1 Riverview Corridor Pre-Project Development Study Policy Advisory Committee Meeting Thursday, October 12, 2017; 9:00 AM Ramsey County Plato Building 1st Floor Conference Room 90 West Plato Boulevard, Saint Paul AGENDA Discussion Leader Item Action Requested Chair Rafael Ortega 1. Welcome and Introductions Chair Rafael Ortega 2. Approval of the Agenda Approval Chair Rafael Ortega 3. Approval of the September PAC Meeting Summary Approval Mike Rogers 4. Meeting Summary Information April Manlapaz 5. Locally Preferred Alternative (LPA) Definition Information April Manlapaz 6. Evaluation Framework Information April Manlapaz 7. Draft LPA Recommendation Approval April Manlapaz 8. Draft Implementation Plan Information Chair Rafael Ortega 9. Public Comment Information

2 Riverview Corridor Pre-Project Development Study Policy Advisory Committee (PAC) Meeting Summary September 14, 2017 Participants See sign-in sheet at the end of this document for a list of attendees. Summary Meeting handouts included: Agenda PAC Meeting Summary July 13, 2017 Presentation Technical Appendix Planning for the Future of W. 7 th Street Public Engagement Activities Overview: Detailed Analysis July 13 - Aug 18, 2017 Public Comments Received July 1 - Aug 31, 2017 United and Children s Hospital Executive Summary Action Items Create timeline or process for a transit investment to support the second travel market in the corridor that isn t selected for this initial phase of the Riverview Corridor Transit Study Provide additional analysis of the comments collected from engagement activities For the public hearing, look into whether there needs to be a formal action to designate public hearing officers 1. Welcome and Introductions Chair Ortega convened the meeting at 9:07 a.m. and led introductions. 2. Approval of the Agenda Action: The PAC unanimously approved the meeting agenda (J. Commers motion; T. Busse second). 3. Approval of the May 11, 2017 Meeting Summary Action: The PAC unanimously approved the July meeting summary (R. Noecker motion; P. Mancini second). 4. PAC Meeting Summary Recap: Previous Meetings RCRRA staff recapped the actions made at the July PAC meeting. PAC moved to reduce 16 alternatives to six alternatives based on TAC recommendation and bring the remaining six alternatives for public review. The public engagement activities from July 14 to August 18 included community meetings, presentations, pop-up events, community events, and living room meetings. The purpose of these activities was to collect community feedback and preferences regarding the six alternatives moving forward, as well as the alternatives that were dismissed. Public comments were also collected via /mail, social media, and phone calls. Staff also summarized presentations and meetings they have participated in since the end of August. This included a TAC meeting and a meeting with United and Children s Hospitals, and presentations to 1

3 Riverview Corridor Pre-Project Development Study Hennepin County Regional Railroad Authority, Highland District Council, Saint Paul Transportation Committee of the Planning Commission, and the Fort Snelling Joint Powers Board. Study Timeline Staff provided an overview of the study timeline. The study is currently in the Draft Detailed Evaluation Results period. From August to September, TAC and PAC will review public comments and technical analysis which will cumulate with a TAC recommendation on a draft Locally Preferred Alternative (LPA) to the PAC at its October meeting. The PAC will be asked to approve the draft LPA for public review and a public hearing to gather additional community input in November. The PAC will be asked to take a final action approving a LPA in December. Meeting Objectives Staff gave a summary of the meeting s objectives. Objectives included review public comments from the July 14 August 18 engagement period, approve TAC recommendation to affirm the six alternatives, and discuss the LPA decision process. 5. Summary of Public Comments Project staff summarized the engagement activities and comments received during the Draft Detailed Evaluation Results period from July 14 to August 18, This period included four community meetings, one community event, four pop-up events, two presentations, and four living room meetings. During this time, the community was also engaged through electronic communications, social media, and print media. updates about PAC s decision to reduce the number of alternatives, an announcement/reminder for the community meetings, and a follow up or overview of comments from the community meetings was sent to 2,154 contacts. The website also had over 1,846 unique visits. The study s Twitter page has 184 followers, and 628 Facebook likes. Boosted Facebook posts were also utilized during the study to promote the community meetings to Facebook users in Downtown St. Paul, West 7 th, Highland Park, Longfellow, and Nokomis. Advertisements for community meetings were also published in the Villager, Community Reporter, and Longfellow Nokomis Messenger, and articles on the PAC decision to reduce alternatives were published in Start Tribune, Pioneer Press, and KSTP had a segment during their evening broadcast. Staff received feedback from over 637 people at the activities, 112 through , mail, phone calls, and social media, and staff received five organizational letters from the Metropolitan Airports Commission, Minnesota Wild, United and Children s Hospitals, W. 7 th Business Association, and Patrick McGovern s Pub & Restaurant. During this period, staff were primarily asking three questions to the public: (1) Which travel market should a transit investment in the corridor serve? (2) What is your feedback on the remaining six alternatives? (3) What is your feedback on the dismissed alternatives? Approximately 200 people attended the July and August Community Meetings. There were 72 speakers during the Q&A portion of the meetings, and 41 people filled out comment sheets. Highlights from the community meetings include, the majority of speakers were supportive of improved transit in the corridor; more attendees supported bus alternatives than rail alternatives; and the majority preferred the Hwy 5 river crossing over a Ford Parkway crossing. Other common comments included cost, concern for residential and business impacts, and future need for better transit than local bus. Staff also provided a brief summary of the comments received during the engagement period regarding vehicles, river crossings, routes, and other concerns regarding safety, mobility, development, noise and parking impacts. 2

4 Riverview Corridor Pre-Project Development Study Discussion: Will we receive more analysis on the comments received? This presentation gives us what we already know, but it doesn t give us an idea of how many people said it. A longer report with all public comments will be provided to the PAC in October. This is an initial summary of comments and staff will review the comments and see what additional analysis can be done. 6. Recap: Evaluation of Alternatives Project staff provided a brief overview of the transit study, including the purpose and need for a transit investment in the corridor, the study goals, the development of the most promising alternatives, and the differentiating criteria to arrive at the six most promising alternatives. 7. TAC Recommendation: Affirm 6 Alternatives TAC recommends affirming the six alternatives to be considered for the locally preferred alternative: Alternative 1: No-Build (Route 54) Alternative 2: Arterial BRT (via Hwy 5) Alternative 4b: Modern Streetcar: W. 7th Hwy 5/Fort Snelling Alternative 6: Modern Streetcar: W. 7th Ford Site Alternative 8: Modern Streetcar: W. 7th CP Spur Ford Site Alternative 10b: Modern Streetcar: W. 7th CP Spur Hwy 5/Fort Snelling Discussion: Why is the PAC being asked to vote on these alternatives again? The previous vote was to bring the six alternatives out for public review. This vote is to affirm the six that were selected to move forward into the analysis to determine what the LPA should be. To make this decision, to affirm the six alternatives, we need to consider how we can serve both travel markets. We should have that conversation now rather than after we vote. Can we go to the ninth item in the agenda, Process to Select a Locally Preferred Alternative, and then take a vote? Yes. 8. Process to Select a Locally Preferred Alternative As per PAC request, staff provided information on the LPA process. In October, PAC will select a draft LPA to be released for public comment, and in November, there will be a public hearing. In December, PAC will vote to approve the Riverview LPA. In early 2018, the LPA will go to the counties and cities it runs through for local resolutions prior to requesting that the Metropolitan Council adopt it into the region s Transportation Policy Plan later in Discussion: It would be helpful to review where we left off at with our discussion on the Y alternative at our last meeting. We recognize that to apply for federal funding we need one route and one vehicle, but the Met Council can adopt two LPAs for the corridor to serve the two travel markets. Other corridors have had similar problems serving two distinct travel markets, and the region has a history of leaving one market behind. We have three examples in this region and two did not show up in the meeting minutes for July: North Minneapolis with the Blue Line Extension, SWLRT/Green Line Extension and the Midtown Corridor. If we don t figure out how to serve both markets now, then history tells us that one is left behind. Chair Ortega stated that he and Councilmember Chris Tolbert are committed to supporting and considering both travel markets. During the last vote, I voted against approval of the six alternatives because I was not comfortable with our lack of knowledge about a viable Y LPA and because of that I still cannot 3

5 Riverview Corridor Pre-Project Development Study vote to affirm the six alternatives at this time. By taking this vote, the PAC is affirming the six alternatives, not denying that there can be a Y LPA for this corridor. Are the six alternatives discrete and unable to be combined to make a Y alternative? At this point, ABRT stands on its own. Streetcar routes to Ford Parkway and Highway 5 may be combined from a technical standpoint. I believe we can only serve one travel market in this study. I think the Y LPA is a false alternative. Chair Ortega stated he has had many conversations on this point, and he is committed to serving both travel markets in the corridor. I appreciate the worksheet project staff provided in the packet about the opportunities and the future of W. 7 th Street, as well as construction impacts. But when will properties be assessed and how will the assessment be affected by the vehicle selected? The assessment is mode neutral and it s completed after an LPA is selected. Is there any way to get this differentiation? Property assessment happens much closer to construction during the engineering phase. The city completes this work. What is the money from the new sales tax funding used for? The money is allocated by the county for transportation. It provides funding for Green Line operations and construction and operating costs for Rush Line, Gold Line and Riverview corridors. What s the implication of not taking the vote today to affirm the six alternatives? Without the vote, it leaves project staff with no direction. When we went to the public, we didn t hear that these are the wrong alternatives. We heard that these are the best moving forward. We re moving forward with six alternatives, but we re not prohibiting a Y alternative from arising from these six. I m confused. Are these six isolated options? Not necessarily. When Gold Line recognized they had two different markets, they ultimately decided to move forward with the route and vehicle that would make the strongest case for federal funding, and left the other market for Rush Line or an extension of route 64. The Gold Line Transit Study provided a jumping off point for the Rush Line study. Could this group approve a Y alternative but select the best route for federal review? We need two different projects to select two different routes. It s important that we receive a timeline or process for the Y solution. Something to help the PAC move forward with our LPA decision. PAC agrees that we want higher standard service for both areas and without a plan for serving the market not served by this project, I don t believe we can make a decision on an LPA in October. The process for moving forward to serve the other travel market is also dependent on which market is not served during this study. I am reassured with the direction of this conversation and that we are seriously considering the needs of both travel markets. I would add that the region has an example of a dual LPA. The City of Minneapolis, Hennepin County, and Met Council found two LPAs in the Lake Street Corridor. One LPA moved to Met Council for adoption and one was sent to the federal government for funding. This project has taken a long time, especially if we go all the way back to the B Line, and I am ready for it to move forward. I respect Chair Ortega s preference to have this conversation at a later meeting. But to add my perspective to this conversation, the Y LPA offers a higher standard of service, but it s not like there is no service for these markets. Hennepin County is committed to funding a single project not multiple projects. 4

6 Riverview Corridor Pre-Project Development Study Thank you Chair and project staff for the clarification. Next month, come back to us with more details on the Y LPA. It s nice to see that we are narrowing down the alternatives to find a solution for the corridor, but we need to listen to the West 7 th Street neighborhood regarding rail. We have heard from the community, No rail on W. 7 th Street from the community meeting at Nova, the neighborhood association - Fort Road Federation, and W. 7th Street Business Association had a petition with over 2,000 signatures. There is a lot of opposition to streetcar in the community. W. 7 th Street is a skinny street and it doesn t allow for the flexibility that is necessary for a vehicle built into the roadway. I m still unclear what the PAC will get in October. Based on the September TAC meeting, we ll report back a recommended draft LPA, and the travel market not served in that recommendation will receive an implementation plan. What s the implementation plan? Is it just a paragraph? No, we ll lay out a process or timeline for the steps to take in 2018 to move forward with a LPA in the corridor. Part of the Y will already have a jump start because of the work this committee has already done. I m still not comfortable voting on this affirmation without a clear idea of a Y LPA. West 7 th Street neighborhood is not served by a Ford Parkway river crossing. So, without clear direction for a Y LPA, I cannot take this vote today. We have made a commitment from the beginning to serve both travel markets. One will not be dropped at the end of this study. But this is where we make the formal decisions that go on the record, so I m not comfortable approving the alternatives today. Chair Ortega stated the county will be a funding partner for a study to move the other alignment forward in So, to recap the plan for the rest of the year, at the next meeting, the PAC will approve one draft LPA to go to public review. During the public meeting, the PAC will sit and listen and a court reporter will take notes. How will the public hearing be announced? The same as we announced our community meetings. There will be ads in newspapers, social media announcements, etc. Do we need to vote to approve the PAC as designated hearing officers? MAC has to formally approve itself as the host for public hearings. Project staff will look into this. Staff should work with PAC to inform us of a practical way of moving forward with both travel markets. I believe no one here would vote for one without knowing if the other travel market will move forward. Chair Ortega noted that nothing will go before RCRRA without stating both travel markets will be served. The long haul is still ahead of us, but it might not be with this group. Another PAC or study may be convened. Action: Councilman Tolbert motioned to affirm the six alternatives with expectation that PAC will receive more information at the October meeting on the implementation steps of a Y solution (All PAC members voted Aye ; except R. Noecker, P. Mancini, and L. Severson voted Nay ) 5

7 Riverview Corridor Pre-Project Development Study 9. Update: United and Children s Hospital Representatives from United and Children s Hospital, as well as their consulting team, provided a brief update on their study to research potential impacts to their facility if either arterial bus rapid transit or modern streetcar were routed on Smith Avenue. Based on their study s findings they are advocating to not place a modern streetcar or arterial bus rapid transit on Smith Avenue because of potential issues with noise, vibrations, and utility impacts. Discussion: You re here to voice your opposition to a Smith Avenue route, but wasn t Smith dismissed? No. If the W. 7 th Street route is selected in Seven Corners, does the hospital still require mitigation efforts? There will likely be some, but not as many than if the route was on Smith Avenue. What type of long-term mitigation efforts would be needed on Smith Ave? We would need to replace windows with a heavy-duty glass; relocate fragile equipment or upgrade it; and structural reinforcements to the walls of the building and the three underground tunnels under Smith Avenue. If Smith Avenue moves forward in this study, will a study of mitigation efforts be conducted by project staff? Yes, that will be done during the environmental analysis. Your study found that neither streetcar nor ABRT should be routed down Smith Avenue. Is there a noise difference between streetcar and ABRT? Streetcar is louder than ABRT, but both exceed the threshold of noise levels acceptable for a hospital. Noise from streetcar bells and whistles and ABRT acceleration exceed the noise threshold. There have been other examples of rail near a hospital and a quiet zone could be implemented on Smith Avenue. The consulting team applied methods from the FTA for determining noise and used assumptions found in the project team s report to determine these impacts. How many employees does the hospital employ? United has 3,500 employees and Children s has 1,000. Do you know how many use public transit to get to work? No. 10. Public Comment Commissioner Ortega opened the meeting to the public. There were no public comments. 11. Adjourn Chair Ortega thanked everyone for attending and adjourned the meeting at 10:43 a.m. Next PAC Meeting: October 12,

8 Riverview Corridor Pre-Project Development Study Policy Advisory Committee Meeting September 14, 2017 Riverview Corridor Pre-Project Development Study PAC Attendance Sheet First Name Last Name Title Representing Kristin Beckmann Deputy Mayor City of Saint Paul X Tim Busse Councilmember City of Bloomington X Jon Commers Councilmember Metropolitan Council Pat Harris Commissioner Metropolitan Airports Commission X Nancy Homans Policy Director City of Saint Paul (Alternate) Sheila Kauppi Metro District Minnesota Department of Transportation (Alternate) X Pat Mancini Owner, Mancini's Char Riverview Corridor Business House Representative Scott McBride Metro District Engineer Minnesota Department of Transportation Peter McLaughlin Commissioner Hennepin County Regional Railroad Authority Pat Mosites Airside Project Manager Metropolitan Airports Commission (Alternate) X Mark Nelson Transportation Planning Minnesota Department of Dir. Transportation (Alternate) X Rebecca Noecker Councilmember - Ward 2 City of Saint Paul X Howard Ornstein Assistant County Attorney Hennepin Co Regional Railroad Authority (Alternate) X Rafael Ortega Commissioner Ramsey County Regional Railroad Authority X John Regal Board Member Saint Paul Area Chamber of Commerce X Bridget Rief Airport Development Metropolitan Airports Commission Director (Alternate) X Laurel Severson Citizen Riverview Corridor Citizen Representative X Chris Tolbert Councilmember - Ward 3 City of Saint Paul X Peter Wagenius Policy Director City of Minneapolis Staff and Consultants X Johanna Berg Acting Director Ramsey County Regional Railroad Authority X Mike Rogers Project Manager Ramsey County Regional Railroad Authority Kevin Roggenbuck Deputy Project Manager Ramsey County Regional Railroad Authority X Tim Mayasich Staff Ramsey County Regional Railroad Authority X April Manlapaz Project Manager AECOM Team X Nancy Stavish Technical Staff AECOM Team X Joy Miciano Public Engagement AECOM Team X Rebecca Lieser Pubic Engagement AECOM Team X Ted Davis Strategic Communications Davis Team Mike Zipko Strategic Communications Davis Team 7

9 Riverview Corridor Pre-Project Development Study Kent ATTENDANCE SHEET Policy Advisory Committee Meeting September 14, 2017 Riverview Corridor Pre-Project Development Study Other Attendees First Name Last Name Organization Petterson Lee Nichols WSB W. 7th Street Business Association and Community Reporter Tony Baxter ESI Engineering Jay Severance All Aboard MN Dan Kueny TAC member Carl Jensen MnDOT Rachel Dammel Kimley-Horn Jim Schoettler Self Joseph Scala Hennepin County Ken Iosso Ramsey County Jane McClure Villager 8

10 Riverview Pre-Project Development Study Policy Advisory Committee October 12,

11 Agenda 1. Welcome and Introductions 2. Approval of the Agenda 3. Approval of the September PAC Meeting Summary 4. Meeting Summary 5. Locally Preferred Alternative (LPA) Definition 6. Evaluation Framework 7. Draft LPA Recommendation 8. Draft Implementation Plan 9. Public Comment 2

12 2. APPROVAL OF THE AGENDA 3

13 3. APPROVAL OF THE SEPTEMBER PAC MEETING SUMMARY 4

14 4. MEETING SUMMARY 5

15 October 12 th Meeting Purpose SEP 14 PAC consider public comment OCT 12 PAC approves Draft LPA for public comment NOV Draft LPA public hearing DEC PAC approval of Riverview LPA Early 2018 Local resolutions of support for LPA 2018 Forward LPA to Met Council for adoption 6

16 Comments Received July 13-August 18, 2017 PAC requested in September to quantify public comments by alternative What was the public asked? Which travel market should advance first as part of the Riverview Study? What are your thoughts on the recommendation to advance Alternatives 1, 2, 4b, 6, 8, 10b for further consideration? What are your thoughts on the recommendation to not advance Dedicated BRT and light rail alternatives? 7

17 Public Input: Vehicle Vehicle Route 54 (No Build) Arterial BRT Modern Streetcar Comments Adequate but extend route and continue to improve service (40%) Too crowded; low frequency; boarding a challenge for people with reduced mobility; poor quality stops/shelters (60%) Flexible; low cost; faster than streetcar option (50%) Low development potential; lower estimated ridership than streetcar (50%) High development potential; higher estimated ridership (50%) High cost; neighborhood and business impacts (50%) Light Rail Continues LRT network in region; faster than streetcar (30%) High cost; greatest neighborhood and business impacts (70%) Note: Percentages shown are relative to the total number of comments that mentioned the specific transit vehicle 8

18 Public Input: River Crossing River Crossing Comments Hwy 5 Shorter travel time/direct connection between Union Depot and MSP, MOA; higher estimated ridership; lower cost per rider (70%) Impacts of constructing bridge over river and/or tunnel in Fort Snelling (30%) Ford Pkwy Serves anticipated growth with redevelopment; better connection between Minneapolis/Highland Park and W. 7 th neighborhood (30%) Longer travel time to MSP, MOA; impacts to residential area (Minneapolis); higher cost per rider; lower estimated ridership (70%) Note: Percentages shown are relative to the total number of comments that mentioned the specific river crossing 9

19 Route Public Input: Route Comments W. 7th Street Better access for people who rely on or choose to use transit, better access to businesses and other activity centers (45%) Impacts to neighborhood and business (55%) CP Rail Spur Existing tracks, less traffic and business impacts (55%) Impacts to residences; less access to businesses and activity centers; preserve Spur for bike/ped trail only (45%) St. Paul Ave Preserve CP Spur for bike/ped trail only (40%) Impacts to residences (60%) Smith Ave Only one person and one business provided feedback on Smith Ave Remain on W. 7 th to keep route simple for transit riders and visitors; impacts to hospital Note: Percentages shown are relative to the total number of comments that mentioned the specific route 10

20 5. LOCALLY PREFERRED ALTERNATIVE (LPA DEFINITION) 11

21 What is a Locally Preferred Alternative (LPA)? A corridor s preferred transit vehicle and route that best meets its Purpose and Need The LPA Identifies: General Service Plan General Station Locations Cost and Ridership Estimates The LPA is NOT: The end of the technical analysis. Further analysis will be needed Final Approval Local partners will have additional review/approval opportunities 12

22 Federal and Local Context of an LPA Federal Context = Local Context = 13

23 For Future Environmental Analysis and Engineering Transportation Traffic, parking, etc. Alignment though Seven Corners, street vs. CP Spur, etc. Operating environment side vs. center, dedicated vs. shared Environmental Cultural, historic, noise, wetlands, etc. Provide flexibility and focus resources to: Avoid, minimize, or mitigate impacts Refine the costs/benefits Discuss costs/benefits with public and stakeholders 14

24 6. EVALUATION FRAMEWORK 15

25 Purpose and Need To enhance mobility and access to opportunities for residents, businesses, and the region and to cultivate economic prosperity 1. Growing population and employment increases travel demand for different travel markets 2. Support and catalyze reinvestment and economic development 3. Transit-reliant population also need improved transit service 4. Limited opportunity to improve the existing transportation network 16

26 Development of the Most Promising Alternatives PAC Action February 2016 October 2016 January 2017 February 2017 July 2017 WE ARE HERE October 2017: PAC approval of Draft LPA December 2017: PAC approval of LPA 17

27 Alternatives Carried Forward Local Bus Arterial BRT Potential connection 18

28 Alternatives Carried Forward Modern Streetcar Modern Streetcar Pair Modern Streetcar alternatives by river crossing They have similar evaluation results Simplifies comparison Modern Streetcar Modern Streetcar 19

29 Ridership Travel Time Construction Development Potential Environmental Considerations Cost per Rider Summary of Alternatives Carried Forward Alternative 2 Arterial BRT via Hwy 5 River Crossing 11,100 riders per day 3,200 transit-dependent riders 200 new riders 39 minutes to travel ~12.4 miles Union Depot Randolph: 16 min. Randolph MSP Terminal 1: 14 min. MSP Terminal 1 MOA: 9 minutes Similar to No-Build. Minimal construction at stations Lower development potential than modern streetcar alternatives Minor environmental considerations at stations $4-$6 Alternative 4b & 10b Modern Streetcar via Hwy 5 River Crossing 20,000 riders per day 4,500 transit-dependent riders 2,500 new riders minutes to travel ~11.8 miles Union Depot Randolph: 14 min. Randolph MSP Terminal 1: min. MSP Terminal 1 MOA: 12 minutes High level of construction activity along route and at stations Higher development potential due to fixed guideway Major, due to new bridge National Park, Historic Fort Snelling, Fort Snelling State Park Tribal coordination Cultural and historic resources $10-$12 Alternative 6 & 8 Modern Streetcar via Ford Pkwy River Crossing 19,000 riders per day 4,300 transit-dependent riders 1,700 new riders minutes to travel ~15.8 miles Union Depot Randolph: 14 min. Randolph MSP Terminal 1: min. MSP Terminal 1 MOA: 12 minutes High level of construction activity along route and at stations Higher development potential due to fixed guideway Major, retrofit existing bridge Minnehaha Falls Regional Park, Coldwater Spring Tribal coordination Cultural and historic resources $12-$14 20

30 Alternatives vs. Federal Funding Criteria Based on technical information on hand What would qualify? What would be the strongest Riverview Corridor alternative for federal funding? 21

31 FTA Evaluation Criteria Each criterion gets a rating: High Medium-High Medium Medium-Low Low Medium Rating required for both Project Justification and Local Financial Commitment 22

32 Local Financial Commitment Criteria Reasonable Financial Plan and Cost Estimates Conservativeness of Financial Plan compared to recent experience Access to additional funds if necessary Commitment of Capital and Operating Funds Current Financial Condition Not included in preliminary assessment Would not likely differentiate alternatives 23

33 Project Justification Criteria Existing conditions Population Density, Employment, Affordable Housing Future development Plans and Policies Ridership Focus on transit-dependent Balance of Cost & Ridership Capital and Operating Costs Benefits compared to cost Capital and Operating New riders All 6 criteria are equally rated 24

34 Preliminary Project Justification Rating Not all necessary information is currently available Reasonable assumptions and professional judgment used to fill in gaps 4 of 6 Project Justification Criteria have been approximated based on available data Modern Streetcar evaluated under New Starts Arterial BRT evaluated under Small Starts 25

35 Economic Development Rating Does not differentiate between alternatives Qualitative assessment of plans and polices Transit Supportive Plans and Policies Growth management, transit corridors, zoning, station area planning, land use tools Performance and Impacts of Policies Performance of land use policies Potential impact of transit project on regional land use Tools to maintain or increase rating Affordable housing need and supply (preserve and increase) 26

36 Environmental Benefits Rating Does not differentiate between alternatives Based on change in Vehicle Miles Traveled by mode Ratio of Monetized Value of Environmental Benefits compared to Annualized Capital Cost + Annual Operating Cost Includes: Greenhouse Gases, Particulates, Energy Use, and Safety 27

37 Land Use Rating Employment served Population density (New Stations) Affordable housing (New Stations) Downtown parking supply Alternative Anticipated FTA Rating Alt. 2: Arterial BRT Medium Alt. 4b: Modern Streetcar W. 7 th -Hwy 5/Fort Snelling Medium Alt. 6: Modern Streetcar W. 7 th -Ford Site Medium Alt. 8: Modern Streetcar W. 7 th -CP Spur-Ford Site Medium Alt. 10b: Modern Streetcar W. 7 th -CP Spur-Hwy 5/Fort Snelling Medium 28

38 Mobility Rating Annual Ridership (Trips on Project) + Trips by Transit-Dependent Persons Average of current year and horizon year ridership forecasts Trips by Transit-Dependent Persons are counted twice Transit-Dependent Persons are people who live in households without an automobile (regardless of income) Alternative Anticipated FTA Rating* Alt. 2: Arterial BRT Medium-Low Alt. 4b: Modern Streetcar W. 7 th -Hwy 5/Fort Snelling Medium Alt. 6: Modern Streetcar W. 7 th -Ford Site Medium Alt. 8: Modern Streetcar W. 7 th -CP Spur-Ford Site Medium Alt. 10b: Modern Streetcar W. 7 th -CP Spur-Hwy 5/Fort Snelling *Based on 2040 ridership forecasts Medium 29

39 Cost Effectiveness Rating Cost Per Rider New Starts (Annualized Capital Cost + Annual Operating Cost)/Annual Ridership Small Starts Annualized Federal Share of Capital Cost/Annual Ridership Average of current year and horizon year ridership forecasts Alternative Anticipated FTA Rating 1 Alt. 2: Arterial BRT Medium-High to Medium-Low 2 Alt. 4b: Modern Streetcar W. 7 th -Hwy 5/Fort Snelling Medium-Low Alt. 6: Modern Streetcar W. 7 th -Ford Site Medium-Low or Low Alt. 8: Modern Streetcar W. 7 th -CP Spur-Ford Site Medium-Low or Low Alt. 10b: Modern Streetcar W. 7 th -CP Spur-Hwy 5/Fort Snelling 1 Based on 2040 ridership forecasts. 2 Based on Small Starts formula and breakpoints. Medium-Low or Low 30

40 Congestion Relief Rating New Transit Riders Average of current year and horizon year new weekday riders Alternative Anticipated FTA Rating* Alt. 2: Arterial BRT Low Alt. 4b: Modern Streetcar W. 7 th -Hwy 5/Fort Snelling Medium or Medium-Low Alt. 6: Modern Streetcar W. 7 th -Ford Site Medium-Low Alt. 8: Modern Streetcar W. 7 th -CP Spur-Ford Site Medium-Low Alt. 10b: Modern Streetcar W. 7 th -CP Spur-Hwy 5/Fort Snelling Medium-Low *Based on 2040 ridership forecasts 31

41 Draft FTA New Starts Ratings Based on 4 Project Justification Criteria Alternative Anticipated Cost- Effectiveness Rating Anticipated Congestion Relief Rating Anticipated Mobility Rating Anticipated Land Use Rating Anticipated Project Justification Rating (based on 4 criteria available) Small Starts New Starts Alt. 2: Arterial BRT Alt. 4b: Modern Streetcar W. 7 th - Hwy 5 Alt. 6: Modern Streetcar W. 7 th -Ford Site Medium-High or Medium or Medium-Low Medium- Low Medium-Low or Low Low Medium-Low Medium Medium or Medium- Low Medium or Medium-Low Medium Medium Medium Medium-Low Medium Medium Medium or Medium-Low Alt. 8: Modern Streetcar CP Spur-Ford Site Medium-Low or Low Medium-Low Medium Medium Medium or Medium-Low Alt. 10b: Modern Streetcar CP Spur-Hwy 5 Medium-Low or Low Medium-Low Medium Medium Medium or Medium-Low 32

42 Purpose and Need 4b, Modern Streetcar-W. 7 th -Hwy 5/Ft. Snelling is the best alternative to Enhance mobility, Provide access to opportunities for residents, businesses, and the region and Cultivate economic prosperity. Highest 2040 weekday ridership (20,400) Highest Development Potential due to fixed guideway Highest number of transitdependent riders (4,600) Double the ridership of No-Build in

43 What is Modern Streetcar? For Riverview Corridor Would share infrastructure with Green and Blue Lines, so Riverview vehicle needs to be compatible Tracks, signals, power Stations in downtown Saint Paul, MSP, Bloomington South Loop Operations and maintenance Other features High amenity stations Pay before you board Level boarding Tacoma Streetcar Atlanta Streetcar 34

44 What is Modern Streetcar? For Riverview Corridor Operating Environment Determine segments of shared use and dedicated in future environmental and engineering phases Dedicated: Tie-ins with Green and Blue Lines 35

45 Draft LPA: Other Considerations Retain these options for future environmental analysis and engineering Alignment Downtown Saint Paul: Green Line tie-in Seven Corners: Smith Ave concepts Alternative 10b: CP Spur segment parallel to W. 7 th St Hwy 5/river crossing concepts Bloomington South Loop concepts Operating environment Dedicated or shared use Center- or side-running 5 4 Potential connection 3 Legend 1) 1 Green Line tie-in 2) 2 Smith Ave concepts 3) 3 CP Spur segment 4) 4 Hwy 5/river crossing concepts 5) 5 Bloomington South Loop concepts

46 7. DRAFT LPA RECOMMENDATION 37

47 TAC Recommendation by Member Agency Recommendation Remarks Saint Paul Public Works Yes Most competitive project for federal funding; greater balance in future development; LPA will be refined in environmental work Saint Paul Planning & Economic Development Yes Agreed with PMT recommendation to forward Alternative 4b as Draft LPA to PAC for public review Saint Paul Ward #2 Yes Goal is to improve transit and W. 7 th walkability; concerns about sidewalk impacts MnDOT Metro District Yes Agreed with PMT recommendation to forward Alternative 4b as Draft LPA to PAC for public review Metropolitan Airports Commission Yes Long term economic benefits to rail; public comment needed; questions will be answered in environmental TLC/Smart Trips Yes Board voted to support Alternative 4b; concerned about walkability, bikeability, construction impacts on businesses City of Minneapolis Yes Technically speaking, Alternative 4b should move forward; up to PAC to discuss technical vs. community issues City of Bloomington Yes Strongly encourage; concerned about adding additional train trips through the 24 th Ave. intersection at MOA station Ramsey County Regional Railroad Authority Yes Alternative 4b best meets Purpose & Need and federal funding criteria; public input on the draft LPA needed Hennepin County Regional Rail Authority Yes From TAC perspective, Alternative 4b appears to be the best alternative; should move to PAC & public for feedback; still many questions to answer Metropolitan Council Yes Agreed with PMT recommendation to forward Alternative 4b as Draft LPA to PAC for public review Metro Transit Yes Agreed with PMT recommendation to forward Alternative 4b as Draft LPA to PAC for public review Transit-Dependent Community Representative No Concerned about impact of rail on W. 7 th St businesses, prefers flexibility of ABRT Highland District Council No Highland District Council supports modern streetcars; need more info for impacts to W. 7 th St businesses before moving forward West 7 th Street/Fort Road Federation No Too many unanswered questions. Can t move forward without answers, there will be 100% opposition from business owners until they are answered. Minneapolis Parks & Rec Board Abstain No formal stance; concerned about access points, ecological impacts, unanswered questions on impact to park board property Ramsey County Public Works Abstain Missed prior meetings and didn t feel comfortable voting National Park Service Abstain Okay with 5 build alternatives, but not transit paralleling the bluff; cultural impacts to be looked at in future work 38

48 Draft LPA Recommendation TAC Recommendation Carry forward Alternative 4b Modern Streetcar W. 7 th Hwy 5/Fort Snelling as the Draft LPA for public review for these reasons: Likely qualifies for Capital Investment Grant (CIG) funding Strongest corridor alternative for CIG funding Best meets the Purpose and Need Connects people and opportunities; yields highest ridership from transit-reliant population; and catalyzes/supports economic development Alternative 4b: Modern Streetcar: W. 7 th Hwy 5/Fort Snelling 39

49 Draft LPA Recommendation TAC Recommendation Retain these concepts for future environmental analysis and engineering Alignment Downtown Saint Paul: Green Line tie-in Alternative 10b: CP Spur segment parallel to W. 7 th St Seven Corners: Smith Ave Hwy 5/river crossing concepts Bloomington South Loop concepts Operating environment Dedicated or shared use Center- or side-running Alignment and Operating Environment concepts identified above 40

50 Other Draft Recommendations TAC Recommendation Commit to a separate study of transit improvements to/from Ford Corridor that include these activities: Identify funding partners Identify study lead/co-leads Initiate study in 2018 Develop and execute necessary inter-agency agreements for the study Develop work plan, schedule, and budget of study Establish distinct advisory committees for Ford Corridor study Identify and adopt LPA, and determine next steps City of Saint Paul, Metro Transit, and RCRRA commitment to study, identify and implement feasible, near-term transit improvements in Highland Park 41

51 8. DRAFT IMPLEMENTATION PLAN 42

52 Draft Implementation Plan Once an LPA is selected, an implementation plan: Identifies the project stakeholders/governance to be involved in future project phases Lays out a series of steps to move a project through the phases of the New Starts/Small Starts process 43

53 Riverview Corridor LPA Draft Implementation Plan Late From From From Complete the Draft Environmental Impact Statement and Engineering to support it. Complete the Final Environmental Impact Statement and Engineering to support it Complete Engineering, construction plans, finalize costs and agreements Obtain a Full Funding Grant Agreement, complete construction 44

54 Ford Corridor Study Draft Implementation Plan Analyze alternatives to serve the Ford Corridor travel market Governance Study lead Agreements Work Plan/budget Adopt a Locally Preferred Alternative Begin analysis in 2018 City of St. Paul, Metro Transit and RCRRA commitment to study, identify and implement feasible, near-term transit improvements 45

55 9. PUBLIC COMMENT 46

56 Public Comment When Commenting, Please Be respectful Be brief - Speak for 3 or fewer minutes to give others an opportunity to speak Visitor comments will be included in the PAC meeting summary The Chair reserves the right to limit an individual s presentation if it becomes redundant, disrespectful, or is not relevant to the Riverview Corridor. 47

57 Riverview Pre-Project Development Study TECHNICAL APPENDIX Policy Advisory Committee October 12, 2017 A-1

58 Technical Appendix ALTERNATIVES SUMMARY A-2

59 Alternative 1 No-Build (Route 54) 12.4 miles 26 stops 10-min peak frequency 2040 Ridership ~50% lower than modern streetcar alternatives: 10,700 riders per day Travel Time Slower travel time than ABRT: 41 minutes over 12.4 miles Union Depot Randolph: 16 minutes Randolph MSP Terminal 1: 14 minutes MSP Terminal 1 MOA: 11 minutes Construction Minor construction impacts W. 7 th St resurfacing and sidewalk reconstruction Development Potential Lowest development potential of all alternatives due to lack of fixed guideway Environmental Considerations None Cost per 2040 Rider Not applicable; cost of additional service to accommodate future demand A-3

60 Alternative 2 Arterial BRT: W. 7 th Hwy Ridership ~40% lower than modern streetcar alternatives: 11,100 riders per day 3,200 transit-dependent riders 200 new riders Travel Time Fastest travel time : 39 minutes over 12.4 miles Union Depot Randolph: 16 minutes Randolph MSP Terminal 1: 14 minutes MSP Terminal 1 MOA: 9 minutes Construction Minimal; at stations (concrete bus pads, shelter, electrical) 12.4 miles 26 stops 10-min peak frequency Development Potential Lower development potential than modern streetcar alternatives due to lack of fixed guideway Environmental Considerations Minor environmental considerations at stations Cost per 2040 Rider Low cost per rider: $4-6 A-4

61 Alternative 4b Modern Streetcar: W. 7 th Hwy 5/Fort Snelling Ridership Highest ridership : 20,400 riders per day; 4,600 transitdependent riders; 2,700 new riders Travel Time 44 minutes to travel ~11.7 miles Union Depot Randolph: 14 minutes Randolph MSP Terminal 1: 18 minutes MSP Terminal 1 MOA: 12 minutes Construction Assumes full road reconstruction, utility relocation, tracks and electrification, and new stations Development Potential Higher development potential due to fixed guideway 11.7 miles 20 stops 10-min peak frequency Environmental Considerations Major environmental considerations include new river crossing, parkland, Historic Fort Snelling, tribal coordination, cultural and historic resources Cost per 2040 Rider Lowest cost per rider of modern streetcar alternatives: $10-11 A-5

62 Alternative 10b Modern Streetcar: W. 7 th CP Spur Hwy 5/Fort Snelling Ridership 19,600 riders per day; 4,500 transit-dependent riders; 2,200 new riders Travel Time Fastest travel time of the modern streetcar alternatives: 43 minutes to travel ~11.9 miles Union Depot Randolph: 14 minutes Randolph MSP Terminal 1: 17 minutes MSP Terminal 1 MOA: 12 minutes Construction Assumes full road reconstruction, utility relocation, tracks and electrification, and new stations 11.9 miles 20 stops 10-min peak frequency Development Potential Higher development potential due to fixed guideway Environmental Considerations Major environmental considerations include new river crossing, parkland, Historic Fort Snelling, tribal coordination, cultural and historic resources Cost per 2040 Rider Similar to Modern Streetcar via Hwy 5: $10-12 A-6

63 Alternative 6 Modern Streetcar: W. 7 th Ford Site Ridership 19,000 riders per day; 4,400 transit-dependent riders; 1,800 new riders Travel Time Longest travel time: 56 minutes to travel ~15.7 miles Union Depot Randolph: 14 minutes Randolph MSP Terminal 1: 30 minutes MSP Terminal 1 MOA: 12 minutes Construction Assumes full road reconstruction, utility relocation, tracks and electrification, and new stations 15.7 miles 27 stops 10-min peak frequency Development Potential Higher development potential due to fixed guideway Ford Site is largest single redevelopment site in corridor Environmental Considerations Major environmental considerations include river crossing, parkland, tribal coordination, cultural and historic resources Cost per Rider Highest cost per rider of all alternatives: $12-14 A-7

64 Alternative miles 27 stops 10-min peak frequency Modern Streetcar: W. 7 th CP Spur Ford Site Ridership 18,400 riders per day; 4,200 transit-dependent riders; 1,500 new riders Travel Time Longest travel time: 54 minutes to travel ~15.8 miles Union Depot Randolph: 14 minutes Randolph MSP Terminal 1: 28 minutes MSP Terminal 1 MOA: 12 minutes Construction Assumes full road reconstruction, utility relocation, tracks and electrification, and new stations Development Potential Higher development potential due to fixed guideway Ford Site is largest single redevelopment site in corridor Environmental Considerations Major environmental considerations include river crossing, parkland, tribal coordination, cultural and historic resources Cost per Rider Highest cost per rider of all alternatives: $12-14 A-8

65 TAC Draft Subject to Change Without Notice 27 Sep 2017 Based on Draft PMT Recommendation F ord Corridor Pre-Project Development Study 1 Develop and analyze alternatives to serve the Ford Corridor/travel market, presuming the Draft Riverview LPA is Alternative 4b, Modern Streetcar: W. 7 th St Hwy 5/Fort Snelling. Outline of Next Steps 1. Identify funding partners 2. Identify study lead/co-leads 3. Initiate study in Develop and execute necessary inter-agency agreements for the study 5. Develop work plan, schedule, and budget of study 6. Establish distinct advisory committees for Ford Corridor study 7. Identify and adopt LPA, and determine next steps 8. City of Saint Paul, Metro Transit, and RCRRA commitment to study, identify and implement feasible, near-term transit improvements in Highland Park If Draft LPA were Modern Streetcar through the Ford Site (Alternative 6 or 8), then conduct a similar for the travel market across Hwy 5 from approximately W. 7 th Street/Saint Paul Ave to the Blue Line Fort Snelling Station. Hwy 5 counterpart requires additional discussion of commitment between these three agencies. R iverview Draft LPA Implementation Plan Alternative 4b, Modern Streetcar: W. 7 th St-Hwy 5/Fort Snelling Overview of Process 1. Governance 3 a. Ramsey County Regional Railroad Authority b. City of Saint Paul c. Hennepin County Regional Railroad Authority d. City of Bloomington e. Metropolitan Council f. Metro Transit g. Minnesota Department of Transportation h. Federal Transit Administration i. Metropolitan Airports Commission 2. Remainder of Riverview Corridor Pre-Project Development Study (From Late ) a. Riverview PAC approve LPA b. Obtain resolutions of support from cities, county RRAs, MAC c. Forward LPA and financial plan to Met Council for amendment into Transportation Policy Plan (TPP) d. Initiate FTA coordination, including determination of NEPA Class of Action e. Initiate environmental review f. Complete engineering to support environmental review; make key decisions; reduce cost and risk g. Explore additional local funding opportunities h. Review and, if necessary, modify implementing legislation i. Prepare New Starts Project Development application j. Establish Project Organization for Project Development and execute associated interagency agreements 3. New Starts Project Development (From ) a. Complete final environmental decision document b. Affirm LPA and consistency with TPP; amend if needed 3 Add City of Minneapolis to the list of key agencies if the Draft LPA were Modern Streetcar through the Ford Site. c. Advance design to obtain final cost estimate to determine federal share d. Develop material for New Starts Engineering (evaluation and rating) e. Demonstrate/document agency technical capacity f. Capital and operating funding Final resolution of the non-capital Investment Grant (CIG) funding sources and operating funding sources 4 Establish intergovernmental Financial Working Group to support required coordination involved with grant application dates, timing of funding, and formal interagency funding agreements. 4. New Starts Engineering (From ) a. Identify utilities and relocation requirements b. Details of right-of-way acquisition requirements c. Prepare contract design/specification documents d. Signal modifications and new signal design e. Finalize project capital costs, operations and maintenance costs, and schedule f. Environmental testing and permitting requirements g. Construction staging and detailed construction mitigation plan h. Capital and Operating Funding Provide a Financial Plan with timing and amount of all capital funding sources vs. expenditures and financing requirements (if any). Prepare Operations Agreement that defines the operating plan, operating costs, fare subsidy and operations funding source assumptions. i. Project Management/Organization Prepare a Project Management Plan (formalizes the Contract Design Procurement approach and method(s)) Update New Starts Evaluation Templates Formalize project organization and interagency agreements j. Agreements Cooperation Agreements Grant Agreements Master Funding Agreements (MFA) and Subordinate/Sub-Funding Agreements (SFA). Memorandum of Understanding Operations and Maintenance Agreements Cooperative Construction and Utility Relocation Agreements Coordinate adjacent projects, e.g. W. 7th Street resurfacing and sidewalk reconstruction (MnDOT) 5. New Starts Grant & Construction (From ) a. As applicable, initiate long-lead items under Letter of No Prejudice (e.g. utility relocation, property acquisition 5 ) b. Execute Full Funding Grant Agreement between FTA and Met Council 4 5 Riverview will pursue CIG funding as a New Starts project. Task would likely occur earlier in the New Starts process for Ford Site and CP Yard, along with required agreements and environmental remediation. rv - imp plan outline docx 1

66 Riverview Corridor Pre-Project Development Study ARTERIAL BRT (Alternative 2) TAC Requested Summary of Technical Issues Requires property for operations and maintenance facility May require utility relocation Requires transit signal priority coordination MODERN STREETCAR (Alternatives 4b, 6, 8, 10b) Requires property for operations and maintenance facility Utility related impacts on residents and businesses with relocation/improvements Requires transit signal priority coordination Smith Ave./W. 7th St. current transit operations, hospital access, ongoing development Proximity to bedrock may require construction methods that are more time consuming, costly and disruptive Typical section priorities consider all users including bicycles Pedestrian safety sidewalk widths and speed of adjacent traffic Tie into the Blue Line and Green Line Potentially affects more parklands Coordination with MSP (access, security, runway protection zone) Coordination with MOA (access, potential for new rail tie-in); may require grade separation at 24 th Ave. Requires greater tribal coordination Hwy 5 (Alternatives 4b & 10b) Ford Parkway Bridge (Alternatives 6 & 8) Hwy 5 bridge/tunnel is eligible for National Ford Parkway Bridge is listed on National Register of Historic Places Register of Historic Places Requires reconstruction of Hwy 5 bridge Requires structural analysis to determine for traffic, rail, pedestrian, and bike or a scope of work to accommodate modern new bridge near Hwy 5 for transit, streetcar pedestrian, and bike Requires grade separation at Blue Line Design/engineering and coordination with Requires grade separation at Soo Line near Historic Fort Snelling: rail tie-in options, 46 th St. access, impacts to parkland and historic resources W. 7 th (Alternatives 4b & 6) CP Spur (Alternatives 8 & 10b) Potential loss of on-street parking Dependent on availability of CP Spur; Denser development limits staging and entails acquisition of entire CP Spur ROW laydown areas during construction from private owner Higher number of access points higher Design/engineering effort associated with safety concern potential land bridge between CP Spur and Montreal Ave. over I-35E

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017 2040 Transportation Policy Plan Update Council Committee of the Whole December 6, 2017 What is the Transportation Policy Plan (TPP)? Long-range transportation plan for the region Required under state and

More information

Transit Operations Funding Sources

Transit Operations Funding Sources Chapter 7. Funding Operations Funding Funding has increased about 56% in absolute terms between 1999 and 2008. There have been major variations in individual funding sources over this time, including the

More information

METRO Orange Line Extension Planning and Implementation

METRO Orange Line Extension Planning and Implementation METRO Orange Line Extension Planning and Implementation December 9, 2015 Planning has begun for an extension of METRO Orange Line south from Burnsville to the Kenrick Avenue park and ride in Lakeville.

More information

METRO Blue Line LRT & METRO Green Line LRT (Light Rail) Table of Contents. Operating Grant Worksheets Pages 6-17

METRO Blue Line LRT & METRO Green Line LRT (Light Rail) Table of Contents. Operating Grant Worksheets Pages 6-17 METRO Blue Line LRT & METRO Green Line LRT (Light Rail) Table of Contents Operating Grant Application Cover Sheet Pages 1-3 Project Benchmarks and Timeline Pages 4-5 Operating Grant Worksheets Pages 6-17

More information

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

SOUTHWEST LRT (METRO GREEN LINE EXTENSION) 10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)

More information

Regional Transit System Plan. Regional Task Force Meeting No. 1

Regional Transit System Plan. Regional Task Force Meeting No. 1 Regional Transit System Plan Regional Task Force Meeting No. 1 Thursday, December 2, 2010 James Wagner Welcome! Introductions Venue Packet Displays Opening Session 1 Agenda (5 mins) (20 mins) What is a

More information

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY Corridor Advisory Committee Meeting #52 February 16, 2017 6:00 PM - 8:00 PM Progress Park 15500 Downey Ave, Paramount, CA 90723 INTRODUCTION On Thursday, February 16, 2017, the Corridor Advisory Committee

More information

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees: Meeting Minutes Project: Subject: DART D2 Stakeholder Work Group for D2 Date: Wednesday, December 16, 2015 Location: Attendees: DART, 1401 Pacific Avenue, Dallas, TX Steve Salin, DART Ernie Martinez, DART

More information

REGIONAL TRANSIT FEASIBILITY PLAN

REGIONAL TRANSIT FEASIBILITY PLAN REGIONAL TRANSIT FEASIBILITY PLAN The Regional Transit Feasibility Plan continues to make progress, having completed Steps One and Two of the process to evaluate opportunities for premium transit within

More information

3. TECHNICAL CAPACITY REVIEW

3. TECHNICAL CAPACITY REVIEW Metropolitan Council Beth El Synagogue, 5224 W. 26 th Street, St. Louis Park, MN 55416 Meeting of the Southwest Corridor Management Committee June 24, 2015 Members Present Chair Adam Duininck Brian Lamb

More information

Corridor Management Committee. September 5, 2012

Corridor Management Committee. September 5, 2012 Corridor Management Committee September 5, 2012 2 Today s Topics SWLRT DEIS Process Overview and Outreach Preliminary Engineering Services Procurement Update Communications and Outreach Update BAC Report

More information

Central City Line Steering Committee

Central City Line Steering Committee Central City Line Steering Committee Meeting #1 Thursday, Spokane Intermodal Center Great Northern Room, #310 221 W. First Ave. Spokane, WA 1 Agenda Welcome, Introductions and Agenda Review Review of Steering

More information

Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 13

Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 13 1 AGENDA Van Ness Avenue Bus Rapid Transit (BRT) Citizens Advisory Committee (CAC) Meeting 13 Date: 5:00 p.m., Tuesday, October 27 th, 2009 Location: 100 Van Ness Avenue, 26 th Floor 5:00 1. Committee

More information

Corridors of Opportunity

Corridors of Opportunity Corridors of Opportunity Presentation to ULI Minnesota District Council September 16, 2010 Commissioner Peter McLaughlin Commissioner Jim McDonough 1 Counties Transit Improvement Board Overview Anoka,

More information

APPENDIX B BUS RAPID TRANSIT

APPENDIX B BUS RAPID TRANSIT APPENDIX B BUS RAPID TRANSIT Table of Contents TABLE OF CONTENTS What is Bus Rapid Transit?... 2 BRT Features... 2 BRT Variations... 3 Where is BRT Currently Located?... 4 How Much Does BRT Cost?... 4

More information

Agenda. 6:00 p.m. - 6:45 p.m. - Registration & Open House. 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks

Agenda. 6:00 p.m. - 6:45 p.m. - Registration & Open House. 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks Agenda 6:00 p.m. - 6:45 p.m. - Registration & Open House 6:45 p.m. - 6:55 p.m. - Welcome & Opening Remarks 6:55 p.m. - 7:15 p.m. - Formal Presentation 7:15 p.m. - 7:30 p.m. - Questions/Answer Session &

More information

Atlanta BeltLine, Inc.

Atlanta BeltLine, Inc. Atlanta BeltLine, Inc. Quarterly Briefing Agenda Welcome & Open House ABI CEO Update Community Engagement Update Design & Construction Update Transit Update Atlanta BeltLine Partnership Update Q&A June

More information

More. January Central Corridor LRT Project included in president s budget

More. January Central Corridor LRT Project included in president s budget January 2010 Central Corridor LRT Project included in president s budget A decades-long dream to link St. Paul and Minneapolis by light rail transit is a step closer to reality with the Obama Administration

More information

SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016

SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016 Minutes of the SPECIAL MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, February 9, 2016 Committee Members Present: Rick Theisen, Bill Weber, Anthony Taylor, Todd Kemery, Sarah Hietpas,

More information

City of Saint Paul Request for Proposals for a Downtown Parking Management Strategy Event 91

City of Saint Paul Request for Proposals for a Downtown Parking Management Strategy Event 91 City of Saint Paul Request for Proposals for a Downtown Parking Management Strategy Event 91 I. Overview The City of Saint Paul requests proposals from qualified consultants to summarize the existing conditions

More information

MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS. Executive Summary

MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS. Executive Summary MULTIMODAL TRANSPORTATION DISTRICT ALTERNATIVES ANALYSIS Executive Summary February 2015 Executive Summary 1. Define the Problem This Alternatives Analysis report is submitted as a deliverable for the

More information

Summary of Committee Discussion/Questions Chris Beckwith, Senior Project Manager from the Gold Line Project Office, presented this item.

Summary of Committee Discussion/Questions Chris Beckwith, Senior Project Manager from the Gold Line Project Office, presented this item. Committee Report Business Item No. 2017-241 Transportation Committee For the Metropolitan Council meeting of November 29, 2017 Subject: Gold Line BRT Project Management/Environmental Contract Proposed

More information

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY COUNCIL STUDY SESSION MEMORANDUM City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared By: Mayor and City Council George Di Ciero, City and County Manager Debra Baskett, Transportation Manager

More information

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

Beth Day Director, FTA Office of Project Planning RailVolution October 2011 Beth Day Director, FTA Office of Project Planning RailVolution October 2011 What is a New or Small Start? New fixed guideways and extensions to existing systems Includes light rail, heavy rail, commuter

More information

Eagle Project Update

Eagle Project Update Construction of Peña Bridge November 2012 Eagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital Programs March 5, 2014 Regional Transportation District (RTD) Performs

More information

On Ramps to the Regional Trail System Three Rivers Park District TAP Funding Proposal

On Ramps to the Regional Trail System Three Rivers Park District TAP Funding Proposal December 20, 2013 To: Local Cities/Agencies From: Kelly Grissman, Director of Planning RE: On Ramps to the Regional Trail System Three Rivers Park District TAP Funding Proposal Three Rivers Park District

More information

FFY Transportation Improvement Program

FFY Transportation Improvement Program Lawton Metropolitan Planning Organization DRAFT FFY 2018-2021 Transportation Improvement Program Approved, 2017 The Federal Fiscal Years (FFY) 2018-2021 Transportation Improvement Program (TIP) is updated

More information

STRATEGIC PLANNING COMMITTEE AGENDA

STRATEGIC PLANNING COMMITTEE AGENDA Interurban Transit Partnership STRATEGIC PLANNING COMMITTEE MEMBERS Charis Austin Aaron Smith Rosalynn Bliss Paul Troost Jack Hoffman, Chair Michael Verhulst Stephen Kepley STRATEGIC PLANNING COMMITTEE

More information

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings Agenda Registration/Open House (30 minutes) Draft EIS/EIR Presentation (30 minutes) Public Comment (90 minutes) 1 Purpose of Today s Meeting

More information

Committee Members Present: Commers, Chavez, Elkins, Letofsky, Munt, Wulff

Committee Members Present: Commers, Chavez, Elkins, Letofsky, Munt, Wulff Minutes of the SPECIAL MEETING OF THE COMMUNITY DEVELOPMENT COMMITTEE Monday, June 15, 2015 Committee Members Present: Commers, Chavez, Elkins, Letofsky, Munt, Wulff Committee Members Absent: Cunningham,

More information

Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS

Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS September 25, 2012 for the Gold Rush Circulator Study A. Purpose Charlotte Center City Partners (CCCP) and the City of Charlotte

More information

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016 REPORT To the Honorable Mayor and City Council From the City Manager May 9, 2016 SUBJECT Study Session for Consideration of the Draft Inner Harbor Specific Plan, Draft Inner Harbor Specific Plan Environmental

More information

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: DEVELOPMENT/PLANNING/ZONING TITLE: TRANSPORTATION PROPORTIONATE SHARE CALCULATIONS FOR NEW DEVELOPMENT PROJECTS CODE NUMBER: AC-13-16 ADOPTED:

More information

2018 Regional Solicitation for Transportation Projects

2018 Regional Solicitation for Transportation Projects 2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)

More information

Transportation Demand Management Workshop Region of Peel. Stuart M. Anderson David Ungemah Joddie Gray July 11, 2003

Transportation Demand Management Workshop Region of Peel. Stuart M. Anderson David Ungemah Joddie Gray July 11, 2003 Transportation Demand Management Workshop Region of Peel Stuart M. Anderson David Ungemah Joddie Gray July 11, 2003 Why Transportation Demand Management (TDM)? Demand management measures support a sustainable

More information

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES

SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING MINUTES SILICON VALLEY RAPID TRANSIT CORRIDOR BART EXTENSION TO MILPITAS, SAN JOSE AND SANTA CLARA POLICY ADVISORY BOARD MEETING Wednesday, April 25, 2007 MINUTES 1. The Regular Meeting of the Silicon Valley Rapid

More information

Puget Sound Gateway Program

Puget Sound Gateway Program Puget Sound Gateway Program SR 167 Completion Project Tacoma Transportation Commission April 18, 2018 THOMAS SLIMAK, PE SR 167 ASSISTANT PROJECT MANAGER Agenda Puget Sound Gateway Program Overview Program

More information

Coordinated Transit Consultation Meetings SmartTrack, GO RER, Relief Line, Scarborough Subway Extension June 20, 2015 Highlights Report

Coordinated Transit Consultation Meetings SmartTrack, GO RER, Relief Line, Scarborough Subway Extension June 20, 2015 Highlights Report Coordinated Transit Consultation Meetings SmartTrack, GO RER, Relief Line, Scarborough Subway Extension June 20, 2015 Highlights Report This concise Highlights Report has been prepared to provide the City

More information

Central City Line Kick-off and Tour

Central City Line Kick-off and Tour Central City Line Kick-off and Tour Phase C Preliminary Engineering, Environmental Documentation and Small Starts Submittal Kickoff Meeting Agenda Time Item 1:00 PM Welcome, Introductions and Agenda Review

More information

Business Advisory Committee. August 26, 2015

Business Advisory Committee. August 26, 2015 Business Advisory Committee August 26, 2015 1 Today s Topics SDEIS Comment Summary Project Update New Starts Application Submittal Municipal Consent Schedule Next Steps: 6 Month Look Ahead Southwest Corridor-wide

More information

CITY OF LA CENTER PUBLIC WORKS

CITY OF LA CENTER PUBLIC WORKS CITY OF LA CENTER PUBLIC WORKS TRAFFIC CALMING PROGRAM APPROVED PER RESOLUTION 08-304 ON DECEMBER 10, 2008 TABLE OF CONTENTS PAGE Summary... 1 Procedures... 2 Project Eligibility... 2 Project Funding &

More information

Metropolitan Council Meeting Wednesday, September 26, 2012 Robert Street Council Chambers 4:00PM

Metropolitan Council Meeting Wednesday, September 26, 2012 Robert Street Council Chambers 4:00PM Metropolitan Council Meeting Wednesday, September 26, 2012 Robert Street Council Chambers 4:00PM Table of Contents Part I - Narrative Attendance:... 1 Call to Order and Approval of Agenda... 1 Minutes...

More information

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

Fixing America s Surface Transportation Act: FAST Act Implications for the Region Fixing America s Surface Transportation Act: FAST Act Implications for the Region Connie Kozlak Metropolitan Transportation Services Mark Fuhrmann Metro Transit Ed Petrie Metro Transit Metropolitan Council

More information

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS 2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..

More information

Open House Round 2. State Rail Plan. A Collaborative Vision for Transportation

Open House Round 2. State Rail Plan. A Collaborative Vision for Transportation Open House Round 2 January 2015 Why We re Here What We ve Heard What s New Federal Guidance Trends Safety Priorities and projects Funding Methods What s Next Welcome Agenda Why We re Here Purpose of Today

More information

MINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, :15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A

MINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, :15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A MINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, 2010 4:15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A. STUART MUNICIPAL BUILDING MEMBERS PRESENT: Margaret Bessette,

More information

Meeting of the Southwest Corridor Management Committee February 1, 2012

Meeting of the Southwest Corridor Management Committee February 1, 2012 Metropolitan Council City of St. Louis Park Chambers, 5005 Minnetonka Boulevard, St. Louis Park 55416 Meeting of the Southwest Corridor Management Committee February 1, 2012 Members Present Jan Callison,

More information

Metro. Board Report. File #: , File Type:Informational Report

Metro. Board Report. File #: , File Type:Informational Report Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #:2015-1743, File Type:Informational Report Agenda Number:56. PLANNING

More information

2. Action Item: Approval of Minutes from the August 20, 2015 MPO Meeting (attached draft) (Bryan Culver L-DC MPO Chair)

2. Action Item: Approval of Minutes from the August 20, 2015 MPO Meeting (attached draft) (Bryan Culver L-DC MPO Chair) Thursday, October 15, 2015 4:00 5:30 PM 6 East 6th Street Lawrence City Hall City Commission Room POLICY BOARD AGENDA - REGULAR MEETING 1. Call Meeting to Order and Introductions (Bryan Culver L-DC MPO

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

Agenda Gateway Corridor Commission February 9 3:30 PM

Agenda Gateway Corridor Commission February 9 3:30 PM Agenda Gateway Corridor Commission February 9 3:30 PM Woodbury City Hall, Birch Room 8301 Valley Creek Road Woodbury, MN 55125 Item Requested Action 1. Introductions Information 2. 2017 Elections* Approval

More information

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal

SAN IPSE CAPITAL OF SILICON VALLEY ?/2W/(T. Memorandum TO: HONORABLE MAYOR AND CITY COUNCIL. FROM: Kim Walesh Jim Ortbal CITY OF 7 S3 SAN IPSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL STUDY SESSION: 3/30/2017 Memorandum FROM: Kim Walesh Jim Ortbal SUBJECT: DIRIDON STATION PLAN AND REGIONAL RAIL PROJECTS

More information

THE BROOKLYN PARK ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN PARK MAY 15, 2017 MEETING MINUTES

THE BROOKLYN PARK ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN PARK MAY 15, 2017 MEETING MINUTES THE BROOKLYN PARK ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN PARK MAY 15, 2017 MEETING MINUTES I. ORGANIZATIONAL BUSINESS: 1. CALL TO ORDER: President Jeffrey Lunde (7:00 p.m.) ROLL CALL PRESENT:

More information

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc. Planning Commission Public Hearing Exhibits Powers Ready Mix Plant Oldcastle SW Group, Inc. Substantial Amendment to a Land Use Change Permit, Major Impact Review (File MPAA-02-16-8424) Applicant is CRC,

More information

Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update

Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update Provide world-class infrastructure and

More information

REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway

REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway Issue Date: November 21, 2008 Proposal Submission Deadline: December 31, 2008 Description of Work: The Bronx

More information

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background May 17, 2010 To: From: Subject: Transportation 2020 Committee Will Kempton, Chief Executive Officer Go Local Fixed-Guideway Program Update Overview The Go Local Fixed-Guidewaof the program, the City of

More information

MOBILITY PARTNERSHIP AGENDA

MOBILITY PARTNERSHIP AGENDA 1. CALL TO ORDER/ROLL CALL MOBILITY PARTNERSHIP Wednesday, October 11, 2017 9:00 a.m. to 10:30 a.m. Gilroy City Council Chambers 7351 Rosanna Street, Gilroy, CA AGENDA 2. PUBLIC PRESENTATIONS: This portion

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: February 22, 2011 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information

Federal Public Transportation Program: In Brief

Federal Public Transportation Program: In Brief Federal Public Transportation Program: In Brief William J. Mallett Specialist in Transportation Policy December 2, 2013 Congressional Research Service 7-5700 www.crs.gov R42706 Contents Introduction...

More information

2018 STP & CMAQ Project Selection Process

2018 STP & CMAQ Project Selection Process 2018 STP & CMAQ Project Selection Process Available Funding: (In Millions) CMAQ STP Preservation TOTAL 2021 2022 2021 2022 2021 2022 Regional $14.27 (project cap)$7.13 Countywide $2.41 (project cap)$1.2

More information

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW UNFUNDED TRANSPORTATION PROJECTS OVERVIEW THE LIST 40 unique unfunded projects are on the list All projects are important to the future of Arvada s transportation needs. The list has developed over many

More information

PINELLAS COUNTY DEO#12-1ESR

PINELLAS COUNTY DEO#12-1ESR Agenda Item #3.H.11 02/13/12 LOCAL GOVERNMENT COMPREHENSIVE PLAN PROPOSED AMENDMENT REPORT PINELLAS COUNTY DEO#12-1ESR 1 THIS PAGE INTENTIONALLY LEFT BLANK 2 PINELLAS COUNTY LPA 22-10-11 Expedited State

More information

Comprehensive Silver Line Plan & Title VI

Comprehensive Silver Line Plan & Title VI Customer Service and Operations Committee Board Action Item III-A April 11, 2013 Comprehensive Silver Line Plan & Title VI Page 3 of 28 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Project Selection Policy Update. Philip Schaffner June 20, 2018

Project Selection Policy Update. Philip Schaffner June 20, 2018 Project Selection Policy Update Philip Schaffner June 20, 2018 Legislative Direction 2017 Laws of Minnesota, Chapter 3, Section 124 New Policy on Project Selection The commissioner of transportation must

More information

Overview of the Regional Transportation Improvement Program

Overview of the Regional Transportation Improvement Program Overview of the 2017-2020 Regional Transportation Improvement Program Table of Contents What is the Puget Sound Regional Council (PSRC)?... 1 What is the Transportation Improvement Program (TIP)?... 1

More information

KEY TAKEAWAYS THE STIMULUS BREAKDOWN

KEY TAKEAWAYS THE STIMULUS BREAKDOWN S T I M U L U S F O R G R E A T E R P H I L A D E L P H I A : W H A T I T M E A N S F O R T R A N S P O R T A T I O N I N V E S T M E N T I N T H E R E G I O N KEY TAKEAWAYS Greater Philadelphia will likely

More information

SFTP Technical Advisory Committee September 19, 2012

SFTP Technical Advisory Committee September 19, 2012 09.19.12 SFTP Technical Advisory Committee September 19, 2012 SFTP Community Advisory Committee Rachel Hiatt Senior Transportation Planner Draft SFTP Project Performance Evaluation Results The SFTP Project

More information

Downtown Oakland Specific Plan Frequently Asked Questions

Downtown Oakland Specific Plan Frequently Asked Questions Downtown Oakland Specific Plan Frequently Asked Questions 1. What is the Downtown Oakland Specific Plan? A Specific Plan is a regulatory tool that local governments can use to implement the general plan

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information

Board Meeting. Wednesday, June 20, :00 a.m.

Board Meeting. Wednesday, June 20, :00 a.m. Board Meeting Wednesday, June 20, 2018 9:00 a.m. Invocation Pledge of Allegiance Roll Call of Members Announcements Introduction of FDOT Staff Call to Order Highlands Transit Plan Public Involvement Award

More information

CHAPTER 6 PUBLIC AND AGENCY OUTREACH

CHAPTER 6 PUBLIC AND AGENCY OUTREACH CHAPTER 6 PUBLIC AND AGENCY OUTREACH This chapter documents the Westside Purple Line Extension Project (the Project) Public Participation Plan for the Draft Supplemental Environmental Impact Statement

More information

PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY

PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY Meeting Overview Sign-In Sheets: Be sure to sign in. Sign-In sheets will be available on

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY V NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M FOR: FROM: Members, Northern Virginia Transportation Authority Chairman Martin E. Nohe, Planning and Programming Committee DATE: September

More information

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study Appendix F Public Meeting Summaries F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary Loop 9 Southeast Corridor/Feasibility Study

More information

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration

More information

Public Information Plan

Public Information Plan Metcalf Shawnee Mission Parkway Bus Corridors Transit Improvements Public Information Plan Prepared by 1 Plan Purpose The public information plan for the Metcalf Avenue/Shawnee Mission Parkway Bus Corridor

More information

Business Item No

Business Item No Business Item No. 2015-316 Community Committee Meeting date: December 21, 2015 For the Metropolitan Council meeting of January 13, 2016 Subject: Livable Communities Demonstration Account Transit Oriented

More information

Smart Region Smart Transportation

Smart Region Smart Transportation Smart Region Smart Transportation Joe Milazzo II, PE, RTA Executive Director Wednesday, Oct. 19, 2016 The Regional Transportation Alliance business coalition: MISSION To leverage the strength of the regional

More information

TRANSIT DEVELOPMENT PLAN: FISCAL YEARS Update

TRANSIT DEVELOPMENT PLAN: FISCAL YEARS Update TRANSIT DEVELOPMENT PLAN: FISCAL YEARS 2014-2019 Update The following will replace Chapter 5 of the Arlington Virginia Transit Development Plan: Fiscal Years 2011-2016 5.0 SIX-YEAR TRANSIT SERVICE AND

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Downtown Triangle Redevelopment 1 st Street North, East Jackson Street, and Market Street City of Wisconsin Rapids 444 West Grand Avenue, Wisconsin Rapids, WI 54495 February 2017

More information

DRAFT. Public Participation Plan

DRAFT. Public Participation Plan DRAFT Public Participation Plan December 2014 Document Purpose and Project Background The purpose of the METRO Red Line Implementation Plan Update (IPU) Public Involvement Plan is to outline tasks related

More information

BROWARD COUNTY TRANSIT MAJOR SERVICE CHANGE TO 595 EXPRESS SUNRISE - FORT LAUDERDALE. A Title VI Service Equity Analysis

BROWARD COUNTY TRANSIT MAJOR SERVICE CHANGE TO 595 EXPRESS SUNRISE - FORT LAUDERDALE. A Title VI Service Equity Analysis BROWARD COUNTY TRANSIT MAJOR SERVICE CHANGE TO 595 EXPRESS SUNRISE - FORT LAUDERDALE A Title VI Service Equity Analysis Prepared September 2015 Submitted for compliance with Title VI of the Civil Rights

More information

Early Scoping Report Appendix Attachment B-5:

Early Scoping Report Appendix Attachment B-5: Early Scoping Report Appendix Attachment B-5: Project Steering Committee Meeting, June 12, 2014 Summary and Presentation GA 400 Transit Initiative Project Stakeholder Committee Meeting North Fulton CID

More information

AGENDA ITEM H-3 PAGE 57 STAFF REPORT. City Council Meeting Date: 5/8/2018 Staff Report Number: CC

AGENDA ITEM H-3 PAGE 57 STAFF REPORT. City Council Meeting Date: 5/8/2018 Staff Report Number: CC AGENDA ITEM H-3 STAFF REPORT City Council Meeting Date: 5/8/2018 Staff Report Number: 18-104-CC Regular Business: Identify a preferred alternative for the Ravenswood Avenue Railroad Crossing study appropriate

More information

KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013

KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013 KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013 January 16, 2014 PROJECT TYPE: Multimodal (bicycle, pedestrian, roadway, transit) LOCATION: Kansas

More information

METHODOLOGY - Scope of Work

METHODOLOGY - Scope of Work The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY Amarillo District May FY 2010 Quarterly Revisions

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY Amarillo District May FY 2010 Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amarillo District May FY 2010 Quarterly Revisions 5-2010 MONDAY, APRIL 26, 2010 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM PAGE: 1 OF 1 11:21:55

More information

Corridor Management Committee. March 28, 2018

Corridor Management Committee. March 28, 2018 Corridor Management Committee March 28, 2018 1 Today s Topics Chair s Update Proposed Corridor Protection Wall Update Environmental Update 2018 Look Ahead Eden Prairie Video 2 Chair s Update 3 Recent Activities

More information

Transportation Alternatives (TA) Northeast Minnesota Workshop

Transportation Alternatives (TA) Northeast Minnesota Workshop Transportation Alternatives (TA) Northeast Minnesota Workshop October 4 th, 2016 1 What are TA Projects? Federally funded community based projects o Expand travel choices o Integrate modes o Improve cultural,

More information

Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio)

Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio) 10.14.11 Plans and Programs Committee October 18, 2011 Plans and Programs Committee: Commissioners Campos (Chair), Chu (Vice Chair), Avalos, Chiu, Wiener and Mirkarimi (Ex Officio) Maria Lombardo Chief

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: May 7, 2013 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

PLANNING SERVICES MEMORANDUM

PLANNING SERVICES MEMORANDUM PLANNING SERVICES MEMORANDUM January 8, 2018 TO: FROM: SUBJECT: City Council Terry Nolan, Associate Planner Consideration and action on a proposed resolution authorizing the City Manager to submit grant

More information

Annual Report on Funding Recommendations

Annual Report on Funding Recommendations Annual Report on Funding Recommendations Fiscal Year 2019 Capital Investment Grants Program Report of the Secretary of Transportation to the United States Congress Pursuant to 49 USC 5309(o)(1) and Section

More information

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS Date: May 1, 2018 Subject: Z18-009 BELLWOOD LAKE & LOOP 323 LLLP (178.05 ACRE TRACT) Request that the Planning and Zoning Commission consider

More information

Subject: Livable Communities Act Livable Communities Demonstration Account Grant Recommendations

Subject: Livable Communities Act Livable Communities Demonstration Account Grant Recommendations Committee Report Business Item No. 2015-293 Community Development Committee For the Metropolitan Council meeting of December 9, 2015 Subject: Livable Communities Act Grant Recommendations Proposed Action

More information

Federal Support for Streetcars: Frequently Asked Questions

Federal Support for Streetcars: Frequently Asked Questions Federal Support for Streetcars: Frequently Asked Questions William J. Mallett Specialist in Transportation Policy April 3, 2014 Congressional Research Service 7-5700 www.crs.gov R43464 Summary Streetcars,

More information

2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds

2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds 2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds INTRODUCTION As described in the adopted 2018 Policy Framework for PSRC s Federal Funds, the policy focus for the 2018 project selection

More information

CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY BOARD OF DIRECTORS MEETING

CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY BOARD OF DIRECTORS MEETING CAPITAL METROPOLITAN TRANSPORTATION AUTHORITY BOARD OF DIRECTORS MEETING 2910 East Fifth Street Austin, TX 78702 ~ Minutes ~ Executive Assistant/Board Liaison Gina Estrada 512-389-7458 Monday, February

More information

RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3

RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 BD050917 RESOLUTION NO. 17-XX RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 WHEREAS, The Transportation Authority annually approves

More information