United Nations Development Program Country: TURKEY Project Document

Size: px
Start display at page:

Download "United Nations Development Program Country: TURKEY Project Document"

Transcription

1 United Nations Development Program Country: TURKEY Project Document Project Title: Technical Assistance for Socioeconomic Development through Demining and Increasing the Border Surveillance Capacity at the Eastern Borders of Turkey Phase-I UNDCS Outcome(s) 1 : Outcome 1: Enabled environment for inclusive and democratic governance, rule of law and access to justice for all, including further compliance with international commitments and human rights norms and standards Outcome 1.1: Capacity-building programs developed for accountable and responsive governance mechanisms and structures in public institutions, at the national, regional and local levels, grounded on international principles, including internally displaced persons, and in alignment with European Union accession priorities Expected Output(s): (Those that will result from the project) Demining the border regions of Van-Ağrı-Iğdır-Kars is completed. Demined areas are certified in compliance with the international and Turkish mine action standards Post project review is conducted. Executive Agency: Ministry of Interior Implementing Agency: UNDP Turkey Brief Description The overall objective of the Project is to contribute to the social and economic development through demining and more secure borders in Eastern Turkey. The specific objective of the Project is to contribute to the prevention of illegal migration and cross-border crime on Turkey s eastern borders by clearing the border regions of mines and providing effective humanitarian border surveillance tools for a technologically supported modern border surveillance system. 1 UN Development Cooperation Strategy ( ) 1 P a g e

2

3 I. 1 DESCRIPTION Title Clearance of Landmines in the Eastern Border Regions of Turkey Phase-I Location Turkey Cost of the Action The cost of the "Action is EUR 26,400,000. Summary Duration Objectives 24 months The overall objective of the Project is to contribute to the social and economic development through demining and more secure borders in Eastern Turkey. The specific objective of the Project is to contribute to the prevention of illegal migration and cross-border crime on Turkey s eastern borders by clearing the border regions of mines and providing effective humanitarian border surveillance tools for a technologically supported modern border surveillance system. Beneficiary: Legal Status: Target group(s) Final beneficiaries Estimated results Main activities UNDP International Organisation Local population The main beneficiaries are Ministry of Interior (Border Management Bureau) and Turkish General Staff (Land Forces Command) Demining the border regions of Van-Ağrı-Iğdır-Kars is completed. Demined areas are certified in compliance with the internationa and Turkish mine action standards Post project review is conducted. Component A: Clearance: This component covers the mine clearance activities for the selected regions. Component B: Certification/Quality Control: This component covers the quality assurance, quality control and post-clearance certification to provide confidence (to the beneficiary and the implementation agency) that clearance and quality requirements defined in the standards have been met and that cleared land is indeed safe for use. Component C: Post-clearance: This component aims to identify the lessons-learned which are relevant to the planning, preparation and clearance phases of the operation through the conduct of a formal post project review (PPR). 3 P a g e

4 Objectives The overall objective of the Project is to contribute to the social and economic development through demining and more secure borders in Eastern Turkey. The specific objective of the Project is to contribute to the prevention of illegal migration and cross-border crime on Turkey s eastern borders in line with EU s IBM policies and strategies via demining the area and providing effective humanitarian border surveillance tools for a technologically supported modern border surveillance system. Justification The Government of Turkey in the course of progress towards accession to the European Union (EU) and in response to the obligations of the EU and its Member States is actively following a National Programme for the Adoption of the Acquis. However the objective of the process of law approximation is not only to implement the relevant amendments to existing legislation but, as importantly, to strengthen those institutions responsible for the enforcement or implementation of the new procedures. This process of Institution Building and Reform in order to enhance administrative capacity, is seen as crucial in ensuring that Turkey is successful in the transition to the standards, norms, expectations and obligations of similar EU Member State administrations. Within the process of Institution Building and Reform, border management which is evaluated under the chapter of Freedom, Justice and Security is regarded as being one of the high priority areas of this process. After the membership to the EU, as Turkey s eastern borders will be the external borders of the Union, management of comprehensive border security and its implementation constitutes an important subject. Management of the eastern borders is not an easy task due to the geographical and climatic conditions of Turkey in that region. Moreover, this region constitutes a big problem in terms of being an illegal crossing route and in order to provide the border security in this region, landmines had been used for security mostly to prevent illegal border crossings, smuggling or security from the PKK. These landmines now constitute a very serious threat for border management in that region. The global landmine crisis is also one of the most pervasive problems facing the world today. In 1996, a comprehensive international initiative, known as the Ottawa Process was started which aimed to put an end to the suffering and casualties caused by anti-personnel landmines by banning their use. On 26 January 1998, the Chief of the Turkish General Staff issued a directive banning the use of anti-personnel mines by the Turkish armed forces. There have been no confirmed instances of use of anti-personnel mines by Turkish forces since that time. The Republic of Turkey acceded to the Anti-Personnel Mine Ban Convention (known as the Mine Ban Treaty) on 25 September 2003, becoming a state party on 1 March Turkey has not enacted domestic implementation legislation, but has indicated that its constitution and criminal code, and directives from Turkey s Armed Forces General Staff, give legal effect to the treaty s provisions. Turkey requested an extension to the 2014 deadline for its obligation under Article 5 of the Mine Ban Treaty to clear all anti-personnel mines from mined areas under its jurisdiction or control and has been granted an 8 year extension. At the Meeting of States Parties to the Mine Ban Treaty in Geneva in December 2013 Turkey announced in the plenary session the successful implementation of the Article 5 extension request and compliance with Turkey s clearance obligations under the commitments made through the accession to the Mine Ban Treaty on 25 September Currently, the size of the mined area in Turkey is 313,274,400 m 2. Turkey considers the Mine Ban Treaty as a success and is working towards clearing the mines in its own southern and eastern border regions. Work is ongoing with regard to 4 P a g e

5 clearance activities along the border with Syria. A law on the The Tender and Mine Clearance Activities along the land borders between the Republic of Turkey and Syria Arab Republic, Law No entered into force on 17 June According to this Law, the Ministry of Defence is tasked to carry out demining activities on the Syrian border to be financed from national funds. This accelerates the coordination between Ministries. Turkey also plans to clear the minefields along the border with Iraq, Iran, Azerbaijan and Armenia. The assessments made by the government and Land Forces Command concerning the resources for clearance activities, deemed that it would be appropriate to use external assistance especially for the clearance activities that will take place in the eastern border regions. In this regard, it is planned to clear the mines along the Armenian, Azerbaijan and Iranian borders using the EU funds. Clearance activities in other areas are awaiting the establishment of the National Mine Action Authority (NMAA) and the Mine Action Centre (MAC) which will supervise the mine clearance activities in Turkey and issue certificates in accordance with the IMAS. Work on the establishment of the NMAA and the MAC by the Turkish Ministry of National Defence is ongoing. It is predicted that mine clearance for these areas will be conducted between 2015 and 2022 following the establishment of the NMAA and MAC in accordance with acquired experience from the mine clearance projects for the Syrian and eastern borders. The necessary procedures for the works that will take place in military forbidden zones are arranged in the Military Forbidden Zone and Safety Regions Law, Military Forbidden Regions and Safety Regions Regulations. As per this law and regulation, it is necessary to get permission from General Staff for all the activities that will take place in these regions. As there is no NMAA or MAC in Turkey at present, for the Syrian border a Top Project Board (TPB) has been established to oversee mine action, based on the Law No. 5903, In addition, a Project Implementation Board (PIB) has been established to pursue the tendering process for the clearance of landmines, to monitor the implementation and to act as a contact point for relevant activities. The experience gained from the works of these boards will be beneficial for the future clearance activities in the other regions of Turkey. The landmines are generally located in border areas, however there are no landmines on the Turkish side of Turkey s borders with Greece, Bulgaria, and Georgia as they have already been cleared. The landmines are only located along the Armenian, Azerbaijani, Iranian, Iraqi and Syrian Borders, which present a problem to providing an efficient border management system. The main reasons of laying the landmines in these regions differ from the countries of South East Europe. Rather than laying mines during inter-ethnic conflict in and around populated areas, the mines in Turkey were generally laid along the borders to prevent illegal migration or smuggling activities or for security reasons against PKK. Today, in addition to the humanitarian concerns, these landmines limit the operational capacity of Turkey in the border areas. They prevent the establishment of good functioning border surveillance systems and as a result lead to decreased efficiency in the fight against illegal migration, cross-border crime and smuggling. For these reasons, demining is seen as an indispensable part of the border management reforms. Turkey aims to have these landmines cleared to provide a more secure way of protecting the borders by means of technologically supported border surveillance systems and achieve the targets set out by EU for a good functioning border management system. Turkey has difficulties in providing border security because of its long, mountainous land borders in the east and south-west and long, coastal borders in the south, north and west. Due to its geographical location as a crossroad between Europe, the Middle East and Asia, Turkey requires a strong border control and security organization. In recent years, illegal border crossings, mostly in the form of multinational organized crime (such as smuggling, trafficking and terrorism) have created serious ramifications not only for Turkey but also for European border management. Illegal immigrants are smuggled into Turkey and Europe either across unregulated land, sea or air borders or through regulated security check points using counterfeit or stolen passports or concealed in cargoes. 5 P a g e

6 State of play in border surveillance at borders: Illegal border crossings constitute a very serious threat to national security and put pressure on European border management systems. Whereas the numbers of illegal migrants crossing the borders, between 2006 and 2009 were 15,270 this number increased to 39,274 in When examined the numbers of apprehended illegal migrants in 2011, 2012 and 2013; 44,415 irregular migrants were apprehended in 2011, 47,510 irregular migrants were apprehended in 2012 and this number was 35,701 in More than half of these illegal crossings took place in the east and southeast of Turkey (Iran, Iraq and Syria). On the Turkish-Iranian border approximately 8,000 illegal crossings take place annually. Nearly half of these illegal crossings have taken place in the Van-Ağrı-Kars-Iğdır provinces. Stated more clearly, 30% of the annual illegal crossings are taking place in this project region. For this reason, increasing the technological measures to prevent these illegal border crossings in this region should be a priority in terms of border management. In order to safely establish a technologically supported border security system it is first necessary to demine these border areas. Turkish Land Forces Command uses the following equipment for border surveillance but as the border region is mined this equipment is currently used in areas close to the border but not on it, thereby affecting the efficiency of border security in these regions. - 4x4 vehicles - Observation towers, border stations - Thermal imaging cameras - Barbed wire fencing It is necessary to strengthen the security measures in the areas that will be cleared from mines in order to have a fully effective border surveillance system. The surveillance vehicles that are planned to be purchased in this project will mostly patrol in the areas yet to be cleared by this project. Ongoing efforts and plans to improve the border surveillance on all borders: Turkey is already in the process of upgrading the infrastructure for border surveillance, with: - Renovation, reconstruction of the border stations via the Housing Development Administration of Turkey (TOKI) - Constructing zero line roads at the borders - Construction of telephone lines, lightening the newly constructed roads and building new fences/wires In the main this has been funded from the Turkish national budget. Since 2010, 69 new border posts, nearly 111 surveillance towers for the staff have been completed as of 2014 and 146,000,000 has been spent for this construction from national funds. The construction of 41 new border posts is still going on and is expected to be finished by the year Besides, projects for an additional 33 border posts have been prepared and the tendering process has been initiated. Additionally, work on the border posts and patrol roads has been started and projects for the replacement, repair and maintenance of 1150 kilometres have been prepared. Two thirds of these roads currently being worked on are in present use. The total budget allocated for all these investments is nearly 350,000,000 A total amount of 8,000,000 has been allocated from the 2012 Budget of MoI to border provinces for the restoration and modernization of lighting systems on the border line. Moreover, a project of the Coast Guard Command, namely the Coastal Surveillance Radar System, was initiated in This system consists of radars, towers, cameras and other electro-optical equipment, hardware and software systems, as well as regional centres, etc. When completed, the project will cover all of Turkey's coastal and maritime jurisdiction areas. The projected total cost of the system is above 100 million. The project will be realized in 4 6 P a g e

7 phases. The first phase will be completed in The contract for the first phase was awarded in the first quarter of Cost of the first phase is 55 million and will be covered from the national budget. The Eastern border project aims to strengthen border surveillance capacity in the Van-Ağrı- Kars-Iğdır provinces. Demining the relevant areas will be the first step to achieve this aim so priority can be given to the construction of a humanitarian physical border security system and the purchase of border surveillance equipment. The same process will take place along the Syrian border once the clearance activity has been completed there. Preparation stage for this project: The first stages of demining, i.e. survey, marking and mapping have already been carried out in the specified eastern borders of Turkey by Land Forces Command for the regions mentioned below. All the related data for this stage will be made available by Land Forces Command by official request from MOI. The preparation activities for the region between Yassıtepe and Sibraltepe are presented as an example to these studies in the annex of the project fiche. - the border of Turkey - Armenia - the region between Dilucu - Gürbulak BCPs - the region between Gürbulak - Yassıtepe - the region between Yassıtepe - Sibraltepe - Özalp region The feasibility studies as the pre-study of this project carried out by the Land Forces Command comprise detailed measurements including the photographing of these mined areas. The surrounding of these mined areas had been marked in a way to leave a safety margin. The identification and defining of the mined areas is termed as technical survey (preparation) and was carried out by Land Forces Command in Two different teams were established by Land Forces Command to conduct an on-site examination of the minefields along the borders with Armenia, Azerbaijan and Iran. This survey detected the location of the mines to be within an error margin of +/ % from the minefield records. After that, these mined areas were marked and fenced with wire fencing. Warning signs were placed on the fencing at 50m intervals in such a way to be seen from the neighbouring countries. Identification of the needs at Eastern Borders: Given the harsh topographic and weather conditions, it is necessary to establish technologically supported physical border security systems and to construct patrol roads to control the borders more effectively. In general, the mines are located in mine panels which vary in depth between meters inland from the borders. To the rear of the minefield there are tracks, patrol roads, border lightning and watchtowers. To have the physical border security systems 500+ from the border makes the border surveillance difficult, especially in bad weather conditions and in mountainous areas. It also makes it impossible to reach the border in motorized vehicles. However, the neighboring countries have patrol roads to the borders with Turkey. The maintenance and controlling of border stones are undertaken from the neighboring countries according to the protocols made with these countries for this purpose. The borders should therefore be demined in order to establish an efficient technological system and to construct patrol roads along borders. Once the clearance activities have been completed, the borders will be supported by physical security systems, such as wire fences, command control centres and patrol roads. However, on the eastern borders it is difficult to establish these physical security systems as the mined areas are separate from each other (the minefields are not uninterrupted long lines as on the Syrian border but rather consist of a patchwork of 7 P a g e

8 separate areas). Some feasibility studies are going on for lighting, construction of roads, optical and physical security systems for this region. Also the Housing Development Administration of Turkey (TOKI) is planning to modernize some security bases but modernizing these bases is not an enough of a solution in itself; it should also be supported by mobile technological equipment to have a sound border protection around this region. It has been evaluated as appropriate to have these technological systems in the region of Van-Ağrı-Iğdır-Kars within the scope of the integrated border management project. The difficulties Turkey is facing in providing border security and controls have been mentioned in the chapters of the National Action Plan. The region of Van-Ağrı-Iğdır-Kars is very mountainous so it is necessary to have additional technological systems to control the illegal crossing route. Landmines were previously laid as barrier systems as a part of the physical border security measures within the overall national security system. Turkey has always been and remains to be seen as a step to reach Europe through illegal migration and the landmines were used along the borders to prevent illegal border crossings and secure border facilities. Due to the new perception of security, Turkey s obligations under the mine ban treaty and for humanitarian reasons, it is considered both cruel and ineffective to fight illegal border crossing, smuggling and cross-border crimes in this way. Mine-contamination also makes it difficult to patrol along the border for surveillance. So, in today s conditions, this minefield barrier needs to be replaced with modern technology but the presence of landmines prevents this from happening. If these areas are demined, modern border technology can be established in that region and staffed and maintained without putting any personnel at risk. Hence; - Due to the changes in the perception of security (disarmament and control of weapons), the landmines used as a deterrent to illegal migration should be cleared in the border region of Van-Ağrı-Iğdır-Kars. - The cleared mined areas will improve border surveillance through modern technology to combat illegal migration, smuggling and cross border crime. - The removal of landmines and establishment of more effective and humanitarian border management methods will save lives. Mine Casualties in Turkey: In most cases, the location of the mines are known by the people trying the cross the border illegally. However the exact locations of mines may change due to weather conditions or to soil movements so even if people think that they can cross these mined areas along the borders,. it is not always the case and many people die or are severely wounded. The way to prevent these casualties is to demine these areas and to provide a more secure way of protecting the borders within the context of border management. Once these minefields are cleared, the casualties caused by these landmines will disappear. The total number of mine/ied and ERW casualties in Turkey is unknown. In its Mine Ban Treaty Article 7 reports Turkey reported 4,189 mine/erw casualties, including 855 people killed and 3,334 injured, as of the end of However, Landmine monitor notes that according to a media report in April 2010, the Ministry of Internal Affairs had recorded 6,360 mine casualties since 1984; 1,269 people were killed (625 security personnel, 644 civilians) and another 5,091 people were injured in mine incidents. In 2007, a demining specialist reported at least 10,000 mine casualties (mostly civilians) along the Turkish-Syrian border since the 1950s (more than 3,000 killed and 7,000 injured). The annual statistics for recent years is given in the table below. 8 P a g e

9 Casualties from landmines in Turkey Year Injured Killed Total casualties Source: Landmine monitor 2012 Quantity of Mines in Turkey: The table below provided the Border Management Bureau shows the exact number of minefields and quantity of mines laid within the affected regions. Border Region Number of Size of mined Number minefields area (m²) mines of Year of laying Ardahan ,225 9, Armenia Kars ,285 10, Iğdır 6 32, Azerbaijan Iğdır 1 85,800 2, Iğdır 13 3,359,380 41, Iran Ağrı 122 6,797, , Van 133 2,984,640 32, Hakkâri 239 1,180,000 11, Total ,699, ,002 Civil society aspect: Within the scope of this project design, Initiative for a Mine Free Turkey (IMFT) was consulted to obtain their views in relation to the impact on civil society. As these minefields are far away from any settlements, the project does not have a direct impact on the local communities. Therefore, no community liaison activities are planned. There are some activities in the region which can be regarded as awareness raising activities such as law enforcement authorities informing the village headmen about minefields who in turn inform the local people on this issue. 9 P a g e

10 From time to time the importance of the issue is emphasized in sermons taking place in mosques. Apart from these activities, no special public awareness campaign is planned. During the clearance operations clearance contractors will have the responsibility to inform the local Land Forces commander on activities before, during and after they conduct clearance. So Land Forces can inform the local village elders who will disseminate information to local inhabitants. Current level of progress As part of the planning for this project Turkey set up a Task Force, bringing together different agencies responsible for border management, asylum and migration. The task force included the General Staff, Ministry of the Interior (General Directorate for Public Security, Gendarmerie General Command and the Coast Guard Command), Ministry of Foreign Affairs, the Under-secretariat of Customs. They developed an overall strategy in these areas in 2002, under the coordination of the Ministry of Interior and three separate working groups connected to this task force were established in the fields of asylum, migration and external borders. As a result the Strategy Paper for the Protection of External Borders was issued on 14 April 2003, with the contributions of the representatives from institutions and agencies such as the General Staff, Ministry of Foreign Affairs, Ministry of the Interior (General Command of Gendarmerie, General Directorate for Security and the European Union Coordination Department). Based on the strategy paper, the National Action Plan towards to Implementation of Turkey s Integrated Border Management Strategy was drawn up as a result of the twinning project carried out in cooperation with France and UK Consortium and was approved by Prime Minister of Turkey on 27 March A working group on external borders continues to hold monthly meetings on the latest progress and problems regarding infrastructure needs for border surveillance and control. A training strategy, programme and curriculum in EU standards for the new border police was established. As a result of the twinning project Development of a Training System for Border Police carried out in cooperation with Spain and Hungary Consortium in the end of 2007, a Common Manual of Checks at the External Borders was developed for personnel currently working at borders. As the legislative, administrative and infrastructural efforts to strengthen the existing border security capacity in accordance with the EU Acquis and standards will take a long time, it has been decided to do it step by step. Therefore the project Action Plan on Integrated Border Management- Phase I was developed, accepted in the context of the first component of IPA in 2007 and started in second quarter of 2010 and is still under implementation. The Border Management Bureau was established in the Ministry of Interior on 15 October This unit is affiliated to the Undersecretary of the Ministry of the Interior. The unit is responsible for carrying out studies for legislative and administrative structure of IBM, preparing of assessment and needs analysis on IBM, carrying out IBM projects, working on the establishment of a new border security unit, organizing External Borders Task Force with the participation of institutions responsible for border surveillance and control on a monthly bases. The Integrated Border Management Coordination Board under the presidency of Undersecretary of Ministry of Interior, with participation of high level representatives from General Staff, Ministry of Foreign Affairs, Ministry of Health, Ministry of Transportation, Ministry of Agriculture and Rural Affairs, Gendarmerie General Command, Undersecretaries of Customs, Under-secretariat of Maritime Affairs, Ministry of EU Affairs, Security General Directorate, Coast Guard Command and General Directorate, National Police was established in May The main goals of the Integrated Border Management 10 P a g e

11 Coordination Board are to develop strategy and policy, to set priorities and oversee implementation of core documents in IBM. According to information provided, the Turkish authorities are in process of establishing implementing bodies which will co-ordinate implementation of IBM documents. In the Justice and Home Affairs Council Meeting which was held in Brussels on February 2010, 29 measures were agreed for reinforcing the protection of the external borders and combating illegal immigration. In article 26 The Commission is also invited, in the context of the existing Instrument for Pre-accession Assistance (IPA) financial framework, to explore possibilities to provide adequate financial means to improve Turkish capacity to tackle illegal migration, including support to the implementation of the Turkish integrated border management system. The corresponding Turkish legislation: Law No: 3497 on Protection and Security of Green Borders. According to this law: - Land Forces Command is tasked to protect and secure the green borders and this task shall be fulfilled by border units. The Land Forces Command is the authorized body for the security of the land borders of Turkey under the provisions of Act No on the Protection and Security of Land Borders. - Law No on the Tender and Mine Clearance Activities along the land borders between the Republic of Turkey and Syria Arab Republic had been accepted in the Turkish Grand National Assembly on 4th June 2009 and entered into force on 17th June Current institutional changes: In compliance with the provisions of Act No on the Protection and Security of Land Borders, the responsibility of border surveillance on the Iraqi border is transferred from the Gendarmerie General Command to the Land Forces Command. As part of the studies regarding the changes in the legal and institutional structures in the area of border management; a Draft Law on Border Security was prepared as it was envisaged at the 2008 National Program. The draft law was sent to other ministries and institutions in order to get their comments and the process is still going on. As foreseen in the Action Plan, the new border management organization will be a welltrained, professional, centrally organized, non-military unit under the Ministry of Interior. UN Assistance to Demining The vision of the United Nations is a world free of the threat of landmines and explosive remnants of war (ERW) fourteen UN department, agencies, programmes and funds play a role in mine-action programs in 30 countries and three territories to achieve this vision. UNDP works in Mine Action in over 20 countries and manages several global partnership projects. UNDP works closely with its UN mine action partners particularly the UN Mine Action Service (UNMAS), United Nations Children s Fund (UNICEF), and the UN Office for Project Services (UNOPS) and with national and international non-governmental organisations, to establish an effective and coordinated approach to the landmine problem. UNDP is the UN s global development network, advocating for change and connecting countries to knowledge, experience and resources to help people build a better life. UNDP is on the ground in 166 countries, and are thus able to respond rapidly to crisis situations and requests for mine action assistance from governments. UNDP provides technical assistance 11 P a g e

12 and training, and it assists national and local authorities with a range of activities including but not limited to: establishing and sustaining national Mine Action Centres, to coordinate, prioritise, and assure the quality of mine action operations setting up and launching information management systems creating national legislative frameworks developing resource mobilisation strategies PROJECT STRATEGY Definition of Demining Demining is considered to be one component of mine action. Mine Action is defined as, activities which aim to reduce the social, economic and environmental impact of mines, and ERW including unexploded sub-munitions. Demining refers to activities which lead to the removal of landmine and explosive remnants of war (ERW) hazards, and include non-technical survey, technical survey, mapping, clearance, marking, post-clearance documentation, community mine action liaison and the handover of cleared land. Another term often used for the removal of suspected landmine hazards is land release, which IMAS defines as the process of applying all reasonable effort to identify or better define Confirmed Hazardous Areas (CHA) and remove suspicion of mines through non-technical survey, technical survey and/or clearance using an evidencebased and documented approach (IMAS 04.10). For this project the word demining will be used instead of land release. Demining can be carried out as a humanitarian intervention, or it may be for socio-economic development in support of national agenda. Despite differences in approach, and possibly even different objectives, common core activities exist, which carry common responsibilities and these are addressed in the International Mine Action Standards (IMAS), in particular in IMAS the Guide for the management of demining operations. The quality of demining is critical and Quality Management, meaning the coordinated activities to direct and control an organisation with regard to quality, (ISO 9000:2000) is a fundamental part of demining to ensure that land has been cleared to international standards and is safe for use. Quality Assurance (QA) is the part of Quality Management focused on providing confidence that quality requirements will be fulfilled. The purpose of QA in humanitarian demining is to confirm that management practices and operational procedures for demining are appropriate, are being applied, and will achieve the stated requirement in a safe, effective and efficient manner. Internal QA will be conducted by demining organisations themselves, but external inspections by an external monitoring body should also be conducted). Quality Control (QC) is the part of Quality Management focused on fulfilling quality requirements QC relates to the inspection of a finished product. In the case of demining, the 'product' is safe cleared land (IMAS 04.10). UNDP will contract the external QA/QC through a contracted service provider. General Overview The overall objective of the Project is to contribute to the social and economic development through demining and more secure borders in Eastern Turkey. The specific objective of the Project is to contribute to the prevention of illegal migration and cross-border crime on Turkey s eastern borders by clearing the border regions of mines and providing effective humanitarian border surveillance tools for a technologically supported modern border surveillance system 12 P a g e

13 UNDP Turkey will be responsible for the implementation of the Project. UNDP will provide technical assistance for demining activities along eastern borders, which are subject to the Project at hand and in close coordination with MoI Border Management Bureau. This includes the following: Project Management (Technical Assistance Team) including: o Adjusting the National Mine Action Standards for the area covered o Inception o Project quarterly and financial reports o Accreditation of the bids during tendering Coordinating and contracting of clearance organizations Coordinating and contracting of Quality Assurance/control organizations Conducting a post-clearance review and report on the project. Due to no National Mine Action Authority (NMAA) in Turkey a Memorandum of Understanding (MOU) was signed on the 1 August 2013 between representatives of the Ministry of Interior (MoI), Turkish General Staff, Ministry of National Defence and Land Forces Command This MOU was agreed to ensure successful cooperation for mine clearance activities along the eastern borders of Turkey to take place. The above mentioned group will establish a Project Implementation Committee (PIC) who will undertake the duties such as managing and coordinating project activities, establishing cooperation between beneficiary institutions, following up on the project activities in cooperation with the contracting agency (UNDP) and project partners. The PIC for this project will act as the de facto NMAA until a formal NMAA is established. The PIC will sign clearance certificates once land is cleared The purpose of the project is to clear known mined areas along the eastern borders of Turkey within a 24 month time frame. The border regions Van, Agri, Igdir and Kars are all contaminated with Anti-Personnel (AP) mines, which have been surveyed, mapped, marked with the minefield records held centrally by Land Forces Command. Demining activities for this project therefore will include only clearance, QA/QC (including post-clearance documentation) and the handover of cleared land. The remaining component of demining is community mine action liaison and will not be required as the border minefields are in military restricted areas. UNDP will establish a Technical Assistance Team (TAT) that will be responsible for managing the clearance component and the quality assurance/quality control, certification component and for conducting a post clearance review upon completion of the project. TAT will consist of key experts and administrative staff that will be recruited based on the required skills. TAT will function in the Project Office (PO) that will be established within the facilities of the MoI. TAT will work in close cooperation with the representatives of the beneficiary in the PO. It is expected that the PO will develop into a Mine Action Centre (MAC) that will report directly to the NMAA. The most practical approach for conducting the clearance of the eastern border is to split the project into three clearance areas/lots for contracting and one QA/QC/Certification contract covering all allocated areas/lots. The division of clearance lots based on geographical considerations, military controlled zones and terrain conditions, contractors bidding on the clearance areas/lots may bid on single areas/lots or on all areas/lots. The minimum amount of contractors used should reduce logistical and management costs and maintain better monitoring and control over the contractor. These areas/lots have been identified during the preparatory period. The contracting should be done in accordance with UNDP s rules and regulations, through competitive tendering by UNDP (e.g. using the UN Global Marketplace website). 13 P a g e

14 The demining period will be effected during the winter months and the clearance QA/QC; Certification contractors will be stood down during the winter period. GEOGRAPHICAL LOCATION OF PROJECT The project runs along the eastern border of Turkey along the borders of Armenia, Azerbaijan and Iran. The minefields are laid in the Turkish provinces of Van, Agri, Igdir and Kars in total there are 241 minefields to be cleared containing around 200,000 mines. Due to climatic conditions the minefields to the north in the province of Kars will only be accessible for demining for 6 months, the central provinces of Agri and Igdir 7 months and the southern province of Van 8 months. These regions also fall under 3 different military commands. Border regions of Kars, Igdir, Agri and Van 14 P a g e

15 DETAILED DESCRIPTION OF ACTIVITIES Overview Preparatory Work (PW) for the Demining of the Eastern Borders of Turkey was launched in August 2014 with the aim of conducting activities to be initiated before the official start of the Project at hand. The PW, which was fully funded by EU, provided an opportunity to bridge the period until the signature of the Grant Contract with UNDP through conducting the immediate activities as listed below: - Project analysis covering the survey of minefields and production of project documentation for Statement of Requirements (SORs), - Draft expression of interest (EOI) for clearance contractors and QA/QC service providers - Advertise the Expression of Interest with Prequalification at the UN Global Market Place and evaluate the applicants and final prequalification for the clearance and QA/QC contractors /service providers - Draft RFPs for pre-qualified clearance and QA/QC service providers - Conduct site visits to minefields with preselected contractors - Submit RFP for contracting through UNGM - Award contracts following the approval by the UN Headquarters The PW is to be completed by end-january 2015 and the results will contribute to the Inception Phase of the project at hand, since all the preparatory work prior to operations of mine clearance such as survey of the mine fields, tendering and contracting processes will be completed during the timeframe of the PW.. The inception period is planned for a period of 4 weeks, during which time the TAT will develop and fine-tune a more detailed activity and resource schedule (work plan) including the in detail definition of tasks of contractors, project management procedures and facilitate importation of equipment, security clearances of staff and establishment of logistical support bases in the project area. Thus the time plans and resources allocated to activity groups mentioned hereinafter are indicative and will be finalised by the TAT during the inception period. The Project is composed of 3 main components: Component A: Clearance: This component covers the clearance activities for the selected regions by the selected contractors. Component B: Certification / Quality Control: Using the selected contractor(s) this component aims to quality assure, quality control and provide post-clearance certification to provide confidence (to the beneficiary and the implementation agency) that clearance and quality requirements defined in the standards have been met and that cleared land is indeed safe for use. Component C: Post-clearance: This component aims to identify the lessons-learned which are relevant to the planning, preparation and clearance phases of the operation through the conduct of a formal post project review (PPR) by a service provider (short term expert) assigned by UNDP. A fourth complementary component (Component 0: Project Management) will ensure efficient and effective implementation of the Project. This component covers the establishment of a technical assistance team that will be responsible from managing the 15 P a g e

16 clearance, certification and post-clearance components including commercial tendering, monitoring, reporting and completion for the demining project. Component 0 Project Management This component covers the management of the demining project, including the contracting of the demining organisations to carry out the clearance and QA/QC contracts, the management of those contracts and the post project review. It covers the initial recruitment and establishment of the TAT, the inception period to fine-tune the project activities and resource schedules in a work plan, the commercial contracting process, and the accreditation, monitoring and reporting of the clearance and QA/QC contracts throughout the project period. The project period will have some lighter schedule (or breaks) at winter times, which would require less work for the project field team. The specific activities under this component are listed below: O.1. Select and recruit all other TAT members. Other members of the TAT will be selected and recruited with the active participation of the beneficiary. (Output: Delivery of the outputs throughout the project life span). O.2. Establish Project Office: The Project Office will be established within the facilities of the Ministry of Interior. Required furnish of the office and daily running costs will be met from the Project budget. (Output: Fully functional infrastructure to support the project team). O.3. Lease 2 project vehicles for TAT to travel to site locations: For the use of TAT and shortterm experts two vehicles will be leased and equipped as required by the UN security guides. (Output; Mobility to monitor and control project activities in the different clearance areas/lots). O.4. Procure Personnel Protective Equipment (PPE) for project staff: For the safety of the project staff, required personnel protective equipment including helmet and body armour plus additional field equipment (GPS) will be purchased. (Output; PPE used by project staff, inspection and monitoring of clearance and QA contracts done in full compliance with international Health and Safety standards for working in hazardous environments). O.5. Fine-tune the project activities and resource schedules in a detailed work plan and draft the inception report weeks : TAT, in close cooperation and consultation with the beneficiary, will fine tune the project document, including the time plan, during the inception period of the Project, whose duration is 4 weeks(output: Inception Report). O.6. Mobilisation of clearance contractor/s and QA/QC service provider: Contractor/s for the clearance and service provider for QA/QC will be mobilized and ready to undergo operational accreditation prior to starting work. (Output: Clearance contractor/s and QA/QC service provider mobilized).. O.7. Accreditation of clearance contractor/s and QA/QC service provider by UNDP TAT: Contractor/s for the clearance and service provider for QA/QC will be mobilized and ready to work. (Output: Accreditation documents and certification). O.8. Project launch event: A high-profile project launch event will be organised in Ankara. O.9. Monitoring clearance contractor/s and QA/QC service provider by UNDP TAT: Clearance contractor/s and QA/QC service provider will be under periodic monitoring to ensure quality standards are being met. (Output: Monitoring reports). 16 P a g e

17 O.10. Site suspension and close down of operations over winter period: Sites are marked, documented and safe during the stand-down period in the winter months. (Output: Marked sites). O.11. Start of second season of operations: Clearance contractor/s and QA/QC service provider are mobilised and ready to work for the second demining season. (Output:. Mobilized contractor/s and QA/QC service provider). O.12. Completion of tasks by clearance contractor/s and QA/QC service provider: Clearance contractor/s and QA/QC service provider will complete the tasks as required in the tender document. By the completion, the land will be safe and certified, clearance report completed. (Output: Cleaned and certified land, clearance report). O.13. Project Closure Event: With the handover of the land and its certification as clear from land mines the Project will be completed and a high level project closure event will be organized in Ankara (Output: Land handed over and certified as clear from landmines). O.14. Post Project Review conducted: A post-project review will be conducted. The review will include a lessons learned report. (Output: Post Project Review). O.15. Final report submitted to beneficiary on completion of the post-project review. (Output: report submitted within 6 months of project completion) Component A Clearance The main objective of Component A is to clear the selected regions covering the border of Turkey-Armenia; the region of Dilucu-Gürbulak; the region of Gürbulak and Yassıtepe (Border Stone No.125); the region of Yassıtepe (Border Stone No. 125) and Sibraltepe (Border Stone No.228); the region of Sibraltepe (Border Stone No.228) and the Özalp region. Specific activities under this Component areisted below: A.1. Draft contracts and agree on clearance methodology with contractor(s). (Output contract(s) and documented agreement on methodology). A.2. Clearance contractor(s) mobilises and undergoes operational accreditation by the selected QA/QC service provider, details of the process will be covered in the Statement of Requirements (SOR). (Output: contractor and equipment in country and country accreditation approved). A.3. Mine clearance conducted by clearance contractor(s). (Output: mines cleared, land made safe, task clearance reports) A.4. Clearance contractors provide written reports, maps and certification to say that they have made the area safe from mines. (Output clearance report, lessons learned report, and certification of cleared land). A.5. Complete clearance contract and write post project review (Output: clearance contractor s post project report). 17 P a g e

18 Component B Certification / Quality Control Quality Assurance/Quality Control/Certification of the cleared land will be carried out to examine the clearance and quality requirements defined the agreed standards have been met and that cleared land is indeed safe for use. The aim of Quality Assurance/Quality Control/Certification that will be conducted by the QA/QC service provider is to provide confidence (to the beneficiary and UNDP) that clearance and quality requirements defined in the standards and the contracts have been met and that cleared land is indeed safe for use. The service provider for Quality Assurance/Quality Control/Certification will be selected by UNDP in line with its corporate rules and procedures. This inspection forms part of a management process which aims to verify the quality of clearance, and to establish sufficient confidence that the demining contractor has removed or destroyed all mine and ERW hazards from the specified area to the specified depth, in accordance with its agreed contractual obligations. Certification/Quality Control activities should also inspect the accuracy of post clearance marking and survey as indicated in completion reports. The inspection body should gain accreditation to operate as an inspection body; apply the national mine action standard for the inspection of clearance tasks. If there is any deficiency provision Eastern Borders Mine Clearance Standards, the inspection body shall apply IMAS and maintain and make available documentation including the sampling plan, methods of inspection and the results of inspections. All the activities related to Certification/Quality Control will be in full compliance with IMAS and standards developed for the Syrian border which are being modified for the eastern borders. Specific activities under this Component are listed below: B.1. Draft contracts and agree on QA/QC methodology with service provider. (Output contract(s) and documented agreement on methodology). B.2. QA/QC service provider mobilises and undergoes operational accreditation by UNDP TAT. (Output: contractor and equipment in country and country accreditation approved). B.3. QA conducted by the QA/QC service provider at each task site. (Output: mines cleared to agreed standards, QA conducted and QA reports for each task site.). B.4. QC and post clearance inspection (sampling) of cleared land conducted. (Output: post clearance inspection report, maps and certification to say that the area is safe from mines). B.5. Complete QA/QC contract and write post project review (Output: QA/QC service providers post project report). B.6. Handover of certified cleared land. (Output: land handed back to Land Forces Command and certified free of mines with clearance certificate signed by all parties) Component C Post Clearance The post project review (PPR) will be conducted to identify lessons-learned which are relevant to the planning, preparation and clearance phases of the operation. The main objective of Component C is to conduct a post project review (PPR) to identify lessons learned of the de-mining process covering all stages i.e. from planning, preparation to clearance of the operation. Within the terms of this agreement UNDP is required to 18 P a g e

19 conduct the PPR including a report on the suitability of the equipment, procedures, training and support and should have all accident/incident reports appended. Issues of concern should be identified and prioritized, and solutions proposed. This activity is not a certification process; just a post implementation review of the contractor and service provider on how they carried out the demining work, what kind of difficulties they have faced during the clearance activities. The post project review will be carried out by a service provider (STE) assigned by UNDP which will be selected according to UNDP rules and procedures. The PPR will be distributed to EUD, MoI, UNDP, and all members of the PIC. Where PPRs highlight shortcomings in established equipment or procedures, particularly issues involving safety, they should be more widely distributed. Specific activities under this component are listed below: C.1. The Project Manager documents all procedures and guidelines for the UNDP TAT and maintains a daily log throughout the duration of the project. (Output: TAT guidelines, MOU with PO, daily log) C.2. A lessons log is to be completed during the life cycle of the project and up dated on a regular basis.(output: lessons log and lessons learnt report) C.3. A formal workshop shall be run at the end of the project with all key personnel present so information from all sides can be captured within the PPR. (Output: workshop report). C.4. Conduct and document a Post Project Review (Output: post project report). PROJECT LAUNCH AND CLOSURE EVENTS Project launch and closure events are to be scheduled at the start of clearance operations and on completion of the Project. The events should include all stakeholders and should focus on promoting the clearance of landmines on Turkish borders in line with its commitment to the Mine Ban Treaty. Successful implementation and finalisation of the project call for a number of measurements. Visibility of the project carries utmost importance both for the Government of Turkey, UNDP and the European Commission. Thus high-profile project launch and closure events will be organised. In order to inform all stakeholders and media about the results and outputs generated by the project, the closure event will be held with the participation of representatives from line ministries, Turkish Land Forces, CSOs, academia, media and international partners. As a result of the one day closure event, a press report including the outputs produced and results achieved during the lifetime of the project will be developed PROJECT AUDIT In line with the Financial and Administrative Framework Agreement (FAFA) and the General Conditions (Article 16), the financial transactions and financial statements shall be subject to the internal and external auditing procedures laid down in the Financial Regulations, Rules and directives of UNDP. PROJECT EVALUATION 19 P a g e

20 Any evaluation and monitoring exercises will be undertaken in compliance with the provisions of the FAFA (Art.1) and the General Conditions (Art. 8). The project will be evaluated (technical evaluation) by an independent team of experts. The selection of independent team of experts for evaluation will be made in line with UNDP rules and procedures. The evaluations are expected to be conducted at end of each year. METHODOLOGY FOR CLEARANCE AND QA/QC/Certification The methodology for this project, like in all planned UN supported demining activities must be in accordance with International Mine Action standards (IMAS) or Eastern Border National Standards adapted from the Syrian Border National Standards Clearance Procedures The need for effective and safe operational procedures is essential. Some operational procedures are based on international norms and 'best-practice', such as the destruction of mines and ERW in-situ, safety distances and the handling of explosives. Some are based on the local mine and ERW hazards and ground conditions. Some reflect equipment characteristics and performance. And some reflect local preferences, such as the position adopted for prodding and excavation. The organisations who are awarded the demining contracts for this project are to have Standing operating procedures (SOPs) prepared for all operational procedures, practices and drills in line with IMAS and national standards and tailored for the local mine hazards and ground conditions. The SOPs will be instructions that define the preferred method of conducting the operational task or activity. Their purpose is to establish recognisable and measurable degrees of uniformity, consistency and commonality within an organisation, with the aim of improving operational effectiveness and safety. Explosive Ordnance Disposal (EOD) EOD involves the disposal of mines and ERW, including unexploded sub-munitions. (See definition in IMAS 04.10). Any mines which are cleared as part of these demining contracts are defined as EOD operations. Guidance for the management of EOD as part of demining programme is given in IMAS It covers general principles and management responsibilities. It does not provide specific technical guidance for the disposal of particular Explosive Ordnance (EO). CWA 15464:2005 provides guidance on requirements of EOD competencies. Manual Demining The aim of manual clearance is the identification and removal or destruction of all mines and Explosive Remnants of War (ERW) hazards, (including unexploded sub-munitions), from a specified area to a specified depth to ensure the land is safe for land users. IMAS provides guidance on clearance requirement. The Clearance Contractor should apply guidelines (SOPs) in advance of clearance; formally recording the area and depth of the intended clearance and manual methodology for each project in a implementation plan which is approved prior to clearance activities. Use of Mine Detection Dogs (MDD) The use of MDD to detect the vapour from buried mines and munitions is one of the key methodologies in demining (along with manual and mechanical demining). It is never a stand-alone demining methodology but used in conjunction with other methodologies. IMAS provides guidance to NMAA and to demining agencies using MDD. Mechanical Demining 20 P a g e

21 An increasing number of mechanical devices have been produced, that aim to either detonate, destroy or isolate mines. The use of demining machines is one of the key methodologies in demining (along with manual demining and MDD). It is never a stand-alone demining methodology but used in conjunction with other methodologies. IMAS provides guidelines for mechanical demining operations. All mechanical systems should be formally evaluated to confirm that they are safe, effective and reliable. Ideally, trials (and the subsequent evaluation of trials data) should be carried out before mechanical systems are introduced into mine action programmes. However, sometimes it may be necessary for the evaluation to be carried out after a programme has commenced. CWA 15044:2004 provides guidelines for the testing of demining machines. Quality Assurance (QA) The purpose of QA is to confirm that management practices and operational procedures for demining are appropriate, and will achieve the stated requirement in a safe, effective and efficient manner. This is an important process by which residual risk can be shown to be as low as reasonably practicable. Internal QA will be conducted by demining organisations themselves, but external inspections by an external monitoring body should also be conducted. Monitoring should involve structured discussions with management and deminers, and formal inspections of SOPs, reports and records. For this project the TAT will contract an independent organisation to carry out the quality monitoring and inspections of the contracted demining organisation(s) under its authority and responsibility, exercised under conditions agreed in the contract or formal agreement. This QA/QC service provider will be required to have all the facilities, staff, management systems and SOPs necessary for adequate inspection and monitoring. IMAS provides guidance on the monitoring requirements and detailed responsibilities. Safety and Occupational Health (S&OH) Managers of demining programmes are required to achieve a safe working environment by providing effective management and supervision, by developing work practices that contribute to risk reduction, by selecting equipment with inherently safe design, by providing appropriate training, and by making available effective and suitable personal protective equipment (PPE) for both men and women. Given the wide range of operational settings and demining activities, it is not possible to provide a precise and complete set of specifications that apply to all situations. The contracted demining organisations should develop and maintain management procedures and processes that will enable S&OH risks to be identified, evaluated and reduced in a systematic and timely manner for each demining task and for each demining worksite. Guidance for the development and implementation of S&OH management systems for use in demining operations is given in IMAS Guidance on demining worksite safety is given in IMAS Guidance on PPE is given in IMAS Guidance on medical support to demining operations is given in IMAS Guidance on the storage, transportation and handling of explosives is given in IMAS Guidance on the reporting and investigation of demining incidents is given in IMAS Guidance on protection of the environment is given in IMAS Quality Control (QC) Quality Control (QC) is the part of Quality Management focused on fulfilling quality requirements (ISO 9000:2000). QC relates to the inspection of a finished product. In the case of demining, the 'product' is safe cleared land (IMAS 04.10). Quality Control activities should also inspect the accuracy of post clearance marking and survey as indicated in completion reports. The inspection body (QA/QC service provider) should gain accreditation to operate 21 P a g e

22 as an inspection body; apply the national mine action standard for the inspection of clearance tasks. In the absence of a national standard, the inspection body shall apply IMAS or other standards as are specified in the contract; and maintain and make available documentation including the sampling plan, methods of inspection and the results of inspections. All the activities related to Certification/Quality Control will be in full compliance with IMAS. Post-Clearance Inspection The inspection of cleared land aims to provide confidence that the clearance requirements have been met, and as such forms an essential part of the overall clearance process. IMAS provides guidance on the implementation of a management system for inspecting the quality of land by sampling. Prior to the handover of cleared land, the area should be surveyed and marked, and all necessary documentation should be prepared, including a formal handover certificate. Handover certification The handover certificate needs to be signed by the Clearance Contractor, the QA/QC Service Provider, the TAT and the PIC (or NMAA if established during the implementation of the Project) as a representative for the landowner. IMAS provides guidance on postclearance handover requirements and management responsibilities. A clearance certificate will be drafted by the TAT for each individual task site/minefield giving details of its position, methods used, number of mines removed/destroyed and date of completion. The clearance certificate shall include details of Clearance Contractor, QA/QC Service Provider, TAT and the PIC, including names and contact details of the organisation nominated to sign. Post Project Review (PPR) The TAT shall conduct a formal post project review through a short term expert who will be selected according to UNDP rules and procedures The PPR will identify lessons-learned which are relevant to the planning, preparation and clearance phases of the operation. The post project review should include the suitability of the equipment, procedures, training and support and should have all accident/incident reports appended. Issues of concern should be identified and prioritised, and solutions proposed. The contracted demining organisations and QA/QC Service Provider will assist in this process by producing post project reports at the end of contract. The requirement for post project reports shall be drafted in the clearance/qa/qc contracts issued by the TAT, the reports will be used for analysis in the PPR for the whole project which will be compiled by TAT (see Component C). PROVISION OF TECHNICAL ASSISTANCE The TAT will be composed of 1 Project Manager (Key Expert),, 1 Project Associate, 1 Administration and Finance Associate, 1 Project Assistant/Interpreter and 2 Field Coordinators. 22 P a g e

23 Project Manager (Key Expert) SHORT TERM EXPERTS PROJECT ASSOCIATE FIELD COORDINATOR Ops/QA/QC FIELD COORDINATOR Ops/QA/QC ASSISTANT INTERPRETER ADMINISTRATION AND FINANCE ASSOCIATE Project Manager (Key Expert) (Project Manager, 24 months) The Project Manager is the mine action technical expert provided for the full time duration of the project (24 months). The Project Manager (PM) shall be the Leader of the Project Technical Assistance Team. The PM will provide high level advice and guidance to the Ministry of Interior Border Management Bureau and UNDP in the effective implementation of the mine-action project for the eastern borders of Turkey. His/her functions include managerial, supervisory and/or representative functions on all mine action related matters. In specific terms, the PM will be responsible for the following areas including project management, coordination and monitoring, technical support for demining, reporting and partnership development. Project management, Coordination and Monitoring The Project Manager: 1. Assumes overall responsibility for the successful execution and implementation of the project towards achieving the expected outputs as indicated in the Project Document and Annual Work Plans. 2. Assumes operational management of the project in line with the Project Document and in accordance with UNDP rules and regulations. 3. Coordinates operations, personnel, resources and administrative support of the Technical Assistance Team (TAT). S/he directs and supervises the work of TAT and works within agreed budgets. 4. Coordinates all project meetings and annual reviews. 5. Plans and arranges, in consultation with UNDP, the procurement of project services in line with agreed procedures. 6. Ensures project communication is in accordance with the visibility rules of the EU and communication standards of UNDP. 23 P a g e

24 7. Is responsible for the coordination, planning, documentation, accreditation and implementation processes of commercial contractors, including but not limited to the following: i. Drafting of task dossiers ii. Authorising accreditation/certification of commercial contractors iii. Approving implementation plans iv. Coordination with the senior management of the Demining contractors and the Quality Assurance / Control Service providers; v. Procurement of equipment and the financial management of project funds. 8. Undertake periodic field monitoring visits and provide timely feedback to all staff and partner organizations. Technical Support for Demining Reporting: 9. Advises the national authorities and UNDP on all aspects of mine action at the country level, including coordination, survey, mapping, marking, clearance, awareness raising and quality assurance. 10. Provides guidance to the national authorities on maintaining the eastern border mine action standards in line with International Mine Action Standards (IMAS) and best practices developed from mine action programmes worldwide. 11. Approving and authorising contractor standing operating procedures (SOPs) for mine clearance, survey, Quality Assurance and Quality control in compliance with IMAS. 12. Defining the technical requirements for the recruitment and administration of Technical Assistance Team and short term experts contracts; 13. Reports on all issues related to project management and implementation, to the UNDP Deputy Resident Representative, through the Inclusive Democratic Governance Programme Manager, 14. Prepares technical and other documents as required. 15. Provides monthly and quarterly progress reports on project activities, financial reports and final report of expenditure for the project. 16. Provides project briefing papers as requested by UNDP and the executing agency. Partnership Development 17. Encourages liaison between the concerned Government Ministries, UNDP, donors, clearance and QA/QC contractors, and any other concerned agency/organization regarding the project activities; 18. Supports UNDP in efforts to build partnerships for the support of outputs indicated in the project document; 19. Maintains regular contact with EU as donor and CFCU as contracting authority of the project; 20. Promotes international cooperation and assists the Government of Turkey in the area of mine action, when felt necessary. Qualification and skills: 1. S/he shall have an advanced degree (masters and higher in administrative or social sciences. 2. Hold a PRINCE 2 or equivalent Project Management qualification. 3. Full proficiency in English and computer literacy are required. 24 P a g e

25 General professional experience: The Project Manager shall have proven experience in working with senior government personnel and commercial contractors in the area of demining. Specific professional experience: S/he should have a minimum of ten (10) years professional international experience (as staff of an international organisation and/or past recruitment under a project of an international organisation), including at least 5 years of operational experience in mine action. S/he must have a at least 5 years of project management with a proven track record. Must have at least 5 years of experience in the application of international Mine Action Standards (IMAS). The Project Manager shall have knowledge of the UN system, in particular UNDP, UNOPS and UNICEF mine action roles and procedures. Team leading experience in an international project will be an asset Project Associate (PAS 24 months) The project associate will assist primarily the Project Manager in fulfilling his/her duties and tasks, including but not limited to drafting project related reports, letters and documents. S/he will also provide assistance to the government counterpart at the MoI and other key experts, as deemed necessary by the Project Manager for the purposes of this project. Qualifications and skills: S/he shall be a university graduate with degree in social/administrative sciences or other related fields of relevance, advanced degrees preferred. Full proficiency in Turkish and English, and computer literacy are required. General professional experience: S/he should have a minimum of 5 (five) years of professional experience, S/he should have a minimum of 2 (two) years of international experience. Specific professional experience: S/he should have a minimum of 2 years of experience in project assistance for contracts with international organizations, Experience of working with governmental organizations will be an asset, S/he should have a minimum of 3 years of experience in international projects with similar scope. Administration and Finance Associate (FPA, 24 months) An administration and finance associate will be hired for providing support on administrative and finance related issues of the Project. Qualifications and skills: University graduate with degree in economics / business administration or other related fields of relevance.. Full proficiency in English, Full computer literacy. General professional experience: At least 5 (five) years of professional experience, 25 P a g e

26 Specific professional experience: At least 2 (two) years of experience on financial and/or administrative management of international projects/contracts., 2 x Field Coordinators (Operations, QA/QC) (FC, 48 months) The 2 x Field Coordinators, are to coordinate work activities between the TAT and the demining contractors. They will be responsible for following up on site access with Land Forces, accessing minefield records, collecting clearance data, monitoring QA/QC activities, documenting clearance activities and QA/QC activities with demining contractors. The Field Coordinators will report to the TAT Project Manager.The Field Coordinator is expected to have a mine action background in mine clearance operations using different clearance methodologies. Qualification and skills: He/she shall have a university degree in management or a senior military command and staff college course. Full proficiency in English/Turkish and computer literacy are required. Valid driving license General professional experience: The Field Coordinators Operations QA/QC shall have experience in working with commercial contractors. Specific professional experience: He/she should have a minimum of five (5) years professional experience in mine action. S/he must have minimum 5 years of experience in operational management with a proven track record. Must have at least 4 years of experience in mine clearance operations applying in depth knowledge of international Mine Action Standards (IMAS) and their application. Project Assistant/Interpreter (PA 24 months) The project assistant/interpreter will be hired for providing the technical assistance team with sufficient administrative support and input of mine action data into the management system. In addition to their daily routine, project assistant/interpreter will also fulfil the tasks to be assigned by Project Manager and/or Field Coordinators. The Assistant/interpreter will be tasked to assist the experts (including STEs) to interact with the Project s stakeholders most of whom are not fluent in English, to translate outputs of the project. In addition to the Assistant/interpreter, some interpretation and translation services will be acquired for other professional work related to this project (such as simultaneous interpretation in high-profile events and professional translation of legislative pieces etc.) Qualifications and skills: S/he shall be a university degree in relevant field, Full proficiency in Turkish and English, and computer literacy are required, A degree in English from an English speaking university would be an asset, General professional experience of at least 5 years, Specific professional experience: S/he should have a minimum of 3 (three) years of experience on project assistance in international projects. Experience of working with international organizations, 26 P a g e

27 Short Term Experts (210 days) and Junior Consultants (150 days) A total of 210 man/days of short-term local and international expertise and 150 man/days of junior consultants will be mobilised for a number of activities. These activities will consist of but are not limited too; Professional development of Operations, QA/QC. Field Coordinators will need some basic training on the role and activities they are going to undertake. Basic mine action training for all field staff. (From qualified UN field QA/Ops Officers) IT training for TAT team on software systems and equipment. Training on an Information management system for managing minefield clearance data, QA reports, QC reports and clearance certification. (Could be IMSMA but not essential for this project) PPR workshop will be conducted to identify the lessons learnt on the project. Three short-term expert categories have been identified and are presented below for ease of reference and consistency. Senior Junior Local labour Overall professional experience (years) International experience (years) Min. 12 Min 3 N/A Min. 10 N/A N/A Man/days The average duration of a short-term assignment is 10 (ten) man/days, however this might vary in accordance with the specific requirements of the relevant assignment. A detailed resource schedule will be developed by the Technical Assistance Team during the inception period. Means of implementation The recruitment of staff will be done in full compliance with the UNDP rules. EUD, Beneficiary Institution and CFCU will be invited to the selection process of the project team as observers. UNDP will inform CFCU, as being the Contracting Authority, EU Delegation and beneficiaries about the final results of the recruitment as well as any changes of human resources policy during project implementation period. For each recruitment the UNDP will inform the same institutions in due time about: - the procedure to be used; - the corresponding level of observer status; - the venue and date of the procedure. The UNDP will provide the relevant documents (such as CVs). Subsequently, the UNDP will inform about: - the assessment and outcome of the recruitment procedure(s); - any changes in the composition of the project team during the project implementation period. The recruitment decision remains the final responsibility of the UNDP. 27 P a g e

28 PROJECT SCHEDULE On the initial assessment for the demining of the Eastern Border region it was calculated that the clearance phases could be completed within a 24 month time frame. This figure would be correct if the control authority and the demining assets were already in place and ready to start operations at the start of the demining season. Once the TAT is recruited and established it can then work on implementation documentation and start the mobilisation of Clearance contractors and a QA/QC service provider. For the Clearance contractors to complete the project in the 24 month time frame it is important that they can start demining at the beginning of the season (early spring) in order to fully utilise the climatic conditions suitable for demining. In the northern province of Kars demining can only be carried out for 6 months, in the central provinces of Ağrı and Iğdır for 8/9 months and in the southern province of Van for 6 months of the calendar year. MANAGEMENT STRUCTURE Project Steering Committee (PSC) For the purpose of this contract, the Steering Committee will be chaired by the Senior Programme Officer (SPO) of the MoI and will convene on quarterly basis. The Steering Committee will consist of representatives the Beneficiary, UNDP and CFCU as members. The Steering Committee will meet to discuss the progress of the project, verify the achievement of the outputs and mandatory results and discuss actions to be undertaken or whenever deemed necessary by its members. As the decision making body of the Project the PSC will provide guidance to the Project implementation. Representative of EUD will also attend the Steering Committee meetings as an observer. The SPO, when necessary, may invite other relevant participants in the Steering Committee meetings. The responsibility for the organization of the Steering Committee meetings including preparation of minutes lies with the TAT. Project Implementation Committee (PIC) Due to lack of a National Mine Action Authority in Turkey within the scope of the project, in order to undertake and coordinate mine clearance activities in the eastern borders, under the presidency of representative of Ministry of Interior, a Project Implementation Committee will be established consisting of the representatives of Turkish General Staff, Ministry of National Defence and Land Forces Command. The Committee shall not be limited to these agencies and if required, participation of other relevant institutions and organizations shall be assured as well. The beneficiaries agreed on the establishment of this Project Implementation Committee which is defined as the Steering Committee in the referred MoU, in annex IX of the Project Fiche. The Project Implementation Committee shall undertake duties such as coordinating project activities, establishing cooperation between beneficiary institutions, following up the project activities in cooperation with the contracting agency and the project partners, identifying the priorities and listing in mine clearance activities, following the completion of mine clearance and quality assurance/quality control, coordinating the handover of the cleared land and solving the possible problems that might arise in undertaking of the project. The PIC will sign clearance certificates once land is cleared. 28 P a g e

29 If a National Mine Action Authority is to be established during the course of the project the Project Implementation Committee shall transfer its duties and take the position of the National Mine Action Authority. Necessary staff from each beneficiary institution will be allocated for this purpose to work fulltime for the project office set up in MoI throughout the project implementation. Ministry of Interior (MOI), Integrated Border Management Bureau Senior Programme Officer (SPO) Senior Programme Officer (SPO) on behalf of the Integrated Border Management Bureau will be responsible for: Contributing to the initiating the project and further one carrying out the start-up activities aimed at preparation of the project s work plan; Following and monitoring the proper implementation of activities of the project and reporting to the Steering Committee; Mobilizing and coordinating other institutions involved in the project; Ensuring proper participation and representation of relevant Turkish institutions in activities organised by the Project; Liaison with the Project s Management team of the UNDP, CFCU and EUD on behalf of governmental authorities when necessary and as appropriate. The European Union Delegation in Ankara (EUD) The European Union Delegation, as an observer and also provider of funds for this project, in addition to provision of direct grant funds as a donor organization will contribute on the implementation of this project on the following aspects: Follow and monitor activities and deliveries as well as the evaluation for this programme; Participate as an observer to the Steering Committee meetings; Attend whenever necessary and represent the Donor Organization in activities and other actions during the implementation of the project; Provide advice and guidance to the Project Implementation Committee when necessary and for the purposes of improving and strengthening further the project s expected results. The CFCU (Central Finance and Contracts Unit) The Central Finance and Contracts Unit (CFCU) is the Contracting Authority of the project. The Contracting Authority will be responsible for tendering, contracting, administration, overall project supervision, review and approval of the reports, financial management including payments of the project activities. Project Office (PO) MoI will provide a Project Office (PO) within the Ministry in Ankara. Required furniture and daily running expenses of the Project office will be met from the Project. The PO will be coordinated by a Senior Program Officer (SPO) appointed by the MoI. The MoI will also task relevant staff from the Border Management Bureau to backstop the work of the UNDP Technical Assistance Team (TAT) and liaise with the TAT on day-to-day project activities. For day-to-day interactions the TAT Project Manager and the SPO will be the main contact persons for clearance contractors and service provider. The TAT responsibilities include; 29 P a g e

30 Acting as the operational body responsible for the day to day operational management and implementation of the components of the project at hand (Clearance, QA/QC and certification of land) for Eastern Borders of Turkey. Maintaining liaison with government authorities (PIC) to determine what the immediate and mid-term priorities for mine action are including the preparation of plans to address these priorities; Management of mine action activities on the Eastern Border in order to ensure that immediate and mid-term priorities for mine action are within the scope of the project, Establishment of a management information system namely Information Management System for Mine Action (IMSMA) or a similar one; Establishment and implementation of processes for gathering and maintaining information about the mine problem, recording clearance activities, maintaining clearance data and organising certification of cleared land. Assisting in developing National Mine Action Standards (NMAS) and internal systems and procedures for the effective management of mine action activities; Implementing the national mine action plan for the Eastern Border; Accrediting mine action operators for the Eastern Border and monitoring mine action activities Responsible for demining tendering and contracting for the Eastern Border. Acting as the secretariat for the PIC (NMAA, if it is established during the implementation of the Project) Example of proposed Project Office. UNDP The UNDP will manage the project through a grant contract that will be signed with the CFCU as per the Financing Agreement between the European Commission and the Government of Turkey. The UNDP is the United Nation s global development network. As an international development agency, the UNDP works with the Government of Turkey to support Turkey s development and reform agenda. UNDP will establish a Technical Assistance Team (TAT), which will work in close cooperation with the Project Office. TAT will be composed of highcalibre national and international experts to be backstopped by UNDP and supported by 30 P a g e

HIGH CONTRACTING PARTY: Republic of Lithuania NATIONAL POINT(S) OF CONTACT:

HIGH CONTRACTING PARTY: Republic of Lithuania NATIONAL POINT(S) OF CONTACT: REPORTING FORMS PURSUANT TO ARTICLE 10, PARAGRAPH 2 (b) OF THE PROTOCOL AND THE DECISION OF THE FIRST CONFERENCE OF THE HIGH CONTRACTING PARTIES TO PROTOCOL V HIGH CONTRACTING PARTY: Republic of Lithuania

More information

UN/CCW Protocol V Norway 2009

UN/CCW Protocol V Norway 2009 CONVENTION ON PROHIBITIONS OR RESTRICTIONS ON THE USE OF CERTAIN CONVENTIONAL WEAPONS WHICH MAY BE DEEMED TO BE EXCESSIVELY INJURIOUS OR HAVE INDISCRIMINATE EFFECTS (CCW) PROTOCOL ON EXPLOSIVE REMNANTS

More information

FSC.EMI/174/17 30 May ENGLISH only

FSC.EMI/174/17 30 May ENGLISH only FSC.EMI/174/17 30 May 2017 ENGLISH only PROTOCOL ON PROHIBITIONS OR RESTRICTIONS ON THE USE OF MINES, BOOBY- TRAPS AND OTHER DEVICES AS AMENDED ON 3 MAY 1996 ANNEXED TO THE CONVENTION ON PROHIBITIONS OR

More information

Annual Report 2015 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden

Annual Report 2015 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden March 2016 The Cabinet Secretariat The Government of Japan 1 Annual Report 2015 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden Somalia and the Surroundings (off the Coast

More information

UNMAS LIBYA: Humanitarian Mine Action and Arms and Ammunition Management

UNMAS LIBYA: Humanitarian Mine Action and Arms and Ammunition Management l UNMAS LIBYA: Humanitarian Mine Action and Arms and Ammunition Management The Threat The conflict in Libya witnessed the loss of national control over military materiel and a complete redistribution of

More information

IMAS Second Edition 01 October 2008 Amendment 4, June 2013

IMAS Second Edition 01 October 2008 Amendment 4, June 2013 IMAS 09.30 01 October 2008 Amendment 4, June 2013 Explosive ordnance disposal Director, United Nations Mine Action Service (UNMAS), 380 Madison Avenue, M11023 New York, NY 10017 USA Email: mineaction@un.org

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 12 May 2004 (OR. en) 8913/04 PESC 310 CONOP 14 CODUN 4 COARM 9 RELEX 188

COUNCIL OF THE EUROPEAN UNION. Brussels, 12 May 2004 (OR. en) 8913/04 PESC 310 CONOP 14 CODUN 4 COARM 9 RELEX 188 COUNCIL OF THE EUROPEAN UNION Brussels, 12 May 2004 (OR. en) 8913/04 PESC 310 CONOP 14 CODUN 4 COARM 9 RELEX 188 LEGISLATIVE ACTS AND OTHER INSTRUMENTS Subject : Council Joint Action on support for IAEA

More information

REPORT BY THE STATES PARTIES TO THE AMENDED PROTOCOL- II TO THE CCW COVERING PERIOD FROM 16 AUGUST 2006 TO 15 AUGUST 2007 DISSEMINATION OF INFORMATION

REPORT BY THE STATES PARTIES TO THE AMENDED PROTOCOL- II TO THE CCW COVERING PERIOD FROM 16 AUGUST 2006 TO 15 AUGUST 2007 DISSEMINATION OF INFORMATION PREAMBLE Pakistan supports the UN vision of a world free from the threat of landmines and Explosive Remnants of War, where individuals and communities live in a safe environment conducive to development,

More information

- PROTOCOL V - (As adopted by the First Conference at its second plenary meeting on 5 November 2007) REPUBLIC OF SLOVENIA

- PROTOCOL V - (As adopted by the First Conference at its second plenary meeting on 5 November 2007) REPUBLIC OF SLOVENIA REPORTING FORMS PURSUANT TO ARTICLE 10, PARAGRAPH 2 (b) OF THE PROTOCOL AND THE DECISION OF THE FIRST CONFERENCE OF THE HIGH CONTRACTING PARTIES TO PROTOCOL V (As adopted by the First Conference at its

More information

MINE ACTION SUB-CLUSTER

MINE ACTION SUB-CLUSTER MINE ACTION SUB-CLUSTER CHF 2014 First Round Allocation Cluster Defense Presentation Mhadeb Ben Khelifa Cluster Co-Lead (Handicap Int.) Sasha Logie Cluster Lead (UNMAS) OCHA Conference Room 4 December

More information

Roma inclusion in the EEA and Norway Grants

Roma inclusion in the EEA and Norway Grants Roma inclusion in the EEA and Norway Grants Mainstreaming for results Financial Mechanism Office Rue Joseph II, 12-16 1000 Brussels, Belgium fmo@efta.int www.eeagrants.org Background The Roma is Europe

More information

Having regard to the Treaty on European Union, and in particular Articles 28(1) and 31(1) thereof,

Having regard to the Treaty on European Union, and in particular Articles 28(1) and 31(1) thereof, 13.12.2017 L 329/55 COUNCIL DECISION (CFSP) 2017/2303 of 12 December 2017 in support of the continued implementation of UN Security Council Resolution 2118 (2013) and OPCW Executive Council decision EC-M-33/DEC.1

More information

Annual Report 2016 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden

Annual Report 2016 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden March 2017 The Cabinet Secretariat The Government of Japan 1 Annual Report 2016 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden Somalia and the Surroundings (off the Coast

More information

EOD Courses ATOM Training Ltd Courses 2018

EOD Courses ATOM Training Ltd Courses 2018 ATOM EOD Courses Catalogue 2018 Published: Jan 2018 Version: V1.1 Publisher: ATOM Training Limited Alford House Epson Square White Horse Business Park Trowbridge Wiltshire BA14 0XG United Kingdom The courses

More information

PERFORMANCE SCORE: AVERAGE

PERFORMANCE SCORE: AVERAGE ARTICLE 4 DEADLINE: 1 NOVEMBER 2023 (NOT ON TARGET TO MEET DEADLINE) PROGRAMME PERFORMANCE 2017 2016 Problem understood 6 5 Target date for completion of cluster munition clearance 3 3 Targeted clearance

More information

COUNCIL DECISION 2014/913/CFSP

COUNCIL DECISION 2014/913/CFSP L 360/44 COUNCIL DECISION 2014/913/CFSP of 15 December 2014 in support of the Hague Code of Conduct and ballistic missile non-proliferation in the framework of the implementation of the EU Strategy against

More information

IMAS First Edition 01 September 2007 Amendment 3, June 2013

IMAS First Edition 01 September 2007 Amendment 3, June 2013 IMAS 09.11 01 September 2007 Amendment 3, June 2013 Battle Area Clearance (BAC) Director, United Nations Mine Action Service (UNMAS) 380 Madison Avenue, M11023 New York, NY 10017 USA Email: mineaction@un.org

More information

Joint Operational Programme Romania Republic of Moldova

Joint Operational Programme Romania Republic of Moldova Joint Operational Programme Romania Republic of Moldova 2014-2020 Procedure for the evaluation and approval of large infrastructure projects selected through direct award Abbreviations CBC Cross Border

More information

Activity. Afghan National Security Forces. Programme Other Asia Status Implementation Country Sector Post-conflict peace-building (UN) Afghanistan

Activity. Afghan National Security Forces. Programme Other Asia Status Implementation Country Sector Post-conflict peace-building (UN) Afghanistan Afghan National Security Forces Implementation Post-conflict peace-building (UN) Start Date 9/03/2015 End Date Afghan National Police (ANP) and Central Prison Department (CPD) personnel are paid in a timely

More information

Permanent Mission of Montenegro to the UN, OSCE and other International Organizations in Vienna

Permanent Mission of Montenegro to the UN, OSCE and other International Organizations in Vienna FSC.EMI/195/17 1 June 2017 ENGLISH only Permanent Mission of Montenegro to the UN, OSCE and other International Organizations in Vienna No: 239-1/2017 The Permanent Mission of Montenegro to the UN, OSCE

More information

Section 3 Counter-piracy Operations

Section 3 Counter-piracy Operations Section 3 Counter-piracy Operations Piracy is a grave threat to public safety and order on the seas. In particular, for Japan, which depends on maritime transportation to import most of the resources and

More information

Adopted by the Security Council at its 4987th meeting, on 8 June 2004

Adopted by the Security Council at its 4987th meeting, on 8 June 2004 United Nations S/RES/1546 (2004) Security Council Distr.: General 8 June 2004 Resolution 1546 (2004) Adopted by the Security Council at its 4987th meeting, on 8 June 2004 The Security Council, Welcoming

More information

CHAD CHAD ARTICLE 5 DEADLINE: 1 JANUARY 2020 (NOT ON TRACK TO MEET DEADLINE) PROGRAMME PERFORMANCE For 2015 For 2014

CHAD CHAD ARTICLE 5 DEADLINE: 1 JANUARY 2020 (NOT ON TRACK TO MEET DEADLINE) PROGRAMME PERFORMANCE For 2015 For 2014 STATES PARTIES ARTICLE 5 DEADLINE: 1 JANUARY 2020 (NOT ON TRACK TO MEET DEADLINE) PROGRAMME PERFORMANCE For 2015 For 2014 Problem understood 6 5 Target date for completion of mine clearance 4 4 Targeted

More information

Ministry of Defence Sudan Mine Action Programme IMSMA Monthly Report- February 2017

Ministry of Defence Sudan Mine Action Programme IMSMA Monthly Report- February 2017 Ministry of Defence Sudan Mine Action Programme IMSMA Monthly Report- February 217 Abbreviations DA Dangerous area SHA Suspected Hazardous Area (result of Level 1 Survey) MF Mine Field (Result of Technical

More information

Maritime Opportunities: Turkey 2014

Maritime Opportunities: Turkey 2014 Maritime Opportunities: Turkey 2014 James V. Koch Board of Visitors Professor of Economics Old Dominion University Sponsored by the Virginia Economic Development Partnership s (VEDP) Going Global Defense

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme

Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme Non-official publication Modified version of 21 December 2013 Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme Annex 1 is an integral part of the Framework Agreement between

More information

Lebanon Mine Action Center. Brigadier General Mohamed Fehmi

Lebanon Mine Action Center. Brigadier General Mohamed Fehmi Lebanon Mine Action Center Brigadier General Mohamed Fehmi LMAC Presentation June 2011 Orientation Presentation Overview Mine Action Structure LMAC Structure, Vision, Mission & Objectives Scope of Mines,

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

PERU ARTICLE 5 DEADLINE: 1 MARCH 2017 (EXTENSION REQUESTED UNTIL 31 DECEMBER 2024) PROGRAMME PERFORMANCE For 2015 For 2014

PERU ARTICLE 5 DEADLINE: 1 MARCH 2017 (EXTENSION REQUESTED UNTIL 31 DECEMBER 2024) PROGRAMME PERFORMANCE For 2015 For 2014 PERU ARTICLE 5 DEADLINE: 1 MARCH 2017 (EXTENSION REQUESTED UNTIL 31 DECEMBER 2024) PROGRAMME PERFORMANCE For 2015 For 2014 Problem understood 4 2 Target date for completion of mine clearance 3 2 Targeted

More information

National Armed Forces Law

National Armed Forces Law Text consolidated by Valsts valodas centrs (State Language Centre) with amending laws of: 20 September 2001[shall come into force on 19 October 2001]; 20 December 2001 [shall come into force on 23 January

More information

IMAS Second Edition 01 October 2008 Amendment 5, October 2014

IMAS Second Edition 01 October 2008 Amendment 5, October 2014 IMAS 09.30 01 October 2008 Amendment 5, October 2014 Explosive Ordnance Disposal Director, United Nations Mine Action Service (UNMAS), 1 United Nations Plaza DC1-0623A New York, NY 10017 USA Email: mineaction@un.org

More information

Handicap International is looking for : Technical Advisor - Libya

Handicap International is looking for : Technical Advisor - Libya Location : TUNISIA (Tunis) Length : 3 months Starting date : 1 st November 2017 Closing date for applications : 29.10.2017 Handicap International is looking for : Technical Advisor - Libya Outraged by

More information

Newsletter JANUARY. LMA BAC Operators. HIGHLIGHTS FROM THE PROGRAM JANUARY APRIL 2011

Newsletter JANUARY. LMA BAC Operators. HIGHLIGHTS FROM THE PROGRAM JANUARY APRIL 2011 Newsletter HIGHLIGHTS FROM THE PROGRAM JANUARY APRIL 2011 JANUARY MINE ACTION COORDINATION WITH THE ROYAL MOROCCAN ARMY (RMA) The Mine Action Coordination (MACC) Senior Technical Advisor (STA) held a series

More information

On 21 November, Ukraine

On 21 November, Ukraine Reforming Ukraine s Armed Forces while Facing Russia s Aggression: the Triple Five Strategy Stepan Poltorak Four years after Ukraine s Euromaidan Revolution and Russia s subsequent invasion, Minister of

More information

OFFICE OF WEAPONS REMOVAL AND ABATEMENT BUREAU OF POLITICAL-MILITARY AFFAIRS

OFFICE OF WEAPONS REMOVAL AND ABATEMENT BUREAU OF POLITICAL-MILITARY AFFAIRS DEPARTMENT OF STATE: to shape and sustain a peaceful, prosperous, just, and democratic world and foster conditions for stability and progress for the benefit of the American people and people everywhere.

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 16.10.2014 C(2014) 7489 final COMMISSION IMPLEMENTING DECISION of 16.10.2014 laying down rules for the implementation of Decision No 1313/2013/EU of the European Parliament

More information

REPORTING FORMS COMPLIANCE

REPORTING FORMS COMPLIANCE Page 1 REPORTING FORMS COMPLIANCE pursuant to the Decision of the Third CCW Review Conference on the establishment of a Compliance mechanism applicable to the Convention, as contained in its Final Declaration,

More information

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations CALL FOR PROPOSALS Application Deadline: 22 September, 2009 This Call for Proposals is designed to pursue

More information

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME OPCW Executive Council Forty-Second Meeting EC-M-42/DG.1 17 June 2014 23 May 2014 Original: ENGLISH NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME 1.

More information

Frameworks for Responses to Armed Attack Situations

Frameworks for Responses to Armed Attack Situations Section 2 Frameworks for Responses to Armed Attack Situations It is of utmost importance for the national government to establish a national response framework as a basis for an SDF operational structure

More information

Transatlantic Strategy Forum

Transatlantic Strategy Forum EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EXTERNAL RELATIONS Transatlantic Strategy Forum CALL FOR PROPOSALS N o RELEX/C1/2009/TSF Application Deadline: 14 April 2009 An amount of EUR 50,000 was earmarked

More information

ISEC & JPEN. Financial Instruments of the EC DG JLS

ISEC & JPEN. Financial Instruments of the EC DG JLS Financial Instruments of the EC DG JLS Agenda Introduction in detail Identification of a project Development and planning Application Implementation Evaluation and auditing The JLS Instruments 3 main programmes

More information

AGRICULTURE AND RURAL DEVELOPMENT

AGRICULTURE AND RURAL DEVELOPMENT 1 EU DELEGATION NEWSLETTER JANUARY - APRIL 2016 EU-FUNDED PROJECTS AND PROGRAMS IN AZERBAIJAN AGRICULTURE AND RURAL DEVELOPMENT The EU together with its partners from the Ministry of Agriculture have launched

More information

Table Of Content. Strengthening voluntary cooperation between Member States to improve the health of EU citizens... 2 Summary... 3 Work Package...

Table Of Content. Strengthening voluntary cooperation between Member States to improve the health of EU citizens... 2 Summary... 3 Work Package... Table Of Content Strengthening voluntary cooperation between Member States to improve the health of EU citizens... 2 Summary... 3 Work Package... 8 Coordination and evaluation of the project... 8 Structured

More information

THE MILITARY STRATEGY OF THE REPUBLIC OF LITHUANIA

THE MILITARY STRATEGY OF THE REPUBLIC OF LITHUANIA APPROVED by the order No. V-252 of the Minister of National Defence of the Republic of Lithuania, 17 March 2016 THE MILITARY STRATEGY OF THE REPUBLIC OF LITHUANIA 2 TABLE OF CONTENTS I CHAPTER. General

More information

- an updated version of the list of EU embargoes on arms exports, (Annex I);

- an updated version of the list of EU embargoes on arms exports, (Annex I); COUNCIL OF THE EUROPEAN UNION Brussels, 27 April 2010 9045/10 PESC 538 COARM 38 NOTE From : Council Secretariat To : Delegations No. prev. doc.: 7016/10 PESC 257 COARM 22 Subject : List of EU embargoes

More information

CRC/C/OPAC/ARM/1. Convention on the Rights of the Child

CRC/C/OPAC/ARM/1. Convention on the Rights of the Child United Nations Convention on the Rights of the Child Distr.: General 13 August 2012 CRC/C/OPAC/ARM/1 Original: English Committee on the Rights of the Child Consideration of reports submitted by States

More information

Call For Proposals (CFP): Provision of Mine/Explosive Remnant of War (ERW) Risk Education in Afghanistan UNOPS Ref.: AFG/UNMAS/ /2017/004

Call For Proposals (CFP): Provision of Mine/Explosive Remnant of War (ERW) Risk Education in Afghanistan UNOPS Ref.: AFG/UNMAS/ /2017/004 Call For Proposals (CFP): Provision of Mine/Explosive Remnant of War (ERW) Risk Education in Afghanistan UNOPS Ref.: AFG/UNMAS/20450-001/2017/004 Contents of this CFP: 1. This document 2. Annex A List

More information

PUBLIC. Brusels,19March 2014 (OR.fr) COUNCILOF THEEUROPEANUNION 7465/14 LIMITE CSDP/PSDC148 PESC250 COAFR83 RELEX213 CONUN61 CSC55 EUCAP MALI1

PUBLIC. Brusels,19March 2014 (OR.fr) COUNCILOF THEEUROPEANUNION 7465/14 LIMITE CSDP/PSDC148 PESC250 COAFR83 RELEX213 CONUN61 CSC55 EUCAP MALI1 ConseilUE COUNCILOF THEEUROPEANUNION Brusels,19March 2014 (OR.fr) 7465/14 LIMITE PUBLIC CSDP/PSDC148 PESC250 COAFR83 RELEX213 CONUN61 CSC55 EUCAP MALI1 LEGISLATIVEACTSANDOTHERINSTRUMENTS Subject: COUNCILDECISIONontheEuropeanUnionCSDPmisionin

More information

SERBIA. Preparatory measures for full participation in Erasmus+ INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

SERBIA. Preparatory measures for full participation in Erasmus+ INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II) 2014-2020 SERBIA Preparatory measures for full participation in Erasmus+ Action Summary This action will facilitate the Serbia s harmonisation with the

More information

Africa & nuclear weapons. An introduction to the issue of nuclear weapons in Africa

Africa & nuclear weapons. An introduction to the issue of nuclear weapons in Africa Africa & nuclear weapons An introduction to the issue of nuclear weapons in Africa Status in Africa Became a nuclear weapon free zone (NWFZ) in July 2009, with the Treaty of Pelindaba Currently no African

More information

Range Clearance in Contingency

Range Clearance in Contingency Range Clearance in Contingency Nicholas J. Stolte, P.E. Former Environmental Chief, U.S. Forces Afghanistan Environmental and Munitions Center of Expertise Huntsville, AL 18 NOV 14 US Army Corps of Engineers

More information

Provisional Reporting Formats for Article 13 para 4 and Article 11 para 2. AUSTRIA. Mr. Wolfgang Banyai

Provisional Reporting Formats for Article 13 para 4 and Article 11 para 2. AUSTRIA. Mr. Wolfgang Banyai PROTOCOL ON PROHIBITIONS OR RESTRICTIONS ON THE USE OF MINES, BOOBY-TRAPS AND OTHER DEVICES AS AMENDED ON 3 MAY 1996 ANNEXED TO THE CONVENTION ON PROHIBITIONS OR RESTRICTIONS ON THE USE OF CERTAIN CONVENTIONAL

More information

Common Challenges Shared Solutions

Common Challenges Shared Solutions PROJECT SHEET Common Challenges Shared Solutions EEA and Norway Grants FINANCING PROGRAM: Program name EEA and Norway Grants Fund for Regional Cooperation 3 donor countries: Iceland, Liechtenstein and

More information

COVER PAGE OF THE ANNUAL ARTICLE 7 REPORT

COVER PAGE OF THE ANNUAL ARTICLE 7 REPORT COVER PAGE OF THE ANNUAL ARTICLE 7 REPORT NAME OF STATE [PARTY]: THE CZECH REPUBLIC REPORTING PERIOD: 01/01/2016 to 31/12/2016 Form A: National implementation measures: X un (last reporting: 2008) Form

More information

INTERNAL AUDIT DIVISION REPORT 2017/118. Audit of demining activities in the United Nations Interim Force in Lebanon

INTERNAL AUDIT DIVISION REPORT 2017/118. Audit of demining activities in the United Nations Interim Force in Lebanon INTERNAL AUDIT DIVISION REPORT 2017/118 Audit of demining activities in the United Nations Interim Force in Lebanon The Mission needed to improve utilization of its demining capacity and monitor performance

More information

Letter dated 4 October 2010 from the Secretary-General addressed to the President of the Security Council

Letter dated 4 October 2010 from the Secretary-General addressed to the President of the Security Council United Nations S/2010/510 Security Council Distr.: General 5 October 2010 Original: English Letter dated 4 October 2010 from the Secretary-General addressed to the President of the Security Council Pursuant

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 8.7.2003 COM(2003) 406 final 2003/0147 (COD) Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on Interoperable Delivery of pan-european

More information

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED

NGO Programme - Greece EEA Financial Mechanism APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED NGO Programme - Greece EEA Financial Mechanism 2009-2014 APPLICATION FORM FOR THE OUTCOME DEMOCRATIC VALUES, INCLUDING HUMAN RIGHTS, PROMOTED Athens September 2014 1 Before filling in the application,

More information

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES DRAFTED BY ACI WORLD SECRETARIAT Table of Contents Table of Contents... 2 Executive Summary... 3 1. Introduction... 4 1.1. Overview... 4 1.2. Background... 5 1.3. Objective... 5 1.4. Non-binding Nature...

More information

*Note: An update of the English text of this Act is being prepared. Text in Bulgarian: Закон за отбраната и въоръжените сили на Република България

*Note: An update of the English text of this Act is being prepared. Text in Bulgarian: Закон за отбраната и въоръжените сили на Република България Republic of Bulgaria Defence and Armed Forces Act Promulgated SG No. 35/12.05.2009, effective 12.05.2009, amended, SG No. 74/15.09.2009, effective 15.09.2009, SG No. 82/16.10.2009, effective 16.10.2009,

More information

Arms Control and Disarmament Policies: Political Debates in Switzerland

Arms Control and Disarmament Policies: Political Debates in Switzerland Swiss Day, UN Fellowship Programme Berne, August 30, 2013 Arms Control and Disarmament Policies: Political Debates in Switzerland Dr. Dr. h. c. Barbara Haering President GICHD Council of Foundation The

More information

Annex 1. Guidelines for international arms transfers in the context of General Assembly resolution 46/36 H of 6 December 1991

Annex 1. Guidelines for international arms transfers in the context of General Assembly resolution 46/36 H of 6 December 1991 I. Introduction Annex 1 Guidelines for international arms transfers in the context of General Assembly resolution 46/36 H of 6 December 1991 1. Arms transfers are a deeply entrenched phenomenon of contemporary

More information

Brussels Bucharest Dublin Madrid Milan Sofia Athens Warsaw

Brussels Bucharest Dublin Madrid Milan Sofia Athens Warsaw YOUR EUROPEAN PARTNERS IN A GLOBAL MARKET Copyright 2016 Schuman Associates Brussels Bucharest Dublin Madrid Milan Sofia Athens Warsaw www.schumanassociates.com EU is the largest donor in the world with

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross

More information

CONCLUDING ACT OF THE NEGOTIATION ON PERSONNEL STRENGTH OF CONVENTIONAL ARMED FORCES IN EUROPE

CONCLUDING ACT OF THE NEGOTIATION ON PERSONNEL STRENGTH OF CONVENTIONAL ARMED FORCES IN EUROPE CONCLUDING ACT OF THE NEGOTIATION ON PERSONNEL STRENGTH OF CONVENTIONAL ARMED FORCES IN EUROPE The Republic of Armenia, the Republic of Azerbaijan, the Republic of Belarus, the Kingdom of Belgium, the

More information

MATRA EMBASSY PROGRAM. Introduction

MATRA EMBASSY PROGRAM. Introduction MATRA EMBASSY PROGRAM Introduction Matra is a major program run by the Dutch Ministry of Foreign Affairs through which the Netherlands supports countries of the Southeast Europe with their EU accession

More information

The State Defence Concept Executive Summary

The State Defence Concept Executive Summary The State Defence Concept Executive Summary 1 The State Defence Concept outlines the fundamental strategic principles of national defence, mid-term and long-term priorities and measures both in peacetime

More information

October 13th, Foreword

October 13th, Foreword An agreement regarding the temporary U.S. presence in Iraq and its activities and withdrawal from Iraq, between the United States and the Iraqi government October 13th, 2008 Foreword Iraq and the U.S.,

More information

Action Fiche for Paraguay (Annex I) Project approach partially decentralised. DAC-code Sector Agricultural policy and administrative management

Action Fiche for Paraguay (Annex I) Project approach partially decentralised. DAC-code Sector Agricultural policy and administrative management Action Fiche for Paraguay (Annex I) Title/Number Support to the economic integration of the Paraguayan rural sector No CRIS: DCI-ALA/2010/22009 Total cost 5,100,000 EU Contribution: 4,000,000 Contribution

More information

Mobility project for VET learners and staff

Mobility project for VET learners and staff Mobility project for VET learners and staff Organisations may apply for a VET learners and staff mobility projects in two ways: Any eligible organisation may apply for funding for Mobility projects for

More information

Convention on Nuclear Safety

Convention on Nuclear Safety Convention on Nuclear Safety National Report by Malta for the 7 th Review Meeting Made in connection with Article 5 of the Convention on Nuclear Safety List of Acronyms and Abbreviations... 2 Introduction....

More information

LESSON 2: THE U.S. ARMY PART 1 - THE ACTIVE ARMY

LESSON 2: THE U.S. ARMY PART 1 - THE ACTIVE ARMY LESSON 2: THE U.S. ARMY PART 1 - THE ACTIVE ARMY INTRODUCTION The U.S. Army dates back to June 1775. On June 14, 1775, the Continental Congress adopted the Continental Army when it appointed a committee

More information

People Programme. Marie Curie Actions. 7th Framework Programme for Research and Technological Development

People Programme. Marie Curie Actions. 7th Framework Programme for Research and Technological Development People Programme Marie Curie Actions 7th Framework Programme for Research and Technological Development MARIE CURIE INITIAL TRAINING NETWORKS (ITN) What are Marie Curie Initial Training Networks? Initial

More information

Operation TELIC - United Kingdom Military Operations in Iraq

Operation TELIC - United Kingdom Military Operations in Iraq Ministry of Defence Operation TELIC - United Kingdom Military Operations in Iraq REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 60 Session 2003-2004: 11 December 2003 LONDON: The Stationery Office 10.75

More information

EXPLOSIVE ORDNANCE DISPOSAL

EXPLOSIVE ORDNANCE DISPOSAL EXPLOSIVE ORDNANCE DISPOSAL 1. INTRODUCTION Page 1 of 5 Chapter 5 1.1 For the purpose of this NTSG the term unexploded ordnance (UXO) applies to all ordnance, munitions and landmines which may be found

More information

Permanent Structured Cooperation (PESCO) first collaborative PESCO projects - Overview

Permanent Structured Cooperation (PESCO) first collaborative PESCO projects - Overview Permanent Structured Cooperation (PESCO) first collaborative PESCO projects - Overview Project Description Press contact European Medical Command The European Medical Command (EMC) will provide the EU

More information

Summary Project Fiche

Summary Project Fiche Summary Project Fiche 1. Basic nformation 1.1 CRS Number: 2003/005-630-03 1.2 Title: Cross-Border Employment nitiative 1.3 Sector: CBC Greece 1.4 Location: Cross-border regions 2. Objectives 2.1 Overall

More information

U.S. DEPARTMENT OF HOMELAND SECURITY

U.S. DEPARTMENT OF HOMELAND SECURITY U.S. DEPARTMENT OF HOMELAND SECURITY SECRETARY DEPUTY SECRETARY Executive Secretariat Military Advisor MANAGEMENT Under Secretary SCIENCE & TECHNOLOGY Under Secretary NATIONAL PROTECTION & PROGRAMS Under

More information

European Forum for Disaster Risk Reduction 1 (EFDRR) Concept Paper. Overview

European Forum for Disaster Risk Reduction 1 (EFDRR) Concept Paper. Overview European Forum for Disaster Risk Reduction 1 (EFDRR) Concept Paper Overview Overall Objective: 1. The European Forum for Disaster Risk Reduction is intended to serve as a forum to stimulate and facilitate

More information

Public Safety and Security

Public Safety and Security Public Safety and Security ESF #13 GRAYSON COLLEGE EMERGENCY MANAGEMENT Table of Contents Table of contents..1 Approval and Implementation.3 Recorded of Change.4 Emergency Support Function 13- Public Safety..5

More information

Response: Accept in principle

Response: Accept in principle Response by the Welsh Assembly Government to the Report of the European and External Affairs Committee: European Year for Combating Poverty and Social Exclusion Recommendation 1. The Welsh Government to

More information

The Dialogue Facility THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support

The Dialogue Facility THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support www.dialoguefacility.org THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support 1 This publication has been produced with the assistance of the European Union. The contents of this publication

More information

6 TH CALL FOR PROPOSALS: FREQUENTLY ASKED QUESTIONS

6 TH CALL FOR PROPOSALS: FREQUENTLY ASKED QUESTIONS 6 TH CALL FOR PROPOSALS: FREQUENTLY ASKED QUESTIONS MARCH 2018 Below are some of the most common questions asked concerning the R2HC Calls for Proposals. Please check this list of questions before contacting

More information

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE WORK PROGRAMME 2012-2013 CAPACITIES PART 3 REGIONS OF KNOWLEDGE (European Commission C (2011) 5023 of 19 July 2011) Capacities Work Programme: Regions of Knowledge The work programme presented here provides

More information

Somalia Summary Graphs. Project By Agency. Organization Type UN International NGO

Somalia Summary Graphs. Project By Agency. Organization Type UN International NGO Somalia 2016 Summary Graphs Fund Detail By By 25M 20M 15M 10M 5M Budget Amount (USD) Shortfall Organization Type UN International NGO Area of work Risk Education Capacity Development Weapons and Ammunition

More information

CSDP Civilian Missions. Bert Versmessen, Chief of Staff Civilian Planning and Conduct Capability (CPCC)

CSDP Civilian Missions. Bert Versmessen, Chief of Staff Civilian Planning and Conduct Capability (CPCC) CSDP Civilian Missions Bert Versmessen, Chief of Staff Civilian Planning and Conduct Capability (CPCC) EU Common Security and Defence Policy (CSDP) CSDP integral part of Common Foreign and Security Policy

More information

Support for regional and local communities to prevent drug addiction on the local level - continuation

Support for regional and local communities to prevent drug addiction on the local level - continuation - continuation 1. Basic information 1.1. CRIS Number: 2006/018-180.05-04 Twinning No: PL/06/IB/JH/04/TL 1.2. Title: Support for regional and local communities to prevent drug addiction on the local level

More information

DRAFT Welsh Assembly Government

DRAFT Welsh Assembly Government DRAFT Welsh Assembly Government HEALTH, SOCIAL CARE AND WELL BEING STRATEGIES: POLICY GUIDANCE Status: Draft @ 031002 1 Welsh Assembly Government Health, Social Care and Well-being Strategies: Policy Guidance

More information

THE EASTERN AFRICA REGION

THE EASTERN AFRICA REGION THE EASTERN AFRICA REGION MEMORANDUM OF UNDERSTANDING ON THE ESTABLISHMENT OF THE EASTERN AFRICA STANDBY BRIGADE (EASBRIG) ADDIS ABABA, EHTIOPIA 11 April, 2005 Coordinating Office: IGAD Secretariat, P.O.

More information

OPCW UN JOINT MISSION IN SYRIA

OPCW UN JOINT MISSION IN SYRIA OPCW UN JOINT MISSION IN SYRIA STATUS OF CONTRIBUTIONS TO THE OPCW-UN JOINT MISSION IN SYRIA As of 31 July 2014 BACKGROUND The OPCW-UN Joint Mission was established on 16 October 2013, in order to support,

More information

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations COUNCIL OF THE EUROPEAN UNION Brussels, 23 June 2009 (OR. en) 10667/09 Interinstitutional File: 2008/0231 (CNS) ATO 63 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: COUNCIL DIRECTIVE establishing a Community

More information

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011 CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011 Date of publication: 12 January 2011 Deadline for submission of applications: 11 March 2011 1 1. BACKGROUND INFORMATION The Central

More information

SUMMARY COVER PAGE OF THE ANNUAL REPORT OF CCW PROTOCOL V 1. Canada. REPORTING PERIOD: 01/04/2012 To 31/03/2013 (dd/mm/yyyy) (dd/mm/yyyy)

SUMMARY COVER PAGE OF THE ANNUAL REPORT OF CCW PROTOCOL V 1. Canada. REPORTING PERIOD: 01/04/2012 To 31/03/2013 (dd/mm/yyyy) (dd/mm/yyyy) SUMMARY COVER PAGE OF THE ANNUAL REPORT OF CCW PROTOCOL V 1 NAME OF STATE [PARTY]: REPORTING PERIOD: 01/04/2012 To 31/03/2013 (dd/mm/yyyy) (dd/mm/yyyy) Form A: Steps taken to implement Article 3 of the

More information

UNMAS IRAQ. Presentation for the Mine Action Support Group. Imad Abdul Baki, Programme Manager. February 2016

UNMAS IRAQ. Presentation for the Mine Action Support Group. Imad Abdul Baki, Programme Manager. February 2016 UNMAS IRAQ Presentation for the Mine Action Support Group Imad Abdul Baki, Programme Manager February 2016 Context Extensive conflict involving Iraqi Security Forces (ISF), Kurdish forces (Peshmerga) and

More information

1540 COMMITTEE MATRIX OF THE REPUBLIC OF TURKEY

1540 COMMITTEE MATRIX OF THE REPUBLIC OF TURKEY 1540 COMMITTEE MATRI OF THE REPUBLIC OF TURKEY The information in the matrices originates primarily from national reports and is complemented by official government information, including that made available

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations L 172/18 Official Journal of the European Union 2.7.2009 DIRECTIVES COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

More information

The Syria Co-ordinated Accountability and Lesson Learning (CALL) Initiative. Terms of Reference for the Thematic Synthesis of Evaluative Reports

The Syria Co-ordinated Accountability and Lesson Learning (CALL) Initiative. Terms of Reference for the Thematic Synthesis of Evaluative Reports The Syria Co-ordinated Accountability and Lesson Learning (CALL) Initiative Terms of Reference for the Thematic Synthesis of Evaluative Reports Background The Syria crisis has entered its fifth year with

More information