1 Embedded Generation Workshop 15 th November 2012 Damilola Ogunbiyi General Manager, Lagos State Electricity Board (LSEB)
2 Contents 1. POWER SECTOR DEVELOPMENT PLAN 2. ENERGY AUDIT PROGRAM 3. ISLAND POWER PROJECT EXPANSION 4. ENERGY CONSERVATION CAMPAIGN
3 LAGOS STATE GOVERNMENT POWER SECTOR DEVELOPMENT PLAN Power Development Public Lighting Energy Awareness Renewable Energy Energy Audit Program Public Lighting Guidelines and Standards Household Energy and Emissions calculator Solar Bulbs Initiative Independent Power Projects Street lighting Maintenance Plan Energy Awareness for Children Waste to Energy Projects Industrial Estates Electrification Public Lighting Rehabilitation Plan Youth Energy Career Program Renewable Energy Policy
4 INDEPENDENT POWER PROJECTS PROJECTS AKUTE POWER ISLAND POWER ALAUSA POWER DESCRIPTION MW plant runs on natural Gas. The plant supplies power to the Akute Intake Facility of Lagos Water Corporation (LWC) 10 MW plant runs on Compressed Natural Gas (CNG) with diesel back up. The plant supplies power to Courts, Hospitals and Street lights within Lagos Island To construct a 10.4 MW plant that will run on natural gas and supply power to the Alausa Secretariat and environs STATUS OPERATIONAL OPERATIONAL CONSTRUCTION FEATURES The Akute Intake Facility is responsible for 80% of water supply in Lagos LWC can now pump over 130 million gallons of water daily The fastest executed power plant (9 months) The project includes a dedicated 18 km distribution network The project will provide 24 hr power therefore allow LASG to function more effective
5 INDEPENDENT POWER PROJECTS PROJECTS PENINSULA INTEGRATED POWER IKEJA GRA POWER INDUSTRIAL ESTATES DESCRIPTION To construct a 6.5 MW plant that will run on Compressed Natural Gas (CNG) to supply power to Lekki water works, Victoria Island water works and public lighting within Lekki Phase 1 and Victoria Island extension To construct a 10 MW plant that will run on natural gas or Compressed Natural Gas (CNG) to supply power to Lagos State Teaching Hospital (LASUTH) and LASG Old Secretariat To construct small, medium and large scale power plants for the following LASG industrial estates : 1. Isolo Industrial estate 2. Matori Industrial estate 3. Imota Agro Allied estate 4. Ikorodu Industrial estate PROPOSED COMPLETION DATE
6 HOUSEHOLD ENERGY AND EMISSIONS CALCULATOR
7 LAGOS STATE ENERGY AUDIT PROGRAM No Area Number of locations surveyed Number of Sectors Identified Installed Capacity (MW) Number of Generators 1 Somolu Printing community 2 Matori Industrial estate Ilupeju Industrial estate Ikorodu Industrial estate 5 Lagos Island (Broad street & Marina only) 6 Ikeja GRA Oba Akran Agidingbi Omole I Omole II Dolphin Estate
8 LAGOS STATE ENERGY AUDIT PROGRAM ENERGY AUDIT PROGRAM Somolu Printing community Matori Industrial estate Ilupeju Industrial estate Ikorodu Industrial estate Lagos Island Ikeja GRA Oba Akran Agidingbi Omole I & II Dolphin Estate Iporin Gbagada Magodo I & II
9 LAGOS STATE ENERGY AUDIT PROGRAM
10 MAGODO I - ENERGY AUDIT
11 MAGODO I - ENERGY AUDIT
12 MAGODO I - ENERGY AUDIT
13 MAGODO I - ENERGY AUDIT
14 MAGODO I - ENERGY AUDIT
15 MAGODO I - ENERGY AUDIT
16 MAGODO I - ENERGY AUDIT
17 MAGODO I - ENERGY AUDIT
18 MAGODO I - ENERGY AUDIT
19 MAGODO I - ENERGY AUDIT
20 MAGODO I - ENERGY AUDIT
21 MAGODO I - ENERGY AUDIT
22 MAGODO I - ENERGY AUDIT
23 ISLAND POWER EXPANSION (IPP2) For Lagos State Government to develop, through public private partnership (PPP), the first integrated and fully independent power generation, distribution and public lighting solution in Nigeria. This will provide 24 hrs uninterrupted power supply to crucial Lagos State facilities within the health, education, security, water, waste management, science & technology, judicial, sport and transportation sectors in Lagos Island.
24 ISLAND POWER EXPANSION (IPP2) BACKGROUND The Island Power project is a 10MW Independent power project that also includes an 18km dedicated underground distribution network which supplies power to the General Hospital (Lagos Island); High Court (Catholic Mission Street); High Court Annex (TBS); Magistrates Court (JLC Taylor Court); Island Maternity Hospital (Lagos Island); State House (Marina), E-learning centre, inner and outer Marina Street lights and street light installations on 20 Streets within Lagos Island.
25 ISLAND POWER EXPANSION (IPP2) OBA' OF LAGOS PALACE MASSEY CHILDREN S HOSPITAL PUBLIC LIGHTING SUBSTATION FOR AN ADDITIONAL 15KM OF LIGHTING LAWMA TRANSFER LOADING STATION SURA/ SIMPSON STREET LIGHTING SUB STATION DOLPHIN JUNIOR AND SENIOR SCHOOLS BOYS & GIRLS JUNIOR AND SENIOR ACADEMY EPETEDO & EBUTE ELEFUN JUNIOR AND SENIOR SCHOOLS DOLPHIN WATER WORKS OKESUNA & LAFIAJI JUNIOR AND SENIOR SCHOOLS LEGEND Island Power Plant (IPP) Facilities connected to IPP Proposed Facilities to be connected to IPP Existing distribution network Proposed distribution network E LEARNING CENTRE CAMPOS STADIUM LAGOS ISLAND LCDA CITY HALL FREEDOM PARK ISLAND MATERNITY AND HEALTH SERVICE COMMISSION HIGH COURT IGBOSERE MAGISTRATE COURT (JlC TAYLOR COURT) LAGOS ISLAND STREET LIGHTING SUB STATION FOR 20 STREETS HIGH COURT ANNEX OBALENDE TRANS -FORMATION SUB STATION TBS/ ONIKAN STREET LIGHTING SUB STATION GENERAL HOSPITAL, LAGOS STATE HOUSE MARINA ONIKAN HEALTH CENTRE ONIKAN WATER WORKS INNER AND OUTER MARINA SUB STATION 1 INNER AND OUTER MARINA SUB STATION 2 ISLAND POWER PROJECT POWER PLANT INNER AND OUTER MARINA SUB STATION 3 STATE HOUSE CAR PARK SUB STATION ONIKAN UNDER BRIDGE SUB STATION ONIKAN UNDER BRIDGE PUBLIC LIGHTING COWRY BRIDGE/ BONNY CAMP AHMADU BELLO LIGHTING
26 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN
27 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN The Problem - Approximately 1% of Lagosians currently practice Energy Conservation - On average Lagos State receives 1000MW of Electrical Power from the grid - Lagos has a population of over 18million people - The Energy is not sufficient but still being Wasted - Energy Wastage is most popular within the Low income citizens
28 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN
29 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN The Purpose of the Awareness Campaign is to enlighten Lagosians on: Understanding Energy and Electrical terms Current Energy Consumption Minimising Energy Wastage Different Sources of Electrical Power Improved Energy Consumption Habits How using less energy will save them money
30 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN
31 ENERGY AND ENVIRONMENTAL CONSERVATION AWARENESS CAMPAIGN Thank you for listening
MINISTRY OF PHYSICAL PLANNING AND URBAN DEVELOPMENT
MINISTRY OF PHYSICAL PLANNING AND URBAN DEVELOPMENT CUSTOMER CHARTER Introduction: In accordance with the Lagos State Urban and Regional Planning and Development law 2010, the Ministry has 3 parastatals
More informationRehabilitation of 17+1 protype Block at Festac Junior, Festac. Lagos. Rehabilitation of 17+1 protype Block at Festac Senior, Festac. Lagos.
75 76 77 78 79 80 81 82 83 84 Lagos State House of Assembly protype Block at GRA Primary Sch. 1. Ogudu. Lagos. protype Block at GRA Primary Sch. II. Ogudu. Lagos. protype Block Pobuna Junior Grammar School,
More informationA'A. Dr. Jim Yong Kim The President The World Bank Headquarters 1818, H Street, NW Washington, DC, 20433, USA LETTER OF DEVELOPMENT POLICY
Public Disclosure Authorized February 17, 2014 A'A Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Dr. Jim Yong Kim The President The World Bank Headquarters 1818,
More informationImplementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956) Operation Name: Lagos Urban Transport Project
More informationÈkó : A Guide. MUSON CENTRE The Musical Society of Nigeria's multipurpose civic auditorium is an
Èkó : A Guide Lagos is Nigeria's premier destination for business and also entertainment. The city is home to some of Nigeria's finest restaurants, beaches, art galleries, leisure centres and so much more!
More informationAfrica-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets
Africa-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets Niklas Hayek, Project Manager Waste to BioEnergy Africa Valladolid, 26
More informationVodafone Group Plc June Our contribution to the UN SDGs
Vodafone Group Plc June 2018 Our contribution to the UN SDGs The UN Sustainable Development Goals In 2015, the United Nations launched 17 goals to end poverty, fight inequality and injustice and tackle
More informationAfrica-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets.
Africa-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets Michael Franz What is the RECP? The RECP is a African-European platform
More informationmarylandmall a development by Purple Capital Partners Limited OPEN 2015
marylandmall a development by Purple Capital Partners Limited OPEN 2015 A B O U T U S PURPLE CAPITAL PARTNERS COMPANY Purple is a specialist investment firm with business areas in Principal Investment,
More informationThe 2017 Lagos Office Market in 5 Charts
The 2017 Lagos Office Market in 5 Charts estateintel.com With the lowest building completions in 3 years, 2017 provided an opportunity for the market to try to absorb the disruptive amount of space that
More informationMINISTRY OF ENERGY KENYA ELECTRICITY MODERNIZATION PROJECT-IDA CR Terms of Reference Power Engineering Consultant
REPUBLIC OF KENYA MINISTRY OF ENERGY KENYA ELECTRICITY MODERNIZATION PROJECT-IDA CR 55870 Background Terms of Reference Power Engineering Consultant The Government of Kenya (GoK) in conjunction with the
More informationAfrica-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets. Alexander Huppertz
Africa-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets Alexander Huppertz What is the RECP? The RECP is a African-European platform
More informationThe African Development Bank Group: A Partner of Choice. GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014
The African Development Bank Group: A Partner of Choice GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014 1 AFRICAN AFRICAN DEVELOPMENT DEVELOPMENT BANK BANK GROUP GROUP PRIVATE SECTOR OPERATIONS
More informationSiemens Power Academy Lagos Course Schedule
Siemens Power Academy Lagos 2016 Course Schedule Schedule of Trainings January - December 2016 Training Nr Location*** Title Duration Price /Part.(N) Dates General Power Engineering Courses SPAL-EENS-01
More informationVietnam Innovation Day 2011
Vietnam Innovation Day 2011 Innovation for social equity and sustainable growth 1. General Introduction Competition Guidelines The Vietnam Innovation Day (VID) 2011, organized through the partnership of
More informationTHIS IS A SAMPLE APPLICATION ONLY ALL APPLICANTS MUST APPLY AND SUBMIT APPLICATIONS ONLINE
THIS IS A SAMPLE APPLICATION ONLY ALL APPLICANTS MUST APPLY AND SUBMIT APPLICATIONS ONLINE Visit the Clean Water and Wastewater website for the online application portal. A. Applicant Information Legal
More informationProject Management Professional. Course Brochure
Project Management Professional Course Brochure 1 Project Management Professional Course Overview This course has been specifically designed to equip participants with the knowledge and skills to manage
More informationSPONSORSHIP PROPOSAL FOR HOFFNUNG INTERNATIONAL FOOTBALL ACADEMY.
SPONSORSHIP PROPOSAL FOR HOFFNUNG INTERNATIONAL FOOTBALL ACADEMY www.hifa.com.ng INTRODUCTION Nigeria is the biggest and most populated country in West Africa. Although, Nigeria is greatly and naturally
More informationUGANDA ENERGY CREDIT CAPITALIZATION COMPANY
UGANDA ENERGY CREDIT CAPITALIZATION COMPANY ORIO Mini Hydro Power Project Solar Loan Programme Connection Loan Programme 1 BACKGROUND The Uganda Energy Credit Capitalisation Company (UECCC), is a Government
More informationRenewable Energy Subsidy Delivery Mechanism, 2013
Government of Nepal Ministry of Science, Technology and Environment Alternative Energy Promotion Centre Renewable Energy Subsidy Delivery Mechanism, 2013 April, 2013 Table of Content 1. Preface 3 2. Definition
More informationVictoria Aiyeyemi International School. Progress Report, March 2017
Victoria Aiyeyemi International School Progress Report, March 2017 Content This is a detailed report on the status and progress of the first project launched by The Book Banque in September 2016. This
More informationS/N MINISTRY/AGENCY PROJECT TITLE CONTRACTOR APPROVED PROJECT COST. 20,231, On-Going residents Eminent Communications Limited
S/N MINISTRY/AGENCY PROJECT TITLE CONTRACTOR APPROVED PROJECT COST 1. 2. Lagos State Residents Registration Lagos State Residents Registration Publicity Strategy for the 20,231,573.75 On-Going residents
More informationCURRICULUM VITAE. Marital Statutes: Married and blessed with children.
EDWIN ONOWORI AGBAIKE Block 94 Flat 1, LCHE, Oke-Afa, Isolo-Lagos Nigeria. Tel. D/L: 0802-338-1900. CURRICULUM VITAE SUMMARY Over 20 years of Consulting and Lecturing experience with strong background
More informationPROVISIONS FOR JOINT IMPLEMENTATION SMALL-SCALE PROJECTS. Version 03. Revision history of the document
UNFCCC/CCNUCC Page 1 PROVISIONS FOR JOINT IMPLEMENTATION SMALL-SCALE PROJECTS Version 03 Document version Adoption Revision Revision history of the document Version 01 JISC 04 1 Initial adoption of the
More informationFEED-IN TARIFF LICENSEE TRANSFER
ABOUT FEED-IN TARIFFS The Feed-in Tariff (FIT) scheme is an environmental programme introduced by Government to promote widespread uptake of a range of small-scale renewable and low carbon electricity
More informationRoss Borden, Director of Intergovernmental Affairs. Recommended Projects for EECBG Direct Allocation
To: From: Mayor and Council Ross Borden, Director of Intergovernmental Affairs Date: June 3, 2009 Re: Recommended Projects for EECBG Direct Allocation SUMMARY As part of the American Recovery and Reinvestment
More informationACCESS TO ENERGY IN DEVELOPPING COUNTRIES. Washington MAY 24th 2012
ACCESS TO ENERGY IN DEVELOPPING COUNTRIES Washington MAY 24th 2012 WHAT STRATEGY? EDF s strategy to promote energy access in rural areas of developing countries is based on : 5 Key elements financial viability,
More informationWorking with the new Instruments for Cooperation Brussels 25/11/2008
Working with the new Instruments for Cooperation Brussels 25/11/2008 luc.bagur@ec.europa.eu 1 1. Overview of EU & EC aid implementation 2. s external cooperation Instruments 3. Sustainable energy in s
More information31 Aug 2018 Page 1 of 8
UN VOLUNTEER DESCRIPTION OF ASSIGNMENT SSDR001108--Generator Mechanic The United Nations Volunteers (UNV) programme is the UN organization that promotes volunteerism to support peace and development worldwide.
More information17. 2bn EUR. EIB Group support for key enabling technologies and technical deployment for an innovative Europe
February 2014 The EIB in Ireland in 2013 During 2013 the European Investment Bank stepped up its lending activity in Ireland by more than a third and provided 680m in long-term low-cost loans to support
More informationRenewable Energy and Mini Grids in East Africa The Technical Challenges and Opportunities for Developers, Investors and Off-Takers AEF June 2017
Renewable Energy and Mini Grids in East Africa The Technical Challenges and Opportunities for Developers, Investors and Off-Takers AEF June 2017 Copenhagen Context for Mini-Grids - A challenging business
More information: N/A. : Chartered Financial Analyst (CFA), Enrolled
1. PROPOSED POSITION : Financial Specialist 2. NAME OF FIRM : Gemelli Consulting 3. NAME OF EXPERT : James Benjamin STEWART (CMS # 045877) 4. CURRENT ADDRESS c/- Gemelli Consulting PO Box 17-645 Christchurch
More informationProject Application Webinar
Green Infrastructure Phase II Emerging Renewable Power Program Project Application Webinar March 9, 2018 2 Contents Background Applicant Guide Overview: Eligibility and funding Application process Project
More informationAfrica-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets. Alexander Huppertz
Africa-EU Renewable Energy Cooperation Programme (RECP) A European Platform for Private Sector Investments in Africa s RE Markets Alexander Huppertz Background I: Demand and Market Volume in Africa SSA:
More informationIFU s financing of UN s SDGs and the new SDG fund. Bjerringbro - 29 August 2018
IFU s financing of UN s SDGs and the new SDG fund Bjerringbro - 29 August 2018 IFU IN BRIEF Independent government-owned fund, operating on commercial terms Promotes economic and social progress in developing
More informationOFFICE MARKET UPDATE LAGOS - Q broll.com/research. Highlights
OFFICE MARKET UPDATE LAGOS - Highlights 12,600m 2 of new office space was added to the Lagos office market through key completions such as Civic Center Tower and 100 Pier Point. Asking rental levels in
More informationPHILANTHROPY
OUR DATA KEY PERFORMANCE INDICATORS (KPIs) To assess how we re doing, we ve established several key performance indicators (KPIs) to measure our progress year-over-year. We ve identified these areas as
More informationNational Grid System Reliability Procurement DemandLink Pilot Update
National Grid System Reliability Procurement DemandLink Pilot Update Docket No. 4545 Presentation at the Rhode Island Public Utilities Commission Review of Electric Rates Issues Meeting May 14, 2015 What
More informationLIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF APRIL 2012
IDENT NBR NAME LIONS S INTERNATIONAL MEMBERSHIP REGISTER SUMMARY THE S AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF APRIL 2 COUNTRY DIST STATUS LAST MMR RPT DATE FCL YR OB NEW M E M B E R S H I P C H A
More information`NIBSS CERTIFIED AND APPROVED PAYMENT TERMINALS AND PAYMENT APPLICATIONS
`NIBSS CERTIFIED AND APPROVED PAYMENT TERMINALS AND PAYMENT APPLICATIONS CERTIFIED AND APPROVED PAYMENT TERMINALS S/N Terminal Name Terminal Type 1 NEXGO G3 Shenzhen Xinguodu Co.. 2 NEXGO G870 Manufacturer
More informationIRENA/ADFD Project Facility Third cycle webinar for applicants. Programme Officer, Seleha Lockwood Website:
IRENA/ADFD Project Facility Third cycle webinar for applicants Programme Officer, Seleha Lockwood Email: adfd@irena.org Website: www.irena.org/adfd 1 Contents Project type and characteristics Eligibility
More informationScott E. Bennett, P.E. Director. Arkansas Asphalt Pavement Association
Scott E. Bennett, P.E. Director Arkansas Asphalt Pavement Association Wednesday, January 3, 2018 Changes at the Department Arkansas Highway Commission Dick Trammel Tom Schueck Robert Moore Alec Farmer
More informationMulilo Renewable Energy Solar PV Prieska (PTY) LTD
Mulilo Renewable Energy Solar PV Prieska (PTY) LTD Presented by: The Gestamp Mulilo Consortium Warren Morse (MSc,BSc Engineering) Ally Vusi Mahlangu (Gestamp Solar PDM, BTech Engineering) Program: 1. Introduction
More informationKfW Development Bank. Germany s Financial Assistance. for the Renewable Energy Sector Myanmar
KfW Development Bank Germany s Financial Assistance for the Renewable Energy Sector Myanmar Outline 1 Who We Are & How We Work 2 FC Myanmar: Energy Sector 3 Renewable Energy in South East Asia 2 Who We
More informationImproving Public Spaces. and Services in New York City
Improving Public Spaces and Services in New York City The Fund s Improving Public Spaces and Services in New York City Program (IPSS) is dedicated to improving the quality of life in its own hometown.
More informationFinding Funding for Energy Efficiency
54M102007D Finding Funding for Energy Efficiency Retail Industry Leaders Association Presented by Shaw Environmental & Infrastructure, Inc. 02M062007D July 9, 2009 2 Agenda Introduction to Shaw Overview
More informationMajor in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate
Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00
More informationArkansas State Highway and Transportation Department. Jonesboro Exchange Club
Arkansas State Highway and Transportation Department Jonesboro Exchange Club Arkansas Highway & Transportation AHTD Quick Facts 3rd Largest State Agency (3,634 employees) Maintain 16,416 miles of highway
More informationEIB support for private sector investment in Africa
EIB support for private sector investment in Africa 1 st Africa Finance Conference Bonn, 5 November 2013 Heike Rüttgers, ACP-IF Department 1 EIB signatures 2012 (in EUR) 07/11/2013 2 EIB Project Approval
More informationRemarks for Ms. Amanda Simpson at the Environmental Law and Policy Annual Review (ELPAR) Conference. 10 April 2015
DEPARTMENT OF THE ARMY OFFICE OF ENERGY INITATIVES OFFICE OF THE ASSISTANT SECRETARY FOR INSTALLATIONS, ENERGY AND ENVIRONMENT 2530 CRYSTAL DRIVE, 8 TH FLOOR ARLINGTON, VA 22202 Remarks for Ms. Amanda
More informationWeatherization and Intergovernmental Program
Weatherization and Intergovernmental Program LeAnn Oliver, Program Manager Weatherization & Intergovernmental Program Office of Energy Efficiency and Renewable Energy U.S. Department of Energy National
More informationIntroduction to the CTCN
Introduction to the CTCN CTCN: The operational arm of the UNFCCC Technology Mechanism Objective: enhance action on the development and transfer of technology for action on climate change Technology Executive
More information5/28/2010. w w w. w a t t c h o i c e s. c o m. Agenda
Agenda Thank you Act 129 and Duquesne Light s goals and plan and budget Rates Commercial Market Segments and goals Programs How do I get a rebate? Why I m happy to be a Duquesne Light customer today 3/11/2010
More informationSPOTLIGHT ON LAGOS HOUSING DEVELOPMENT OUTLOOK
Review This is the fourth edition of our biennial publication Spotlight on Lagos Housing Development Market 2016 Outlook Report. Since our last report a lot of change has transpired nationally particularly
More informationUC/CSU/IOU Energy Efficiency Partnership
UC/CSU/IOU Energy Efficiency Partnership 1. Projected Program Budget $ 6,830,972 2. Projected Program Impacts MWh 2,596 MW (Summer Peak) 0.55 3. Program Cost Effectiveness TRC 2.18 PAC 2.22 4. Program
More informationUniversity of Lagos, Nigeria Department of Urban and Regional Planning
University of Lagos, Nigeria Department of Urban and Regional Planning Leke Oduwaye and Taibat O. Lawanson 1. Introduction There is a reciprocal relationship between the quality of human resources and
More informationNIGERIA. AIDS Prevention Initiative in Nigeria (APIN) Capacity Building for the Quality Management Programme. AIDS Prevention Initiative Nigeria
NIGERIA AIDS Prevention Initiative in Nigeria (APIN) Capacity Building for the Quality Management Programme Human Development Profile of Nigeria and HIV/AIDS Population Population growth Infant mortality
More informationVREDENDAL SOLAR POWER PARK (PTY) LTD.
VREDENDAL SOLAR POWER PARK (PTY) LTD. NERSA Public Hearing on the the Application for a Generation License for Renewable Energy Power Plants 13 AUGUST 2012 Contents 1. Background and Project Company Structure
More informationCUMBERLAND COUNTY. Expanding Opportunities Economic Development
CUMBERLAND COUNTY Expanding Opportunities Economic Development The Authority s Focus on Economic Development A Stronger Workforce More Strategic Investments Added Business Expansion & Growth Economic Focused
More informationOVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015
OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia Jakarta, 3 rd February 2015 Disclaimer This presentation is to facilitate the Q&A by providing an overview
More informationMISSION INNOVATION ACTION PLAN
MISSION INNOVATION ACTION PLAN Introduction Mission Innovation (MI) is a global initiative designed to accelerate the pace of innovation and make clean energy widely affordable. Led by the public sector,
More informationPT SMI CDIA Partnership in Developing Cities Infrastructure in Indonesia Project Development Support for Balikpapan City Government
A LEADING CATALYST IN FACILITATING INDONESIA S INFRASTRUCTURE DEVELOPMENT PT SMI CDIA Partnership in Developing Cities in Indonesia Project Development Support for Balikpapan City Government 1 Sharia Conventional
More informationFederal stimulus funds allotted to City, County and surrounding municipalities
Energy Edge A NEWSLETTER FOR MEMPHIS LIGHT, GAS AND WATER DIVISION GENERAL POWER CUSTOMERS MAY 2009 Federal stimulus funds allotted to City, County and surrounding municipalities MLGW and other City Divisions
More informationCLP Power Launches Community Energy Saving Fund to Champion Low-Carbon Living and Help People in Need
27 23 June 2018 中華電力有限公司 CLP Power Hong Kong Limited CLP Power Launches Community Energy Saving Fund to Champion Low-Carbon Living and Help People in Need CLP Power Hong Kong Limited (CLP Power) today
More informationPUBLIC EMPLOYMENT SERVICES IN INDONESIA. Ir. Abdul Wahab Bangkona, M.Sc
PUBLIC EMPLOYMENT SERVICES IN INDONESIA Ir. Abdul Wahab Bangkona, M.Sc SECRETARY GENERAL MINISTRY OF MANPOWER AND TRANSMIGRATION REPUBLIC OF INDONESIA THE FIRST MEETING OF PUBLIC EMPLOYMENT AGENCIES OF
More informationClover Connection. Being green, becoming green and living green. March/April 2010
McCurtain County 4-H Clover Connection March/April 2010 Inside this issue: Forestry Camp 2 Plant and Soil camp Dates to Remember 2 3 Re-Enrollment 4 State Record books 4 Job Readiness 5 The 4-H emblem
More informationAFRICAN DEVELOPMENT BANK UGANDA DECENTRALIZED RENEWABLES DEVELOPMENT PROGRAM
AFRICAN DEVELOPMENT BANK Public Disclosure Authorized Public Disclosure Authorized UGANDA DECENTRALIZED RENEWABLES DEVELOPMENT PROGRAM RDGE DEPARTMENT March 2017 TABLE OF CONTENTS Page 1. INTRODUCTION...
More informationCLP s Town Island Project is Hailed as an Engineering Wonder
中華電力有限公司 CLP Power Hong Kong Limited 20 April 2013 CLP s Town Island Project is Hailed as an Engineering Wonder CLP Power Hong Kong Limited s Town Island Renewable Energy (RE) Supply Project was today
More informationProduction Device Registration
I-REC Code Subsidiary Document 02 Production Device Registration version 1.4 I-REC Code Subsidiary Document 02 Production Device Registration Version 1.4 Contents 1. Introduction... 4 1.1 The I-REC Service...
More information( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES
14 July 2017 (17-3798) Page: 1/24 Committee on Subsidies and Countervailing Measures Original: English SUBSIDIES NEW AND FULL NOTIFICATION PURSUANT TO ARTICLE XVI:1 OF THE GATT 1994 AND ARTICLE 25 OF THE
More informationProfessional financing advice for meso-scale renewable energy projects in sub-saharan Africa.
Professional financing advice for meso-scale renewable energy projects in sub-saharan Africa. Salzburg 29 November 2017 What is the RECP Finance Catalyst? The Finance Catalyst team links renewable energy
More informationWestern Balkans Regional Energy Efficiency Programme (REEP / REEP +)
Western Balkans Regional Energy Efficiency Programme (REEP / REEP +) WBIF Steering Committee London, UK 15 December 2016 The Programme is funded by EU IPA, the European Western Balkans Joint Fund and EBRD
More information1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.
1 2 3 4 1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs. Research contractors and third party system owners
More informationEnerg-E-News. July QCOSS Energy Project News
Energ-E-News July 2009 1. QCOSS Energy Project News 1.1 Subscribe to Energ-E-News Welcome to the second edition of Energ-E-News, our monthly newsletter on the QCOSS Energy Consumer Advocacy Project and
More informationRolling Plan for the Federated States of Micronesia
Annex of Country Policy Rolling Plan for the Federated States of Micronesia As of April, 2016 Basic Policy of Continuous economic development and improvement of living standards considering environment
More informationFinancing Innovations in RES and EE in Germany. ener2i Training Workshop, Minsk, Belarus, Julian Schoenbeck, EnergyAgency.
Financing Innovations in RES and EE in Germany ener2i Training Workshop, Minsk, Belarus, 15.10.2014 Julian Schoenbeck, EnergyAgency.NRW Content 1. Background: NRW, EnergyAgency.NRW and German Energy Transition
More informationCommittee of the Whole
Committee of the Whole Committee of the Whole to be held at City of Penticton, Council Chambers 171 Main Street, Penticton, B.C. Tuesday, March 20, 2018 Recessed from the Regular Council Meeting at 1:00
More informationSTATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION
STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION In the Matter of ) Application of Duke Energy Progress, LLC for a ) ADDITIONAL
More informationEfficient Buildings Fund Presentation for the Rhode Island Public Utilities Commission. Jeffrey R. Diehl Executive Director and CEO December 8, 2016
Efficient Buildings Fund Presentation for the Rhode Island Public Utilities Commission Jeffrey R. Diehl Executive Director and CEO Table of Contents Rhode Island Infrastructure Bank Overview Efficient
More informationTourism Incentive Programme
Tourism Incentive Programme Portfolio Committee on Tourism 13 March 2015 Department of Tourism www.tourism.gov.za A force for change Tourism brings socio-economic development and growth Tourism has transformative
More informationReport of the ESTATES COMMITTEE. 19 January 2010
F 2009 31 Finance and General Purposes Committee 4 March 2010 For decision Report of the ESTATES COMMITTEE 19 January 2010 F&GPC is invited to endorse the attached Carbon Management Plan for approval by
More informationProject Information Document/ Identification/Concept Stage (PID)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:
More informationRoss Borden, Director of Intergovernmental Affairs. American Recovery & Reinvestment Act (Stimulus) Update
To: From: Mayor and Council Ross Borden, Director of Intergovernmental Affairs Date: November 15, 2011 Re: American Recovery & Reinvestment Act (Stimulus) Update The $787 billion American Recovery and
More informationScatec Solar: Kalkbuilt Project Nersa IPP Public Hearing Kimberly 5 March 2012
July 2011 page 1 Scatec Solar: Kalkbuilt Project Nersa IPP Public Hearing Kimberly 5 March 2012 July 2011 page 2 Scatec Solar a brief overview Established: 2007, HQ in Oslo Employees: 80 Main shareholders:
More informationA. Assistance to Address Climate Change and to Protect Environment. C. Support for Regional Disaster Risk Reduction and Disaster Management
Japan s Support to SAARC 1. Support for Sustainable Development in South Asia A. Assistance to Address Climate Change and to Protect Environment B. Support for Infrastructure Development C. Support for
More informationNEBOSH. International General Certificate. Course Brochure
NEBOSH International General Certificate Course Brochure 1 NEBOSH (IGC) Course Overview The NEBOSH International General Certificate (IGC) is a global Safety Qualification that covers the principles relating
More informationTILLYARD NIGERIA LIMITED
RC. 393297 TILLYARD NIGERIA LIMITED Chartered Quantity Surveyors Project Managers Construction Consultants COMPANY PROFILE First Floor 241, Igbosere Road Lafiaji Lagos Post Office Box 2167 Lagos tel.:
More informationCentre de Formation Agricole Frère Remy A Model for Sustainable Production & Consumption Practices & Eco-Entrepreneurship Development
Centre de Formation Agricole Frère Remy A Model for Sustainable Production & Consumption Practices & Eco-Entrepreneurship Development Overview Introduction & Background of the SAG Project Challenges of
More informationPRESIDENT GOODLUCK JONATHAN S ADMINISTRATION OUR. Nigerians Some Reasons for Continuity with PDP and more. To be continuing
MAJOR ECONOMIC ACHIEVEMENTS OF THE PRESIDENT GOODLUCK JONATHAN S ADMINISTRATION OUR PARTY LEADER- Nigerians Some Reasons for Continuity with PDP and more. To be continuing By Hon. Dr. Harold Molokwu Chairman
More informationTERMS OF REFERENCE. Regional Off-Grid Electrification Project
Regional Off-Grid Electrification Project Development of implementation frameworks for private investment in the off-grid electrification of public institutions and to promote productive uses of electricity
More informationCURRICULUM VITAE. The Canadian Institute of Quantity Surveyors - (CIQS)- Construction Estimator Certified CEC (Reg. no )
AKINWUNMI IDOWU (MR.) PGDM, DIP. QS. CEC, RQS, MNIQS 42, Oduduwa Crescent, GRA, Ikeja Lagos State, Nigeria. Tel: (+234) 817 1900 005, (+234) 803 302 0517 e-mail: akinwunmi.idowu@gmail. com. CAREER OBJECTIVE
More informationENERGY PERFORMANCE CONTRACTING
ENERGY PERFORMANCE CONTRACTING Mississippi Development Authority Energy Division Stimulus Opportunities for Minority Contractors WHAT IS IT? Energy Performance Contracting A method of making the energy
More informationRising Uttar Pradesh
Rising Uttar Pradesh Uttar Pradesh A snapshot of India s growth engine Growth of UP s Per Capita GSDP (2004-15) (in US$) 4 th largest state occupying 7.3% of India s land area 326 365 402 504 501 564 660
More informationDOCUMENT 3. Invitations to host future World Scout Events
DOCUMENT 3 Invitations to host future World Scout Events Invitations to host future World Scout Events Table of Contents INVITATIONS TO HOST FUTURE WORLD SCOUT EVENTS... 3 42 nd WORLD SCOUT CONFERENCE
More information2017 High Level Political Forum on Sustainable Development: New Zealand National Statement
2017 High Level Political Forum on Sustainable Development: New Zealand National Statement Statement delivered by Mr. Hamish Cooper, Principal Adviser Multilateral and Legal Affairs on 20 July 2017. Thank
More informationTHE COMBAT CENTER. Refining excellence since 1952
THE COMBAT CENTER Refining excellence since 1952 When you passed through the gates of the Marine Air Ground Task Force Training Command, Marine Corps Air Ground Combat Center (Combat Center), you entered
More informationExecutive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October
3 July 2018 中華電力有限公司 CLP Power Hong Kong Limited Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October CLP Power Hong
More informationSustainable Finance: Opportunities & Challenges
Sustainable Finance: Opportunities & Challenges Inaugural West African Roundtable By United Nations Environmental Programme - UNEP (21-22 May 2008 (9.50AM -11.35 AM) Venue: Citi - Nigeria International
More informationInterconnection: Meeting the Solar Rush. Leslie Moynihan, Snohomish PUD Jake Wade, Puget Sound Energy Katie Zook, Seattle City Light
Interconnection: Meeting the Solar Rush Leslie Moynihan, Snohomish PUD Jake Wade, Puget Sound Energy Katie Zook, Seattle City Light March 26, 2015 WEBINAR HOUSEKEEPING Technical Difficulties: Call (206)
More informationNevada Energy Perspectives
Nevada Energy Perspectives Governor s Office of Energy www.energy.nv.gov Paul A. Thomsen Director @PaulThomsen1 @NevGoe 1 Department Overview The mission of the Governor's Office of Energy is to ensure
More information