Magnetic contactor, Thermal overload relay, auxiliaries. LSISC0., Ltd. 127, LS-ro, Dongan-gu, Anyang-si, Gyeonggi-do Korea, Republic of
|
|
- Stewart Stevens
- 6 years ago
- Views:
Transcription
1 Ref. Certif. No. NL-45852/Ml -Al IEC SYSTEM FOR MUTUAL RECOGNITION OF TEST CERTIFICATES FOR ELECTRICAL EQUIPMENT (IECEE) CB SCHEME CB TEST CERTIFICATE Product Name and address of the applicant Name and address of the manufacturer Name and address of the factory Note tamen more than one factoiy. please report on page 2 Ratings and principal characteristics Trademark (if any) Magnetic contactor, Thermal overload relay, auxiliaries LSISC0., Ltd. 127, LS-ro, Dongan-gu, Anyang-si, Gyeonggi-do Korea, Republic of LSIS Co., Ltd. 127, LS-ro, Dongan-gu, Anyang-si, Gyeonggi-do Korea, Republic of LI Additional information on page 2 LSIS Co., Ltd. Cheongju Plant 95, Baekbong-ro, Heungdeok-gu, Cheongju-si, Chungcheongbuk-do Korea, Republic of Magnetic contactor: Ue up to 690 Vac; tb 25 A up to 1050 A, le (AC-3) up to 800 A (440 Vac) (AC-4) up to 630 A (440 Vac) 3 pole or 4 pole; Ui up to 1000 V; Uimp up to 8 kv; 50/60 Hz Thermal Overload relay: Ue up to 690 Vac; le up to 800 A 3 pole; Ui 690 V; Uimp 6 kv Interlock unit: UR-02 Auxiliary contact AC-15; DC V up to 600 V; up to 6 A See annex for further ratings LS Customers Testing Facility (CTF) Stage used Model / Type Ref. MC-...a; MC-...a/4; MT...12H; MT.../3H; MT.../3K; MT.../3D; UR-02; UA-1 Additional information (if necessary may also be reported on page 2) A sample of the product was tested and found to be in conformity with As shown in the Test Report Ref. No. which forms part of this Certificate LI Additional information on page 2 This certificates replaces certificate NL-31652/A3 date of issue and CB NL date of issue MC-600a model added. Al: editorial modification. Date of first issue Ml: AC1 ratings updated. IEC :2009, IEC :2009/AMD1 :2012, I EC :2003, IEC :2003/AMD1 : up to-65; up to -77 and ; up to 59 This CB Test Certificate is issued by the National Certification Body DEKRA Certification B.V. Meander 1051, NL-6825 MJ Arnhem, Netherlands DEKRA Date: Signature: H.R.M. Barends
2 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 1 of 11 Additional information: Product: Type(s) Ue Ith le (AO-3) le (AO-4) Number of poles Ui Uimp frequency Magnetic contactor 3 pole MC-6a, MC-9a, MC-12a, MC-18a, MC-9b, MC-12b, MC-18b, MC-22b, MC-32a, MC-40a, MC-50a, MC-65a, MC-75a, MC-85a, MC-lOOa, MC-130a, MC-150a, MC-185a, MC-225a, MC-265a, MC-330a, MC-400a, MC-500a, MC-600a, MC-630a, MC-800a 4 pole MC-6a/4, MC-9a/4, MC-i 2a/4, MO-i 8a/4, MO-22a/4, MC-32a/4, MC-40a/4, MC-50a/4, MC-65a/4, MC-75a/4, MC-85a/4, MO-i 00a14, MC-i 30a14, MO-i 50a14, MO-i 85a14, MO-225a/4, MO-265a/4, MC-330a14, MO-400a14, MO-500a/4, MO-630a/4, MO-800a/4 Upto69OVac 25AuptoiO5OA Up to 800 A (440 Vac) Up to 630 A (440 Vac) 3 pole or 4 pole Up to 1000 Vac Upto8kV 50/60 Hz Product: Type(s) Ue le Number of poles Ui Uimp frequency Thermal overload relay MT-12/2H, MT-i2/3H, MT-12/3K, MT-i2/3D MT-3212H, MT-32/3H, MT-32/3K, MT-32/3D MT-6312H, MT-63/3H, MT-63/3K, MT-63/3D MT-95/2H, MT-95/3H, MT-95/3K, MT-95/3D MT-i 5012H, MT-i 50/3H, MT-i 50/3K, MT-i 50/3D MT-22512H, MT-22513H, MT-255/3K, MT-225/3D MT-400/2H, MT-400/3H, MT-400/3K, MT-400/3D MT-800!2H, MT-800/3H, MT-800/3K, MT-800/3D Upto69OVac Upto800A 3 pole Upto69OVac Upto6kV 50/60 Hz
3 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 2 of 11 Utilization categories: MC-6a Operational AC1 AC2 AC3 AC A 25 A 7A 6A 4A 7A 6A 4A 7A 5A MC-9a Operational AC 1 AC2 AC3 AC A 25 A 11 A 7A 5A 11 A 7A 5A 8A 6A MC-12a Operational AC1 AC2 AC3 AC A 25 A 13 A 12 A 12 A 13 A 12 A 12 A 11 A MC-18a A 18A 18A 16A A 18A 18A 11 A A 13A
4 7A 20A isa > DEKRA ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 3 of 11 MC-9 b A ha ha BA A 6A JA A 6A - MC-12b Operational AC1 AC2 AC 3 AC4 VoltaaeiVac) A 27A 1 3A 12A 12A 1 3A 12A 12A 1 1A 690 M C- lbb Operational AC1 AC2 AC 3 AC4 Volta cielvacl A 32A 18A isa isa isa 16A 1 1A A 1 3A Ni C- 22 b A 22A 22A isa A 22A 22A 13A A - isa -
5 28A 43A DEKRA ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 4 of 11 MC-32a A 32A 32A 20A A 32A 32A 17A A A 20A - MC-40a MC-50a A 55A 55A 35A A 50A 50A 32A A A 28A -
6 60A 35A 64A 42A 45A 85A DEKRA ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 5 of 11 MC-65a A 65A 65A 50A lisa 65A 65A 47A A A - MC-75a A 75A 75A 55A A 75A 75A 52A A A - MC-85a A 85A 85A 65A A 85A 85A 62A A 75A A - MC-lOOa A 105A 105A 80A A 105A 105A 75A A A 65A -
7 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 6 of 11 MG-i 30a Operational AOl AC2 AC3 AC A 130A 130A 93A A 130A 130A 90A A 90 A 90 A A 60A 60A - MO-i 50a Operational AOl AC2 AC3 AC A 150A 150A 120A A 150A 150A 11OA A 100A 100A A 60A 60A - MG-i 85a Operational AOl AC2 AC3 AC A 185A 185A 150A A 185A 185A 150A A 180A 180A A 120A 120A -
8 ANNEX TO OBTEST CERTIFICATE NL-45852/M1-A1 Page 7 of 11 MC-225a Operational AOl AC2 AC3 AC A 225A 225A 180A A 225A 225A 180A A 200 A 200 A A 150A 150A - M C-265a Operational AOl A02 AC3 A A 265A 265A 200A A 265 A 265 A 200 A A 225 A 225 A A 185A 185A - M C-330a Operational AOl AC2 AC3 AC A 330 A 330 A 220 A A 330 A 330 A 220 A A 280 A 280 A A 220 A 220 A -
9 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 8 of 11 MC-400a Operational AOl AC2 AC3 AC A 400 A 400 A 300 A A 400A 400A 300A A 350 A 350 A A 300 A 300 A - M C-500a A 500 A 500 A 350 A A 500A 500A 350A A 400 A 400 A A 380 A 380 A - M C-600a A 630A 630A 400A A 630 A 630 A 400 A A 500 A 500 A A 420A 420A -
10 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 9 of 11 M C-630a A 630A 630A 400A A 630A 630A 400A A 500 A 500 A A 420A 420A - MC-800a A 800A 800A 630A A 800A 800A 630A A 720A 720A A 630A 630A -
11 ANNEX TO CB TEST CERTIFICATE NL-45852/M1-A1 Page 10 of 11 Rating MC -6a14 MC -9a/4 MC -12a/4 MC -18a14 MC-22a/4 Ith 25A 25A 25A 40A 40A 200 V 240 V 25 A 25 A 25 A 40 A 40 A Operational 380 V440 V 25 A 25 A 25 A 40 A 40 A Current 500 V 550 V 25 A 25 A 25 A 40 A 40 A (AC-i) 690V 25A 25A 25A 40A 40A Rating MC-32a/4 MC-40a/4 MC -50a/4 MC -65a/4 MC -75a/4 Ith 50A 60A 80A 100A 11OA 200 V 240V 50A 60A 80A 100A 11OA Operational 380 V440 V 50 A 60 A 80 A 100 A 1 10 A Current 500 V 550 V 50 A 60 A 80 A 100 A 1 10 A (AC-i) 690V 50A 60A 80A 100A 11OA Rating MC -85a/4 MC-1 OOa/4 MO-i 30a/4 MO-i 50a/4 MO-i 85a/4 Ith i35a 200A 250A 275A 300A 200 V 240V i35a 200A 250A 275A 300A Operational 380 V440 V 135 A 200 A 250 A 275 A 300 A Current 500 V 550 V 135 A 200 A 250 A 275 A 300 A (AC-i) 690V i35a 200A 250A 275A 300A Rating MO-225a/4 MC-265a/4 MC-330a/4 MO-400a/4 MC-500a/4 Ith 350 A 400 A 500 A 520 A 700 A 200 V 240 V 350 A 400 A 500 A 520 A 700 A Operational 380 V440 V 350 A 400 A 500 A 520 A 700 A Current 500 V 550 V 350 A 400 A 500 A 520 A 700 A (AC-i) 690 V 350 A 400 A 500 A 520 A 700 A
12 ANNEX TO OBTEST CERTIFICATE NL-45852/M1-A1 Page 11 of 11 Rating MC-630a/4 MC-800a/4 Ith 900A 1050A 200 V 240V 900A 1050A Operational 380 V440 V 900 A 1050 A Current (AC-i) 500 V 550 V 900 A 1050 A 690V 900A 1050 A Auxiliary contact: MC-6a. MC-9a, MC-12a, MC-18a 120V GA 240V 3A AC15 380V 1. A V 1.5A 500V 1.4A DC13 P V 1.2A 125V 1.1A 250V O.55A 400V 0.31A 500V O.27A 600V 0.2A
IEC SYSTEM FOR MUTUAL RECOGNITION OF TEST CERTIFICATES FOR ELECTRICAL EQUIPMENT (IECEE) CB SCHEME
IEC SYSTEM FOR MUTUAL RECOGNITION OF TEST CERTIFICATES FOR ELECTRICAL EQUIPMENT (IECEE) CB SCHEME CB TEST CERTIFICATE Product Connecting devices for low-voltage circuits Name and address the applicant
More informationTelergon DC Isolators. for Photovoltaic applications
Telergon DC Isolators for Photovoltaic applications Photovoltaic Switches up to 1800A Telergon DC isolators are the ideal switch range for photovoltaic installations, with a high DC switching capability,
More informationIECEE OPERATIONAL DOCUMENT
IECEE OD-4004 Edition 2.0 2016-06-01 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Requirements for IECEE-Factory Inspectors
More informationREQUIREMENTS FOR FACTORY INSPECTORS
IECEE CB-Factory Surveillance Service OD-4004 OPERATIONAL & RULING DOCUMENTS REQUIREMENTS FOR FACTORY INSPECTORS OD- 4004 ed. 1.3 IEC - IECEE - Copyright 2014-02-04 all rights reserved Except for IECEE
More informationPowered by Safety. Powell Training Catalog
Powell Training Catalog TABLE OF CONTENTS SAFE 102 ELECTRICAL SAFETY AND ARC FLASH AWARENESS 1 EL101 ELECTRICAL EQUIPMENT BASICS 1 PV102 LOW VOLTAGE SWITCHGEAR BASICS FOR OPERATORS AND ELECTRICIANS 2 PV202
More informationREPORT. Unit # 1, Street Surrey, British Columbia, V3W 4E6, Canada
REPORT For Acura Embedded Systems Inc. Unit # 1, 7711-128 Street Surrey, British Columbia, V3W 4E6, Canada Date: August 8, 2011 Report No.: 10052-1S Revision No.: 0 Project No.: 10052 Equipment: Mobile
More informationNo: GTU/ITAP/2018/ 4046 Date: 31/05/2018 CIRCULAR
No: GTU/ITAP/2018/ 4046 Date: 31/05/2018 CIRCULAR Larsen and Tubro (L & T) - Switchgear Training Centre has announce the schedule to provide training to final and pre-final year B.E./Diploma students of
More informationIEC-IEEE development of dual logo standards on condition monitoring Update November Kjell Spång KS miltek
IEC-IEEE development of dual logo standards on condition monitoring Update November 2009 Kjell Spång KS miltek IEEE SC-2 November 2009 1 IEC-IEEE agreement Agreement between IEC and IEEE (AC/22/2008) in
More informationEMPANELMENT OF CONTRACTORS FOR ELECTRICAL TURNKEY PROJECTS
EMPANELMENT OF CONTRACTORS FOR ELECTRICAL TURNKEY PROJECTS AYCL is looking for Contractors for Empanelment for its Turnkey Contract Business in India in Electrical Transmission / Distribution/ Substation
More informationUniversity of South Florida Gear Up Program:
University of South Florida Gear Up Program: 2004-2005 Institute for Community Leadership (ICL) and Starbucks Partnership Principal Investigator: Patra Wiley-Cooks Authors: Patra Wiley-Cooks Joko Sengova
More informationThis Letter. Re: PC Guide For Power System Protection Testing
Approval Letter 1 of 2 8/11/2005 9:47 AM 11 August 2005 Email This Letter Jeffrey G Gilbert PPL Electric Utilities Corp 2 N 9th Street, GENN 4 Allentown, PA 18101-1179 jggilbert@pplweb.com Re: PC37.233
More informationEuropean Innovation Council
European Innovation Council 2018-2020 European Innovation Council Comprehensive Scheme 1.4 billion in funding over the period 2018-2020 FET OPEN Future Emerging Technologies FTI Fast Track to Innovation
More informationAnnex: Table with EU' s reservations on public services extracts from TiSA and the CETA services chapter
Ref. Ares(2015)412272-02/02/2015 Annex: Table with EU' s reservations on public services extracts from TiSA and the CETA services chapter How to read the table: This table lists only the most relevant
More informationWiring Diagrams RZD RZDB (Detroit Diesel Powered) Industrial Generator Sets. Models:
Wiring Diagrams Industrial Generator Sets Models: 135-275RZD 135-275RZDB (Detroit Diesel Powered) Controllers: Decision-Maker 550 Decision-Maker 340 Decision-Maker 3+, 16-Light Decision-Maker 3+, 7-Light
More informationGenerator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377
Generator Impact Study Report Bladen County, NC 75.0 Solar Farm Queue #377 Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results... 4 3.2 Stability Analysis
More informationFEED-IN TARIFF LICENSEE TRANSFER
ABOUT FEED-IN TARIFFS The Feed-in Tariff (FIT) scheme is an environmental programme introduced by Government to promote widespread uptake of a range of small-scale renewable and low carbon electricity
More informationGenerator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364
Generator Interconnection Impact Study Report Wayne County, NC 20.0 Solar Farm Queue #364 Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results... 4 3.2 Stability
More informationDocument ID: MC_PP_endorsement-v1.1.doc Subject: MC Endorsement Procedure for SOGIS Protection Profiles. Definition
MC PP Endorsement Procedure SOG-IS Recognition Agreement Management Committee Policies and Procedures Document ID: MC_PP_endorsement-v1.1.doc Subject: MC Endorsement Procedure for SOGIS Protection Profiles
More informationMay 2012 Jim Blackburn, Project Officer CIED. European Defence Agency CIED briefing to the Global EOD Conference
May 2012 Jim Blackburn, Project Officer CIED European Defence Agency CIED briefing to the Global EOD Conference Agenda Introduction to the EDA EDA CIED 2 EUROPEAN-US DEFENCE EXPENDITURE - GENERAL Europe*
More informationWelcome to the KIEMSTA
Welcome to the KIEMSTA KIEMSTA IS... WHERE DREAM COME TRUE : KIEMSTA will provide a great opportunity to have a trustworthy business network and the main route to wor dwide agricultural industry. KIEMSTA
More informationMedical Device and Health Software
Medical Device and Health Software Standards and regulations now and in the future Justin McCarthy Introduction I was head of Clinical Engineering in Cardiff till 2009. I have been chair of BSI committee
More informationTRAINING OF AIR TRAFFIC CONTROLLERS. Rating Training ACS and ADV/ADI (TWR/RAD/AIR/GMC/GMS) and the Assessment Center for Candidates
CROATIA CONTROL LTD. AMENDMENT No. 1 TO REQUEST FOR TENDERS IN THE PROCEDURE FOR AWARDING PUBLIC SERVICES CONTRACTS AS SET OUT IN ANNEX II. B OF THE PUBLIC PROCUREMENT ACT TRAINING OF AIR TRAFFIC CONTROLLERS
More informationCOST. European Cooperation in Science and Technology. Introduction to the COST Framework Programme
COST European Cooperation in Science and Technology Introduction to the COST Framework Programme Outline What is COST and how does it work? What are the COST Actions and how to participate in them? How
More informationProduction Device Registration
I-REC Code Subsidiary Document 02 Production Device Registration version 1.4 I-REC Code Subsidiary Document 02 Production Device Registration Version 1.4 Contents 1. Introduction... 4 1.1 The I-REC Service...
More informationGenerator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1
Generator Interconnection System Impact Study Report Carteret County, NC 120.8 MW Queue #297 Original Submittal Revision 1 PURPOSE The purpose of this study is to assess the impacts of a combined wind/solar
More information( +44 (0) or +44 (0)
* Registration Department 184 Kenningn Park Road, London, SE11 4BU ( +44 (0)845 300 4472 or +44 (0)20 7582 5460 8 www.hcpc-uk.org ö registration@hcpc-uk.org Making a declaration the Health and Care Professions
More informationTECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) POWER UNIT, 2 1/2 TON DIESEL ENGINE DRIVEN, TRAILER MOUNTED, 60 kw, 50/60 Hz, PU-805
More informationMedical Grade Power Strips
Product Bulletin for Medical Grade Power Strips For use in Patient Care Areas of Health Care Facilities Conforms to UL 60601-1, UL 60950-1 and UL 1363A Leviton s family of medical-grade power strips are
More informationSmoke Control BACnet PTEC Unit Vent Controller. Control Applications. Product Description. Product Numbers
Document No. 550-161 Smoke Control BACnet PTEC Unit Vent Controller Generic Controller I/O Layout. See Wiring Diagram for application specific details. Control Applications 6675 through 6679 Product Description
More informationDEPARTMENT OF THE ARMY TECHNICAL MANUAL *TM DEPARTMENT OF THE AIR FORCE TECHNICAL ORDER TECHNICAL MANUAL
DEPARTMENT OF THE ARMY TECHNICAL MANUAL *TM 5-6115-593-12 DEPARTMENT OF THE AIR FORCE TECHNICAL ORDER TO-35C2-3-463-1 TECHNICAL MANUAL Operator and Organizational Maintenance Manual GENERATOR SET, DIESEL
More informationAustralian/New Zealand Standard
AS/NZS 3003:2003 Australian/New Zealand Standard Electrical installations Patient areas of hospitals, medical and dental practices and dialyzing locations PREPARATION OF JOINT AUSTRALIAN/NEW ZEALAND STANDARDS
More informationSiemens TEC Unit Vent 0-10V Output Controller. Accessories. Control Applications. Product Description. Product Numbers. Warning/Caution Notation
Document No. 540-1027 Siemens TEC Unit Vent 0-10V Output Controller Generic Controller I/O Layout. See Wiring Diagram for application specific details. Control Applications 2281, 2283, 2284, 2286, 2287
More information4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.
A. Introduction 1. Title: Nuclear Plant Interface Coordination 2. Number: NUC-001-3 3. Purpose: This standard requires coordination between Nuclear Plant Generator Operators and Transmission Entities for
More information50CIML-AMD-03. Agenda item 7.2. Liaison report: IAF Update. 50th CIML Meeting - Additional Meeting Document
50th CIML Meeting - Additional Meeting Document 50CIML-AMD-03 2015-10-01 Agenda item 7.2 Liaison report: IAF Update 50 CIML WD AMD 03 Page 1 of 11 2015-10-01 (IAF) BD-15-007 1. IAF Membership IAF Liaison
More informationPlease find enclose Addendum No. 01 for the subject ITB, which includes the following:
Iraq To: All Bidders Subject: ITB-175/16- Establishing Long Term Agreement (LTA) in Two Lots for purchasing various capacities Generators under Funding Facility for Immediate Stabilization (FFIS) Project
More informationAMC 30% 40% 10% 20% Electric power(kw) kw 25,44. Rotation speed (rpm) rpm 40,00. Got the Cochlea to reach the maximum availability of water
AMC AIRMEC offers a type of cochlea turbine (AMC) in a partnership (called AIREN) with other companies production with a solid experience. The AMC-25 is a turbine able to deliver 25 kwe designed for location
More informationWiring Diagrams 200REOZPB REOZDB 350/400REOZD 350/400REOZDC 450REOZDB. Industrial Generator Sets. Models:
Wiring Diagrams Industrial Generator Sets Models: 200REOZPB 230-300REOZDB 350/400REOZD 350/400REOZDC 450REOZDB Controllers: Decision-Maker 550 Decision-Maker 3+, 16-Light TP-6338 9/07e Product Identification
More informationCOMPRESSOR TECHNICAL OVERVIEW
AWECO COMPRESSOR TECHNICAL OVERVIEW COMMERCIAL REFRIGERATION HEAT PUMP sanhuaclimate.com 1 AWECO Key compressor range - typical applications Page AWECO Series Refrigerant Control Typical Application 2
More informationMOTOR CONTROL WIRING DIAGRAMS EPUB
22 October, 2017 MOTOR CONTROL WIRING DIAGRAMS EPUB Document Filetype: PDF 471.59 KB 0 MOTOR CONTROL WIRING DIAGRAMS EPUB MOTOR control and wiring diagram. 6.6K likes. Motor control wiring diagram ppt
More informationHorizon Support to Public-Public Partnershiups
Horizon 2020 Support to Public-Public Partnershiups Jörg NIEHOFF DG Research & Innovation Dir. B Innovation Union and European Research Area Unit B2 ERA Policy and Reform ERA-NET Cofund main features ERA-NET
More informationDifferences of Job stress, Burnout, and Mindfulness according to General Characteristics of Clinical Nurses
, pp.191-195 http://dx.doi.org/10.14257/astl.2015.88.40 Differences of Job stress, Burnout, and Mindfulness according to General Characteristics of Clinical Nurses Jung Im Choi 1, Myung Suk Koh 2 1 Sahmyook
More informationIAF MLA Document. Policies and Procedures for a MLA on the Level of Single Accreditation Bodies and on the Level of Regional Accreditation Groups
IAF MLA Document Level of Single Accreditation Bodies and on the Level of Regional Accreditation Groups (IAF ML 4:2016) Issued: 11 May 2016 Application Date: 11 May 2016 IAF ML 4:2016, Page 2 of 23 The
More informationAn action plan to boost research and innovation
MEMO/05/66 Brussels, 1 October 005 An action plan to boost research and innovation The European Commission has tabled an integrated innovation and research action plan, which calls for a major upgrade
More informationIntegrating mental health into primary health care across Europe
Integrating mental health into primary health care across Europe Social Breakthroughs Symposium Friday, 26th june BMAG Porto Authors Tiago Vieira Pinto Registered Nurse Serpa Pinto Family Health Unit Family
More informationInternational Credit Mobility. Marissa Gross Yarm National Erasmus+ Office Israel
International Credit Mobility Marissa Gross Yarm National Erasmus+ Office Israel Contents Benefits of Mobility for Higher Education Principles of International Credit Mobility Application Process Budget
More informationWiring Diagrams REOZJ REOZJB. Industrial Generator Sets. Models: Controllers: Decision-Maker 550 Decision-Maker 3000 Decision-Maker 6000
Wiring Diagrams Industrial Generator Sets Models: 350-500REOZJ 350-500REOZJB Controllers: Decision-Maker 550 Decision-Maker 3000 Decision-Maker 6000 TP-6797 1/13b Product Identification Information Product
More informationMethodology for capacity calculation for ID timeframe
Methodology for capacity calculation for ID timeframe NRA approval package Version 1.0 Date 05-11-2015 Status Draft Final Contents 1 Introduction and purpose... 3 2 Definitions... 3 3 General principles
More information1510 Self-Contained Biological Indicator Incubator OPERATION MANUAL
1510 Self-Contained Biological Indicator Incubator OPERATION MANUAL Bozeman Manufacturing Facility Bozeman, MT USA (303) 987-8000 FAX: (406) 585-9219 www.mesalabs.com Omaha Manufacturing Facility Omaha,
More informationTRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015
TRIP OF YALLOURN POWER STATION NO.2 220 KV BUSBAR ON 6 DECEMBER 2015 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICITY MARKET Published: March 2016 VERSION RELEASE HISTORY VERSION
More informationSummer Korean Language & Culture Program at Kyonggi University
Summer & Culture Program at Kyonggi University Summer & Culture Program is a 3-weeks program offered in August. This program is intended for international students and visitors with interest in learning
More informationCALL FICHE 1 SCIENCE IN SOCIETY 2009
CALL FICHE 1 SCIENCE IN SOCIETY 2009 Call identifier: FP7-SCIENCE-IN-SOCIETY-2009-1 Date of publication: Wednesday 3 September 2008 Deadline: Tuesday 13 January 2009 at 17.00.00, Brussels local time. Indicative
More informationInternational Cooperation Types of Activities
1 International Cooperation Types of Activities Information Exchange Program Agreements and Annexes: 26 agreements with > 700 technical area annexes Engineer and Scientist Exchange Program: > 70 personnel
More informationLifelong Learning Programme
EUROPEAN COMMISSION Directorate-General for Education and Culture Lifelong Learning : policies and programme Higher education; "Erasmus" Lifelong Learning Programme STATISTICAL OVERVIEW OF THE IMPLEMENTATION
More informationResource Pack for Erasmus Preparatory Visits
Resource Pack for Erasmus Preparatory Visits 2013 Page 1 of 8 General Overview - Preparatory Visits Objectives and description of the action Who can benefit Who can apply The main objective of the action
More informationFOR EUPA USE ONLY ERASMUS+ PROGRAMME EN
FOR EUPA USE ONLY ERASMUS+ PROGRAMME EN Registration number: MT/15/E+/EVAL- Please fill the form in, print it out, sign it and send it to the EUPA by email, post, by private courier service or in person,
More informationARMY TM AIR FORCE TO 35C MARINE CORPS TM 10155A-13/1
OPERATOR S, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL OPERATING INSTRUCTIONS 2-1 OPERATOR TROUBLESHOOTING 3-3 UNIT LEVEL PMCS 4-7 UNIT LEVEL TROUBLESHOOTING 4-12 UNIT MAINTENANCE PROCEDURES 4-27 DIRECT
More informationTraining and Evaluation Outline Report
Training and Evaluation Outline Report Status: Approved 08 Dec 2014 Effective Date: 27 Mar 2018 Task Number: 05-PLT-5703 Task Title: Perform Electrical Safety Systems Testing and Maintenance Distribution
More informationCommunication Strategy
ANNEX III. INFORMATION AND COMMUNICATION STRATEGY AND ANNUAL INFORMATION AND COMMUNICATION PLAN FOR 2016 Managing Authority Ministry of Regional Development and Public Administration Communication Strategy
More informationThe Provision and Use of Work Equipment (PUWER) Policy
The Provision and Use of Work Equipment (PUWER) Policy DOCUMENT CONTROL Version: 4 Ratified by: Estates Sub-Committee Date Ratified: 12 December 2016 Name of originator / author: Health and Safety Lead
More informationSpace Functional Use Definitions
Space Functional Use Definitions Handout #7 General Information and Background Functional use allows us to classify space costs consistent with the activities the space is used for. In Banner Finance,
More informationThe birth of a new era Excellent neonatal respiratory support at your fingertips DRÄGER BABYLOG VN500
D-22136-2009 The birth of a new era Excellent neonatal respiratory support at your fingertips DRÄGER BABYLOG VN500 02 DRÄGER BABYLOG VN500 One of the greatest challenges in medicine Neonatal ventilation
More informationRebates & Incentives - WTF. Lee Guthman February 28, 2012
Rebates & Incentives - WTF Lee Guthman February 28, 2012 1 The dilemma we face 2 Who is GreenOhm? Mainstream benefits of energy efficient products and services Drive purchasing behavior for energy efficient
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination of Protection Systems for Performance During Faults and Specific Training for Personnel Reliability Standards ) ) )
More informationDeclaration of Classification ValiSpore Incubator Manual
alisafe Declaration of Classification ValiSpore Incubator Manual I hereby confirm that the Valisafe chemical indicators used to monitor steam sterilization are an accessory to a class 1 medical device
More informationTENDER FOR EMPANELMENT OF MANUFACTURERS/SUPPLIERS FOR SUPPLY & INSTALLATION OF MODULAR FURNITURE AT BANK S VARIOUS OFFICES/BRANCHES PAN INDIA
BANK OF BARODA TENDER FOR EMPANELMENT OF MANUFACTURERS/SUPPLIERS FOR SUPPLY & INSTALLATION OF MODULAR FURNITURE AT BANK S VARIOUS OFFICES/BRANCHES PAN INDIA Last date of submission of application 22.02.2016
More informationThe budget for this call is indicative. The final budget awarded to actions implemented through the call for proposals may vary:
CALL FICHE 1 SCIENCE IN SOCIETY 2011 Call identifier: FP7-SCIENCE-IN-SOCIETY-2011-1 Date of publication: Tuesday 20 July 2010 Deadline 1 : Thursday 20 January 2011 at 17.00.00, Brussels local time. Indicative
More informationTender Information. Overseas Information. DB Ref. No.: WB780-02/13
Tender Information Azerbaijan (EEPC Ref. No. DB-1200) Project : Water Users Association Development Support Project (WUAP) IBRD Loan No. : 8039-AZ ; IDA Credit No. : 4913-AZ Loan/Credit from IBRD & IDA
More informationSkillsnet workshop. "Job vacancy Statistics"
EUROPEAN COMMISSION EUROSTAT Directorate F: Social Statistics and Information Society Unit F-2: Labour market statistics Skillsnet workshop Bucarest, 21-22 June 2007 "Job vacancy Statistics" Eurostat contact:
More informationThe European Research Council. ERC and Greece. FP7 achievements and H2020 results. January Theodore PAPAZOGLOU ERCEA Head of Unit A.
Art & Build Architect / Montois Partners / credits: S. Brison January 2016 1 The European Research Council ERC and Greece FP7 achievements and H2020 results Theodore PAPAZOGLOU ERCEA Head of Unit A.1 Strategy
More informationCall title: Science in Society 2013
Call title: Science in Society 2013 Call identifier: FP7-SCIENCE-IN-SOCIETY-2013-1 Date of publication: 10 July 2012 Deadline 1 : 16 January 2013 at 17.00, Brussels local time. Indicative budget: 51.7
More informationATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet
ATTACHMENT B RFP RESPONSE PACKAGE Proposals should be developed to include all of the applicable information as detailed in Section 7 ( RFP Documentation/Forms in RFP Response Package ) of the Request
More informationGood Pharmacovigilance Practice. Overview of GVP Modules on ADR, PSURs, Signal Management and Additional Monitoring Mick Foy - MHRA
Good Pharmacovigilance Practice Overview of GVP Modules on ADR, PSURs, Signal Management and Additional Monitoring Mick Foy - MHRA Content ADR Reporting Definition & Increased scope Transition arrangements
More informationIGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL
IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. GENERAL REQUIREMENTS... 3 4. DETAILED GUIDANCE ON ISOLATION... 4 5. TRAINING
More informationInvitation to Submit Expression of Interest and Proposal
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE MINISTÉRIO DAS FINANCAS Invitation to Submit Expression of Interest and Proposal I. INTRODUCTION 1. The Government of Timor-Leste is inviting interested eligible Power
More informationInternational Credit mobility
International Credit mobility Call for Proposals Deadline :1 February 2018 Amer Helwani Erasmus+ Office - Lebanon A streamlined architecture: 3 Key Actions A single integrated programme KA1 Learning Mobility
More informationCall title: "The Ocean of Tomorrow 2013"
Call title: "The Ocean of Tomorrow 2013" Call identifier: FP7-OCEAN-2013 Date of publication: 10 July 2012 Deadline: 07 February 2013 at 17.00.00, Brussels local time 1 Indicative budget 2 : EUR 55 million
More informationRailway Interoperability and Safety Committee. Working document
08/57-ST12 RISC 62 Version EN01 Origin EN 06.10.2011 Status: NA Railway Interoperability and Safety Committee Working document Draft Commission Decision amending Commission Decisions 2006/679/EC and 2006/860/EC
More informationIsolette TI500 Neonatal Transport
Isolette TI500 Neonatal Transport Transport neonates safely, comfortably and with a minimum of stress with a fully-featured, high-performance transport incubator. D-1587-2009 02 Isolette TI500 Benefits
More informationStandard NUC Nuclear Plant Interface Coordination
A. Introduction 1. Title: Nuclear Plant Interface Coordination 2. Number: NUC-001-2.1 3. Purpose: This standard requires coordination between Nuclear Plant Generator Operators and Transmission Entities
More informationFeed in Tariffs (FIT) Generator Application Form
First Utility is part of the Feed in Tariffs scheme and support our own electricity customers. If your current electricity supplier is British Gas, E.ON, EDF Energy, Npower, Scottish Power, SSE, Utility
More informationInternational Credit Mobility Call for Proposals 2018
International Credit Mobility Call for Proposals 2018 Information Day National Office in Palestine Dr. Amir Khalil/BZU Venue: Ramallah/ Grand Park Hotel Gaza/ Islamic University November 8 th, 2017 1 What
More informationPersonal Attendant Service Rates Effective 9/1/14 1 unit= 1 HOUR
PARTICIPANT LEVEL HCPCS MODIFIER Personal Attendant Service Rates Effective 9/1/14 = 1 HOUR WAIVER PAYMENT RATE (includes enhanced rate) MODIFIER BLENDED PAYMENT NON WAIVER/ PROTECTIVE SERVICES (includes
More informationGovernor s Office of Electronic Health Information (GOEHI) The National Council for Community Behavioral Healthcare
Governor s Office of Electronic Health Information (GOEHI) The National Council for Community Behavioral Healthcare PBHCI Grantees by HHS Regions AK (2) OR WA (3) Region 10 6 Grantees ID MT Region 8 2
More informationLTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4. Tactical Wheeled Vehicles 27 January 2003
LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4 Tactical Wheeled Vehicles 27 January 2003 TRUCK HISTORY LESSON The first motor truck was built in 1896 by Gottlieb Daimler Pre-WWI
More informationKentucky HIPAA HEALTH CARE CLAIM: INSTITUTIONAL Companion Guide 837
Kentucky HIPAA HEALTH CARE CLAIM: INSTITUTIONAL Companion 837 Version 1.4 Final RECORD OF CHANGE VERSION NUMBER DATE REVISED DESCRIPTION OF CHANGE PERSONS INVOLVED 1.0 10/25/02 Creation and first view
More informationRAPID RUG GUIDE RUG-III, VERSION GROUPER Effective for Assessments With an ARD on or After 10/1/2013
RAPID RUG GUIDE RUG-III, VERSION 5.20 34-GROUPER Effective for Assessments With an ARD on or After 10/1/2013 Step 1: Calculation To calculate the score of Bed Mobility (G0110A), Transfer (G0110B) and Toilet
More informationYou can apply for all these vacancies at Do NOT contact employer directly
Ref VAC001405714 No of Vacancies 1 Vacancy Title Business and Administration Apprenticeship Employer Name Mainway insurance (Bolton) Postcode BL2 1ES Wage 150 Start Date 26/06/2018 Date Posted 24/05/2018
More informationStrengthening Collaborations for Operating Pharmacovigilance in Europe (SCOPE) Joint Action
www.scopejointaction.eu Strengthening Collaborations for Operating Pharmacovigilance in Europe (SCOPE) Joint Action The SCOPE Joint Action has received funding from the European Union Contents 1. Overall
More informationBUFFALO S SHIPPING POST Serving Napa Valley Since 1992
BUFFALO S SHIPPING POST Serving Napa Valley Since 1992 2471 Solano Ave Napa, CA 94558 707-226-7942 FAX: 707-226-1510 buffship.com October 21, 2017 RE: New Pricing Hi Everyone, Because of continual fuel
More informationPart 145 Aircraft Maintenance Organisation
Part 145 Compliance Matrix The Rule references in this compliance matrix have been extracted from the Civil Aviation Rules system as the minimum compliance requirements for an applicant for the issue or
More informationMinutes of the Meetings held on May 1 st, 2 nd and 3 rd 2013 in Galveston - TX, US
Minutes of the Meetings held on May 1 st, 2 nd and 3 rd 2013 in Galveston - TX, US Joint IEC/IEEE revision of IEEE C37.013: IEEE Standard for AC High-Voltage Generator Circuit Breakers Rated on a Symmetrical
More informationPublic Address System Norwalk Public Schools REQUEST FOR PROPOSAL 1/16/15 Proposal Response Date:
Public Address System Norwalk Public Schools REQUEST FOR PROPOSAL 1/16/15 Proposal Response Date: NORWALK PUBLIC SCHOOLS Central Office 125 East Avenue Norwalk, Connecticut 06852-6001 Replacement of Public
More informationTender Information. Armenia (EEPC Ref. No. DB-157) : Health System Modernization Project Credit No AM, Project ID No. P Credit from IDA
Tender Information Angola (EEPC Ref. No. DB-156) : HIV/AIDS, Malaria and Tuberculosis Control (HAMSET) IDA Grant No. H 140 ANG; ID No. P083180 Grant from IDA : WB1647-750/09 : Dr. Catarina Aragao Deputy
More informationPrescribed Connections to NHS England
Prescribed Connections to NHS England NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance
More informationFall 2017 elearning Course Offerings Start Session
Fall 2017 elearning Offerings Start Session Period Fac Subject Number Credits Section Period Format Title Fac Unit Catalog Number FA17 AP ADMS 1000 3 E F ONLN Introduction to Business AP ADMS Z91T01 FA17
More informationINTER POWER ENGINEERING PTE LTD
INTER POWER ENGINEERING PTE LTD CORPORATE BROCHURE YOUR SUCCESS IS OUR SUCCESS Inter Power Engineering Pte Ltd Blk 20 Ang Mo Kio Industrial Park 2A #03-01/07/14/15/16 Ang Mo Kio Techlink Singapore (567761)
More informationEU RESEARCH FUNDING Associated countries FUNDING 70% universities and research organisations. to SMEs throughout FP7
10 KEY FACTS 1 BUDGET TOTAL 55 billion 82% 18% 4 specific programmes* Cooperation - 28.7bn Ideas - 7.7bn People - 4.8bn Capacities - 3.8bn Euratom, JRC direct actions, ITER, Risk Sharing Finance Facility
More informationFrequently Asked Questions (FAQs) regarding ISO/IEC 17025:2017 and the transition of accreditation from the previous version of the Standard
Frequently Asked Questions (FAQs) regarding ISO/IEC 17025:2017 and the transition of accreditation from the previous version of the Standard Issue Date: 10 July 2018 General Questions 1. When was the new
More informationGIs from the point of view
GIs from the point of view of EU Pavlos DIMITRIOU EU legal instruments for GIs Agricultural products and foodstuffs Regulation (EC) No 510/2006 Wines Regulation (EC) No 1234/2007 Aromatised wines Regulation
More informationIt* Public Hearing. DATE: April 22,2008 AGENDA ITEM NO.
Consent Agenda County Administrator's Signature: Subiect: BOARD OF COUNTY COMMISSIONERS Regular Agenda n/ 9 h I7 : April 22,2008 AGENDA ITEM NO. It* Public Hearing Receipt and File of Procurement Items
More information