1 Proceedings of the 112 nd SEIAA meeting held on 28 th January 2016 at Room No. 709, M.S Building, Bangalore Confirmation of the proceedings of 111 th SEIAA Meeting held on 11 th January Proceedings of 111 th SEIAA Meeting held on 11 th January 2016 was read and as there were no comments the same was accepted Action Taken reports on the proceedings of 111 th SEIAA meeting held on 11 th January The Authority noted that the action is being taken on the proceedings of 111 th SEIAA meeting held on 11 th January Deferred Project: For Invite: Construction Projects: Residential Apartment at Survey No. 21/1 and 12, Chikkanagamangala Village, Sarjapura Hobli, Anekal Taluk, Bangalore Urban District of M/s. M.J.Infrastructure, (SEIAA 37 CON 2015) It is a proposal seeking Environmental Clearance for construction of Residential Apartment of 225 Units with BF + GF + 4 UF on a plot area of 14, Sq.mts and with total built up area of 34, Sqm. Total water requirement of project is KLD. The subject was discussed in the SEAC meeting held on 5 th & 6 th June 2015 and 17 th & 18 th August The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition that the proponent shall maintain more greenery on the mother earth and with the following observations: 1. The proposal is a low rise building having B+G+4UF only and the conceptual plan have been approved by the competent authority.
2 2. The proponent clarified that sufficient ventilation and lighting has already been provided by providing open to sky spaces wherever required in order to maintain the good ventilation and light. 3. NOC dated from the Village Panchayat for water supply has been submitted by the proponent and the water balance also calculated fresh water demand at the rate of 55 LPCD as per the norms prescribed for rural water supply and the scheme for meeting the additional requirement has been given. 4. Since the ground coverage is only 50%, there is a scope for providing more than 30% of the greenery on the mother earth. The Authority during the meeting held on 29 th August 2015 had perused the proposal and took note of the recommendation of The Authority noted that the following observations were raised during the 99 th SEIAA meeting held on 29 th June 2015: The Authority observed that the residential units are compactly arranged without adequate space for ventilation. The project does not have required recreational area and the greenbelt. The internal circulation roads are narrow and having varying width. The proposal do not have any proof assured source of water supply. The picturesque view of the drawing gives an indication of possible high level of indoor pollution in the proposed residential units. The Authority after discussion decided to get the following information for further considerations: 1. Modification in the conceptual plan keeping the observations of the Authority made on 29 th June Details of Recreation Ground Area. 3. Details of greenbelt with provision for at least 33% of the plot area. 4. Details of the internal circulation roads of at least 6m width and drive way of 8 m width. 5. Possibility of high level indoor pollution and the proposed modified plan for preventing indoor pollution. The Authority also decided to invite the proponent. The Authority during the meeting held on had perused the reply submitted by the proponent on The proponent appeared before the Authority and explained the proposal in brief. The Authority opined that the reply submitted vide letter dated is incomplete and do not address the issues raised by SEIAA completely. The proponent 2
3 sought for some time for submission of revised reply as directed by the Authority. The Authority after discussion decided to consider after the receipt of revised reply. The Authority also decided to invite the proponent. The Authority perused the reply submitted by the proponent on The proponent appeared before the Authority and explained the proposal in brief. The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1. Revised scaled layout plan clearly indicating entry/exit, STP/MSW treatment facility location and all other infrastructural facility including RG area. 2. Enhance RG Area to the required 15% and converting one flat area for recreational purpose, as committed. 3. Relocate STP. 4. Increase in the green belt area to at least 33% and if there is a space constraint, alternate provision for compensating the greenery. 5. Specific social commitment plan with budget, activity and timeframe Modification of High Rise commercial Building (Multiplex and Shopping Mall), Residential Apartments Project at Sy.No.2699/1, (old no.42 to 47, 10, 11, 12, 32), PID No of Hosakere Road, Binnypet, Ward No.121, Bangalore Urban District of M/s. Relationship Properties Pvt. Ltd., (SEIAA 134 CON 2015) This is a proposal seeking Environmental clearance for proposed modification for High-rise commercial building (Mall & Amenities) and residential Apartment on a total plot area of Sq.mts and with total Built up area of 7,56, Sq.mts. The proposed building under expansion and modification consists of residential apartment of 3484 units consisting 11 blocks, Mall with 2 Basement+ Ground Floor+ 5 Upper Floor + Terrace Floor and Amenity Centre with Basement+ Ground Floor+ 1 Upper Floor + Terrace Floor. Total water requirement is 3316 KLD. It is noted that the proposal had earlier obtained Environmental Clearance vide Environmental Clearance letter No. SEIAA 201 CON 2012 dated 19 th July 2013 for the expansion and modification of Mixed Use Development consisting residential apartments with 5 Towers & a premium tower having 2B + G + 19 UF + Terrace. Commercial building consists of club house, hotel in 2B + G + 8 UF + Terrace and mall in 2B + G + 5 UF + Terrace. The subject was discussed in the SEAC meeting held on 30 th September 2015 and 2 nd November The Committee has recommended to SEIAA for issue of Environmental Clearance. 3
4 The Authority during the meeting held on had perused the proposal and took note of the recommendation of The Authority noted that construction of block number 1, 2 and 3 have been undertaken and the rest are proposed to be modified. Even though there is a reduction in built up area from the earlier E.C., there is an increase in the height of the buildings in the proposed plan upto 41 m. Justification in this regard is required. The Authority after discussion decided to get the following information for further consideration: (1) Layout plan of the proposed project super imposed on the project already issued with Environmental Clearance. (2) Revised calculation for the water requirement and corresponding water balance chart along with design of the STP and equalization tank taking the peak flow into consideration. (3) Explore the possibility of providing block-wise STP for decentralized sewage treatment and utilization of the treated water. (4) Revised layout plan to the scale clearly indicating all the infrastructure facilities and the proposed construction activity. (5) Real time traffic study report. (6) Details of the developments in the neighbourhood such as other developmental projects, infrastructural facilities, commercial establishments, road, railway line, etc in a radius of 3 Kms along with the sloping pattern. (7) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements and parking plan for corresponding number of vehicles. (8) Proposal to enhance energy savings to at least 25%. (9) Details of Recreational Ground Area with total percentage to the plot area. (10) Compliance on the earlier E.C. The Authority also decided to invite the proponent. The Authority during the meeting held on 17 th December 2015 had perused the reply submitted by the proponent. The proponent appeared before the Authority and explained the proposal in brief. The Authority noted that the proponent have already undertaken construction activity in violation of the provisions of EIA Notification, The construction activity that have been undertaken is not in accordance with the proposal approved vide the Environmental Clearance letter No. SEIAA 201 CON 2012 dated 19 th July The Authority therefore directed the proponent to stop the construction activity with immediate effect. 4
5 The Authority after discussion took the following decisions: (1) Issue the following directions under section 5 of the Environment (Protection) Act, 1986 to the proponent: (a) To suspend the construction activity of the above said project with immediate effect at the existing level till the Environmental Clearance is obtained. (b) To submit details regarding present level of construction along with latest dated photographs. (c) To show cause why action should not be initiated against you for the violation (2) Get the mahazar of the project site done to establish the violation. (3) Filing a complaint before the jurisdictional court for the violation under section 19 of the Environment (Protection) Act, The Scientific Officer, SEIAA is authorized for filing complaint on behalf of the Authority. (4) To consider the proposal after filing of the complaint and receipt of the information sought. Accordingly, the direction has been issued on The Authority perused the reply dated and the report of the mahazar conducted on The proponent was invited as per the request made in their letter dated The proponent appeared before the Authority and explained the proposal in brief. The proponent informed the Authority that out of 11 towers proposed as per the modified plan, construction of only three floors have been undertaken as per the approved plan. The Authority further noted that total plinth area of Tower 1, Tower 2 and Tower 3 as per the plan produced for Environmental Clearance issued on 19 th July 2013, whereas the plinth area of the said Towers as per the modified plan submitted for the Environmental Clearance is Sqm only which is less than the approved area. The proponent further informed that in Tower 1, out of 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 5 Upper Floors are completed and the 6 th Floor is in progress. In Tower 2, out of 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 5 Upper Floors are completed and the 6 th Floor is in progress and in Tower 3, 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 3 Upper Floors are completed and the 4 th Floor is in progress. The proponent therefore asserted that they have not exceeded the construction approved in the Environmental Clearance letter dated 19 th July 2013 and therefore it should not be treated as a case of violation. The 5
6 proponent while responding to a query with regard to change in the location of the said towers informed the Authority that two Towers (Tower1 and Tower 3) are started in the same location as approved and only location of Tower-2 is slightly shifted towards eastern side to accommodate parks and open spaces as per BDA norms at the western end of the project site. The Authority after discussion opined that the construction undertaken is not in violation of the provisions of EIA Notification, 2006 as the proponent hold a valid Environmental Clearance. The Authority therefore decided not to treat this as a case of violation and to drop the proposed action under E (P) Act. The Authority further decided to issue Environmental Clearance as per the recommendation made by the SEAC, subject to submission of the following information: 1) Ways and means of utilization of excess treated water proposed to be let into the sewer line including exploring the possibility of providing a detention pond. 2) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. 3) Neighbourhood details of the proposed project site. 4) Details of Recreational Ground area with at least 15% of the plot area. 5) Specific social commitment plan with budget, activity and timeframe For further consideration: Residential Development, Sy. Nos. 80, 2/1, 2/2, 2/3, 54/1B, 54/1A, 79/4, Rachenahalli Village, K.R.Puram Hobli, Bangalore East Taluk, Bangalore Urban District of M/s. Mantri Technology Constellations Pvt. Ltd (SEIAA 50 CON 2013) It is a proposal seeking Environmental Clearance for proposed residential development Mantri Sun3 project of 1273 flats on a Plot Area of 47, Sqm and with the total Built Up Area of 1,96, Sqm. The Authority noted that the SEAC during the 102 nd SEAC meeting held on 26 th & 27 th April 2013 have decided to issue model ToRs along with the additional TORs for the preparation of EIA by the project proponent. Accordingly the ToR was issued on The proponents have submitted the EIA report on The subject was discussed in the SEAC meeting held on 11 th & 12 th August 2014, 30 th & 31 st March 2015, 13 th July 2015, 23 rd September 2015 and 7 th October The Committee has recommended for issue of environmental clearance, after appraising the proposal along with the EIA report. 6
7 The Authority during the meeting held on had perused the proposal and took note of the recommendation of The Authority after discussion decided to get the following information for further consideration: (1) Clarification as to why action should not be taken for the discrepancies in the EIA report as observed by (2) Revised scaled layout plan duly indicating entry, exit, STP/MSW treatment facility location and all other infrastructural facility. (3) Project configuration with drawing. (4) Water audit for the project along with water balance chart for the monsoon and non-monsoon season. (5) Details of excavated Earth and plan for safe disposal of excess excavated earth with details of site proposed for disposal. (6) Justification for utilization of entire organic waste generated in the project with due calculations. (7) Details of green belt development with at least 33% of the plot area. The Authority also decided to invite the proponent. The Authority during the meeting held on 11 th January 2016 had perused the reply submitted by the proponent vide letter dated The proponent appeared before the Authority and explained the proposal in brief. The Authority opined that the clarification furnished by the proponent with regard to discrepancies in the EIA report is not convincing. The Authority therefore decided to reconsider the proposal during the next meeting with a detailed scrutiny of EIA report submitted by the proponent earlier and the present EIA report in the office. The proponent was advised by the Authority to submit the lab reports pertaining to the baseline data collection undertaken for preparation of the latest EIA report. The Authority perused the reply submitted by the proponent vide letter dated The Authority after discussion decided to get explanation for the discrepancies such as building configuration, baseline data, projected impact on the environmental parameters, etc in the EIA report submitted. The Authority also decided to invite the proponent for furnishing clarification. 7
8 Proposed Residential Project Sumadhura Soham at Khata No. 1791, Sy. No. 147/2, 148/1, Pattandur Agrahara Village, Bangalore East Taluk, Bangalore of Sri. Milind S. Thakker, No. 43, CKB Plaza, 2nd Floor, Varthur Main Road, Marathahalli, Bangalore. (SEIAA 169 CON 2015) This is a proposal seeking Environmental clearance for Development of Residential apartment of 299 units with B + GF +4UF+Terrace, on a total Plot area of 16, Sq.mts and with total Built up area of 49, Sq.mts. Total water requirement is 174 KLD. The subject was discussed in the SEAC meeting held on 17 th November The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of the following information: 1. Requisition letter given to BWSSB 2. Corrected FAR after considering TDR. The Authority during the meeting held on had perused the proposal and took note of the recommendation of SEAC along with the reply submitted by the proponent vide letter dated The Authority after discussion decided to get the following information for further consideration: 1) Revised scaled layout plan in metric units clearly indicating entry, exit, location of municipal solid waste management facility, STP, internal circulation, etc. 2) Details of Recreational Ground area. 3) Details of green belt with at least 33% of the plot area. 4) Revised water calculation and corresponding water balance chart. 5) Revised quantification of MSW as per standards and the corresponding management plan. 6) Rain water harvesting as per CGWA norms. The Authority perused the reply submitted by the proponent vide letter dated The Authority opined that the point-wise information furnished are incorrect and not satisfactory. The Authority therefore decided to direct the proponent to submit the following information for further consideration: 1) Layout plan on the scaled drawing with all the details such as entry/exit, internal road and other infrastructural facilities. 2) Width of the internal circulation road. 8
9 3) Details of Recreational Ground area with at least 15% of the plot area "Bren Edge Water", Residential apartments at Sy. No.33/1 and 33/2, Haralur Village and Sy.No.30/8B, Kasavanahalli village, Varthur Hobli, Bangalore East, Bangalore of M/s. Bren Corporation, (SEIAA 11 CON 2015) It is a proposal seeking Environmental Clearance for Construction of "Bren Edge Water", Residential Apartments of 308 Flats with Basement + GF + 13 UF + TF on a plot area of Sq.mts and with total built up area of Sq.mts. Total water requirement of project is 208 KLD. The subject was discussed in the SEAC meeting held on 19 th and 20 th March The Committee has recommended for issue of environmental clearance, subject to submission of the following information. 1. Revised hydrological study of the area influencing the surface water flow duly marking the ridges. 2. Lake water quality analysis report. The Authority during the meeting held on had perused the proposal and took note of the recommendation of The Authority further noted that the project authorities are alleged to have undertaken earth work and have caused inconvenience to the local people due to unscientific way of handling the excavated earth. The Authority therefore decided to consider the proposal after getting details on the said allegation. The Authority perused the reply submitted by the proponent vide letter dated The Authority noted that the proponent have informed that the earthwork referred to above is because of the works undertaken for construction of compound wall and site leveling/soil testing. The proponent have submitted an undertaking that the earthwork will be done in scientific way and ensure that it will not cause any inconvenience to the surrounding people. The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. 2) Specific social commitment plan with budget, activity and timeframe. 9
10 Residential Apartment at Sy. No. 103/1, Khatha No.216, Doddatogur Village, Begur Hobli, Bengaluru South Taluk, Bengaluru Urban District of M/s Sree & Sree Builders & Promoters (SEIAA 94 CON 2015) It is a proposal seeking Environmental Clearance for construction of Residential Apartment of 351 units with Basement+Ground Floor+11 Upper Floor on a plot area of 17, Sq.mts (karab area = Sq.m) and with total built up area of 54, Sqm. Total water requirement of project is 237 KLD. The subject was discussed in the SEAC meeting held on 4 th September The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of the following information. 1. Scientific assessment of the availability of the water from the bore well in the project site 2. Revised water balance calculating fresh water demand at the rate of 55 LPCD as per the norms prescribed for rural water supply and the scheme for meeting the additional requirement 3. Revised rain water harvesting calculations 4. Proposal to provide an underpass to connect the other side of the project site. The Authority during the meeting held on 26 th September 2015 had perused the proposal and took note of the recommendation of The Authority observed that the parcel of land in Part-2 is not of any practical use or beneficial to the project activities, as it is bifurcated by a public road and the entire activity is concentrated on the land in Part-1 The Authority after discussion decided to get the following information, in addition to information sought by SEAC for further consideration: 1. Revised layout plan exclusively for the land in Part-1 without considering the land in Part Details of Kharab land duly marking it on layout plan. 3. Revised land-use plan such as ground coverage, park & open spaces, greenbelt, parking area, etc. with respect to Part-1 only. 4. Source of water and NOC from the competent authority. 5. Enhance energy savings to at least 25%. 6. Revised quantification of MSW as per the standards. 7. Revised water balance with due emphasis for utilization of the treated water. 8. Design of rainwater harvesting pit as per CGWA norms. The Authority also decided to invite the proponent. 10
11 [ 112 th SEIAA Meeting Proceedings Dated 28 th January 2016 The Authority during the meeting held on had perused the reply submitted by the proponent vide letter dated The proponent appeared before the Authority and explained the proposal in brief. The Authority observed that the drawing submitted is not to the scale, the land in the Part -2 of the project site is deducted, but the activities in the land in Part-1 remains unchanged. In view of this, the activities proposed are disproportionate to the available area and therefore required lung space and other amenities cannot be accommodated as per norms. The Authority therefore advised the proponent to submit revised plan designed as per norms. The proponent requested for an opportunity to submit the revised plan and other required information. The Authority therefore decided to reconsider the proposal after the receipt of revised drawing and other relevant information from the proponent. The Authority perused the reply submitted by the proponent vide letter dated The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1) Justification for the higher density of occupancy in the proposed built up area. 2) Specific social commitment plan with budget, activity and timeframe Expansion of Residential building Project at Survey Nos.22, 23 & 24 of Chandrashekarpura Village & Sy. No. 50/2(P) of Yellenahalli Village, Begur Hobli, Bangalore South Taluk, Bangalore Urban District of M/s. Nandi Housing Pvt. Ltd., # 48, 36 th Main Road, BTM Dollars Scheme, Bangalore (SEIAA 147 CON 2015) It is a proposal seeking Environmental clearance for expansion of Residential Building Project from 672 units with BF+GF+4UF to 851 units with BF+GF+4 UF on a plot area of Sq.mtr and with the total Built up area of 1,19, Sq.mtr (additional Sq.mtr). Total water requirement is 574 KLD. The proponent obtained EC from MoEF vide No: /2006-IA.III dated The subject was discussed in the SEAC meeting held on 20 th October The Committee has recommended to SEIAA for issue of Environmental Clearance, after the submission of the following information. 1. Detailed Hydrological study of the influencing the area 2. Details of the adjoining lake. The Authority during the meeting held on had perused the proposal and took note of the recommendation of 11
12 The Authority noted that Environmental Clearance for the ongoing project has been issued on by the Ministry of Environment and Forests, Government of India. Validity of the Environmental Clearance as specified by the MoEF is only 7 years. The proponent have submitted the application for the modification of the Environmental Clearance on i.e., after the expiry of validity period of the Environmental Clearance. The Authority after discussion decided to get the following information in addition to the information sought by SEAC for further consideration: (1) Present level of construction undertaken as per the earlier Environmental Clearance issued by the Ministry of Environment and Forests, Government of India. (2) Details of constructions that has already been completed and the proposed with a comparative statement. (3) Justification with regard to addition of 179 units with 48,176.1 Sqm built up area, when the plot area and the configuration of the building remains the same. (4) Details of Recreational Ground Area with total percentage to the plot area. (5) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. (6) Revised greenbelt development plan with at least 33% of the plot area. (7) Rain water harvesting plan as per the CGWA norms. (8) Location of STP, solid waste management facility and other infrastructure facilities duly indicating on layout plan. (9) Revised scaled layout plan super imposing the proposed activity on the earlier plan. (10) Revised design of the equalization tank taking peak hour flow into consideration. The Authority also decided to invite the proponent. The Authority during the meeting held on 11 th January 2016 had perused the reply submitted by the proponent vide letter dated The proponent appeared before the Authority and explained the proposal in brief. The Authority noted that Environmental Clearance has been issued for this project by the Ministry of Environment and Forests, Government of India on 21 st February Therefore the validity of the E.C. which is now revised to seven years is lapsed and the proponent have not got it extended following the due procedure of law. The proponent informed that the said Environmental Clearance has been issued in accordance with the provisions of EIA Notification, 1994 and no validity period is mentioned in the E.C. letter. Therefore, seeking extension of validity was not felt 12
13 necessary. Now the proponent is before the Authority for expansion of the project by undertaking additional construction in the vacant land reserved for future expansion. The Authority after discussion decided to take up the proposal for further consideration after ascertaining the statutory position with regard to validity of E.C. issued under EIA Notification, It is ascertained from the available records that the Environmental Clearance letter No /2006-IA.III dated issued by the erstwhile Ministry of Environment and Forests in favour of M/s Nandi Housing Pvt. Ltd. has been issued under EIA Notification, As per Notification No. S.O. 356 dated 4/5/1994 read with Notification No. S.O.2555(E) dated 21 st August 2013, validity of the Environmental Clearance is for a period of five years for commencement of the construction or operation. The Authority while examining the proposal sought to know whether the construction activity has been started well within the validity period or not. The Authority therefore decided to get authentic documents if any to convince the Authority that the construction activity has been started as per the provisions of the EIA Notification, 1994 and the amendments made thereon. The Authority therefore decided to consider the proposal after the receipt of the aforesaid document. Mining Projects: Building Stone Quarry Project, Sy.No.179/1A of Pajeer Village, Bantwal Taluk, Dakshina Kannada Dist. (1-0 Acre) (QL No.63) of Sri Dinakar Ullal (SEIAA 1108 MIN 2015) This is a Renewal proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 19 th October The committee observed that based on the elevation of the quarry site above ground level (Difference in level m), depth proposed is 9 m, area of quarrying (as per land use plan), and with the available area, it is not possible to go that depth, because lifting of quarrying material from that depth & movement of vehicles will be very difficult. Also the committee observed that already mining has been done in the proposed quarry area. Though it is a patta land, without obtaining EC, doing mining is violation of EIA Notification The Committee after discussion decided to limit the production to 70%(Restricting the depth of mining to 10m) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind and decided to recommend the proposal to SEIAA for issue of Environmental Clearance. 13
14 The Authority during the meeting held on had perused the proposal and took note of the recommendation of The Authority after discussion decided to get a clarification from the proponent with regard to the violation noted for further consideration. The Authority perused the reply submitted by the proponent vide letter dated The Authority noted that it is a renewal quarry with a validity of 5 years as per the Notification dated extraction of building stone limiting the production to 70%(Restricting the depth of mining to 10m) of the proposed production, as recommended by Fresh Projects: Mining Projects: Building Stone Quarry Project of Sy.No.122/3K/2 of Ainapur Village, Bijapur Taluk & Dist. (2-0 Acres) of Sri Vivekananda Virappa Gunari, Neelaganagai, Plot No.77, Aishwarya Nagar, Bijapur District. (SEIAA 385 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Building stone in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 24 th to 29 th July 2015, 17 th November 2015 and 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance with a condition that, before execution, the proponent must obtain land conversion from the competent authority. extraction of building stone as per approved quarry plan, with a condition that, before execution, the proponent must obtain land conversion from the competent authority Building Stone Quarry Project, Sy.No.123 (P) of Bilakundi Village, Gokak Taluk & Belagavi Dist. (16-0 Acres) of Sri Gopal Durgappa Harijan, #180, Kalliguddi Village, Gokak Taluk, Belagavi Dist. (SEIAA 738 MIN 2015) [ This is a new proposal seeking Environmental clearance for quarrying of Building Stone in Acres, Govt. Gyrana Land. 14
15 The subject was discussed in the SEAC meeting held on 21 st October 2015 and 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan Building Stone Quarry Project, Sy.No.123 (P) of Bilakundi Village, Gokak Taluk, Belagavi Dist. (23 Acres) of Sri Shivappa Venkappa Kuddemmi S/o Sri. Venkappa Kuddemmi # 170/D, Badigswad Village, Gokak Taluk, Belagavi District (SEIAA 741 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in Acres, Govt. Gyrana Land. The subject was discussed in the SEAC meeting held on 5 th September 2015, 21 st October 2015 and 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan Ornamental Stone Quarry Project, Sy.No.145/2 of Maniyambal Village, Kanakapura Taluk, Ramanagara Dist. (13-23 Acres) of H.A.Iqbal Hussain (SEIAA 1204 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Ornamental Stone in Acres, Patta Land. The subject was discussed in the SEAC meeting held on 21 st October 2015, and 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of ornamental stone as per approved quarry plan. 15
16 Pink Granite Quarry Project, Sy.No.32/2/1 of Bandargal Village, Kustagi Taluk & Koppala District (2-0 Acres) (QL No.774) of Sri Rekhappa L Rathod (SEIAA 1445 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Pink Granite in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of pink granite as per approved quarry plan Building Stone Quarry Project at Sy.No.75 of Varavukaval Village, Challakere Taluk, Chitradurga District (1-0 Acre) (QL No.503) of Sri R. Tipperudraiah, Chitrayyanahatti Village, Challakere Taluk, Chitradurga District (SEIAA 1482 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan Building Stone Quarry Project at Sy.No.263 of Nannivala Village, Challakere Taluk, Chitradurga District (1-03 Acre) (QL No.509) of Sri R. Tipperudraiah, Chitrayyanahatti Village, Challakere Taluk, Chitradurga District (SEIAA 1483 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 1-03 Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. 16
17 extraction of building stone as per approved quarry plan Building Stone Quarry Project at Sy.No.372/c of Dashamapura Village, Hagaribommanahalli Taluk, Bellary District (12-0 Acres) of M/s. Travancore Minerals & Transport Co., #610, Sree Vilasa, 15 th Ward, Bharathi Nagar, Amravathi, Hospet (SEIAA 1490 MIN 2015) This is a New proposal seeking Environmental clearance for quarrying of Building Stone in Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking that the approach road to be made pucca. extraction of building stone as per approved quarry plan, subject to submission of information sought by Pink Porphery Granite Quarry Project at Sy.No.44, Kengal Village, Nelamangala Taluk, Bangalore Rural District 4-0 Acres (Q.L.No.464) of M/s. Vijay Enterprises (SEIAA 1213 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Pink Porphery Granite in 4-00 Acres, Govt. Revenue Land. The subject was discussed in the SEAC meeting held on 21 st October 2015, 25 th November 2015 and 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition that, the proponent should strictly follow the conditions stipulated in the earlier issued EC and also further EC conditions also and after submission of revised land use plan duly signed by DMG. extraction of Pink Porphery Granite as per approved quarry plan, with a condition that, the proponent should strictly follow the conditions stipulated in the earlier issued EC and subject to submission of information sought by 17
18 Black Rock (Dolorite) Quarry Project, Sy.No.81/4, Andagove Village, Somwarpet Taluk, Kodagu Dist. (2-0 Acres) (QL No.845) of Sri S K Raj Kumar, Reliance Stationary Mart, #55, Commercial Street, Bengaluru, Karnataka (SEIAA 770 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Black Rock (Dolorite) Quarry in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 22 nd September 2015 and 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, after submission of the following information. 1. Scheme of disposal of quarry waste 2. Provision of garland drain all along the periphery of the quarry boundary with gully plugs and series of check dams in the lowest level of the quarry area. extraction of Black Rock (Dolorite) as per approved quarry plan, subject to submission of information sought by Building Stone Quarry Project, Sy.No.1118/4 of Bangaramakki Bengre II Village, Bhatkal Taluk & Uttara Kannada Dist. (0-20 Acre) of Sri Sunil B Naik (SEIAA 1370 MIN 2015) This is a new proposal seeking Envionmental clearance for quarrying of Building Stone in 0-20 Acre, Patta Land The subject was discussed in the SEAC meeting held on 25 th November 2015 and 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan Building Stone Quarry Project at Sy.No.66 of Gabbadi Village, Kanakapura Taluk, Ramanagara District (QL No.1178) of M/s. Sri Venkateshwara Stone Crushing Company, Yelethotadapalya Village, Anjapura Post, Bangalore South Taluk, Bangalore Urban District. (SEIAA 1492 MIN 2015) This is a working Quarry proposal seeking Environmental clearance for quarrying of Building Stone in 2-00 Acres, Government Land. 18
19 The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of complete audit report. extraction of building stone as per approved quarry plan, subject to submission of complete audit report Building Stone Quarry Project at Sy.No.66 of Gabbadi Village, Kanakapura Taluk, Ramanagara District (1-0 Acre) (QL No.1222) of M/s. Sri Venkateshwara Stone Crushing Company, Yelethotadapalya Village, Anjapura Post, Bangalore South Taluk, Bangalore Urban District (SEIAA 1493 MIN 2015) This is a working Quarry proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, subject to submission of audit report, modified quarry plan for the above quantity approved by DMG and an undertaking to make approach road pucca. extraction of building stone limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by Building Stone Quarry Project at Sy.No.28/A of Bingapur Village, Hangal Taluk, Haveri District (1-0 Acre) of Sri Shivappa Puttappa Basapur, Bingapur Village, Hangal Taluk, Haveri District. (SEIAA 1498 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. 19
20 The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, extraction of building stone as per approved quarry plan Building Stone Quarry Project at Sy.No.28/A of Bingapur Village, Hangal Taluk, Haveri District (1-0 Acre) of Sri Basavaraj Kuravatti, Bingapura Village, Hangal Taluk, Haveri District. (SEIAA 1499 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acre, Government Land. The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of complete audit report. extraction of building stone as per approved quarry plan, subject to submission of complete audit report Shahabad Stone Quarry Project at Sy.No.100/7 of Miriyan Village, Chincholi Taluk, Kalaburgi District (1-0 Acre) of Sri Sudhakar, H.No.36, R/o Miriyan, Chincholi Taluk, Kalaburagi District. (SEIAA 1502 MIN 2015) This is a new proposal submitted by Sri Sudhakar, seeking Environmental clearance for quarrying of Shahabad Stone in 1-00 Acre, Patta Land. The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, after the submission of the modified quarry plan for the above quantity approved by DMG. 20
21 extraction of Shahabad stone limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by Grey Granite Quarry Project, Sy.Nos.70/3 & 70/4 of Chendur Village, Yelburga Taluk, Koppala Taluk (5-0 Acres) (2.023 Ha) of Sri Suresh Yankanagouda Patil, No.4610/A/72, Joshigalli, Ilkal, Hunagunda Taluk, Bagalkot District (SEIAA 1505 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Grey Granite in 5-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 29 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, after the submission of an undertaking to utilize the quarry waste as building material with the permission of DMG. extraction of grey granite as per approved quarry plan, subject to submission of information sought by Shahabad Stone Quarry Project at Sy.No.80/1 of Miryan Village, Chincholi Taluk, Gulbarga District (1-0 Acre) (QL No.409) of Sri. Venkatram Reddy S/o N. Shivareddy, Plot No.30, C/o Somashekhara Rao, Shanthappa Conlony, Tandur (AP) (SEIAA 1476 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Shahabad Stone in 1-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 11 th December 2015 and 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 50%(Restricting the depth of mining to 5m considering the depth of reserves submitted in the quarry plan as 5 m only) of the total estimated production, after the submission modified quarry plan for the above quantity approved by DMG. 21
22 extraction of shahabad stone limiting the production to 50%(Restricting the depth of mining to 5m considering the depth of reserves submitted in the quarry plan as 5 m only) of the proposed production, as recommended by Building Stone Quarry Project, Sy.No. 61 of Ajjagowdana Valse Village, Kanakapura Taluk, Ramanagara District (8-20 Acres) (QL No.1261) of Sri Mohan Kumar S N (SEIAA 1287 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 8-20 Acres, Government Gomala Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan Limestone & Dolomite Mining Project, Sy.Nos.45/1A & 47/1 of Kamkeri Village, Ramadurga Taluk, Belgaum Dist. (4.12 Ha) of Sri R S Pujari Jadar Aralikatti Village, Lokapur Post, Mudhol Taluk,Bagalkot District (SEIAA 519 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Limestone & Dolomite Mine Quarry in 4.12 Acres at Sy.Nos.45/1A & 47/1 of Kamkeri Village, Ramadurga Taluk, Belgaum District. The subject was discussed in the SEAC meeting held on 29 th July 2015, 2 nd November 2015 and 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to condition that the cross sections & drawings should be got signed by IBM. extraction of Limestone & Dolomite as per approved quarry plan Grey Granite Quarry Project at Sy.No.101/2 Killarhatti Village, Lingasugur Taluk, Raichur District (11-10 Acres) of Sri Govindappa T. Pulpatli, #4265/J, Ilkal, Hunagunda Taluk, Bagalkot District (SEIAA 1506 MIN 2015) 22
23 This is a new proposal seeking Environmental clearance for quarrying of Grey Granite in Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, after the following. 1. An agreement with surrounding patta land owners for utilizing their land for transportation of quarry material. 2. Mitigation measures to protect the adjoining agricultural fields. 3. Copy of RTC 4. An under taking to make approach road pucca. extraction of grey granite as per approved quarry plan, subject to submission of information sought by Building Stone Quarry Project at Sy.No.17 of Udarahalli Village, Kanakapura Taluk, Ramanagara District (5-0 Acres) of M/s. Aprameya Granites Pvt. Ltd., No.981, 18th Main Road, 66th Cross, 5th Block, Rajajinagara, Bangalore (SEIAA 1507 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 5-00 Acres, Government Gomala Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition to make approach road pucca. SEAC along with the reply submitted by the proponent vide letter dated extraction of building stone as per approved quarry plan, with a condition to make approach road pucca Black Granite Quarry Project at Sy.Nos.148/2 & 148/3 of Nanjadevanapura Village, Chamarajanagara Taluk & District (1-28 Acres) of Sri R M Rajappa, M/s. Nanjadevanapura Cluster Association, #713, Ramasamudra, Chamarajanagara Taluk & District (SEIAA 1510 MIN 2015) 23
24 This is a new proposal seeking Environmental clearance for quarrying of Black Granite in 1-28 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, extraction of black granite as per approved quarry plan.[ Building Stone Quarry Project at Sy.No.203/4 (P) of Theerthkunde Village, Khanapur Taluk, Belgaum District (5-0 Acres) of Sri A K Savanth, PL No.678, Subhas Chandra Nagar, Tilakwadi, Belgaum District. (SEIAA 1511 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 5-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 70%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, subject to submission of audit report, modified quarry plan for the above quantity approved by DMG, Mitigation measures taken to protect adjoining agricultural fields and an undertaking to make approach road pucca. extraction of building stone limiting the production to 70%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by Building Stone Quarry Project at Sy.No.545/2 of Tabakada Honalli Village, Khalghatgi Taluk, Dharwad District of Smt. Mangala M Challamarad, Plot No.34, 8th Cross, Vishweshwara Nagar, Hubli & Sri Bheemanna H Ghanti, Masalagara Oone, Sarswathapura, Dharwad. (SEIAA 1512 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 6-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of measures taken to preserve top soil and with a condition that, 24
25 mining should be started only after taking written consent from the adjoining patta land owners for using their land as approach road for transportation of quarry material. extraction of building stone as per approved quarry plan, subject to submission of information sought by Building Stone Quarry Project at Sy.No.2 (P) of Bilkundi Village, Gokak Taluk, Belgaum District (2-0 Acres) (QL No.1566) of Sri Ramesh Karepa Utagi, Avaradi Village & Post, Gokak Taluk, Belagavi District. (SEIAA 1513 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 2-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking to make approach road pucca. SEAC, along with the reply submitted by the proponent vide letter dated extraction of building stone as per approved quarry plan Building Stone Quarry Project at Sy.No.1/D1 of Ucchangidurga Village, Harapanahalli Taluk, Davanagere District (1-0 Acre) of Sri Manjunatha R Patil (SEIAA 1514 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acre, Government Land. The subject was discussed in the SEAC meeting held on 30 th December The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking to make approach road pucca. SEAC along with the reply submitted by the proponent vide letter dated extraction of building stone as per approved quarry plan, subject to submission of information sought by 25
Proceedings of the 126 th SEIAA Meeting held on 5 th December 2016 at Room No. 709, M.S Building, Bangalore.
Proceedings of the 126 th SEIAA Meeting held on 5 th December 2016 at Room No. 709, M.S Building, Bangalore. Members present: - 1. Dr. H.S. Ramesh - Chairman, SEIAA 2. Dr. H.R. Rajmohan - Member, SEIAA
More information, 89, SAS
Excerpt pertaining to Item No. 148.06 from the proceedings of the 148 th meeting of SEAC held on 19.07.2016 in Committee Room, Punjab Pollution Control Board, Patiala. Item no.148.06 Application for obtaining
More informationSTATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India No. SEIAA/M.S./2011/ To Registered M/s JBR Technologies Pvt. Ltd., 2680, Moti Nagar,
More information14. Corporate Tower at Plot No-A-143, Sector-136, Noida- Sri Rakesh Gupta, Director, A-68, New Friends Colony, New Delhi. File No.
Minutes of 283 rd SEAC Meeting Dated 21/07/2016 14. Corporate Tower at Plot No-A-143, Sector-136, Noida- Sri Rakesh Gupta, Director, A-68, New Friends Colony, New Delhi. File No. 3641/DD(Y) The committee
More informationEIA process in India. Sujit Kumar Singh Programme Manager Centre for Science and Environment New Delhi, India
EIA process in India Sujit Kumar Singh Programme Manager Centre for Science and Environment New Delhi, India EIA history - India After Bhopal Gas tragedy Environmental Protection Act was enacted (1986)
More informationFKCCI EXPORT EXCELLENCE AWARD 2016
FKCCI EXPORT EXCELLENCE AWARD 20 th Edition GUIDELINES Federation of Karnataka Chambers of Commerce & Industry Federation House K.G. Road, Bangalore 50 009 Ph: 080-2222355/ Fax: 080-222582 Website: www.fkcci.org
More informationMUSSOORIE DEHRADUN DEVELOPMENT AUTHORITY, TRANSPORT NAGAR, DEHRADUN
MUSSOORIE DEHRADUN DEVELOPMENT AUTHORITY, TRANSPORT NAGAR, DEHRADUN Terms of References for Environmental Impact Assessment study and obtaining clearances for Composite housing Scheme of Mussoorie Dehradun
More informationGOVERNMENT OF ANDHRA PRADESH ABSTRACT
GOVERNMENT OF ANDHRA PRADESH ABSTRACT W.P.No.9669/2008 Hon ble High Court orders Dated 21.10.2008 Rules relates to Regulation of Buildings and Development activities in the vicinity of Airports, Defense
More informationOPERATING PERMITS FAQs
Oregon Department of Geology and Mineral Industries (DOGAMI) Mineral Land Regulation and Reclamation (MLRR) Program OPERATING PERMITS FAQs What is the purpose of an Operating Permit? The purpose of the
More informationNo. SEAC/CEE(HQ)/ Dated Registered POST
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2216980
More informationGUIDELINES OF THE MEGA LEATHER CLUSTER SUB-SCHEME OF INDIAN LEATHER DEVELOPMENT PROGRAMME
GUIDELINES OF THE MEGA LEATHER CLUSTER SUB-SCHEME OF INDIAN LEATHER DEVELOPMENT PROGRAMME 1. BACKGROUND 1.1 The Leather Industry holds a prominent place in the Indian economy. This sector is known for
More informationEnvironmental Impact Assessment
Annual Report 2006-2007 Environmental Impact Assessment Introduction Keeping in view the tenets of Sustainable Development, it has been realized that all developmental efforts need to be harmonized with
More informationAn Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.
An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO 2015 An Bord Pleanála Reference Number: 29S.PA0043 (Planning Authorities: Dublin City Council, Fingal County
More informationPRE BID CLARIFICATION/CORRIGENDUM NO. 1
PRE BID CLARIFICATION/CORRIGENDUM NO. 1 TENDER NO: KIOCL/BD/DIOM/ MP/666 DATED 24.03.2017 SUBJECT: ENGAGEMENT OF CONSULTANT FOR PREPARATION OF MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR IRON
More informationMATCHING SCHEME OF ASSISTANCE TO PUBLIC LIBRARIES TOWARDS INCREASING ACCOMMODATION
MATCHING SCHEME OF ASSISTANCE TO PUBLIC LIBRARIES TOWARDS INCREASING ACCOMMODATION Title and Object 1. The object of this matching scheme is to render matching assistance to Government run or aided public
More information1136 Dupont Street - Zoning Amendment Application - Preliminary Report
STAFF REPORT ACTION REQUIRED 1136 Dupont Street - Zoning Amendment Application - Preliminary Report Date: May 15, 2012 To: From: Wards: Reference Number: Planning and Growth Management Committee Acting
More informationPlanning: a Short Guide
Planning: a Short Guide Planning: a Short Guide www.doi.vic.gov.au/planning Introduction This booklet outlines the planning permit process and planning scheme amendment process, and the course to be followed
More informationIN THE HIGH COURT OF KARNATAKA AT BENGALURU BEFORE THE HON BLE MR. JUSTICE H.G.RAMESH MISCELLANEOUS FIRST APPEAL NO.
1 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 29 TH DAY OF JANUARY 2016 BEFORE THE HON BLE MR. JUSTICE H.G.RAMESH MISCELLANEOUS FIRST APPEAL NO.7259/2015 (CPC) BETWEEN: SRI C.Y. NARAYANAPPA
More informationAPPLICATION FORM FOR PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (Seven Copies to be submitted)
The Secretary, Ministry of Information & Broadcasting A Wing, Shastri Bhawan, New Delhi 110 001 APPLICATION FORM FOR PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (Seven Copies to be submitted) Sir,
More informationContractors who are desirous of tendering for above work and fulfills the Following requirements shall be eligible to apply:
NOTICE FOR PRE QUALIFICATION OF CONTRACTORS FOR PROPOSED ELECTRIFICATION WORK FOR MULTISTORIED OFFICE AND RESIDENTIAL BUILDING FOR BANK OF BARODA AT GHOD DOD ROAD, SURAT. Bank of Baroda invites application
More informationCITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS
CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS Date: May 1, 2018 Subject: Z18-009 BELLWOOD LAKE & LOOP 323 LLLP (178.05 ACRE TRACT) Request that the Planning and Zoning Commission consider
More informationSection F: Committee of Adjustment: Minor Variance and Consent Applications
Executive Summary Introduction The Development Review Process STAR Process Pre-application Consultation Submission of "Complete" Applications STAR Application Streams Section A: Official Plan and Zoning
More informationCorporate Social Responsibility Policy *********
Corporate Social Responsibility Policy ********* INDEX Item No. SUBJECT Page No. I. Introduction II. III. IV. Preamble Objectives CSR Committee V. Activities/ Areas of focus on CSR VI. VII. VIII. IX. Allocation
More informationStandard Operating Procedures for Registration of Environmental Consultancy Offices in Abu Dhabi
s for Registration of Environmental Consultancy Offices in Abu Dhabi EAD-EQ-PCE-SOP-6 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General Originated
More information1. Sh. Kuldip Singh, IFS (Retd) Chairman 2. Er. Malvinder Singh, FIE Member 3. Sh. Harbax Singh Member 4. Dr. A.S.Reddy Member
Proceedings of the 151st meeting of State Expert Appraisal Committee held on 24.10.2016 at 10.00 AM in the Committee Room, Punjab Pollution Control Board, Nabha Road, Patiala. The following were present
More informationPoint Wise Compliance Report (EDS Dtd. 24 September 2017)
Point Wise Compliance Report (EDS Dtd. 24 September 2017) for POL Terminal Storage Capacity Expansion At Ratlam Terminal, Indian Oil Corporation Ltd. (MD), Bangrod, Ratlam, Madhya Pradesh Project Proponent
More informationRural Innovation Fund FAQS
Rural Innovation Fund FAQS Frequently Asked Questions (FAQs) on Rural Innovation Fund ( RIF) RIF Application English RIF Application What is RIF? Rural Innovation Fund (RIF) is a fund designed to support
More informationKANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE
KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE REVISED MAY 2015 Prepared by: FOTENN Consultants Inc. 223 McLeod Street Ottawa, ON K2P 0Z8 T: 613-730-5709 F: 613-730-1136 www.fotenn.com Prepared
More informationEIA/VER-2/2008 EIA Consultant Registration Scheme Guidance Document
EIA/VER-2/2008 EIA Consultant Registration Scheme Guidance Document Department of Environment Ministry of Natural Resources and Environment Level 1-4, Podium Block 2 & 3 Lot 4G3, Precinct 4 Federal Government
More informationEase Of Doing Business
Ease Of Doing Business Guidelines on Land Allotment System of MIDC As per MIDC's Disposal of Land Regulations, 1975 and as per guidelines issued in accordance with the decisions taken by Board of MIDC
More informationUnregulated Heating Oil Tank Program Guidance
Unregulated Heating Oil Tank Program Guidance Scope and Intent The Unregulated Heating Oil Tank Program allows pre-qualified environmental professionals to investigate and remediate certain low risk Unregulated
More information(Under Construction)
KHURJA SUPER THERMAL POWER PLANT- (2 X 660 MW) (Under Construction) BACKGROUND 2 X 660 MW Khurja Super Thermal Power Project at District Bulandshahar (U.P), is being implemented by THDCIL. The MoU for
More informationDowntown Shoulder Area Community Improvement Plan. Investing in our Community
Downtown Shoulder Area Community Improvement Plan Investing in our Community The Downtown Shoulder Area Renaissance Community Improvement Plan consists of the following: PART A - The preamble which does
More informationNCC Infrastructure Holdings Limited
NCC Infrastructure Holdings Limited Request for Proposal (RfP) for formation of Joint Venture for development of coal mine & coal based pithead thermal power plant 10 th October 2011 1 NCC Infrastructure
More informationGOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD)
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD) No.2008/LMB/SG/WCS New Delhi, Dated 12.03.2009 The General Manager All Indian Railways The General Manager (construction) NF Railway, Maligaon,
More informationNORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS
NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS CITY OF CEDAR HILL CITY CENTER TRANSIT-ORIENTED DEVELOPMENT PLAN August 19, 2011 REQUEST FOR PROPOSALS
More information555 Dupont Street - Rezoning - Preliminary Report
STAFF REPORT ACTION REQUIRED 555 Dupont Street - Rezoning - Preliminary Report Date: July 23, 2010 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,
More informationApplication Form A BACKGROUND
Application Form A APPLICATION FORM A is to be filled by For-Profit Organizations, Not-For-Profit Organizations, or Government Departments working in the Social Sector; APPLICATION FORM B is to be filled
More informationPetition 487, Quintain City Park Gate Birmingham Limited
A26 (1) HS2 Bill Select Committee Petition 487, Quintain City Park Gate Birmingham Limited Exhibits relating to the evidence of Adam Ward MRICS Director of the Regions, Quintain Estates and Development
More informationSPECIFIC AND MASTER PLANS
CHAPTER 14: SPECIFIC AND MASTER PLANS 14.1. PURPOSE In accordance with the Goals and Policies, TRPA may adopt area-wide specific plans or project-oriented master plans to augment plan area statements or
More informationPLAN (SIMP) AND REHABILATION AND RESETTLEMENT STUDIES. Date of Submission:- 5/11/2016 up to 17:00Hrs
INVITING EXPRESSION OF INTEREST (REVISED) MAHAGENCO Tender Specification No. CE(C) -III./GP/T- 27 / 2016-17 Name of work: Gare Palma Coal mine project, Dist Raigarh ( Chhattisgarh) - Inviting expression
More informationNATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI
EXPRESSION OF INEREST (EOI) FOR EMPANELMENT OF ZOO CONSULTANT FOR PREPARATION OF DESIGN OF VARIOUS ZOO ENCLOSURES AT NATIONAL ZOOLOGICAL PARK, NEW DELHI. NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI
More informationYork Mills Road Rezoning Application Refusal Report
STAFF REPORT ACTION REQUIRED 850-858 York Mills Road Rezoning Application Refusal Report Date: July 30, 2010 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and
More informationThe Karnataka Sakala Services Act 2011
The Karnataka Sakala s Act 2011 Report Card for the month of September 2013 Message: It is heartening to note that by the end of September, about 3.5 crore citizens application have been processed by
More informationPLANNING DEPARTMENT ADMINISTRATION
PLANNING DEPARTMENT ADMINISTRATION Support Division Planning & Community Zoning Administration Review & Compliance Land Use & Design Rezoning & Permitting Plan Review Community LDO Management Zoning &
More information42695 C/o Shree Hospital, Behind Akkamahadevi College, BIDAR DISTRICT, BIDAR.
List of Doctors found guilty of Medical Negligence / Misconduct and Punished by K.M.C. w.e.f. year 2015 Sl. No. Enquiry No. Doctor s Name Reg. No. Address Action Taken Order date 1 34/2013 Dr.H.Shamalabai
More informationAPPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES
APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES Broward County Land Use Plan Amendment Requirements Amendments which are not within the rules of flexibility or more
More informationIntegrated Low Cost Sanitation Scheme Revised Guidelines, 2008
Integrated Low Cost Sanitation Scheme Revised Guidelines, 2008 This document is available at ielrc.org/content/e0830.pdf Note: This document is put online by the International Environmental Law Research
More informationFill in this form to apply for a Building and Land use Permit for the following activities: (Please tick whichever applies)
DISTRICT/MUNICIPAL COUNCIL OF... BUILDING AND LAND USE PERMIT APPLICATION FORM Fill in this form to apply for a Building and Land use Permit for the following activities: (Please tick whichever applies)
More informationThis report will be open to the public on 11 July 2017.
This report will be open to the public on 11 July 2017. Report Number C/17/29 To: Cabinet Date: 19 July 2017 Status: Key Decision Corporate Director: Alistair Stewart, Chief Executive Cabinet Member: Cllr
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-13-5 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE CHAPTER 335-13-5 PROCEDURES FOR OBTAINING PERMITS TABLE
More informationKarnataka Health Geographical Information System
Karnataka Health System Development & Reform Project Karnataka Health Geographical Information System Dr. B.G. PRAKASH KUMAR Deputy Director (SICF/HMIS) KHSDRP, Bangalore D.L. Devaraj, M.Tech.-Geoinformatics
More informationNOW THEREFORE, the parties enter into the following Agreement:
Interlocal Agreement Between the Board of County Commissioners of St. Johns County, Florida, City of St. Augustine, City of St. Augustine Beach, Town of Hastings and the School Board of St. Johns County,
More informationTHE CORPORATION OF THE CITY OF ST. CATHARINES
THE CORPORATION OF THE CITY OF ST. CATHARINES PO Box 3012, 50 Church Street St. Catharines, ON L2R 7C2 Tel : 905.688.5600 Fax: 905.682.3631 www.stcatharines.ca TTY : 905.688.4TTY (4889) PLANNING SERVICES
More informationMaster Development Plan Written Report
Master Development Plan Written Report A master development plan must be accompanied by a written report, to be adopted as a part of the master development plan. The following information must be completed
More informationRegulation for the Environmental Clearance of Projects
Regulation for the Environmental Clearance of Projects February 2001 National Environment Commission Secretariat Thimphu Bhutan Table Of Contents CHAPTER I. ADMINISTRATION...1 AUTHORITY...1 PURPOSE...1
More informationPage 1 of 12. Sl. No. Enquiry No. Reg. No. Doctor s Name. Address Action Taken Order date
List of Doctors found guilty of Medical Negligence / Misconduct and Punished by K.M.C. w.e.f. year 2015 Sl. No. Enquiry No. Doctor s Name Reg. No. Address Action Taken Order date 1 34/2013 Dr.H.Shamalabai
More informationAPPLICATION FORM FOR ENLISTMENT OF VENDORS
APPLICATION FORM FOR ENLISTMENT OF VENDORS Integrated Facility Management (IFM) Services at Delhi/ Noida/ Gr. Noida Region BHARAT PETROLEUM CORPORATION LTD., Plot No. A-5&6, Sector-1, Noida - 201301 NOTICE
More informationSHARED SPACE and SERVICES
SHARED SPACE and SERVICES 1. The Peace Programme The EU Programme for Peace and Reconciliation is a unique Structural Funds programme aimed at reinforcing progress towards a peaceful and stable society
More informationPlanning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.
Planning Commission Public Hearing Exhibits Powers Ready Mix Plant Oldcastle SW Group, Inc. Substantial Amendment to a Land Use Change Permit, Major Impact Review (File MPAA-02-16-8424) Applicant is CRC,
More informationKARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD
KARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD (Government undertaking) No:KIADB/JD (T&P)/608 /2016-17 Date:12-04-2016 :: CIRCULAR :: Sub: Fixing of time limit for Allotment of plot, construction of buildings
More informationREQEUEST FOR EXPRESSION OF INTEREST (REOI) FOR OIL, CENTRE OF EXCELLENCE FOR ENERGY STUDIES (COEES) BUILDING AT GUWAHATI IN ASSAM
REQEUEST FOR EXPRESSION OF INTEREST (REOI) FOR OIL, CENTRE OF EXCELLENCE FOR ENERGY STUDIES (COEES) BUILDING AT GUWAHATI IN ASSAM EOI NO. PL/ CONT/CIVIL-COEES BUILDING/EOI/F-1775/1888 DT: 24-01-2018 Oil
More informationLICENSINGAPPLICATION GUIDELINES, 2016
LICENSINGAPPLICATION GUIDELINES, 2016 1.0 INTRODUCTION In exercise of the powers conferred by the Communications Act, Cap 68:01 of the Laws of Malawi, Malawi Communications Regulatory Authority (hereinafter
More informationNorthern Ireland Social Care Council. NISCC (Registration) Rules 2017
Northern Ireland Social Care Council NISCC (Registration) Rules 2017 April 2017 Produced by: Northern Ireland Social Care Council 7 th Floor, Millennium House 19-25 Great Victoria Street Belfast BT2 7AQ
More informationApplication for POOLING OF CONTRACTORS FOR VARIOUS CATEGORIES OF WORKS IN IIMK
INDIAN INSTITUTE OF MANAGEMENT KOZHIKODE IIM KOZHIKODE CAMPUS P.O, KOZHIKODE 673 570 Tel: 0495-2809195, 2809217, 2809222 Fax: 0495-2803011 Web site: www.iimk.ac.in Application for POOLING OF CONTRACTORS
More informationCONNECTED CITY FREQUENTLY ASKED QUESTIONS
1) What is the Connected City project? CONNECTED CITY FREQUENTLY ASKED QUESTIONS The Connected City Corridor is a State-initiated pilot program that is unique to Pasco County, and will be the first planned
More informationCOCHIN SHIPYARD LIMITED KOCHI (P&A Department) No.P&A/2(239)/14 25 Sep 2017 SELECTION OF CSR PROJECTS MANAGER ON CONTRACT BASIS
COCHIN SHIPYARD LIMITED KOCHI 682015 (P&A Department) No.P&A/2(239)/14 25 Sep 2017 SELECTION OF CSR PROJECTS MANAGER ON CONTRACT BASIS Cochin Shipyard Limited (CSL), a premier Mini Ratna Company of Government
More informationA. SUPPORT FOR CONDUCTING SEMINAR / WORKSHOP /CONFERENCE
RESEARCH AND DEVELOPMENT (R & D) FUND The Research and Development (R & D) Fund has been set-up in NABARD for facilitating training (through its training establishments), seminar/conference, conduct of
More informationPOLICIES & PROCEDURES
SRI LANKA ACCREDITATION BOARD for CONFORMITY ASSESSMENT POLICIES & PROCEDURES for ACCREDITATION OF INSPECTION BODIES CONTENTS Page INTRODUCTION 01 1. GENERAL 01 1.1 Scope 01 1.2 References 01 1.3 Terms
More informationCOCHIN SHIPYARD LIMITED KOCHI-15 (P&A DEPARTMENT) No.P&A/6(90)/02-VI 07 March 2018
COCHIN SHIPYARD LIMITED KOCHI-15 (P&A DEPARTMENT) No.P&A/6(90)/02-VI 07 March 2018 SELECTION OF SHIP DRAFTSMAN TRAINEES Cochin Shipyard Limited, a listed premier Mini Ratna Company of Government of India,
More informationAPPLICATION FOR PARCEL MAP
Public Works Number: - / 3- APPLICATION FOR PARCEL MAP Department of Public Works Development Services 200 East Santa Clara Street San Jose, California 95113 (408) 535-7802 Applicant Phone Number Fax Number
More informationNATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI
EXPRESSION OF INEREST (EOI) FOR EMPANELMENT OF ZOO CONSULTANT FOR PREPARATION OF DESIGN OF VARIOUS ZOO ENCLOSURES AT NATIONAL ZOOLOGICAL PARK, NEW DELHI. NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI
More informationGovernment of India Planning Commission (LEM Division)
Government of India Planning Commission (LEM Division) Subject: Scheme for New Initiative in Skill Development through PPP - Guidelines for Grants-in-Aid & Other Heads 1. Introduction The Planning Commission
More informationChild Care Program (Licensed Daycare)
Chapter 1 Section 1.02 Ministry of Education Child Care Program (Licensed Daycare) Follow-Up on VFM Section 3.02, 2014 Annual Report RECOMMENDATION STATUS OVERVIEW # of Status of Actions Recommended Actions
More informationINVITING EXPRESSION OF INTERESTS (EOIs)
Ref. No. 08 /C-1/P1BLHC/2018-19 Dated.09/10/2018. INVITING EXPRESSION OF INTERESTS (EOIs) Expression of Interests (EoIs) are invited for engagement of Fashion Textile Designer cum-marketing Executive at
More informationCity of Signal Hill Wireless Communications Facility Application
Wireless Telecom Application 2017 rev02.docx City of Signal Hill Wireless Communications Facility Application INTRODUCTION a. All applicants seeking to install a wireless communication facility ( WCF )
More informationGovernment of Haryana Industries and Commerce Department
NOTIFICATION The 6 th January, 2017 No. 49/43/2015-4IB1 - In pursuance to provision under annexure 10 of Enterprises Promotion Policy, 2015 notified vide No. 49/43/2015-4IB1 dated 14 th August, 2015, the
More informationPradhan Mantri Awas Yojana Housing for All (Urban) State Urban Development Agency (SUDA)
Pradhan Mantri Awas Yojana Housing for All (Urban) State Urban Development Agency (SUDA) Housing for All - Overview Mission Period 2015 2022 Mission to cover all 4041 statutory towns focusing 500 Class
More informationExpansion of the Wanchai Campus of the Hong Kong Academy for Performing Arts
For discussion on 12 January 2012 Expansion of the Wanchai Campus of the Hong Kong Academy for Performing Arts PURPOSE This paper seeks Members views on the proposal for expansion of the Wanchai campus
More informationMMRCL Recruitment Advertisement
MUMBAI METRO RAIL CORPORATION LIMITED (A JV company of Govt. of India and Govt. of Maharashtra) NaMTTRI Building, Plot # R-13, E Block, Bandra-Kurla Complex, Bandra (E), Mumbai - 400 051. Website: www.mmrcl.com
More informationRequest for Empanelment (RFE) of. Facilitators
BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED (Wholly owned by Government of Karnataka Undertaking) Office of the General Manager (DSM) BESCOM, K.R Circle Bangalore 560 001 Ph: 080-2234 0816 E-mail: gmdsm@bescom.co.in
More informationPOLICY NUMBER: C553B AUTHORITY: City Manager EFFECTIVE DATE: October 31, Development Incentive Program Procedures
Page 1 of 24 1. DEFINITIONS 1.1 Apartment Housing means a development consisting of one or more Dwellings contained within a building in which the Dwellings are arranged in any horizontal or vertical configuration,
More informationPROPINSIGHT A Detailed Property Analysis Report
PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project
More informationPublic Scoping Meeting for the Environmental Impact Report
Public Scoping Meeting for the Environmental Impact Report Solana Highlands Revitalization Project November 20, 2014 @ 5:30pm 1 Scoping Meeting Agenda Welcome and Introductions Purpose of the Notice of
More informationLocal Area Key Issues Paper No.12: Cane lands
Draft Sunshine Coast Planning Scheme Review of Submissions Local Area Key Issues Paper No.12: Cane lands Key Issue: Future use of Maroochy River Plain Cane lands No. of submissions: 217 Major issues raised:
More informationGOVERNMENT OF INDIA MINISTRY OF LABOUR AND EMPLOYMENT
GOVERNMENT OF INDIA MINISTRY OF LABOUR AND EMPLOYMENT SUBJECT: Grant-in-aid to Research and Academic Institutions and Voluntary Organisations / Non-governmental Organisations for undertaking research in
More information2011 SURVEY OF MUNICIPAL REGULATIONS AND FIRE CODE REGULATIONS AFFECTING CHILD CARE FACILITIES DEVELOPMENT IN SANTA CLARA COUNTY
2011 Prepared for the Santa Clara County Early Learning Master Plan Facilities Committee Prepared by the Office of the Superintendent, Santa Clara County Office of Education 2011 SURVEY OF MUNICIPAL REGULATIONS
More informationDEPARTMENT OF TOURISM
DEPARTMENT OF TOURISM GOVERNMENT OF KARNATAKA Dated:20 th February 2018 DEPARTMENT OF TOURISM Government of Karnataka 2 nd Floor, Khanija Bhavan, #49, Race Course Road, Bengaluru 560001. Telephone: 080-2235
More informationRequest for Proposal Tree Trimming Services June 4, 2018 Procurement Contact Linda Lapeyrouse
Request for Proposal Tree Trimming Services 2018 June 4, 2018 Procurement Contact Linda Lapeyrouse citymanager@skyvalleyga.com 1. CITY OF SKY VALLEY OVERVIEW The City of Sky Valley s intent is to establish
More informationPlanning Board Submission Process and Instructions
City Planning Board Department of Planning and Community Development City Hall - Roosevelt Square Mount Vernon, New York 10550-2060 (914) 699-7230 FAX (914) 699-1435 Ernest D. Davis Mayor William Holmes
More informationIncentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY
Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY RIGHTS COSTS (FOR SMALL AND MEDIUM-SIZED ENTERPRISES).
More informationTechnology Business Incubator (TBI)
Technology Business Incubator (TBI) GENERAL GUIDELINES AND PROFORMA FOR SUBMISSION OF PROPOSALS Government of India Ministry of Science & Technology Department of Science & Technology National Science
More informationToR FOR DEVELOPING AQUACULTURE PRODUCTION STRATEGY & THEIR IMPLEMENTATION UNDER OTELP
ToR FOR DEVELOPING AQUACULTURE PRODUCTION STRATEGY & THEIR IMPLEMENTATION UNDER OTELP 1.Introduction Orissa Tribal Empowerment & Livelihoods Programme (OTELP) focuses on empowering the Tribals and enabling
More informationPROCEDURE AND CHECKLIST FOR APPROVAL OF BUILDING PLANS AND REGISTRATION/RENEWAL OF LICENCE OF FACTORY UNDER FACTORIES ACT, 1948
PROCEDURE AND CHECKLIST FOR APPROVAL OF BUILDING PLANS AND REGISTRATION/RENEWAL OF LICENCE OF FACTORY UNDER FACTORIES ACT, 1948 Department of Labour and Employment Contents A. Approval of building Plans...
More informationRequest for Qualifications Professional Engineering Services
Page 1 of 7 Combined Sewage Storage Tunnel Preparation of Preliminary Design, Detailed Design, Tender Documents and Services during Construction Requirement: The City of Ottawa, hereinafter referred to
More informationAPPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (To be submitted in Quadruplicate)
APPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (To be submitted in Quadruplicate) The Secretary, Ministry of Information & Broadcasting A Wing, Shastri Bhawan, New
More informationEXISTING CONDITIONS
02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility
More informationRFP for Empanelment of Interior Furnishing Contractors
Premises & Procurement Division, Repco Towers, # 33, North Usman Road, T.Nagar, Chennai 600 0017. www.repcobank.co.in RFP for Empanelment of Interior Furnishing Contractors Last Date for Submission: 11.00
More informationMunicipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program
Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program Program Information Guide In accordance with the Ontario Planning Act, the Municipality of North
More informationRs with GP Rs.2800/-
KONKAN RAILWAY CORPORATION LIMITED NOTIFICATION No.CO/P-R/01/2015 Applications are invited from eligible land loser candidates (Self / Sons / Spouse / Unmarried daughters / Grandsons / Unmarried Granddaughters
More information