project and the project schedule, the qualifications and experience and availability of the actual project team, and familiarity with state and federal procedures. Scoping Meeting Prior to negotiations, the City will provide the top-ranked consultant with a draft contract/scope of work. Then a scoping meeting will be held to discuss the specific details of the work. After the scoping meeting, the consultant will be asked to provide a cost proposal to perform the work described in a draft contract/scope of work and discussed at the scoping meeting. Method of Payment Method of payment for this contract shall be on a time-charge plus expense basis. Negotiation A cost proposal shall then be submitted by the top-ranked firm. If an agreement on cost is not reached with the top-ranked firm, then the City will negotiate with the next highest ranked firm. If necessary, this process will continue with the next highest ranked candidate until either an agreement is reached or the City decides to re-advertise the RFQ. Attached is the City of Santa Cruz Sample Professional Services Agreement. Schedule The City anticipates the following tentative schedule: SOQ Submittal Deadline July 31, 2017 Interviews (as needed) Week of August 14, 2017 Consultant Selection Week of August 21, 2017 Conclude Negotiations September 1, 2017 Award Contract (City Manager) September 6, 2017 Notice to Proceed September 6, 2017 Statement of Qualifications (SOQ) - Content The Statement of Qualifications should include the following:
5 1. Transmittal Letter A short letter summarizing the firm s Statement of Qualification submittal. 2. Qualifications of the Firm A short description of the firm, including the firm's qualifications in providing design and engineering services to develop construction bid documents, and management of sub-consultants, including environmental and geotechnical firms, on state and federally funded transportation construction projects. 3. Relevant Project Experience A summary of relevant transportation design, traffic engineering experience and trail development knowledge related to railroad facilities, bridges, and retaining walls. Describe experience in designing in or around environmentally sensitive areas and obtaining environmental clearance. 4. Client References A list of recent references, including contact persons and current telephone numbers, for work of similar character that the consultant has successfully performed. References must include public agencies. 5. Project Team The actual team members proposed for this particular project including sub-consultants. 6. Organization Chart An organizational chart including prime consultant and sub-consultants indicating the lines of responsibility of each member of the project team and clearly indicating the team member responsible for interface with the City is required as part of this submittal. 7. Staff Resumes The submittal must include personal resumes that detail the relevant experience and qualifications of all the project team members. 8. Contact Person The statement shall identify a project contact person, with telephone number and , for scheduling follow-up interviews.
4:00 p.m. on May 6, 2016
Request for Qualifications On-Call General Engineering Services Public Works Department City of Daly City 333 90 th Street Daly City, CA 94015 April 4, 2016 The City of Daly City is accepting proposals
More informationRequest for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403
Request for Proposals On-Call General Engineering Services Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo is accepting proposals to
More informationREQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway
REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway Issue Date: November 21, 2008 Proposal Submission Deadline: December 31, 2008 Description of Work: The Bronx
More informationSubject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue
DEPARTMENT OF PUBLIC WORKS Matt Machado Director 1010 10 th Street, Suite 3500, Modesto, CA 95354-0847 Phone: 209.525.6550 Date «FirstName» «LastName» «Company» «Address1» «City», «State» «PostalCode»
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS Federal Project No. CML-5008(179) City Project No. PW1722 Issued by: City
More informationMidpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017
Request for Qualifications and Proposals (RFQP) for Design Consulting Services for the Webb Creek Bridge Replacement Project, Bear Creek Redwood Open Space Preserve Midpeninsula Regional Open Space District
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR PROFESSIONAL DESIGN SERVICES RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD CITY PROJECT NO. PW1716 FEDERAL PROJECT NO. HSIPL-5008(167) CITY OF STOCKTON PUBLIC WORKS
More informationRequest for Qualifications (RFQ) Environmental and Permitting Services
Request for Qualifications (RFQ) Environmental and Permitting Services Responses Due: City of Banning Public Works Department 99 E. Ramsey Street Banning, CA 92220 (951) 922-3130 May, 2015 05/19/15 i TABLE
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR TO PREPARE PROFESSIONAL DESIGN SERVICES PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) FOR THE RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD CITY PROJECT NO. PW1716/ FEDERAL
More informationRequest for Qualifications Wayfinding, Signage and Streetscape Design Initiative City of Mobile, AL
1.0 INTRODUCTION The City of Mobile is inviting qualified consultants to submit a statement of qualifications (SOQ) in response to this RFQ for a wayfinding signage program and streetscape design standards
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS FOR PROFESSIONAL DESIGN SERVICES INSTALL PEDESTRIAN CROSSINGS AT NINE INTERSECTIONS CITY PROJECT NO. PW1715 FEDERAL PROJECT NO. HSIPL-5008(161) CITY OF STOCKTON PUBLIC WORKS DEPARTMENT
More informationCITY OF MADISON, ALABAMA
CITY OF MADISON, ALABAMA Request for Proposals No.02-10 Consulting Services for Madison Growth Plan Madison, Alabama 100 Hughes Road Madison, Alabama 35758 www.madisonal.gov Improving the Quality of Life
More informationGRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9 PROJECT NO. SEB-18-005 Issued by: City of Stockton Public Works Department 22 E.
More informationJanuary 19, To Whom It May Concern:
January 19, 2018 To Whom It May Concern: The Airport South Community Improvement District and the Airport West Community Improvement District, collectively known as the Aerotropolis Atlanta Community Improvement
More informationREQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION
REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT Table of Contents I. Events Calendar
More informationRequest for Qualifications
Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT FEDERAL PROJECT NO. BPMP-5008 (157) CITY PROJECT NO. PW1603 Issued by: City of Stockton Public Works Department 22 E. Weber
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by:
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET (BETWEEN ESSEX STREET AND THE CALAVERAS RIVER BRIDGE) Federal Project No. HRRRL-5008(163) Issued by: City of Stockton Public
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) City Project No. PW1517 Federal Project No. CML-5008(150) Issued by: City of Stockton
More informationThe next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.
5 Implementation 5.1 Anticipated Caltrans Review Process... 2 5.1.1 Project Initiation Document and Project Report... 2 5.1.2 Environmental Review Process... 4 5.1.3 Right of Way Acquisition Process...
More informationAppendix B Review Matrix Text & Table Footnotes
Review Submissions The PDP includes a series of review submissions designed to ensure that all projects are developed in accordance with ODOT policies. The PDP Products Review Matrix found in this Appendix
More informationPUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE
PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA 95202-3717 (209) 937-8411 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE TRAFFIC SIGNAL, ROUNDABOUT, AND PROTECTED LEFT-TURN PHASING
More informationCITY OF LAREDO Environmental Services Department
CITY OF LAREDO Environmental Services Department May 11, 2000 Request for Proposals February 18, 2016 Project: Completion of Feasibility Study of the Rio Grande Basin Chacon Creek under Section 203 of
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR THE NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER CITY PROJECT NO. PW1724 City of Stockton Public Works Department 22 E. Weber Avenue,
More informationLACEY MUSEUM AT THE DEPOT PRELIMINARY SCHEMATIC DESIGN PROJECT REQUEST FOR LETTER OF INTEREST & STATEMENT OF QUALIFICATIONS INFORMATION PACKET
LACEY MUSEUM AT THE DEPOT PRELIMINARY SCHEMATIC DESIGN PROJECT REQUEST FOR LETTER OF INTEREST & STATEMENT OF QUALIFICATIONS INFORMATION PACKET PROJECT The City of Lacey is soliciting Statements of Qualifications
More informationOrder of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.
COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business
More informationBrazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project
Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project Brazoria Drainage District No. 4 is requesting Statements of
More information2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen
2018 Pipelines Engineering Services Boerne Stage Road, West Avenue, and Highway 90 & General McMullen M. Antonio Leyva, P.E. Manager Engineering Angelica Mata Manager Contract Administration Marisol V.
More informationAddendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)
Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN) To: Request for Qualifications / Proposals Recipients From: Matt Brunnings, Project Manager Date: February 7th, 2017 Re: Addendum 1 Addendum
More informationBRF-009-9(73) IA 9 Black Hawk Bridge
BRF-009-9(73) 38-03 IA 9 Black Hawk Bridge Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Location and Environment (Department), in
More informationRequest for Proposals for Exterior Concrete Structural Analysis Services for The Mount Umunhum Radar Tower Project
Request for Proposals for Exterior Concrete Structural Analysis Services for The Mount Umunhum Radar Tower Project Sierra Azul Open Space Preserve Santa Clara County, CA Proposals Due by 5 pm, February
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM PROJECT NO. SEB-18-004 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue,
More informationREQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION
REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION FOR THE COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT Table of Contents ADDENDUM NO. 2 March
More informationREQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT. Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina
REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 1, 2018 1. INTRODUCTION Palmetto Railways, a division of
More informationCITY OF PLACERVILLE Development Services Department ENGINEERING DIVISION
CITY OF PLACERVILLE Development Services Department ENGINEERING DIVISION REQUEST FOR PROPOSALS FOR ENGINEERING DESIGN AND ENVIRONMENTAL CONSULTING SERVICES for PLACERVILLE DRIVE BICYCLE AND PEDESTRIAN
More informationREQUEST FOR PROPOSALS
Community Development Department Planning & Zoning Division REQUEST FOR PROPOSALS COMBINED ACTIVE TRANSPORTATION/ SAFE ROUTES TO SCHOOL PLAN State Project No. ATPL-5169 (048) RELEASE DATE: SEPTEMBER 23,
More informationREQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018
REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON October 2, 2018 The Port of Walla Walla, owner and operator of the Walla Walla Regional Airport,
More informationREQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington
REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design City of Fircrest Department of Parks and Recreation, Fircrest, Washington INVITATION The City of Fircrest seeks the services of a qualified
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT
REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR FM 471 (CULEBRA ROAD) KALLISON LANE TO FM 1560 CSJ: 0849-01-046 PASS-THROUGH FINANCE PROJECT Bexar County Public
More informationNCDOT Planning Summary for NCTA Projects
NCDOT Planning Summary for NCTA Projects Page 1 Triangle Expressway Southeast Extension Wake and Johnston Counties (STIP Projects R-2721, R-2828, and R-2829) The Triangle Expressway Southeast Extension
More informationRequest for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project
Request for Qualifications No. 7-1718 Architectural & Engineering Services for LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Submittal Deadline: November 10, 2017, 2:00 P.M. Spokane Public Schools
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Public relations support and outreach services for Advanced Water Purification Program PROPOSALS DUE: Friday, December 19, 2014 12:00 p.m. SUBMIT PROPOSALS TO: Melissa McChesney Padre
More informationCITY OF LOMITA REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO PROVIDE BID PROPOSAL FOR
CITY OF LOMITA REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO PROVIDE BID PROPOSAL FOR CONSULTING SERVICES FOR THE REVIEW AND NEGOTIATION OF A POSSIBLE EXTENSION TO AN EXISTING SOLID WASTE FRANCHISE
More informationREQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER
REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER For the UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF FACILITIES DESIGN & CONSTRUCTION Issue Date: August 24, 2016 Proposals due: Thursday,
More informationCal Poly EXECUTIVE SUMMARY. Cal Poly Master Plan. In Fall 1999, the average GPA and SAT scores for incoming freshmen were 3.64 and 1162.
EXECUTIVE SUMMARY Cal Poly California Polytechnic State University, founded in 1901, is a predominately undergraduate, teaching university specializing in applied technical and professional fields. With
More informationREQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA
July 12, 2018 REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA The Pullman-Moscow Regional Airport (PMRA) is soliciting Statements of Qualifications (SOQ)
More informationREQUEST FOR QUALIFICATIONS PITTSBURGH INTERNATIONAL AIRPORT PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE
REQUEST FOR QUALIFICATIONS PITTSBURGH INTERNATIONAL AIRPORT PROFESSIONAL ARCHITECTURAL AND ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR THE TERMINAL MODERNIZATION PROGRAM The Allegheny County
More informationSTUDY AND ARCHITECTURAL DESIGN SERVICES
REQUEST FOR PROPOSALS For a FEASIBILITY STUDY AND ARCHITECTURAL DESIGN SERVICES For the Smugglers Notch Scenic Highway Corridor s Barnes Camp Visitor Center on VT Route 108 in Stowe, VT EA #: EH02030 Contract
More informationTown of Middlebury Request for Qualifications
Town of Middlebury Request for Qualifications Engineering and Design Services Middlebury STP BP14(8) Middlebury/Weybridge Seymour Street/Pulp Mill Bridge Road Bicycle and Pedestrian Design and Construction
More informationREQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF PURPLE LINE EXTENSION PROJECT BY LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY Project No. 16-34 CITY
More informationMOBILITY PARTNERSHIP AGENDA
1. CALL TO ORDER/ROLL CALL MOBILITY PARTNERSHIP Wednesday, October 11, 2017 9:00 a.m. to 10:30 a.m. Gilroy City Council Chambers 7351 Rosanna Street, Gilroy, CA AGENDA 2. PUBLIC PRESENTATIONS: This portion
More informationDALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)
DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6 (February 14, 2012) RFQ 1. Part A, Section 4.2(a), Page 6 2. Part A, Sections 4.2(b) & 4.2(c) Please confirm that financial requirements are to be provided
More informationARCHITECTURAL/ENGINEERING SERVICES
Sheriff Department Bruce Haney, Sheriff Department of Transportation Richard Tippett, Director County of Trinity REQUEST FOR STATEMENT OF QUALIFICATIONS TO PROVIDE ARCHITECTURAL/ENGINEERING SERVICES FOR
More informationBASIN CITY WATER AND SEWER DISTRICT Request for Qualifications
BASIN CITY WATER AND SEWER DISTRICT for: LEON DRIVE AND ESTELLA DRIVE WATERLINE REPLACEMENT PROJECT Basin City Water and Sewer District (hereinafter called District ) is requesting Statements of Qualifications
More informationMEMORANDUM. July 7, 2016
MEMORANDUM July 7, 2016 TO: FROM: MEMBERS, PORT COMMISSION Hon. Willie Adams, President Hon. Kimberly Brandon, Vice President Hon. Leslie Katz Hon. Eleni Kounalakis Hon. Doreen Woo Ho Elaine Forbes Interim
More informationMassachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016
Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority
More informationCal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC
Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is
More informationMark A. Doctor, PE CAREER PATH
Mark A. Doctor, PE Professional Profile A career of over 27 years with the Federal Highway Administration in various transportation engineering positions with diverse experiences and accomplishments in
More informationQUALIFICATIONS BASED SELECTION (QBS)
QUALIFICATIONS BASED SELECTION (QBS) Transportation Professional Services Procurement Process LaSalle County Highway Department 1400 N.27 th Road Ottawa, IL 61350 Phone: (815) 434-0743 Fax: (815) 434-0747
More informationCRAWFORD MEMORIAL PARK
REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEERING AND LANDSCAPE ARCHITECTURE CONSULTING SERVICES FOR CRAWFORD MEMORIAL PARK CITY OF DALLAS PARK AND RECREATION DEPARTMENT FEBRUARY 15, 2018 CIZ1707 Page 2
More informationD.R. Michel, Executive (509) or
Upper Columbia United Tribes 25 W. Main, Suite 434 Spokane, WA 99201 Phone: 509-838-1057 Fax: 509-209-2421 Spokane Description Coeur d Alene Colville Kalispel Kootenai Mural at Drumheller Springs Park
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G
REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ #14-002 ARCHITECTURAL SERVICES Bond Measure G The Solano Community College District ( District ) is requesting qualified persons, firms, partnerships,
More informationA DEFINITIONS AND ACRONYMS
Exhibit A DEFINITIONS AND ACRONYMS Addenda/Addendum means supplemental additions, deletions, and modifications to the provisions of the RFP after the release date of the RFP. Adjusted Available Public
More informationREQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is
More informationScope of Services The City is seeking consulting services for the following tasks:
REQUEST FOR PROPOSAL (RFP) FOR PROFESSIONAL SERVICES FOR AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES (ATSPM) AND ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS) DEPLOYMENT AND PROJECT MANAGEMENT May 11, 2018
More informationFISCAL & COMPLIANCE AUDITS
REQUEST FOR PROPOSALS THE TRANSPORTATION AGENCY FOR MONTEREY COUNTY (TAMC) INVITES CONSULTANTS TO SUBMIT THEIR PROPOSALS FOR THE: FISCAL & COMPLIANCE AUDITS You are invited to submit your proposal for
More informationREQUEST FOR PROPOSALS (RFP)
REQUEST FOR PROPOSALS (RFP) TO: All Prospective Providers FROM: Kevin Keller, Planning and Development Director RE: Request for Proposals Town Green and Streetscape Improvements Consulting and Engineering
More informationOctober 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.
October 6, 2017 Dear Sir/Madam Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No. 17-00206-AMJP Elwyn to Wawa R3-2 Right of Way Improvements. The proposal due date and time scheduled for Friday, November
More informationSouth Dakota Transportation Alternatives
South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation
More informationREQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT
SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San Felipe Road, San Jose, CA 95135 REQUEST FOR QUALIFICATIONS G2010.0069 ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced
REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:
More informationREQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION
REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR A NEW PUBLIC
More informationREQUEST FOR PROPOSALS FOR. ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus
REQUEST FOR PROPOSALS FOR ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus RFP Issue Date: October 2, 2017 RFP Due Date: October 27, 2017 I. Introduction The San Francisco
More informationCITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS
CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design
More informationSANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services
SANTA ROSA CITY SCHOOLS DISTRICT 211 Ridgway Avenue Santa Rosa, CA 95401 Request for Proposals For Architectural Services Request for Proposals Issued: March 9, 2016 Deadline for Submittal of Responses:
More informationCounty Transportation Infrastructure Fund Grant Program Frequently Asked Questions
County Transportation Infrastructure Fund Grant Program Frequently Asked Questions Updated Feb. 10, 2015 FREQUENTLY ASKED QUESTIONS County Transportation Infrastructure Fund Grant Program A. Deadlines
More informationSan Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form
San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form FY 2004/05 Project Name: Implementing Agency: Illinois Street Inter-modal Bridge over Islais Creek
More informationREQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL DESIGN SERVICES FOR THE EAGLE RIVER PARK PROJECT
REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL DESIGN SERVICES FOR THE EAGLE RIVER PARK PROJECT Issued: Monday, September 12, 2016 PURPOSE OF REQUEST The Town of Eagle is requesting statements of qualifications
More informationPUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE
PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA 95202-3717 (209) 937-8411 REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE TRAFFIC SIGNAL AND SAFETY LIGHTING MODIFICATIONS AT
More informationMONROVIA PUBLIC LIBRARY STRATEGIC PLAN
REQUEST FOR PROPOSAL (RFP) RFP ISSUANCE DATE Wednesday, May 11, 2016 RFP RESPONSE DUE DATE Monday, June 6, 2016 @ 5:00 p.m. DIRECT QUESTIONS Tina Cherry, Public Services Director E-mail: tcherry@ci.monrovia.ca.us
More informationREQUEST FOR QUALIFICATIONS (RFQ)
REQUEST FOR QUALIFICATIONS (RFQ) Public-Private Partnership Legal Advisor Services for the Diversion Channel and Associated Infrastructure Work Package of the Fargo-Moorhead Area Diversion Project Issue
More informationThis request for qualifications seeks the following type of service providers:
ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,
More informationRequest for Qualifications/Proposals LAND ACQUISITION DUE DILIGENCE & PROFESSIONAL TECHNICAL SERVICES ADDENDUM #1: FEBRUARY 1, 2018
ADDENDUM #1: FEBRUARY 1, 2018 Unless explicitly noted herein, all requirements will remain as originally prepared. Any variations or claims of equality or superiority must be demonstrated, proven and tested
More informationREQUEST FOR QUOTATIONS
REQUEST FOR QUOTATIONS Professional Surveying Services for the Record Plan Survey of Project Area of KWA Contracts S-4005, S-4006 S-4007 and GCDC-WWS Contract S-5004 Issuing Agency: Lapeer County Road
More informationRequest for Qualifications. for. Electrical Substation Transformer Replacement. Stillwater Utilities Authority (SUA) City of Stillwater, Oklahoma
Request for Qualifications for Electrical Substation Transformer Replacement Stillwater Utilities Authority (SUA) City of Stillwater, Oklahoma July 31, 2017 Mandatory scope review meeting in Stillwater
More informationOkeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements
Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements Request for Qualifications/Proposals PART 1 1.1 PURPOSE The Okeechobee Utility Authority is requesting respondents
More informationTRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016
Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment
More informationCITY OF JOPLIN, MISSOURI
Engineering Department CITY OF JOPLIN 602 South Main Street Joplin, Missouri 64801 Phone (417) 624-0820 Ext. 530 Fax (417) 625-4738 CITY OF JOPLIN, MISSOURI ON-CALL ENGINEERING PROFESSIONAL SERVICES REQUEST
More informationFederal, State, Local Funding and Assistance Programs. Nicole Fox, Iowa DOT Office of Local Systems
Federal, State, Local Funding and Assistance Programs Nicole Fox, Iowa DOT Office of Local Systems 1 RISE Revitalize Iowa s Sound Economy Construction or Improvement of a Roadway Immediate Opportunity
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Public relations support and outreach services for Advanced Water Treatment Demonstration Project PROPOSALS DUE: Friday, October 25, 2013 12:00 p.m. SUBMIT PROPOSALS TO: Melissa McChesney
More informationPENNSYLVANIA TURNPIKE COMMISSION
PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION MANAGEMENT FIRM Construction Inspection / Project Management Services Roadway and Bridge Reconstruction, Mileposts 202-210 Cumberland
More informationCFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference
CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference - 2016 Topics to Share Federal Lands Access Program History Funding Type of Projects PDC FLMA Coordination
More informationPIEDMONT TRIAD AIRPORT AUTHORITY
PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for FAR PART 150 NOISE COMPATIBILITY STUDY for PIEDMONT TRIAD INTERNATIONAL AIRPORT The Piedmont Triad Airport Authority (PTAA) will receive
More informationMet r 0 Met"'fKK'ibn Transportation Authority
~ Los Angeles County Met r 0 Met"'fKK'ibn Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro.net CONSTRUCTION COMMITTEE MARCH 19, 2015 SUBJECT: ACTION: ROSECRANS/MARQUARDT
More informationTRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS
PIMA ASSOCIATION OF GOVERNMENTS 2014-2016 TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS Proposals may be obtained by contacting: Pima Association of Governments 1 E. Broadway Blvd, Ste.401 Tucson, AZ 85701
More informationTOWN OF GROVELAND REQUEST FOR PROPOSALS ENGINEER DESIGN SUPPORT FOR THE GROVELAND COMMUNITY TRAIL, A PROPOSED 3.25 MILES SHARED-USE PATH PROPOSAL DUE:
TOWN OF GROVELAND REQUEST FOR PROPOSALS ENGINEER DESIGN SUPPORT FOR THE GROVELAND COMMUNITY TRAIL, A PROPOSED 3.25 MILES SHARED-USE PATH PROPOSAL DUE: JULY 31, 2014 AT 11AM SUBMIT TO: FINANCE DIRECTOR
More informationWolf River Conservancy in partnership with The City of Memphis Division of Park Services. Request for Proposals
Wolf River Conservancy in partnership with The City of Memphis Division of Park Services Issued by Bob Wenner Wolf River Greenway Coordinator Wolf River Conservancy September 2, 2011 Proposal Deadline:
More informationOHIO TURNPIKE AND INFRASTRUCTURE COMMISSION
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS
More informationSTATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION REQUEST FOR QUALIFICATIONS NOTICE NUMBER 03A2139
May 28, 2013 RFQ Number 03A2139 Page 1 of 6 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION REQUEST FOR QUALIFICATIONS NOTICE NUMBER 03A2139 Read carefully as the following revision has been made to this
More informationREQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA
REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY Police Department CITY OF LA PALMA Released on November 27, 2013 Police Operations Study REQUEST FOR PROPOSAL ( RFP ) 1. BACKGROUND The City of La Palma
More information