Bond Update to Bond Oversight Committee
|
|
- Beverly Palmer
- 6 years ago
- Views:
Transcription
1 Bond Update to Bond Oversight Committee or, What We Did Over Summer Vacation September 10,
2 Bond Oversight Committee Read Ahead Note: This section will not be briefed at the meeting. We will answer any questions the BOC may have) 2
3 Communications Web site: If you haven t visited, please do; Updated monthly Contact us feature 9News: Bond in general at South HS (David Suppes/Nelson Garcia: Explanation of Capital vs. Operating Expenses) North HS (Gary Beutler, Sr. PM/Nelson Garcia: Realization of the promised Renovation) Kennedy HS (JFK Graduates make good, give back to their alma mater as artificial turf contractors) 7 News: North HS: 3
4 Bond Program s Objectives To maximize the value to the District each year, and for the overall Program, within the funds available, through: Timing of projects; Deliver a year early Delivery methods Minimizing overhead costs To develop (recruit, train, mentor) the DPS Program staff to deliver both the 2008 Bond, and the next Bond Program To capitalize on opportunities to involve DPS students in the Design and Construction process, to encourage the next generation of engineers, architects, scientists, and skilled craft workers
5 Objective 1 Maximize Value 5
6 This summer 2010 started 222 Bond projects valued at $135M 14 Learning landscapes 5 artificial turf fields and tracks 11 roofing projects Bond Construction Update 10 September, 2010 Significant renovations at East, South, and West High Schools, Smiley, and Lake. The North High renovation (started in 2009) is on track to complete May window projects Mechanical, electrical and plumbing upgrades at 23 schools Opened two previously closed schools to provide new schools for the Green School at Fallis, and a total immersion language school at Whiteman Converted Philips to become Odyssey's home, added AC Broke ground on the Third School at Stapleton Dedicated the Evie Dennis E-12 Campus at Green Valley Ranch As of 2 Sep, completed 179 of the 2010 projects; no impacts on school openings 390 Projects complete Program-to-Date 30 Solar projects (not Bond) scheduled; 9 complete 6
7 2008 Bond Composition Maint/Reno/ADA/Energy/LL s and Reserves $320.1M (70.5%) 1 Expansion School, (Evie Dennis E-12 Campus) $48.5M (10.7%) 1 Major Renovation, North HS 1911 Building $24.4M (5.4%) New/Shared/Performance Schools (OSRI) $20M (4.4%) Hazmat $13.2M (3%) Security $ 3.7M (0.8%) Educational Technology (Promethean Boards, projectors) $10.6M (2.3%) DoTs $13.5M (3%) 7
8 Projects All-City Stadium Track Complete and ready for Paralyzed Veterans Games DSA Roof replacement saturated lightweight concrete; adds 10 lb/sf to dead load 8
9 Projects DSA Roof replacement saturated lightweight concrete added 10 lb/sf to dead load ADA: Exterior Elevator Shaft Whittier Toilet Room Renovation Whittier 9
10 Projects Manual HS Windows Ashley ES Carpet and Tile Manual HS Interior Demolition Manual HS Windows 10
11 Projects Montclair LL and New Modular 4 th and last modular, Colfax, is set week of 6/28 Ashley LL Sod 14 Learning landscapes in progress New School at Stapleton Foundations Manual HS Artificial Turf 11
12 Projects Inventorying a High School s worth of Door Hardware West HS Holm Windows 12
13 Projects - Lighting Retrofits Merrill Kitchen Before 145 watts After 56 watts 13
14 Bond Technology Update 10 September, 2010 Project Approved Bond Funding % Complete Estimated Project Completion Current Milestone K-12 Assessment & Progress Monitoring Systems $4,358,274 10% 12/1/2011 Contract for 6th-10th grade predictive Math and Reading pending signature. Educator Performance Management System $2,500,000 15% 7/15/2011 RFP for System Solution issued 8/20/2010. Planning activities in progress. Security/Identity Management System Upgrade $1,140,000 10% TBD - Based Performing Analysis & Developing Architecture plan on Vendor chosen Integrated Financial System Upgrade - Phase 1 $2,000,000 0% 9/1/2012 Project has not yet begun Wireless Network Upgrade $1,766,427 4% 9/1/2011 Installation in progress. 6 of 134 schools complete. Parent/Student Portal $1,500,000 0% 12/31/2011 Scheduled to start in Dec, Talent Management System - Compensation $450,000 5% TBD - Based on Build or Buy decision Build vs Buy decision in progress. Prototype creation underway. Talent Management System - Employee Appraisal $581,000 0% TBD Awaiting internal resources. Video Distribution & Content Management System $600,000 5% Schedule Project kick-off meeting 9/3/2010 Finalization underway Teacher Laptops $2,625,000 5% Schedule Finalization underway Project kick-off meeting 8/31/2010 $17,520,701 14
15 Objective 2 Build the Team 15
16 Substantially at Full Strength; The Bond Team Alison Daase Warranty Manager James (JT) Allen Deputy Director, Planning Sam Adair Safety & Security Manager Jim Wages Senior Project Manager Brady Rog Mechanical Engineer Margaret Anderson, AIA Project Manager Joe Ramirez Mechanical Engineer 16
17 Objective 3 Involve Students 17
18 2010 SUMMER INTERN COHORT Alex Metzdorff is a 2010 graduate of East High School and worked with Project Manager Rebecca Brown. Alex will attend the University of Oregon this fall. Esmeralda Garcia, was the class of 2010 s valedictorian at Bruce Randolph and worked with Project Manager Kaki Zeeb. Esme has been accepted at UC Denver Amanda Romero is a senior at JFK and worked with Project Manager Darin DeLay. Ce Vonn Watkins is a sophomore at Manual this fall. He worked with Project Manager Tim Dolezal. David Riley worked with PM Andrew Amador and is a Senior at GW. Rachel Mora worked with Project Manager Maggie Anderson. She is a Senior this fall at CEC. Libertad Mendivil is a junior at Manual. She worked with Project Manager Rebecca Brown Jonathan Dimas is a junior at Manual this fall and worked with Project Manager Tim Dolezal. 18
19 Discussion 19
Denver Public Schools 2008 Bond Program
Denver Public Schools 2008 Bond Program Priority Allocation of Available Bond Savings Bond and Mill Levy Oversight Committee December 14, 2011 0 Overview Confirmed Project Savings Allocated May 2010: $75.6
More informationMonthly Bond Update June 17, SAISD Managed Projects Dept. of Facilities Planning and Construction
Monthly Bond Update June 17, 2013 SAISD Managed Projects Dept. of Facilities Planning and Construction Internally Managed Projects 1. Athletic Tracks High Schools 2. Playground equipment 3. Fencing Site
More informationOriginal Revision Total Project Budget: $14,530,000 $47,700,000 $62,230,000 District Funding Commitment Anticipated State Match: $14,530,000 $N/A
Page 1 of 14 FACILITIES PLAN STATUS REPORT December 11, 2017 CAPITAL IMPROVEMENT PLANNING The decision to design and construct capital improvement projects begins with the Education and Facilities Master
More informationDAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT
DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT By approval of this measure by at least fifty-five percent (55%) of the registered voters voting thereon, the Davis Joint Unified School
More informationBallot Measures-J Section
J, Anaheim Elementary Schools Repair/Improvement Measure To repair and modernize classrooms and older neighborhood schools to support reading, math, science, technology, arts, replace deteriorating roofs,
More informationCustomer Guide. Colorado Historic Preservation Income Tax Credit
Colorado Historic Preservation Income Tax Credit Overview of Residential Program (CRS 39-22-514.5 of 2014, as amended) Colorado offers a state income tax credit for preservation and rehabilitation work
More informationWaterford School District 2003 Bond Update
Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013
More informationMeasure H Update CITIZEN S BOND OVERSIGHT COMMITTEE (CBOC) JANUARY 11, 2016
Measure H Update CITIZEN S BOND OVERSIGHT COMMITTEE (CBOC) JANUARY 11, 2016 Presentations PDA Day (August 2015, February 2016) 2030 Plan Steering Committee (Monthly from July 2015 through January 2016,
More informationLong Beach Unified School District Measure K Citizens' Bond Oversight Committee 2015 Annual Report. April 7, 2016
Long Beach Unified School District Measure K Citizens' Bond Oversight Committee 2015 Annual Report April 7, 2016 To the Board of Education and residents of the Long Beach Unified School District: The Measure
More informationNYS Construction Grant Program RonKirsop
NYS Construction Grant Program - 2017 RonKirsop http://pls-net.org/constructiongrant State Aid for Public Library Construction $24 million program bonded through Dormitory Authority of New York State (DASNY)
More informationUNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA
MEETING OF THE BOARD OF TRUSTEES JUNE 15, 2013 UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA ACADEMIC, RESEARCH AND STUDENT AFFAIRS...Dr.
More informationNovember 6 th REMEMBER TO TURN OVER THE BALLOT! DEAR COMMUNITY MEMBERS: QUESTION #1 QUESTION #2. IN this Newsletter: FACILITY NEEDS & SOLUTIONS
EDGERTON SCHOOL DISTRICT REFERENDUM NOVEMBER 6 DEAR COMMUNITY MEMBERS: On August 13, 2018, the School Board unanimously approved placing two referendum questions on the November 6 th ballot. Their decision
More informationBond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations
Bond Issue Update Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations 1 2003 Bond History June 9, 2003 Waterford School District voters approved a $100
More informationEMERGENCY SHELTER RELOCATION/EXPANSION
We could not have gotten where we are in owning property and renovating it into a state of art emergency shelter and advocacy center without years of support and leadership that you have provided -Michelle
More informationREQUEST FOR PROPOSALS (RFP) AND STATEMENT OF QUALIFICATIONS
REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS Roseville Area Schools is soliciting Request for Proposals and Statement of Qualifications from interested firms for the implementation of architectural
More informationLACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE
LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE Presented to DBIA Western Pacific Region James D. O Reilly Chief Facilities Executive, LACCD Terri Mestas Program Director, PMO - AECOM June 3, 2014
More informationLOCKHART INDEPENDENT SCHOOL DISTRICT
LOCKHART INDEPENDENT SCHOOL DISTRICT Request for Qualifications #14-011 The Lockhart Independent School District ( District ) is seeking Submissions in response to this Request for Qualifications ( RFQ
More informationBond Projects Update A. R. Rucker Middle
Bond Projects Update A. R. Rucker Middle Sound system added in gym Doors & locks 10/28/16 Facilities being assessed for needs & sizes, developing replacement schedule for interior hardware & doors & for
More informationREQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION
Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:
More informationEASTERN KENTUCKY UNIVERSITY
EASTERN KENTUCKY UNIVERSITY Proposed Projects Involving the State General Fund (cash or bonds)* Priority Project Title / Description Total Budget 2002-2004 0001 Construct Business/Technology Center, Phase
More informationSmithsonian Institution
Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific
More informationStoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969
More informationGreen Building Incentive Guidelines
Green Building Incentive Guidelines A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5314 N. Clark St., 2 nd Fl. Chicago, Illinois 60640 Phone:
More informationCapital Projects Levy
Bonds-vs-Levies Bond = Building Bond proceeds purchase new buildings, renovate existing buildings, add infrastructure, new equipment and technology Bonds require 60% + 1 vote to pass Levies = Learning
More informationPAULY ELEMENTARY SCHOOL RELOCATABLES P1-P5 & R23-R26
IBI Group Architecture Planning 4119 Broad Street, Suite 210 San Luis Obispo, CA 93401 ADDENDUM PAULY ELEMENTARY SCHOOL RELOCATABLES P1-P5 & R23-R26 ADDENDUM NO. One (1) DATE: December 11, 2017 CLIENT
More informationLos Angeles Unified School District Page 1 of 3
Los Angeles Unified School District Board of Education Report 333 South Beaudry Ave, Los Angeles, CA 90017 89 File #: Rep-152-17/18, Version: 1 Approval of Facilities Contract Actions December 12, 2017
More informationQ. What are we voting on? Q. How was the referendum developed?
Q. What are we voting on? A. On April 3rd, the voters of the Peshtigo School District will have the opportunity to vote on two referendum questions. The first question will approve $29,960,000 for the
More informationBoulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects
4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural
More informationTHIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2552 as follows:
Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 15-BS-2552 CM GC ADDENDUM NUMBER ONE September 9, 2015 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM
More informationFY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us
FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us 1 Facilities and Technology Long- Term Facilities Maintenance (LTFM) FY 2017 MDE > School Support > School Finance > Facilities and
More informationFAQ s HISTORY AND FEATURES. 1. What is on the May 8, 2018 ballot? 2. How was this bond program developed?
FAQ s HISTORY AND FEATURES 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal to implement improvements and renovations
More informationProfessional Design Services for Memorial Field. City Of Scranton Lackawanna County
Proposal to Provide: Statement of Qualifications for: General Engineering Consulting s Environmental and Geotechnical Engineering s Professional Design s for Memorial Field Submitted to: Submitted to:
More informationREQUEST FOR PROPOSAL DESIGN BUILD PUBLIC WORKS BUILDING. March 2017
REQUEST FOR PROPOSAL DESIGN BUILD PUBLIC WORKS BUILDING The City of Alabaster is currently accepting proposals for Design Build Services for the design and construction of a new public works facility to
More informationNEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES
NEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES PROGRAM OBJECTIVES Property owners desire to generate adequate rents from their commercial buildings while
More informationThis request for qualifications seeks the following type of service providers:
ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,
More informationELEVATE GRANTS DOWNTOWN FACADE GRANT PROGRAM
ELEVATE GRANTS DOWNTOWN FACADE GRANT PROGRAM Elevate Goals: The mission of this façade restoration program is to provide grants and low interest loans to downtown property owners for revitalizing the exteriors
More informationBLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW. April 24, 2018 Special Election
BLAINE SCHOOL DISTRICT CAPITAL LEVY DETAIL REVIEW April 24, 2018 Special Election Urgent Needs and Related Program Implications The Facility Needs Review Committee was charged with considering projects
More informationSouthern Kern Unified School District
Southern Kern Unified School District REQUEST FOR QUALIFICATIONS 18-01 FOR Energy Program Professional Services RESPONSES DUE BY November 8, 2017 SUBMIT TO Southern Kern Unified School District 2601 Rosamond
More informationREQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT PRICE CENTER WEST INTERIOR/EXTERIOR DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO
EXECUTIVE ARCHITECT FOR THE PRICE CENTER WEST INTERIOR/EXTERIOR DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO CPM Project No. 5250 Proposals due JANUARY 8, 2018 Issue date December 18, 2017 I.
More informationBond Frequently Asked Questions
Bond Frequently Asked Questions Q: This Bond program totals $680 million. How does that compare with prior BSD Bond programs? A: The proposed 2014 Bond is quite comparable with recent Bond programs considering
More informationProjects awarded to consultants under Annual Services agreements or to contractors under Job Order Contracting purchase orders are not listed.
Update and projected projects Updates generally are posted following our monthly Governing Board meeting when official awards are made. These meetings are the fourth Tuesday of each month except December
More informationLOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No.
LOOSE FORMS PACKAGE TECHNICAL RFP No. 63973-F; Project No. 16-676-207-00 1. GENERAL CONTRACTOR EXPERIENCE FORM 2. KEY PERSONNEL FORM 3. PROJECT APPROACH/PRELIMINARY SCHEDULE 5. COMPANY PROFILE 6. ANNUAL
More informationDoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)
DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page Request Request Mission No. Kentucky Fort Knox High School Replacement
More informationFrequently Asked Questions 2018 Bond Program
HISTORY AND FEATURES Frequently Asked Questions 2018 Bond Program 1. What is on the May 8, 2018 ballot? On May 8, 2018, voters in the Jackson Public Schools District will be asked to consider a bond proposal
More informationHOME RENOVATION TAX CREDIT (HRTC)
HOME RENOVATION TAX CREDIT (HRTC) The Home Renovation Tax Credit applies to eligible expenses of more than $1,000, but not more than $10,000, resulting in a maximum non-refundable tax credit of $1,350
More informationSOUTH DAKOTA BOARD OF REGENTS. Planning, Governance, and Resource Development
SOUTH DAKOTA BOARD OF REGENTS Planning, Governance, and Resource Development AGENDA ITEM: 5 F DATE: December 5-7, 2017 ****************************************************************************** SUBJECT
More informationGreen Building Incentive Program Guidelines & Procedures
Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,
More informationREQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT
REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT The Town of Cromwell is seeking written responses to a Request
More informationCanby Façade Improvement Program
Canby Façade Improvement Program Grant Program Manual (January 2017) A Project of Canby Urban Renewal Agency Managed By: Downtown Canby Main Street Program Jamie Stickel, Main Street Manager 222 NE 2nd
More informationInformation & Application
City of Holly Hill Community Redevelopment Area Commercial Property Improvement Matching Grant Program Guidelines and Application adopted April 14, 2015 Information & Application Please note that applications
More informationDEVELOPMENT INCENTIVE PROGRAMS
DEVELOPMENT INCENTIVE PROGRAMS The Joliet City Center Partnership seeks to promote a healthy and expanding business climate in the Downtown Core Area. Utilizing revenues from an economic development special
More informationREQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER
REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER For the UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF FACILITIES DESIGN & CONSTRUCTION Issue Date: August 24, 2016 Proposals due: Thursday,
More informationNew Hope-Solebury School District Facilities Committee Meeting Minutes April 19, 2017, 6:00 pm Upper Elementary School Room 105
New Hope-Solebury School District Facilities Committee Meeting Minutes April 19, 2017, 6:00 pm Upper Elementary School Room 105 Attendance School Board John Capriotti, Mark Cowell Administration Dave Hansel,
More informationBCPS 2017 Bond Issue Frequently Asked Questions
BCPS 2017 Bond Issue Frequently Asked Questions The Beal City Public Schools Board of Education formally approved the ballot language for a proposal to be put forward to the community for a bond issue
More informationDATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP
Attendees: reference sign-in sheet. Tom Brown, Coordinator Design & Construction, opened meeting at 9:30 AM. Welcomed attendees Meeting recorded; mandatory meeting, sign-in required; leave business cards
More information21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEE MEETING SEPTEMBER 9, 2014
21ST CENTURY SCHOOLS BOND ADVISORY COMMITTEE MEETING SEPTEMBER 9, 2014 APPROVAL OF ANNUAL REPORT 2 APPROVAL OF ANNUAL REPORT Since the August 25, 2014 meeting, based on input provided at the time and in
More informationRIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016
RIVERSIDE LOCAL SCHOOL DISTRICT JANUARY 2016 BUILDING YEAR BUILT (per OFCC audit) AGE (years old) BUILDING SQUARE FOOTAGE (per OFCC audit) Buckeye 1964 1994 52 22 28,512 sq. ft. Hadden 1932 1942 1952
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced
REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:
More informationVARIOUS CITY OF BUFFALO PARKS AND BUFFALO PUBLIC SCHOOLS FACILITIES SURVEY AND DESIGN DEVELOPMENT
Request for Proposals Professional Architectural & Engineering Services VARIOUS CITY OF BUFFALO PARKS AND BUFFALO PUBLIC SCHOOLS FACILITIES SURVEY AND DESIGN DEVELOPMENT INTRODUCTION & BACKGROUND The Community
More informationSchool Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year
School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year 2015-16 Prepared By: Internal Auditors April 12, 2016 Table of Contents Transmittal Letter... 1 Overview... 2-6
More informationREQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS
AS-NEEDED EXECUTIVE ARCHITECTS FOR INFRASTRUCTURE PROJECTS UC SAN DIEGO HEALTH SYSTEM - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF CAPITAL PROGRAM MANAGEMENT Proposals due June 5, 2018 Issue
More informationCAPITAL IMPROVEMENT PROGRAM (CIP)
CAPITAL IMPROVEMENT PROGRAM (CIP) City of Chesapeake FY 2016 2020 11/26/2014 1 OBJECTIVES Preserve and protect existing infrastructure and municipal facilities Strategic investments Comply with Federal
More informationENERGY EFFICIENCY PARTNERSHIP PROGRAM BEST PRACTICE AWARDS APPLICATION FORM
This form is only for nominations in the Sustainability Innovations category This award category was created to recognize sustainability projects that do not fit into any of the other award categories.
More informationENERGY UPGRADE CALIFORNIA
ENERGY UPGRADE CALIFORNIA Cathy Fogel, Residential Energy Efficiency Program Analyst California Public Utilities Commission California and Energy: Agencies California Public Utilities Commission Regulates
More informationMETROPOLITAN FOOTBALL STADIUM DISTRICT. Request for Proposal for Conditions Assessment
February 26, 2016 METROPOLITAN FOOTBALL STADIUM DISTRICT Request for Proposal for Conditions Assessment Purpose The purpose of this request for proposals (RFP) is to engage the services of a qualified
More informationREPORT OF THE CHIEF LEGISLATIVE
REPORT OF THE CHIEF LEGISLATIVE ANALYST DATE: December 4, 2013 TO: FROM: Honorable Members of the Economic Development GerryF.Miller ~~~ L. Chief Legi a ive Committee A TERNATIVE MODERNIZATION OPTIONS
More informationDallas County Community College District Bond Program. July 10, 2007
Dallas County Community College District 2004 Bond Program July 10, 2007 1 2004 Bond Program Eastfield College 2 Industrial Technology Site Plan Workforce Development Eastfield College Learning Center
More informationTHE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR:
REQUEST FOR QUALIFICATIONS DESIGN PROFESSIONAL SERVICES DATE ISSUED: 4/05/18 THE ARIZONA BOARD OF REGENTS for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: ASU PROJECT DESIGN
More informationMain Street Saskatchewan Grant Program Application deadline: August 31, 2015
Main Street Saskatchewan Grant Program Application deadline: August 31, 2015 The (MSSGP) supports implementation of the Main Street Four Point Approach in communities participating in the Main Street Saskatchewan
More informationDistrict Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016
REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECT/ENGINEER (A/E) PROFESSIONAL SERVICES For the At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 PART 1 GENERAL INTRODUCTION
More informationRebuilding Albany High School Facilities referendum Tuesday, Feb. 9
Rebuilding Albany High School Facilities referendum Tuesday, Feb. 9 Community Forum January 14, 2016 Agenda Welcome Presentation: New proposal What s changed? What s stayed the same? Benefits for students
More informationCity of Batavia Downtown Improvement Grant
City of Batavia Downtown Improvement Grant INTRODUCTION The Downtown Improvement Grant Program is designed to enhance the overall economic viability and appearance of downtown Batavia by assisting in the
More informationLos Angeles Unified School District Page 1 of 5
Los Angeles Unified School District 333 South Beaudry Ave, Los Angeles, CA 90017 Board of Education Report File #: Rep-341-15/16, Version: 1 Amendment to the Facilities Services Division Strategic Execution
More informationPalm Springs Unified School District
Palm Springs Unified School District Facilities and Upcoming Projects Presented by PSUSD Staff: Julie Arthur, Executive Director Facilities Planning & Development May 4, 2017 Palm Springs Unified School
More informationREGULAR MEETING OF THE CITIZENS OVERSIGHT COMMITTEE
Mt. SAN ANTONIO COLLEGE REGULAR MEETING OF THE CITIZENS OVERSIGHT COMMITTEE Tuesday, November 18, 2003 MINUTES Prior to the regular meeting, Gary Nellesen, Director, Facilities Planning & Management, Randy
More informationREQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT
REQUEST FOR PROPOSALS: COMPACT BLUE PROGRAM MANAGEMENT Background Compact Blue is an innovative program recently approved for $4 million in grant funding by The Bill and Melinda Gates Foundation. Compact
More informationREQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES
REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES Prepared by: Middleton-Cross Plains Area School District 7106 South Avenue Middleton, Wisconsin 53562 December 22, 2011 Request for
More informationJacksonville Defense Business Conference
Jacksonville Defense Business Conference - 2015 Doing Business with Military Bases in Florida Tuesday - July 28, 2015 7:30am - 4:00pm University of North Florida (Herbert Conference Center) 12000 Alumni
More informationupgrade to consider may be the Heating Ventilation and Air Conditioning (HVAC) system. Facilities may have to maintain higher humidity & filtration le
Upgrading Your ASC Options for Adding Surgical Capacity John A. Marasco, AIA President, Marasco & Associates, Healthcare Architects & Consultants As Published in Today s Surgicenter, June, 2004 When an
More informationJanuary 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES
January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Courthouse & Administrative Building II. Goal Forsyth County requests responses from licensed
More informationDowntown Interior Improvement Grant Program Application Packet
VILLAGE OF GLEN ELLYN Downtown Interior Improvement Grant Program Application Packet Village Manager s Office 535 Duane Street Glen Ellyn, IL 60137 Telephone 630.547.5345 Fax 630.469.8849 X:\Plandev\PLANNING\FORMS\Downtown
More informationBusiness Ready Community Grant and Loan Program
Business Ready Community Grant and Loan Program Report and Recommendations to the Wyoming Business Council November 23, 2015 CONTENTS BRC Financial Summary 2 BRC Application and Program Summary 2 Laramie
More informationHISTORIC ARCHITECTURE ASSISTANCE FUND
HISTORIC ARCHITECTURE ASSISTANCE FUND Policies The Historic Architecture Assistance Fund provides the service of architects to the owners of historic buildings to address issues involved with the rehabilitation
More informationParrington Hall Renovation Evan School of Public Policy & Governance Project no RFQ Pre-submission Meeting - April 24, 2018
Parrington Hall Renovation Evan School of Public Policy & Governance Project no. 205475 RFQ Pre-submission Meeting - April 24, 2018 Agenda Introduction Parrington Project Overview RFQ Process and Schedule
More informationAbout Faculty Grants
About Faculty Grants VentureWell awards faculty grants to colleges and universities for the purpose of strengthening existing curricular programs and/or building new courses and programs in invention,
More informationCapital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins
Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies
More informationA model of new thinking in mental health treatment HOFFMAN BUILDS:
04.2014 HOFFMAN BUILDS: A model of new thinking in mental health treatment At the turn of the 21st Century, the Oregon State Hospital in Salem was ready for some tender, loving care. The Cuckoo s Nest
More informationMerced Community College District Bond Oversight Committee Minutes Thursday, October 15, 2009
Merced Community College District Bond Oversight Committee Minutes Thursday, October 15, 2009 Members Present: Members Absent: Others Present: Mike Amabile (chairperson), William Warner, Shawna Guerrero,
More informationFAÇADE RENOVATION GRANT PROGRAM DESCRIPTION
PROGRAM DESCRIPTION The Façade Renovation Grant is designed for large scale renovation projects to the façade of a building within the boundaries of the Longmont Downtown Development Authority (LDDA).
More informationDonald W. Reynolds Razorback Stadium North End Zone Addition and Stadium Renovation. Project Update as of January 2018
Donald W. Reynolds Razorback Stadium North End Zone Addition and Stadium Renovation Project Update as of January 2018 EXECUTIVE SUMMARY The Donald W. Reynolds Razorback Stadium Project is on schedule and
More informationSAN ANTONIO FOR GROWTH ON THE EASTSIDE 2014 ANNUAL REPORT
SAN ANTONIO FOR GROWTH ON THE EASTSIDE 2014 ANNUAL REPORT 2014 was a year of putting key building blocks into place to support community revitalization FROM THE BOARD CHAIR & EXECUTIVE DIRECTOR For SAGE,
More informationPat McGough, WLWV Remo Douglas, WLWV Tony Vandenberg HEERY Karina Ruiz, DOWA-IBI Group Norm Dull, DOWA-IBI Group
DULL OLSON WEEKES - IBI GROUP ARCHITECTS, INC. 907 SW Stark Street Portland OR 97205 USA tel 503 226 6950 fax 503 273 9192 www.dowa-ibigroup.com DATE: May 7, 2015 PROJECT: WLWSD 2014 Bond Planning PROJECT
More information2018 CRA Business Incentive & Assistance Program
2018 CRA Business Incentive & Assistance Program Program Guidelines - Procedures Application Program Description: The CRA Business Incentive & Assistance Program assists qualified business or property
More informationREQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT CANYON VISTA DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No.
EXECUTIVE ARCHITECT FOR THE CANYON VISTA DINING RENOVATION UNIVERSITY OF CALIFORNIA, SAN DIEGO CPM Project No. 5289 Proposals due JUNE 11, 2018 Issue date May 24, 2018 I. INTRODUCTION The University of
More informationREQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT FOR HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT FD&C Project No. 4952 Proposals due THURSDAY, JUNE 4, 2015 Issue Date May 19, 2015 I.
More informationFARMERSVILLE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT SERVICES
FARMERSVILLE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT SERVICES RESPONSES ARE DUE: September 1, 2017-2:00 P.M. Voluntary Facility Walk Through: August 11, 2017-2:00 P.M. Farmersville
More informationColorado School Finance Project School finance research since 1995.
Bond,, Mill, Technology Mill November 2013 Elections BOND ELECTIONS: Adams 14 Bond $44,000,000 Provide instructional technology to enable students, including students with learning disabilities to access
More informationGalesburg Public Library, Galesburg, IL
Galesburg Public Library, Galesburg, IL Request for Qualifications ( RFQ ) Architectural, Engineering, Construction Management and Related Services I. OVERVIEW The Galesburg Public Library is seeking architectural,
More informationMINNESOTA STATE COLLEGES AND UNIVERSITIES
MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State Community and Technical College Center for Student and Workforce Success REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL AND ENGINEERING DESIGN SPECIAL
More informationHerricks Union Free School District Capital Improvements Bond Update. July 20, 2017
Herricks Union Free School District 2016 Capital Improvements Bond Update July 20, 2017 Timeline to Date December 6, 2016 Successful Bond Referendum Vote December, 2016 BBS conducts field survey of existing
More information