GOVERNING BODY. Corporate Objective addressed by this paper (please select one or more with an X):
|
|
- Isabel Miles
- 5 years ago
- Views:
Transcription
1 Enclosure: H Agenda item: 12 GOVERNING BODY Title of paper: Governing Body Assurance Framework (GBAF) Report Date of meeting: September 2018 Presented by: Yvonne Leese Prepared by: Diane Goodenough Title: Director of Quality and Integrated Governance & contact: yvonne.leese@nhs.net Title: Patient Safety Manager & contact: d.goodenough@nhs.net Corporate Objective addressed by this paper (please select one or more with an X): sustainable, efficie reduce health inequalities with an additional focus on the urgent and emergency x care system improvement along the pathway. 2. To ensure the CCG s position recovers to meet its financial and governance duties and performance standards. x 3. To nurture and support primary care to be resilient and thrive. x 4. To strengthen productive relationships with partners and the public to work as a health and care system. x 5. To actively engage with our communities to improve their experience of healthcare. x 6. To play an active and influential role in shaping SE London and London wide commissioning. x Purpose of the report: NHS Greenwich Clinical Commissioning Group (CCG) has a Governing Body Assurance Framework (GBAF) that has been developed from the organisation s strategic objectives as identified by the Governing Body. The GBAF is the organisation s main process through which the Governing Body receives assurance on the management of high level risks to the achievement of the organisations strategic objectives. Issues arising: New Risks Closed Risks Reduced Risk Scores Increased Risk Scores None None None ID 293: Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target. This risk has been reassessed as red with a score of 16 due to the work on reducing backlog issues and strengthening the administrative processes in the CHC team.
2 Main risks There are six main risks to the CCG: ID Risk Description Changes since 284 There is a risk that Primary Care reducing GP workforce with an increasing population, will impact on service delivery and resilience over time. 281 The CCG's risk of not achieving the improvement trajectory for meeting the access to cancer treatment as measured by the constitutional standard for 62 days from urgent GP referral to treatment. 290 The CCG is at risk of fully delivering it core functions if acute contracts over perform in 2018/19. last assessment The CCG has a risk of not halving the numbers of patients waiting more than 52 weeks for treatment at March 2018 compared to numbers by March Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target. 282 There is a risk of failure to deliver the transformation work of the SEL Sustainability and Transformation Partnership (STP) by Our Healthier South East London [OHSEL] The process is supported by a formal risk management framework which considers the CCG s appetite for risk and roles and responsibilities for risk management within the organisation. 2
3 The criteria used to determine the level of impact and likelihood the risk will occur is shown in the following matrix, which demonstrates the range of scores available to be assigned against a risk: Severity/ Consequence RISK SCORE MATRIX Likelihood Rare Unlikely Possible Likely Almost certain 5 Catastrophic Major Moderate Minor Negligible Risk score Action Extreme risk Escalate to the Governing Body 8-12 High risk Escalate to the Greenwich Executive Group 4-6 Moderate risk Escalate to relevant Directorate Director 1-3 Low risk Manage within Directorate Teams The consequence and likelihood scores must be multiplied together to give an overall risk score. Summary of actions, if any, following this meeting: The current focus is on derisking the QIPP plan by: a) Fully assuring existing schemes at local and collaborative level. b) Developing new schemes through collaborative work programme with Bexley and Lewisham. c) Contract due diligence. The CCG has a QIPP of 14.3m in 2018/19 to achieve financial balance. The 14.3m has not been fully identified so there is a level of risk with delivering the target. Financial recovery remains the priority for the CCG, which is detailed in the Financial report. Previous committee involvement: Audit Committee: Date: 19 March 2018 for consideration and approval Governing Body: Date: 02 May 2018 for consideration and approval Greenwich Executive Group: Date: 20 June 2018 for consideration and approval Quality Committee: Date: 04 May 2018 for consideration and approval FPQ Committee: Date: 27 June 2018 for consideration and approval Recommendations to the Governing Body: The Governing Body is asked to: To scrutinise the risk register and consider if the controls are sufficient and appropriate to mitigate risks. (Please provide details below where Yes is indicated) 3
4 Impact on Governing Body Assurance Framework (x) Yes x No N/A Impact on Environment (x) Yes No N/A x Legal Implications (x) Yes x No N/A Resource and or financial implications (x) Yes x No N/A Equality impact assessment (x) Yes No N/A x Privacy impact assessment (x) Yes No N/A x Impact on current NHS Outcomes Framework areas (x) Yes x No N/A Patient and Public Involvement (x) Yes No N/A x Communications and Engagement (x) Yes No N/A x Impact on CCG Constitution (x) Yes No N/A x The report has identified: Impact on Governing Body Assurance Framework: The current GEG risk register outlines details of all identified organisational risks that may prevent the CCG from achieving its strategic objectives. Legal implications: All risks detailed on the risk register have legal implications attached to them as the CCG is required to meet statutory financial duties, Civil Contingencies Act duties and Section 11 duties. Resource and or financial implications: All risks detailed on the risk register have legal implications attached to them as the CCG is required to meet statutory financial duties, Civil Contingencies Act duties and Section 11 duties. Impact on current NHS Outcomes Framework areas: Risks in relation in relation to providers not delivering quality and safety standards to patients which could impact on the current NHS Outcomes Framework (specifically Outcome 5: treating and caring for people in a safe environment and protecting them from avoidable harm) linked to strategic objective 1. Attachments: (i) Governing Body Assurance Framework (GBAF) Report (ii) Appendix A: Governing Body Assurance Framework (GBAF) (iii) Appendix B: NHS Greenwich Clinical Commissioning Group Risk Register 4
5 GOVERNING BODY Governing Body Assurance Framework Report September Introduction NHS Greenwich Clinical Commissioning Group (CCG) has a Governing Body Assurance Framework (GBAF) that has been developed from the organisation s strategic objectives as identified by the Governing Body. The GBAF is the organisation s main process through which the Governing Body receives assurance on the management of high level risks (risks scored 12 and above) to the achievement of the organisations strategic objectives. This report provides the Governing Body with an overview of the totality of risks affecting the organisation s strategic objectives together with the action plans to address them. The detailed review and scrutiny of the GBAF ensures that appropriate controls and assurances are in place to manage the mitigations of these risks. Analysis identifies any objectives that are at greater risk and provides opportunities for remedial action which will increase the level of assurance. 2. NHS Greenwich CCG s Strategic Objectives 2018/19 sustainable, efficie inequalities with an additional focus on the urgent and emergency care system improvement along the pathway. 2. To ensure the CCG s position recovers to meet its financial and governance duties and performance standards. 3. To nurture and support primary care to be resilient and thrive. 4. To strengthen productive relationships with partners and the public to work as a health and care system. 5. To actively engage with our communities to improve their experience of healthcare. 6. To play an active and influential role in shaping SE London and London wide commissioning. Page 1 of 5
6 3. Activity since last report Table 1: Risk activity since the last report New Risks Closed Risks Reduced Risk Scores Increased Risk Scores None None None ID 293: Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target. This risk has been reassessed as red with a score of 16 due to the work on reducing backlog issues and strengthening the administrative processes in the CHC team. The full Governing Body Assurance Framework (GBAF) is detailed in Appendix A. 4. Main risks There are six main risks to the CCG: ID Risk Description Changes since last assessment 284 There is a risk that Primary Care reducing GP workforce with an increasing population, will impact on service delivery and resilience over time. 281 The CCG's risk of not achieving the improvement trajectory for meeting the access to cancer treatment as measured by the constitutional standard for 62 days from urgent GP referral to treatment. 290 The CCG is at risk of fully delivering it core functions if acute contracts over perform in 2018/ The CCG has a risk of not halving the numbers of patients waiting more than 52 weeks for treatment at March 2018 compared to numbers by March Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target. 282 There is a risk of failure to deliver the transformation work of the SEL Sustainability and Transformation Partnership (STP) by Our Healthier South East London [OHSEL] The CCG is working closely with Southwark s Integrated Contracts Delivery Team (ICDT) along with the North East London s Commissioning Support Unit (NEL CSU) to monitor its acute Page 2 of 5
7 providers to redesign patient pathways and improve quality and outcomes for patients. The CCG is also collaboratively working with all South East London (SEL) Clinical Commissioning Groups (CCGs) to strengthen monitoring processes of commissioned services to gain assurances on value for money, safety and clinical effectiveness in services received by the local population. The current focus is on derisking the QIPP plan by: a) Fully assuring existing schemes at local and collaborative level. b) Developing new schemes through collaborative work programme with Bexley and Lewisham. c) Contract due diligence. The CCG has a QIPP of 14.3m in 2017/18 to achieve financial balance. The 14.3m needs to be fully identified as there is a level of risk with delivering the target. The CCG s recovery plan recognises that it must deliver on the following 4 key areas to manage these risks: 1. Manage acute over-performance more effectively 2. Deliver QIPP programmes more consistently 3. Manage budgets more effectively not spending more money than we have 4. Build the capacity and capability to deliver this larger change programme Financial recovery remains the priority for the CCG, which is detailed in the Financial report. 5. Overview of the organisation s risk register monitoring process There are currently 14 risks on the GBAF. Table 2: Monitoring of identified risks: Objective Number of risks Monitoring 1 10 Quality Committee, FPQ Committee, GEG & Governing Body 2 2 FPQ Committee, GEG & Governing Body 3 1 FPQ Committee, GEG & Governing Body 4 N/A Monitored on the corporate Risk Register 5 N/A Quality Committee, GEG & Governing Body 6 1 FPQ Committee, GEG & Governing Body Total 14 The process is supported by a formal risk management framework which considers the CCG s appetite for risk and roles and responsibilities for risk management within the organisation. Page 3 of 5
8 The criteria used to determine the level of impact and likelihood the risk will occur is shown in the following matrix, which demonstrates the range of scores available to be assigned against a risk: Table 3: Risk Score Matrix RISK SCORE MATRIX Severity/ Consequence Likelihood Rare Unlikely Possible Likely Almost certain 5 Catastrophic Major Moderate Minor Negligible Risk score Action Extreme risk Escalate to the Governing Body 8-12 High risk Escalate to the Greenwich Executive Group 4-6 Moderate risk Escalate to relevant Directorate Director 1-3 Low risk Manage within Directorate Teams The consequence and likelihood scores must be multiplied together to give an overall risk score. Conclusion The GBAF has identified risks that may prevent the organisation from achieving its statutory duties e.g. the ability of the Governing Body to meet its statutory duties, particularly around managing breaching the 18 week RTT standard; breaching the 62 day referral to treatment cancer target and that acute contracts may over perform in 2018/19. Actions have been identified to mitigate these risks and the Governing Body will continue to monitor the progress on the action plans. Recommendations To scrutinise the risk register and consider if the controls are sufficient and appropriate to mitigate the risks. Page 4 of 5
9 Summary of all 14 Risks on the CCG s GBAF as at 02/08/18 ID Risk Description (Target) (Initial) Changes since last assessment 284 There is a risk that Primary Care reducing GP workforce with an increasing population, will impact on service delivery and resilience over time. 281 The CCG's risk of not achieving the improvement trajectory for meeting the access to cancer treatment as measured by the constitutional standard for 62 days from urgent GP referral to treatment. 290 The CCG is at risk of not fully delivering it core functions if acute contracts over perform in 2018/ The CCG is at risk of not halving the numbers of patients waiting more than 52 weeks for treatment at March 2018 compared to numbers by March Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target There is a risk of failure to deliver the transformation work of the SEL Sustainability and Transformation Partnership (STP) by Our Healthier South East London [OHSEL]. 280 The CCG's risk of not being able to maintain the patient tracking list (PTL) size at March 2018 levels. The PTL size is the total number of patients on the waiting list. The operating plan guidance for 2018/19 expects the Referral to Treatment (RTT) PTL at end of March 2019 should not be higher than the level at March The CCG fails to achieve its financial statutory duties in 2018/ Failure to deliver the 14.3m QIPP target for 2018/ There is a project delivery risk to the implementation of the frailty model ahead of winter 2018/ Non achievement of national 4 hour ED waiting time target could impact on patient care and clinical outcomes Vacancy for Designated Nurse for Looked After Children (LAC) post impact on care LAC children receive. 248 CCG is unable to meet the statutory requirements of the Deprivation of Liberty Safeguards (DoLS) 181 Appropriate systems and processes not in place to ensure monitoring of quality and safety of main commissioned services Page 5 of 5
10
11 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID Date Opened Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) (Initial) Changes since last assessment Action Plan Director GP Lead Committee Responsible /09/2017 There is a risk that Primary Care reducing GP workforce with an increasing population, will impact on service delivery and resilience over time. Primary Care Risk Register. Bi-monthly reporting with updates to Primary Care Commissioning Committee (PCCC) and GP Forward View [GPVF] Board. Regular reporting on progress to SEL STP through Standard Assurance Process. Regular updates on progress to LMC. Successful bid for Pharmacists recruitment. Successful bid for GP recruitment. Applying GPFV resilience funding to target support to practice with biggest growth in list size. Inability to influnce primary care recruitment and retention. Financial and employment impact on practices to recruit more staff to address growing demand. Population growth through Greenwich regeneration programmes. Changing population profile to more mobile, younger population. Escalation of issues through the SEL Healthy London Partnerships (HLP) Assurance Return. Minutes of PCCC, GPVF Board and LMC Meetings. Monitoring list size and including reports in CCG Quality Report to ensure focus. Primary care team action plan to help improve patient registration process to ensure funding follows the patient. 3. To nurture and support primary care to be resilient and thrive Assurance Returns and feedback from HLP to SEL Primary Care Exec. Group supports local action planning to address issues that are escalated. August Update: Pharmacists recruitment in implementation stage by the Federation. The national GP recruitment scheme is expected to commence in September Shaw, Robert - Director of Commissioning Perera, Ranil - GP Clinical Commissioner /05/18 The CCG's risk of not achieving the improvement trajectory for meeting the access to cancer treatment as measured by the constitutional standard for 62 days from urgent GP referral to treatment. Trusts action plans to deliver their 62 day trajectory including a SEL Recovery plan focusing on shared pathway actions and performance. Monthly performance meeting with acute trusts - focus on internal trust performance and actions relation to them, covering areas not picked up by the 62 day leadership group. Fortnightly system leadership group - 62 day leadership meeting, focusing on shared pathway actions and performance. The Schared Care Cancer Delivery Team (SCCD) - the operational arm of the ACN to progress actopms on a day to day basis. Monthly ACN Steering Group. Monthly Members Board - a trust CEO. COO board which facilitates trust level escalation where plans are not progressed. Development of KPIs for all shared pathway commitments. Real time information. Trust level plans and SEL recovery plan with SMART actions and senior level action owners. Trust performance reports for performance meetings. Monthly performance against trajectory by Trust and CCG. Minutes of Performance Meetings. CCG Integrated Governance report papers. Trust performance report to 62 day leadership group showing progress updates for actions by Trust and Tumour Type. Minutes and Action Log from 62 day Leadership Meeting. Reports showing KPIs for -time to first outpatient (shared pathway commitment). Action Plans RAG ratings. Papers and minutes of the monthly Members Board The development of KPs for all shared pathwy commitments to allow near time monitoring of impact of actions to be in pace by end of Q2. This development is being led by the Operational arm of the ACN. Shaw, Robert - Director of Commissioning Wahba, Hany - GP Clinical Commissioner Page 1 of 6
12 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID 290 Date Opened 29/03/17 Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) The CCG is at risk of not fully delivering its core functions if acute contracts over perform in 2018/19. Contracts funded at outturn and specific growth levels for e.g. to sustain cancer and diagnostic activity and generic demographic growth editions. Detailed examination of activity level by point of delivery by NEL CSU and CCG MDT. CMBs. Regular update reports to the FPQ and Governing Body. Controls on prior approval and consultant to consultant referral require review. Variance analysis planned to actual by point of delivery by provider monthly analysis. Summary level to FPQ monthly. Monthly Operational Plan reporting to FRB. Notes and Action Trackers of CMBs. CSU and CCG MDT monthly meetings. Improved analysis of forward order book for Elective Care through referral management and referral data by source. Strengthening of integration of perfomance and finance reports to FPQ. (Initial) Changes since last assessment Action Plan Management of unplanned activity via QIPP schemes. Implementation of Planned Care Programme Board across Bexley, Greenwich and Lewisham with focus on high referring specialities, referral optimisation and increasing access to specialist opinion to reduce referral levels. Director GP Lead Shaw, Robert - Director of Commissioning Perera, Ranil - GP Clinical Commissioner Committee Responsible /06/18 The CCG has a risk of not halving the numbers of patients waiting more than 52 weeks for treatment at March 2018 compared to numbers by March GSTT and KCH both have agreed A specialty level plan and trajectory for trajectories to reduce the number key specialties with long waiters for KCH. of long waiters to zero over the course of the year. This is over and above the national requirement. LGT currently has not long waiting patients - the expectation is that this position will be maintainewd throughout 2018/29. Specialty level plan and trajectory for key specialties with long waiters for GSTT. Monthly performance meeting with acute trusts. Integrated Performance Reports to the Integrated Governance Committee. Contract Management Board (CMB) and Performance Meeting minutes and reports. CQRG minutes and reports. CSU service Auditors Reports (SARs). CG and CSU MDT A specialty level action plan has been provided by KCH by the end of Q1, which has senior level ownership. Currently working with the Trust to understand the intricacies of the plan to ensure progress can be tracked effectively. Shaw, Robert - Director of Commissioning Patel, Dr Nayan - GP Clinical Commissioner /05/18 Risk of the Continuing Healthcare (CHC) team not delivering its 1.34m QIPP target. CHC Improvement Programme and Action Plan. QIPP CHC milestones monitored monthly at QPDM with risks escalated to FRB. CHC monthly budget meetings. SEL CHC QIPP programme monitored by SEL QIPP oversight group. CHC has developed pricing structure to negotiate new packages of care in 2018/19. Risk of being unable to control costs and market resilience with current providers. Limited capacity to re-negotiate contracts from spot purchase to AQP providers. CHC information systems require development and strengthening. Monthly reports to QPDM. Monthly budget reports and minutes from CHC Governance Group meetings are also monitored for assurance at the Quality Committee. Minutes of FPQ and FRB meetings An end to end review of the systems and processes within the CHC budget is being undertaken to assess for further efficiencies to backup potential non-delivery of existing identified schemes. Action plan developed to deliver CHC System improvements for Invoice Management and monthly reconcilliation of the budget spend. Backlog of invoices and packages of care are being logged into CHC system. Quality Committee Leese, Yvonne - Director of Quality & Governance Nyame, Dr Sylvia - GP Page 2 of 6
13 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID 282 Date Opened 24/05/18 Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) There is a risk of failure to deliver the transformation work of the SEL Sustainability and Transformation Partnership (STP) by Our Healthier South East London [OHSEL]. The CCG's membership and participation in the following: SEL STP Steering Group; SEL STP Strategy Group and SEL STP work streams. CCG's Managing Director [MD] is Senior Responsible Officer (SRO) on Transforming Care Partnership (TCP). Reporting to the Governing Body (GB). Included into the CCG's workplan. STP work incorporated into the CCG's QIPP programme. Under developed systems and processes to update GB from various meetings. Financial gap yet to be closed. Regular reports to GB. CCG's membership and participation in various STP work streams. Weekly SEL Executive meetings with MD and Director of Finance. Shared Accountable Officer for the SEL Commissioning Alliance. 6. To play an active and influential role in shaping SE London and London wide commissioning. (Initial) Changes since last assessment Action Plan Quality surveilance monitoring of services being delivered. Development of Community Based Care (CBC) and Activity Based Care Programme Implementation of key workstreams. Director GP Lead Kennett-Brown, Neil - Managing Director Wright, Ellen - Chair Committee Responsible /05/18 The CCG's risk of not being able to maintain the patient tracking list (PTL) size at March 2018 levels. The PTL size is the total number of patients on the waiting list. The operating plan guidance for 2018/19 expects the Referral to Treatment (RTT) PTL at end of March 2019 should not be higher than the level at March GSTT, LGT and KCH all have agreed Recovery plans received from both KCH trajectories to deliver reduced PTL and LGT but further issues to be clarified. size (trust wide) by March 2019, which are reflected in start year contracts. Trusts have agreed trajectories to improve RTT performance levels of imcomplete, which is over and above the national requirment and should further the reduction of PTL size. Activity plan for GSTT for RTT delivery. Monthly performance meeting with acute trusts. Integrated Performance Reports to the Integrated Governance Committee. Contract Management Board (CMB) and Performance Meeting minutes and reports. CQRG minutes and reports. CSU service Auditors Reports (SARs). CCG and CSU MDTs. NHS England stocktakes A specialty level action plan to be provided by KCH and LGT, which has senior level ownership. Currently working with the Trusts to understand the intricacies of the plan to ensure progress can be tracked effectively. Shaw, Robert - Director of Commissioning Patel, Dr Nayan - GP Clinical Commissioner /03/18 The CCG fails to achieve its financial statutory duties in 2018/19. Monthly Financial Recovery Board (FRB) meetings. Monthly Finance, Performance & QIPP (FPQ) meetings. Contract Monitoring Board (CMB) meetings. Regular financial report to Governing Body. Regular assessment meetings with NHSE. Continuous review of the CCG's 2018/19 budget and expenditure. None. Weekly QIPP, Performance, Delivery and Monitoring (QPDM) meetings. Project Management Office (PMO) leading on QIPP delivery process. Monthly FPQ monitoring. Regular meetings with budget managers. Monthly Financial Recovery Board (FRB) meetings. Quarterly Audit Meetings. 2. To ensure the CCG's position recovers to meet its financial and governance duties and performance standards Joint working with other SEL CCGs to ensure achievement of SEL Control Total. Maloney, David - Chief Financial Officer Wright, Ellen - Chair Page 3 of 6
14 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID 291 Date Opened 29/03/17 Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) Failure to deliver the 14.3m QIPP target for 2018/19. Monthly reporting on progress to Organisation's ability and capacity to the Financial Recovery Board generalise large scale and focus projects. (FRB). Weekly QIPP, Performance, Delivery and Monitoring (QPDM) tracking of live schemes and development of new schemes. Robust assurance for all schemes within the QIPP programme. System tracking of delivery against all live schemes by project plan milestones. Continuous review of development opportunities in QIPP pipeline. Staffed Programme Management Office (PMO). CCG wide launch of PMO Operating Procedures. CEP process being implemented across SEL. Minutes and trackers of QPDM Group. Minutes/papers to FRB. Minutes/papers to FPQ. Minutes/papers to Governing Body. SOPs. 2. To ensure the CCG's position recovers to meet its financial duties and performance standards. (Initial) Changes since last assessment Action Plan Identify actions to be taken to reduce the risk of increased schemes and reduce the risk of non-delivery QIPP by the PMO. Horizon scanning of new QIPP opportunities. Current focus is on derisking the QIPP plan by: a) Fully assuring existing schemes at local and collaborative level. b) Developing new schemes through collaborative work programme with Bexley and Lewisham. c) Contract due diligence. Director GP Lead Shaw, Robert - Director of Commissioning Wright, Ellen - Chair Committee Responsible /11/17 There is a project delivery risk to the implementation of the frailty model ahead of winter 2018/19. Escalation plans. Arrangements in place to manage activity. Communication plans and ongoing escalation routes. Business continuity plans (DToC, UCC, ED flow). Weekly mobilisation meeting to review CAU activity and outcomes. Duncan House open to receive patients. Good Practice Visit to West London CCG to observe and embedded Frailty Model. Affordability of plan. Workforce - existing vacancies and staff needed to open the escalation capacity (both within acute and community). Failure of surge and proposed contingency measures to address pressures within the U&EC system/ Surge outside of the scope of the demand model - e.g. flu; impact of diverts to support local systems in heightened escalation Monthly reports to monitor breaches. Work with the SEL Surge Hub to ensure Surge and Escalation measures are fully agreed and underpinned by key partners e.g. LAS. Improved streaming and extended access to Ambulatory Care Pathways (ACP). Daily CAU activity reporting. Weekly Duncan House mobilisation meetings Stakeholders workshops for frontline staff across all frailty related services. Implementation of Task and Finish Groups for Discharge to Assess Remodelling. Shaw, Robert - Director of Commissioning Subbarayan, Krishna Page 4 of 6
15 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID 279 Date Opened 18/05/17 Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) Non achievement of national 4 hour ED waiting time target could impact on patient care and clinical outcomes. CCG attendance at ED Delivery Board meetings. Admission avoidance schemes supported by the CCG, Work to redesign patient pathways to improve patient flow and focus on improving the management of frailty patients. The ICDT leading work to redesign pathways to support patients avoided. Acute Frailty Unit Rapid Access Treatment (RAT) in place. UCC reconfiguration completed in October Discharge to Assess processes in place. Limited frailty/ambulatory care pathways in place. Current layout of the ED does not aid flow and limits available space for UCC patients. UCC & ED have different ways of recording breaches with different data. Requires agreement for standard methodology of data collection. LGT's estate plan to utilise available capital funding to improve capacity and flow. LGT's service transformation team working on improving patient flow. Performance scrutinized closely at the ED Delivery Board; LGT's CMBs and LGT's CQRGs. Ambulatory Emergency Care (AEC) opened in July This manages a range of conditions sent from GPs/ED/UCC and discharge on the same day. A&E Delivery board has appointed an independent Chair across the BGL system. PMO resourced to support key work streams with system SROs. Re-design of UCC Pathway for Mental Health. Telehealth Scheme for Care Homes launched in May (Initial) Changes since last assessment Action Plan LGT Emergency Pathway Improvement Plan. UCC Pathway re-design work undertaken for CAMHS work to improve patient flow. Frequent Attenders QIPP re-launched in July Care Homes medication review to reduce hospital admissions. Mapping work on Falls to be completed by end of August Director GP Lead Kennett-Brown, Neil - Managing Director Patel, Dr Nayan - GP Clinical Commissioner Committee Responsible /01/18 Vacancy for Designated Nurse for Looked After Children (LAC) post impact on care LAC children receive. Designated Nurse for Safeguarding Children is providing strategic and governance role within the CCG. Designated Nurse for Safeguarding Children provides information and support for service development. Designated Nurse for Safeguarding Children is working with the current part-time Designated Nurse for Looked After Children (LAC) to develop a service which reflects current national guidance and statutory regulation. Designated Nurse for Safeguarding Children does not have the expertise in LAC services and has competing workload priorities. Looked After Children (LAC) Doctor in post (part-time). LAC Nurse (part-time) in post. Designated Nurse for Safeguarding Children in post. Regular meetings with Designated professionals to review LAC CCG considering options to optimise recruitment. Leese, Yvonne - Director of Quality & Governance Salman, Dr Sabah - GP Joint Safeguarding Group Page 5 of 6
16 APPENDIX A: Governing Body Assurance Framework (GBAF) as at 02/08/18 ID 248 Date Opened 26/01/18 Risk Description Controls/Mitigation Gaps in controls/mitigation Assurance CCG's Objectives (Target) CCG is unable to meet the statutory requirements of the Deprivation of Liberty Safeguards (DoLS) Liaise with Continuing Health Care (CHC) team to scope approximate numbers where this ruling may apply. Legal support available on a case by case basis. Raised with National Safeguarding Steering Group/MCA & DoLS subgroup. None. CHC activity is controlled in-house and hence it is easier to seek assurance. It is likely that this ruling will apply to a small number of patients. Designated Nurse for Safeguarding Adults has met twice with the CHC team to scope this issue. Revised national CHC guidance has clarified that the CCG is responsible for making applications to the Court Protection (CoP) where they are the funding authority. (Initial) Changes since last assessment Action Plan CHC team have now scoped the number of patients that this is likely to apply to and have started discussions with RBG re:comissioning a service to complete the CoP applications. Director GP Lead Committee Responsible Joint Safeguarding Group Leese, Yvonne - Director of Quality & Governance Wahba, Hany - GP Clinical Commissioner /04/18 Appropriate systems and processes not in place to ensure monitoring of quality and safety of main commissioned services. Challenge and rigour of the quality monitoring systems in the: Quality Committee, CQRGs and CMB meetings. Receipt of Quality Reports at Quality Committee, GEG and Governing Body. Robust QIA & EIA process. Memorandum of Understanding with Public Health. Health & Wellbeing Board. Service contracts include quality and safety metrics. Quality Assurance Visits (QAVs). BRAVO system to share intelligence of quality and safety in contracts. Review of Impact Analysis via Quality Assurance Visits (QAVs) reporting back to the Quality Committee. Quality Surveillance Group NHSE. Contracts do not prioritise quality issues / Quality KPIs. Contracts review highlights lack of commissioning capacity. Limited capacity to monitor small contracts. Patient Alert Monitoring System (PAMS) and the Quality Alert Management System (QAMS) both appear under utilised across the health economy. Develop a consistent approach to KPIs that focus on outcome based care. Minutes and reports from Quality Committee. Quality Report to the Governing Body. Quality Issues Log. Monthly joint performance/quality/finance integrated report. Integrated Quality Dashboard. Escalation at CQRG to Contract Monitoring Board. Data from PAMS/QAMS used in reports to the Joint Safeguarding Group/Quality Committee. Annual Governance Statement and Report. Reports and minutes from the SI Review Panel. Quality Strategy. Evidence for CCG Statutory duties completed by July Development for a quality schedule / forward planner for each main contract. The CCG is considering mechanisms for monitoring of Primary Care contract. Leese, Yvonne - Director of Quality & Governance ddr Nayan Patel Quality Committee Page 6 of 6
GOVERNING BODY. Corporate Objective addressed by this paper (please select one or more with an X):
Enclosure: D Agenda item: 8 Title of paper: Managing Director s Report Date of meeting: 5 September 2018 GOVERNING BODY Presented by: Neil Kennett-Brown Prepared by: Neil Kennett-Brown Title: Chief Officer
More informationStrategic Risk Report 4 July 2016
Strategic Report 4 July 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Group s control over the delivery of
More informationChief Accountable Officer Director Transformation and Quality. Director Transformation and Quality Chief Accountable Officer
Governing Body Assurance Framework (July/August 2016) Introduction The Governing Body Assurance Framework identifies the CCG s principal, strategic objectives and the principal risks to their delivery.
More informationNHS Herts Valleys Clinical Commissioning Group Board Meeting 14 April 2016
NHS Herts Valleys Clinical Commissioning Group Board Meeting 14 April 2016 Title 2015/16 Annual Report and Accounts proposed approval process Agenda Item: 13 Purpose (tick one only) Decision or Approval
More informationStrategic Risk Report 12 September 2016
Strategic Report September 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Commissioning Group s control over
More informationStrategic Risk Report 1 March 2018
Strategic Report 1 March 2018 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Commissioning Group s control over
More informationPerformance and Delivery/ Chief Nurse
Governing Body 26th May 2017 Quality and Performance Report 22nd May 2017 Author: Other contributors: Executive Lead Audience Eileen Clark - Acting Director of Clinical Performance and Delivery/ Chief
More informationMINUTES OF MEETING: QUALITY COMMITTEE. 04 July 2016 Room BG.01, The Woolwich Centre, 35 Wellington Street, SE18 6HQ 10:30 12:30 PART ONE
Enclosure Svi MINUTES OF MEETING: QUALITY COMMITTEE 04 July 2016 Room BG.01, The Woolwich Centre, 35 Wellington Street, SE18 6HQ 10:30 12:30 PART ONE PRESENT: Dr Iynga Vanniasegaram ( IV) (Chair) Diane
More informationNovember NHS Rushcliffe CCG Assurance Framework
November 2015 NHS Rushcliffe CCG Assurance Framework ASSURANCE FRAMEWORK SUMMARY No. Lead & Sub Committee Date placed on Assurance Framework narrative Residual rating score L I rating in 19 March 2015
More informationReport to Governing Body 19 September 2018
Report to Governing Body 19 September 2018 Report Title Author(s) Governing Body/Clinical Lead(s) Management Lead(s) CCG Programme Purpose of Report Summary NHS Lambeth Clinical Commissioning Group (CCG)
More informationEnclosure: L Agenda item: 16 GOVERNING BODY. Title of paper: Quality report. Date of meeting: 28 March 2018
Enclosure: L Agenda item: 16 Title of paper: Quality report GOVERNING BODY Date of meeting: 28 March 2018 Presented by: Yvonne Leese Prepared by: Anne Douse Title: Director of Quality and Integrated Governance
More informationSummary two year operating plan 2017/18
One Trust - serving our local communities Summary two year operating plan 2017/18 & 2018/19 www.lewishamandgreenwich.nhs.uk Summary two year operating plan: 2017/18 and 2018/19 1. Introduction This summary
More informationA meeting of NHS Bromley CCG Governing Body 25 May 2017
South East London Sector A meeting of NHS Bromley CCG Governing Body 25 May 2017 ENCLOSURE 4 SOUTH EAST LONDON 111 AND GP OUT OF HOURS MEMORANDUM OF UNDERSTANDING SUMMARY: The NHS England Commissioning
More informationNHS Southwark Clinical Commissioning Group Board Assurance Framework December 2017
TP-12 TP-02 TP-08 QN-15 18/12/2017 QN-11 NHS Southwark Clinical Board Assurance Framework December 2017 CCG CORPORATE OBJECTIVES 2017-18 Involvement Delivery and 1. Act to comprehensively assure and improve
More informationNewham Borough Summary report
Newham Borough Summary report April 2013 Prepared on 17/04/13 by Commissioning Support team Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 GREE N Finance and Activity
More informationDELIVERING THE LEFT SHIFT IN ACUTE ACTIVITY THE COMMUNITY MODEL
DELIVERING THE LEFT SHIFT IN ACUTE ACTIVITY THE COMMUNITY MODEL 1. Introduction The Strategic Outline Case (SOC) and subsequent developing Outline Business Case (OBC) for the reconfiguration of acute hospital
More informationMERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 25 th January 2018 Agenda No: 7.2 Attachment: 7 Title of Document: Acute Sustainability at Epsom & St Helier University Hospitals NHS
More informationGOVERNING BODY REPORT
GOVERNING BODY REPORT 1. Date of Governing Body Meeting: 2. Title of Report: Finance, Performance and Commissioning Committee Report 3. Key Messages: At the end of March 2017 the clinical commissioning
More informationAppendix 1: Croydon Clinical Commissioning Group Risk Register and Board Assurance Framework - 9th April 2013
Appendix 1: Croydon Clinical Register and Board Assurance Framework - 9th April 2013 Principal to Delivery Key Assurance on we have in in our are 1. To achieve financial sustainability in three years (2013-2014
More informationGOVERNING BOARD. Governing Board Assurance Framework. Date of Meeting 16 March 2016 Agenda Item No 6. Title
GOVERNNG BOARD Date of Meeting 16 March 2016 Agenda tem No 6 Title Governing Board Assurance Framework Governing Board members reviewed the GBAF s and process at a development session on 10 February 2016.
More informationSurrey Downs Clinical Commissioning Group Governing Body Part 1 Paper Acute Sustainability at Epsom & St Helier University Hospitals NHS Trust
Surrey Downs Clinical Commissioning Group Governing Body Part 1 Paper Acute Sustainability at Epsom & St Helier University Hospitals NHS Trust 1. Strategic Context 1.1. It has long been recognised that
More informationNorfolk and Waveney STP. Meeting with East Suffolk Partnership 27 September 2017
Norfolk and Waveney STP Meeting with East Suffolk Partnership 27 September 2017 2 The Norfolk and Waveney STP Members Waveney District Council Focus of Norfolk and Waveney STP Our plan is in line with
More informationCouncil of Members. 20 January 2016
Council of Members 20 January 2016 Feedback on election process: Council of Members Chair and Deputy Chair Malcolm Hines, Chief Financial Officer Minutes of last meeting: 14 October 2015 Dr. Richard Proctor,
More information5. Does this paper provide evidence of assurance against the Governing Body Assurance Framework?
Item Number: 6.3 Governing Body Meeting: 4 February 2016 Report Sponsor Anthony Fitzgerald Director of Strategy and Delivery Report Author Anthony Fitzgerald Director of Strategy and Delivery 1. Title
More informationNHS Norwich CCG Operational Plan and
NHS Norwich CCG Operational Plan 2017-18 and 2018-19 Commissioning NHS care for the people of Norwich 1 Release: V17 Final Date: 2016.01.11 Table of Contents Page 1 Introduction 4 2 National Background
More informationNewham Borough Summary report
Newham Borough Summary report March 2013 Prepared on 18/03/13 by Commissioning Support team Finance and Activity Millions Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Newham Headlines March 2013 Feb-12 Apr-12 Jun-12
More informationNHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY AND URGENT CARE BOARD UPDATE
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY AND URGENT CARE BOARD UPDATE Date of the meeting 17/05/2017 Author Sponsoring GB member Purpose of Report Recommendation Stakeholder
More information21 March NHS Providers ON THE DAY BRIEFING Page 1
21 March 2018 NHS Providers ON THE DAY BRIEFING Page 1 2016-17 (Revised) 2017-18 (Revised) 2018-19 2019-20 (Indicative budget) 2020-21 (Indicative budget) Total revenue budget ( m) 106,528 110,002 114,269
More informationRTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning
RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within
More informationEXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY Anne Gibbs, Director of Strategy & Planning
EXECUTIVE SUMMARY D REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY 2018 Subject Supporting TEG Member Author Status 1 A review of progress against Corporate Objectives 2017/18 and planned Corporate Objectives
More informationPatient Reference Group 04 April 2017 Room BG.01, Woolwich Centre, Ground floor. Name Job Title Organisation
PRESENT: Patient Reference Group 04 April 2017 Room BG.01, Woolwich Centre, Ground floor. Name Job Title Organisation Dr Sylvia Nyame (SN) (Chair) CCG GB GP Executive Greenwich CCG Angela Basoah (ABa)
More informationGoverning Body meeting on 13th September 2018
Governing Body meeting on 13th September 2018 Report from the Chair of the Integrated Governance Committee (IGC) Date of Meetings Reported: 9 th August 2018 Key achievements Author: Martin Wilkinson, Chair
More informationNHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER C Hickson, Head of Management Accounts
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER 2013 Date of the meeting 15/01/2014 Author Sponsoring GB member Purpose of report Recommendation Resource
More informationGOVERNING BODY. Purpose of the report: To ensure the Governing Body has knowledge of and approve the annual report ahead of submission to NHS England.
Enclosure: L Agenda item: 15 GOVERNING BODY Title of paper: NHS Greenwich CCG Annual Report 2015/16 Date of meeting: 25 May 2016 Presented by: Diane Jones Prepared by: Diane Jones Title: Director of Integrated
More informationReport to the Board of Directors 2016/17
Attachment 8 Report to the Board of Directors 2016/17 Date of meeting 30 September 2016 Subject Report of Prepared by Purpose of report Previously considered by (Committee/Date) Local A&E Delivery Board
More informationNorth West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee
North West London Accident and Emergency Performance Report for the winter of 2016/17 North West London Joint Health Overview and Scrutiny Committee 20 April 2017 1 This paper will summarise the performance
More informationNHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance
NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Fiona and Louise Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss
More informationGuy s and St Thomas NHS Foundation Trust Operational Plan 2016/17. For publication version 18 th April 2016
Guy s and St Thomas NHS Foundation Trust Operational Plan 2016/17 For publication version 18 th April 2016 This plan is written according to the NHS Improvement guidance on provider operational plans 2016/17
More informationCCG Governing Body. Thursday 10 May 2018, 13:00 16:30. Room G02A&B, 160 Tooley Street, London SE1 2QH AGENDA. Time Item ENC Presented by
CCG Governing Body Thursday 10 May 2018, 13:00 16:30 Room G02A&B, 160 Tooley Street, London SE1 2QH AGENDA Time Item ENC Presented by 13.00 1 Chair s Welcome - Dr. Heaversedge 13.05 2 Introductions and
More informationMERTON CLINICAL COMMISSIONING GROUP PRIMARY CARE COMMISSIONING COMMITTEE. Purpose of Report: For Note
Date of Meeting: 23 rd March 2017 MERTON CLINICAL COMMISSIONING GROUP PRIMARY CARE COMMISSIONING COMMITTEE Agenda No: 7 Attachment: 6 Title of Document: Primary Care Strategy Update Purpose of Report:
More informationCambridgeshire and Peterborough Sustainability and Transformation Partnership
Cambridgeshire and Peterborough Sustainability and Transformation Partnership Governance Framework November 2017 Page 1 of 28 Contents 1. Introduction 2. Sustainability and Transformation Partnership 3.
More informationNHS Dorset Clinical Commissioning Group Governing Body Meeting Financial Position as at 31 st July C Hickson, Head of Management Accounts
NHS Dorset Clinical Commissioning Group Governing Body Meeting Financial Position as at 31 st July 2013 9.4 Date of the meeting 18/09/2013 Author Sponsoring GB member Purpose of report Recommendation Resource
More informationNHS THANET CLINICAL COMMISSIONING GROUP GOVERNING BODY. TUESDAY 21 NOVEMBER 2017 AGENDA PART ONE (Public) - 13:00-13:10. Chair Dr Tony Martin
NHS THANET CLINICAL COMMISSIONING GROUP GOVERNING BODY HELD IN THE HARBOUR SANDS MEETING ROOM, 3 RD FLOOR, THANET DISTRICT COUNCIL TUESDAY 21 NOVEMBER 2017 AGENDA PART ONE (Public) - 13:00-13:10 Chair
More informationPatient Safety & Clinical Quality Committee Chair s Report. Sue Hayter, Governing Body Registered Nurse Member
Agenda Item: 10.2 Subject: Presented by: Patient Safety & Clinical Quality Committee Chair s Report Sue Hayter, Governing Body Registered Nurse Member Submitted to: NHS West Norfolk CCG Governing Body,
More informationThe Community Based Target Model
1 The Community Based Target Model Integrated Single System Leadership and Management The Core (as a minimum all LCNs should encompass) Working with High Impact Changes Lambeth Serving geographically coherent
More informationStrategy & Business Plan: Executive Summary
Strategy & Business Plan: Executive Summary May 2016 Overview The 2016/17 Strategy and Business Plan puts Yorkshire and Humber Academic Health Science Network at the heart of the sustainability and transformation
More informationSWLCC Update. Update December 2015
SWLCC Update Update December 2015 Croydon, Kingston, Merton, Richmond, Sutton and Wandsworth NHS Clinical Commissioning Groups and NHS England Working together to improve the quality of care in South West
More informationNHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016.
1604 Executive 18/06/2014 1603 Executive 18/06/2014 Finance - Fin. Management 1491 Responsiveness 29/08/2013 ED - Adult Involvement of Service Users 11//2017 Failure to maintain Emergency Department performance
More informationDRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8
DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8 West London Clinical Commissioning Group This document sets out a clear set of plans and priorities for 2017/18 reflecting West London CCGs ambition
More informationApprove Ratify For Discussion For Information
NHS North Cumbria CCG Governing Body Agenda Item 2 August 2017 10 Title: General Practice Update Report August 2017 Purpose of the Report This is the first report on General Practice since the CCG boundary
More informationUpdate on NHS Central London CCG QIPP schemes
Update on NHS Central London CCG QIPP schemes NHS Central London CCG has identified circa 11m for QIPP during 2013/14. Commissioning Intentions approved by the governing body included transformational
More informationPerformance and Quality Report Sean Morgan Director of Performance and Delivery Mary Hopper Director of Quality Dino Pardhanani, Clinical Director
Sutton CCG Clinical Commissioning Group Governing Body Date Thursday, 06 September 2018 Document Title Lead Director (Name and Role) Clinical Sponsor (Name and Role) Performance and Quality Report Sean
More informationLeeds West CCG Governing Body Meeting
Agenda Item: LW2015/115 FOI Exempt: N Leeds West CCG Governing Body Meeting Date of meeting: 4 vember 2015 Title: Delegated Commissioning of Primary Medical Services Lead Governing Body Member: Dr Simon
More informationNewham Borough Summary report
Newham Borough Summary report Item K1 September 2013 Prepared on 30/09/2013 by Support team GREEN Finance and Activity Millions AMBER RED Headlines M5 Financial position M4 activity data The QIPP net savings
More informationAgenda Item: 14 NHS Norwich CCG Governing Body
Agenda Item: 14 NHS Norwich CCG Governing Body Tuesday 23 rd May 2017 Subject: Presented By: Submitted To: Purpose of Paper: Commissioning Report James Elliott Director of Clinical Transformation NHS Norwich
More informationOxfordshire Clinical Commissioning Group: Annual Public meeting
Oxfordshire Oxfordshire Clinical Commissioning Group: Annual Public meeting Dr Joe McManners Clinical Chair 28 September 2017 Agenda Oxfordshire Review of the year: 2016 / 2017 Financial Accounts Bicester
More informationNorfolk and Waveney s Sustainability and Transformation Plan (June 2017)
Norfolk and Waveney s Sustainability and Transformation Plan (June 2017) 1 Sustainability and Transformation Plans (STP) A national policy initiative that are part of the delivery of the NHS Five Year
More informationUrgent Care Short Term Actions to Improve Performance
To: Trust Board From: Chief Operating Officer Date: March 2017 Healthcare standard Title: Urgent Care Short Term Actions to Improve Performance Author/Responsible Director: Michael Woods / Andrew Prydderch
More informationPortsmouth Hospitals NHS Trust Winter/Surg Plan 2013/14. pg. 1
Portsmouth Hospitals NHS Trust Winter/Surg Plan 2013/14 pg. 1 Introduction The purpose of this winter/surg plan is to ensure that Portsmouth Hospitals NHS Trust (PHT) is prepared and co-ordinated to respond
More informationIn year 1 (15/16) these outcomes will be measured as outlined below and baselines established from robust data for each indicator.
7. Key Performance Indicators (KPIs) (s These KPIs have been selected to demonstrate that care planning in Hillingdon improves patient experience of care, patient s quality of life and improves health
More informationNHS England (London) Assurance of the BEH Clinical Strategy
NHS England (London) Assurance of the BEH Clinical Strategy NHS England (London) Assurance of the BEH Clinical Strategy Status Report 8 th September 203 - Version.0 2 Contents. Overview & Executive Summary
More informationOperational Plan 2017/ /19 Dartford and Gravesham NHS Trust
Operational Plan 2017/18-2018/19 Dartford and Gravesham NHS Trust Page 1 of 5 Introduction Our Family, caring for yours defines our purpose as an organisation. This captures the approach taken by our teams
More informationMelanie Craig NHS Great Yarmouth and Waveney CCG Chief Officer. Rebecca Driver, STP Communications and Jane Harper-Smith, STP Programme Director
Agenda Item: 9 Governing Body Thursday 25 January 2018 Subject: Presented By: Prepared By: Submitted To: Purpose of Paper: Norfolk and Waveney Sustainability and Transformation Partnership Update Melanie
More informationPapers for the. West Kent Primary Care Commissioning Committee (Improving Access) Tuesday 21 st August at 4 4:30 pm
Papers for the West Kent Primary Care Commissioning Committee (Improving Access) on Tuesday 21 st August at 4 4:30 pm at Hadlow Suite, Hadlow Manor Hotel Hadlow, TN11 0JH 1 of 23 Primary Care Commissioning
More informationQuality Impact Assessment Policy
Quality Impact Assessment Policy Date: February 2016 Version: 2.1 Review Due: February 2018 Reader information Reference Directorate Document purpose Q005 Quality The purpose of this policy is to set out
More informationWOLVERHAMPTON CCG. Governing Body Meeting 9 th September 2014
WOLVERHAMPTON CCG Governing Body Meeting 9 th September 2014 ` Agenda item:12 TITLE OF REPORT: REPORT PRESENTED BY: Title of Report: Purpose of Report: Commissioning Committee Summary Kamran Ahmed Update
More informationAppendix 1: Integrated Urgent Care Service Update. 1. Purpose
Appendix 1: Integrated Urgent Care Service Update 1. Purpose The purpose of this paper is to provide Governing Body members across the collaborative CCGs with an update on the progress of the Integrated
More informationHalton. Local system review report Health and Wellbeing Board. Background and scope of the local system review. The review team
Halton Local system review report Health and Wellbeing Board Date of review: 21-25 August 2017 Background and scope of the local system review This review has been carried out following a request from
More informationCOMMISSIONING FOR QUALITY FRAMEWORK
This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version COMMISSIONING FOR QUALITY FRAMEWORK Document Title: Commissioning for Quality Framework
More informationSUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs
SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs December 2012 SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPS First published: 21 December 2012 2 Contents 1. INTRODUCTION...
More informationJOB DESCRIPTION. Joint Commissioning Manager for Older People s Residential Care and Nursing Homes
JOB DESCRIPTION Job Title: Grade: Team: Accountable to: Joint Commissioning Manager for Older People s Residential Care and Nursing Homes HAY 14 / AfC 8b (indicative) Partnership Commissioning Team Head
More informationService Transformation Report. Resource and Performance
SUMMARY REPORT Meeting Date: 31 May 2018 Agenda Item: 9.1 Enclosure Number: 9 Meeting: Trust Board (Part 1) Title: Author: Accountable Director: Other meetings presented to or previously agreed at: Service
More informationMERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 23 rd March 2017 Agenda No: 9.3 Attachment: 15 Title of Document: CCG Governing Body Assurance Report & Scorecards: Month 9 Quality &
More informationREPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 28 May 2015 Agenda No: 6.4 Attachment: 09 Title of Document: Emergency Preparedness Response and Resilience (EPRR) Policy v0.1
More informationReport. Report Author Presented By Responsible Director Susi Clarke, Primary Care Strategic Development Lead
Governing Body Meeting Held in Public Report Date of Meeting: 5.7.18 Agenda Item: 11.0 Report Title Extended Access Update Report Author Presented By Responsible Director Susi Clarke, Primary Care Strategic
More informationREPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 26 th January 2106 Agenda No: 5 Attachment: 04 Title of Document: Clinical Chair and Chief Officer Report Report Author: Adam
More informationMarket Management & Procurement Meeting Thursday 4 th September 2014 Greenwich Park Street
Market Management & Procurement Meeting Thursday 4 th September 2014 Greenwich Park Street PRESENT Jim Wintour (JM) - Chair Bridget Cameron (BC) Alison Goodlad (AG) Leceia Gordon-Mackenzie (LG) Sam Jones
More informationNHS TRAFFORD CLINICAL COMMISSIONING GROUP GOVERNING BODY 19 DECEMBER 2017
Part 1 X Part 2 NHS TRAFFORD CLINICAL COMMISSIONING GROUP GOVERNING BODY 19 DECEMBER 2017 Title of report Purpose of the report and key highlights Directorate Update - Nursing The report updates the Governing
More informationMarginal Rate Emergency Threshold. Executive Summary
Part 1 meeting of the Castle Point and Rochford CCG Governing Body held on 29 th September 2016 Agenda item 16 Marginal Rate Emergency Threshold Submitted by: Prepared by: Status: Robert Shaw, Joint Director
More information10.1 NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY BOARD UPDATE. Date of the meeting 19/07/2017 Author
NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY BOARD UPDATE Date of the meeting 19/07/2017 Author Sponsoring Board member Purpose of Report M Wood, Director of Service Delivery
More information18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework
18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework Vicky Scott Head of Delivery & Development (North West London) NHS Trust Development Authority Lyndsay Pendegrass
More informationMinutes of Part 1 of the Merton Clinical Commissioning Group Governing Body Tuesday, 26 th January 2016
Minutes of Part 1 of the Merton Clinical Commissioning Group Governing Body Tuesday, 26 th January 2016 Chair: Dr Andrew Murray Present: CC Cynthia Cardozo Chief Finance Officer CChi Dr Carrie Chill GP
More informationGreenwich Clinical Commissioning Group. Patient and Public Engagement Strategy ( )
Greenwich Clinical Commissioning Group Patient and Public Engagement Strategy (2017 2020) Page 1 of 22 Contents Page Executive Summary 3 Background 4 Statutory Duties, Guidance and Good Practice Local
More informationUtilisation Management
Utilisation Management The Utilisation Management team has developed a reputation over a number of years as an authentic and clinically credible support team assisting providers and commissioners in generating
More information: Geraint Davies, Director of Commercial Services
Report to : Trust Board of Directors Date of Report: 15/05/2015 Agenda Item: 0/15 Date of Meeting : 28 May 2015 Subject Report from Purpose : Report on Corporate Risk Register : Geraint Davies, Director
More informationEnclosure Lxi Greenwich Inclusion Project, Rooms 133 & 133A, Island Business Centre, 18/36 Wellington Street, Woolwich, London, SE18 6PF
Enclosure Lxi Greenwich Inclusion Project, Rooms 133 & 133A, Island Business Centre, 18/36 Wellington Street, Woolwich, London, SE18 6PF PRESENT: Name Job Title Organisation Dr Greg Ussher (GU) (Chair)
More informationQUALITY STRATEGY
NHS Nene and NHS Corby Clinical Commissioning Groups QUALITY STRATEGY 2017-2021 Approved: By the Joint Quality Committee on 11 April 2017 Ratified: By the NHS Corby Clinical Commissioning Group on 25 April
More informationNHS North West London
NHS North West London Shaping a Healthier Future Pre-Consultation Business Case Volume 6 Appendices A1 & A2 Edition: 1 20 June 2012 Page 1 of 29 APPENDIX A1 Programme Governance A.1.1 Key governance principles
More informationDecision-Making Business Case
Clinical Services Review Decision-Making Business Case Volume 2 September 2017 version 1.4 Clinical Services Review Decision-Making Business Case Volume 2 September 2017 version 1.4 DMBC CONTENTS CONTENTS
More informationMedicines optimisation in care homes
Medicines optimisation in care homes Programme overview March 2018 NHS England INFORMATION READER BOX Directorate Medical Operations and Information Specialised Commissioning Nursing Trans. & Corp. Ops.
More informationGOVERNING BODY REPORT
GOVERNING BODY REPORT 1. Date of Governing Body Meeting: 2. Title of Report: Chief Executive Officer s Business Report 3. Key Messages: This report provides an overview of important clinical commissioning
More informationOutcomes Based Commissioning. Update for Governing Body. 19 May 2015
Outcomes Based Commissioning Update for Governing Body 19 May 2015 Background To enable the commissioning of the outcomes based contract (OBC) for out of hospital health and social care an outcomes framework
More informationFramework for NHS provider and commissioner involvement in: Maximising the appropriate use of care homes
Publications Gateway reference number: 07483 Framework for NHS provider and commissioner involvement in: Maximising the appropriate use of care homes Cohort caring in Therapy-Led Units for inpatients ready/safe
More informationDriving and Supporting Improvement in Primary Care
Driving and Supporting Improvement in Primary Care 2016 2020 www.healthcareimprovementscotland.org Healthcare Improvement Scotland 2016 First published December 2016 The publication is copyright to Healthcare
More informationChief Officer s Report March and April 2018
Purpose This paper provides a summary of the key areas of business led by the Chief Officer in the CWHHE Clinical Commissioning Groups. CWHHE comprises NHS Central London, NHS West London, NHS Hammersmith
More informationAddressing ambulance handover delays: actions for local accident and emergency delivery boards
Addressing ambulance handover delays: actions for local accident and emergency delivery boards Published by NHS England and NHS Improvement November 2017 Contents Foreword... 2 Actions to be taken now,
More informationNorth West London Draft Sustainability and Transformation Plan Review
North West London Draft Sustainability and Transformation Plan Review In carrying out our work and preparing our report, we have worked solely on the instructions of the West London Alliance (specifically
More informationA meeting of Bromley CCG Primary Care Commissioning Committee 22 March 2018
A meeting of Bromley CCG Primary Care Commissioning Committee 22 March 2018 ENCLOSURE 7 PROPOSAL FOR ENHANCED MEDICAL SUPPORT TO BROMLEY CARE HOMES SUMMARY: Bromley CCG gained agreement at the CCG Clinical
More informationThe following tables define the impact and likelihood scoring options and the resulting score: - Risk score. Category
DRAFT Wirral Clinical Commissioning Group: Quality Assessment Tool v1 Overview This tool involves an initial assessment (stage 1) to quantify potential impacts (positive or negative) on from any proposal
More informationGeneral Practice 5 Year Forward View Operational Plan Leicester, Leicestershire and Rutland (LLR) STP
Leicester City Clinical Commissioning Group West Leicestershire Clinical Commissioning Group East Leicestershire and Rutland Clinical Commissioning Group General Practice 5 Year Forward View Operational
More information