1 PUBLIC COMPANY ORLEN LIETUVA APPROVED BY Director of Quality, Labour Safety and Environmental Control January 3, 2017 Order No. TV1(1.2-1)-2 OCCUPATIONAL HEALTH AND SAFETY PROCEDURE BDS-6/1 EQUIPMENT UNSEALING AND MAINTENANCE WORKS I. GENERAL PROVISIONS Purpose and Scope of Application 1. The purpose of the Equipment Unsealing and Maintenance Works (hereinafter the Procedure) is to establish the occupational health and safety (hereinafter OHS) requirements for execution of equipment unsealing and maintenance works at Public Company ORLEN Lietuva (hereinafter the Company). 2. This Procedure shall apply to each and every employee of the Company arranging, planning and/or performing equipment unsealing and maintenance works, as well as to employees of contracting organizations (hereinafter contractor) where such works fall within the scope of respective contracts concluded with the Company. 3. The Procedure shall not apply to the unsealing and maintenance works performed at the Power Plant where the Rules for Safe Operation of Heating Facilities, as approved with Order No as of 13 September 2016 by the Minister of Energy of the Republic of Lithuania, apply. II. REFERENCES 4. The Procedure shall be used in conjunction with the below listed legal acts (as amended to date): 4.1. Regulations Concerning Protection of Employees from Exposure to Chemical Factors at Work, as approved with Order No. 97/406 as of 24 July 2001 by the Minister of Social Security and Labor and Minister of Health of the Republic of Lithuania; 4.2. Lithuanian Hygienic Norm HN 23:2011. Occupational Exposure Limits for Chemical Substances. General Requirements for Measurement and Impact Assessment, as approved with Order No. V-824/A1-389 as of 1 September 2011 by the Minister of Social Security and Labour of the Republic of Lithuania. III. TERMS, ABBREVIATIONS AND DEFINITIONS 5. The following are the terms used herein and definitions thereof: Personal protection equipment (or PPE) any equipment to be worn or held by an employee in order to be protected against hazards that may endanger the health and safety of the employee. For the purpose of the present Procedure: Mandatory PPE the PPE indicated in the OHS signs displayed at the entries to process unit territories, buildings or any other facilities at the Company (safety helmet with a strap, goggles, protective work clothing, safety footwear, ear and respiratory protection equipment); Special PPE the PPE selected with due respect of the performed equipment preparation works and level of hazard posed by the to be done works (safety harness, lifelines, PPE resistant to chemical substances, filtration gas mask, self-contained breathing apparatus, etc.).

2 Occupational risk identification card (or card) a document of established form to be used by contractor to identify risks that may arise in the course of works, and to plan measures for safe execution of works. The recommended form of the card is established by OHS Department of the Company. Contractor may use the card of any other form after agreeing upon such with OHS Department of the Company. Permit for works (or permit) a document of established form authorizing to perform equipment unsealing or maintenance works. The specimen form of the permit is established by Occupational Safety and Health Department of the Company. Work supervisor an employee of an organizational unit of the Company who has been assigned by the issuer of permit to supervise respective equipment unsealing or maintenance works. Work coordinator: an employee of an organizational unit led by Director of Maintenance of the Company who, under a decree of Deputy Director of Maintenance or Chief Mechanical Engineer, has been assigned to organize and coordinate proper execution of works during maintenance of and repairs to static and rotating mechanical equipment/facilities, structures/buildings of the respective organizational unit; an employee of Technology and Investment Department of the Company who, under a decree of Director of Investment and Technology, has been assigned to organize and coordinate proper execution of technical activities related to project implementation. When equipment unsealing and maintenance works are initiated by heads of some other organizational units of the Company, the employee of the respective organizational unit who, by means of a decree of the head of the organizational unit, has been assigned to organize and coordinate proper execution of works, must be appointed to act as a work coordinator. Work manager a manager assigned by a contractor in written form for organization of and control over equipment unsealing and maintenance works. Work executors the contractor employees who perform equipment unsealing and maintenance works. Work site a place where equipment unsealing and maintenance works are performed. Equipment any device, apparatus, piping, etc. which poses hazard to the safety and health of employees because of contained residual hazardous energy or energy supplied to such from other sources. Unit manager a superior over the employees operating a process unit (Head of Unit, Head of Section, Terminal Operations Manager, etc.). Equipment unsealing works (or works) equipment demounting / disassembling works (e.g., opening of pipeline flanges, vessel hatches, slide valves, vent valves, removal of gaskets, insertion of blinds, etc.) during which a confined space inside the equipment which contained, contains or may contain various temperatures, pressures and substances (e.g., petroleum products, water, steam. etc.) is unsealed. Maintenance works (or works) demounting / (re)assembling of unsealed equipment (e.g., demounting or (re)installing of heat exchanger tube sheets, closing of vessel hatches, inserting of slides, vent valves, etc.). Issuer of permit the head of a Company's organizational unit (Head of Operations, Deputy Head of Operations, Head of Shop, Head of Unit or any other manager), Engineer, also Shift Supervisor assigned under a decree of the head of the organizational unit. Issuer of permit shall be entitled to issue permits for the assigned to him/her facilities only. During maintenance of process units, when process units are to be shut down following a relevant order from the General Director of the Company, the head of the organizational unit may (if needed) with his/her decree assign Process Unit Operators to act as issuers of permits. Air testing person an employee of Mažeikiai Fire and Rescue Board for Protection of Facilities (hereinafter FRB) duly trained and appointed to test air samples, or an employee of the organizational unit of the Company appointed with a decree of the head of the organizational unit to perform air samples. 2 9

3 Process unit the entirety of indoor or outdoor crude refining installations, mechanisms, machinery, devices, apparatuses, instruments, vessels erected, installed and interconnected on supporting civil structures and foundations, isolated from or integrated with piping. IV. DUTIES AND RESPONSIBILITIES OF EMPLOYEES 6. Unit manager shall be responsible for isolation of equipment using energy isolating devices (hereinafter EID) from any actual or potential sources of dangerous energy pursuant to the Company's Occupational Health and Safety Procedure BDS-29 Equipment Isolation, and shall organize preparation of equipment for the works, as prescribed by the present Procedure. 7. Issuer of permit shall: 7.1. Issue or extend the permit as prescribed hereunder only if directly requested by the assigned work coordinator; 7.2. Make sure the equipment has been properly isolated from all types of dangerous energy sources according to EID list, and the preparatory measures related to execution of works have been implemented; 7.3. Coordinate the possibility to execute equipment unsealing works with the heads of organizational units or shift superiors operating adjacent process units which, including the persons working and/or present therein, may be exposed to the negative impact resulting from the planned unsealing works; 7.4. Consider hazardous chemical substances which were contained or could have been contained and, where such substances may release to the working atmosphere while unsealing the equipment, anticipate means to protect employees against exposure to such substances (e.g., periodical or continuous monitoring of ambient air with the works in progress, use of adequate respiratory protection equipment by work executors, etc.); 7.6. Fill out the permit form in the manner prescribed by the present Procedure; 7.7. Register the permit with the hazardous work logbook of the organizational unit (the specimen form of such log is established by Occupational Safety and Health Department); 7.8. Where alarm systems are available next to the place of equipment unsealing works, inform Dispatcher of FRB (phone No ) about potential activation of the alarm systems in the course of works, and indicate the contact person who, upon an alarm system activated, would notify FRB Dispatcher of any actual hazard posed; 7.9. Check the work manager's certification card and make sure it is still valid; Issue (sign) the permit and allow starting the works after making sure that the signatures of all the persons indicated herein are present in the permit; Be present on the work site during the process of expansion of flanged connections to be sure the equipment is free from any residual pressure and/or hazardous substance residue; Make sure no hot works and any other works which may pose hazard to employees and/or unsealing works in progress are undertaken during the execution of unsealing works; Each shift, upon completing works under the issued permit, inspect the orderliness of the work site, and sign both counterparts of the permit in the respective section thereof; also inform, if needed, the heads of the organizational units or shift superiors operating adjacent process units about unsealing works completed; Where the issued permit is to be extended for a new term, make sure the working conditions on the work site have not changed, and extend the permit by signing both counterparts of the permit in the permit extension section; After completing all works under the permit or with no empty lines left for extension of the permit, close the permit by signing it and entering the date and time of closing in the section 'Permit closed' of the first counterpart of the permit; If the issuer of permit is a head of organizational unit, he/she may assign a work supervisor to control the work and perform the duties listed in Items and 7.15 hereof. 3 9

4 8. Work coordinator shall: 8.1. Before starting the works, agree with the work manager on the date, time and place for the work execution, the to-be-done works, their scopes and course of execution, make sure adequate tools, equipment, materials and/or other work means are used for the works, also discuss on the OHS equipment to be applied during the works; 8.2. Inform the issuer of permit about the need to issue / extend the permit, by indicating the work execution date and time, the contractor, the work execution place (name and technological number of unit), also the required works; 8.3. Get familiar with the requirements set in the permit and safety measures, and sign the permit (except for the cases specified in Item 30 hereof); 8.4. Coordinate the course of the works in progress; 8.5. Where the issued permit is to be extended for a new term, make sure the nature of scopes of the works on the work site have not changed, and sign the first counterpart of the permit in the permit extension section. 9. Work manager shall: 9.1. Before starting the works, get in touch with the work coordinator and agree on the date, time and place for the work execution, the to-be-done works, their scopes and course of execution, also discuss on the OHS equipment to be applied during the works; 9.2. Get familiar with the required special PPE as well as any other protective equipment indicated in the permit, and sign the permit; 9.3. In case a work manager has difficulties in communicating with the issuer of permit and/or work coordinator due to a language barrier, the work manager shall make sure an interpreter is present at the time of permit issue and during execution of unsealing works; 9.4. Evaluate the risks posed by the equipment used for the works, adverse weather conditions, also any other hazards likely to rise in the course of works, anticipate measures (equipment) for safe working, and fill in the occupational risk identification card; 9.5. Make sure the equipment, devices and tools used for the works are in proper condition and adequately selected, inspected or tested under the effective legal norms governing occupational health and safety in the Republic of Lithuania; 9.6. Assign only properly trained and duly certified work executors to perform the works; 9.7. Indoctrinate work executors by familiarizing them with the works to be done, the course of their execution, safe methods of work, required mandatory and special PPE, also any other protective equipment against their signed acknowledgment in the second counterpart of the permit and the card; 9.8. Before the start of works, enclose the hazardous area of equipment unsealing works according to the Company's Occupational Health and Safety Procedure BDS-40 Enclosures; 9.9. Provide the work site with a gas detector or analyzer where the permit requires for continuous monitoring of ambient air; Make sure the work executors start the works only after the signatures of all the persons referred to herein have been affixed onto the permit; Keep control over compliance by work executors with the requirements established in the permit, card and other OHS procedures of the Company, over the application of safe work methods for execution of the works, use of mandatory and special PPE and any other required protective equipment; Refrain from expansion of flanged connections with the issuer of permit absent on the work site; Make sure the issued permit and the card are available on the work site at all times; Make sure that the work site is always in proper order, i.e. free from waste, irrelevant items, that required materials are kept in good order, etc.; Each shift, upon completing works under the issued permit, organize the clear-up of the work site, notify the issuer of permit or work supervisor on works completed, and sign both counterparts of the permit in the respective section; 4 9

5 9.16. Where the issued permit is to be extended for a new term, make sure the nature and scopes of the to-be-done works has not changed, instruct newly assigned work executors, also sign both counterparts of the permit in the permit extension section. 10. Work executors shall: Start unsealing or maintenance works only upon getting aware of any potential hazards and risks on the work site, with all the required mandatory and special PPE indicated in the permit as well as the card, also any other protective equipment available, also after the indoctrination by the work manager (against signed acknowledgment in the second counterpart of the permit and in the card); Execute works specified in the permit only, and comply with the requirements indicated in the permit, card and the applicable OHS procedures of the Company; Keep the work site clean and tidy at all times, i.e. free from irrelevant items, with materials required for unsealing or maintenance works placed / warehoused in a due manner, etc. 11. Heads of organizational units operating adjacent process units shall: Upon the potential risks which may arise during the planned unsealing works assessed, determine the possibility to perform the respective unsealing works (in respect of any possible impact on the subordinate unit); Upon approval granted for unsealing works: Inform respective shift personnel about scheduled unsealing works and their completion; With unsealing works in progress at the subordinate process unit, perform no other works posing risk to employees and/or to the unsealing works in progress. 12. A head of an organizational unit shall arrange and control that unsealing and maintenance works at the organizational unit managed by him/her are performed in due compliance with the requirements established herein. 13. Any employee of the Company or contractor shall suspend the works if such are executed unsafely or their execution poses the risk of emergencies, incidents, accidents, etc. Work execution shall be resumed only after making sure that all unsafe conditions of work have been identified and their causes have been eliminated. V. OHS REQUIREMENTS BEFORE THE START OF WORKS Equipment preparations for execution of works 14. Any hazardous substances present in the equipment being unsealed and the risks posed by such shall be identified. Process diagrams, markings on pipelines, safety data sheets, etc. shall be used for this purpose. 15. The equipment to be unsealed shall be isolated with energy isolating devices (EID) from any actual or imminent sources of hazardous energy pursuant to Occupational Safety and Health Procedure BDS-29 Equipment Isolation. 16. Pressure in the equipment being unsealed shall be reduced down to atmospheric pressure. 17. Any hazardous substances present in the equipment being unsealed shall be removed from such. For this purpose, the equipment shall be drained, vented, flushed with water, steamed out, purged with inert gas, etc. Any liquid hazardous substances shall be removed by routing such to closed systems (underground drums), gas to the flare line. 18. The equipment to be unsealed shall be cooled down to the temperature below 40 C. Checking of Equipment Preparedness 19. While checking the prepared equipment, readings of pressure gauges, level meters and other measuring devices shall be checked first of all. Later, the conditions in an inside confined space of the piece of equipment shall be checked through drainage, air relief, sampling points, by slowly opening their shutoff valves. 5 9

6 Requirements for Unsealing of Unprepared Equipment 20. In case it is impossible to fully prepare a piece of equipment according to the requirements set forth in Items 14 to 18 hereof as well as to check the preparedness of the equipment, the following additional measures ensuring occupational health and safety shall be applied while unsealing such equipment: Where hazardous chemical vapour or gas may release to the atmosphere while unsealing equipment, continuous air monitoring using portable explosive gas concentration analyzers shall be ensured at the site. In case the analyzer gets activated with the works in progress, work executors shall use the respiratory protecting equipment indicated in the permit; Covers, enclosures or shields resistant to chemical substances and protecting work executors against spill-overs, also directing the releases/spills to specific collection areas shall be used; Work executors shall wear chemical resistant clothing, panoramic closed type safety glasses, protective face shields, etc.; Where a spill-over with etching substances (acid or alkali) is possible during unsealing works, an emergency shower and an eye flushing station shall be located within the distance of not more than 50 meters. In case no stationary emergency washing equipment is available within the above mentioned distance, other means (e.g., portable flushing equipment, a vessel with water, water hose, etc.) shall be used. Before starting works, the functioning of washing equipment (if such is in good operating condition, not closed-up and has free (nonobstructed) access to it) shall be checked. 21. In case flammable substances are likely to release in the course of unsealing works, the below extra requirements shall be complied with: The hazard area shall be free from any sources of ignition (hot works in progress, machinery with internal combustion engines, temporary connections of el. equipment, etc.); Only the work means (including equipment, instruments and protective equipment) intended for potentially explosive atmospheres (as specified in the manufacturer s documentation) shall be used; Work tools shall be made from metal which does not generate sparks, or coated with nonferrous metal; Work executors shall wear work clothes from anti-static and fire-retardant fabric. Transfer of Equipment for Maintenance 22. Before transferring equipment for maintenance to other organizational units, it shall be unsealed and prepared (washed, cleaned, steamed out, etc.) so to remove any hazardous (flammable, toxic, noxious, corrosive, etc.) substances from it. 23. Before transporting unprepared equipment to the place of its preparation for maintenance, the equipment shall be prepared so that any leaks of hazardous substances during transportation are prevented (e.g., openings shall be blinded, equipment or its separate parts shall be tightly wrapped in covers resistant to hazardous substances, etc.). 24. Compliance with the requirement in Item 22 above shall be the responsibility of the head of the organizational unit which the equipment belongs to. Compliance with the requirement in Item 23 above shall be the responsibility of the contractor in charge of equipment delivery to the place of its preparation for maintenance. VI. PERMIT FOR EQUIPMENT UNSEALING AND MAINTENANCE WORKS Procedure of Issue 25. The permit shall be executed in two counterparts: the first (top) counterpart of the permit (white) is the original, the second (duplicate, pale yellow) a copy. The permit may also be filled in electronically (in this case, both counterparts of the permit are considered original). 26. The permit shall provide for the name of the organizational unit where the works are going to be performed, the contractor, the process unit and its technological identification 6 9

7 number, the substance/medium that was/is present in the equipment, the required works, the preparations for work execution performed, the OHS requirements applicable to execution of works, the required special PPE. 27. Depending on the preparations made as well as on the potential risks, the permit shall also indicate any additional occupational safety and health assurance measures. 28. The permit shall be registered with the hazardous work logbook of the organizational unit; its registration number and date shall be recorded on the permit. 29. The permit shall include its expiry date and time, and shall bear the signatures of all the persons indicated herein. 30. In case of emergencies and any other contingencies (e.g., pending process unit shutdown), when the work coordinator is absent at work (after his/her working hours, on weekends, on holidays, etc.), the issuer of permit shall, based on the information received from the work coordinator, enter the contact data (name, surname and mobile phone number) of the work coordinator in the permit. 31. For performing of equipment unsealing works, the permit shall be enclosed with a copy of an isolation with EID diagram which shall indicate the permit registration number and the unsealing point/points. The diagram shall be signed by the issuer of permit. 32. The first (top) counterpart of the permit shall be kept by the issuer of permit and stored in the control room or any other established place of permit issue; the second counterpart of the permit shall be handed over to the work manager. All through the period of the works, this counterpart shall be kept on the work site. Requirements for Permit Issue 33. The permit shall be issued for each specific piece of equipment (e.g., tower, vessel, piping, etc.) separately. 34. The permit shall remain effective for the duration of one shift, however, for no longer than 12 hours. 35. The permit may be extended until the completion of the works indicated in it, however, for no longer than seven shifts from the date of issue of the permit, provided that the working conditions and nature of works remain the same. Extending of the work permit for the next following shift (e.g., extending of a permit issued for the period from 8 AM to 8 PM for the shift from 20 PM to 8 AM) shall be prohibited in case of change of responsible persons (work coordinator and /or work manager). In such cases, a new permit shall be issued and extended. 36. For unsealing of OSBL piping which contains, used to contain or may contain hazardous chemical substances or their mixtures, the permit shall be agreed in writing with the head of the organizational unit in the territory of which the unsealing works are to be performed. The head shall refrain from any hot works and any other works which may pose hazard to the employees involved in the unsealing works. VII. OCCUPATIONAL HEALTH AND SAFETY REQUIREMENTS DURING EXECUTION OF WORKS Equipment Unsealing 37. During unsealing of equipment (e.g., flanged connections), such shall be treated as pressurized items. 38. The flanges being unsealed shall be approached by a work executor with the wind blowing to his/her back. 39. An executor of unsealing works shall first of all loosen (by approx. three turns of the nut) the furthest from him/her bolt; only then the bolts adjacent to this bolt shall be loosened (with approx. two turns of the nut). 40. In case of failure to unseal the flanges upon loosening the bolts as per Item 40 hereof, such flanges shall be unsealed by expanding them. 41. Nuts shall not be completely turned off the bolts until flanges are unsealed in full. 42. In case some hazardous substances get released during unsealing works, or where pressure is detected inside the equipment, the unsealed point shall be immediately 7 9

8 resealed by tightening the bolts of flanged connections. The issuer of permit shall identify the causes of such hazards and shall authorize to resume unsealing works only upon the elimination of the causes of such hazards. 43. The blinds for process piping shall be selected, installed and removed in accordance with Process Equipment and Piping Blinding/De-blinding Manual BM-12. Collection of Released Hazardous Substances 44. In case release of hazardous substances is likely during unsealing works, certain provisions shall be made for collecting such releases and for preventing the entry of such substances to unit platforms, soil and sewers, etc. Various containers, trays, mats, screens, etc. shall be used for this purpose. VIII. EMPLOYEES ACTIONS IN CASE OF EMERGENCY 45. In case of fire, accident or any other incident during unsealing or maintenance works, the work executors shall interrupt the works immediately and report this to the Dispatcher of Production Control Department of the Company by phone 3333 (from a fixed-line or Omnitel network) or (from any other mobile communication line), also to the employees of the facility they have been working at. 46. In case of fire, accident or any other incident during unsealing or maintenance works, the permit shall become void and all its counterparts shall be transferred to the incident investigation committee. 47. In case of an accident due to released hazardous substances, data on such substances (safety data sheets, written procedures and other documents) shall be immediately provided to the medical institution where the casualties undergo medical treatment. IX. DOCUMENT CUSTODY 48. Upon unsealing works completed, the first (top) counterpart of the permit (original) shall be kept for 30 days at the organizational unit which has issued it. 49. Upon unsealing works completed, the second counterpart of the permit shall be kept at the contracting organization. 50. A hazardous work logbook shall be stored at the organizational unit for the period of its validity and for 5 more years after its completion. X. EMPLOYEE TRAINING 51. The issuer of permit, work supervisor and work coordinator shall be required to pass the test hereunder pursuant to the Company s occupational health and safety indoctrination procedure. 52. Work managers shall be tested hereunder prior to the commencement of works and later periodically, every 12 months at least. A work manager having passed the test shall be provided with a card certifying the employee's qualification. Such card shall indicate the following details: employee's full name, name of organization and period of validity of the certification. During the execution of works, a work manager shall be required to have this card on the work site. 53. Contractor employees involved in unsealing or maintenance works shall be familiarized with the requirements established herein. The responsibility for such familiarization shall be vested in the contractor's manager. XI. FINAL PROVISIONS 54. This Procedure establishes only the key and minimum occupational safety and health requirements for unsealing and maintenance works; therefore, all employees organizing or 8 9

9 performing unsealing and maintenance works shall, in case of need, undertake additional measures to ensure occupational safety and health. 55. Periodic review and, where appropriate, updating of this Procedure shall be the responsibility of Occupational Health and Safety Manager. Prepared by Senior Occupational Safety and Health Specialist Egidijus Luomanas

REPUBLIC OF LITHUANIA LAW ON SAFETY AND HEALTH AT WORK. 1 July 2003 No IX-1672 Vilnius (As last amended on 2 December 2010 No.

REPUBLIC OF LITHUANIA LAW ON SAFETY AND HEALTH AT WORK. 1 July 2003 No IX-1672 Vilnius (As last amended on 2 December 2010 No. REPUBLIC OF LITHUANIA LAW ON SAFETY AND HEALTH AT WORK 1 July 2003 No IX-1672 Vilnius (As last amended on 2 December 2010 No. XI-1202) PART I GENERAL PROVISIONS CHAPTER I SCOPE, BASIC CONCEPTS AND APPLICATION

More information

Health and Safety at Work (General Risk and Workplace Management) Regulations 2016 (LI 2016/13)

Health and Safety at Work (General Risk and Workplace Management) Regulations 2016 (LI 2016/13) Reprint as at Workplace Management) Regulations 2016 (LI 2016/13) Jerry Mateparae, Governor-General Order in Council At Wellington this 15th day of February 2016 Present: His Excellency the Governor-General

More information

Formaldehyde Exposure Control Plan

Formaldehyde Exposure Control Plan A. Purpose To maintain formaldehyde exposure below the limits established by the Occupational Safety and Health Administration s (OSHA) Formaldehyde Standard 29 CFR 1910.1048. These limits are the Action

More information

Formaldehyde Exposure Control Policy

Formaldehyde Exposure Control Policy Formaldehyde Exposure Control Policy POLICY AND PROCEDURES FOR WORKING WITH FORMALDEHYDE Policy: It is Columbia University (CU) policy to maintain formaldehyde exposure below the action level (AL) 0.5

More information

Somerset Road Education Trust. Health and Safety Policy

Somerset Road Education Trust. Health and Safety Policy Somerset Road Education Trust Health & Safety Policy Somerset Road Education Trust - SRET Name of document Health and Safety Policy Date Approved May 2016 Owner SRET H&S Committee Author Sharon Day Distributed

More information

Topic 3 Contribute to safe work practices in the workplace 43

Topic 3 Contribute to safe work practices in the workplace 43 Contents Before you begin vii Topic 1 Follow safe work practices 1 1A Follow workplace policies and procedures for safe work practices 2 1B Identify existing and potential hazards, and report and record

More information

Northeast Fire Department Association Operations Date Issued: 12/2003 Date Revised: 8/2011

Northeast Fire Department Association Operations Date Issued: 12/2003 Date Revised: 8/2011 Northeast Fire Department Association Operations Date Issued: 12/2003 Date Revised: 8/2011 NEFDA Hazardous Materials Response Team Approved by: Wes Rhodes NEFDA President I. PURPOSE The intent of these

More information

Fluorine Gas Mist Pot Fails

Fluorine Gas Mist Pot Fails Fluorine Gas Mist Pot Fails Lessons Learned Volume 03 Issue 09 2004 USW Fluorine Gas Mist Pot Fails Purpose To conduct a small group lessons learned activity to share information gained from incident investigations.

More information

CHEMICAL HYGIENE PLAN ENVIRONMENTAL HEALTH AND SAFETY 72 ONYX BRIDGE

CHEMICAL HYGIENE PLAN ENVIRONMENTAL HEALTH AND SAFETY 72 ONYX BRIDGE CHEMICAL HYGIENE PLAN ENVIRONMENTAL HEALTH AND SAFETY 72 ONYX BRIDGE 541-346-3192 Environmental Health and Safety Staff and Services Waste Collection Request ----------------------------- 541-346-3192

More information

RESPIRATORY PROTECTION PROGRAM

RESPIRATORY PROTECTION PROGRAM RESPIRATORY PROTECTION PROGRAM 1.0 PURPOSE The purpose of this Respiratory Protection Program is to protect respirator users at California State University East Bay from breathing harmful airborne contaminants

More information

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice CoP 2.0 Personal Protective Equipment Version 3.1 June 2018 Table of Contents 1. Introduction... 3 2. Training and

More information

CHABOT/LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT/LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT/LAS POSITAS COMMUNITY COLLEGE DISTRICT HAZARD COMMUNICATION PLAN Chabot/Las Positas Community College District Hazard Communication Program 2/2007 Pg 1 of 7 Hazard Communication Program Policy Policy

More information

Personal Protective Equipment Procedure

Personal Protective Equipment Procedure Related Policy Responsible Officer Approved by Approved and commenced October 2013 Review by October, 2016 Responsible Organisational Unit Personal Protective Equipment Procedure Work Health and Safety

More information

Laboratory Chemical Hygiene Plan Research Lab

Laboratory Chemical Hygiene Plan Research Lab Laboratory Chemical Hygiene Plan Research Lab A chemical hygiene plan is a written program developed to establish procedures, protective equipment requirements and standard work practices that promote

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures DRD Builders Health and Safety Policy and Procedures VALID TO: 7 June 2016 Prepared on Wednesday, 5 August 2015-11:09am Page 1 of 33 Table of Contents 1. Policy Statement 3 2. Health and Safety Procedures

More information

Gasket Failure Causes Leak

Gasket Failure Causes Leak Gasket Failure Causes Leak Lessons Learned Volume 04 Issue 35 2004 USW Gasket Failure Causes Leak Purpose To conduct a small group lessons learned activity to share information gained from incident investigations.

More information

Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs

Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs Provisional Translation (as of August 2012) Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs Ordinance of the Ministry of Health and Welfare No.21 of March 26,

More information

Health and Safety Policy

Health and Safety Policy Lower Earley Baptist Church To be a community where Jesus is encountered and lives are transformed Health and Safety Policy To all employees, voluntary helpers and contractors: The success of this policy

More information

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795 08-16-85 MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795 Summary of Duties : Performs a variety of tasks in maintaining and repairing mechanical equipment

More information

CIC Seminar on Site Welfare, Health and Safety Measures

CIC Seminar on Site Welfare, Health and Safety Measures CIC Seminar on Site Welfare, Health and Safety Measures Site Welfare, Health and Safety Measures on New Works Contracts of Hong Kong Housing Authority Ms Ada YS FUNG, JP Chairperson, Committee on Construction

More information

HEALTH AND SAFETY POLICY 2010

HEALTH AND SAFETY POLICY 2010 April 2008 CONTENTS Page No ii 1 GENERAL STATEMENT OF POLICY 2 2 DELIVERING HEALTH AND SAFETY 3 2.1 Management 3 2.2 Policy and Procedures 3 2.3 Training 4 2.4 Communication and Involvement 4 2.5 The Working

More information

SAFETY REQUIREMENTS UCLA DEPARTMENT OF CHEMISTRY AND BIOCHEMISTRY

SAFETY REQUIREMENTS UCLA DEPARTMENT OF CHEMISTRY AND BIOCHEMISTRY SAFETY REQUIREMENTS UCLA DEPARTMENT OF CHEMISTRY AND BIOCHEMISTRY On July 25, 2012 the Regents and Chancellor Block signed a Settlement Agreement with the Los Angeles District Attorney that terminated

More information

Respiratory Protection Plan

Respiratory Protection Plan Respiratory Protection Plan Contents: Sample Respiratory Protection Plan Introduction... ii Plan Cover Sheet... 1 Policy... 2 Responsibility... 2 Plan Elements... 3 Organizational Responsibility Chart...

More information

Health & Safety Policy & Procedures

Health & Safety Policy & Procedures Health & Safety Policy & Procedures [CS 1.0] Table of Contents Table of Contents... 2 1. Policy Statement... 4 2. Health and Safety Procedures Overview... 6 Part A Our Health and Safety Procedures... 7

More information

No. 22 in In accordance to articles 152 & 108 / second of Labor Law no. (71) of 1987 we decided to issue the following instructions:

No. 22 in In accordance to articles 152 & 108 / second of Labor Law no. (71) of 1987 we decided to issue the following instructions: No. 22 in 1987 Occupational Health and Safety Instructions In accordance to articles 152 & 108 / second of Labor Law no. (71) of 1987 we decided to issue the following instructions: Article one: these

More information

Hobart and William Smith Colleges. Personal Protective Equipment Program

Hobart and William Smith Colleges. Personal Protective Equipment Program Hobart and William Smith Colleges Geneva, New York Personal Protective Equipment Program Copies of the Personal Protective Equipment Program: 1. Human Resources Office 2. Office of the President (Provost)

More information

Laboratory Chemical Hygiene Plan -- Teaching Lab

Laboratory Chemical Hygiene Plan -- Teaching Lab Laboratory Chemical Hygiene Plan -- Teaching Lab A chemical hygiene plan is a written program developed to establish procedures, protective equipment requirements and standard work practices that promote

More information

P N R Associates Ltd

P N R Associates Ltd HEALTH AND SAFETY POLICY P N R Associates Ltd 19 Reading Road Pangbourne Berkshire RG8 7LR Tel: 0118 984 4646 Fax: 0118 984 4862 Email: info@pnr-associates.com PREPARED BY 16a Market Square, Sandy, Bedfordshire

More information

State of Maine Department of Transportation

State of Maine Department of Transportation State of Maine Department of Transportation Administrative Policy Memorandum 410 Supercedes APM dated effective April 4, 2001 Revised Date: January 23, 2002 TO: All employees SUBJECT: Protective Clothing,

More information

CHEMICAL HYGIENE PLAN

CHEMICAL HYGIENE PLAN SAMPLE WRITTEN CHEMICAL HYGIENE PLAN For Compliance With 29 CFR 1910.1450 Wyoming General Rules and Regulations Wyoming Department of Workforce Services OSHA Division Consultation Program ACKNOWLEDGEMENTS

More information

Accident Prevention Process

Accident Prevention Process page 8 of 44 Accident Prevention Process Accidents and injuries can be prevented, but it takes planning, organizing, leadership and coordination to do so. Safety and health professionals have identified

More information

Section 5 General Policies Work, Health and Safety Policy. The Gums Childcare Centre Policies

Section 5 General Policies Work, Health and Safety Policy. The Gums Childcare Centre Policies The Gums Childcare Centre Policies Section 5 General Policies 3.14 Work, Health and Safety Policy Background 1. The Gums Childcare Centre is committed to ensuring a safe and healthy working and learning

More information

Respiratory Protection

Respiratory Protection Respiratory Protection Program ENVIRONMENTAL HEALTH & SAFETY pg. 1 Table of Contents A. Introduction...3 B. Scope...3 C. Responsibilities...3 1. Department - Chair/Director...3 2. Environmental Health

More information

Section 2. Definition of Terms The terms as used in these Rules shall have the following meanings:

Section 2. Definition of Terms The terms as used in these Rules shall have the following meanings: RULES AND REGULATIONS IMPLEMENTING EXECUTIVE ORDER NO. 307 ESTABLISHING AN OCCUPATIONAL SAFETY AND HEALTH CENTER IN THE EMPLOYEES' COMPENSATION COMMISSION STATEMENT OF AUTHORITY These Implementing Rules

More information

[Type here] RESPIRATORY PROTECTION PROGRAM

[Type here] RESPIRATORY PROTECTION PROGRAM [Type here] RESPIRATORY PROTECTION PROGRAM 1 March 7, 2017 TABLE OF CONTENTS Section Title Page 1. Scope... 1 2. Program Administration and Responsibilities... 1 3. Immediately Dangerous to Life and Health

More information

Western Michigan University. Respiratory Protection Safety Policy

Western Michigan University. Respiratory Protection Safety Policy Western Michigan University Respiratory Protection Safety Policy I. Purpose: The purpose of Western Michigan University s Respiratory Protection Safety Program is to enhance the protection of employee

More information

Respiratory Protection Program

Respiratory Protection Program Respiratory Protection Program Revised 7/1/2010 Marquette University Effective: 5/21/06 Respiratory Protection Program Updated: 07/21/10 Revision No. 1 l. OBJECTIVE The Marquette University Respiratory

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Reviewed by SLT 31/7/17 Ratified by Governors 30 September 2015 Effective from 1 October 2015 Review scheduled for Autumn 2019 Responsible person Responsible Governor Committee Business

More information

Code of Practice Controlling access to hazardous or sensitive areas

Code of Practice Controlling access to hazardous or sensitive areas Code of Practice Controlling access to hazardous or sensitive areas April 2008 Preface 1. This Code of Practice describes the procedures to be followed for securing sensitive or hazardous areas within

More information

HARBEX METAL PROCESSING LTD. Health and Safety Policy and Procedures

HARBEX METAL PROCESSING LTD. Health and Safety Policy and Procedures HARBEX METAL PROCESSING LTD Health and Safety Policy and Procedures This page is intentionally blank. Contents General Policy A declaration of our intent to provide and maintain, so far as is reasonably

More information

SSE Generation Safe System of Work

SSE Generation Safe System of Work Safe System of Work SSOW The Safe System of Work provides a formal framework to ensure that all of the steps necessary for safe working have been anticipated and implemented. The SSoW process described

More information

Management Standards. EHS Policy and Program

Management Standards. EHS Policy and Program Global Environment, Health and Safety Standards Abbott has an established Environment, Health and Safety (EHS) Policy and set of management and technical standards that form the basis of our EHS management

More information

HAZARDOUS MATERIALS EMERGENCY. Awareness Level Response Plan 29 CFR (q) and 40 CFR 311

HAZARDOUS MATERIALS EMERGENCY. Awareness Level Response Plan 29 CFR (q) and 40 CFR 311 HAZARDOUS MATERIALS EMERGENCY Awareness Level Response Plan 29 CFR 1910.120 (q) and 40 CFR 311 This plan addresses health and safety protection for the Med-Care Ambulance Service Prepared By: Chris Moretto

More information

Safety and Health Management Regulations of Osaka University. Chapter 1: General Provisions

Safety and Health Management Regulations of Osaka University. Chapter 1: General Provisions Safety and Health Management Regulations of Osaka University Note: The document below is an English translation of the University Work Regulations, originally composed in Japanese. The English version

More information

Niagara County Emergency Services

Niagara County Emergency Services Niagara County Emergency Services STANDARD OPERATING PROCEDURES Subject: J. Francis Gaughn and Wheatfield Training Facilities Use by Fire Service or Law Enforcement Agencies Table of Contents Chapter 1...

More information

NORTH CAROLINA A&T STATE UNIVERSITY Chemical Hygiene Plan

NORTH CAROLINA A&T STATE UNIVERSITY Chemical Hygiene Plan North Carolina Agricultural and Technical State University OFFICE OF ENVIRONMENTAL HEALTH & SAFETY Safety Manual Subject: Chemical Hygiene Plan Number: 5-1 Date February 1, 2009 Amends: None Supersedes:

More information

Health, Safety, Security and Environment

Health, Safety, Security and Environment Document owner and change code Document Owner Aaron Perronne Title HSSE Manager Mark X Change Code Description X N/A First Issue A Typographical/Grammatical correction; formatting change; text clarification-no

More information

PyroLance LLC. STANDARD OPERATING PROCEDURE

PyroLance LLC. STANDARD OPERATING PROCEDURE PyroLance LLC. STANDARD OPERATING PROCEDURE Section: Subject: Approved: Demo/Training Live Fire Training Exercises SOP: 1.00 October 24, 2012 Execute d: Revised: Casparus Seyffert VP Operations Table of

More information

FAMILIARIZATION AND ONBOARD TRAINING

FAMILIARIZATION AND ONBOARD TRAINING EXERCISES FAMILIARIZATION AND ONBOARD TRAINING Written By Verified By Approved )RU NAME AND SURNAME NAME AND SURNAME NAME AND SURNAME Safety & Quality Department Manager Technical Department Director Managing

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Policy reviewed by: Philippa Mills : September 2017 Next review date : September 2018 School refers to Cambridge International School; parents refers to parents, guardians and

More information

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY Page 1 of 12 ISSUED: 6/94 REVISED: 06/07 Introduction: Purpose The purpose of this program is to ensure the protection of all employees from respiratory hazards through the proper use of respirators. Respirators

More information

Incident Command System Awareness Participant Guide May 2016

Incident Command System Awareness Participant Guide May 2016 Incident Command System Awareness Participant Guide May 2016 Copyright 2016 Midwest Consortium for Hazardous Waste Worker Training Acknowledgments The Midwest Consortium developed this course for Hazardous

More information

Draft Regulation. 23. This Regulation comes into force on the fifteenth. 18. The IQPF will recognize or refuse to recognize

Draft Regulation. 23. This Regulation comes into force on the fifteenth. 18. The IQPF will recognize or refuse to recognize Part 2 GAZETTE OFFICIELLE DU QUÉBEC, September 26, 2001, Vol. 133, No. 39 5053 (2) an explanation of how the activity will be conducted; (3) an explanation of how the activity allows for the development

More information

CORK COUNTY COUNCIL SANITARY CARETAKER GRADE 5 WATER SERVICES ZONE 3 (SOUTH EAST)

CORK COUNTY COUNCIL SANITARY CARETAKER GRADE 5 WATER SERVICES ZONE 3 (SOUTH EAST) QUALIFICATIONS 1. Each candidate must be of good character. 2. Each applicant must hold a full current Category B European Community Model Driving Licence free from endorsement. 3. Be capable of writing

More information

Kanawha Putnam Emergency Management Plan Functional Annex. (completed by plan authors) Local / County Office of Emergency Management

Kanawha Putnam Emergency Management Plan Functional Annex. (completed by plan authors) Local / County Office of Emergency Management Kanawha Putnam Emergency Management Plan Functional Annex Chemical HazMat Response A16 Coordination: Primary Agency: (completed by plan authors) Local / County Office of Emergency Management Support Agencies:

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures . Health and Safety Policy and Procedures CANTERBURY COATING SPECIALISTS LTD VALID TO: 10 May 2017 Table of Contents 1. Policy Statement 4 2. Health and Safety Procedures Overview 5 Part A Our Health and

More information

If a desired course is not listed, please contact the ChemDept Safety Adviser at (604) Special arrangements may be possible.

If a desired course is not listed, please contact the ChemDept Safety Adviser at (604) Special arrangements may be possible. UBC Chemistry Department SAFETY ORIENTATION Online at: http://www.chem.ubc.ca/safety#safety-1 and click on "Training" Last updated: July 15, 2014 Welcome to UBC Chemistry Department The overall safety

More information

HORRY COUNTY FIRE RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING GUIDELINE. SOG 607 Live Fire Training in Acquired Structures

HORRY COUNTY FIRE RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING GUIDELINE. SOG 607 Live Fire Training in Acquired Structures HORRY COUNTY FIRE RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING GUIDELINE APPROVED BY GARRY ALDERMAN, FIRE CHIEF: DATE: August 4, 2010 SOG 607 Live Fire Training in Acquired Structures

More information

Personal Protective Equipment Program. Risk Management Services

Personal Protective Equipment Program. Risk Management Services Personal Protective Equipment Program Services Table of Contents I. Program Goals and Objectives... 2 II. Scope and Application... 2 III. Responsibilities... 2 IV. Procedures... 3 V. Training... 5 VI.

More information

General Health and Safety Information for Victoria University. An outline of any further Health and Safety Training you may require.

General Health and Safety Information for Victoria University. An outline of any further Health and Safety Training you may require. Directed by: Health and Safety Officer Physical Plant Updated: March 2017 General Health and Safety Information for Victoria University. General Health and Safety Information for the task and work you

More information

Incident Reporting, Notification, and Review Procedure

Incident Reporting, Notification, and Review Procedure Incident Reporting, Notification, and Review Procedure 1. Purpose and Scope 1.1. The purpose of this procedure is to require incident reporting and notification and to aid the University of Notre Dame

More information

Control of Substances Hazardous to Health (COSHH)

Control of Substances Hazardous to Health (COSHH) Control of Substances Hazardous to Health (COSHH) 1. PURPOSE 1.1 The Control of Substance Hazardous to Health regulations are the main piece of legislation covering control of the risks to staff and other

More information

Louisiana State University

Louisiana State University Revision: 3 Effective Date: December 1, 2010 Page 1 of 9 Louisiana State University Office of Facility Services Operating Instruction 4006 SUBJECT: RESPIRATOR PROTECTION PROGRAM I. General A. In compliance

More information

FIRE TACTICS AND PROCEDURES HAZARDOUS MATERIALS 12 October 19, 2005 TECHNICAL DECONTAMINATION TASK FORCES 1. INTRODUCTION

FIRE TACTICS AND PROCEDURES HAZARDOUS MATERIALS 12 October 19, 2005 TECHNICAL DECONTAMINATION TASK FORCES 1. INTRODUCTION FIRE TACTICS AND PROCEDURES October 19, 2005 1. INTRODUCTION 1.1 The grouping of several companies into a task force enables an Incident Commander to quickly deploy several units to address a specific

More information

OSHA (PESH) Records. Presented by: Doug Miller. Occupational Safety Consultants, Inc.

OSHA (PESH) Records. Presented by: Doug Miller. Occupational Safety Consultants, Inc. OSHA (PESH) Records Presented by: Doug Miller Objectives At the end of this presentation you will know and understand: OSHA s Written Program Requirements OSHA s Training Documentation Requirements OSHA

More information

Regulations concerning Administrative Arrangements

Regulations concerning Administrative Arrangements Norwegian Labour Inspection Authority Order no. 706-ENG Regulations concerning Administrative Arrangements Regulations concerning administrative arrangements within the area of application of the Working

More information

Requirements for Construction Site Welfare Facilities

Requirements for Construction Site Welfare Facilities Requirements for Construction Site Welfare Facilities The Construction Safety Partnership and the HSA Construction Advisory Committee combined in 2016 to become the Construction Safety Partnership Advisory

More information

250- PERSONAL PROTECTIVE EQUIPMENT PROGRAM

250- PERSONAL PROTECTIVE EQUIPMENT PROGRAM 250.1 PURPOSE A. To set forth procedures for the use, care, and maintenance of personal protective equipment (PPE) required to be used by employees for the prevention of injuries. 250.2 SCOPE A. Applies

More information

SafeGulf Program Agreement (Form SCO-03sg)

SafeGulf Program Agreement (Form SCO-03sg) SafeGulf Program Agreement (Form SCO-03sg) You indicated your intent to operate the HSE RigPass accreditation program in accordance with the SafeGulf requirements. You should be aware that the following

More information

Installation Operations Sample Method Statement

Installation Operations Sample Method Statement Description of Works Task / Operation Customer / Location Heat Exchanger Replacement 40 XXXXX XXXXX, Business Park, XXX XXX Issue Date 23/05/2014 Proposed Start Date 24/05/2014 Validity Period 4 Days This

More information

320- HAZARD COMMUNICATION

320- HAZARD COMMUNICATION 320.1 PURPOSE A. To ensure the safe use of hazardous chemicals and to comply with the requirements of OSHA 1910.1200. 320.2 SCOPE A. This program is applicable to all CNM employees who may be exposed to

More information

Health & Safety Policy and Procedures Manual SECTION 31 CADMIUM

Health & Safety Policy and Procedures Manual SECTION 31 CADMIUM SECTION 31 CADMIUM 1. CADMIUM A. Scope: This written compliance program applies to all Maul Electric, Inc employees or employees of Maul Electric, Inc subcontractors who may be exposed to cadmium at or

More information

Palm Beach State College. Florida s First Public Community College SAFETY MANUAL

Palm Beach State College. Florida s First Public Community College SAFETY MANUAL Palm Beach State College Florida s First Public Community College SAFETY MANUAL PALM BEACH STATE COLLEGE SAFETY MANUAL TABLE OF CONTENTS 1. INTRODUCTION... 2 2. RESPONSIBILTIES... 3 3. WORKPLACE HAZARD

More information

CHEMICAL HYGIENE PLAN

CHEMICAL HYGIENE PLAN CHEMICAL HYGIENE PLAN The SDSU Laboratory Chemical Safety Program for Compliance with 29 CFR 1910.1450 and 8 CCR 5191: Occupational Exposure to Hazardous Chemical in Laboratories Prepared by San Diego

More information

General Safety. Keene State College Policies and Procedures

General Safety. Keene State College Policies and Procedures General Safety Keene State College Policies and Procedures General Safety Section Menu The purpose of the EHS Manual is to document Keene State College s Environmental Health and Safety (EHS) Procedures

More information

Oak Grove School District Respiratory Protection Program

Oak Grove School District Respiratory Protection Program Oak Grove School District Respiratory Protection Program District Policy The purpose of this notice is to inform you that Oak Grove School District is complying with the OSHA Respiratory protection Standard,

More information

Statement of Principles

Statement of Principles Health and Safety Policy V2.1 Date Name Notes Drafted 22 nd Sep 2009 D.Robinson Drafted new version based on DCC model policy. Adopted 23 rd Nov 2009 PPC Reviewed 18 th Jun 2013 PPC Drafted new version

More information

Under no circumstance shall a supervisor assign an employee to work without the protective equipment furnished to him to assure his personal safety.

Under no circumstance shall a supervisor assign an employee to work without the protective equipment furnished to him to assure his personal safety. Employees Personal Protection The City offers a variety of safety devices and protective equipment for the employees personal protection. It is the supervisor s responsibility to evaluate job tasks to

More information

Worker s Arm Pulled Into Belt and Pulley

Worker s Arm Pulled Into Belt and Pulley Worker s Arm Pulled Into Belt and Pulley Lessons Learned Volume 04 Issue 37 2004 USW Worker s Arm Pulled Into Belt and Pulley Purpose To conduct a small group lessons learned activity to share information

More information

Crane Bashes Pipes. Lessons Learned. Volume 03 Issue USW

Crane Bashes Pipes. Lessons Learned. Volume 03 Issue USW Crane Bashes Pipes Lessons Learned Volume 03 Issue 13 2004 USW Crane Bashes Pipes Purpose To conduct a small group lessons learned activity to share information gained from incident investigations. To

More information

University Facilities Personal Protective Equipment Procedure

University Facilities Personal Protective Equipment Procedure Personal Protective Equipment Procedure Internal Procedure: SP1.2 Effective date: 5/13/02 Last Modified: 9/5/2012 Approved by: Personal Protective Equipment PURPOSE To establish requirements for a Personal

More information

FIRE AND DISASTER MANAGEMENT ORGANIZATION ACT

FIRE AND DISASTER MANAGEMENT ORGANIZATION ACT FIRE AND DISASTER MANAGEMENT ORGANIZATION ACT (LAW NO. 226, DEC. 23, 1947) Amendments (1) Law No. 187, Jul.24, 1948 (25) Law No.83, Dec.10, 1983 (2) Law No.193, Jun.4, 1949 (26) Law No.69, Jun.21, 1985

More information

Duties of a Principal

Duties of a Principal Duties of a Principal 1. Principals shall strive to model best practices in community relations, personnel management, and instructional leadership. 2. In addition to any other duties prescribed by law

More information

LIETUVOS RESPUBLIKOS SOCIALINĖS APSAUGOS IR DARBO MINISTERIJA MINISTRY OF SOCIAL SECURITY AND LABOUR OF THE REPUBLIC OF LITHUANIA

LIETUVOS RESPUBLIKOS SOCIALINĖS APSAUGOS IR DARBO MINISTERIJA MINISTRY OF SOCIAL SECURITY AND LABOUR OF THE REPUBLIC OF LITHUANIA LIETUVOS RESPUBLIKOS SOCIALINĖS APSAUGOS IR DARBO MINISTERIJA MINISTRY OF SOCIAL SECURITY AND LABOUR OF THE REPUBLIC OF LITHUANIA International Labour Standards Department 2013-10-30 International Labour

More information

STATE OF ALASKA COMPETENCY SPECIFICATION

STATE OF ALASKA COMPETENCY SPECIFICATION STATE OF ALASKA COMPETENCY SPECIFICATION Occupational Group: LABOR, TRADES AND CRAFTS Occupational Family:Safety Inspection and Compliance 996X CAREER AREA: Occupational Safety Compliance Officer 9961-49

More information

60/ ) Act No. 68/2003, Article 1.

60/ ) Act No. 68/2003, Article 1. Act on Working Environment, Health and Safety in Workplaces, No. 46/1980, as amended by act No. 15/1986, No. 61/1990, No. 7/1996, No. 52/1997, No. 83/1997, No. 17/2003, No. 68/2003, No. 90/2004, No. 138/2005

More information

Biology 100, 101, 102, 105 Laboratory Safety Agreement

Biology 100, 101, 102, 105 Laboratory Safety Agreement Biology 100, 101, 102, 105 Laboratory Safety Agreement In the interest of safety and accident-prevention, there are regulations to be followed by all credit students in designated science laboratory rooms

More information

Central Washington University

Central Washington University Central Washington University General Safety Information Accident Prevention Plan Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg,

More information

CONTRACTOR ORIENTATION

CONTRACTOR ORIENTATION CONTRACTOR ORIENTATION Health, Safety & Environmental WESTLAKE 1149 NORTHSIDE ROAD BURLINGTON, ONTARIO L7M 1H5 Tel.: 905-336-5200 Fax.: 905-336-6501 Prepared by: Julie Heleno, Health & Safety Administrator

More information

SECTION 6 PERSONAL PROTECTIVE EQUIPMENT (PPE)

SECTION 6 PERSONAL PROTECTIVE EQUIPMENT (PPE) SECTION 6 PERSONAL PROTECTIVE EQUIPMENT (PPE) 6.1 Personal Protective Equipment 6.2 Respiratory Protection Program 6.3 Information for Voluntary Use of Respirators 6.4 Hearing Conservation Program Reviewed:

More information

Section I Referenced Publications. ANSI/IES-RP American National Standards Institute and Illuminating Engineering Society standard

Section I Referenced Publications. ANSI/IES-RP American National Standards Institute and Illuminating Engineering Society standard Appendix A References Army publications are available at http://www.apd.army.mil/. TRADOC publications are available at http://www.tradoc.army.mil/publications.htm. 29 CFR parts 1910, 1926, and 1960 are

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Health & Safety Policy for Winton Primary School 1. Policy Statement The aim of the governing body and the headteacher is to provide a safe and healthy working and learning environment

More information

INSTRUMENTATION TECHNICIAN I/II/III

INSTRUMENTATION TECHNICIAN I/II/III I/II/III I. Position Identification: A) Title: Instrumentation Technician I/II/III B) Bargaining Unit: Public Employees Union, Local #1 C) Customary Work Hours: Within the hours of 6:00am to 6:00pm D)

More information

SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland

SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland May 2015 Contents Page Acknowledgements... 4 Introduction... 5 1. Aim and scope... 6

More information

Welcome to Environmental Health and Safety s New Employee Online Orientation

Welcome to Environmental Health and Safety s New Employee Online Orientation Welcome to Environmental Health and Safety s New Employee Online Orientation 1200 Carothers Hall (850) 644 6895 www.safety.fsu.edu Rev 01/04/17 I. Department of Environmental Health and Safety (EH&S) Mission

More information

WRITTEN HAZARD COMMUNICATION PROGRAM. Prepared for: BORO OF

WRITTEN HAZARD COMMUNICATION PROGRAM. Prepared for: BORO OF Prepared for: BORO OF 2013 TABLE OF CONTENTS INTRODUCTION...1 POLICY:...1 OBJECTIVE:...1 PURPOSE:...1 RESPONSIBLE PERSONS:...2 HAZARD DETERMINATION...3 PHYSICAL HAZARDS:...3 HEALTH HAZARDS:...4 EXEMPT

More information

Personal Protective Equipment

Personal Protective Equipment Policies & Procedures Personal Protective Equipment Internal Procedure: PPE Effective Date: 1-15-18 Last Modified: 1-15-18 Approved By: Todd Barnette Contents Purpose... 2 Applicability... 2 Definitions...

More information

Injury and Illness Prevention Program and Safety Procedures Manual

Injury and Illness Prevention Program and Safety Procedures Manual Injury and Illness Prevention Program and Safety Procedures Manual City of Redding, California June 2007 City of Redding Injury and Illness Prevention Program and Safety Procedures Manual Table of Contents

More information

THE CORPORATION OF THE UNITED TOWNSHIPS OF HEAD, CLARA & MARIA HEALTH AND SAFETY POLICY APPENDIX A TO BY-LAW

THE CORPORATION OF THE UNITED TOWNSHIPS OF HEAD, CLARA & MARIA HEALTH AND SAFETY POLICY APPENDIX A TO BY-LAW THE CORPORATION OF THE UNITED TOWNSHIPS OF HEAD, CLARA & MARIA HEALTH AND SAFETY POLICY APPENDIX A TO BY-LAW 2008-19 Approved by: Municipal Council Approval date: August 2008 HEALTH AND SAFETY POLICY STATEMENT

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3031 PERSONAL PROTECTIVE EQUIPMENT (PPE) / ASSESSMENTS Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations

More information