Training and Evaluation Outline Report

Size: px
Start display at page:

Download "Training and Evaluation Outline Report"

Transcription

1 Training and Evaluation Outline Report Status: Approved 08 Dec 2014 Effective Date: 27 Mar 2018 Task Number: 05-PLT-5703 Task Title: Perform Electrical Safety Systems Testing and Maintenance Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure: FD1 - This training product has been reviewed by the training developers in coordination with the Fort Leonard Wood, MSCoE foreign disclosure officer. This training product can be used to instruct international military students from all approved countries without restrictions. Supporting Reference(s): Step Number Reference ID Reference Name Required Primary ATP 5-19 (Change /08/ Pages) RISK MANAGEMENT NTRP /TM /AFPAM /MCRP F TB Construction Project Management ( ( dr_aa/pdf/tm3_34x42_ph_navy.pdf) SAFETY INSPECTION AND TESTING OF LIFTING DEVICES TM ENGINEER PRIME POWER OPERATIONS TM TM TM TM TM ENGINEER FIELD DATA {MCRP 3-17A} r_b/pdf/tm3_34x85.pdf Rigging Techniques, Procedures, and Applications {MCRP j} DEPOT PACKAGING, DEPRESERVATION AND FIELD PACKAGING INSTRUCTIONS FOR NONTACTICAL GENERATOR SETS AND POWER PLANTS; GENERATOR SET, 700 KW, ELECTRIC (NSN ); GENERATOR SET, 750 KW, ELECTRIC (6 OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL FOR SUBSTATIONS, TRAILER MTD, 500 KVA, AC, Y/240 V;208Y/120 V, 3 PHASE, 50/60 HZ (AVIONICS MODEL A) (FSN ) Operator and Unit Maintenance Manual for Generator Set, Diesel Engine Driven, Air Transportable Skid Mounted, 750 kw, 3 Phase, 4 Wire, 2400/4160 and 2200/3800 Volts (DOD Model MEP-208A) Class Prime Utility... NAVFAC P Conditions: The element is conducting operations in a contemporary operational environment and receives a directive to conduct electrical safety systems maintenance and testing. The element has available all assigned equipment, personnel and materials. Liaison operations have been performed. te: The Commander must still determine at what level of training they would want the element to perform. Crawl, walk or run. This can only be determined after consideration as to the units training level. The Commander prior to evaluating an element in the conduct of the task must determine if it will be conducted in a Live, Virtual, or Constructive environment, additionally it must also be determined which condition as described below that the element will conduct the task. The selection made for this task is at a trained level of proficiency. The commander must determine which of the environments below will best suit the unit and the proficiency level at which the unit is. When conducting crawl or walk level training units should not increase the intensity until the unit has achieved the standards and then unit trainers should include variables that increase proficiency in all conditions. te: The condition statement for this task is written assuming the highest training conditions reflected on the Task Proficiency matrix required for the evaluated unit to receive a "fully trained" (T) rating. Page 1

2 te: Condition terms definitions: Dynamic Operational Environment: Three or more operational and two or more mission variables change during the execution of the assessed task. Operational variables and threat Tactics, Techniques, and Procedures (TTPs) for assigned counter-tasks change in response to the execution of Blue Forces (BLUFOR) tasks. Complex Operational Environment: Changes to four or more operational variables impact the chosen friendly COA/mission. Brigade and higher units require all eight operational variables of Political, Military, Economic, Social, Infrastructure, Information, Physical environment, and Time (PMESII-PT) to be replicated in varying degrees based on the task being trained. Single threat: Regular, irregular, criminal or terrorist forces are present. Hybrid threat: Diverse and dynamic combination of regular forces, irregular forces, and/or criminal elements all unified to achieve mutually benefiting effects. This task should not be trained in MOPP 4. Standards: The element deploys to the site of the assignment and conducts electrical safety systems testing and maintenance In Accordance With ( IAW) the equipment's operating instructions, manuals and unit Standing Operating Procedure (SOP), within the time allotted in the directive. te: Leaders are defined as the Commander, Executive Officer, First Sergeant, Operations Sergeant, Platoon Leaders, Platoon Sergeants, Squad Leaders, and Team Leaders. Live Fire: Page 2

3 Objective Task Evaluation Criteria Matrix: Plan and Prepare Execute Assess Operational Environment SQD & PLT Training Environment (L/V/C) Training/Authorized % of Leaders Present at % of Soldiers Present at External Eval % Performance % Critical Performance % Leader Performance Task Assessment >=85% >=91% >=90% T Dynamic (Single Threat) Static (Single Threat) Day IAW unit CATS statement % 65-74% 60-64% >=80% 75-79% 60-74% 80-90% 65-79% 51-64% All 80-89% T- P P- <All <=79% <=59% <=59% <=50% U Remarks: ne tes: All required references and technical manuals will be provided by the local Command. Safety Risk: Low Task Statements Cue: ne Page 3

4 DANGER DO NOT OPERATE THE GENERATOR SET UNLESS IT HAS BEEN PROPERLY GROUNDED. FAILURE TO COMPLY MAY CAUSE PERMANENT INJURY OR DEATH. Leaders have an inherent responsibility to conduct Risk Management to ensure the safety of all Soldiers and promote mission accomplishment. WARNING THIS TASK SHOULD BE ONLY PERFORMED BY QUALIFIED PERSONNEL WHO ARE KNOWLEDGEABLE IN THE INSTALLATION, OPERATION AND MAINTENANCE OF MEDIUM-VOLTAGE ELECTRICAL POWER GENERATION EQUIPMENT AND ITS ASSOCIATED HAZARDS. FAILURE TO COMPLY MAY CAUSE PERMANENT INJURY OR DEATH. Risk management is the Army s primary decision-making process to identify hazards, reduce risk, and prevent both accidental and tactical loss. All Soldiers have the responsibility to learn and understand the risks associated with this task. CAUTION NOISE LEVELS IN EXCES OF 85 DECIBELS EXIST WITHIN A 50-FOOT RADIUS OF OPERATING EQUIPMENT. ALWAYS WEAR SINGLE HEARING PROTECTION WITHIN 50-FOOT RADIUS OF OPERATING EQUIPMENT. FAILURE TO COMPLY MAY CAUSE INJURY. Identifying hazards and controlling risks across the full spectrum of Army functions, operations and activities is the responsibility of all Soldiers. Page 4

5 NOTE: Assess task proficiency using the task evaluation criteria matrix. Performance Steps and Measures NOTE: Asterisks (*) indicate leader steps; plus signs (+) indicate critical steps. STEP/MEASURE GO NO-GO N/A +* 1. The element leader performs Troop Leading Procedures (TLP) The element conducts movement to work site. + a. Performs a pre-deployment reconnaissance. + b. Determines the requirement for prime power assets. + c. Verifies the specifications of the assignment. (1) Verifies the requester's identification (name, location, and contact information). (2) Determines if there was a potential hostile threat in the area. (3) Determines the exact nature of the technical assistance required The element assesses the electrical safety system requirements and design support technical data available. + a. Procures a map of the area. + b. Procures a one-line diagram of the system. + c. Procures any pertinent manufacturers literature pertaining to the system The element determines the components of the electrical safety system and testing requirements for those components. + a. Includes the ground grid system. + b. Includes the lightning arrestors. + c. Includes the surge capacitors. + d. Includes the equipment grounding points. + e. Includes the neutral connections. +* 5. The element leader prepares a Bill of Materials (BOM) for any supplies required to complete the mission The element conducts testing and maintenance of the electrical safety system. + a. Performs testing according to the (1) American Society for Testing and Materials (ASTM). (2) Institute of Electrical and Electronic Engineering (IEEE). (3) American Society of Mechanical Engineers (ASME). (4) National Electrical Testing Association (NETA). + b. Performs maintenance based on the test results The element performs an After Action Report (AAR). +* 8. The element leader reports completion to higher Headquarters (HQ) IAW the unit SOP. Page 5

6 TASK / PERFORMANCE EVALUATION SUMMARY BLOCK Training Unit ITERATION Date of Training per Iteration: Day or Night Training: Day / Night Day / Night Day / Night Day / Night # % # % # % # % Total Leaders Authorized % Leaders Present Total Soldiers Authorized % Soldiers Present Total Number of Performance Measures Total Number of Critical Performance Measures Live Fire, Total Number of Critical Performance Measures Total Number of Leader Performance Measures % Performance % Critical Performance % Critical Performance % Leader Performance MOPP LEVEL Evaluated Rating per Iteration T, T-, P, P-, U Mission(s) supported: ne MOPP 4: Never MOPP 4 Statement: ne NVG: Never NVG Statement: ne Prerequisite Collective Task(s): Step Number Task Number Title Proponent Status 05-PLT-5740 Provide Prime Power Sustainment Maintenance 05 - Engineers (Collective) Approved Supporting Collective Task(s): Page 6

7 Step Number Task Number Title Proponent Status 05-CO-5001 Perform Project Management 05 - Engineers (Collective) Approved 05-PLT PLT PLT-5732 Perform Electrical-Power Generation Equipment Organizational Maintenance Operations Perform Electrical-Power, Distribution Equipment Organizational Maintenance Operations Conduct Electrical-Power Generation Equipment Intermediate Maintenance Operations 05 - Engineers (Collective) Approved 05 - Engineers (Collective) Approved 05 - Engineers (Collective) Approved CO-5100 Conduct Troop Leading Procedures 71 - Combined Arms (Collective) Approved CO-0018 Conduct Report Procedures 05 - Engineers (Collective) Approved OPFOR Task(s): Task Number Title Status 71-CO-8502 OPFOR Execute an Ambush Approved 71-CO-8504 OPFOR Execute a Reconnaissance Attack Approved Supporting Individual Task(s): Page 7

8 Step Number Task Number Title Proponent Status Q-1108 Inspect Powerline Distribution Safety Equipment Q-1117 Inspect Hot-Line Equipment Q-1120 Install Personal Protective Grounds Q-1214 Construct a Termination on a URD Power Cable Rescue an Injured Victim From a Utility Pole Rescue an Injured Victim From a Manhole Perform Operator Preventive-Maintenance Checks and Services (PMCS) on a Line Truck With Auxiliary Equipment Operate a Line Truck with Auxiliary Equipment Maintain Rigging/Hoisting Equipment Perform Operator Preventive-Maintenance Checks and Services (PMCS) on a Bucket/Material Handler Truck Install Distribution System Protection and Equipment (De-energized) Operate a Bucket/Material Handler Truck Conduct a Safety Briefing Conduct a Safety Inspection Develop a Bill of Materials (BOM) List Energize an Electrical Distribution System Locate an Underground Cable and/or Fault Perform Maintenance on Electrical Distribution Equipment Manage a Power Line Crew Perform Switching, Blocking and Tagging Procedures Perform Primary Voltage Live-Line Testing Perform Secondary Voltage Live-Line Testing Trouble Shoot Primary/Secondary Voltage Systems Service a Low-Voltage Circuit Breaker Service an Oil Switch Service a Vacuum Switch Service a System Ground Service a naerial Air Switch Service an Electrical-Equipment Grounding System Service a Power Transformer Service a Distribution Transformer Service Bus Bars Service a Switchgear Enclosure Service an Air-Magnetic Circuit Breaker Service an Alternating-Current (AC) Generator Assembly Service a Sulfur Hexafluoride (SF6) Circuit Breaker Service a Vacuum Circuit Breaker Supervise an Annual Electrical Service Service a Timing Relay Service a Volt-Ampere Reactance (VAR) Meter Service a Frequency Meter Service a Current Boost Module Service a Signal Transmission Circuit Service an Induction Disk and/or Electromagnetic Relay Service a Programmable Logic Controller (PLC) Service Optoelectronic Equipment Service a Solid-State Relay Service a Digital Synchronizer and Load Controller (DSLC) Manage the Construction/Repair of Electrical Utilities Manage the Installation of an Interior Electrical System Manage Risk Management of Power Generation Systems Manage Installation of a Medium Voltage n-aerial Air Switch Page 8

9 Manage Lock out and Tag out Procedures Manage Load Assessment Design a Temporary Medium Voltage Distribution System Manage Risk Mgmt Proc. for Power Systems Manage Electrical Safety Systems Testing and Maintenance Manage Construction Survey Operations Manage Power Generation Systems for Damage Assessment Manage Disaster Relief Operations Prepare a Bill of Materials Schedule Work Read Construction Prints Splice a Medium-Voltage Power Cable Terminate a Medium-Voltage Power Cable Perform Operator Preventive-Maintenance Checks and Services (PMCS) on Test, Measurement, and Diagnostic Equipment (TMDE) Perform Preventive-Maintenance Checks and Services (PMCS) on a Mobile Electric Power (MEP)-012 or -208 Generator Check Power Plant to Load Compatibility Supervise the Maintenance of Distribution Equipment Supervise an Automatic Transfer Switch (ATS) Service Perform a Power Plant After-Installation Inspection Supervise a Power Plant Installation Service an Auxiliary and/or an Instrumentation Sensing Device Service an Electronic Governor Service a Potential Transformer Service a Current Transformer (CT) Service an Automatic Transfer Switch (ATS) Service a Voltage Regulator Service an Uninterruptible Power Supply (UPS) Direct Installation of Theater of Operation (T/O) Electrical Equipment / Fixtures 052-IS Perform an Insulation Resistance Test 052-IS Service a Sulfur Hexafluoride (SF-6) Circuit Interrupter B-1020 Manage Maintenance on Ground Based Electronic Support Equipment Ordnance (Individual) Approved Supporting Drill(s): ne Supported AUTL/UJTL Task(s): ART Task ID Provide General Engineering Support Title TADSS TADSS ID Title Product Type Quantity TADSS specified Equipment (LIN) LIN menclature Qty equipment specified Page 9

10 Materiel Items (NSN) NSN LIN Title Qty materiel items specified Environment: Environmental protection is not just the law but the right thing to do. It is a continual process and starts with deliberate planning. Always be alert to ways to protect our environment during training and missions. In doing so, you will contribute to the sustainment of our training resources while protecting people and the environment from harmful effects. Refer to the current Environmental Considerations manual and the current GTA Environmental-related Risk Assessment card.. Safety: In a training environment, leaders must perform a risk assessment in accordance with current Risk Management Doctrine. Leaders will complete the current Deliberate Risk Assessment Worksheet in accordance with the TRADOC Safety Officer during the planning and completion of each task and sub-task by assessing mission, enemy, terrain and weather, troops and support available-time available and civil considerations, (METT-TC). te: During MOPP training, leaders must ensure personnel are monitored for potential heat injury. Local policies and procedures must be followed during times of increased heat category in order to avoid heat related injury. Consider the MOPP work/rest cycles and water replacement guidelines IAW current CBRN doctrine.. Page 10

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Dec 2014 Effective Date: 01 Mar 2017 Task Number: 05-PLT-5722 Task Title: Prepare Power Systems Construction Estimates Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 31 Jul 2014 Effective Date: 13 Jun 2017 Task Number: 05-PLT-5110 Task Title: Perform Lifting and Loading Operations Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 31 Jul 2014 Effective Date: 13 Jul 2017 Task Number: 05-CO-5001 Task Title: Perform Project Management Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 05 Jan 2016 Effective Date: 30 Jul 2018 Task Number: 05-PLT-5124 Task Title: Provide Construction Project Asphalt Support Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 31 Mar 2014 Effective Date: 05 Oct 2016 Task Number: 05-PLT-5121 Task Title: Set Up Asphalt Plant Equipment Distribution Restriction: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 08 Dec 2015 Effective Date: 19 Jan 2017 Task Number: 05-PLT-5117 Task Title: Provide Grading Support Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Oct 2014 Effective Date: 04 Jun 2018 Task Number: 05-PLT-5130 Task Title: Perform Quarry Operations Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 29 Dec 2014 Effective Date: 08 Mar 2017 Task Number: 05-SEC-5001 Task Title: Perform Construction Survey Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Oct 2014 Effective Date: 30 Nov 2016 Task Number: 05-PLT-5144 Task Title: Perform Dump Truck-Hauling Operations Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Feb 2015 Effective Date: 21 Apr 2017 Task Number: 05-PLT-5001 Task Title: Perform an Initial Infrastructure Assessment Distribution Restriction:

More information

Perform Primary Voltage Live-Line Testing Status: Approved

Perform Primary Voltage Live-Line Testing Status: Approved Report Date: 09 Mar 2018 052-204-2303 Perform Primary Voltage Live-Line Testing Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 11 Feb 2015 Effective Date: 05 Jan 2017 Task Number: 05-TM-5525 Task Title: Support Underwater Security Operations Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 12 Jun 2015 Effective Date: 23 Jun 2017 Task Number: 05-PLT-8011 Task Title: Perform Rope Rescue Operations Distribution Restriction: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 02 Nov 2015 Effective Date: 19 Jan 2017 Task Number: 05-PLT-5106 Task Title: Install a Culvert Distribution Restriction: Approved for public release;

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Dec 2015 Effective Date: 24 Jan 2017 Task Number: 05-PLT-5137 Task Title: Provide Borrow Pit Support Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 05 Jun 2015 Effective Date: 31 Aug 2017 Task Number: 05-DET-5405 Task Title: Perform Hazardous Materials (HAZMATs) Incident Operations Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 05 Jun 2015 Effective Date: 31 Aug 2017 Task Number: 05-DET-5401 Task Title: Perform Aircraft Rescue Firefighting (ARFF) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Feb 2015 Effective Date: 05 Jun 2018 Task Number: 71-CORP-6220 Task Title: Develop Personnel Recovery Guidance (Brigade - Corps) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 06 Oct 2005 Effective Date: 06 Dec 2016 Task Number: 34-PLT-0005 Task Title: Perform Risk Management Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 03 Mar 2014 Effective Date: 20 Apr 2018 Task Number: 71-CO-1001 Task Title: Conduct Unit Training Management (Platoon-Company) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Sep 2016 Effective Date: 12 May 2017 Task Number: 12-BDE-0012 Task Title: Conduct Personnel Readiness Procedures (S1) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Jan 2015 Effective Date: 03 Oct 2016 Task : 71-8-7648 Task Title: Plan Offensive Operations During Counterinsurgency Operations (Brigade - Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 03 Oct 2016 Effective Date: 03 Oct 2016 Task Number: 12-EAC-1252 Task Title: Operate a Military Mail Terminal (HR CO) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 27 Jul 2010 Effective Date: 28 Feb 2018 Task Number: 12-BDE-0037 Task Title: Conduct Strength Reporting (S1) Distribution Restriction: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Aug 2005 Effective Date: 22 May 2017 Task Number: 12-BDE-0009 Task Title: Process Replacements (S1) Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 29 Dec 2011 Effective Date: 23 May 2017 Task Number: 12-BDE-0011 Task Title: Maintain Unit Strength (S1) Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1233 Task Title: Monitor Casualty Reporting (HROB) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Oct 2007 Effective Date: 02 Jan 2018 Task Number: 14-EAC-8004 Task Title: Conduct Commercial Vendor Pay Operations (Financial Management Support

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 27 Jul 2010 Effective Date: 28 Feb 2018 Task Number: 12-BDE-0036 Task Title: Conduct Personnel Accountability (S1) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 19 Jun 2017 Effective Date: 02 Jan 2018 Task Number: 14-EAC-8027 Task Title: Conduct Paying Agent Operations (Financial Management Support Detachment

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 18 Feb 2015 Effective Date: 30 Sep 2016 Task Number: 71-9-6221 Task Title: Conduct Counter Improvised Explosive Device Operations (Division Echelon

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 27 Nov 2007 Effective Date: 17 Apr 2018 Task Number: 14-EAC-8025 Task Title: Provide Funding Support to Financial Management Elements During Offense, Defense,

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 11 May 2010 Effective Date: 01 Jun 2017 Task Number: 12-EAC-1256 Task Title: Monitor Postal Services (HRSC) Distribution Restriction: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 28 Dec 2015 Effective Date: 21 Jun 2017 Task Number: 05-PLT-5119 Task Title: Conduct Surface Treatment Operations Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1255 Task Title: Manage Military Mail Terminal (HROB) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 02 May 2017 Effective Date: 02 May 2017 Task Number: 12-EAC-1212 Task Title: Perform Transient Personnel Accountability (HR CO) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 01 Mar 2007 Effective Date: 22 May 2017 Task Number: 12-EAC-1251 Task Title: Establish a Military Mail Terminal (MMT) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 20 Apr 2015 Effective Date: 13 Sep 2016 Task Number: 71-8-3501 Task Title: Coordinate Electronic Warfare (Brigade - Corps) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 02 May 2017 Effective Date: 02 May 2017 Task Number: 12-EAC-1260 Task Title: Establish Theater Postal Support (HRSC) Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1234 Task Title: Plan Establishment of Theater Casualty Assistance Center (HRSC) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 27 Jul 2017 Effective Date: 27 Jul 2017 Task Number: 12-EAC-1219 Task Title: Monitor Transient Personnel Activities at Theater Gateway (ESC-HROB) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 03 Oct 2016 Effective Date: 15 Feb 2017 Task Number: 12-EAC-1228 Task Title: Coordinate Human Resources Support During Offense, Defense, Stability and Defense

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1235 Task Title: Maintain the Theater Casualty Assistance Center (HRSC) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 20 Mar 2015 Effective Date: 15 Sep 2016 Task Number: 71-8-5715 Task Title: Control Tactical Airspace (Brigade - Corps) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 21 May 2015 Effective Date: 03 Oct 2016 Task Number: 71-8-7511 Task Title: Destroy a Designated Enemy Force (Division - Corps) Distribution Restriction:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task : 71-8-5702 Task Title: Determine Integrated Airspace User Requirements (Brigade-Corps) Distribution Restriction: for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 20 Jun 2012 Effective Date: 28 Feb 2018 Task Number: 14-EAC-8008 Task Title: Provide Military Pay Support (Financial Management Support Unit (FMSU)) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 22 Sep 2010 Effective Date: 12 Sep 2016 Task Number: 16-TM-1001 Task Title: Conduct Religious Services Distribution Restriction: for public release; distribution

More information

150-MC-7654 Employ the Knowledge Management Processes Status: Approved

150-MC-7654 Employ the Knowledge Management Processes Status: Approved Report Date: 09 Jun 2017 150-MC-7654 Employ the Knowledge Management Processes Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 20 Feb 2018 Effective Date: 23 Mar 2018 Task Number: 71-CORP-5119 Task Title: Prepare an Operation Order Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 12-1-1212 Task Title: Perform Transient Personnel Accountability Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 30 Mar 2017 Effective Date: 14 Sep 2017 Task Number: 71-CORP-1200 Task Title: Conduct Tactical Maneuver for Corps Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 71-8-3510 Task Title: Plan for a Electronic Attack (Brigade - Corps) Distribution Restriction: for public release; distribution is unlimited. Destruction

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 14 Sep 2005 Effective Date: 22 May 2017 Task Number: 12-BDE-0005 Task Title: Conduct Casualty Operations (S1) Distribution Restriction: Approved

More information

Conduct Field Maintenance on a Hydra-start System Status: Approved

Conduct Field Maintenance on a Hydra-start System Status: Approved Report Date: 03 Oct 2016 551-881-8211 Conduct Field Maintenance on a Hydra-start System Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice:

More information

150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved

150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved Report Date: 09 Jun 2017 150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 14 Sep 2005 Effective Date: 12 May 2017 Task Number: 12-BDE-0007 Task Title: Perform Essential Personnel Services (S1) Distribution Restriction: for public

More information

805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved

805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved Report Date: 12 Feb 2018 805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved

805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved Report Date: 12 Feb 2018 805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice:

More information

805C-42B-6109 Manage Unit Postal Operations Status: Approved

805C-42B-6109 Manage Unit Postal Operations Status: Approved Report Date: 12 Feb 2018 805C-42B-6109 Manage Unit Postal Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 07-6-1043 Task Title: Conduct Non-Combatant Evacuation (Battalion - Brigade) Distribution Restriction: for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 30 Sep 2016 Effective Date: 27 Mar 2018 Task Number: 14-EAC-8002 Task Title: Perform Disbursing Operations (Financial Management Support Unit (FMSU)) Distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 01-6-0029 Task Title: Maintain the BCT Current Situation for Aviation Supporting Reference(s): Step Number Reference ID Reference Name Required Primary

More information

805C-42A-4060 Plan Unit Postal Operations Status: Approved

805C-42A-4060 Plan Unit Postal Operations Status: Approved Report Date: 12 Feb 2018 805C-42A-4060 Plan Unit Postal Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved

805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved Report Date: 12 Feb 2018 805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

150-MC-0006 Validate the Protection Warfighting Function Staff (Battalion through Corps) Status: Approved

150-MC-0006 Validate the Protection Warfighting Function Staff (Battalion through Corps) Status: Approved Report Date: 14 Jun 2017 150-MC-0006 Validate the Protection Warfighting Function Staff (Battalion through Corps) Status: Approved Distribution Restriction: Approved for public release; distribution is

More information

Summary Report for Individual Task M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved

Summary Report for Individual Task M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved Summary Report for Individual Task 551-88M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved Report Date: 28 Jul 2014 Distribution Restriction: Approved for

More information

150-LDR-5012 Conduct Troop Leading Procedures Status: Approved

150-LDR-5012 Conduct Troop Leading Procedures Status: Approved Report Date: 05 Jun 2017 150-LDR-5012 Conduct Troop Leading Procedures Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

805A-36A-8005 Implement e-commerce Activities Status: Approved

805A-36A-8005 Implement e-commerce Activities Status: Approved Report Date: 02 May 2017 805A-36A-8005 Implement e-commerce Activities Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805A-36A-7022 Establish Army e-commerce Systems Status: Approved

805A-36A-7022 Establish Army e-commerce Systems Status: Approved Report Date: 13 Apr 2018 805A-36A-7022 Establish Army e-commerce Systems Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805C-42B-6108 Report Casualty Information Status: Approved

805C-42B-6108 Report Casualty Information Status: Approved Report Date: 12 Feb 2018 805C-42B-6108 Report Casualty Information Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 28 Mar 2017 Effective Date: 08 Feb 2018 Task Number: 71-BN-7361 Task Title: Organize Foreign Security Forces for Battalion Distribution Restriction:

More information

805C-42A-1307 Create an Ad Hoc Query Status: Approved

805C-42A-1307 Create an Ad Hoc Query Status: Approved Report Date: 12 Feb 2018 805C-42A-1307 Create an Ad Hoc Query Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: Foreign Disclosure: FD1

More information

805C-LF Dispatch Outgoing Registered Mail Status: Approved

805C-LF Dispatch Outgoing Registered Mail Status: Approved Report Date: 13 Feb 2018 805C-LF5-1223 Dispatch Outgoing Registered Mail Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805C Coordinate Personnel Accountability Functions Status: Approved

805C Coordinate Personnel Accountability Functions Status: Approved Report Date: 12 Feb 2018 805C-420-6000 Coordinate Personnel Accountability Functions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice:

More information

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved Report Date: 04 Jun 2014 Summary Report for Individual Task 091-94E-1069 Maintain the KVG-72(*) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805A-36A-6004 Conduct Paying Agent Operations Status: Approved

805A-36A-6004 Conduct Paying Agent Operations Status: Approved Report Date: 13 Apr 2018 805A-36A-6004 Conduct Paying Agent Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved Report Date: 14 Oct 2014 Summary Report for Individual Task 091-94E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved Distribution Restriction: Approved for public release; distribution

More information

150-MC-5320 Employ Information-Related Capabilities (Battalion-Corps) Status: Approved

150-MC-5320 Employ Information-Related Capabilities (Battalion-Corps) Status: Approved Report Date: 09 Jun 2017 150-MC-5320 Employ Information-Related Capabilities (Battalion-Corps) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 01-6-0416 Task Title: Conduct Aviation Missions as part of an Area Defense Supporting Reference(s): Step Number Reference ID Reference Name Required

More information

805A-36B-1002 Research Finance Regulations Status: Approved

805A-36B-1002 Research Finance Regulations Status: Approved Report Date: 08 Aug 2017 805A-36B-1002 Research Finance Regulations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign Disclosure:

More information

DANGER WARNING CAUTION

DANGER WARNING CAUTION Training and Evaluation Outline Report Task Number: 01-6-0447 Task Title: Coordinate Intra-Theater Lift Supporting Reference(s): Step Number Reference ID Reference Name Required Primary ATTP 4-0.1 Army

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 71-8-5320 Task Title: Synchronize Information-Related Capabilities (Battalion- Distribution Restriction: for public release; distribution is unlimited.

More information

805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved

805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved Report Date: 13 Apr 2018 805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805C-LF Prepare Consolidated Business Report Status: Approved

805C-LF Prepare Consolidated Business Report Status: Approved Report Date: 13 Feb 2018 3519 Prepare Consolidated Business Report Status: Distribution Restriction: for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure: FD5 - This product/publication

More information

805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved

805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved Report Date: 25 May 2016 805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805A-36B-4001 Conduct Central Funding Status: Approved

805A-36B-4001 Conduct Central Funding Status: Approved Report Date: 13 Apr 2018 805A-36B-4001 Conduct Central Funding Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: Foreign Disclosure: FD1

More information

Summary Report for Individual Task A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved

Summary Report for Individual Task A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved Summary Report for Individual Task 091-91A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved Report Date: 17 Jun 2014 Distribution Restriction: Approved for public release;

More information

805C-LF Operate the Automated Military Postal System (AMPS) Database Status: Approved

805C-LF Operate the Automated Military Postal System (AMPS) Database Status: Approved Report Date: 13 Feb 2018 805C-LF4-3565 Operate the Automated Military Postal System (AMPS) Database Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task Supervise a CBRN Reconnaissance Status: Approved

Summary Report for Individual Task Supervise a CBRN Reconnaissance Status: Approved Report Date: 13 Mar 2014 Summary Report for Individual Task 031-516-2039 Supervise a CBRN Reconnaissance Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

More information

805C-LF Prepare Daily Money Order Business Report Status: Approved

805C-LF Prepare Daily Money Order Business Report Status: Approved Report Date: 13 Feb 2018 805C-LF5-1215 Prepare Daily Money Report Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

Conduct a Bridge Reconnaissance Status: Approved

Conduct a Bridge Reconnaissance Status: Approved Report Date: 19 Apr 2016 052-196-3008 Conduct a Bridge Reconnaissance Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

805A-36B-1005 Prepare a Stored Value Card Status: Approved

805A-36B-1005 Prepare a Stored Value Card Status: Approved Report Date: 13 Apr 2018 805A-36B-1005 Prepare a Stored Value Card Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805C Administer Strength Reporting Information Status: Approved

805C Administer Strength Reporting Information Status: Approved Report Date: 12 Feb 2018 805C-201-0011 Administer Strength Reporting Information Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne

More information

Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved

Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved Report Date: 13 Apr 2015 Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 01-6-0444 Task Title: Employ Automated Mission Planning Equipment/TAIS Supporting Reference(s): Step Number Reference ID Reference Name Required Primary

More information

805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved

805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved Report Date: 09 Feb 2018 805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved

805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved Report Date: 09 Aug 2017 805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign

More information

Summary Report for Individual Task H-4501 Monitor External Sling Load Operation Status: Approved

Summary Report for Individual Task H-4501 Monitor External Sling Load Operation Status: Approved Report Date: 10 Apr 2014 Summary Report for Individual Task 551-88H-4501 Monitor External Sling Load Operation Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

More information

805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved

805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved Report Date: 12 Feb 2018 805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information