FCS Changing the Face of Live Training

Size: px
Start display at page:

Download "FCS Changing the Face of Live Training"

Transcription

1 FCS Changing the Face of Live Training Deborah A. Ratliff US Army, PEO STRI Orlando, FL Oxana S. Fedak Boeing Philadelphia, PA Abstract. The Future Combat Systems (FCS) program is revolutionizing the way the United States Army conducts live training. The need for an Embedded Tactical Engagement Simulation System (E-TESS) has been expressed over the past decade; however it was not capable of being fully realized on the System of Systems scale until the introduction of FCS. This paper will focus on the innovative approaches to E-TESS requirements development, capability design and collaboration with a multitude of stakeholders: Army programs, the training and operational user communities, and platform developers. The paper will address lessons learned and provide best practices recommendations based on the authors experiences collaborating across multiple program participants. The FCS program is pioneering the effort to evolve the E-TESS vision by designing in the training capabilities on the platforms upfront, vice engineering an appended training system on the back end. The suite of FCS platforms is size, weight, and power constrained, limiting the ability to embed training-unique components. This is driving the E-TESS developers to capitalize on the concept of dual use hardware for both operations and training. By utilizing the FCS Brigade Combat Team (BCT) operational assets, such as the tactical network, radios, sensors and processors, the Soldier can be ready for a live training exercise within minutes of arrival at a homestation, combat training center or a deployed location. The E-TESS capabilities will consist of current and future tactical engagement simulation technologies, which will enable the FCS BCT to train against both current force Multiple Integrated Laser Engagement Simulation (MILES) -equipped vehicles and the future One Tactical Engagement Simulation System (OneTESS) -enabled platforms. FCS will be the first warfighting system to provide the Army an embedded live training capability that supports individual, crew, collective, unit, and leader training anywhere, anytime. 1. OVERVIEW OF FCS EMBEDDED TRAINING The Army is in the midst of an ongoing process of transformation with a broad mandate to change across many domains. Future Combat Systems (Brigade Combat Team) (FCS (BCT)) is a key materiel solution for the future force. FCS (BCT) is the Army s modernization program consisting of a family of manned and unmanned systems, connected by a common network that enables the modular force providing our Soldiers and leaders with leading edge technologies and capabilities allowing them to dominate in complex environments. It will operate as a System of Systems (SoS) that will network existing systems, systems already under development, and systems to be developed to meet the requirements of the Army s Future Force. The FCS network facilitates the Soldier s ability to train anywhere, anytime. Technology has matured to a level that supports these requirements. Unlike historical programs, Embedded Training (ET) will be developed as an integral part of the FCS manned platform and command, control, communications, computers, intelligence, surveillance, and reconnaissance (C4ISR) architectures. ET must be designed-in at the start of the program to ensure it is developed in conjunction with the other FCS System of Systems (SoS) components. To do otherwise would lead to needless duplication of software development, potential negative training as a result of inevitable baseline divergence (as training tries to keep pace with operational software functionality) and additional space, weight and power (SWAP) claims for training. To fulfill the operational and organizational concepts, the SoS must be capable of supporting operations, mission rehearsal and training of separate audiences (Soldiers, units, leader/staff teams) simultaneously. (FCS Fact Files, 2007) ET is defined as the user s requirement for Future Combat Systems (FCS) training in the institution, at the Combat Training Centers (CTCs), at homestation, while deployed, and for self development. All FCS platforms, manned and unmanned, will have embedded training capability. Unmanned platforms will be able to train the operator and maintainer through the use of technology hosted on the manned FCS platform or through the basic kit which comes with the FCS unmanned platform. All FCS variants have the embedded capability to train the operation, maintenance, and employment of the FCS. FCS embedded training is a requirement that is technically feasible, but represents an integration challenge. Over the past three decades, the Army has developed systems including platforms, information management, weapons, communications, command and control (C2), and Soldier systems to address a specific threat and support the then-relevant warfighting doctrine. Today, the Army trains as

2 branches, but then task organizes and fights as multiple systems. As the Army's systems have evolved, horizontal integration between functional entities has become more difficult. This has proven to be a time-consuming approach to training and resulted in a very difficult transition to warfighting. As demonstrated in Figure 1, the FCS SoS must have a networked, embedded, virtual, Full Task Training resource allocation, subcontract implementation and coordination, and programmatic responsibilities: the Lead Systems Integrator (LSI). The LSI is not a prime contractor, but rather a true partner with the Government in delivering the FCS SoS. The LSI operates at the direction of the Government and is a trusted member of the FCS Team (Figure 2). Figure 2. The FCS One Team Figure 1. Embedded Training Concept (FTT) capability to support individual, crew, and multi-echelon training without reconfiguration of the equipment. The FCS SoS embedded training systems must provide a capability to simulate faults and errors in degraded modes of operation. The FCS SoS ET systems must simulate, replicate, or access tactical, target, threat and other operational data received and processed by the system. The FCS ET system must provide interfaces that allow it to interoperate within the FCS SoS, with Training Aids Devices, Simulators, and Simulations (TADSS), and with the current synthetic training environment that includes live, virtual, and constructive simulators/simulations (e.g. range instrumentation, Close Combat Tactical Trainer (CCTT), Warfighter Simulation (WARSIM), and One Semi-Automated Forces (OneSAF)). 2. STAKEHOLDERS The FCS program is the Army s first large scale system of systems development which will be integrated across many platforms and disciplines, and therefore requires a dedicated organization to be successful. Since the FCS program is a system of systems and not a collection of platforms, any trades being identified will span across multiple platforms and not be limited to a single system. As such, the FCS program requires a General Contractor for The Training Integrated Product Team (IPT) is coled by PEO STRI and the LSI and is composed of members from each platform development team, Complementary Systems, and the User Community. The Training customers include the Army Training Support Center (ATSC), the Future Force Integration Directorate (FFID), and ultimately, the Soldier. All stakeholders are involved throughout the entire phase of the development cycle, providing concurrence on all decisions, analyses, and capability demonstrations. Through this close relationship with the User community, the materiel developers not only get exposure to the current practices in live training, but also receive instantaneous feedback on FCS-specific requirements and design strategies. 3. SHORTCOMINGS OF CURRENT LIVE TRAINING SOLUTIONS Commanders today cannot use on-board battle command systems to train the troops to fight while they are still at their headquarters or homestation. The commander must either use artificial response cells in a static simulation center or must plan for months and spend a large amount of money to establish interfaces between the battle command systems and simulations. Without an embedded battle command training and mission rehearsal capability, commanders cannot realistically train their staff, prepare for the mission, or wargame courses of action. Today s Army lacks an approach that will develop Soldiers through educational decision-making tools and experiential learning that prepares them for operational experiences. The ability of units to train collectively today is significantly limited by the

3 availability of resources to execute training (e.g. time, terrain, enablers, and infrastructure). Today s training environment requires the physical presence of all units of the combined arms team. A deployable instrumentation package does not exist to support unit training at homestation or while deployed. A standard training feedback system does not exist to perform exercise control, After Action Review (AAR) preparation, AAR delivery, and take home package preparation functions from platoon through brigade/combat team levels. Current tactical engagement simulation capabilities do not replicate the full range of weapons effects (e.g. Non Line of Sight (NLOS) mounted/dismounted platforms) or realistically replicate air-to-air, air-to-ground, and ground-to-air systems. They are cumbersome and require a substantial amount of time to install, calibrate and test. Additionally, current engagement simulation systems have inherent limitations that impact realism (e.g. inability to shoot through obscurants). Today s instrumentation packages do not meet FCS s objective to train anytime, anywhere. 4. E-TESS REQUIREMENTS Embedded TESS (E-TESS) capability provides the means to replicate the Operational Environment (OE). This capability must be able to interface with the Combat Training Centers (CTC)/Joint National Training Capability (JNTC), and homestation/deployed range and instrumentation systems. This capability allows training integration with current forces across all training environments. This ability to have engagement data collection facilitates the development of AARs, which enhances individual and collective experiential learning and sustaining higher levels of task proficiency. Embedded TESS reduces the time required for live tactical engagement training. The customer-defined requirements documents and performance parameters are the foundation of the E- TESS requirements structure (Figure 3). E-TESS Trade Study E-TESS risk mitigation plan and critical technologies One Team Partners SOW Customer-defined requirements Figure 3. E-TESS Requirements Structure Requirements at this level flow into each of the One Team Partner (OTP) Statements of Work (SOWs). Technological integration challenges are managed in a risk plan and E-TESS technology readiness levels (TRL). Development and maturation of geometric pairing and pointing accuracy capabilities are tracked via the critical technology mitigation plan. The implementation strategies for the solution are guided by the program TESS Trade Studies, both at the SoS and individual platform levels. There are five core capabilities that the E-TESS design must fulfill: (1) Fully embedded solution that is readily available for use The requirement to have a readily available and immediately accessible (i.e. embedded) Tactical Engagement Simulation System stems from the Army s priority: tough, realistic, and challenging training against an established standard, in peace and in war. To accomplish this, Army training doctrine advocates that training plans, preparation, and execution will be developed with a "train as you fight" mentality. (2) Interoperable with current and future Army TESS With the Army transition from current TESS (Multiple Integrated Laser Engagement System (MILES)) to future TESS (One Tactical Engagement Simulation System (OneTESS)), FCS platforms need to have the ability to train against a mixed opposing force (OPFOR). The critical requirement is that FCS E-TESS be interoperable with current and future systems, so that the platform can engage and be engaged by MILES- and OneTESS- equipped entities. Battlefield effects are essential to a live exercise, therefore target and shooter platforms will account for hit/kill audio and visual feedback, as well as appropriate weapons signatures.

4 (3) Interoperable with CTC-OIS Interoperability between FCS and the Combat Training Center-Objective Instrumentation System (CTC-OIS) is presently being defined by the FCS Training and C4ISR Integrated Product Teams (IPTs). Figure 4 outlines the required data exchange at a Combat Training Center (CTC)-based live training event. Figure 4. E-TESS Data Exchange at a CTC The following interoperability challenges have been identified:! Ability to allow the exercise Observer/Controller (OC) to listen to the tactical network, to include monitoring of video, digital and voice data received by the OC s counterpart, i.e. individual being observed! Ability to allow the OC to store tactical data for an After Action Review (AAR) at the platoon level and below! Ability to transmit FCS company, brigade and battalion level tactical data to the Instrumentation System to be stored for the AAR (4) Support the CTIA architecture The Common Training Instrumentation Architecture (CTIA) is a component-based, client-server architecture, which allows for plug and play components to interact through the CTIA infrastructure. E-TESS must be compliant with CTIA in order to ensure message interoperability. (5) Implementable in Joint exercises Since FCS will participate in Joint training activities, it must adhere to the proper security protocols, and thus incorporate appropriate communication and Information Assurance (IA) guards. 5. CAPABILITY DESIGN During the early phase of E-TESS requirements decomposition, participants discovered that it would be difficult to meet the embedded requirement without affecting vehicle SWAP. A team of FCS LSI, U.S. Army/Government, and OTP Subject Matter Experts (SMEs) conducted a trade study to identify, evaluate, and recommend an E-TESS design strategy for FCS to enable individual and collective training in a Live training environment. Three technical alternatives and three levels of embeddedness were evaluated using a comprehensive analytical process model. One alternative, the Appended Training Hardware TESS solution, employing the current MILES capabilities coupled with appended components from the OneTESS program, provided a hybrid appended solution that would employ Laser Pairing and Geometric Pairing. This solution was the least desirable due to initial development and total life cycle costs, and the negative impacts on training realism and effectiveness. The second alternative, the Embedded Hybrid Training Unique Hardware solution, involved a geometric pairing capability and a MILES laser transmission from an embedded dedicated training laser, in addition to the operational laser system, and other training-unique hardware and software that needed to be designed into the platform. This training-unique installation implies that the components are designed as part of the operational platform, and therefore are not dismounted during non-training activities. The major disadvantage of this option was that the space and weight claims of the embedded training-unique hardware had to be accounted for in the platform design, thus further burdening SWAP. The third alternative, an Embedded Hybrid Dual Use Operational Hardware TESS, was the recommended solution based on the trade study criteria scores. Using this approach, all training functionality is accomplished through the stimulation of operational platform hardware by training software that becomes an integral part of the platform s configuration and remains on the platform at all times. The advantage of hardware reuse is that it eliminates transportation, installation, calibration and logistics cost burdens typical of an appended TESS. It also eliminates cumbersome appended hardware and cable components, and requires minimal space or weight claims to the platform design. The Trade Study focused on the Manned Ground Vehicles (MGVs) and did not address the unique design configuration of the unmanned systems. Unlike MGVs, many unmanned systems have limited dual-use opportunities and will require training unique hardware to be embedded on the platform for use in Live Training, which is the second preferred design alternative to the full dual-use hardware

5 approach. Upon completion of the trade study, the E-TESS stakeholders began defining and documenting the architecture for the solution that would be common across the SoS. The E-TESS solution will include components that will enable the shooter to engage targets and the target to be engaged by shooters. A target platform will have detectors and decoders, a Real Time Casualty Assessment (RTCA) / Battle Damage Assessment (BDA) processor, a radio, a Global Positioning System (GPS) and a kill indicator. A shooter will have detectors and decoders, a laser transmitter (for every onboard weapon), a RTCA/BDA processor, a radio, GPS, a kill indicator and a weapons effects visual/audible simulator. Larger FCS platforms, with extensive sensor suites, will be used for the detector/decoder functionality. For example, the MGV will dual-use the Active Protection System (APS) sensors which are components of the Hit Avoidance System (HAS). Sensors will be augmented to detect MILES laser pulses. Operational laser transmitters will include a training laser, which will transmit MILES encoded energy. The vehicles Integrated Computer System (ICS) will encompass the RTCA and BDA computing. Larger systems will utilize the onboard processor, thus performing adjudication locally while smaller systems will host the adjudication capability offboard on either the controlling devices or the MGVs. A tactical network, onboard Ground Mobile Radio (GMR) and tactical data and voice waveforms, are planned for transmittal of training data. Information from the onboard GPS will be used in shot pairing calculations. Many platforms are researching innovative methods to achieve the traditional queues, such as using onboard marker lights, headlights and landing lights for kill indicator and/or battlefield effects. FCS platforms will use a common RTCA software module, which will be reused from the OneTESS program, thus minimizing the interoperability risk within the family of systems. Because the OneTESS software supports both the lower fidelity MILES mode as well as a higher fidelity OneTESS mode, FCS will be able to successfully train against a mixed current and future OPFOR. 6. CHALLENGES FACING E-TESS 6.1 Bandwidth and Latency The concept of network and radio dual-use poses a significant challenge. Engagement latency is a critical component of Live Training, requiring real time engagement feedback. Sharing bandwidth with the tactical traffic increases the chance of added latency. Ongoing network load analysis shows that Live training throughput exceeds operational estimates particularly in the area of the OC monitoring functionality. Simulation results show that peak effective bandwidth for continuous data flow at the division, brigade and battalion levels can range from 2.5 and 4 Mbps (DeMara, R. F., Leon- Barth, C., Marshall, H., 2006). Training communication needs will drive network improvement initiatives to include tailoring network management plans, channel allocation for training use and routing optimization analysis. Limited spectrum at the CTCs and Homestations may drive additions or changes to the Joint Tactical Radio System (JTRS) or Warfighter Information Network- Tactical (WIN-T) waveforms, allowing access to higher frequency bands not used for tactical voice, data, image and video transmittal. 6.2 Complex Network Topology Changes to the network topology that may help minimize the number of node hops from shooter to target must also be considered. A hierarchical subnetwork structure of the FCS network (Figure 5) Figure 5. Example of the Logical Network Topology does not provide for optimized routing, particularly in close range engagements where latency cannot be tolerated. This potentially diminishes the platform s ability to use geometric pairing for direct fire engagements and poses the risk of reverting to MILES laser methodology. One of the optimized routing protocols being implemented by the OneTESS program is called tiered geocast, which transmits messages between network tiers using decision rules for bridging packets between transport tiers; while each tier operates at a characteristic range. Using this concept, a packet is transmitted between nodes until it reaches a long range capable node, which can then send it to a node close to the geocast region (Auzins, J., Hall, R. J., 2006). Although at a first glance this multicast method is not easily implemented within the FCS Internet Protocol (IP)- based network and the subnetwork structure, the program needs to review potential applicability of the methodology and architecture.

6 6.3 Additional Hardware for Training Use Several smaller, unmanned systems will not be able to only utilize dual-use hardware due to the limited operational functionality available on the platforms. In order to participate in Live Training exercises, these systems will embed training unique components including MILES-compatible detectors, decoders and kill indicators. Keeping in mind the overall vehicle weight, training unique hardware cannot account for a significant percentage of the overall component weight. In the case of small systems such as the Unmanned Air System (UAS) Class I, training component weight cannot exceed several ounces. Primary and secondary weapons effects are challenging to embed due to many safety issues inherent to pyrotechnics. Non-pyrotechnic approaches are often viewed as degradation to training realism; however, they must be evaluated as alternatives for FCS platforms given the embedded requirements. REFERENCES 1. Auzins, J., Hall, R. J. (2006). A Tiered Geocast Protocol for Long Range Mobile Ad Hoc Networking. [Electronic Version] Military Communications Conference. Retrieved April 23, 2007, from r= &isyear=2006&count=578&page=15& ResultStart= DeMara, R. F., Leon-Barth, C., Marshall, H. (2006). Communication Modeling of Training and Simulation Traffic in a Tactical Internet. MSIAC S M&S Journal Online. Volume FCS Fact Files web site, Retrieved 2007 from er07.pdf 7. SUMMARY FCS Live Training capabilities will be first demonstrated during the FCS Limited User Test (LUT) in Capability development is progressing as the program approaches design milestones, however, much of the modeling and integration analysis remains to be completed in the years leading to the demonstration. Because of the technological and network improvements over time, we will continue to evaluate training network usage and search for ways to optimize throughput and decrease latency associated with training engagement traffic. E-TESS component requirements are forcing FCS materiel developers to think outside the box in terms of TESS components, opening the door for innovative solutions such as integrated dual-use kill indication and laser detection hardware. One of the key lessons learned from the E-TESS trade studies and analyses is that not all systems can capitalize on the dual-use hardware, therefore design trade-offs must be made in order to bring state- of-the-art live training capabilities to the warfighter. Working closely with the LSI, Army User community, OTPs and Complementary programs, FCS is exploiting the industry s best practices to deliver the first fully embedded TESS capability: a true success story in the Training and Simulation community. 8. ACKNOWLEDGEMENTS The authors wish to thank the FCS Training IPT (LSI, PEO STRI and OneTeam Partners) and C4ISR IPT for their continued support. The authors also wish to acknowledge ATSC, FFID and Operational Test Command (OTC) for their contributions to E- TESS.

NDIA Air Targets and UAV Division Symposium. LTC Scott Tufts 4 October 2012

NDIA Air Targets and UAV Division Symposium. LTC Scott Tufts 4 October 2012 NDIA Air Targets and UAV Division Symposium LTC Scott Tufts 4 October 2012 Topics PEO STRI is working numerous force on force initiatives to enhance training Bring indirect fire capability into the force

More information

FCS Embedded Training: An Overview

FCS Embedded Training: An Overview FCS Embedded Training: An Overview Chuck Moler FCS LSI Training Systems IPT 12/13/2005 Training is THE factor in determining the victor. - DSB Task Force on Training Superiority and Training Surprise Approved

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Non-System Training Devices - Eng Dev FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Non-System Training Devices - Eng Dev FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 64715A: Non-System Training Devices

More information

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction Synthetic Training Environment (STE) White Paper Combined Arms Center - Training (CAC-T) The Army s future training capability is the Synthetic Training Environment (STE). The Synthetic Training Environment

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

Directorate of Training and Doctrine Industry Day Break out Session

Directorate of Training and Doctrine Industry Day Break out Session Directorate of Training and Doctrine Industry Day 2018 Break out Session Mr. Chris K. Jaques Chief, Individual and Systems Training Division, DOTD (706) 545-5209 Mr. Richard C. Bell Chief, Simulations

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 PE 64715A: Non-System Training Devices

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 2 - Applied Research 0602308A - Advanced Concepts and Simulation COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005

More information

Accelerating Networked Sensors & Fires

Accelerating Networked Sensors & Fires Accelerating Networked Sensors & Fires October 19, 2005 Precision Engagement Strategic Business Area Providing the Warfighter timely, effective and affordable Mission Solutions that span the breadth and

More information

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.

More information

Train as We Fight: Training for Multinational Interoperability

Train as We Fight: Training for Multinational Interoperability Train as We Fight: Training for Multinational Interoperability by LTC Paul B. Gunnison, MAJ Chris Manglicmot, CPT Jonathan Proctor and 1LT David M. Collins The 3 rd Armored Brigade Combat Team (ABCT),

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE Communications Technology COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

LTG Richard Formica U.S. Army Retired Vice President, CALIBRE Systems

LTG Richard Formica U.S. Army Retired Vice President, CALIBRE Systems Moderator: Introductions LTG Richard Formica U.S. Army Retired Vice President, CALIBRE Systems AUSA Global Force Symposium TLE Prerequisites for Success - Multi-Domain Battle Readiness is #1 and there

More information

Test and Evaluation Strategies for Network-Enabled Systems

Test and Evaluation Strategies for Network-Enabled Systems ITEA Journal 2009; 30: 111 116 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation Strategies for Network-Enabled Systems Stephen F. Conley U.S. Army Evaluation Center,

More information

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) Army ACAT ID Program Prime Contractor Total Number of Systems: 59,522 TRW Total Program Cost (TY$): $1.8B Average Unit Cost (TY$): $27K Full-rate production:

More information

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) Briefing for the SAS Panel Workshop on SMART Cooperation in Operational Analysis Simulations and Models 13 October 2015 Release of

More information

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3 Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3 30 May 2001 R. John Bernard Angela M. Alban United Defense, L.P. Orlando, Florida Report Documentation Page Report Date 29May2001 Report

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160404BB Special Operations (SO) Tactical

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

AUSA BACKGROUND BRIEF

AUSA BACKGROUND BRIEF AUSA BACKGROUND BRIEF No. 46 January 1993 FORCE PROJECTION ARMY COMMAND AND CONTROL C2) Recently, the AUSA Institute of Land Watfare staff was briefed on the Army's command and control modernization plans.

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

The Army Executes New Network Modernization Strategy

The Army Executes New Network Modernization Strategy The Army Executes New Network Modernization Strategy Lt. Col. Carlos Wiley, USA Scott Newman Vivek Agnish S tarting in October 2012, the Army began to equip brigade combat teams that will deploy in 2013

More information

Joint Program Executive Office Joint Tactical Radio System

Joint Program Executive Office Joint Tactical Radio System (24 APRIL 2006) Joint Program Executive Office Joint Tactical Radio System MIDS International Review Board JTRS Moving Forward JPEO JTRS 5 May 2006 Mr. Howard Pace Deputy JPEO JTRS 619-524-4498 Howard.Pace@navy.mil

More information

MC Network Modernization Implementation Plan

MC Network Modernization Implementation Plan MC Network Modernization Implementation Plan Mission Command Center of Excellence 1 Principles (Why) Warfighting Requirements CSA s Mission, Principles, Characteristics of the Network & Requirements Network

More information

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS)

WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT (WMSA&IS) EXCERPT FROM CONTRACTS W9113M-10-D-0002 and W9113M-10-D-0003: C-1. PERFORMANCE WORK STATEMENT SW-SMDC-08-08. 1.0 INTRODUCTION 1.1 BACKGROUND WARFIGHTER MODELING, SIMULATION, ANALYSIS AND INTEGRATION SUPPORT

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0603008A Electronic Warfare Advanced Technology ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

Force 2025 Maneuvers White Paper. 23 January DISTRIBUTION RESTRICTION: Approved for public release.

Force 2025 Maneuvers White Paper. 23 January DISTRIBUTION RESTRICTION: Approved for public release. White Paper 23 January 2014 DISTRIBUTION RESTRICTION: Approved for public release. Enclosure 2 Introduction Force 2025 Maneuvers provides the means to evaluate and validate expeditionary capabilities for

More information

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018

NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 NETWORKING THE SOLDIER ARMY TACTICAL NETWORK MODERNIZATION APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS LIMITED. AUGUST 2018 THE ARMY WILL FIELD A NETWORK THAT IS EASY TO USE, WORKS IN ALL ENVIRONMENTS,

More information

Soldier Division Director David Libersat June 2, 2015

Soldier Division Director David Libersat June 2, 2015 Soldier Division Director David Libersat June 2, 2015 Soldier Division Maneuver Center of Excellence Soldier Division develops future requirements and manages Soldier capabilities for all Soldiers across

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR FCS Update & Testing Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR 3/13/2009 10:36:11 AM 1 Army Leadership s View Future Combat Systems is the core of our modernization

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 8100.1 September 19, 2002 Certified Current as of November 21, 2003 SUBJECT: Global Information Grid (GIG) Overarching Policy ASD(C3I) References: (a) Section 2223

More information

LOE 1 - Unified Network

LOE 1 - Unified Network LOE 1 - Unified Network COL Denise Brown and COL Mark Parker UNCLASSIFIED//FOUO//PRE-DECISIONAL//DRAFT 1 CSA s Principles, Characteristics and Requirements Principles (Why) Warfighting Requirements Characteristics

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

DIGITAL CAVALRY OPERATIONS

DIGITAL CAVALRY OPERATIONS Appendix B DIGITAL CAVALRY OPERATIONS The digitized squadron is composed of forces equipped with automated command and control systems and compatible digital communications systems. The major components

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

Modeling, Simulation & Training Services

Modeling, Simulation & Training Services Modeling, Simulation & Training Services Modeling, Simulation & Training Services The 21st Century presents security and military forces with a wide array of threats. Meeting these threats means making

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

AFCEA Mission Command Industry Engagement Symposium

AFCEA Mission Command Industry Engagement Symposium UNCLASSIFIED/ AFCEA Mission Command Industry Engagement Symposium MG Pete Gallagher Director, Network CFT 3 April 2018 Network CFT Collaboration, Fusion & Transparency WARFIGHTING REQUIREMENTS Army Warfighters

More information

Future Combat Systems Industry Day Briefing

Future Combat Systems Industry Day Briefing Future Future Industry Day Briefing MG Joseph L. Yakovac Program Executive Officer, Ground 11 February 2003 Program Manager s Intent: Field FCS-Equipped Units of Action With Threshold Objective Force Capability

More information

MANPACK300 DEPLOYING THE FUTURE IN LIVE TRAINING

MANPACK300 DEPLOYING THE FUTURE IN LIVE TRAINING www.saabgroup.com MANPACK300 DEPLOYING THE FUTURE IN LIVE TRAINING 1 CHANGING THE GAME THE ALL-NEW MANPACK 300 is a portable, readily deployable training system that enables instrumented training exercises

More information

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype 1.0 Purpose Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype This Request for Solutions is seeking a demonstratable system that balances computer processing for modeling and

More information

Simulation and Emulation in Support of Operational Networks: ALWAYS ON

Simulation and Emulation in Support of Operational Networks: ALWAYS ON UNCLASSIFIED Simulation and Emulation in Support of Operational Networks: ALWAYS ON NDIA 15 th Annual Systems Engineering Conference 25 October 2012 Dr. Nancy Bucher ASA(ALT) OCSE/PoR nancy.bucher@us.army.mil

More information

US Army Combined Arms Center SOLDIERS AND LEADERS - OUR ASYMMETRIC ADVANTAGE. Synthetic Training Environment (STE) STE Update to PALT

US Army Combined Arms Center SOLDIERS AND LEADERS - OUR ASYMMETRIC ADVANTAGE. Synthetic Training Environment (STE) STE Update to PALT Synthetic Training Environment (STE) STE Update to PALT Forward to STE As Is 1980s technology limits ability to train Combined Arms operations 47 terrain formats Concurrency challenges and not designed

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 1322.18 January 13, 2009 Incorporating Change 1, Effective February 23, 2017 USD(P&R) SUBJECT: Military Training References: (a) DoD Directive 1322.18, subject as

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

Conducting. Joint, Inter-Organizational and Multi-National (JIM) Training, Testing, Experimentation. in a. Distributive Environment

Conducting. Joint, Inter-Organizational and Multi-National (JIM) Training, Testing, Experimentation. in a. Distributive Environment Conducting Joint, Inter-Organizational and Multi-National (JIM) Training, Testing, Experimentation in a Distributive Environment Colonel (USA, Ret) Michael R. Gonzales President and Chief Executive Officer

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributive Interactive Simulations (DIS) - Eng Dev FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributive Interactive Simulations (DIS) - Eng Dev FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 15.31 15.787 13.926-13.926 13.92 14.19 14.43

More information

Determining and Developing TCM-Live Future Training Requirements. COL Jeffrey Hill TCM-Live Fort Eustis, VA June 2010

Determining and Developing TCM-Live Future Training Requirements. COL Jeffrey Hill TCM-Live Fort Eustis, VA June 2010 Determining and Developing TCM-Live Future Training Requirements COL Jeffrey Hill TCM-Live Fort Eustis, VA June 2010 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for

More information

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet

Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet Net-Enabled Mission Command (NeMC) & Network Integration LandWarNet / LandISRNet 1 LandWarNet (LWN) Initial Capabilities Document (ICD) / Network Enabled Mission Command (NeMC) ICD LandISRNet Intel Appendices

More information

A Case Study for the Naval Training Meta-FOM (NTMF): Analyzing the Requirements from MAGTF FOM

A Case Study for the Naval Training Meta-FOM (NTMF): Analyzing the Requirements from MAGTF FOM Title A Case Study for the Naval Training Meta-FOM (NTMF): Analyzing the Requirements from MAGTF FOM Track Modeling and Simulation Authors Ranjeev Mittu Naval Research Laboratory 4555 Overlook Avenue Washington,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research,, Test & Evaluation, Army / BA 5: System & Demonstration (SDD) COST ($ in Millions) Years FY 2014 FY 2015 FY 2017

More information

Domain Reuse. Mr. Neil Patterson & Mr. Milton Smith

Domain Reuse. Mr. Neil Patterson & Mr. Milton Smith Domain Reuse Mr. Neil Patterson & Mr. Milton Smith Background The Fires Software Engineering Division has been moving and promoting domain reuse for the last 20 years. We have an active on-going reuse

More information

COE. COE Snapshot APPLICATIONS & SERVICES CONNECTING OUR SOLDIERS EXAMPLE SERVICES. COE Enables. EcoSystem. Generating Force

COE. COE Snapshot APPLICATIONS & SERVICES CONNECTING OUR SOLDIERS EXAMPLE SERVICES. COE Enables. EcoSystem. Generating Force COE Snapshot APPLICATIONS & SERVICES Generating Force COE Enables Increased Capability Agility Reduced Life Cycle Costs Flexible Standards-based Infrastructure Enhanced Cyber Protection Command Post Data

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346 Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October 2015 19 February 2016 Battle Lab Report # 346 DESTRUCTION NOTICE For classified documents, follow

More information

The Verification for Mission Planning System

The Verification for Mission Planning System 2016 International Conference on Artificial Intelligence: Techniques and Applications (AITA 2016) ISBN: 978-1-60595-389-2 The Verification for Mission Planning System Lin ZHANG *, Wei-Ming CHENG and Hua-yun

More information

OE Conditions for Training: A Criterion for Meeting Objective Task Evaluation Requirements

OE Conditions for Training: A Criterion for Meeting Objective Task Evaluation Requirements OE Conditions for Training: A Criterion for Meeting Objective Task Evaluation Requirements Mario Hoffmann The Army Operating Concept directs us to win in a complex world. To accomplish this directive,

More information

General Dynamics at AUSA 2017: Meeting the U.S. Army s Needs Through Innovation

General Dynamics at AUSA 2017: Meeting the U.S. Army s Needs Through Innovation 2941 Fairview Park Drive, Suite 100 Falls Church, VA 22042-4513 www.generaldynamics.com Media Advisory October 3, 2017 General Dynamics at AUSA 2017: Meeting the U.S. Army s Needs Through Innovation WHAT:

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR

More information

Yemen ISR CONOPS and Capabilities

Yemen ISR CONOPS and Capabilities Yemen ISR CONOPS and Capabilities THIS INFORMATION WAS APPROVED FOR PUBLISHING PER THE ITAR AS BASIC MARKETING INFORMATION OF DEFENSE ARTICLES OR PER THE EAR AS ADVERTISING PRINTED MATTER. harris.com Yemen

More information

GLOBAL BROADCAST SERVICE (GBS)

GLOBAL BROADCAST SERVICE (GBS) GLOBAL BROADCAST SERVICE (GBS) DoD ACAT ID Program Prime Contractor Total Number of Receive Suites: 493 Raytheon Systems Company Total Program Cost (TY$): $458M Average Unit Cost (TY$): $928K Full-rate

More information

Public Affairs Operations

Public Affairs Operations * FM 46-1 Field Manual FM 46-1 Headquarters Department of the Army Washington, DC, 30 May 1997 Public Affairs Operations Contents PREFACE................................... 5 INTRODUCTION.............................

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

COL Mike Flanagan Project Manager Training Devices

COL Mike Flanagan Project Manager Training Devices COL Mike Flanagan Project Manager Training Devices PM TRADE Project Manager Training Devices VISION: To be the first-choice provider of innovative Live Training solutions for the Warfighter and Coalition

More information

Test and Evaluation WIPT

Test and Evaluation WIPT Test and Evaluation WIPT 11 December 2003 Mrs. Ellen M. Purdy Acting Director, Combined Test Organization Office: 703-647-1452 ellen.purdy@fcscto.army.mil 1 Analysis Synthesis Model Test via Operational

More information

CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission. Elements of Intelligence Support. Signals Intelligence (SIGINT) Electronic Warfare (EW)

CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission. Elements of Intelligence Support. Signals Intelligence (SIGINT) Electronic Warfare (EW) CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission The IEW support mission at all echelons is to provide intelligence, EW, and CI support to help you accomplish your mission. Elements of Intelligence

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5040.4 August 13, 2002 Certified Current as of November 21, 2003 SUBJECT: Joint Combat Camera (COMCAM) Program ASD(PA) References: (a) DoD Directive 5040.4, "Joint

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

Department of Defense INSTRUCTION. Policy and Procedures for Management and Use of the Electromagnetic Spectrum

Department of Defense INSTRUCTION. Policy and Procedures for Management and Use of the Electromagnetic Spectrum Department of Defense INSTRUCTION NUMBER 4650.01 January 9, 2009 Incorporating Change 1, October 17, 2017 ASD(NII) DoD CIO SUBJECT: Policy and Procedures for Management and Use of the Electromagnetic Spectrum

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 3528A: Distributed Common Ground/ FY

More information

Tank Automotive Research, Development & Engineering Center (TARDEC)

Tank Automotive Research, Development & Engineering Center (TARDEC) Tank Automotive Research, Development & Engineering Center (TARDEC) A major element of RDECOM and partner in the TACOM Life-Cycle Management Command: Provides full life-cycle engineering support provider-of-first-choice

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete F58 NON LINE OF SIGHT

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Using the ITE enabled both the BDE and BN to approximate the operational environment and enhance the battle staff proficiency.

Using the ITE enabled both the BDE and BN to approximate the operational environment and enhance the battle staff proficiency. Executive Summary The Army Training Support Center (ATSC), Training Support Analysis and Integration Division (TSAID), was tasked by CAC-T to perform an independent review to assess the training value

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Intelligence Preparation of the Battlefield Cpt.instr. Ovidiu SIMULEAC

Intelligence Preparation of the Battlefield Cpt.instr. Ovidiu SIMULEAC Intelligence Preparation of the Battlefield Cpt.instr. Ovidiu SIMULEAC Intelligence Preparation of Battlefield or IPB as it is more commonly known is a Command and staff tool that allows systematic, continuous

More information

Army IAMD Modular Open Systems Approach

Army IAMD Modular Open Systems Approach Army IAMD Modular Open Systems Approach Presented to the Defense Daily OA Summit The Power of Modularity and New Open Business Models Panel Presented by Mr. Charley Robinson, Director, System Engineering,

More information

DEPARTMENT OF DEFENSE TRAINING TRANSFORMATION IMPLEMENTATION PLAN

DEPARTMENT OF DEFENSE TRAINING TRANSFORMATION IMPLEMENTATION PLAN DEPARTMENT OF DEFENSE TRAINING TRANSFORMATION IMPLEMENTATION PLAN June 10, 2003 Office of the Under Secretary of Defense for Personnel and Readiness Director, Readiness and Training Policy and Programs

More information

STE Industry Day Briefs

STE Industry Day Briefs Building and Maintaining Readiness to Win in a Complex World STE Industry Day Briefs 18 Sep 2017 Further dissemination only as directed by TCM ITE, 410 Kearney Ave., Fort Leavenworth, KS 66027 or higher

More information

An Interview With BG(P) Charles A. Cartwright. Meg Williams

An Interview With BG(P) Charles A. Cartwright. Meg Williams FCS AND THE UNIT OF ACTION ACCELERATING TECHNOLOGY TO THE MODULAR FORCE An Interview With BG(P) Charles A. Cartwright Meg Williams BG(P) Charles A. Cartwright, Program Manager Unit of Action (PM UA), recently

More information

Why Should You Consider Simulators?

Why Should You Consider Simulators? Why Should You Consider Simulators? Individual Marksmanship Units still have soldiers with issues in grouping, zeroing and qualifying with individual weapons Identify soldiers requiring remedial training

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($

More information

CD Compilation Copyright by emilitary Manuals

CD Compilation Copyright by emilitary Manuals Field Manual No. 25-4 FM 25-4 HEADQUARTERS DEPARTMENT OF THE ARMY Washington, DC, 10 September 1984 HOW TO CONDUCT TRAINING EXERCISES Table of Contents * This publication supersedes FM 105-5, 31 December

More information

Preparing to Occupy. Brigade Support Area. and Defend the. By Capt. Shayne D. Heap and Lt. Col. Brent Coryell

Preparing to Occupy. Brigade Support Area. and Defend the. By Capt. Shayne D. Heap and Lt. Col. Brent Coryell Preparing to Occupy and Defend the Brigade Support Area By Capt. Shayne D. Heap and Lt. Col. Brent Coryell A Soldier from 123rd Brigade Support Battalion, 3rd Brigade Combat Team, 1st Armored Division,

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE Sensor Tech COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost

More information