Cooperative Development of Operational Safety & Continuing Airworthiness Programme. Phase IV Programme Progress Report Discussion Paper 2 (DP-2)

Similar documents
Universal Safety Oversight Audit Programme Continuous Monitoring Manual

COSCAP-SA - EASA - SARI Joint Activity Plan 2017 Initial issue for review

USOAP Continuous Monitoring Approach (CMA) Workshop

SUMMARY Transition to USOAP Continuous Monitoring Approach (CMA) ICAO Secure websites:

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training Course on Part VI _ DOC 8335

TCB and other Assistance Projects A TCB project, in the area of AGA and ANS was implemented between November 2011 and April 2012.

ON THE JOB TRAINING (OJT) RECORD

European Aviation Safety Agency. Annex C. SSP Phase Implementation Survey Results Final

Inspector Training System

Session 6. Accident Prevention Measures

State Safety Programme (SSP) Implementation

CURRENT SITUATION AND EMERGING TRENDS OF ICT DEVELOPMENT TOWARD NORTHEAST ASIAN ECONOMIC INTEGRATION

Department of Defense DIRECTIVE. SUBJECT: Assistant Secretary of Defense for Asian and Pacific Security Affairs (ASD(APSA))

TANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword

ACHIEVING SDG AND INCLUSIVE DEVELOPMENT IN ASIA AND THE PACIFIC

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar. USAP-CMA Activity Process Conduct

Call for mobility grants with South Asia and Iran, Q1 2018

Reference. No. 02/16 Issue: 1 Page: 1 of 13 Issue Date: 16/05/16 Focal: Aircrew

Tel.: +1 (514) ext Ref.: AN 12/51-07/74 7 December 2007

Quarterly Monitor of the Canadian ICT Sector Third Quarter Covering the period July 1 September 30

Training Manual For DGCA Officers (Aircraft Engineering Directorate)

Safety Occurrence Reporting and Analysis

ASIA PACIFIC INFORMATION SUPERHIGHWAY (AP-IS)

OVERVIEW: ICT CONNECTIVITY AND ASIA PACIFIC INFORMATION SUPERHIGHWAY (AP-IS)

SI STAFF INSTRUCTION ORGANIZATION, USE AND REVISION

Health Promotion Amendment (Amendment 173 to Annex 1)

Proposed Programme of 2018 AFI SECFAL Plan Activities

SAFE- PSX IPO SUMMIT EDITION THE PREMIER IPO MEETING PLACE

THE TOURISM INDUSTRY S SUSTAINABILITY PRACTITIONERS INSPIRING RESPONSIBILITY AND EXCELLENCY

ASIA-PACIFIC INFORMATION SUPERHIGHWAY (AP-IS) FOR SDG HELPDESK

ERASMUS+ current calls. By Dr. Saleh Shalaby

Mr. Sena Peiris, Chairman, APRSCP Queen s Park Hotel 7 November 2013, 1 st 10 YFP Asia Pacific Regional Meeting, Bangkok Thailand

OPEN GOVERNMENT DATA TO MONITOR SDGS PROGRESS

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Erasmus + program the way towards the global mindset (from the partner countries perspectives)

How to bridge the standardization gap

What makes a good safety recommendation in the aviation industry?

SURVEILLANCE PROCEDURES MANUAL

Objective To introduce ICAO workshop facilitators and participants. To introduce the workshop goals, concept, contents and structure. 3 ICAO workshop

therefore very encouraging to see expressions of interest and offers of support for the AFI Plan coming constantly from States and partners.

ICTD Capacity Development for SIDS

Erasmus Mundus Partnerships Joint and double degrees

HUMAN DEVELOPMENT FELLOWSHIPS

International Workshop on Disaster Risk Management

UNOOSA in the Asia-Pacific Region

Engaging with the Internet Society An update on activities in the Asia-Pacific

Information Note. Date: I-Note Number: Contact: Title. Executive Summary. Audience. Action. The international dimension of Erasmus+ 16/09/2014 IUIN22

TERMS OF REFERENCE FOR PROFESSIONAL STAFF. Terms of Reference for the following 5 positions of Professional Staff are appended below:

Established 2009 June 3G 20, BMICH, Colombo, Sri Lanka

Seeker to Creator. CAYE Young Entrepreneurs Challenge Bangladesh Brunei India Malaysia Maldives Pakistan Singapore Sri Lanka Nepal

ASIA PACIFIC INFORMATION SUPERHIGHWAY (AP-IS) Atsuko Okuda Chief, ICT and Development Section ICT and Disaster Risk Reduction Division ESCAP

WOMEN S ECONOMIC EMPOWERMENT THROUGH ASIA-PACIFIC INFORMATION SUPERHIGHWAY

NATIONAL LANGUAGE PROFICIENCY IMPLEMENTATION PLAN OF THE REPUBLIC OF BULGARIA

Engaging with the Internet Society An update on activities in the Asia-Pacific

ASEAN-SAARC-WHO Collaboration for implementation of the HPED Project

Regional knowledge and cooperation initiatives for improved disaster risk reduction in Asia and the Pacific

Advertisement for Enlistment of Law Firms

CALL FOR PROPOSAL CORRIGENDUM NO. 2 (SECTIONS 2.2, 2.3 AND 9.1)

Phuntsho Wangdi Affiliate Leader. Affiliate Forum 22 October 2013 GM New Delhi INTERNATIONAL ELECTROTECHNICAL COMMISSION

Guidelines for Completing the Grant Application Form

SESAR 2020 priorities for improved civil-military ATM interoperability

EU-NICE, Eurasian University Network for International Cooperation in Earthquakes

Asia-Pacific Telecommunity and its activities in 2018

GOVERNMENT OF INDIA DIRECTORATE GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI CAR 147

Global Fund to Fight AIDS, Tuberculosis and Malaria

EGNOS Exploitation Grant Plan 2017

Organized by: COMSATS Institute of Information Technology, Islamabad Campus

Asia-Pacific Telecommunity

South-East Asia Region Country Experiences in Global Fund Implementation and Impact of WHO Support: A Review and Assessment

Information and Communications Technologies (ICT) Quarterly Monitor of the Canadian ICT Sector Second Quarter 2011

ASIAN DEVELOPMENT BANK

THE CIVIL AVIATION AUTHORITY OF THAILAND APPLICATION FORM FOR FOREIGN REPAIR STATION CERTIFICATE

Global Strategy IMPROVING AG-STATISTICS IN ASIA PACIFIC

Information and Communications Technologies (ICT) Quarterly Monitor of the Canadian ICT Sector Third Quarter 2011

SAARC, Food Security and TADs

HEALTH MANPOWER DEVELOPMENT

SAARC ENERGY CENTRE ISLAMABAD

Maintenance Review Board PR.MRB

Progress and plans on PPM in TB Control in South-East Asia Region. Dr Md Khurshid Alam Hyder Regional Adviser-TB WHO/SEARO

Notice of Proposed Rule Making NPRM 15-03

The 8th Euromed GNSS WG Meeting Brussels, 25 Novemeber Eng. Abdelmutalab Abdelali

WHO Health System Building Blocks: considerations for NCD prevention and control. Dr Sudhansh Malhotra Regional Advisor, Chronic Disease Management

9 th South Asian International Conference (SAICON 2017) Theme: Today s vision, tomorrow s reality 23 rd -25 th August 2017 PC Bhurban Hotel, Murree

Information and Communications Technologies (ICT) Quarterly Monitor of the Canadian ICT Sector Third Quarter 2012

UNIDO s Trade Capacity Building Programme

08 20 JUL Temasek Foundation. Water Leadership Programme

Workshop with SE Asian research agencies Goals and objectives

South West Portugal/Spain FAB Initiative Annual SW FAB Report Annual SW FAB Report Page 1 of 16

Regional Meeting of National TB Control Programme Managers and Partners Bangkok, Thailand, September

JICA signs a Memorandum of Cooperation with IDB Invest

The UK CAA believes this is justifiable for CPL/MPL/ATPL and IR but not for LAPL, PPL, BPL and SPL.

WG-108 ATN/IPS Strategy Terms of reference

FRENCH REPUBLIC MINISTRY OF DEFENCE

Information and Communications Technologies (ICT) Quarterly Monitor of the Canadian ICT Sector First Quarter 2011

Role: Senior Programme Manager Reports to: Director of Learning and Programmes. Salary: 28,000-35,000 Location: London SUMMARY

Report of the meeting

Airport Excellence (APEX) Safety Assessor Training Programme Reference Document

MANUAL OF ATS PERSONNEL RATINGS AND CERTIFICATION PART 7 SAFETY OVERSIGHT. First Edition- July, 2017 (ED/CAP/2017/V1.0-MARC-PRT7)

Practical Information

See above. No. No. Yes.

Transcription:

COSCAP South Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 27 th COSCAP-SA STEERING COMMITTEE MEETING Phase IV Programme Progress Report Discussion Paper 2 (DP-2) (Presented by the CTA) SUMMARY The purpose of this paper is to outline the progress made to achieve programme objectives as stated in the COSCAP-SA Programme Document Phase IV and other additional objectives approved at the Steering Committee Meetings. 1. Background: The Directors General of Civil Aviation of seven South Asian States, in association with ICAO, formed a Steering Committee to consider the possibility of participating in an ICAO Technical Cooperation Bureau proposed Programme for the cooperative development of operational safety and continuing airworthiness of aircraft in the Region. At its first meeting on 7-9 January 1997, the Steering Committee considered and approved the initial Project Document for the Cooperative Development of Operational Safety and Continuing Airworthiness Project South Asia (COSCAP-SA). The first Phase of the Project began implementation in 1997, with an initial duration of 5 years. The Project was revised in 2001 and its duration was extended to the end of 2007 (Phase II). At the 16 th Meeting of the Programme Steering Committee, it was decided to extend into Phase III, covering the period from 2008 to 2012. During this phase, COSCAP- SA transferred into an institution to which Member States are committed through a Memorandum of Understanding (MOU). On 28 March 2012, the Steering Committee decided to extend the Programme by another five years, from 2013 to 2018 (Phase IV). During each Phase, the Programme Steering Committee has reviewed and revised the Programme Objectives. Each year a Work Plan is developed to help the region achieve its goals. 2. Discussion of Immediate Objectives and Outputs: The COSCAP-SA Steering Committee formally assigned priorities against the objectives and activities contained in Phase IV subsequent to the 23 rd Steering Committee Meeting and determined that these be reviewed at each SC Meeting. The following criteria were utilized for assigning priorities: High- Work to achieve the objectives will be continuous. Medium- Work to achieve the objectives will be carried out as time permits. Low- little or no work will be carried out to achieve the objectives. 27th COSCAP-SA SCM 1

3. IMMEDIATE OBJECTIVES Phase IV 3.1 Immediate Objective 1 High Priority The establishment of a dedicated forum/organization to facilitate dialogues and exchange of information and experience on aviation safety matters among COSCAP-SA Member States and promote solutions to common problems as well as provide a vehicle for the harmonization of policies, regulations and procedures related to aviation safety oversight. Update: COSCAP-SA conducted regular meetings that provide the Member States with platforms that facilitate dialogues and exchange of information. State Visits, the Steering Committee, SARAST, APRAST, National Coordinators meetings and DGCA Conferences all focus on aviation matters. The CTA conducted the following activities to meet these objectives in 2018: VISITS/MISSIONS Conducted by the CTA (18) 1. SARI OPS - Bhutan January 2018 2. Audit Technique Course - Bangladesh January 2018 3. Audit Technique Course Sri Lanka February 2018 4. PQ OPS - Sri Lanka February 2018 5. Audit Technique Course - Bhutan February 2018 6. SARI OPS - Bangladesh May 2018 7. PQ PEL and QA on PQ OPS - Sri Lanka May 2018 8. Executive SMS Part I - Nepal June 2018 9. PQ LEG, ORG and AIG - Bhutan June 2018 10. QA on PQ ANS - Bhutan July 2018 11. PQ OPS and RCIA (FRMS) - Maldives July 2018 12. QA on PQ ANS, ORG, LEG - Bhutan August 2018 13. PQ OPS - Pakistan September 2018 14. SARI OPS - Bhutan October 2018 15. PQ OPS and RCIA (ATO) - Maldives November 2018 16. PQ OPS CAT mission - Afghanistan November 2018 17. RCIA (AOC) - Nepal November 2018 18. PQ PEL nd QA on PQ OPS - Pakistan December 2018 NOTE: June and July were originally blocked for India for TA in ANS, AGA and PEL however due to the other pressing priorities, India was not able to accommodate the missions accordingly. More time will be allocated to India in the 2019-2020 AWP (DP4). COSCAP SA PROGRAMME MEETINGS (12) 1. COSCAP SA 26 th SCM Nepal - January 9-11, 2018 2. SACBM IT Meeting Bangladesh - January 29, 2018 3. SARI SM and EASA MBM Bangkok - Mar 5-8, 2018 4. SARAST Teleconference Bhutan - April 26, 2018 5. SACBM IT Meeting Bangladesh - May 10-11, 2018 6. 12 th APRAST Meeting Bangkok May 28 June 1, 2018 7. RASG Meeting Bangkok September 6-7, 2018 27th COSCAP-SA SCM 2

8. 11 th NC Meeting Bangkok October 9-10, 2018 9. 20 th SARAST Bangkok October 11-12, 2018 10. 55 th DGCA Conference Fiji October 22 26, 2018 11. COSCAP SA SCM Side Meeting October 23, 2018 12. 13 th APRAST Meeting Bangkok December 3-7, 2018 3.2 Immediate Objective 2 - High Priority Ensuring a coordinated, cost-effective approach for obtaining technical assistance in the field of aviation safety oversight, by minimizing duplication of efforts and allowing the sharing of available resources to the maximum extent. Promoting a comprehensive system approach/continuous monitoring approach for the conduct of safety oversight activities, focusing on effective implementation of Standards and Recommended Practices (SARPs), the efficient oversight capability of Member States and on assisting Member States in the effective implementation of the critical elements of safety oversight as identified by ICAO. Update: Activities (19) conducted to meet this objective included the following: Technical assistance/visit was provided to the following member States: 1. SARI OPS #1 Bhutan January 2018 2. PQ OPS Sri Lanka February 2018 3. SARI OPS #2 Bhutan March 2018 4. ANS TA Sri Lanka March 2018 5. ANS TA Bhutan April 2018 6. SARI OPS #3 Bhutan May 2018 7. SARI OPS #2 Bangladesh May 2018 8. PQ PEL and OPS Sri Lanka May 2018 9. ANS TA Maldives June 2018 10. AGA TA Bhutan June 2018 11. PQ LEG, ORG and AIG Bhutan 2018 June 2018 12. QA on PQ ANS Bhutan July 2018 13. QA on PQ ANS/ORG/LEG Bhutan August 2018 14. PQ OPS Pakistan September 2018 15. SARI OPS #4 Bhutan October 2018 16. RCIA and PQ OPS Maldives November 2018 17. CAT mission and COSCAP SA TA Afghanistan November 2018 18. RCIA(AOC) Nepal November 2018 19. PQ PEL and OPS Pakistan December 2018 3.3 Immediate Objective 3- High Priority Enhancing the knowledge and skills of the aviation safety professional personnel of COSCAP-SA Members, through a variety of formal training courses and on-the-job training. Update: Activities conducted to meet this objective included the following: Courses/Workshops 2018 (21) 1. SAFA and Ramp course Nepal January 2018 27th COSCAP-SA SCM 3

2. Regulator Audit Technique Sri Lanka January 2018 3. Audit Technique course Bangladesh January 2018 4. Audit Technique Course Sri Lanka February 2018 5. Audit Technique Course Bhutan February 2018 6. Audit Technique Course Nepal March 2018 7. Flight Operations Inspector Initial Pakistan March 2018 8. Initial DG Course Oversight Sri Lanka March 2018 9. SMS and SSP Implementation - Nepal April 2018 10. Flight Operations Inspector Initial Sri Lanka May 2018 11. Executive SMS Part I Nepal June 2018 12. SMS and SSP Implementation Training India June 2018 13. Basic Inspector PEL course Pakistan July 2018 14. OJT Part 21 and CS25 interfaces with Parts M and 145 Sri Lanka July 2018 15. HIRA Course Pakistan August 2018 16. CRM course Pakistan September 2018 17. SMS and SSP Implementation Pakistan September 2018 18. Human factors Bangladesh September 2018 19. Training Standardization Pakistan September 2018 20. Aerodrome Inspector and Certification Course Bhutan October 2018 21. Basic ANS and Oversight Course Bhutan Oct/Nov 2018 A partnership programme was established between the COSCAP SA and EU South Asia Project under the 2018 COSCAP SA-EASA-SARI Joint activity plan (JAP). A total of 17 courses were listed for delivery, of which 10 were originally slated for 2018 and 7 for the first half of 2019. Out of the 17 courses that had been committed only 5 have been delivered. EASA South Asia Aviation Partnership Project provided the following reasons for the disruption: a. The training courses we deliver are contracted out to a consortium of three EU National Aviation Authorities (UK CAA, DGAC France and AESA Spain). The UK CAA is the lead partner in this consortium, with responsibility for managing the Framework Contract. It also undertakes the majority of the scheduling and coordination work. Unless negotiated otherwise, Brexit will result in the UK leaving the EU on 29 March 2019. In this event, the UK CAA will no longer be eligible to participate in EU-funded projects as of this date, and my understanding is that the EASA Framework Contract with the consortium will be deemed void. b. In addition, the same Framework Contract is approaching its financial limits. Whilst we are looking at successor arrangements with a number of EU National Aviation Authorities, the conclusion of said arrangements is delayed due to unresolved questions of compatibility with the European Commission s requirements. c. Taken together, these in effect mean an interruption in our ability to involve EU National Aviation Authorities in the EU-South Asia Aviation Partnership Project. 27th COSCAP-SA SCM 4

d. For these reasons, my proposal would be that for the duration of 2019, the EU-South Asia Aviation Partnership Project contributes to the COSCAP-SA programme primarily by providing OJT and technical assistance though the deployment of experts in South Asia, for anywhere between 2 6 months at a time. A new COSCAP SA EASA SARI Joint Activity Plan is in the process of being developed for 2019. Emphasis will be given on the provision of Technical Assistance and OJT (versus pure theoretical courses) as proposed on point d) above. In addition to the above, the COSCAP SA will contract out directly with other course service providers for the delivery of priority courses listed in the 2019-2020 AWP (DP4). 3.4 Immediate Objective 4 High Priority Using Programme Personnel, personnel seconded from other COSCAP-SA Members or ICAO Staff, undertake missions to COSCAP-SA Member States to maintain liaison and augment the resources of those Member administrations. Update: Activities conducted to meet this objective included the following (DP6): The South Asia Capacity Building Matrix (SACBM) was developed to identify inspectors/officers within South Asia Member States - Civil Aviation Authorities/DGCAs who could provide support in terms of expertise/training and technical assistance to other Member States within the sub region (South Asia). In addition, the SACBM also identifies retired inspectors/officers who could continue to provide support to member States (COSCAP SA would employ them). Note: At a later stage, it is also intended to include South Asian experts within the industry on the SACBM. Currently 5 Member States have actively participated in the SACBM with a few more missions to be scheduled (Bhutan and Nepal). The SACBM has now been fully computerized and is referred to the E-SACBM. The CTA is currently updating the E-SACBM Standard Operating Procedures (SOPs). Once complete, the CTA will provide training to Member States accordingly. This will be scheduled in 2019. The E-SACBM will be expanded to North Asia and South East Asia. Measures are currently being taken to include the two additional sub regions. Once completed the matrices will be referred to as the Electronic COSCAP Capacity Building Matrices (E-CCBM) accordingly. The CTA will also provide training to COSCAP NA and SEA. Note: This will be covered in detail in DP6 3.5 Immediate Objective 5 Medium Priority Assisting within available resources COSCAP-SA Member States in rectifying deficiencies identified by USOAP audits on aspects covered by Annexes 1, 6, 8, 10, 11, 13 and 14. Support Member States in implementation of CMA Processes and States who may be audited under the CMA. 27th COSCAP-SA SCM 5

Update: Activities conducted to meet this objective included the following (DP4): Note: A significant increase in COSCAP SA support to Member States was requested this year due to States preparing themselves for an ICAO USOAP CMA ICVM or Audit (scheduled or to be scheduled). These States included Sri Lanka, Bhutan, the Maldives, Afghanistan, and Pakistan. PQ Related Missions (13) 1. PQ OPS Sri Lanka February 2018 2. PQ ANS Sri Lanka March 2018 3. PQ PEL and OPS Sri Lanka - May 2018 4. PQ AGA Bhutan June 2018 5. PQ LEG, ORG and AIG Bhutan 2018 June 2018 6. PQ ANS Bhutan July 2018 7. PQ ANS Maldives June 2018 8. PQ OPS Maldives July 2018 9. QA on PQ ANS/ORG/LEG Bhutan August 2018 10. PQ OPS Pakistan September 2018 11. PQ OPS Maldives November 2018 12. PQ OPS Afghanistan November 2018 13. PQ PEL and QA PQ OPS Pakistan December 2018 3.6 Immediate Objective 6 High Priority Supporting Member States to establish an effective Safety Management Systems in the area of Aircraft Operations, Aerodromes and Air Traffic Management. Update: Activities conducted to meet this objective included the following (DP4): The following training was provided to Member States in order to assist in establishing an effective SMS among their operators: Executive SMS Part I Nepal June 2018 SMS and SSP Implementation Pakistan September 2018 Note: there was not much demand from the Member States on SMS training this year OJT SMS training will be provided in 2019-2020 AWP with more emphasis on how to conduct SMS evaluations on site 3.7 Immediate Objective 7 High Priority Supporting Member States in establishing an integrated State Safety Programme by identifying the gaps in States SSP and develop an action plan to address the gaps. Update: Activities conducted to meet this objective included the following: The following training was provided to Member States in order to assist in establishing an effective SSP: - SMS and SSP Implementation Pakistan September 2018 27th COSCAP-SA SCM 6

- Note: there was not much demand from the States on SSP training this year. 3.8 Immediate Objective 8 Medium Priority Supporting the Member States in the effective implementation of Performance Based Navigation (PBN) in coordination with ICAO RO and the ICAO Flight Procedures Programme (FPP). Update: Activities conducted to meet this objective included the following: The CTA continues to support Member States in the effective implementation of PBN related activities on a demand basis. The CTA will continue to support the BCAA in the operational evaluation and approval of the RNP AR Approach - PARO 3.9 Other Programme Tasks A significant amount of work and time was dedicated in the development of the COSCAP SA Phase V Programme Document. Multiple consultation sessions had taken place with Member States, the APAC ICAO Regional office and ICAO HQ throughout the year. The timeline allocated was rather tight however a finalized COSCAP SA Phase V Programme document (signed off by the ICAO Secretary General) had been successfully developed and presented on schedule at the 55 th DGCA Conference Side meeting on October 23, 2018. In addition to the above, a significant among of work was also dedicated to the development of the E-SACBM (quality assurance and testing the system), which is now fully functional. The E-SACBM was also adapted to incorporate other sub regions in the near future. 4 Action of the Meeting 4.1 The Steering Committee is invited to: a) Comment on the nature of the work completed; and b) Confirm or revise programme priorities. 27th COSCAP-SA SCM 7