Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2013 Budget Estimate

Size: px
Start display at page:

Download "Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2013 Budget Estimate"

Transcription

1 Department of the Air Force Military Family Housing Fiscal Year (FY) 2013 Budget Estimate Justification Data Submitted to OSD/OMB February 2012

2

3 INDEX SUBJECT PAGE INDEX 1 FAMILY HOUSING NARRATIVE 3 FINANCIAL SUMMARY 4 Summary of Inadequate Housing FH-11 5 Air Force Inadequate Housing Units Eliminated FH-8 8 LEGISLATIVE LANGUAGE Authorization 11 Appropriation 12 NEW CONSTRUCTION New/Current Mission Activities 13 Construction Purpose and Scope 14 POST ACQUISITION CONSTRUCTION Purpose and Scope 15 Overseas Japan 18 Post Acquisition Over $50,000 per Unit Overseas Kadena AB, JA 21 Misawa AB, JA 25 Misawa AB, JA 28 ADVANCE PLANNING AND DESIGN 31 OPERATION AND MAINTENANCE SUMMARY Narrative (Purpose and Scope) 33 Inventory and Funding Summary FH-2 36 Historic Housing FH-6 40 February

4 INDEX SUBJECT PAGE OPERATIONS 43 Management OP-5 44 Services OP-5 45 Furnishings OP-5 46 Miscellaneous OP-5 49 UTILITIES OP-5 51 MAINTENANCE OP-5 55 MAINTENANCE AND REPAIR OVER $20,000 PER UNIT 59 GENERAL OFFICER QUARTERS OVER $35,000 PER UNIT 61 REIMBURSABLE PROGRAM OP-5 65 LEASING Purpose and Scope 67 OP-5 69 Exhibit FH-4, Leasing (Other than Section 801) 70 Exhibit FH-4A, High Cost Foreign Leased Units 71 Exhibit FH-4B, Section 801 Leases 72 HOUSING PRIVATIZATION OP-5 73 Exhibit FH-6, Family Housing Privatization 76 FOREIGN CURRENCY PB-18 EXHIBIT, Foreign Currency Exchange Data 79 February

5 NARRATIVE SUMMARY This Military Family Housing request reflects the Air Force s commitment to revitalize inadequate houses and provide service members with homes that meet contemporary standards similar to the size and floor pattern of homes constructed in the local community. The Air Force created the Air Force Family Housing Master Plan (FHMP) as the roadmap to guide our planning and programming of investment, operations and maintenance, and privatization in military family housing. This budget request fully funds the AF FHMP which privatizes all family housing in CONUS bases and sustains and modernizes family housing in overseas bases. The Air Force FHMP provides a balanced, requirements based strategy that integrates and prioritizes traditional construction and operations and maintenance, with a measured approach to privatization into a single roadmap. The Air Force recognizes that we rely on the local community and privatized housing to provide more than 75 percent of our military family housing needs. When local community housing is unavailable, or inadequate, or demand for base housing is high due to economic factors, we construct, replace, improve, or repair and maintain existing military family housing to modern-day, industry standards. Also, where possible and fiscally appropriate, we attempt to lease adequate housing for our families. Consistent with AF FHMP priorities, this budget provides a program that emphasizes construction to upgrade homes to whole-house standards, and supports operations and maintenance of our housing inventory for daily operations to keep the doors open and where needed to keep good houses good. In this way we prevent deterioration in our existing adequate inventory. We are accelerating revitalization of inadequate homes in the worst condition by improving or replacing to contemporary standards, where economically justifiable. The operations, maintenance and leasing accounts predominantly support must pay requirements. These costs include service contracts, lease contracts, utilities, and essential maintenance for operating the units and contract funding to correct life safety, health, and facility preservation issues that cannot wait for Family Housing Construction funding. We believe this funding profile represents a well-balanced, fiscally constrained program. By allocating adequate funds to construction investment, we are sustaining and modernizing our inadequate units and ensuring Maintenance & Repair (M&R) dollars are working to fund must pay bills and essential housing repairs. We respectfully request full support for the Air Force family housing needs presented herein. February

6 FY 2013 FINANCIAL SUMMARY AUTHORIZATION FOR APPROPRIATION REQUESTED FOR FY 2013: FUNDING REQUEST FY 2013 ($000) Construction $ 0 Post-Acquisition Construction 79,571 Advance Planning and Design 4,253 Appropriation Request: Construction 83,824 Operations, Utilities and Maintenance 388,972 Operating Expenses 111,373 Utilities 75,662 Maintenance 201,937 Housing Privatization 46,127 Leasing - Worldwide 62,730 Appropriation Request: O&M, Leasing, Housing Privatization and Debt Payment 497,829 Appropriation Request 581,653 Reimbursement Request 5,715 FY 2013 FAMILY HOUSING BUDGET REQUEST 587,368 February

7 FH-11 Inventory and Condition 1 of Government-Owned, Family Housing Units WORLDWIDE (Number of Dwelling Units in Inventory) Number of Units - Worldwide FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 Beginning of FY Adequate Inventory Total 29,170 27,536 26,556 24,702 17,495 17,495 17,495 Q1-90% to 100% 20,419 19,275 18,602 17,304 12,247 12,247 12,247 Q2-80% to 89% 8,751 8,261 7,954 7,398 5,248 5,248 5,248 Beginning of FY Inadequate Inventory Total 8,066 5,538 5,537 5, Q3-60% to 79% 6,453 4,431 4,430 4, Q4-59% and below 1,613 1,107 1,107 1, Beginning of FY Total Inventory 37,236 33,074 32,093 30,239 17,557 17,557 17,557 Percent Adequate - Beginning of FY Inventory 78% 83% 83% 83% 99% 99% 99% Inadequate Inventory Reduced Through: (2,528) (1) (416) (5,475) Construction (MilCon) (404) (1) (416) Maintenance & Repair (O&M) Privatization (1,189) - - (5,475) Demolition/Divestiture/Diversion/Conversion (935) Funded by Host Nation Adequate Inventory Changes: (1,634) (980) (1,438) (7,207) Privatization (1,198) (674) - (7,207) Demolition/Divestiture/Diversion/Conversion (840) (307) (1,854) Construction (MilCon) End of FY Adequate Inventory Total 27,536 26,556 24,702 17,495 17,495 17,495 17,495 Q1-90% to 100% 19,275 18,602 17,304 12,247 12,247 12,247 12,247 Q2-80% to 89% 8,261 7,954 7,398 5,248 5,248 5,248 5,248 End of FY Inadequate Inventory Total 5,538 5,537 5, Q3-60% to 79% 4,431 4,430 4, Q4-59% and below 1,107 1,107 1, End of FY Total Inventory 33,074 32,093 30,239 17,557 17,557 17,557 17,557 Percent Adequate - End of FY Inventory 83% 83% 82% 99% 99% 99% 99% DoD Performance Goal - At least 90% Q1/Q2 beginning in FY % 90% 90% 90% 90% 90% NOTE: 1 - Condition Index (CI) is a general measure at a specific point in time with respect to physical condition and ability to support the current occupant or mission. CI is calculated as the ratio of Plant Replacement Value (PRV) minus the estimated cost of maintenance and repair requirements, divided by PRV. This provides a CI, or Q-rating (Q1 to Q4), from 0% to 100%, with 100% representing excellent condition. February

8 FH-11 Inventory and Condition 1 of Government-Owned, Family Housing Units UNITED STATES (CONUS plus Hawaii and Alaska) (Number of Dwelling Units in Inventory) Number of Units - U.S. FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 Beginning of FY Adequate Inventory Total 10,226 8,188 7,207 7, Q1-90% to 100% 7,158 5,731 5,057 5,057 Q2-80% to 89% 3,068 2,457 2,150 2,150 Beginning of FY Inadequate Inventory Total 7,599 5,475 5,475 5, Q3-60% to 79% 6,079 4,380 4,380 4,380 Q4-59% and below 1,520 1,095 1,095 1,095 Beginning of FY Total Inventory 17,825 13,663 12,682 12, Percent Adequate - Beginning of FY Inventory 57% 60% 57% 57% % % % Inadequate Inventory Reduced Through: (2,124) - - (5,475) Construction (MilCon) Maintenance & Repair (O&M) Privatization (1,189) (5,475) Demolition/Divestiture/Diversion/Conversion (935) Funded by Host Nation Adequate Inventory Changes: (2,038) (981) - (7,207) Privatization (1,198) (674) (7,207) Demolition/Divestiture/Diversion/Conversion (840) (307) Construction (MilCon) End of FY Adequate Inventory Total 8,188 7,207 7, Q1-90% to 100% 5,731 5,057 5,057 Q2-80% to 89% 2,457 2,150 2,150 End of FY Inadequate Inventory Total 5,475 5,475 5, Q3-60% to 79% 4,380 4,380 4,380 Q4-59% and below 1,095 1,095 1,095 End of FY Total Inventory 13,663 12,682 12, Percent Adequate - End of FY Inventory 60% 57% 57% % % % % NOTE: 1 - Condition Index (CI) is a general measure at a specific point in time with respect to physical condition and ability to support the current occupant or mission. CI is calculated as the ratio of Plant Replacement Value (PRV) minus the estimated cost of maintenance and repair requirements, divided by PRV. This provides a CI, or Q-rating (Q1 to Q4), from 0% to 100%, with 100% representing excellent condition. February

9 FH-11 Inventory and Condition 1 of Government-Owned, Family Housing Units FOREIGN (includes U.S. Territories) (Number of Dwelling Units in Inventory) Number of Units - Foreign FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 Beginning of FY Adequate Inventory Total 18,944 19,348 19,349 17,495 17,495 17,495 17,495 Q1-90% to 100% 13,261 13,544 13,545 12,247 12,247 12,247 12,247 Q2-80% to 89% 5,683 5,804 5,804 5,248 5,248 5,248 5,248 Beginning of FY Inadequate Inventory Total Q3-60% to 79% Q4-59% and below Beginning of FY Total Inventory 19,411 19,411 19,411 17,557 17,557 17,557 17,557 Percent Adequate - Beginning of FY Inventory 98% 99% 99% 99% 99% 99% 99% Inadequate Inventory Reduced Through: (404) (1) (416) Construction (MilCon) (404) (1) (416) Maintenance & Repair (O&M) Privatization Demolition/Divestiture/Diversion/Conversion - Funded by Host Nation Adequate Inventory Changes: (1,438) Privatization Demolition/Divestiture/Diversion/Conversion (1,854) Construction (MilCon) End of FY Adequate Inventory Total 19,348 19,349 17,495 17,495 17,495 17,495 17,495 Q1-90% to 100% 13,544 13,545 12,247 12,247 12,247 12,247 12,247 Q2-80% to 89% 5,804 5,804 5,248 5,248 5,248 5,248 5,248 End of FY Inadequate Inventory Total Q3-60% to 79% Q4-59% and below End of FY Total Inventory 19,411 19,411 17,557 17,557 17,557 17,557 17,557 Percent Adequate - End of FY Inventory 99% 99% 99% 99% 99% 99% 99% NOTE: 1 - Condition Index (CI) is a general measure at a specific point in time with respect to physical condition and ability to support the current occupant or mission. CI is calculated as the ratio of Plant Replacement Value (PRV) minus the estimated cost of maintenance and repair requirements, divided by PRV. This provides a CI, or Q-rating (Q1 to Q4), from 0% to 100%, with 100% representing excellent condition. February

10 FH-8 Air Force Inadequate Family Housing Units Eliminated in FY2011 MAJCOM Project Type Base Total Inventory minus Leased & Privatized Total Inadequate Inventory Total Inadequate Addressed Units at the beginning of FY ,236 8,066 FY2011 traditional construction, improvement, and O&M projects to eliminate inadequate units 7, PACAF Improve Hsg Kadena 7, USAFE Improve Hsg Menwith Hill Privatization projects executed to eliminate inadequate housing -2,387 1,189 Southern Group ACC Privatize Hsg Shaw AETC Privatize Hsg Keesler -1,188 0 AMC Privatize Hsg Charleston AFMC Privatize Hsg Arnold Units demolished/otherwise permanently removed from family housing Projects added by Congress in previous FY Deficit Construction projects -1, Units at end of FY ,074 5,538 2,528 Note: 1. Kadena units will become inadequate in FY11 February

11 Air Force Inadequate Family Housing Units Eliminated in FY2012 MAJCOM Project Type Base Total Inventory minus Leased & Privatized Total Inadequate Inventory Total Inadequate Addressed Units at the beginning of FY ,074 5,538 FY2012 traditional construction, improvement, and O&M projects to eliminate inadequate units USAFE Improve Hsg Menwith Hill Privatization projects executed to eliminate inadequate housing Northern Group ACC III Privatize Hsg Dyess II Units demolished/otherwise permanently removed from family housing Various bases - Adjustments for USAF Other O&M "whole house" projects, demolition, and adjustments in Projects added by Congress in previous FY 0 0 Deficit Construction projects 0 0 Units at end of FY ,093 5,537 1 February

12 Air Force Inadequate Family Housing Units Eliminated in FY2013 MAJCOM Project Type Base Total Inventory minus Leased & Total Inadequate Inventory Total Inadequate Addressed Units at the beginning of FY ,093 5,537 FY2013 traditional construction, improvement, and O&M projects to eliminate inadequate units 2, PACAF Improve Hsg Misawa (1) 2, Privatization projects executed to eliminate inadequate housing Units demolished/otherwise permanently removed from family -1,854 0 Various bases - Adjustment to inventory for USAF Other executed divestiture not previously reflected Various USAFE bases - Adjustment to USAF Other inventory for executed divestiture not previously reflected Projects added by Congress in previous FY 0 0 Deficit Construction projects 0 0 Units at end of FY ,239 5, Note: (1) Misawa units will become inadequate and improved in FY13. February

13 FY 2013 AUTHORIZATION LANGUAGE SEC FAMILY HOUSING Using amounts appropriated pursuant to the authorization of appropriations in section 2304(a)(5)(A), the Secretary of the Air Force may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of military family housing units in an amount not to exceed [$4,208,000] $4,253,000. SEC IMPROVEMENT TO UNITS Subject to section 2825 of Title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2304(a)(5)(A), the Secretary of the Air Force may improve existing military family housing units in an amount not to exceed [$80,596,000] $79,571,000. SEC AUTHORIZATION OF APPROPRIATIONS, AIR FORCE (a) IN GENERAL (5) for Military Family Housing functions - (A) For planning and design, and improvement of military family housing and facilities, [$84,804,000] $83,824,000. (B) For support of military family housing (including functions described in section 2833 of Title 10, United States Code), [$404,761,000] $497,829,000. February

14 FY 2013 APPROPRIATION LANGUAGE Family Housing Construction, Air Force For expenses of family housing for the Air Force for construction, including acquisition, replacement, addition, expansion, extension and alteration, as authorized by law, [$60,042,000] $83,824,000 to remain available until September 30, Family Housing Operations and Maintenance, Air Force For expenses of family housing for the Air Force for operations and maintenance, including, leasing, minor construction, principal and interest charges, and insurance premiums, as authorized by law [$429,523,000] $497,829,000. February

15 FY 2013 NEW/CURRENT MISSION ACTIVITIES In compliance with the Senate Appropriations Committee Report ( ) on the FY 1989 Military Construction Appropriation Act, the Air Force has included the following exhibit that displays construction projects requested in two separate categories: new mission and current mission. "New Mission" projects are projects that support deployment and beddown of new weapon systems, new program initiatives, and major mission expansions. "Current Mission" projects are projects that either replace inadequate existing facilities or construct new facilities which are not available to meet current requirements. REQUESTED NUMBER OF AUTHORIZATION LOCATION MISSION UNITS AMOUNT ($000) REQUESTED AUTHORIZATION SUMMARY: AMOUNT ($000) NEW MISSION TOTAL $ 0 CURRENT MISSION TOTAL $ 0 IMPROVEMENTS $ 79,571 PLANNING AND DESIGN $ 4,253 GRAND TOTAL $ 83,824 February

16 NEW CONSTRUCTION Purpose and Scope Budget Request $ In Thousands FY 2013 Budget Request $ 0 FY 2012 Budget Request $ 0 This program provides for the construction of new homes where the local community cannot provide adequate housing and replacement of existing homes, where improvements for Air Force personnel are not economically feasible, and support facilities where existing facilities are inadequate. Costs reflect all amounts necessary to provide complete and usable facilities. Program Summary A summary of the funding program for FY 2013 is as follows: AUTHORIZATION Number of Requested Type/Locations Mission Units Amount ($000) AUTHORIZATION Requested Amount ($000) NEW MISSION TOTAL $ 0 CURRENT MISSION TOTAL $ 0 IMPROVEMENTS $ 79,571 PLANNING AND DESIGN $ 4,253 GRAND TOTAL $ 83,824 February

17 FY 2013 POST ACQUISITION CONSTRUCTION Purpose and Scope Budget Request $ In Thousands FY 2013 Budget Request $79,571 FY 2012 Budget Request $55,834 The Air Force has approximately 32,100 owned units and 41,500 privatized units in the beginning of FY The average age of housing units in the Air Force inventory is close to 20 years. In FY 2013 and based on recent analysis incorporated into the Air Force Family Housing Master Plan (AF FHMP), more than 400 units require renovation to meet contemporary living standards. Many of these units require major expenditures to repair or replace deteriorated mechanical, electrical, or structural components, and to provide some of the basic modern amenities found in comparable community housing. The Post Acquisition Construction Program provides this needed revitalization. Each project also includes a significant amount of concurrent maintenance and repair to maximize the project cost effectiveness. The Air Force is the acknowledged DoD leader in developing the "whole house" revitalization concept. Whole house is the combination of needed maintenance and repair together with improvements to bring the unit to contemporary standards. In addition, we are looking beyond the house to the entire housing area in our requirements plan. Our "whole neighborhood" concept is being refined and includes the development of supporting housing infrastructure requirements, neighborhood vehicular and pedestrian circulation concepts to consider citing, density, landscaping, parking, playgrounds, recreation areas and utilities, in addition to the housing unit itself. Consistent with Authorization and Appropriation Committees' language in FY 1990, the Air Force is seeking to maintain funding in this account to continue revitalizing our aging homes. Consistent with Appropriation Committees' language in FY 1985, the Air Force has gathered data on the post acquisition construction projects to detail past projects on these units and any future work being programmed within a three year period. This information is provided as a part of this submittal. February

18 Program Summary Authorization is requested for: (1) Various improvements to existing public quarters, as described on DD Form (2) Appropriation of $79,571,000 to fund projects in FY NOTE: Projects within the program are within the statutory limitation of $50,000 per unit adjusted by area cost factor, except as identified by separate DD Form February

19 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION AND LOCATION VARIOUS AIR FORCE BASES 5. PROGRAM ELEMENT 6. CATEGORY CODE 4. PROJECT TITLE FAMILY HOUSING POST ACQUISITION CONSTRUCTION 7. PROJECT NUMBER 8. PROJECT COST ($000) 88742/ COST ESTIMATE ITEM U/M QUANTITY UNIT COST POST ACQUISITION CONSTRUCTION PROJECTS TO IMPROVE HOUSING UNITS PROJECTS TO IMPROVE INFRASTRUCTURE TOTAL CONTRACT COST TOTAL REQUEST UN LS 79,571 COST ($000) ,923 62,648 79,571 79, DESCRIPTION OF PROPOSED CONSTRUCTION: Includes all work necessary to revitalize military family housing by providing: air-conditioning, where authorized; modern functional layouts; soundproofing; and utility and site improvements. Energy conservation actions include new and additional insulation, storm windows, solar screens, and efficient heating and cooling systems. Infrastructure work upgrades common, dedicated electrical, water and wastewater utility systems to meet current code, configuration and capacity requirements. 11. PROJECT: This request is for an authorization and appropriation of $ million to accomplish improvement in family housing. REQUIREMENT: To revitalize and improve the livability of older, obsolete family housing units, to conserve energy in these older housing units, and to bring utility systems up to current safety standards. Whole-house improvements include but are not limited to: kitchen upgrades, bathroom additions/upgrades, repair/replacement of roofs, upgrade of mechanical and electrical systems, replacement of windows, doors, floors, and exterior improvements (patios, fences, storages, etc.) CURRENT SITUATION: The majority of these family housing units and utility systems were constructed during the late 1950 s through 1980 s using various design and construction criteria, with different types of material, equipment, and appliances. Insulation, storm windows and doors, etc. are needed to conserve energy and reduce operating costs. This program will extend the useful life of many of our older, less modern units by enhancing livability, functionality, reducing operation costs and improving safety standards. ADDITIONAL: These projects meet the criteria/scope specified in Part II of Military Handbook 1190, Facility Planning and Design Guide. Energy evaluation/life-cycle cost analysis was performed in support of these projects. The Air Force will improve existing family housing units to the size and floor pattern similar to the local standards and up to the following size: E1-E6: 2 BR (1080 NSF/1340 GSF), 2 BR Modified (1180 NSF/1480 GSF), 3 BR (1310 NSF/1630 GSF), 4 BR (1570 NSF/1950 GSF), 5 BR (1850 NSF/2300 GSF); E7-E9/O1-O3: 2 BR (1200 NSF/1490 GSF), 2 BR Modified (1350 NSF/1670 GSF), 3 BR (1500 NSF/1860 GSF), 4 BR (1730 NSF/2150 GSF), 5 BR (2020 NSF/2510 GSF); O4-O5: 3 BR (1630 NSF/2020 GSF), 4 BR (1860 NSF/2310 GSF); O-6: 4 BR (2030 NSF/2520 GSF); O-7: 4 BR (2690 NSF/3330 GSF). DD FORM 1391, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO UNTIL EXHAUSTED February

20 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION AND LOCATION VARIOUS AIR FORCE BASES 4. PROJECT TITLE POST ACQUISITION CONSTRUCTION 5. PROJECT NUMBER 10. Description of work to be accomplished Current Working Location and Project Estimate ($000) OVERSEAS JAPAN KADENA AB 32,558 IMPROVE INFRASTRUCTURE, PHASE 2 LXEZ Provide electrical, water and sewer systems improvements in the military family housing (MFH) in Kadena Air Base, Japan Electrical system - Replace and upgrade existing overhead electrical distribution system to underground electrical distribution system of the T1 & T2 feeders entering from the Ty-Base substation and necessary duct banks for communication and CATV in the remaining area of Sebille Manor area. Construct duct banks in support of communications circuits in Washington Height, North Terrace and Terrace Heights. Replace/install street lighting in Washington Heights, Jennings and all Camp Courtney area. Abate electrical manholes for lead and asbestos in all USMC (Camp Courtney/Camp McTureous/Camp Foster/ Camp Lester) and Kadena areas (Sebille Manor/Washington eights/jennings/north Terrace/Terrace Heights) 2. Water system - Replace and upgrade water distribution system in housing areas to include performing necessary repairs to and replacement of water mains, laterals, gate valves, and hydrants in Washington Heights, North Terrace and Terrace Heights areas. 3. Sewer system - Replace and upgrade all existing sewer mains, laterals, and manholes with PVC piping and new concrete manholes in North Terrace and Terrace Heights areas. - Other electrical, water and sewer related work including service disconnects, repairs to disturbed and displaced pavements and existing adjacent utilities, associated site improvements and demolition of existing infrastructure which impairs construction. Provide hazardous materials abatement and lab tests and analysis to confirm results. (Separate DD Form 1391 attached) - WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None - WORK PROGRAMMED FOR NEXT THREE YEARS: None MISAWA AB 30,090 IMPROVE MFH INFRASTRUCTURE, PHASE 2 QKKA Replace the exterior MFH electrical system for all of the housing areas--from the main substation to all houses. Upgrade and reconfigure existing substations as necessary. All feeders shall be underground. Replace all PCB transformers and worn transformers, switches and devices. Include all wiring up to the panel of each house. Transformers (including potential transformers), and capacitors will be tested for PCB content before disposal. Design new system to increase the capacity to meet current and near future needs. Overall increase of the capacity of the system to be 9,000 KVA in order to supply added power for future air conditioners. (Separate DD Form 1391 attached) - WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None - WORK PROGRAMMED FOR NEXT THREE YEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO UNTIL EXHAUSTED February

21 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION AND LOCATION VARIOUS AIR FORCE BASES 4. PROJECT TITLE POST ACQUISITION CONSTRUCTION 5. PROJECT NUMBER MISAWA AB 16,923 IMPROVE FAMILY HOUSING QKKA133001P2 - Install air conditioning in 416 MFH units via air source heat pumps. Include heat pumps, wall or ceiling mount units, ducting, electrical, controls, and all other necessary related work for complete and usable air conditioning systems. Architectural works include enclosure of refrigerant lines and electrical lines to each fan coil unit and pad for mounting each outside condensing unit. Electrical works include electrical wiring from fan coil unit to distribution service panel and main distribution panel and upgrade main distribution panel, secondary feeder and service transformer, and base energy monitor and control system. (Separate DD Form 1391 attached) - WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: None - WORK PROGRAMMED FOR NEXT THREE YEARS: None DD FORM 1391c, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO UNTIL EXHAUSTED February

22 POST ACQUISITION CONSTRUCTION PROJECTS (OVER $50,000 PER UNIT) A separate DD Form 1391 follows for each Post Acquisition Construction project which is over $50,000 per unit (multiplied by the Area Cost Factor). February

23 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE KADENA AIR BASE KADENA AIR BASE SITE # 1 JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE FAMILY HOUSING INFRASTRUCTURE, 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /LXEZ COST ESTIMATES ITEM U/M QUANTITY UNIT COST 32,558 COST ($000) PRIMARY FACILITIES ELECTRICAL SYSTEM WATER SYSTEM SEWER SYSTEM SUPPORTING FACILITIES SUBTOTAL DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 29,115 CONTINGENCY (5.0%) 1,456 TOTAL CONTRACT COST 30,571 SUPERVISION, INSPECTION AND OVERHEAD (6.5%) 1,987 TOTAL REQUEST 32,558 AREA COST FACTOR Description of Proposed Work: Provide electrical, water and sewer systems improvements in the military family housing (MFH) in Kadena Air Base, Japan. 1. Electrical system - Replace and upgrade existing overhead electrical distribution system to underground electrical distribution system of the T1 & T2 feeders entering from the Ty-Base substation and necessary duct banks for communication and CATV in the remaining area of Sebille Manor area. Construct duct banks in support of communications circuits in Washington Height, North Terrace and Terrace Heights. Replace/install street lighting in Washington Heights, Jennings and all Camp Courtney area. Abate electrical manholes for lead and asbestos in all USMC (Camp Courtney/Camp McTureous/Camp Foster/ Camp Lester) and Kadena areas (Sebille Manor/Washington eights/jennings/north Terrace/Terrace Heights) 2. Water system - Replace and upgrade water distribution system in housing areas to include performing necessary repairs to and replacement of water mains, laterals, gate valves, and hydrants in Washington Heights, North Terrace and Terrace Heights areas. 3. Sewer system - Replace and upgrade all existing sewer mains, laterals, and manholes with PVC piping and new concrete manholes in North Terrace and Terrace Heights areas. Other electrical, water and sewer related work including service disconnects, repairs to disturbed and displaced pavements and existing adjacent utilities, associated site improvements and demolition of existing infrastructure which impairs construction. Provide hazardous materials abatement and lab tests and analysis to confirm results. Improve family housing infrastructure, phase 2 (Current Mission). REQUIREMENT: The existing overhead electrical distribution system servicing the Sebille Manor area needs to be replaced with an underground electrical distribution system for a typhoon path location like Okinawa. Air Force has established a minimum level of lighting to meet the safety criteria for streets based on vehicular and pedestrian traffic as well as hazards involved, which is an average of 0.4 foot candles for this MFH area. The underground communications duct bank within all housing areas in support of upgrades to the Kadena housing telecommunications system. Cable television service be provided to housing units through the same network or a LF LF LF Requirement: LF Adequate: 0 LF Substandard: LF PROJECT: ,115 ( 19,011 ) ( 5,810 ) ( 4,294 ) February

24 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE KADENA AIR BASE KADENA AIR BASE SITE # 1 JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE FAMILY HOUSING INFRASTRUCTURE, 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /LXEZ ,558 parallel fiber network. Abatement will ensure that electricians servicing and working in electrical manholes are not exposed to hazardous, carcinogenic, or toxic substances. A reliable and safe water system is required to support the housing areas. The sanitary sewer system is in need of complete replacement. A reliable and functional sanitary sewer system is required to replace all of the aging sanitary sewer lines and associated equipment. CURRENT SITUATION: Existing overhead electrical distribution is unsuitable to sustain reliable power during storms, is difficult to maintain due to pole-mounted transformers, and is time-consuming to repair following damage. The overhead lines are exposed to the elements and have a problem with bats getting in the lines. The largest portion of these outages was caused by equipment failures, during severe weather exposure, and inoperable and failed water valves require utility maintenance personnel to implement work-arounds when making repairs to the mains or water distribution system. During periods of water system isolation, all housing residents in the affected area are left without potable tap water and must use bottled water for drinking and cooking. Out-of-service hydrants place military family housing units at risk due to the increased distance that fire fighters must run water hose in the event of a fire emergency. The existing sanitary sewer system has experienced numerous failures due to old age and subsiding soils resulting in cracked and leaking sewer lines every time a sanitary sewer main fails in this area. IMPACT IF NOT PROVIDED: Failure to replace deteriorated and damaged systems will require the Air Force to continue to pay an increased cost to repair and maintain the water distribution system in the all these housing areas. Repairs to the system will require a higher commitment of time by the utility maintenance staff reducing their ability to perform routine and preventative maintenance operations. Military family housing occupants will continue to face unreliable water service and to be exposed to more frequent outages and unsafe conditions. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: None. None. ADDITIONAL: The Project is not eligible for Japanese Facility Improvement Program (JFIP). The improvement/replacement ratio is 7%. The construction agent for this project is the Army Corps of Engineers, resulting in a SIOH of 6.5%. Total No. Units Supported by Neighborhood: ELECTRICAL SYSTEM Replace Overhead Elec. to Underground Ph4, SM 143 units Repair Street Lighting, WH 336 units Repair Street Lighting, JE 380 units Repair Street Lighting, CC 545 units Abate Elec. MH for Lead & Asbestos, Kadena 3970 units Abate Elec. MH for Lead & Asbestos, Camp Foster/Lester 1992 units/375 units DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. February

25 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE KADENA AIR BASE KADENA AIR BASE SITE # 1 JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE FAMILY HOUSING INFRASTRUCTURE, 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /LXEZ ,558 Abate Elec. MH for Lead & Asbestos, Camp Courtney/McT 545 units/450 units Add Comm. /CATV Support Structures, WH 336 units Add Comm. /CATV Support Structures, NT Add Comm. /CATV Support Structures, TH 327 units 135 units WATER SYSTEM Repair Water System, TH 135 units Repair Water System, NT Repair Water System, WH SEWER SYSTEM Repair Sewer System, TH Repair Sewer System, NT 327 units 336 units 135 units 327 units 718 Civil Engineer Squadron, DSN (315) FOREIGN CURRENCY: FCF Budget Rate Used: YEN DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. February

26 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE KADENA AIR BASE, JAPAN 4. PROJECT TITLE IMPROVE FAMILY HOUSING INFRASTRUCTURE 12. SUPPLEMENTAL DATA: a. Estimated Design Data: 5. PROJECT NUMBER LXEZ (1) Status: ( a ) Date Design Started 15 Jul 11 ( b ) Parametric Cost Estimate used to develop costs N ( c ) Percent Complete as of Jan ( d ) Date 35% Designed 15 Sep 11 ( e ) Date Design Complete 28 Sep 12 ( f ) Energy Study/Life-Cycle analysis was performed; (2) Basis: (a) Standard or Definitive Design - NO (b) Where design was most recently used - N/A (3) Total Cost ( c ) = ( a ) + ( b ) or ( d ) + ( e ): ($000) ( a ) Production of Plans and Specifications 1,162 ( b ) All other Design Costs 00 ( c ) Total 1,162 ( d ) Contract 1,162 ( e ) In-house (4) Construction Contract Award 15 Mar 13 (5) Construction Start 20 Jul 13 (6) Construction Completion 20 Mar 15 b. Equipment associated with this project will be provided from other appropriations: N/A DD FORM 1391c, DEC 76 PAGE NO PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED February

27 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE MISAWA AIR BASE MISAWA AIR BASE JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE MFH INFRASTRUCTURE, PHASE 2 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /QKKA COST ESTIMATES ITEM U/M QUANTITY UNIT COST 30,090 COST ($000) PRIMARY FACILITIES REPLACE POTABLE WATER LINES - MAIN BASE REPLACE POTABLE WATER LINES - NORTH BASE REPLACE SEWER LINES - MAIN BASE REPLACE SEWER LINES - NORTH BASE PRESSURE CONTROL AT NORTH WATERTOWER DEMOLITION AND DISPOSAL SUPPORTING FACILITIES SUBTOTAL 27,823 CONTINGENCY (5.0%) 1,391 TOTAL CONTRACT COST 29,214 SUPERVISION, INSPECTION AND OVERHEAD (3.0%) 876 TOTAL REQUEST 30,090 AREA COST FACTOR Description of Proposed Work: Replace all potable waterlines in family housing. Provide pressure control device at the North Base Water tower to control spikes in water pressure. Replace all sewer lines in MFH areas. Include all demolition and related work for complete and usable systems. PROJECT: Replace all potable waterlines and all sewer lines in both North base and Main base family housing. Provide pressure control device at the North Base Water tower to control spikes in water pressure. REQUIREMENT: A robust potable water and sewage utility distribution system is required to maintain MFH functionality. Misawa AB has MFH Units in two areas: North Base and Main Base. The potable water and sewer distribution systems service 1193 units at Main Base and 792 units at North Base for a total of 1,985 units. There are approximately 7,800 LM of waterline and 15,400 LM of sewer line serving these areas. Replacement of those water and sewer lines is required to maintain the function of the base housing. Installation of a pressure control system is required at the water tower on North Base to prevent pressure spikes. CURRENT SITUATION: The existing utility lines were constructed in the early 1970s and 1980s and have since been subject to deteriorative effects such as cathodic corrosion and seismic activity. Therefore, water and sewer lines in the MFH areas need to be replaced due to age and use. Water leaks are leading to waste and sewer leakage negatively affects the environment and quality of life. Homes in the North base area are subject to pressure spikes in the potable water system leading to waste and unnecessary strain on the utility system. IMPACT IF NOT PROVIDED: If this project is not funded, leaks in the water and sewer lines will worsen with the passing of time. Houses in the north base area would remain subject to pressure spikes. These conditions put the housing mission at risk LM LM LM LM EA LS ,344 1,344 57, Requirement: LM Adequate: 0 LM Substandard: LM 27,823 ( 1,927 ) ( 1,568 ) ( 12,099 ) ( 8,604 ) ( 115 ) ( 3,510 ) 0 DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. February

28 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE MISAWA AIR BASE MISAWA AIR BASE JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE MFH INFRASTRUCTURE, PHASE 2 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /QKKA ,090 and, in-turn, negatively impact the base mission. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: None. None. ADDITIONAL: This project is not eligible for Japanese Facility Improvement Program (JFIP). An economic analysis was not prepared for this project because there is only one method to accomplish the objective -- to replace the potable water and sewer lines. 35 Civil Engineer Squadron, DSN (315) FOREIGN CURRENCY: FCF Budget Rate Used: YEN DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. February

29 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE MISAWA AIR BASE, JAPAN 4. PROJECT TITLE IMPROVE MFH INFRASTRUCTURE, PHASE SUPPLEMENTAL DATA: a. Estimated Design Data: 5. PROJECT NUMBER QKKA (1) Status: ( a ) Date Design Started 19 Jul 11 ( b ) Parametric Cost Estimate used to develop costs N ( c ) Percent Complete as of Jan ( d ) Date 35% Designed 28 Sep 11 ( e ) Date Design Complete 26 Sep 12 ( f ) Energy Study/Life-Cycle analysis was performed; (2) Basis: (a) Standard or Definitive Design - NO (b) Where design was most recently used - N/A (3) Total Cost ( c ) = ( a ) + ( b ) or ( d ) + ( e ): ($000) ( a ) Production of Plans and Specifications 1,074 ( b ) All other Design Costs 0 ( c ) Total 1,074 ( d ) Contract 1,074 ( e ) In-house (4) Construction Contract Award 26 May 13 (5) Construction Start 26 Aug 13 (6) Construction Completion 30 May 15 b. Equipment associated with this project will be provided from other appropriations: N/A DD FORM 1391c, DEC 76 PAGE NO PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED February

30 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE MISAWA AIR BASE MISAWA AIR BASE JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE FAMILY HOUSING, PH 2 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) PRIMARY FACILITIES /QKKA133001P2 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST 16,923 COST ($000) 10,498 INSTALL AIR CONDITIONING IN 416 MFH UNITS EA ,236 ( 10,498 ) SUPPORTING FACILITIES ARCHITECTURAL INSTALLATION WORKS ELECTRICAL UPGRADE WORKS SUBTOTAL DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. 15,648 CONTINGENCY (5.0%) 782 TOTAL CONTRACT COST 16,430 SUPERVISION, INSPECTION AND OVERHEAD (3.0%) 493 TOTAL REQUEST 16,923 AREA COST FACTOR Description of Proposed Work: Install air conditioning in 416 MFH units via air source heat pumps. Include heat pumps, wall or ceiling mount units, ducting, electrical, controls, and all other necessary related work for complete and usable air conditioning systems. Architectural works include enclosure of refrigerant lines and electrical lines to each fan coil unit and pad for mounting each outside condensing unit. Electrical works include electrical wiring from fan coil unit to distribution service panel and main distribution panel and upgrade main distribution panel, secondary feeder and service transformer, and base energy monitor and control system. 11. Requirement: 416 UN Adequate: 0 UN Substandard: 416 UN PROJECT: Install air conditioning in 416 MFH units accomplished through the installation of air source heat pumps. Air source heat pumps will provide heating, cooling, and dehumidifing capabilities. 5,150 REQUIREMENT: Provide air conditioning in 416 MFH units by installing air source heat pump HVAC systems. Air conditioning is required for MFH customer quality of life and to comply with UFC FA. Heat pump system will include air handling units capable of performing heating, cooling, and dehumidifying functions. Each MFH unit requires approximately 2.5 Tons or 8.8 KW of cooling capacity. Each heat pump should also be sized to provide adequate heat during winter months (average of 30 BTU/Hr/sf). Installation must be completed while unit is occupied. CURRENT SITUATION: MFH units currently have no air conditioning. Air conditioning is required to improve housing environment because unit interiors become hot in the summers and experience mold/mildew growth. Additionally, many units do not have adequate cross-ventilation or have mainly south-facing exposures. Air source heat pump units will cool and dehumidify MFH units, reducing mold/mildew growth in the summer and leading to better indoor air quality for MFH customers. Installation of air conditioning is in accordance with the 2008 HCP for this base and complies with UFC FA. Misawa AB currently experiences more than 800 hours per year of wet bulb temperatures above 67 degrees F. IMPACT IF NOT PROVIDED: EA EA 6,731 5,649 2,800 ) 2,350 ) If this project is not funded, occupants would continue to February ( (

31 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA (computer generated) 2. DATE 3. INSTALLATION, SITE AND LOCATION 4. PROJECT TITLE MISAWA AIR BASE MISAWA AIR BASE JAPAN 5. PROGRAM ELEMENT 6. CATEGORY CODE IMPROVE FAMILY HOUSING, PH 2 7. RPSUID/PROJECT NUMBER 8. PROJECT COST ($000) /QKKA133001P2 16,923 be impacted by uncomfortable heat during the summers and mold/mildew growth would continue to be encouraged by the indoor air quality. These conditions negatively impact the mission of base housing and, in-turn, the mission of the base. WORK ACCOMPLISHED IN PREVIOUS THREE YEARS: WORK PROGRAMMED FOR NEXT THREE YEARS: None ADDITIONAL: This project is phase two of a phased effort to install air conditioning in all housing units on Misawa Air Base. This project would complete installation of air conditioning in all North Base housing units. This project is not eligible for Japanese Facility Improvement Program (JFIP). 35 Civil Engineer Squadron, DSN None BASE CIVIL ENGINEER: Robison FOREIGN CURRENCY: FCF Budget Rate Used: YEN DD FORM 1391, DEC 99 Previous editions are obsolete. Page No. February

32 1. COMPONENT AIR FORCE 3. INSTALLATION AND LOCATION FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE MISAWA AIR BASE, JAPAN 4. PROJECT TITLE IMPROVE FAMILY HOUSING 12. SUPPLEMENTAL DATA: a. Estimated Design Data: 5. PROJECT NUMBER QKKA133001P2 (1) Status: ( a ) Date Design Started 19 Jul 11 ( b ) Parametric Cost Estimate used to develop costs N ( c ) Percent Complete as of Jan ( d ) Date 35% Designed 24 Sep 11 ( e ) Date Design Complete 20 Sep 12 ( f ) Energy Study/Life-Cycle analysis was performed; (2) Basis: (a) Standard or Definitive Design - NO (b) Where design was most recently used - N/A (3) Total Cost ( c ) = ( a ) + ( b ) or ( d ) + ( e ): ($000) ( a ) Production of Plans and Specifications 604 ( b ) All other Design Costs 0 ( c ) Total 604 ( d ) Contract 604 ( e ) In-house (4) Construction Contract Award 20 May 13 (5) Construction Start 20 Aug 13 (6) Construction Completion 25 May 15 b. Equipment associated with this project will be provided from other appropriations: N/A DD FORM 1391c, DEC 76 PAGE NO PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED February

33 FY 2013 ADVANCE PLANNING AND DESIGN Purpose and Scope Budget Request $ In Thousands FY 2013 Budget Request $4,253 FY 2012 Budget Request $4,208 This program provides for preliminary studies to develop additional family housing facilities, one time multi-phase design, and housing community profile developments; studies for site adaptation and determination of type and design of units; and working drawings, specifications, estimates, project planning reports and final design drawings of family housing construction projects. This includes the use of architectural and engineering services in connection with any family housing new or post acquisition construction program. Program Summary Authorization is requested for: (1) Advance planning and design for future year housing programs; (2) FY 2013 Authorization and Appropriation of $4,253,000 to fund this effort as outlined in the following exhibit: February

34 1. COMPONENT AIR FORCE FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE 3. INSTALLATION AND LOCATION VARIOUS AIR FORCE BASES 5. PROGRAM ELEMENT 6. CATEGORY CODE 4. PROJECT TITLE FAMILY HOUSING ADVANCE PLANNING AND DESIGN 7. PROJECT NUMBER 8. PROJECT COST ($000) FAMILY HOUSING ADVANCE PLANNING AND DESIGN SUBTOTAL TOTAL CONTRACT COST TOTAL REQUEST COST ESTIMATE ITEM U/M QUANTITY UNIT COST 4,253 COST ($000) LS 4,253 4,253 4, DESCRIPTION OF PROPOSED CONSTRUCTION: Architect-engineer services, survey, fees, etc., in connection with advance planning and design of family housing dwelling units and properties included in or proposed for the Air Force Family Housing Construction Account. 11. PROJECT: This request is for an authorization and appropriation of $4.253 million to provide planning and design costs in connection with family housing new or post acquisition construction programs. REQUIREMENT: The funds requested are necessary to procure architect-engineer services to make site and utility investigations; one time multi-phase design, and housing community profiles (HCP) developments; and for the preparation of design and specifications of advance plans for future year family housing programs in connection with any family housing new or post acquisition construction programs. IMPACT IF NOT PROVIDED: The funds requested are necessary to support the development of the housing community plans and to support the new and post acquisition construction programs. Without the requested funds, housing community profiles cannot be developed and the new and post acquisition construction programs cannot be designed and constructed. DD FORM 1391, DEC 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY PAGE NO UNTIL EXHAUSTED February

35 OPERATIONS, UTILITIES AND MAINTENANCE (Excluding Leasing and Privatization) Budget Request $ in Thousands FY 2013 Budget Request $388,972 FY 2012 Budget Request $301,055 Purpose and Scope: Provides operations and maintenance resources to pay for the cost of ownership in terms of property management, utilities, and maintenance of Air Force owned units. The Air Force family housing budget requests essential resources to provide military families with housing either in the private market through assistance from a housing referral office, or by providing government housing. Increased emphasis has been placed on the proper funding of the family housing operations and maintenance program. The Air Force's Military Family Housing Operation and Maintenance program emphasizes the following goals: * Identify affordable housing for military members. Where shortages exist, identify project proposals to privatize or request new construction or leasing of housing for military families. * Reduce utility consumption through whole-house improvements to improve energy efficiency, increased management emphasis on energy conservation, and maintenance and repair projects to reduce energy consumption. * Provide government appliances and furniture in foreign countries where member-owned units are inappropriate or non-existent and where new housing units needing governmentsupplied appliances are coming on line. Redistribute excess furnishings from realigned bases. * Invest wisely in maintenance and repairs to preserve the existing adequate housing inventory worldwide. The top priorities are preservation of the good inventory that we have-- keeping good houses good --and resolving problems that are a threat to life, safety, or health. We are also funding demolition of inadequate surplus housing to eliminate unneeded inventory. * Schedule maintenance and repair activities along with whole-house improvements to obtain the greatest economies of scale and enhancement in livability while increasing the useful life of housing units with the minimum capital investment and minimum impact on occupants. * Support privatization of utilities through the housing or utilities privatization program as appropriate. a. Operations. This portion of the program provides for operating expenses in the following sub-accounts: February

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate Department of the Air Force Military Family Housing Fiscal Year (FY) 2017 Budget Estimate Justification Data Submitted to Congress February 2016 FISCAL YEAR 2017 BUDGET REQUEST Table of Contents FAMILY

More information

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2015 Budget Estimate

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2015 Budget Estimate Department of the Air Force Military Family Housing Fiscal Year (FY) 2015 Budget Estimate Justification Data Submitted to Congress March 2014 MARCH 2014 117 MARCH 2014 118 Table of Contents FAMILY HOUSING

More information

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands) Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page State/Installation/Project Request Request Mission No. Virginia Pentagon Reservation

More information

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS JUSTIFICATION OF ESTIMATES MARCH 2017 Military Construction The estimated cost for this report for the Department of the

More information

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands) DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page Request Request Mission No. Kentucky Fort Knox High School Replacement

More information

Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM February 2010 DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF

More information

AIR FORCE RESERVE COMMAND

AIR FORCE RESERVE COMMAND FY 1999 Budget Estimate AIR FORCE RESERVE COMMAND FY 1999 MILITARY CONSTRUCTION PROGRAM February 1998 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND JUSTIFICATION

More information

FAMILY HOUSING, DEFENSE-WIDE FY 2007 BUDGET ESTIMATE. Table of Contents PROGRAM SUMMARY...FH-2 APPROPRIATION LANGUAGE...FH-3 NEW CONSTRUCTION..

FAMILY HOUSING, DEFENSE-WIDE FY 2007 BUDGET ESTIMATE. Table of Contents PROGRAM SUMMARY...FH-2 APPROPRIATION LANGUAGE...FH-3 NEW CONSTRUCTION.. FAMILY HOUSING, DEFENSEWIDE BUDGET ESTIMATE Table of Contents Page No. PROGRAM SUMMARY...FH2 APPROPRIATION LANGUAGE...FH3 NEW CONSTRUCTION..FH4 POST ACQUISITION CONSTRUCTION..FH8 PLANNING AND DESIGN FH13

More information

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM March 2014 DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF ESTIMATES

More information

Repair Project Approval

Repair Project Approval Repair Project Approval Office of the Assistant Chief of Staff for Installation Management Bill Allen (703) 601-0705 0705 bill.allen@us.army.mil Michael Dean (703) 601-0703 0703 mike.dean@us.army.mil 1of?

More information

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies

More information

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM Fiscal Year (FY) 2017 Budget Estimates FY 2017 MILITARY CONSTRUCTION PROGRAM February 2016 DEPARTMENT OF THE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF ESTIMATES FOR FISCAL YEAR 2017 TABLE OF CONTENTS

More information

FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13

FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13 1. COMPONENT AR FY 213 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Charlotte USARC AMSA 122 Addition Charlotte,NC 5. PROGRAM ELEMENT 6. CATEGORY CODE

More information

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM April 2013 DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF ESTIMATES

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-6002 15 JANUARY 2008 Civil Engineer FAMILY HOUSING PLANNING, PROGRAMMING, DESIGN, AND CONSTRUCTION ACCESSIBILITY: COMPLIANCE WITH THIS

More information

APPENDIX K OVERSEAS HOUSING ALLOWANCE (OHA) MEMBERS ONLY

APPENDIX K OVERSEAS HOUSING ALLOWANCE (OHA) MEMBERS ONLY App K: Overseas Housing Allowance (Members Only) Table of Contents APPENDIX K OVERSEAS HOUSING ALLOWANCE (OHA) MEMBERS ONLY PART 1: GENERAL INFORMATION Par. Contents A. General B. Rental Allowance C. Utility/Recurring

More information

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011 AIR NATIONAL GUARD Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR NATIONAL GUARD

More information

H A C S A M E M O R A N D U M

H A C S A M E M O R A N D U M H A C S A M E M O R A N D U M TO: PRESENTED BY: AGENDA ITEM TITLE: HACSA Board of Commissioners Jacob Fox, Executive Director ORDER In the Matter of In the Matter of Adopting the Significant Amendment

More information

Smithsonian Institution

Smithsonian Institution Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific

More information

DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands)

DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands) DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands) New/ State/Installation/Project Authorization Approp. Current Page Request Request Mission No. North Carolina

More information

Fort Monroe Authority. Capital Improvement Plan Fiscal Years 2017 Through 2022

Fort Monroe Authority. Capital Improvement Plan Fiscal Years 2017 Through 2022 Fort Monroe Authority Capital Improvement Plan Fiscal Years 2017 Through 2022 December 2016 Cover image credit: ational Park Service December 2016 Project Cost Summary Five Year CIP Project Appropriations

More information

Ballot Measures-J Section

Ballot Measures-J Section J, Anaheim Elementary Schools Repair/Improvement Measure To repair and modernize classrooms and older neighborhood schools to support reading, math, science, technology, arts, replace deteriorating roofs,

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-6002 20 NOVEMBER 2015 Civil Engineer FAMILY HOUSING PLANNING, PROGRAMMING, DESIGN, AND CONSTRUCTION COMPLIANCE WITH THIS PUBLICATION

More information

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005 Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE FY 2006 MILITARY CONSTRUCTION PROGRAM February 2005 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR FORCE MILITARY CONSTRUCTION

More information

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011 North Dakota State University Minard Hall Project Status Summary As of September 30, 2011 Overview Minard Hall is the largest academic facility located in the historical district on NDSU s campus. The

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4715.6 April 24, 1996 USD(A&T) SUBJECT: Environmental Compliance References: (a) DoD Instruction 4120.14, "Environmental Pollution Prevention, Control and Abatement,"

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

DEPARTMENT OF THE NAVY

DEPARTMENT OF THE NAVY DEPARTMENT OF THE NAVY FY 2004 BUDGET ESTIMATES MILITARY CONSTRUCTION NAVAL AND MARINE CORPS RESERVE PROGRAM JUSTIFICATION DATA Submitted to Congress February 2003 FY 2004 Military Construction Program

More information

Pennsylvania State System of Higher Education (PASSHE) a. The October 17, 2013, Board meeting minutes state the following:

Pennsylvania State System of Higher Education (PASSHE) a. The October 17, 2013, Board meeting minutes state the following: Pennsylvania Department of the Auditor General Bureau of Special Performance Audits 302 Finance Building Harrisburg, PA 17120 717-787-2150 Information Request-10 Page 1 of 3 Requested of: For: Pennsylvania

More information

Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands)

Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands) Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands) New/ State/Installation/Project Authorization Approp. Current Page Request Request Mission No.

More information

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness Report to the Governor and to the Legislature 1999 Recommended Physical Plant Improvements to Existing Nursing

More information

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us 1 Facilities and Technology Long- Term Facilities Maintenance (LTFM) FY 2017 MDE > School Support > School Finance > Facilities and

More information

B. All of the documents in this RFP form the Basis-of-Design for this project.

B. All of the documents in this RFP form the Basis-of-Design for this project. SECTION 01 91 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

65, Administration (may not exceed 10% of line 21) 65, Audit Liquidated Damages Fees and Costs

65, Administration (may not exceed 10% of line 21) 65, Audit Liquidated Damages Fees and Costs Expires 06/30/207 Part I: Summary PHA Name: Des Moines Municipal Housing Agency Des Moines, IA, 5030 Capital Fund Program Grant No: IA0P020508 of CFFP: FFY of Grant: 208 FFY of Grant Approval: Type of

More information

POLY HIGH REDEVELOPMENT PROJECT AREA FIVE-YEAR IMPLEMENTATION PLAN

POLY HIGH REDEVELOPMENT PROJECT AREA FIVE-YEAR IMPLEMENTATION PLAN POLY HIGH REDEVELOPMENT PROJECT AREA FIVE-YEAR IMPLEMENTATION PLAN Fiscal Year 2010 Fiscal Year 2014 (October 1, 2009 - September 30, 2014) CITY OF LONG BEACH REDEVELOPMENT AGENCY 333 West Ocean Boulevard,

More information

STATE OF ALASKA-2018 Weatherization Health and Safety Plan

STATE OF ALASKA-2018 Weatherization Health and Safety Plan ` 1 STATE OF ALASKA-2018 Weatherization Health and Safety Plan Budgeting (Check one): The grantee is encouraged to budget health and safety costs as a separate category and, thereby, excludes such costs

More information

Department of Veterans Affairs VHA HANDBOOK HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM

Department of Veterans Affairs VHA HANDBOOK HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM Department of Veterans Affairs VHA HANDBOOK 1173.14 Veterans Health Administration Transmittal Sheet Washington, DC 20420 October 30, 2000 HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM 1.

More information

AIR FORCE RESERVE COMMAND

AIR FORCE RESERVE COMMAND FY 2000 Budget Estimate AIR FORCE RESERVE COMMAND FY 2000 MILITARY CONSTRUCTION PROGRAM February 1999 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND JUSTIFICATION

More information

USDA Rural Development

USDA Rural Development USDA Rural Development USDA Rural Development USDA RD Mission Committed to helping improve the economy and quality of life in rural America Accomplish the mission by: Providing support for essential public

More information

FINAL 2017 CDBG PROGRAM RULES

FINAL 2017 CDBG PROGRAM RULES FINAL 2017 CDBG PROGRAM RULES TO: FROM: All HCPC Municipalities and Hancock County Tom Martin, Executive Director DATE: December 15, 2016 RE: 2017 Program Summary This memorandum describes the final 2017

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 4715.1 February 24, 1996 USD(A&T) SUBJECT: Environmental Security References: (a) DoD Directive 5100.50, "Protection and Enhancement of Environmental Quality," May

More information

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994 BY ORDER OF THE AIR FORCE POLICY DIRECTIVE 32-70 SECRETARY OF THE AIR FORCE 20 JULY 1994 Civil Engineering ENVIRONMENTAL QUALITY 1.1. Achieving and maintaining environmental quality is an essential part

More information

Master Development Plan Written Report

Master Development Plan Written Report Master Development Plan Written Report A master development plan must be accompanied by a written report, to be adopted as a part of the master development plan. The following information must be completed

More information

Business Redevelopment & Historic Building Grant Program

Business Redevelopment & Historic Building Grant Program Business Redevelopment & Historic Building Grant Program City of Florence Downtown Development Office 324 West Evans Street Florence, SC 29501 843-665-2047 Business Redevelopment & Historic Building Grant

More information

HOME RENOVATION TAX CREDIT (HRTC)

HOME RENOVATION TAX CREDIT (HRTC) HOME RENOVATION TAX CREDIT (HRTC) The Home Renovation Tax Credit applies to eligible expenses of more than $1,000, but not more than $10,000, resulting in a maximum non-refundable tax credit of $1,350

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1012 22 July 1994 CIVIL ENGINEERING RESERVE COMPONENT FACILITIES PROGRAMS COMPLIANCE WITH THIS PUBLICATION

More information

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery Jacqueline Berger, APPRISE ABSTRACT This paper reports on an observational study of energy efficiency service

More information

Compliance Appendix E: Compliance Budget Overview

Compliance Appendix E: Compliance Budget Overview The Compliance Program includes resources that enable the Department of Defense s (DoD s) day-today operations to comply with federal, state, and local environmental laws and regulations. Under the Compliance

More information

AIR FORCE RESERVE COMMAND

AIR FORCE RESERVE COMMAND FY 2003 Budget Estimate AIR FORCE RESERVE COMMAND FY 2003 MILITARY CONSTRUCTION PROGRAM February 2002 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE COMMAND JUSTIFICATION

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 1225.08 May 10, 2016 Incorporating Change 1, December 1, 2017 USD(P&R) SUBJECT: Reserve Component (RC) Facilities Programs and Unit Stationing References: See Enclosure

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Office of Secretary

More information

Military Construction Program

Military Construction Program Department of the Air Force Military Construction Program Fiscal Year (FY) 2010 Overseas Contingency Operations Supplemental Request Justification Data Submitted to Congress February 2010 DEPARTMENT OF

More information

Incident Planning Guide Tornado Page 1

Incident Planning Guide Tornado Page 1 Incident Planning Guide: Tornado Definition This Incident Planning Guide is intended to address issues associated with a tornado. Tornadoes involve cyclonic high winds with the potential to generate damaging

More information

Defense Environmental Funding

Defense Environmental Funding 1 Defense Environmental Funding The Department of Defense (DoD) funds its environmental programs through effective planning, programming, budgeting, and execution processes that allocate financial resources

More information

FY 2018 Capital Development Plan Arizona State University

FY 2018 Capital Development Plan Arizona State University FY 2018 Capital Development Plan Arizona State University EXECUTIVE SUMMARY Page 1 of 33 Item Name: FY 2018 Capital Development Plan (ASU) Action Item Committee Recommendation to Full Board First Read

More information

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description TAHOE CITY PUBLIC UTILITY DISTRICT Job Description Job Title: Department: Utilities Supervised By: Utilities Superintendent FLSA Status: Non-Exempt Revised as of: January 2015 JOB SUMMARY To oversee and

More information

Business and Finance Committee Meeting June 13, 2012 Agenda Item # EXECUTIVE SUMMARY Page 1 of 22. FY 2013 Capital Development Plan (NAU)

Business and Finance Committee Meeting June 13, 2012 Agenda Item # EXECUTIVE SUMMARY Page 1 of 22. FY 2013 Capital Development Plan (NAU) EXECUTIVE SUMMARY Page 1 of 22 Item Name: X FY 2013 Capital Development Plan (NAU) Action Item Discussion Item Information Item ISSUE: Northern Arizona University requests approval of the FY 2013 Capital

More information

UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA

UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA MEETING OF THE BOARD OF TRUSTEES JUNE 15, 2013 UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA ACADEMIC, RESEARCH AND STUDENT AFFAIRS...Dr.

More information

NATIONAL GUARD BUREAU. SUBJECT: Air National Guard Engineering Technical Letter (ANGETL) 10-04, Military Construction Cooperative Agreements (MCCA)

NATIONAL GUARD BUREAU. SUBJECT: Air National Guard Engineering Technical Letter (ANGETL) 10-04, Military Construction Cooperative Agreements (MCCA) NATIONAL GUARD BUREAU 3500 FETCHET AVENUE JOINT BASE ANDREWS MD 20762-5157 3 June 2010 MEMORANDUM FOR SEE DISTRIBUTION FROM: NGB/A7 SUBJECT: Air National Guard Engineering Technical Letter (ANGETL) 10-04,

More information

Energy and Telephone Assistance in the States Oregon

Energy and Telephone Assistance in the States Oregon in Brief (2006) Total state population: 3,700,758 State median income: $61,570 Percent households age 50+: 49.2% Percent Households under 150% of Poverty, by Age Under 50 All ages 50+ 19.7% Energy Assistance

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

WEATHERIZATION ASSISTANCE PROGRAM AUTHORIZING STATUTE

WEATHERIZATION ASSISTANCE PROGRAM AUTHORIZING STATUTE WEATHERIZATION ASSISTANCE PROGRAM AUTHORIZING STATUTE 6861. Findings and purpose 42 USCS 6861 (a) The Congress finds that-- (1) a fast, cost-effective, and environmentally sound way to prevent future energy

More information

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE Update Report on the Capital Outlay Plan for 2018-2024 JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE August 1, 2017 Background: At its April 2017 meeting, the Board

More information

Attachment FC 08 (REVISED 5/17/2018) SBCC 05/18/2018. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 18, 2018 FY

Attachment FC 08 (REVISED 5/17/2018) SBCC 05/18/2018. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 18, 2018 FY A. Approval - New (Non-State and Other Name (Other State) (Other State) 1 Central Piedmont Main Campus 2408 Parking Deck 3 Repairs 2 Edgecombe Tarboro Campus 2411 Tarboro Campus Loop Road Repairs will

More information

Customer Guide. Colorado Historic Preservation Income Tax Credit

Customer Guide. Colorado Historic Preservation Income Tax Credit Colorado Historic Preservation Income Tax Credit Overview of Residential Program (CRS 39-22-514.5 of 2014, as amended) Colorado offers a state income tax credit for preservation and rehabilitation work

More information

DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT

DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT By approval of this measure by at least fifty-five percent (55%) of the registered voters voting thereon, the Davis Joint Unified School

More information

202, Audit Liquidated Damages Fees and Costs

202, Audit Liquidated Damages Fees and Costs Annual Statement/Performance and Evaluation Report 7-3-5 Capital Fund Financing Program OMB No. 577-06 Part I: Summary PHA Name: Brockton Housing Authority Capital Fund Program Grant No: MA06P04506 of

More information

Weatherization Program Update

Weatherization Program Update Weatherization Program Update A Briefing to the Housing Committee Housing/Community Services Department January 18, 2011 1 Purpose Provide an update on the State Weatherization Program funded through the

More information

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System

WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY. House as a System WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY House as a System WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010 1 WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM August 2010

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

INSTITUTIONS REGULATION, 1981

INSTITUTIONS REGULATION, 1981 Province of Alberta PUBLIC HEALTH ACT INSTITUTIONS REGULATION, 1981 Alberta Regulation 143/1981 With amendments up to and including Alberta Regulation 109/2003 Office Consolidation Published by Alberta

More information

BALLJT MEASURE SUBMITTAL FORM

BALLJT MEASURE SUBMITTAL FORM BALLJT MEASURE SUBMITTAL FORM Official Use Only: Date Stamp RECEIVED Alameda County IUL ') 2l11! Reg~ af Voters BALLOT MEASURE QUESTION Jurisdiction Name: Oakland Unified School District Election Date:

More information

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1)

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1) 2018 CDBG Application Workshop Downtown Revitalization Program Joe Bohlke, Project Manager Iowa Economic Development Authority Joseph.Bohlke@iowaeda.com 725-3011 Ed Basch, Project Manager Iowa Economic

More information

103, Administration (may not exceed 10% of line 21) 103, Audit Liquidated Damages Fees and Costs

103, Administration (may not exceed 10% of line 21) 103, Audit Liquidated Damages Fees and Costs Part I: Summary PHA Name: The Huntington WV Housing Authority of CFFP: FFY of Grant: 2014 FFY of Grant Approval: 2014 Type of Grant Original Annual Statement Reserve for Disasters/Emergencies Revised Annual

More information

2017 Developer Handbook

2017 Developer Handbook 2017 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items...

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items... FY 2018 TRANSPORTATION ALTERNATIVES PROGRAM INSTRUCTIONS, GUIDELINES AND APPLICATION TABLE OF CONTENTS Page(s) 1. Instructions for Submitting a Transportation Alternatives Program Application.. 1 2. Transportation

More information

NAVFAC Hawaii Construction Outlook

NAVFAC Hawaii Construction Outlook NAVFAC Hawaii NAVFAC Hawaii Construction Outlook Stanley Shen Construction Lead Engineer NAVFAC Hawaii 10/17/2017 1 NAVFAC Hawaii Commanding Officer: CAPT Richard D. Hayes III Executive Officer: CAPT Brian

More information

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM F3 Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: For Meeting of July 12, 2017 ACTION ITEM APPROVAL OF BUDGET AND EXTERNAL FINANCING, NUEVO EAST STUDENT HOUSING PROJECT,

More information

Berne Knox Westerlo Central School District

Berne Knox Westerlo Central School District Berne Knox Westerlo Central School District Proposed Capital Project Progress Summary Report to the Board of Education May 8, 2017 Proposed Capital Project Background In 2015 the Board of Education and

More information

State Board of Education Fixed Capital Outlay Legislative Budget Request

State Board of Education Fixed Capital Outlay Legislative Budget Request State Board of Education 2011-12 Fixed Capital Outlay Legislative Budget Request Florida K-20 Education System September 21, 2010 Green Book Page # EDUCATION BUDGET Expenditure Detail Legislative Budget

More information

NEIGHBORHOOD BUILDING IMPROVEMENT PROGRAM

NEIGHBORHOOD BUILDING IMPROVEMENT PROGRAM SALT LAKE CITY NEIGHBORHOOD BUILDING IMPROVEMENT PROGRAM Now Targeting the Poplar Grove and Central Ninth Neighborhoods Program Guidelines SALT LAKE CITY Housing and Neighborhood Development (HAND) A Division

More information

ARMY FAMILY HOUSING MASTER PLAN FY2015 FY2019

ARMY FAMILY HOUSING MASTER PLAN FY2015 FY2019 ARMY FAMILY HOUSING MASTER PLAN FY2015 FY2019 March 2014 v1.1 Headquarters, Department of the Army Office of the Assistant Chief of Staff for Installation Management Army Family Housing Division Report

More information

PROMOTIONAL PRACTICES SCHEDULE PRO

PROMOTIONAL PRACTICES SCHEDULE PRO P.S.C. Mo. No. 5 Sec. 4 4 th Revised Sheet No. 8 Canceling P.S.C. Mo. No. 5 Sec. 4 3 rd Revised Sheet No. 8 A. Dealer Cooperative Advertising The Company may develop and implement various cooperative advertising

More information

Overview of Electronic Security Systems

Overview of Electronic Security Systems Overview of Electronic Security Systems NAVFAC Northwest Presented by: Richard Cofer, P.E. Naval Facilities Engineering Command Atlantic Capital Improvements Business Line Engineering Criteria and Programs

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 32-60 4 MARCH 2015 Civil Engineering HOUSING COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications and forms are

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Complete Program Element 20.405 43.300 91.866-91.866 90.598 129.201

More information

Report No. D September 22, The Department of the Navy Spent Recovery Act Funds on Photovoltaic Projects That Were Not Cost-Effective

Report No. D September 22, The Department of the Navy Spent Recovery Act Funds on Photovoltaic Projects That Were Not Cost-Effective Report No. D-2011-106 September 22, 2011 The Department of the Navy Spent Recovery Act Funds on Photovoltaic Projects That Were Not Cost-Effective Additional Copies To obtain additional copies of this

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844

More information

Community Development Part I Application Infrastructure Capacity Enhancement

Community Development Part I Application Infrastructure Capacity Enhancement Community Development Part I Application Infrastructure Capacity Enhancement For eligible activities administered by the Michigan Economic Development Corporation (MEDC) on behalf of the Michigan Strategic

More information

EMERGENCY SHELTER RELOCATION/EXPANSION

EMERGENCY SHELTER RELOCATION/EXPANSION We could not have gotten where we are in owning property and renovating it into a state of art emergency shelter and advocacy center without years of support and leadership that you have provided -Michelle

More information

$5, Administration (may not exceed 10% of line 21) $47, Audit Liquidated Damages Fees and Costs

$5, Administration (may not exceed 10% of line 21) $47, Audit Liquidated Damages Fees and Costs Part I: Summary PHA Name: Housing Authority of St. Louis County Capital Fund Program Grant No: MO36P00450115 Date of CFFP: FFY of Grant: 2015 FFY of Grant Approval: 2015 Type of Grant Original Annual Statement

More information

Smart Energy New Homes Program

Smart Energy New Homes Program Smart Energy New Homes Program 2014 Certification Guidelines TM Program Overview...Page 3 How To Participate...Page 4 FAQs...Page 5 2013 Participation Application & Agreement...Page 8 2013 Rebate Reservation

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C.

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C. Welcome Public Meeting Your involvement assists the Marine Corps in making an informed decision. Marine

More information

Five-Year Capital Program Non-State and State Funds to

Five-Year Capital Program Non-State and State Funds to C49822_FINAL_Nonstate 10/18/05 1:50 PM Page 1 Five-Year Capital Program Non-State and State Funds 2005-2006 to 2009-2010 Teaching Research Public Service University of California Office of the President

More information

Green Building Incentive Program Guidelines & Procedures

Green Building Incentive Program Guidelines & Procedures Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0800 - COMMISSIONING OF ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. The purpose of this section is to specify the Division 26 responsibilities and participation in the commissioning process.

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4165.56 January 7, 2013 Incorporating Change 1, November 30, 2017 SUBJECT: Relocatable Buildings USD(AT&L) References: See Enclosure 1 1. PURPOSE. In accordance

More information

AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017 AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017 Justification Data Submitted to Congress DEPARTMENT OF THE AIR FORCE AIR NATIONAL GUARD

More information