CONTRACT-BASED AIR TRANSPORTATION SYSTEM (CATS) Operational Assessment

Size: px
Start display at page:

Download "CONTRACT-BASED AIR TRANSPORTATION SYSTEM (CATS) Operational Assessment"

Transcription

1 CONTRACT-BASED AIR TRANSPORTATION SYSTEM (CATS) Operational Assessment A Human in the Loop experiment to assess the CoO concept from ATCO & Pilot point of view Presented by Sandrine Guibert EUROCONTROL Second CATS Workshop Geneva January 26th, 2010 Page: 1

2 Goal Proof of Concept Study, following E-OCVM Idea Implemented Concept V0 V1 V2 V3 V4 V 5 ATM Needs Scope Feasibility Integration Pre-operation Operation CATS Identify ATM performance needs & constraints Scope operational concepts and create validation strategy Iteratively develop and evaluate concept Integrate concept in wider context And confirm performance Industrialisation and procedure approval Implementation E-OCVM Concept Lifecycle Model The CATS operational assessment is focused on the En-route part and covers the V1 level (Scope) and V2 level (Feasibility) of the Level of Maturity. Page: 2

3 Goal Second operational assessment to evaluate the operational acceptability of the CoO and associated TWs concepts from the controllers' and pilots point of view. Operational acceptability will be evaluated in the context of the transfer of responsibility area between two ANSPs, and the relationship between ATCOs and Pilots. Evaluation environment is restricted to 4 2 en-route controller working positions (CWP: EXE + PLN) which manage the traffic and handover the aircraft 4 and two cockpit positions The objectives of the HIL2 experiment is twofold: Analyse the collaboration process between controllers and aircrew regarding the TW management. Analyse the impact of the TW management on the aircrew's activity in the cockpit. Page: 3

4 HIL2 Hypothesis CoO implementation allows safe operations. CoO is still manageable even with increase of traffic as foreseen in CoO implementation affects positively the flight within the sector (flight duration...). Implementation of TWs ensures the respect of schedule. TWs integrate flexibility to cope with uncertainty. The working methods offered to ATCOs and pilots, as a result of the CoO implementation, are feasible and acceptable (task sharing, role and responsibility, as well as the offered support tools). Implementation of CoO does not impose significant additional workload to ATCOs or pilots. Page: 4

5 Methodology Evaluation principles: SESAR KPAs (Key Performance Area): system performance 4 4 KPAs are applicable for CATS Safety Capacity Efficiency Predictability Objectives relating to human performance Page: 5

6 Operational issues evaluation Objectives relating to system performance Objectives relating to human performance SAFETY CAPACITY EFFICIENCY Feasibility and acceptability of the aircrew & ATCos' working methods due to the CoO execution Impact of CoO execution on aircrew & ATCOs' performance Impact of CoO on aircrew & ATCOs' activity PREDICTABILITY Indicators Indicators SAF.LOCAL.ER. PI (1, 2, 3, 5, 6 & 8) CAP.LOCAL.ER. PI (2, 8, 10, 11, 12 & 13) Workload: ISA, NASA-TLX, Interviews, Observations, Performance outcomes, Questionnaire Situation Awareness: SASHA_Q, Interviews, EFF.LOCAL.ER. PI (1, 7, 8, 9, 10, 11) Observations, Performance outcomes, questionnaire Error production and management: Observations, PRED.LOCAL.ER. PI (1 & 2) Questionnaire, Interviews, Performance outcomes Operator's activity: Cognitive processes, Decision making, Risk management, Constraints, etc. Collaborative and R/T activity: Communications (number, time, content, speaker and receiver, etc.) Number of TWs fulfilled Page: 6

7 Experimental environment Traffic: Real traffic Traffic load has been adapted to the airspace Current level of traffic (2008) 2020 traffic load (EUROCONTROL STATFOR) Simulation facilities SkySoft platform (rapid prototyping adapted from SkyGuide simulator) 2 sectors (MI1 & KL1) EXE and PLN on each CWP 2 cockpits (Microsoft Flight Simulator) No pseudo-pilot: Automatic order execution by aircraft Automatic hand over/ assume by feed sectors Page: 7

8 Experimental environment Measured Sectors ACC Sector Min FL Max FL KL1 FL275 FL345 LSAG LIRR LSAGKL1 LIRRMI1 FL275 FL275 FL345 FL345 MI1 FL275 FL345 Crew1 Pilot KL ATCos Crew2 Pilot MI Exe Pln Exe Pln Page: 8

9 Conduct of the experiment Duration: 10 days Dates: 19th. to the 23th. October th. to the 30th. October Location: Skysoft premises Geneva Four controllers experienced in En-route ATC Two experimented pilots One on site pre-training session at Roma ACC and in Airfrance Page: 9

10 Conduct of the experiment Timetable: Day 19 th. October Morning Simulation devices presentation Afternoon Familiarization 20 th. October 21 th. October 22 th. October 23 th. October Familiarization Operational training (session Operational training (session 2) 1) Operational training (session Experimental runs #1, 2 & 3 3) Experimental runs #4, 5 & 6 26 th. October Familiarization and Training Experimental runs #7 & 8 27 th. October 28 th. October 29 th. October 30 th. October Experimental runs #9, 10 & 11 Experimental runs #12, 13 & 14 Experimental runs #15 & 16 Final Debriefing Spare day Page: 10

11 Conduct of the experiment Daily Programme Daily Programme SkySoft arrival Set-up in Operations Room Exercise 1 + Debriefing & Questionnaires Break Exercise 2 + Debriefing & Questionnaires Lunch Exercise 3 + Debriefing & Questionnaires 1630 Leave Page: 11

12 Experimental plan (1) Independent variables: With and without TWs 2 levels of traffic (2008/expected in 2020) Disruptions (nominal & non nominal scenario) 4 similar traffic scenarios Independent variables TWs Traffic load disruptions ATCO X X X Pilot X X Geographic Sector Load 30 Geo Sect Load Geo Sect Load (Avg) Nb of Aircraft :00 16:10 16:20 16:30 16:40 16:50 17:00 17:10 17:20 17:30 Simulation Time Page: 12

13 Experimental Plan (2) Dependent variables: Observations 4 ATCOs performance (Overt The Shoulder OTS rating scales, FAA) 4 Spontaneous verbalisations Performance measurements 4 STCA, Separation Performance Indicators (Intervention type to resolve predicted conflict, Time of intervention before potential LoS, Distance before potential LoS, Localisation of controllers interventions) 4 ATCO orders 4 Flight duration 4 Fulfilled TW Self assessment 4 Workload : ISA & NASA-TLX 4 Situation awareness : SASHA_Q 4 Safety feeling : questionnaire on risks & hazards Post run interviews & Post experimental questionnaires (concept, performance, cooperation, simulation) Page: 13

14 Experimental plan (3) 16 runs and 32 measures: 2 traffic loads per run 8 runs with TW for 2008 & 2020 traffic loads for ATCO 8 runs without TW for 2008 & 2020 traffic loads for ATCO The 4 experimental conditions were compared for each ATCOs team (EXE-PLN for MI1 & EXE-PLN for KL1 ) 16 x 4 measured flight segments for pilots Page: 14

15 ATCOs Workload (ISA) 5.0 ISAWorkLoad KL1_EXE 5.0 ISAWorkLoad MI1_EXE /2008-TW -- No Impact -- p > (z:0) 2020/2020-TW -- No Impact -- p = (z:1.05) 2008/ Impacted -- p = 18 (z:-2.10) 2008TW/2020TW -- Impacted -- p = 47 (z:-1.68) ISAWorkLoad KL1_PLN 2008/2008-TW -- No Impact -- p > (z:0.26) 2020/2020-TW -- No Impact -- p = 65 (z:-1.52) 2008/ Impacted -- p = 33 (z:-1.84) 2008TW/2020TW -- Impacted -- p = 02 (z:-2.84) ISAWorkLoad MI1_PLN /2008-TW -- No Impact -- p > (z:0.53) 2008/2008-TW -- No Impact -- p = (z:-0.79) 2020/2020-TW -- No Impact -- p = (z:-0.74) 2020/2020-TW -- No Impact -- p > (z:-5) 2008/ Impacted -- p = 05 (z:-2.57) 2008/ Impacted -- p = 33 (z:-1.84) 2008TW/2020TW -- Impacted -- p = 21 (z:-2.05) 2008TW/2020TW -- Impacted -- p = 21 (z:-2.05) Not significant between with TW and without TW Significant between 2008 and 2020 traffic load Page: 15

16 ATCOs Workload self assessment (NASA TLX) 9 8 NASA TLX WorkLoad KL1_EXE 9 8 NASA TLX WorkLoad MI1_EXE /2008-TW -- No Impact -- p = (z:-0.95) 2020/2020-TW -- No Impact -- p > (z:-0.32) 2008/ Impacted -- p < 02 (z:-3.36) 2008TW/2020TW -- Impacted -- p < 02 (z:-2.94) /2008-TW -- No Impact -- p > (z:0.32) 2020/2020-TW -- No Impact -- p > (z:0.32) 2008/ Impacted -- p < 02 (z:-2.94) 2008TW/2020TW -- Impacted -- p < 02 (z:-3.36) 9 8 NASA TLX WorkLoad KL1_PLN 9 8 NASA TLX WorkLoad MI1_PLN /2008-TW -- No Impact -- p > (z:-0.63) 2020/2020-TW -- No Impact -- p = (z:0.95) 2008/ Impacted -- p < 02 (z:-2.94) 2008TW/2020TW -- Impacted -- p = 23 (z:-2.00) 2008/2008-TW -- No Impact -- p > (z:-0.63) 2020/2020-TW -- No Impact -- p = (z:-1.21) 2008/ Impacted -- p = 06 (z:-2.52) 2008TW/2020TW -- Impacted -- p < 02 (z:-2.99) Not significant between with TW and without TW Significant between 2008 and 2020 traffic load Page: 16

17 Pilots Workload self assessment (NASA TLX) NASA TLX Pilots Significant impact of TW implementation Pilot evaluated this impact as fully acceptable with the workload induced by the other cockpit tasks during the cruise phase. 5 0 Without TW With TW Wilcoxon test: Variable impact results if p<0,05 With-TW / Without- TW Impact P=0, %-75% Min-Max However, experiments should be done to validate the workload induced by the TWs in emergency situations or in high workload conditions. Page: 17

18 ATCOs Situation Awareness (SASHA- Q) SASHA (Situational Awareness for SHAPE) KL1_EXE SASHA (Situational Awareness for SHAPE) MI1_EXE /2008-TW -- No Impact -- p > (z:0) 2020/2020-TW -- No Impact -- p > (z:-0.11) 2008/ Impacted -- p < 02 (z:3.15) 2008TW/2020TW -- Impacted -- p < 02 (z:3.05) 2008/2008-TW -- No Impact -- p > (z:-5) 2020/2020-TW -- No Impact -- p > (z:-5) 2008/ Impacted -- p = 04 (z:2.68) 2008TW/2020TW -- Impacted -- p = 07 (z:2.47) SASHA (Situational Awareness for SHAPE) KL1_PLN SASHA (Situational Awareness for SHAPE) MI1_PLN /2008-TW -- No Impact -- p = (z:-1.16) 2008/2008-TW -- Impacted -- p = 26 (z:1.94) 2020/2020-TW -- No Impact -- p = (z:-0.89) 2020/2020-TW -- Impacted -- p = 06 (z:2.52) 2008/ Impacted -- p < 02 (z:3.26) 2008/ Impacted -- p = 18 (z:2.10) 2008TW/2020TW -- Impacted -- p = 02 (z:2.84) 2008TW/2020TW -- No Impact -- p = 65 (z:1.52) Not significant between with TW and without TW, except MI PLN. Significant between 2008 and 2020 traffic load Page: 18

19 Pilots Situation Awareness (SASHA- QP) 6,2 SASHA Pilots 6,0 5,8 5,6 5,4 5,2 5,0 4,8 4,6 4,4 4,2 Without TW With TW 25%-75% Min-Max Wilcoxon test: Variable impact results if p<0,05 With-TW / Without- TW No impact P=0,2425 Not significant between with TW and without TW Page: 19

20 OTS Performance OTS overall Performance 2020 (Over The sholders observations) KL1 OTS overall Performance 2020 (Over The sholders observations) MI TW TW 2020/2020-TW -- No Impact -- p > (z:-0.37) 2020/2020-TW -- No Impact -- p > (z:0) Not significant between with TW and without TW Page: 20

21 Acceptability and Usability Concept has been described by pilots and ATCOs as: Feasible & Acceptable TW was manageable, for 2008 as well as 2020, even if TW management is an additional task Traffic volume constrained ATCOs more than the TW Training proposed provided sufficient knowledge on the concept, platform, HMI and tools Pilots and ATCOs find the concept easy to learn and to use Potential improvements: For ATCOs, some aspects regarding the TWs positions within the sector have to be changed in TWs calculation For Pilots, there is a need to more anticipate the following TWs on display. Page: 21

22 ATCOs Orders ATCO GLOBAL Orders/hours KL1_EXE ATCO GLOBAL Orders/hours MI1_EXE /2008-TW -- No Impact -- p = (z:1.00) 2020/2020-TW -- No Impact -- p = (z:0.84) 2008/ Impacted -- p = 08 (z:-2.42) 2008TW/2020TW -- Impacted -- p = 37 (z:-1.79) 2008/2008-TW -- No Impact -- p = (z:1.16) 2020/2020-TW -- No Impact -- p = (z:0.95) 2008/ No Impact -- p = (z:-1.05) 2008TW/2020TW -- No Impact -- p = (z:-0.84) Not significant between with TW and without TW Significant between 2008 and 2020 traffic load for KL Detailed analysis shows: no impact of TW implementation on FL and speed orders impact on Go To orders, as expected, significant in 2008, not in Page: 22

23 RT Communication 2,2 Radio Communication 2,0 1,8 1,6 1,4 Controller communication duration with piloted aircraft shows no significant difference between with TW and without TW whatever the traffic load conditions 1,2 1,0 0, TW 2020TW 25%-75% Min-Max 2020 traffic condition generates longer communication duration, even if it is not significant. Wilcoxon test: Variable impact results if p<0, /2008-TW TW TW/2020TW No impact No impact No impact No impact P=0,0678 P=0,2733 P=0,1441 P=0,1441 Page: 23

24 Working Methods Pilots and ATCOs affirmed that TWs implementation induces no particular changes in their working methods TW management was consider as a task mainly for PLN, for traffic preparation. TW management was consider as a PF task 4 But a need to have party line and maybe TWs on FMS Safety remains the first priority Conflict resolution first then TW achievement Collaboration Aircraft s intentions more shared between operators not impacted between ATCOs 4 PLN able to help the EXE through collaborative tool pilots have the feeling TW implementation could increase slightly the communication between the aircrew. Page: 24

25 Safety: Aircraft Separation 2008 No loss of separation Majority of the traffic is maintained of more than 10Nm and 1000ft Page: 25

26 Safety: Aircraft Separation 2020 No loss of separation A high safety level is maintained whatever the traffic load conditions and/or the TWs conditions The TWs do not impact the controllers anticipation to manage safety Pilots and ATCOs reported in questionnaires that their safety feeling was not impaired by the TWs use Page: 26

27 Efficiency: Flight duration FlightDuration for Pseudo-piloted A/C KL1 FlightDuration for Pseudo-piloted A/C MI /2008-TW 2020/2020-TW 2008/ TW/2020TW -- Impacted No Impact No Impact No Impact -- p = 14 (z:2.21) p = (z:0.84) p > (z:-0.53) p = (z:-0.95) 2008/2008-TW 2020/2020-TW 2008/ TW/2020TW -- Impacted No Impact No Impact Impacted -- p = 05 (z:2.63) p > (z:0.63) p = 71 (z:1.47) p = 47 (z:1.68) Significant between with TW and without TW in both sectors in 2008 conditions Significant between with TW and without TW in both sectors in 2020 condition for Milano only The flight durations "with TW" are closer to the reference than "without TW" whatever the traffic load conditions. Page: 27

28 Efficiency: TWs OUT Target Windows Out (Percentage) KL1 Target Windows Out (Percentage) MI TW 2020-TW 2008-TW 2020-TW 2008TW/2020TW -- No Impact -- p > (z:-0.42) 2008TW/2020TW -- No Impact -- p > (z:0.42) 10 Target Windows Out (Percentage) KL1 10 Target Windows Out (Percentage) MI TW 2020EV-TW 2020-TW 2020EV-TW 2020-TW/2020EV-TW -- No Impact -- p > (z:-0.42) 2020-TW/2020EV-TW -- No Impact -- p = (z:-0.84) No significant difference (p<0,05) between the two traffic load conditions whatever the controlled sector or event- very low level of TWs OUT Page: 28

29 Efficiency: Fuel Burned Fuel burned FS1_PIL Fuel burned FS2_PIL /2008-TW -- No Impact -- p = (z:0.68) 2020/2020-TW -- No Impact -- p > (z:-0.11) 2008/ No Impact -- p > (z:-5) 2008-TW/2020-TW -- No Impact -- p > (z:-0.42) 2008/2008-TW -- No Impact -- p > (z:-0.53) 2020/2020-TW -- No Impact -- p > (z:-0.58) 2008/ No Impact -- p > (z:-0.21) 2008-TW/2020-TW -- No Impact -- p > (z:0.11) No significant difference (p<0,05) for the fuel burned by the aircraft whatever the traffic load conditions and the TWs implementation Page: 29

30 Conclusions CoO concept is manageable and acceptable with the 2008 & 2020 traffic loads, without any impact on Safety. CoO improve the predictability in times and routing ATCOs and pilots agreed CoO could optimise ATM system. However, the forecasted increase of traffic remains a limitation. New tools are required to support the traffic load. The number of TWs not fulfilled predicts positive prospect for HIL3. Page: 30

31 Thank you for your attention! Page: 31

TRAINING OF AIR TRAFFIC CONTROLLERS. Rating Training ACS and ADV/ADI (TWR/RAD/AIR/GMC/GMS) and the Assessment Center for Candidates

TRAINING OF AIR TRAFFIC CONTROLLERS. Rating Training ACS and ADV/ADI (TWR/RAD/AIR/GMC/GMS) and the Assessment Center for Candidates CROATIA CONTROL LTD. AMENDMENT No. 1 TO REQUEST FOR TENDERS IN THE PROCEDURE FOR AWARDING PUBLIC SERVICES CONTRACTS AS SET OUT IN ANNEX II. B OF THE PUBLIC PROCUREMENT ACT TRAINING OF AIR TRAFFIC CONTROLLERS

More information

MEASURING THE IMPACT OF RADAR SUPPORT OPTIONS ON AIR TRAFFIC CONTROL SITUATIONAL AWARENESS

MEASURING THE IMPACT OF RADAR SUPPORT OPTIONS ON AIR TRAFFIC CONTROL SITUATIONAL AWARENESS MEASURING THE IMPACT OF RADAR SUPPORT OPTIONS ON AIR TRAFFIC CONTROL SITUATIONAL AWARENESS Dr John Steele Mr Roger L. Roy Ms Eugenia Kalantzis Op Research Analysts/DGLCD Maj James S. Denford Director Land

More information

CWE Flow-based Market Coupling Project. at EMART Energy 2012

CWE Flow-based Market Coupling Project. at EMART Energy 2012 CWE Flow-based Market Coupling Project at EMART Energy 2012 1 Agenda Flow Based Market Coupling: reminder of essentials From ATC Market Coupling to Flow Based Market Coupling: key milestones and main impacts

More information

SESAR 2020 priorities for improved civil-military ATM interoperability

SESAR 2020 priorities for improved civil-military ATM interoperability SESAR 2020 priorities for improved civil-military ATM interoperability EUROCONTROL EDA work programme 2017-2018 Edgar REUBER / Juan Ignacio del Valle Senior Military Expert / Project Officer Air Programmes

More information

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels CWE FB MC project PLEF SG1, March 30 th 2012, Brussels 1 Content 1. CWE ATC MC Operational report 2. Detailed updated planning 3. Status on FRM settlement 4. FB model update since last PLEF Intuitiveness

More information

Modelling and Simulating Airport Surface Operations with Gate Conflicts

Modelling and Simulating Airport Surface Operations with Gate Conflicts Modelling and Simulating Airport Surface Operations with Gate Conflicts Shannon Zelinski Robert Windhorst NASA Ames Research Center Royal Aeronautical Society and AIAA Flight Simulations Conference, London

More information

CONSULTATION ONLY - NOT FOR FURTHER DISSEMINATION

CONSULTATION ONLY - NOT FOR FURTHER DISSEMINATION Home Police Pursuits Police Pursuit When a situation falls within the definition of Pursuit, officers will need to decide whether a pursuit is justified, proportionate and conforms to the principle of

More information

LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW

LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW 29 September 2016 CONTENT 2016 CEF Transport Calls for Proposals 3 Preparing proposals under SESAR Deployment Manager coordination

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 4.5.2013 Official Journal of the European Union L 123/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 409/2013 of 3 May 2013 on the definition of common projects, the

More information

DOC Volume 2 of 2

DOC Volume 2 of 2 DOC 97-70-13 Volume 2 of 2 PD/2 FINAL REPORT Annex B Controller Subjects and Training Rue de la Fusée 96 B - 1130 Bruxelles Prepared by: A Link Date: June 98 Version: Version 1.0 Annex B: Controller Subjects

More information

WheelTug Pushback Time Savings Analysis

WheelTug Pushback Time Savings Analysis WheelTug Pushback Time Savings Analysis 31 March 2016 WheelTug has collected data on in-service aircraft to calculate the time which can be saved each cycle. A non-wheeltug pushback operation has the following

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element

More information

Coflight efdp Angelo Corsaro, Ph.D. Software Technologies Scientist

Coflight efdp Angelo Corsaro, Ph.D. Software Technologies Scientist Coflight efdp Angelo Corsaro, Ph.D. Software Technologies Scientist Strategic and Technological Planning Directorate SELEX-SI [angelo.corsaro@selex-si.com] Agenda Group Overview Coflight Programme DDS

More information

EPSRC-KETEP Call for Collaborative Research between the UK and Korea in Smart Grids

EPSRC-KETEP Call for Collaborative Research between the UK and Korea in Smart Grids EPSRC-KETEP Call for Collaborative between the UK and Korea in Smart Grids Summary Call type: Collaborative research Closing date: 16.00 on 16 December 2015 Related themes: Energy The Engineering and Physical

More information

Army Ground-Based Sense and Avoid for Unmanned Aircraft

Army Ground-Based Sense and Avoid for Unmanned Aircraft Army Ground-Based Sense and Avoid for Unmanned Aircraft Dr. Rodney E. Cole 27 October, 2015 This work is sponsored by the Army under Air Force Contract #FA8721-05-C-0002. Opinions, interpretations, recommendations

More information

Context paper CWE Intraday

Context paper CWE Intraday Continuous Improvement Process of Intraday Capacity Calculation after FBMC go live Version 1.0 Date 05-11-2015 Status Draft Final Version 1.0 Date 05-11-2015 Page 1 of 12 Contents 1 General information

More information

Building a Smarter Healthcare System The IE s Role. Kristin H. Goin Service Consultant Children s Healthcare of Atlanta

Building a Smarter Healthcare System The IE s Role. Kristin H. Goin Service Consultant Children s Healthcare of Atlanta Building a Smarter Healthcare System The IE s Role Kristin H. Goin Service Consultant Children s Healthcare of Atlanta 2 1 Background 3 Industrial Engineering The objective of Industrial Engineering is

More information

Summary Report for Individual Task Perform a Tactical Aerial Reconnaissance and Surveillance Mission Status: Approved

Summary Report for Individual Task Perform a Tactical Aerial Reconnaissance and Surveillance Mission Status: Approved Summary Report for Individual Task 301-350-2205 Perform a Tactical Aerial Reconnaissance and Surveillance Mission Status: Approved Report Date: 19 Aug 2014 Distribution Restriction: Approved for public

More information

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO Pursuant to pages 327-330 of the Joint Explanatory Statement

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

SR&ED Program: (Scientific Research and Experimental Development) Should You Apply? Douglas Clay, Research & Technology Advisor

SR&ED Program: (Scientific Research and Experimental Development) Should You Apply? Douglas Clay, Research & Technology Advisor SR&ED Program: (Scientific Research and Experimental Development) Should You Apply? Douglas Clay, Research & Technology Advisor What is the SR&ED Program? a tax incentive program to encourage Canadian

More information

CWE Flow-based Market Coupling Project

CWE Flow-based Market Coupling Project CWE Flow-based Market Coupling Project 1 Agenda ATC CWE MC Operations CWE FB MC Project FB implementation status FB theoretical basics Market communication during the external parallel run 2 ATC CWE MC

More information

NATIONAL LANGUAGE PROFICIENCY IMPLEMENTATION PLAN OF THE REPUBLIC OF BULGARIA

NATIONAL LANGUAGE PROFICIENCY IMPLEMENTATION PLAN OF THE REPUBLIC OF BULGARIA NATIONAL LANGUAGE PROFICIENCY IMPLEMENTATION PLAN OF THE REPUBLIC OF BULGARIA The present Language Proficiency Implementation Plan has been developed in accordance with the recommendations set out in State

More information

Flow-Based Market Coupling First lessons

Flow-Based Market Coupling First lessons Flow-Based Market Coupling First lessons TSOs in Central Western Europe have set a new benchmark Market integration 2010 > 2014 Extension of the geographic area for market DA allocation 3 A long road to

More information

List all the SESAR members involved in the task, either as main contributor or as partner contributor: Company A; Company B; etc.

List all the SESAR members involved in the task, either as main contributor or as partner contributor: Company A; Company B; etc. Final Project Report Document information Project Title Project Number 07.06.03 Project Manager Deliverable Name Deliverable ID DCB/ASM Scenarios Management EUROCONTROL Final Project Report D01 Edition

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities for the objective of optimising the integration and interconnection of transport modes and enhancing the interoperability of transport services, while ensuring

More information

Request for Proposal Close Air Support Aircraft (A-10 Replacement)

Request for Proposal Close Air Support Aircraft (A-10 Replacement) Request for Proposal Close Air Support Aircraft (A-10 Replacement) Background The A-10 Close Air Support (CAS) aircraft is now over 45 years old. While still a very effective CAS aircraft, the A-10 airframes

More information

Utilisation Management

Utilisation Management Utilisation Management The Utilisation Management team has developed a reputation over a number of years as an authentic and clinically credible support team assisting providers and commissioners in generating

More information

2010 Citation Mustang N678MB S/N

2010 Citation Mustang N678MB S/N 2010 Citation Mustang N678MB S/N510-348 High Sierra Edition Specifications and Summary 2010 CITATION MUSTANG N678MB S/N510-0348 OFFERED AT: $2,150,000 AIRCRAFT HIGHLIGHTS: High Sierra Edition One Owner

More information

AIR FORCE MISSION SUPPORT SYSTEM (AFMSS)

AIR FORCE MISSION SUPPORT SYSTEM (AFMSS) AIR FORCE MISSION SUPPORT SYSTEM (AFMSS) MPS-III PFPS Air Force ACAT IAC Program Prime Contractor Total Number of Systems: 2,900 AFMSS/UNIX-based Systems: Total Program Cost (TY$): $652M+ Sanders (Lockheed

More information

Forum Virium Helsinki

Forum Virium Helsinki Forum Virium Helsinki 1 Forum Virium Helsinki 2 Forum Virium Helsinki 3 Cognitive workload Collect feedback Context of use Cost benefit analysis Evaluate existing system Evaluate prototype Evaluate working

More information

This interim change updates the paragraph titles of Section 7.

This interim change updates the paragraph titles of Section 7. BY ORDER OF THE COMMANDER AIR FORCE MATERIEL COMMAND AIR FORCE MATERIEL COMMAND INSTRUCTION 11-201 1 AUGUST 2007 Incorporating Change, 16 SEPTEMBER 2010 Certified Current On 4 September 2014 Flying Operations

More information

Announcement of Opportunity soliciting for proposals using the Human Spaceflight Analogue Parabolic Flight ISLSWG-AO-2016-PFC

Announcement of Opportunity soliciting for proposals using the Human Spaceflight Analogue Parabolic Flight ISLSWG-AO-2016-PFC Announcement of Opportunity soliciting for proposals using the Human Spaceflight Analogue Parabolic Flight ISLSWG-AO-2016-PFC Images : Novespace/CNES/DLR/ESA Proposals due: December 2nd, 2016 Summary for

More information

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION F-22 RAPTOR (ATF) Air Force ACAT ID Program Prime Contractor Total Number of Systems: 339 Lockheed Martin, Boeing, Pratt &Whitney Total Program Cost (TY$): $62.5B Average Flyaway Cost (TY$): $97.9M Full-rate

More information

IDEA II PROJECT A WALK-THROUGH

IDEA II PROJECT A WALK-THROUGH The Team Detlef Pulsack Team Leader Elena Kostadinova, Key Expert Dr. Ashraf Hamed, Key Expert Financial Expert Legal Expert Transport Expert IDEA II PROJECT A WALK-THROUGH International Consortium ITALY

More information

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see TITLE 49 - TRANSPORTATION SUBTITLE VII - AVIATION PROGRAMS PART A - AIR COMMERCE AND SAFETY subpart iii - safety CHAPTER 445 - FACILITIES, PERSONNEL, AND RESEARCH 44505. Systems, procedures, facilities,

More information

Incident Planning Guide Tornado Page 1

Incident Planning Guide Tornado Page 1 Incident Planning Guide: Tornado Definition This Incident Planning Guide is intended to address issues associated with a tornado. Tornadoes involve cyclonic high winds with the potential to generate damaging

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 63-112 9 AUGUST 2006 Incorporating Change 1, 26 July 2011 Acquisition COCKPIT WORKING GROUPS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

More information

Quality and Safety Considerations You Haven t Thought About

Quality and Safety Considerations You Haven t Thought About Quality and Safety Considerations You Haven t Thought About Learning Objectives Understand safety from a systems view. Understand & give examples of safety barriers. Be able to take actions to improve

More information

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016 Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation September 2016 SMART SCALE Safety Factors Evaluation 1. Using Crash Modification Factors for SMART SCALE Safety Evaluation

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 90-16 31 AUGUST 2011 Special Management STUDIES AND ANALYSES, ASSESSMENTS AND LESSONS LEARNED COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

More information

Open Proposers Day November, 2014

Open Proposers Day November, 2014 1 Call Fiche ERS einfügen + Fotos Georg Aufreiter Full Proposers Day April 4, 2017 Elisabeth Nagl Donia Lasinger 2 Agenda Environmental Systems Research: Urban Environments Pilot Call Full Proposal Phase

More information

Jean Monnet activities within the Erasmus+ Programme

Jean Monnet activities within the Erasmus+ Programme Jean Monnet activities within the Erasmus+ Programme Context Management of projects Snejina Nikolova Unit A2, EACEA Europe week video-conference Voronezh, 18 May 2017 Erasmus + Programme - How is it managed

More information

MAGTF Summer Training Program

MAGTF Summer Training Program UNITED STATES NAVAL ACADEMY MAGTF Summer Training Program Cruise Guide Name: This page intentionally left blank 1 MIDSHIPMAN MAGTF CRUISE GUIDE This booklet provides general guidelines for Midshipman Marine

More information

Tomahawk Deconfliction: An Exercise in System Engineering

Tomahawk Deconfliction: An Exercise in System Engineering TOMAHAWK DECONFLICTION Tomahawk Deconfliction: An Exercise in System Engineering Ann F. Pollack, Robert C. Ferguson, and Andreas K. Chrysostomou Improvements to the navigational and timing accuracy of

More information

1 - PROJECT DETAILS 1.1 PROMOTER S INFORMATION. Title and full name of main contact: Position: Investment and Economic Initiatives Manager

1 - PROJECT DETAILS 1.1 PROMOTER S INFORMATION. Title and full name of main contact: Position: Investment and Economic Initiatives Manager Strategic Outline Business Case Please complete this to enable an initial assessment of your project. Once completed, please return by email to callsubmissions@sheffieldcityregion.org.uk by 5pm on 8 th

More information

HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS. World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland

HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS. World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland HEALTH WORKFORCE SUPPLY AND REQUIREMENTS PROJECTION MODELS World Health Organization Div. of Health Systems 1211 Geneva 27, Switzerland The World Health Organization has long given priority to the careful

More information

Point Mugu Sea Range Scheduling

Point Mugu Sea Range Scheduling Point Mugu Sea Range Scheduling Presented by Mr. John Gurka Range Department Naval Air Warfare Center Weapons Division Point Mugu, CA 1 Sea Range Scheduling Goal The goal of Point Mugu Sea Range scheduling

More information

Reference. No. 02/16 Issue: 1 Page: 1 of 13 Issue Date: 16/05/16 Focal: Aircrew

Reference. No. 02/16 Issue: 1 Page: 1 of 13 Issue Date: 16/05/16 Focal: Aircrew Page: 1 of 13 The purpose of this Memorandum is to outline the requirements as well as IAA instructions and procedures for the initial approval and ongoing maintenance of Cabin Crew Training Organisations

More information

Physical Protection of Nuclear Installations After 11 September 2001

Physical Protection of Nuclear Installations After 11 September 2001 Physical Protection of Nuclear Installations After 11 September 2001 Joachim B. Fechner Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Bonn, Germany I. Introduction The terrorist

More information

USING BIG DATA AND DATA FUSION TO FACILITATE COOPERATIVE TRAFFIC MANAGEMENT

USING BIG DATA AND DATA FUSION TO FACILITATE COOPERATIVE TRAFFIC MANAGEMENT USING BIG DATA AND DATA FUSION TO FACILITATE COOPERATIVE TRAFFIC MANAGEMENT 1 PAS DIT AAN OF VERWIJDER HET 2 From current to a Cooperative Mobility future Current situation Many legacy roadside systems

More information

LV Prasad Eye Institute Final Presentation

LV Prasad Eye Institute Final Presentation LV Prasad Eye Institute Final Presentation Ali Kamil, Dmitriy Lyan, Nicole Yap, MIT Student MIT Sloan School of Management Global Health Lab May 8, 2013 1 Courtesy of Ali S. Kamil, Dmitriy E. Lyan, Nicole

More information

Guidelines for Submission

Guidelines for Submission Guidelines for Submission DEADLINES Papers, Workshops, Symposia: 25 February 2015 Pecha Kucha, Poster and Bursary Applications: 15 April 2015 Please read this document carefully before submitting your

More information

CWE Enhanced FB. Report presentation. March 22 nd, 2011

CWE Enhanced FB. Report presentation. March 22 nd, 2011 CWE Enhanced FB Report presentation March 22 nd, 2011 Background The Memorandum of Understanding of the Pentalateral Energy Forum on market coupling and security of supply in Central Western Europe (CWE),

More information

DEPARTMENT OF THE AIR FORCE. SUBJECT: Air Force Guidance Memorandum to AFI , Cockpit/Crew Resource Management Program.

DEPARTMENT OF THE AIR FORCE. SUBJECT: Air Force Guidance Memorandum to AFI , Cockpit/Crew Resource Management Program. DEPARTMENT OF THE AIR FORCE HEADQUARTERS UNITED STATES AIR FORCE WASHINGTON, DC MEMORANDUM FOR DISTRIBUTION C FROM: HQ USAF/A3 1630 Air Force Pentagon Washington, DC 20330-1630 AFI11-290_AFGM2017-01 27

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016

SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 SESAR Joint Undertaking (SJU) Project Execution Guidelines for SESAR 2020 Exploratory Research 2016 Version 1.00.00 7 December 2016 EDITION [01.00.00] Authoring & Approval Authors of the document Name

More information

L'ERC dans Horizon 2020

L'ERC dans Horizon 2020 The European Research Council L'ERC dans Horizon 2020 Monique Smaihi Call Coordinator ERC Executive Agency Scientific Department Paris, 27 Novembre 2013 1 Outline Evaluation Process Preparing an application

More information

Careers. Aviation Training Academy ATS Instructors Engineering Instructors Simulator Support Officers Course Administrators Instructional Designers

Careers. Aviation Training Academy ATS Instructors Engineering Instructors Simulator Support Officers Course Administrators Instructional Designers 22 Careers Careers at ATNS The SHR department is responsible for the implementation of the recruitment processes within ATNS and also to ensure that the Policies and Procedures are adhered to in this regard.

More information

Aircrew Training Manual, Utility Helicopter, MI-17 Series

Aircrew Training Manual, Utility Helicopter, MI-17 Series , C1 Change 1 Headquarters Department of the Army Washington, DC, 31 August 2010 Aircrew Training Manual, Utility Helicopter, MI-17 Series 1. Change TC 3-04.35, March 2010, as follows: Remove old pages:

More information

Development of a draft five-year global strategic plan to improve public health preparedness and response

Development of a draft five-year global strategic plan to improve public health preparedness and response Information document 1 August 2017 Development of a draft five-year global strategic plan to improve public health preparedness and response Consultation with Member States SUMMARY 1. This document has

More information

2 Description of the Proposed Action and Alternatives

2 Description of the Proposed Action and Alternatives 2 Description of the Proposed Action and Alternatives 2.1 Proposed Action The DON proposes to transition the Expeditionary VAQ squadrons at NAS Whidbey Island from the EA-6B Prowler to the EA-18G Growler

More information

OPERATIONS PLAN Texas Wing Civil Air Patrol. Mountain Training Search and Rescue Exercise Alpine, Texas April 2013

OPERATIONS PLAN Texas Wing Civil Air Patrol. Mountain Training Search and Rescue Exercise Alpine, Texas April 2013 Page 1 of 6 OPERATIONS PLAN Texas Wing Civil Air Patrol I. SITUATION: Mountain Training Search and Rescue Exercise Alpine, Texas 26-28 April 2013 A. On the weekend of 26-28 April, Texas Wing will conduct

More information

DISASTER MANAGEMENT PLAN

DISASTER MANAGEMENT PLAN DISASTER MANAGEMENT PLAN Purpose This Allen University Disaster Management Plan (AUDMP) will be the basis to establish policies and procedures, which will assure maximum and efficient utilization of all

More information

PEER Request for Proposal: Solicitation TSRP-PEER 17-01

PEER Request for Proposal: Solicitation TSRP-PEER 17-01 PEER Request for Proposal: Solicitation TSRP-PEER 17-01 Introduction The Pacific Earthquake Engineering Research Center (PEER) is a multi-campus research center that has continuing funding from the State

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 01-6-0444 Task Title: Employ Automated Mission Planning Equipment/TAIS Supporting Reference(s): Step Number Reference ID Reference Name Required Primary

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 20 Mar 2015 Effective Date: 15 Sep 2016 Task Number: 71-8-5715 Task Title: Control Tactical Airspace (Brigade - Corps) Distribution Restriction:

More information

SSF Call for Proposals: Framework Grants for Research on. Big Data and Computational Science

SSF Call for Proposals: Framework Grants for Research on. Big Data and Computational Science 2016-01-28 SSF Call for Proposals: Framework Grants for Research on Big Data and Computational Science The Swedish Foundation for Strategic Research announces SEK 200 million in a national call for proposals

More information

FY19 Warfighting Lab Incentive Fund Project Proposal Background and Instructions

FY19 Warfighting Lab Incentive Fund Project Proposal Background and Instructions FY19 Warfighting Lab Incentive Fund Project Proposal Background and Instructions Background: The Deputy Secretary of Defense (DSD) Warfighting Lab Incentive Fund (WLIF) Memo, signed 6 May 2016, established

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0602712A Countermine Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element (PE) Cost 26267 29171 22088 21965

More information

Decreasing Environmental Services Response Times

Decreasing Environmental Services Response Times Decreasing Environmental Services Response Times Murray J. Côté, Ph.D., Associate Professor, Department of Health Policy & Management, Texas A&M Health Science Center; Zach Robison, M.B.A., Administrative

More information

EGNOS Exploitation Grant Plan 2017

EGNOS Exploitation Grant Plan 2017 EGNOS Exploitation Grant Plan 2017 UPDATED 24 January 2018 V2.0 UNCLASSIFIED Contents CONTENTS... 2 EGNOS EXPLOITATION 2017 GRANT PLAN... 3 A.1 DUAL FREQUENCY MULTI-CONSTELLATION RECEIVERS... 4 A.2 ACCELERATION

More information

Guidance on Training Requirements for Operational Users of A-SMGCS Levels 1 & 2

Guidance on Training Requirements for Operational Users of A-SMGCS Levels 1 & 2 EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL Guidance on Training Requirements for Operational Users of A-SMGCS Levels 1 & 2 Edition Number : 1.1 Edition Date : 27/11/2006 Status

More information

Ogden Air Logistics Center

Ogden Air Logistics Center Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Linda Y. Gay, Deputy Director 508 MASSG/GFMM, Hill AFB UT DSN 777-7823, 801-777-7823 Linda.Gay@hill.af.mil Training

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Page 1 of 18 FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC FSH 5109.17 - FIRE AND AVIATION MANAGEMENT QUALIFICATIONS HANDBOOK Amendment No.: 5109.17-2007-3 Effective Date: August 27,

More information

JEPPESEN JeppView General Info Biak, IDN S ' E ' Mag Var: 3.1 E Elevation: 46' Runway Info Runway ' x 148' asphalt

JEPPESEN JeppView General Info Biak, IDN S ' E ' Mag Var: 3.1 E Elevation: 46' Runway Info Runway ' x 148' asphalt Airport Information WABB (Frans Kaisiepo) General Info Biak, IN S 01 11.5' E136 06.6' Mag Var: 3.1 E Elevation: Public, IFR, Control Tower, Rotating Beacon, Customs Fuel: Jet Time Zone Info: GMT+9:00 no

More information

Page. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs...

Page. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs... TABLE OF CONTENTS I. INTRODUCTION............... Page 1 II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction.... 4 B. Technical Assistance Areas.. 5 1. Rate Design.... 5 2. Consumer Programs...

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 22.63 3.676 32.789-32.789 35.932

More information

Air Traffic Control Career Prep: A Comprehensive Guide To One Of The Best-paying Federal Government Careers, Including Test Preparation For The

Air Traffic Control Career Prep: A Comprehensive Guide To One Of The Best-paying Federal Government Careers, Including Test Preparation For The Air Traffic Control Career Prep: A Comprehensive Guide To One Of The Best-paying Federal Government Careers, Including Test Preparation For The Initial Air Traffic Control Exams. By Patrick R. Mattson

More information

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability U.S. Army Research, Development and Engineering Command Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability NDIA Systems Engineering Conference

More information

AMRDEC. Core Technical Competencies (CTC)

AMRDEC. Core Technical Competencies (CTC) AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY FEASIBILITY REPORT In November 2008, Measure R was approved by a significant two-thirds majority, committing a projected $40 billion to traffic relief and transportation upgrades

More information

LEAN Transformation Storyboard 2015 to present

LEAN Transformation Storyboard 2015 to present LEAN Transformation Storyboard 2015 to present Rapid Improvement Event Med-Surg January 2015 Access to Supply Rooms Problem: Many staff do not have access to supply areas needed to complete their work,

More information

Local Energy Challenge Fund

Local Energy Challenge Fund Guidance for applicants to the Local Energy Challenge Fund Managed by Local Energy Scotland as part of the Scottish Government s CARES programme Version 1 15th August 2014 Local Energy Challenge Fund Guidance

More information

dtank Updated: Exploring Moderated Behavior in a Light-weight Synthetic Environment

dtank Updated: Exploring Moderated Behavior in a Light-weight Synthetic Environment dtank Updated: Exploring Moderated Behavior in a Light-weight Synthetic Environment Frank Ritter 1, Sue Kase 1, Damodar Bhandarkar 1, Bil Lewis 2, Mark Cohen 3 1 Pennsylvania State University College of

More information

Digital Lives call for proposals

Digital Lives call for proposals www.snf.ch Wildhainweg 3, P.O. Box 8232, CH-3001 Berne Humanities and Social Sciences Division digitallives@snf.ch Digital Lives call for proposals 1. Subject and purpose of the call for proposals 1.1

More information

EILEEN A. BJORKMAN, PhD CURRICULUM VITAE

EILEEN A. BJORKMAN, PhD CURRICULUM VITAE EILEEN A. BJORKMAN, PhD CURRICULUM VITAE SUMMARY More than 33 years experience leading diverse personnel in complex, high technology acquisition, research, development, test and analysis organizations

More information

POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY

POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY 15 September 2017 1 Context The implementation of DA FB MC in the Central West Europe (CWE) region started on the basis

More information

Methodology for capacity calculation for ID timeframe

Methodology for capacity calculation for ID timeframe Methodology for capacity calculation for ID timeframe NRA approval package Version 1.0 Date 05-11-2015 Status Draft Final Contents 1 Introduction and purpose... 3 2 Definitions... 3 3 General principles

More information

Online Scheduling of Outpatient Procedure Centers

Online Scheduling of Outpatient Procedure Centers Online Scheduling of Outpatient Procedure Centers Department of Industrial and Operations Engineering, University of Michigan September 25, 2014 Online Scheduling of Outpatient Procedure Centers 1/32 Outpatient

More information

Logic-Based Benders Decomposition for Multiagent Scheduling with Sequence-Dependent Costs

Logic-Based Benders Decomposition for Multiagent Scheduling with Sequence-Dependent Costs Logic-Based Benders Decomposition for Multiagent Scheduling with Sequence-Dependent Costs Aliza Heching Compassionate Care Hospice John Hooker Carnegie Mellon University ISAIM 2016 The Problem A class

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 19.1.2016 COM(2016) 5 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

JAGIC 101 An Army Leader s Guide

JAGIC 101 An Army Leader s Guide by MAJ James P. Kane Jr. JAGIC 101 An Army Leader s Guide The emphasis placed on readying the Army for a decisive-action (DA) combat scenario has been felt throughout the force in recent years. The Chief

More information

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES 14 July 2017 (17-3798) Page: 1/24 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL NOTIFICATION PURSUANT TO ARTICLE XVI:1 OF THE GATT 1994 AND ARTICLE 25 OF THE

More information

SURGEONS ATTITUDES TO TEAMWORK AND SAFETY

SURGEONS ATTITUDES TO TEAMWORK AND SAFETY SURGEONS ATTITUDES TO TEAMWORK AND SAFETY Steven Yule 1, Rhona Flin 1, Simon Paterson-Brown 2 & Nikki Maran 3 1 Industrial Psychology Research Centre, University of Aberdeen, Aberdeen, Scotland, UK Departments

More information

Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics

Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics REPORT ON THE DETERMINATION OF UNACCEPTABLE RISK TO NATIONAL SECURITY FROM A PROPOSED COMMERCIAL WIND TURBINE PROJECT IN THE VICINITY OF NAVAL AIR STATION PATUXENT RIVER AND THE ATLANTIC TEST RANGE Pursuant

More information

OKALOOSA COUNTY EMERGENCY MEDICAL SERVICES STANDARD OPERATING PROCEDURE Medical Incident Command Policy:

OKALOOSA COUNTY EMERGENCY MEDICAL SERVICES STANDARD OPERATING PROCEDURE Medical Incident Command Policy: Title: Medical Incident Command Policy: 429.00 Purpose: Policy: This standard operating procedure (SOP) identifies the procedure to be employed when establishing EMS Command. It also designates responsibility

More information

Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria

Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria International Journal of Traffic and Transportation Engineering 2016, 5(2): 32-39 DOI: 10.5923/j.ijtte.20160502.02 Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria Olutaiwo

More information