Appendix 1: Croydon Clinical Commissioning Group Risk Register and Board Assurance Framework - 9th April 2013
|
|
- Logan Barrett
- 6 years ago
- Views:
Transcription
1 Appendix 1: Croydon Clinical Register and Board Assurance Framework - 9th April 2013 Principal to Delivery Key Assurance on we have in in our are 1. To achieve financial sustainability in three years ( to ) Lead: Director of Finance and Recovery 1.1 To ensure contracts perform within their financial envelope Patient demand and supplie4r induce4d demand exceeds contract volumes Contracts have been negotiated based on maximised efficiency and minimised risk.slcsu provide contract management for SEL contracts. Rigorous investigation of CHS over performance Evident reduction of activity Gover Body not receiving reports on a specialty basis; requires special level reporting and drivers Acute Task Monthly contract meetings Senior Mgmt. Team / Recovery QIPP Operational Board 25(5x5) Actions to reduce A&E/UCC attendances. More control over non-elective activity needed. Working with CUH to understand demand and capacity Review waiting list data at CUH (31/03/13) 25(5x5) Di Carter CSU Contracts Manager 1.2 To ensure delivery of QIPP schemes ( ) Failure of acute pathway redevelopments to deliver savings Year end negotiations Planned care developments included in contract LTC savings have long stop date of 30 th May for inclusion Acute Task 20 (5x4) Pathway activity data to be reflected in SLAM from M4. (31/3/13) 20 (5x4) Di Carter CSU Contracts Manager Page 1 of 17
2 to Delivery Key Assurance on we have in in our are MH/SLAM Acute inpatient financial over performance Insufficient commissio resource available to deliver savings. agreement with SLaM; regular contract monitoring, which has been included in this year s contract. Temporary resource identified to support key areas, e.g. urgent care, LTCs. Additional support from Price Waterhouse Cooper (PWC) Approach for management Business case not yet completed and agreed as at None identified QIPP Operational Performance SMT/ Recovery SMT/Recovery None identified 16 (4x4) Approve SLaM business case for service re-design, including new triage ward. (31/3/13) 2013/2014 contract negotiations Adopt matrix structure at SMT level. Rapidly progress recruitment into posts covered by interims Development of ICU structure Maximise CSU support for all related areas 12(3x4) 12 (4x3) John Haseler Senior Mental Health ner Slippage in QIPP delivery Developing and delivering QIPP plan that delivers PCT/ only supporting new investments that Too early in the process to assess results Robust reports which triangulate activity and QIPP schemes Too early in the process to assess results TBC 25(5x5) Develop QIPP plans that will deliver. EMW regular opportunity with wider engagement to develop new QIPP schemes 25(5x5) Page 2 of 17
3 to Delivery Key Assurance on we have in in our are 1.3 To identify plans for longer term recovery (2013/2014 to 2015/2016)) Continuing care retrospective review result in additional claims Unable to identify further schemes supports QIPP. New dedicated CC Nurse working on this. Claims being reviewed Admin resource has been identified and allocated to assist the CC nurse. All scheme to be stretched where possible e.g. prescribing, corporate. Ongoing project with PWC to review benchmark and develop new initiatives OD plan with GP networks including Final findings of review awaited Further understanding of potential areas to focus on Developing and delivering QIPP plan that delivers PCT/ only supporting new investments that supports QIPP. Governance structure in. Strengthened by QIPP network across South London, initiated in Croydon. QOB SMT/Recovery Final findings of review awaited 12(3x4) 25(5x5) -Consideration being given to participation in cluster centralised approach to ensure sufficient capacity to undertake the reviews. PWC engaged to support development of schemes Financial review Benchmarking Impact testing from elsewhere Support development of local schemes (to ) Engagement event with Pharmacists, LTC stakeholders 12(3x4) 20(5x4) Mike Sexton Chief Finance Officer Page 3 of 17
4 to Delivery Key Assurance on we have in in our are leadership (David Colin-Thome) /201 4 To identify and manage financial risk arising from allocation/pb R e.g. specialist commissioni ng; primary care (added by CFO ) Increase the recurring financial challenge Reconciliation of baseline return and NCB working papers Reconciliation of specialist commissio transfers Limited information from NCB Formal approach to NCB seeking resolution 25 (5x5) Escalating discussions with NCB 15 (3x5) Mike Sexton Chief Finance Officer 2. To commission integrated, safe, high quality service in the right at the right time Lead: Director of Governance and 2.1 To achieve the improvement and performance targets with a specified focus on A&E, RTT, and Imms Lack of understanding of the key issues and so actions do not deliver the necessary change Monthly dashboard reports reviewed by SMT & gover body Monthly performance discussions at CQR Escalation to Full root cause analysis of poor performance Comprehensive dashboard not in SMT CQR Performance Task and finish group Leads responsible for ensuring action are in CSU to undertake full analysis of key acute indicators not performing to inform action Ensure dashboard covers all indicators - end of February. COMPLETED Review the governance for 12(3x4) Fouzia Harrington Governanc e and Page 4 of 17
5 to Delivery Key Assurance on we have in in our are A&E performance Type 1 and all performance recovery provider Action plan in Ongoing meeting of the Clinical Outcomes/ Service Spec Operational provider leads group Daily situation reporting from ED and UCC. A&E prioritised Recovery Trajectory agreed following Emergency Care Intensive Support Team follow up review Effective streaming and pathway Urgent Care Integrated Governance SMT/Recovery 20(4x5) management of provider performance - by the end of April Review of the protocols and processes for patient pathways management to ensure ness. Revised streaming pathway to be agreed between ED and UCC clinical leads completed. Agreed pathway documentation to be approved by the Urgent Care Integrated Governance Board. Hold system wide summit to review emergency pathway Review of urgent care diagnostic 20 (4x5) Page 5 of 17
6 to Delivery Key Assurance on we have in in our are RTT Performance Recovery Meeting held with CHS Action plan to clear back log agreed Action plan for sustainable performance SMT - 20(4x5) Further analysis to be completed with (Mid Feb) COMPLETED input to the development of a sustainable by end of April 20 (4x5) Fouzia Harrington 2.2 To achieve improved quality of service at CHS Unable to deliver Improving Access to Psychological Therapies in accordance with the NHS Operating Framework Lack of focus on key issues - clinician led review group for all psychological therapies. -Current budgets and services reviewed CHS clinical quality review group has a programme of focus Alignment of all interested organisations expectations Clear measurable improvements not defined -Value for money reviewed at monthly SLAM CQR (part 2 Business/Perfor mance) & at relevant contract meetings with other providers. Monitoring CHS Clinical Review SMT 20(4x5) -Report going to SMT regarding gap with demand and current commissioned service Agree with CHS, NCB and TDA priorities and improvement expected (mid march 2013) Revised time scale end of May Development of dashboard (mid march 2013) () Revised timescale end of 12(3x4) 15(3x5) John Haseler Senior Mental Health ner Fouzia Harrington Governanc e and Page 6 of 17
7 to Delivery Key Assurance on we have in in our are Committee May Align CQUINS where possible (mid march 2013) Develop a quality strategy and plan. (end of May 2013) Failure to deliver an Community Diabetic Service Improvement agreed with clinical lead and CHS LES brought back to by Assurances to be provided by CHS on patient education arrangements None identified SMT/recovery Discussion of risks at CQR April 2013 None identified to carry out a peer lead skills development programme for Primary Care. 12(4x3) Page 7 of 17 Project plan on to reprocure intermediate service and
8 to Delivery Key Assurance on we have in in our are patient education to April Gover Body 2.3 To achieve improved patient experience Lack of focus on key issues CHS clinical quality review group has a programme of focus Alignment of all interested organisations expectations Clear measurable improvements not defined Monitoring CHS Clinical Review SMT Committee 20(4x5) Agree with CHS, NCB and TDA priorities and improvement expected (mid march 2013) Revised time scale end of May Development of dashboard (mid march 2013 Revised timescale end of May Align CQUINS where possible (mid march 2013) 15(3x5) Fouzia Harrington Governanc e and Develop a quality strategy and plan. (end of May 2013) 2.4 To ensure safe services Management of within Health Visiting Bank staff have been used. Weekly prioritisation of allocated workload. TBC Weekly meetings with Sector Director of Nursing, designated Nurse for ners 20(4x5) -Escalation plan to be reviewed by CBT and Sector. CBT commissioners to confirmed core requirements for 2012/13. 9(3x3) Jane McAllister Senior Children s ner Page 8 of 17
9 to Delivery Key Assurance on we have in in our are Fully used of skill mix. Child health clinics reduced. 3 year CQUIN agreed that includes increase to number of HV's to an acceptable ration and Public Health. CHS HVs up to establishment of 52 WTE as of Target level of 60 WTE by ; 62 WTE by 2014/2015 Root cause analysis carried out on low levels of under-one reviews. Insufficient regarding Urgent Care Children processes Liaison Health Visitor in Action Plan in and regular meetings with designated Lead. Further Named GP Lead Children's Governance. Provision of processes are being followed in accordance with contract. Action plan (see ) may not be meeting all its milestones because of insufficient /evidence received from provider. 9(3x3) Sally Innis Head of Safeguardi ng Page 9 of 17
10 to Delivery Key Assurance on we have in in our are Insufficient regarding Edridge Road children processes engagement from UCC. Action Plan in and regular meetings with designated Lead. Action plan updated Dec 2012, and progress made. TBC Named GP Lead Children's Governance. Evidence to be provided that robust processes are in and being followed. Although some evidence has been received this will remain an action until all s received. 9(3x3) Sally Innis Head of Safeguardi ng Lack of within GP Practice DBSDisclosure and Barring Service (DBS) checks have been completed Lead nurse has increased capacity to manage safeguarding children. DBS check is completed for all GPs when joi their Performers List stating they know there are no gaps and all GP on their Performers List will have had an enhanced DBS undertaken SW London Primary Care Team provided /evidence of DBS checks as part of Primary Care Report DBS checks in GP Practices now the responsibility of CQC as part of the registration process risk CLOSED Page 10 of 17
11 to Delivery Key Assurance on we have in in our are No Named GP for Children. No of Accreditation of Intermediate Services (GPSI) and Enhanced Services because it is a mandatory requirement Recommendation reported to SMT. SMT have approved recruitment into post. -Action plan in for the recruitment process. -Post is advertised on NHS Jobs. Intermediate/Enh anced Services CQR has established an accreditation document to record information and this has been reviewed at the monthly CQR meeting. Vasectomy Intermediate Recruitment process to be completed - interview date now arranged. TBC transferred SMT 12(4x3) COMPLETED 9(3x3) Sally Innis Head of Safeguardi ng CQR Medical Director has provided in relation to the 12(4x3) Assurance to be provided that all Enhanced services are accredited where relevant and recorded on the approved accreditation document reviewed at the monthly CQR. 9(3x3) Page 11 of 17
12 to Delivery Key Assurance on we have in in our are CAMHS Demand and Capacity not being met Service currently not GPSi accredited Additional investment of 250k negotiated through the NHS contract for SLAM 2012/13. Shared Care Prescribing Protocols. Further management of demand Addressing capacity Additional of safeguarding safety of the service to the lead commissioner. CAMHS Partnership SLAM Clinical Review Croydon Borough SMT /Recovery None identified Review of prescribing and intensive outreach support required at Primary Care level through enhanced service provision (Complete) Review of the referral criteria. (Complete) 12(4x3) Jane McAllister Senior Children s ner QIPP Operational Board Shared Care Prescribing Protocols to be extended. (Complete) Data to be reviewed on current estimated waiting times of 7 months. (31/3/13) Page 12 of 17 Data to be reviewed on why approximately 50% of referrals from Primary Care are rejected. (31/3/13)
13 to Delivery Key Assurance on we have in in our are Recruitment requirements to be reviewed. (31/3/13) issues to be reviewed. (31/3/13) 3. To have collaborative relationships to ensure integrated approach Lead: Director of Governance and 3.1 To improve and sustain robust and working relationships Deterioration of relationships led Transformation Board has all partners Active Membership of the HWBB Engagement strategy in Increased GP engagement. Implementation of engagement strategy Engagement Manager post established SMT - 12(3x4) Present priorities to SMT ((February 2013) COMPLETE Appoint to Engagement Manager position (March 2013) Review of key partnership executive meetings to be completed by COMPLETED 8(2x4) Fouzia Harrington Governanc e and Review of partnership executive meetings. Seeking alternative methods of engagement Page 13 of 17
14 to Delivery Key Assurance on we have in in our are 4. To develop as a mature membership organisation Lead: Director of Governance and Executive & Senior focus and Capacity other than formal meetings where practical. Clear Organisational Prioritised Director & Work Plans Prioritised Dire ctor & work plans See below Integrated Strategic Operating Plan (ISOP) Regular 1:1 with CO Formalised assessment of progress Formalised assessment of Progress 12 (3x4) Quarterly Review of Progress against ISOP Development of prioritised director & work plans by function (End of May 2013) Monthly Review of Progress. 9 (3x3) Paula Swann Chief Officer Full Recruitment to Permanent Posts (see below) See below See below Delivery of End to end CSU service (see below) See below Contingency monies available for gaps in Page 14 of 17
15 to Delivery Key Assurance on we have in in our are functions not commissioned Lack of Permanent Recruitment to & PMO posts Full Recruitment to Permanent Posts Vacancies in team Vacancy Monitoring Manpower Reporting Review of Capacity Recruitment plan for permanent posts. Monthly Review of Manpower & Capacity CSU do not deliver the commissio support required End to end service specification in with KPIs including responsiveness CSU MD is the account manager Contingency monies available for gaps in functions not commissioned Responsiveness of CSU Staff understanding Croydon and the new model of commissio Monthly Contract Meeting Monthly KPI reporting Performance management escalation process in contract Deputy Director lead for contract management Regular Monthly Contract Meeting Monthly KPI reporting 20 (5x4) Internal Audit Review of CSU Contract Management Formal review of capacity CSU and staff joint event (May 2013) Develop an exit strategy including alternative structure and process in case of CSU non-delivery Page 15 of 17 Monthly contract meetings
16 to Delivery Key Assurance on we have in in our are 4.1 To achieve authorisation 4.2 To ensure wider GP member involvement in the commissioni ng agenda Delivery of the authorisation conditions and directions GPs do not engage sufficiently Progress reports to SMT and Board GP network s with CL leading each network Development of commissio support to networks and engagement framework. Single project plan for addressing each of the caveats Plans still to be implemented Regular report to SMT and Gover Body Gover Body Clinical Leadership - 20(4x5) Authorisation implementation plan (COMPLETE) - 20(5x4) Implementation of : - support -Engagement LES 8(2x4) Fouzia Harrington Governanc e and Lack of understanding and willingness from GP s to engage Delegation of budgets / QIPP Plan to GP Practices. Engagement LES As above As above As above - 20(4x4) GP development programme to be implemented (Start March 2013) 12(3x4) Page 16 of 17
17 to Delivery Key Assurance on we have in in our are 4.3 To Ensure Conflict of interests are managed ly Lack of robust governance structures in with trai Governance in conflicts of interest register updated monthly GB and CL members Lack of formal governance and reporting processes by practice cluster groups Integrated Governance and Audit Committee 20(4x5) Implement management of conflict of interest trai by 2013 Roll out formal conflicts of interest register to all members (Sept 2013) 12(3 x4) Fouzia Harrington Governanc e and 5.1 To ensure all functions/ responsibiliti es / contracts are handed over Failure to manage transition PWC leading on transition Capacity of commissioners Progress reports to SMT. 20(5x4) Ensure function sheets completed Identify additional capacity for commissioners (Feb 2013) Completed Identify project manager capacity post 1 April Fouzia Harrington Governanc e and Page 17 of 17
Croydon Clinical Commissioning Group Clinical Leadership Meeting Minutes
Attachment 16 Appendix 1 Date: 13 July 2012 Time: 13 30 15 30 Location: Room 11.4, Leon House Present: Dev Malhotra, GP Board Member Bobby Abbot, GP Dipti Gandhi, Clinical Leader Brian Okumu, GP Clinical
More informationNewham Borough Summary report
Newham Borough Summary report April 2013 Prepared on 17/04/13 by Commissioning Support team Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 GREE N Finance and Activity
More informationREPORT TO CROYDON CLINICAL COMMISSIONING GROUP GOVERNING BODY Meeting in Public. 30 October 2012
REPORT TO CROYDON CLINICAL COMMISSIONING GROUP GOVERNING BODY Meeting in Public 30 October 2012 Title: CROYDON CCG AND CROYDON PUBLIC HEALTH MEMORANDUM OF UNDERSTANDING Lead Director Report Author Contact
More informationNewham Borough Summary report
Newham Borough Summary report March 2013 Prepared on 18/03/13 by Commissioning Support team Finance and Activity Millions Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Newham Headlines March 2013 Feb-12 Apr-12 Jun-12
More informationREPORT TO CROYDON CLINICAL COMMISSIONING GROUP GOVERNING BODY Meeting in Public. 30 April 2013
REPORT TO CROYDON CLINICAL COMMISSIONING GROUP GOVERNING BODY Meeting in Public 30 April 2013 Title of Paper: CONTRACT PERFORMANCE AND MANAGEMENT: NON ACUTE CONTRACTS Lead Director Report Author Contact
More informationCroydon Clinical Commissioning Group Governance Arrangements
Croydon Clinical Commissioning Group Governance Arrangements 31 October 2012 Rev. V10 Contents 1. Introduction 3 2. Internal Governance Structures 4 2.1 The Governing Body 2.2 The Governing Body Committees
More informationStrategic Risk Report 1 March 2018
Strategic Report 1 March 2018 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Commissioning Group s control over
More informationNewham Borough Summary report
Newham Borough Summary report Item K1 September 2013 Prepared on 30/09/2013 by Support team GREEN Finance and Activity Millions AMBER RED Headlines M5 Financial position M4 activity data The QIPP net savings
More informationStrategic Risk Report 12 September 2016
Strategic Report September 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Commissioning Group s control over
More informationNHS East and North Hertfordshire Clinical Commissioning Group. Quality Committee. Terms of Reference Version 4.0
NHS East and North Hertfordshire Clinical Commissioning Group Quality Committee Terms of Reference Version 4.0 1. Introduction 1.1 The Quality Committee (the committee) is established in accordance with
More informationENCLOSURE: J. Date of Trust Board 29 February Pressure Ulcer Clinical Improvement Programme. Purpose of Report
ENCLOSURE: J Date of Trust Board 29 February 2012 Title of Report Purpose of Report Abstract Pressure Ulcer Clinical Improvement Programme This paper provides a progress report on our work in support of
More informationAvon & Wiltshire Mental Health Partnership NHS Trust. Extract from NHS STANDARD MULTILATERAL MENTAL HEALTH AND LEARNING DISABILITY SERVICES CONTRACT
SCHEDULE 4 QUALITY PERFORMANCE INCENTIVE SCHEMES 2011/12 Schedule 4 Part 1: Nationally Mandated Incentive Schemes Schedule 4 Part 2: National Incentive Framework for Commissioning for Quality and Innovation
More informationUpdate on NHS Central London CCG QIPP schemes
Update on NHS Central London CCG QIPP schemes NHS Central London CCG has identified circa 11m for QIPP during 2013/14. Commissioning Intentions approved by the governing body included transformational
More information102/14(ii) Bridgewater Board Date. Thursday 5 June Agenda item. Safe Staffing April 2014 Review
Bridgewater Board Date Thursday 5 June 2014 Agenda item 102/14(ii) Title Safe Staffing April 2014 Review Sponsoring Director Authors Presented by Purpose Dorian Williams, Executive Nurse/Director of Governance
More informationA meeting of NHS Bromley CCG Governing Body 25 May 2017
South East London Sector A meeting of NHS Bromley CCG Governing Body 25 May 2017 ENCLOSURE 4 SOUTH EAST LONDON 111 AND GP OUT OF HOURS MEMORANDUM OF UNDERSTANDING SUMMARY: The NHS England Commissioning
More informationReport to Governing Body 19 September 2018
Report to Governing Body 19 September 2018 Report Title Author(s) Governing Body/Clinical Lead(s) Management Lead(s) CCG Programme Purpose of Report Summary NHS Lambeth Clinical Commissioning Group (CCG)
More informationGoverning Body meeting on 13th September 2018
Governing Body meeting on 13th September 2018 Report from the Chair of the Integrated Governance Committee (IGC) Date of Meetings Reported: 9 th August 2018 Key achievements Author: Martin Wilkinson, Chair
More informationCOMMISSIONING FOR QUALITY FRAMEWORK
This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version COMMISSIONING FOR QUALITY FRAMEWORK Document Title: Commissioning for Quality Framework
More informationNHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance
NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Fiona and Louise Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss
More informationAppendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations
No. Domain CQC Recommendation Lead Operational Lead Current Status 1 Appendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations Wording in long
More informationStrategic Risk Report 4 July 2016
Strategic Report 4 July 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Group s control over the delivery of
More informationJOB DESCRIPTION. Pharmacy Technician
JOB DESCRIPTION Pharmacy Technician Issued by AT Medics Primary Care Pharmacy Technician Job Description Job Title: Reporting to: Location: Salary: Job status: Contract: Notice Period: Primary care pharmacy
More informationREFERRAL TO TREATMENT ACCESS POLICY
Directorate of Strategy & Planning REFERRAL TO TREATMENT ACCESS POLICY Reference: DCP175 Version: 7.0 This version issued: 17/12/15 Result of last review: Major changes Date approved by owner (if applicable):
More informationGOVERNING BOARD. Governing Board Assurance Framework. Date of Meeting 16 March 2016 Agenda Item No 6. Title
GOVERNNG BOARD Date of Meeting 16 March 2016 Agenda tem No 6 Title Governing Board Assurance Framework Governing Board members reviewed the GBAF s and process at a development session on 10 February 2016.
More informationA meeting of Bromley CCG Primary Care Commissioning Committee 22 March 2018
A meeting of Bromley CCG Primary Care Commissioning Committee 22 March 2018 ENCLOSURE 7 PROPOSAL FOR ENHANCED MEDICAL SUPPORT TO BROMLEY CARE HOMES SUMMARY: Bromley CCG gained agreement at the CCG Clinical
More informationRedesign of Front Door
Redesign of Front Door Transforming Acute and Urgent Care Strategic Background and Context Our Change and Improvement Programme What have we achieved and how? What did we learn? Ian Aitken, General Manager
More information21 March NHS Providers ON THE DAY BRIEFING Page 1
21 March 2018 NHS Providers ON THE DAY BRIEFING Page 1 2016-17 (Revised) 2017-18 (Revised) 2018-19 2019-20 (Indicative budget) 2020-21 (Indicative budget) Total revenue budget ( m) 106,528 110,002 114,269
More informationNovember NHS Rushcliffe CCG Assurance Framework
November 2015 NHS Rushcliffe CCG Assurance Framework ASSURANCE FRAMEWORK SUMMARY No. Lead & Sub Committee Date placed on Assurance Framework narrative Residual rating score L I rating in 19 March 2015
More informationNHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER C Hickson, Head of Management Accounts
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER 2013 Date of the meeting 15/01/2014 Author Sponsoring GB member Purpose of report Recommendation Resource
More informationPerformance and Delivery/ Chief Nurse
Governing Body 26th May 2017 Quality and Performance Report 22nd May 2017 Author: Other contributors: Executive Lead Audience Eileen Clark - Acting Director of Clinical Performance and Delivery/ Chief
More informationQuality Framework Healthier, Happier, Longer
Quality Framework 2015-2016 Healthier, Happier, Longer Telford & Wrekin Clinical Commissioning Group (CCG) makes quality everyone s business. Our working processes are designed to ensure we all have the
More informationMilton Keynes CCG Strategic Plan
Milton Keynes CCG Strategic Plan 2012-2015 Introduction Milton Keynes CCG is responsible for planning the delivery of health care for its population and this document sets out our goals over the next three
More informationApprove Ratify For Discussion For Information
NHS North Cumbria CCG Governing Body Agenda Item 2 August 2017 10 Title: General Practice Update Report August 2017 Purpose of the Report This is the first report on General Practice since the CCG boundary
More informationPreparing to implement the new access and waiting time standard for early intervention in psychosis
Preparing to implement the new access and waiting time standard for early intervention in psychosis Sarah Khan Deputy Head of Mental Health (Policy & Strategy) 1. Context for the introduction of access
More informationCCG authorisation Case Study Template. NHS Croydon Clinical Commissioning Group. Patient Navigation (PatNav) 3 of 3
CCG name: Case study title: CCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group Patient Navigation (PatNav) CCG case study number: Does the case study provide core evidence?
More informationSupporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014
TFA document Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Tripartite Formal Agreement between: Hertfordshire Community NHS Trust NHS East of England Department of Health
More informationNHS GRAMPIAN. Local Delivery Plan - Mental Health and Learning Disability Services
NHS GRAMPIAN Board Meeting 01.06.17 Open Session Item 8 Local Delivery Plan - Mental Health and Learning Disability Services 1. Actions Recommended The Board is asked to: Note the context regarding the
More informationJOB DESCRIPTION. The post holder will focus on urgent care but may take responsibility for specialist projects and other services when required.
JOB DESCRIPTION Job Title: Deputy Medical Director Reports to: Medical Director, Urgent Care Location: Across Greenbrook urgent care services. Key Working Relationships: Director of Operations; Director
More informationGP Cover of Nursing, Residential, Extra Care and Intermediate Care Homes. Camden Clinical Commissioning Group. Care Home LES Spec v1
Local Enhanced Service Clinical Lead Commissioner Reporting Mechanism/Frequency Payment Frequency Payment Contact This Version GP Cover of Nursing, Residential, Extra Care and Intermediate Care Homes Dr
More informationCouncil of Members. 20 January 2016
Council of Members 20 January 2016 Feedback on election process: Council of Members Chair and Deputy Chair Malcolm Hines, Chief Financial Officer Minutes of last meeting: 14 October 2015 Dr. Richard Proctor,
More informationNHS Herts Valleys Clinical Commissioning Group Board Meeting 14 April 2016
NHS Herts Valleys Clinical Commissioning Group Board Meeting 14 April 2016 Title 2015/16 Annual Report and Accounts proposed approval process Agenda Item: 13 Purpose (tick one only) Decision or Approval
More informationRoyal College of Paediatrics and Child Health Service Review Action Plan and Progress Report 26 th May 2016
Royal College of Paediatrics and Child Health Service Review Action Plan and Progress Report 26 th May RAG Dark green Light green Amber Red White Definition Action complete and assurance gained Action
More informationEnclosure: L Agenda item: 16 GOVERNING BODY. Title of paper: Quality report. Date of meeting: 28 March 2018
Enclosure: L Agenda item: 16 Title of paper: Quality report GOVERNING BODY Date of meeting: 28 March 2018 Presented by: Yvonne Leese Prepared by: Anne Douse Title: Director of Quality and Integrated Governance
More informationGOVERNING BODY. Corporate Objective addressed by this paper (please select one or more with an X):
Enclosure: H Agenda item: 12 GOVERNING BODY Title of paper: Governing Body Assurance Framework (GBAF) Report Date of meeting: September 2018 Presented by: Yvonne Leese Prepared by: Diane Goodenough Title:
More informationThe new mental health access & waiting time standards
The new mental health access & waiting time standards Dr Frank Burbach Consultant Clinical Psychologist Somerset Partnership NHS Foundation Trust frank.burbach@sompar.nhs.uk 1 NHS Presentation to [XXXX
More informationPreparing to implement mental health access and waiting time standards
Preparing to implement mental health access and waiting time standards Becki Hemming MH Access & Waits Programme Lead, NHS England Presentation summary 1. Context 2. The standards to be introduced from
More informationAction Plan Template (Adopted Logic Model) Service User(S) Independent Review StEIS Ref Version 2.0
Action Plan Template (Adopted Logic Model) Service User(S) Independent Review StEIS Ref 30766 Version 2.0 Recommendation Desired Outcome Action required Deadline for completion 1. The formulation of HCR20
More informationIntegrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee
EPB53/825 Title of Report: Prepared By: Sponsor: Action Required: Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee Gale Hart, Director
More informationNHS England (London) Assurance of the BEH Clinical Strategy
NHS England (London) Assurance of the BEH Clinical Strategy NHS England (London) Assurance of the BEH Clinical Strategy Status Report 8 th September 203 - Version.0 2 Contents. Overview & Executive Summary
More informationService Transformation Report. Resource and Performance
SUMMARY REPORT Meeting Date: 31 May 2018 Agenda Item: 9.1 Enclosure Number: 9 Meeting: Trust Board (Part 1) Title: Author: Accountable Director: Other meetings presented to or previously agreed at: Service
More informationWarrington Children and Young People s Mental Health and Wellbeing Local Transformation Plan
Warrington Children and Young People s Mental Health and Wellbeing Local Transformation Plan 2015-2020 1 Introduction 1.1 Welcome to the update on Warrington s Local Transformation Plan for Children and
More informationHEALTHCARE INSPECTORATE WALES SAFEGUARDING AND PROTECTING CHILDREN IN WALES:
HEALTHCARE INSPECTORATE WALES SAFEGUARDING AND PROTECTING CHILDREN IN WALES: A Review of the arrangements in place across the Welsh National Health Service ACTION PLAN - UPDATED August 2010 RECOMMENDATION
More informationClinical Commissioning Group (CCG) Governing Body Meeting
Clinical Commissioning Group (CCG) Governing Body Meeting Date of Meeting: Agenda Item: Subject: Reporting Officer: Friday 21st September Paper 18(ii) Quality in the new health system - Maintaining and
More informationReport to Patients. A summary of NHS Norwich Clinical Commissioning Group s Annual Report for 2014/15. Healthy Norwich. Patient
Report to Patients A summary of NHS Norwich Clinical Commissioning Group s Annual Report for 2014/15 Healthy Norwich GP Care Patient Quality YourNorwich The work of the CCG, what it has achieved for patients,
More informationA Successful Health Visitor Retention Strategy - Walsall Healthcare NHS Trust
A Successful Health Visitor Retention Strategy - Walsall Healthcare NHS Trust Health Visiting Local Picture Population of approx 21,000 under 5s 10 Health Visitor Teams across the borough New model of
More informationLonger, healthier lives for all the people in Croydon
D R A F T Croydon Clinical Commissioning Group Prospectus 2013/14 Longer, healthier lives for all the people in Croydon (Version TL) 1 Contents Foreword from the chair 3 Introduction 4 Who we are our Governing
More informationNHS THANET CLINICAL COMMISSIONING GROUP GOVERNING BODY. TUESDAY 21 NOVEMBER 2017 AGENDA PART ONE (Public) - 13:00-13:10. Chair Dr Tony Martin
NHS THANET CLINICAL COMMISSIONING GROUP GOVERNING BODY HELD IN THE HARBOUR SANDS MEETING ROOM, 3 RD FLOOR, THANET DISTRICT COUNCIL TUESDAY 21 NOVEMBER 2017 AGENDA PART ONE (Public) - 13:00-13:10 Chair
More informationClinical Pharmacists in General Practice March 2018
Clinical Pharmacists in General Practice March 2018 1. Background Following a successful national pilot programme, the General Practice Forward View committed over 100million to support an extra 1,500
More informationGOVERNING BODY REPORT
GOVERNING BODY REPORT Date of Governing Body Meeting: Title of Report: Key Messages: Finance, Performance and Commissioning Committee Report At the end of September 2017 we have reported an inyear deficit
More informationLearning from Deaths Policy. This policy applies Trust wide
Learning from Deaths Policy This policy applies Trust wide Document control page Name of policy Learning from Deaths Policy Names of linked Learning from Deaths Procedure procedures Accountable Medical
More informationTERMS OF REFERENCE. Transformation and Sustainability Committee. One per month (Second Thursday) GP Board Member (Quality) Director of Commissioning
TERMS OF REFERENCE Committee: Frequency Of Meetings: Committee Chair: Membership: Attendance: Lead Officer: Secretary: Transformation and Sustainability Committee One per month (Second Thursday) GP Board
More informationEXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY Anne Gibbs, Director of Strategy & Planning
EXECUTIVE SUMMARY D REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY 2018 Subject Supporting TEG Member Author Status 1 A review of progress against Corporate Objectives 2017/18 and planned Corporate Objectives
More informationDelegated Commissioning Updated following latest NHS England Guidance
Delegated Commissioning Updated following latest NHS England Guidance 13th August 2015 Croydon, Kingston, Merton, Richmond, Sutton and Wandsworth NHS Clinical Commissioning Groups and NHS England (Direct
More informationVision 3. The Strategy 6. Contracts 12. Governance and Reporting 12. Conclusion 14. BCCG 2020 Strategy 15
Bedfordshire Clinical Commissioning Group Quality Strategy 2014-2016 Contents SECTION 1: Vision 3 1.1 Vision for Quality 3 1.2 What is Quality? 3 1.3 The NHS Outcomes Framework 3 1.4 Other National Drivers
More informationNorth Central London Medicines Optimisation Network. Terms of Reference. North Central London Medicines Optimisation Network 1 of 8
North Central London Medicines Optimisation Network Medicines Optimisation Committee Terms of Reference North Central London Medicines Optimisation Network 1 of 8 Document control Date Version Amendments
More informationService Update Clinical Services System Resilience and Commissioning Update
Service Update Clinical Services System Resilience and Commissioning Update Agenda Item: 17 Reference: WCT14/15-309 Meeting Name: Trust Board Meeting Date: 4 March 2015 Lead Director: Sandra Christie Job
More informationDRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8
DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8 West London Clinical Commissioning Group This document sets out a clear set of plans and priorities for 2017/18 reflecting West London CCGs ambition
More informationIslington Practice Based Mental Health Care: Roll-out plans and progress
Report to: Board of Directors (Public) Paper number: 3.2 Report for: Information Date: 26 th October 2017 Report author/s: Emily van de Pol, Divisional Director, Community Mental Health and Primary Care
More information2. This year the LDP has three elements, which are underpinned by finance and workforce planning.
Directorate for Health Performance and Delivery NHSScotland Chief Operating Officer John Connaghan T: 0131-244 3480 E: john.connaghan@scotland.gsi.gov.uk John Burns Chief Executive NHS Ayrshire and Arran
More informationShaping the best mental health care in Manchester
Clinical Transformation Plans Manchester Shaping the best mental health care in Manchester Meeting the needs of our communities Improving Lives OUR SHARED WAY AHEAD... Clinical Service Transformation in
More informationGE1 Clinical Utilisation Review
GE1 Clinical Utilisation Review Scheme Name QIPP Reference Eligible Providers GE1 Clinical Utilisation Review QIPP 16-17 S40-Commercial 17/18 QIPP reference to be added locally. This CQUIN is supported
More informationAgenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:
TRUST BOARD Date of Meeting: Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome: For noting For information For decision Title of Report: Update on Clinical Strategy Aims: To brief Trust Board
More informationItem E1 - Bart s Health Quality Indicators
Item E1 - Bart s Health Quality Indicators 1.0 Purpose 1.1 The purpose of this report is to provide the CCG Board with an update on quality matters across pertaining to our main local Provider organisations.
More informationNHS Dorset Clinical Commissioning Group Governing Body Meeting Financial Position as at 31 st July C Hickson, Head of Management Accounts
NHS Dorset Clinical Commissioning Group Governing Body Meeting Financial Position as at 31 st July 2013 9.4 Date of the meeting 18/09/2013 Author Sponsoring GB member Purpose of report Recommendation Resource
More information5. Does this paper provide evidence of assurance against the Governing Body Assurance Framework?
Item Number: 6.3 Governing Body Meeting: 4 February 2016 Report Sponsor Anthony Fitzgerald Director of Strategy and Delivery Report Author Anthony Fitzgerald Director of Strategy and Delivery 1. Title
More informationJOB DESCRIPTION. Joint Commissioning Manager for Older People s Residential Care and Nursing Homes
JOB DESCRIPTION Job Title: Grade: Team: Accountable to: Joint Commissioning Manager for Older People s Residential Care and Nursing Homes HAY 14 / AfC 8b (indicative) Partnership Commissioning Team Head
More informationNHS Bradford Districts CCG Commissioning Intentions 2016/17
NHS Bradford Districts CCG Commissioning Intentions 2016/17 Introduction This document sets out the high level commissioning intentions of NHS Bradford Districts Clinical Commissioning Group (BDCCG) for
More informationPersonalised Health and Care 2020: Next steps
Personalised Health and Care 2020: Next steps Paul Rice PhD Head of Technology Strategy NHS England www.england.nhs.uk Better use of data and technology has the power to improve health, transforming
More informationAny Qualified Provider: your questions answered
Any Qualified Provider: your questions answered September 8, 2011 These answers cover a range of questions about the detail of Any Qualified Provider on integrated care, competition and procurement, liability
More informationQuality and Safety Strategy
Quality and Safety Strategy 2017-2020 Vision statement ESHT combines community and hospital services to provide safe, compassionate, and high quality care to improve the health and wellbeing of the people
More informationCity and Hackney Clinical Commissioning Group Prospectus May 2013
City and Hackney Clinical Commissioning Group Prospectus May 2013 Foreword We are excited to be finally live as a CCG, picking up our responsibilities as commissioners for the bulk of the NHS. The changeover
More informationCCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group. Urgent Care Redesign
CCG name: CCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group Case study title: Urgent Care Redesign CCG case study number: (specify 1 to 5) Does the case study provide core
More informationQuality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement
Quality Accounts: Corroborative Statements from Commissioning Groups Quality Accounts are annual reports to the public from providers of NHS healthcare about the quality of services they deliver. The primary
More informationSUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs
SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs December 2012 SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPS First published: 21 December 2012 2 Contents 1. INTRODUCTION...
More informationIUC and Vanguard. Greater Nottingham Integrated Urgent Care 1
IUC and Vanguard The 2016/17 Vanguard funding has been confirmed at 1.3M This funding is to deliver the 8 elements of Integrated Urgent Care by March 2017 With careful management of funds we will be able
More informationThis paper explains the way in which part of the system is changing to become clearer and more accessible, beginning with NHS 111.
Unscheduled care in Haringey 1. Introduction There have been many changes to urgent, unscheduled and unplanned care over recent years. To begin with Casualty departments became Accident and Emergency departments,
More informationIntegrated Care in North Central London
Integrated Care in North Central London 5 th July 2012 Sylvia Kennedy AD Strategy & Planning Strategic context Many of our frailest and sickest groups receive care in a fragmented and disorganised way
More informationRTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning
RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within
More informationQuality Assurance Accreditation Scheme Assignment Report 2016/17. University Hospitals of Morecambe Bay NHS Foundation Trust
Quality Assurance Accreditation Scheme Assignment Report 2016/17 Contents 1. Introduction 2. Executive Summary 3. Findings, Recommendations and Action Plan Appendix A: Terms of Reference Appendix B: Assurance
More informationInpatient and Community Mental Health Patient Surveys Report written by:
2.2 Report to: Board of Directors Date of Meeting: 30 September 2014 Section: Patient Experience and Quality Report title: Inpatient and Community Mental Health Patient Surveys Report written by: Jane
More informationProject Initiation Document Review of Community Nursing Services in Wyre Forest
Project Initiation Document Review of Community Nursing Services in Wyre Forest Contents Page 1. Management Summary 1 2. Introduction 1 2.1 Purpose of Document 1 2.2 Background 2 3. Project Definition
More informationSWLCC Update. Update December 2015
SWLCC Update Update December 2015 Croydon, Kingston, Merton, Richmond, Sutton and Wandsworth NHS Clinical Commissioning Groups and NHS England Working together to improve the quality of care in South West
More informationNHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016.
1604 Executive 18/06/2014 1603 Executive 18/06/2014 Finance - Fin. Management 1491 Responsiveness 29/08/2013 ED - Adult Involvement of Service Users 11//2017 Failure to maintain Emergency Department performance
More informationChairing the Barking and Dagenham Medicines Management Committee, providing advice to the Board on the safe and efficient use of medicines;
Job Role Medicines Management Barking and Dagenham Clinical Commissioning Group Job Title: Accountable to: Hours: Remuneration: Clinical Lead Medicines Management Chair Clinical Commissioning Group Two
More informationSummary two year operating plan 2017/18
One Trust - serving our local communities Summary two year operating plan 2017/18 & 2018/19 www.lewishamandgreenwich.nhs.uk Summary two year operating plan: 2017/18 and 2018/19 1. Introduction This summary
More informationSUPPORT FOR VULNERABLE GP PRACTICES: PILOT PROGRAMME
Publications Gateway Reference 04476 For the attention of: NHS England Directors of Commissioning Operations Clinical Leaders and Accountable Officers, NHS Clinical Commissioning Groups Copy: NHS England
More informationDocument Details Clinical Audit Policy
Title Document Details Clinical Audit Policy Trust Ref No 1538-31104 Main points this document covers This policy details the responsibilities and processes associated with the Clinical Audit process within
More informationWOLVERHAMPTON CLINICAL COMMISSIONING GROUP QUALITY & SAFETY COMMITTEE
Wolverhampton Clinical Commissioning Group WOLVERHAMPTON CLINICAL COMMISSIONING GROUP QUALITY & SAFETY COMMITTEE Minutes of the Quality and Safety Committee Meeting held on Tuesday 12 th May 2015 Commencing
More informationWelsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report
Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report We welcome the findings of the report and offer the following
More informationWAITING TIMES 1. PURPOSE
Agenda Item Meeting of Lanarkshire NHS Board 28 April 2010 Lanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone 01698 281313 Fax 01698 423134 www.nhslanarkshire.org.uk WAITING TIMES 1. PURPOSE
More information