INSTITUTE FOR DEFENSE ANALYSES

Similar documents
INSTITUTE FOR DEFENSE ANALYSES

SUBPART ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (Revised December 29, 2010)

The Other Transaction Authority Basic Legal Principles*

DARPA. Doing Business with

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

The Shifting Sands of Government IP. John McCarthy Karen Hermann Jon Baker

For More Information

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

USAF Tankers: Critical Assumptions for Comparing Competitive Dual Procurement with Sole Source Award

The Five Myths of a Non-Developmental Item (NDI) Acquisition Program and. Implications for the T-X Program

DOD INSTRUCTION DIRECTOR OF SMALL BUSINESS PROGRAMS (SBP)

GAO INTERAGENCY CONTRACTING. Franchise Funds Provide Convenience, but Value to DOD is Not Demonstrated. Report to Congressional Committees

Doing Business with DARPA

Part 1: Employment Restrictions After Leaving DoD: Personal Lifetime Ban

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

a GAO GAO WEAPONS ACQUISITION DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems

Enabling Greater Productivity

Headquarters U.S. Air Force. Ensuring An Adequate Infrastructure To Execute Assigned Maintenance Workload

GAO DEFENSE CONTRACTING. Improved Policies and Tools Could Help Increase Competition on DOD s National Security Exception Procurements

Strategic Cost Reduction

Department of Defense INSTRUCTION

World-Wide Satellite Systems Program

Doing Business with DARPA

Vital Trends in DOD Contracting and Implications for 1102s

Defense Logistics Agency Instruction. Organic Manufacturing

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress

Open DFARS Cases as of 5/10/2018 2:29:59PM

H-60 Seahawk Performance-Based Logistics Program (D )

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

Department of Defense DIRECTIVE. SUBJECT: Department of Defense Small Business and Small Disadvantaged Business Utilization Programs

GAO TACTICAL AIRCRAFT. Comparison of F-22A and Legacy Fighter Modernization Programs

Report No. D August 12, Army Contracting Command-Redstone Arsenal's Management of Undefinitized Contractual Actions Could be Improved

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

SOURCE SELECTION AND BID PROTESTS: PRE- AND POST-AWARD CONSIDERATIONS. Daniel Forman Amy O Sullivan Olivia Lynch Robert Sneckenberg

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

REQUIREMENTS TO CAPABILITIES

It s All about the Money!

ACTION: Notice of Proposed Amendments to SBIR and STTR Policy Directives.

SBIR/Prime Opportunities: A Rapidly Changing Landscape How Do We Move Forward?

Acquisitions and Contracting Basics in the National Industrial Security Program (NISP)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

Other Transactions Authorities

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

GUIDELINES FOR PREPARATION AND SUBMISSION OF NAVY STTR PHASE II PROPOSALS

DFARS Procedures, Guidance, and Information

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center

DoDI Defense Acquisition of Services What's new? GAO and DoDIG Reports Say. Mr. Lawrence Floyd Dr. Adam Stroup. Services Acquisition

GAO CONTINGENCY CONTRACTING. DOD, State, and USAID Continue to Face Challenges in Tracking Contractor Personnel and Contracts in Iraq and Afghanistan

Small Business Innovation Research (SBIR) Program

Contract Oversight for the Broad Area Maritime Surveillance Contract Needs Improvement

2016 Major Automated Information System Annual Report

GSA OASIS and the DoD 4 th Estate

GAO IRAQ AND AFGHANISTAN. DOD, State, and USAID Face Continued Challenges in Tracking Contracts, Assistance Instruments, and Associated Personnel

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

Legislative Updates / Topics for Small Business

HQMC 7 Jul 00 E R R A T U M. MCO dtd 9 Jun 00 MARINE CORPS POLICY ON DEPOT MAINTENANCE CORE CAPABILITIES

Total Ownership Cost. CAPT Tom Ryan OPNAV N414

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

INNOVATION AND TECHNOLOGY IN A BRICS COUNTRY CASE OF SOUTH AFRICAN ENTERPRISES

APPENDIX D CHECKLIST FOR PROPOSALS

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

Analyzing Sustainment and Maintenance Alternatives. Moderator Ms. Lisha Adams Deputy Assistant Secretary of Defense for Material Readiness

New DoD Protections Against Counterfeit Parts: Is Your Company Ready?

Be clearly linked to strategic and contingency planning.

UNCLASSIFIED UNCLASSIFIED

Reducing System Acquisition Risk with Software Architecture Analysis and Evaluation

SMALL BUSINESS INNOVATIONS AND CONTRIBUTIONS

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

Guest Presenter Jay Bottelson

DOD INSTRUCTION DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS

Number: DI-MGMT Approval Date:

Bringing the Issues Posed by the DFARS PGI to Light

TRANSITION FROM DARPA TO AIR FORCE MANAGEMENT

Department of Defense INSTRUCTION

Common Range Integrated Instrumentation System (CRIIS)

SBIR at the Department of Defense:

Shay Assad assumed his position as director of defense

The Air Force Aviation Investment Challenge

Legacy Tanker Division

PLA Determination Guide for DoD

August 23, Congressional Committees

Uniform Guidance Overview. Why did the federal government implement the Uniform Guidance?

DRAFT. January 7, The Honorable Donald H. Rumsfeld Secretary of Defense

Subject: The Department of Homeland Security Needs to Fully Adopt a Knowledge-based Approach to Its Counter-MANPADS Development Program

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Other Transaction Agreement (OTA) Management Office. Mr. Randal Gaereminck, Director 16 October 2017

DOD MANUAL ACCESSIBILITY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO

Collaborative Operations and Services Grant Program GUIDELINES Revised January 15, 2014

a. To promulgate policy on cost analysis throughout the Department of the Navy (DON).

Performance-Based Logistics

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

NATIONAL AIRSPACE SYSTEM (NAS)

TRI-Association Small Business Advisory Panel (TRIAD) Conference

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

Transcription:

INSTITUTE FOR DEFENSE ANALYSES DOD Access to Intellectual Property for Sustainment of Weapon Systems Richard Van Atta, Project Leader Royce Kneece Michael Lippitz Christina Patterson August 11, 2017 -- In support of DOD response to Section 875 of the 2016 NDAA -- Sponsor: Director, Defense Procurement and Acquisition Policy (DPAP), OUSD(AT&L)

Outline Background Approach Findings Conclusions Recommendations

What is Intellectual Property(IP) Intellectual property comprises patents, copyrights, trademarks and trade secrets In DOD sustainment, IP largely means Technical data (trade secrets), and Software (copyrights) 2320 and 2321 of Title 10 United States Code (U.S.C.) codifies DOD and industry rights in intellectual property Access to IP requires two separate provisions Rights to the data Delivery of data

Tasking / Focus: IDA study driven by Congressional requirement Section 875 of FY2016 NDAA calls for an independent review of: a. DOD regulations, practices, and sustainment requirements related to government access to and use of intellectual property rights of private sector firms; and b. DOD practices related to the procurement, management, and use of intellectual property rights to facilitate competition in sustainment of weapon systems throughout their life-cycle. The study shall consult with each Center of Industrial and Technical Excellence (CITEs) (CITEs include all major DOD maintenance depots) 4

Approach Review DOD policies, regulations and implementation documents Review literature on intellectual property and sustainment Obtain inputs from CITEs (questionnaire sent to all + selected interviews) Conduct interviews with DOD and industry (see table below) Distill key issues and examples of practices and their effects Document findings and conclusions Contractors Commercial CITES / PMOs Other Military Offices Boeing GS&S Rockwell-Collins LMCO IP attorney First Aviation Corporation HEICO Corporation Aeronautical Repair Station Assn. Mod. & Replacement Parts Assn. NAVAIR JAX PAX Army PMs AF PEO OSD General Counsel Army (Acq., Log. and Tech.) Navy (Exp. Prog. & Log. Mgmt.) Air Force (General Counsel; Sustainment Command) 5

In a Nutshell DOD programs report they are forced into costly sole-source contracts due to lack of sustainment IP/TD Tech data either not required in the original development and production contracts or not delivered due to differences between DoD and OEM Maintenance organizations become the victims the cake is already baked Original Equipment Manufacturers (OEMs) claim that their sustainment contracts are largely derived from IP/TD created with internal funds and are basis for lower initial purchase prices offered to DOD Sustainment has become major business focus for OEMs In defense aviation, estimated DOD savings of $10s of billions annually if DOD followed commercial practices on systems derived from commercial aircraft FAA regulations mandate 3 rd party access to maintenance IP/TD on aircraft they certify; unclear whether/when these rules apply to DoD systems 6

Leadership Focus Conclusions and Recommendations (1 of 2) Management has not given IP for sustainment adequate attention DoD acquisition decision makers in past failed to focus sufficient attention on identifying and acquiring the IP rights and data needed for weapon systems sustainment Recommendation: Make sustainment and acquisition of related IP data and rights an explicitly stated high-priority in DOD management and oversight of acquisition programs Impact of Insufficient Access to IP Inhibits ability of DoD to use competitive contracting for repair parts, maintenance, and follow-on production, and likely translates into higher longer-term sustainment costs Core sustainment needs may not be met because of a lack of necessary IP data Recommendation: Establish or expand existing organizational capabilities within OSD and the DOD components to provide expertise in the acquisition of IP to acquisition managers throughout lifecycles Opportunity Use of FAA maintenance data for DoD commercial derivative aircraft could be expanded and result in substantially lower sustainment costs Recommendation: State as policy that DOD acquisition programs should maximize use of data provided for FAA-certified aircraft under FAA regulations to facilitate competition for maintenance and supply of parts for systems and components

Conclusions and Recommendations (2 of 2) Policy and Terminology DoD policy is robust in coverage of the importance of IP data and rights However, ambiguous terms and loosely defined constructs impair implementation of IP for sustainment Recommendation: Establish DOD advisory group to work with industry to clarify ambiguities Market Reality Major Weapon Systems Acquisition has severely limited competition Buy-in bids for development and production contracts are a basis for prime contractors locking in sole-source sustainment franchises Recommendations: (1) Require DOD acquisition programs with sole-source contracts for sustainment to conduct a Business Case Analysis to transition to a competitive model for sustainment. The results should be forwarded to the component acquisition executive with a recommended plan to obtain the necessary IP data and rights (2) Conduct assessment of alternative approaches for contracting and overseeing the development, procurement, and sustainment of weapon systems under severely limited competition

Outline Background Findings Conclusions Recommendations

IP issues reflect differing priorities and incentives MRO: Maintenance and Repair Organizations

IP laws and DOD policies IP rules fundamentally shape how DOD interacts with its contractors and commercial companies Laws and DOD regulations and guidance aim to foster competition in sustainment (includes IP access) and also encouraging innovation (by respecting firms IP rights) Depots have legally mandated roles in sustainment of core weapon systems but the required data and rights must be in contracts Competition in sustainment is clearly stated in DoD policies and guidance, but implementation uneven OEM claims of developed at own expense vs. government funds impact directly on IP rights While DOD is entitled to unrestricted rights to technical data needed for operations, maintenance, installation, and training (OMIT) specific data required is not defined in the regulations and open to interpretation What is OMIT ( maintenance vs. detailed manufacturing )? Even though DOD may have rights to data, delivery must be specified in contract deliverables 11

Program management realities Obtaining IP data and rights is an acquisition mandate PMOs required to assess the long-term technical data needs and establish corresponding acquisition strategies that provide for technical data rights needed to sustain such systems and subsystems over their life cycle. Before issuance of a contract solicitation. Funding and time pressures on Program Office often lead to kicking the can down the road Focus on concluding a competitive systems integration contract at an acceptable cost Upfront required sustainment plans often incomplete Service acquisition orgs provide little expert support to PMOs; acquisition workforce has been reduced in recent years Detailed IP consideration often deferred until Milestone C, at which point PMOs at a negotiating disadvantage relative to selected OEM For PMs, TD needed for sustainment is in distant future, not on their watch, and would require allocating scarce funds needed for development and procurement 12

Lack of IP data and rights is an obstacle to organic depot maintenance For systems designated as core, Title X requires DoD to establish depot sustainment within 4 years of IOC OEM support generally necessary for initial procurement period, due to learning curve on specialized equipment, processes and expertise If PMOs didn t negotiate tech data deliverables and rights, then there is little recourse to relying on contractor logistics support Purchasing the required data delivery and rights after EMD contract award can be prohibitively expensive [almost never an option] Programs often forced to go to OEMs for maintenance and parts, which affects availability and cost Difficulty obtaining parts for weapons systems that are no longer produced and that the OEM no longer supports Public-Private Partnerships often means OEMs subcontracting back to depots, in effect keeping the OEM as the sole-source sustainer 13

Some Notable Examples DOD dependence on OEM DOD independence P-8: DOD plans to eventually switch to depot maintenance, but much of the needed technical data are marked proprietary. Sustainment in limbo. Reaper: Contractor-developed system for which DOD has limited IP rights but is still required to set up depot maintenance. Other examples of DOD lacking technical data needed for depot sustainment MRAP, MTVR, and LVSR PaveWay II & III, Laser Guided Bomb, JDAM, Advanced Kill Weapon System C-130J: Navy possesses TD to perform glass cockpit modernization at substantially less cost than OEM F-18: OEM claimed a $1,500 part needed to be swapped every 200 hours, but Navy had sufficient data to determine when replacement actually necessary, resulting in substantial savings 14

Difficult for DOD organizations to challenge IP rights Laws and regulations define government rights to IP Either Unlimited, Government Purpose, Limited, Restricted or Specifically Negotiated License based on who funded Problems of whose IP it is Data rights based on who funded the development which is difficult unravel OEMs stamp Proprietary on TD, which is not a conforming marking, but OEMs use to bolster claims of ownership which DOD then has to challenge Challenging OEM claims is onerous Cases must escalate from PMO to PEO to Service Acq. Exec to General Counsel seldom happens DOJ must initiate any lawsuits over IP rights Legal challenges can take years, during which time the contractor markings must be honored Certain court decisions have been detrimental to DOD s access to IP 15

Limited competition for acquisition of Defense weapons constrains IP access Only very small number of firms (2-3) compete in any weapons segment (also for major subsystems) Uncertainties on front-end (Milestones A & B) make it difficult to specify IP needs early Once in full-scale development (FSD) there s only one supplier solesource monopoly. Once a monopoly position exists for a system, solesource provider has strong leverage in negotiations on IP While DOD funds much of the underlying R&D, firms fund considerable development and some have funded most development of some systems, e.g., REAPER making ownership of IP contentious DOD has pushed development costs increasingly onto the competing vendors firms see this as needing to be recouped Reduced DOD acquisition of major systems has focused OEMs on locking in sustainment business

OEM perspectives See DoD infringing franchise that OEM won competitively Sustainment income was a factor in the production bid; price for initial procurement [ostensibly] would be much higher otherwise OEMs claim ownership of IP based on internal investment difficult to assess Concerns about DOD using IP access as evaluation factor in RFPs (cannot be a condition of contract award but can be an evaluation factor) See DoD accessing their IP as damaging their competitive advantages OEMs invest in technologies they expect to use across multiple programs OEMs claim such IP often involve detailed manufacturing or process data to which DOD is not entitled (per 2420 USC 10) Industry organizations (AIA) have taken strong positions on rolling back DoD efforts to access their IP 17

Commercial MRO Contentions See prospects of substantial business in servicing commercially-derived defense aircraft but feel DOD treating them unfairly [limiting their ability to compete] Contend that DOD can adopt FAA rules for many of its commercially-derived aircraft systems Significant savings possible on parts, labor, facilities, commercial practices--$10s of billions annually across DOD Recent RAND engine study documents savings Earlier PBL studies show similar possible savings Tinker AFB examples In 2007, AF approved use aftermarket parts, based on several years of effort by commercial MROs and airlines. In 2011, reversed this policy for unknown reasons, closing out commercial MROs. AF intends to build hangars for KC-46 Tanker, based on Boeing 767 that commercial MROs have been maintaining in high volume for 30 years. 18

DOD vs. Commercial Aviation Many aircraft systems are military-unique strong OEM leverage Classified designs and specialized equipment, processes, expertise Highly integrated risk in trying new approach/vendor for a subsystem Much lower production volumes than commercial aircraft insufficient business to sustain multiple MRO providers Various factors inhibit near-term DOD investment for long-term savings, enterprise value maximization and risk-management Separated acquisition, sustainment, and operational authorities Budget uncertainty risks of making longer-term commitments Personnel turnover and contracting rules hinder DOD from the commercial practice of building long-term, trusted relationships with preferred suppliers (Contractors develop institutional knowledge that DOD employees lack) Laws/regulations are used (interpreted) to constrain use of 3rd party MROs by restricting the availability of tech data and rights 19

Key focus area: Commercially-Derived defense aircraft For commercially-derived aircraft, adoption of FAA-style rules could save money and improve readiness; however, DOD must still perform MRO at military depots for certain of these aircraft because: For core systems depots required to maintain MRO sustainment capable of surging to meeting wartime demands "50-50 rule": No more than 50% of a Service s annual maintenance budget may be spent on contractors Some DOD programs contend that the flight profiles of their commercially-derived aircraft do not permit accepting FAA standards 20

What are the prospects of DOD generating greater competition for its commercially-derived aircraft? DOD has had some but limited success in utilizing FAA-required air worthiness data for competitive maintenance services and parts procurement Extra burden on risk-adverse PMOs Could face long legal battles with OEM (though winning an early test case could shift OEMs perception of risk/reward) Which and how much organic depot MRO capabilities is it prudent for DOD to maintain? This is extremely political unlikely anyone would take it on. How much could DOD actually save? claims are in $10s billion RAND study found a cost savings of over $1 million per overhaul, or over $200 million from FY 2010 to 2013 for the F103 engine used on the KC-10 Recent successes show potential: KC-46 and Army utility helicopters Needs more study to assess full potential and roadblocks 21

Outline Background Findings Conclusions Recommendations

Summary findings: Why DOD s policies on IP for sustainment are often not reflected in practice? IP rights are fundamental to industry, with inherent tensions (and often ambiguity) between creators and users IP strategy is complex and requires judgments about uncertain future needs for sustainment and associated costs Here and now acquisition pressures tend to take precedence OEMs focus on profits (near and long-term) whereas DOD acquisition management incentives are less focused, considering diverse stakeholders DOD faces fundamental limitations in adopting commercial best practices Need to maintain sustainment capabilities for wartime (depots) Much smaller, more disparate market for sustainment services than commercial airlines [but still $ billions.] Budget uncertainty and personnel turnover inhibit consideration of longer-term tradeoffs Higher-level DOD acquisition management has in the past given little priority on either IP or sustainment, leaving PMOs essentially on their own

Policy and Terminology Conclusions DoD policy is robust in coverage of the importance of IP data and rights to the sustainment of weapon systems However, ambiguous terms and loosely defined constructs impair implementation of IP for sustainment Market Reality Major Weapon Systems Acquisition has severely limited competition Buy-in bids for development and production contracts are a basis for prime contractors locking in sole-source sustainment franchises Leadership Focus DoD acquisition decision makers have in the past failed to focus sufficient attention on identifying and acquiring the IP rights and data needed for weapon systems sustainment; recent evidence of improvement exists, but it is too early to assess whether those efforts are sufficient Management has not given IP for sustainment adequate attention Impact of Insufficient Access to IP Inhibits ability of DoD to use competitive contracting for repair parts, maintenance, and follow-on production, and likely translates into higher longer-term sustainment costs Core sustainment needs may not be met because of a lack of necessary IP data Opportunity Use of FAA maintenance data for DoD commercial derivative aircraft could be expanded and result in substantially lower sustainment costs

Outline Background Findings Conclusions Recommendations

Recommendations Place a higher priority on sustainment and the acquisition of IP and technical data rights and deliverables in the management and oversight of programs Establish or expand Component organizational capabilities (with OSD help) to provide expertise on IP and technical data rights and deliverable requirements to programs Require that programs dependent on sole-source sustainment contracts to conduct a Business Case Analysis of options for transitioning to a competitive model for sustainment; the results should inform the IP and technical data rights and deliverables obtained Establish policy for programs that use commercially derivative aircraft to maximize the use of data provided for Federal Aviation Administration-certified aircraft, in order to facilitate competition for maintenance and supply of parts Establish an advisory group to identify and, in consultation with industry, resolve ambiguities and disagreements in terms and provisions related to DoD sustainment needs, particularly related to access to and use of IP Fund an assessment of acquisition and sustainment focused on alternative approaches for contracting and overseeing the development and sustainment of weapon systems under severely limited competition