What has been accomplished to date? Spring 2008: Sanford Submitted 4 applications to the State for prioritization in for SRTC/SHS, and 3 elementary
|
|
- Clifford Henderson
- 5 years ago
- Views:
Transcription
1 Frequently Asked Questions Is there State funding for this project? Yes. Based on our needs, the State of Maine, Department of Education has ranked this project #2 on their Major Capital Improvement Program s Final Priority list. For more information on the State s Major Capital School Construction Program and funding, visit What has been accomplished to date? Spring 2008: Sanford Submitted 4 applications to the State for prioritization in for SRTC/SHS, and 3 elementary schools 2010: Two projects selected by State School Board for funding- SRTC/SHS and Emerson State DOE outlines a 21 step process required of all projects Spring 2012: City Council formed a Core Building Committee with purpose to select an architect for SHS/ SRTC project. Fall 2012: School Committee begins to formulate Educational Specifications document to describe overall program needs, relationship between two schools and a key design features. Fall 2012: School Committee hires Consultant David Stephen to help facilitate staff and community meetings around defining the Ed Specs. October 2012-January 2013: Core Building Committee advertised for architect, interviewed 5 and did site visits on 2. Selected Lavallee Brensinger Architects of Manchester, NH January 2013: State requires a study of the existing SHS/SRTC site to see if it can accommodate an expanded facility. February 2013-Current An RFQ is posted for a civil engineering firm to identify potential alternative sites for SHS/SRTC, as required by the State. Qualifications to be reviewed March 7th. February 2013-Current: Architects conduct a program review to identify program needs, as required by the State. February 2013: City Budget Committee recommends and City Council approves interim financing for initial expenses with site studies and program reviews. Citizens will vote on bond this June 2013 for interim financing. The interim financing will be reimbursed by the state once Concept Approval occurs (March 2013) February 2013: Architects begin meeting with key school staff on program needs. Architects also outline scope and time line of work. March 2013: City Council re-appoints Core Building Committee to make decisions through Conceptual Design March 2013: Core Building Committee seeks community involvement via Community Advisory Committee and Community Awareness Committee Who is Lavallee Brensinger Architects? Lavallee Brensinger Architects were chosen based on their qualifications, work experience, and outstanding reputation. See attached information on Lavallee Brensinger Architects. What are the next steps? When will the project be complete? See attached overall project schedule. We are anticipating opening doors to the new/improved facility in the Fall of Note that this is anticipated schedule is subject to community and Committee approvals. How can I get involved? The Core Building Committee is currently seeking volunteers to join the Community Advisory Committee and the Community Awareness Committee. Please see attached description and application. These forms can also be found on the School Department Website or hard copy at Sanford Schools, Library, and School or City Offices.
2 Sanford High School and Regional Technical Center Project Community Volunteer Community Involvement Opportunities Community Advisory Committee: The Sanford Building Committee is seeking volunteers who wish to help shape the Sanford High School and Regional Technical Center by joining the Community Advisory Committee. This group will assist the Building Committee in reviewing and making decisions on the project throughout planning and design. The Community Advisory Committee will advise the Design Team and the Building Committee on many aspects of the project. They will solicit and provide feedback from the Greater Sanford Community. They will review issues and preliminary designs in an effort to create a facility that best reflects the core character of Sanford, and that will create a lasting and significant impact to both the School System and the Community. The Community Advisory Committee may also form Focus Groups to review specific aspects of the proposed facility (See below). All participants should be open-minded, positive, and team oriented. The Building Committee hopes to assemble a group that represents a wide cross section of the Sanford Community. This group should include all age levels, current public interest groups, active community members, and any person which represents a Sanford demographic or existing community group. Committee Meetings are anticipated to be held at the Sanford High School. Public Awareness Committee and Chair: The Sanford Building Committee is seeking volunteers to serve on the Public Awareness Committee and an energetic person to chair this Committee. This group will be responsible to communicate progress of the Sanford High School and Regional Technical Center Project. They will ensure that the Sanford Community stays informed on this important project. The Building Committee feels that it is imperative that the community be engaged throughout the process. The Public Awareness Committee will identify opportunities to post information and endeavor to maintain that information accurately throughout the planning, design, and construction of the project. Information may include decisions and opportunities to weigh in on programming, design, sites selection, progress updates, and upcoming meetings. Avenues to get this information out might include Newspapers, Websites (run by the school, the city, or private groups), local television, flyers, local postings, community meetings, etc. Sanford Team Diagram:
3 Community Involvement Opportunities SANFORD SCHOOL PROJECT VOLUNTEER RESPONSE FORM Name Date Address Phone (H) Phone (W) Phone (cell) Age Group years of age years of age years of age 55+ years of age Volunteer Statement Briefly tell us why you feel you would be a good Advisor to the Core Building Committee and why you would like to volunteer. Group information (optional) Please list any Boards, Committees, or Groups that you are currently involved in. Examples include: PTA, Economic Development Council, City Committees, Senior Citizen or Youth Organizations, etc. Please tells us what Sanford Demographic(s) you feel you represent. Examples include: Parent of Current Student, Parent of Future Student, Current Student, Young Families, Alumni, Active Community Members, Citizens without kids in the school system, Extra-curricular Volunteers, Educators, Long-term Citizen, etc Availability (check all that apply) Mon Tues Weds Thurs Fri Sat Daytime Evenings Interest Areas (check all that apply) Overall / All Areas of the Project Public Awareness Committee Site Selection Exterior Building Character Site Planning School Security Interior Building Character Green Design (sustainability) Community Access Common Areas General Education Spaces Performing Arts Fine Arts Maths Special Education Technology Integration Sciences Humanities Special Education Library/Media Center Athletics / Physical Education / Health Staff and Faculty Areas Technical Center Programs Integration of High School and Technical Center Other: Submit completed form to: Sanford School Dept, 917 Main Street, Sanford ME, ATT: Core Building Committee Or to: BuildingCommittee@Sanford.org. The Core Building Committee anticipates that the City Council to appoint the Committees in April 2013
4 Overall Project Schedule Education Visioning New Versus Reno Site Selection Programming Conceptual Design Review & Approval Design, Engineer, & Document Bidding & Approval Construction Occupy Building Community Support & Involvement FMAM J J A S OND J FMAM J J A S OND J FMAM J J A SOND J FMAMJ J A SOND
5 12 Month Schedule February March April May 2013 June July August September October November December January February March Task Week New Versus Renovation Analysis Existing Site and Space Analysis Existing Educational Space and Program Analysis State and Client Review of New versus Reno Options Design Team Review of Reno Options State and Client Decision Critical Path Item Currently a State Led Process Site Selection Hire Civil to initiate Site Identification Identify all viable Sites Site Testing: Wetlands, survey, topography, etc Site Review by Design Team Site Review by DOT, DEP, DHS, ACOE, Local AHJs Site Selection State Site Approval Educational Specs & Programming Meetings with Key Groups Form Advisory Committee Meet with Community Groups Program Conference Review Finalize Begin Concept Design Design Charrettes Design Concept Review Review Concept Conference Finalize Currently a State Led Process 1 month Extended schedule may be required Public Hearing / Concept Approval Estimate Costs Review Refine Concept Finalize Approve State Concept Approval Local Referendum Marketing / Public Awareness Campaign Public Referendum Vote Community Support / Involvement Client / Committee Meetings Create Community Awareness Committee Civic / Local Board / Council Meetings Key Public / Community Presentations Critical Path Item
6 LAVALLEE BRENSINGER ARCHITECTS A Proven Partner With more than 36 years experience in education facility planning and design, Lavallee Brensinger Architects is uniquely qualified to meet the challenges of education projects of any size. Consistently our firm is chosen by school districts for the following reasons: Thought leader in regional education design and planning Over 300 successfully completed public school projects Committed to strong communities and lasting client relationships Specialized in planning new high schools and integrated career technical centers A Regional Design Firm with national training and projects throughout the northeast Award-winning school designs for less cost per square foot Believers that architecture, applied at the highest level empowers educators, energizes students, and builds communities These qualifications, combined with our reputation for creative design, technical excellence, and tireless client service, identify us as a leading educational design firm in the Northeast, and make us a clear choice as your best design partner. Lavallee Brensinger created a design for our school that is exactly reflective of the spirit, culture and tenor we were striving for. Our building has an energy, a life to it - you want to strive for greatness when you are in it. Beth Valentine, Past School Board Member Windham School District
7 LAVALLEE BRENSINGER ARCHITECTS Overall the facility is beautiful and the use of color is amazing! A space like this communicates to the kids and speaks to what we value in them. We think that this facility proves the Broken Window Theory. In a space like this that looks cared for, is well designed, and very nice, these kids feel valued more. Kim Carter, Making Community Connections Charter School
Q. What are we voting on? Q. How was the referendum developed?
Q. What are we voting on? A. On April 3rd, the voters of the Peshtigo School District will have the opportunity to vote on two referendum questions. The first question will approve $29,960,000 for the
More informationNovember 16, 2015 I. INTRODUCTION
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES FOR A NEEDS ASSESSMENT AND CONCEPTUAL DESIGN OF A NEW ANIMAL SHELTER FACILITY FOR THE CITY OF MARSHALL, TEXAS November 16, 2015 I. INTRODUCTION The
More informationREQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT
REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT DUE: May 4, 2018 4:00 P.M. Walla Walla Public Schools 364 S. Park Street Walla Walla, WA 99362 District Representative/Contact:
More informationREQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT
REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT The Town of Cromwell is seeking written responses to a Request
More informationREQUEST FOR PROPOSALS (RFP) AND STATEMENT OF QUALIFICATIONS
REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS Roseville Area Schools is soliciting Request for Proposals and Statement of Qualifications from interested firms for the implementation of architectural
More informationCITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY
CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 fx: (323) 771-9473 I. INTRODUCTION CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY
More informationREQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES
REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES The City of Waller, TX is requesting Statements of Qualifications from firms and individuals desiring to perform various space needs assessment,
More informationGalesburg Public Library, Galesburg, IL
Galesburg Public Library, Galesburg, IL Request for Qualifications ( RFQ ) Architectural, Engineering, Construction Management and Related Services I. OVERVIEW The Galesburg Public Library is seeking architectural,
More information2017 Multifamily Executive Awards
2017 Multifamily Executive Awards Eligibility Eligible submissions include projects that opened for occupancy between July 1, 2015, and Dec. 1, 2016, as well as activities and programs in progress during
More informationRequest for Proposals
Request for Proposals Big Bethel AME Church Campus Development Strategy October 21, 2013 Big Bethel AME Church 220 Auburn Avenue NE Atlanta, Georgia 30303 Introduction Big Bethel AME Church and Bethel
More informationRequest for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado
Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado PURPOSE The Clear Creek Board of County Commissioners
More informationLA COUNTY ARTS COMMISSION SEEKS ARTIST(S) TO CREATE PERMANENT INTERIOR ARTWORK FOR ZEV YAROSLAVSKY FAMILY SUPPORT CENTER
REQUEST FOR QUALIFICATIONS (RFQ) LA COUNTY ARTS COMMISSION SEEKS ARTIST(S) TO CREATE PERMANENT INTERIOR ARTWORK FOR ZEV YAROSLAVSKY FAMILY SUPPORT CENTER Fig. 1: Location for new artwork commission in
More informationCITY OF NEW ROCHELLE DEPARTMENT OF DEVELOPMENT
The City of New Rochelle has established a Signage, Awnings and Façade Program to help improve the aesthetic appearance of gateway commercial areas. Business and property owners can receive grants for
More informationRequest for Qualifications
Request for Qualifications Architectural & Engineering Services for HUTTON ELEMENTARY SCHOOL Modernization and Additions Project Submittal Deadline: August 24, 2012, 4:00 P.M. Spokane Public Schools 2815
More informationRequest for Proposals for Space Needs Analysis and Projected Building Program Aram Public Library City of Delavan, WI
Request for Proposals for Space Needs Analysis and Projected Building Program City of Delavan, WI Invitation to Submit Proposals The City of Delavan is seeking proposals from responsive and responsible
More informationREQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services
REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT
More informationTransmittal Letter. Via Hand Delivery. January 10, 2011
Transmittal Letter Via Hand Delivery January 10, 2011 Kathleen Diohep Project Manager Port of San Francisco Pier 1, The Embarcadero San Francisco, CA 94111 Re: Request for Developer Qualifications Pier
More informationREQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)
REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) Hinsdale County School District RE-1 PO Box 39 614 N. Silver St. Lake City, CO 81235 (970) 944-2314 PROPOSAL DUE DATE/DELIVERY REQUIREMENTS-
More informationREQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS
REQUEST FOR QUALIFICATIONS: RFQ 2018-100-1 PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS The City of Cedar Hill, Texas is soliciting statements of
More informationREQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project
REQUEST FOR QUALIFICATIONS General Contractor Construction Manager (GC/CM) Services Centralia High School Modernization Project Centralia High School 813 Eshom Rd Centralia, WA 98531 Submit Proposals to:
More information2016 Multifamily Executive Awards
2016 Multifamily Executive Awards Eligibility Eligible submissions include projects that opened for occupation between July 1, 2014, and Dec. 1, 2015, as well as activities and programs in progress during
More informationREQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, :00 P.M.
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, 2015 2:00 P.M. (CST) Specifications Prepared by: Design and Construction Department
More informationSchool Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year
School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year 2015-16 Prepared By: Internal Auditors April 12, 2016 Table of Contents Transmittal Letter... 1 Overview... 2-6
More informationREQUEST FOR QUALIFICATIONS. Design Professional Services
REQUEST FOR QUALIFICATIONS Design Professional Services Return Completed Qualifications To: Bonneville Joint School District No. 93 3497 North Ammon Road Idaho Falls, Idaho 83401 TO BE CONSIDERED, QUALIFICATIONS
More informationREQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington
REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design City of Fircrest Department of Parks and Recreation, Fircrest, Washington INVITATION The City of Fircrest seeks the services of a qualified
More informationThe Marion County Sheriff s Office
The Marion County Sheriff s Office Application Position: (Circle all that apply) Deputy Sheriff Dispatcher Auxiliary Deputy Other Part time Full Time MARION COUNTY SHERIFF S OFFICE EMPLOYMENT OR AUXILIARY
More informationREQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT UNIVERSITY OF CALIFORNIA, SAN DIEGO
REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE LANDSCAPE ARCHITECT FOR HOPKINS LANE BIKE & PEDESTRIAN IMPROVEMENT FD&C Project No. 4952 Proposals due THURSDAY, JUNE 4, 2015 Issue Date May 19, 2015 I.
More informationSeptember 5, 2018 FREQUENTLY ASKED QUESTIONS (FAQs) EPS REFERENDUM 18 VOTE, Tuesday, October 2, 2018
September 5, 2018 FREQUENTLY ASKED QUESTIONS (FAQs) EPS REFERENDUM 18 VOTE, Tuesday, October 2, 2018 On Tuesday, October 2 nd, The Ewing Public Schools will ask the community to vote on a $59.3 million
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G
REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ #14-002 ARCHITECTURAL SERVICES Bond Measure G The Solano Community College District ( District ) is requesting qualified persons, firms, partnerships,
More informationNovember 6 th REMEMBER TO TURN OVER THE BALLOT! DEAR COMMUNITY MEMBERS: QUESTION #1 QUESTION #2. IN this Newsletter: FACILITY NEEDS & SOLUTIONS
EDGERTON SCHOOL DISTRICT REFERENDUM NOVEMBER 6 DEAR COMMUNITY MEMBERS: On August 13, 2018, the School Board unanimously approved placing two referendum questions on the November 6 th ballot. Their decision
More informationREQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES
REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES Prepared by: Middleton-Cross Plains Area School District 7106 South Avenue Middleton, Wisconsin 53562 December 22, 2011 Request for
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES FOR THE RENOVATION OF VARIOUS PUBLIC HOUSING BUILDINGS THAT WILL BE CONVERTED TO NON-PROFIT OWNERSHIP Submittal Deadline Wednesday, October 31, 2012
More informationREQUEST FOR PROPOSALS TO DEVELOP CONCEPTUAL PLANS FOR CALDER PLAZA
REQUEST FOR PROPOSALS TO DEVELOP CONCEPTUAL PLANS FOR CALDER PLAZA Grand Rapids, MI PROJECT SUMMARY Downtown Grand Rapids Inc. (DGRI), in collaboration with the City of Grand Rapids (City) and Kent County
More informationLexington Center Corporation Request for Proposal for Convention Center Naming Rights Request for Proposals
Request for Proposal for Convention Center Naming Rights Request for Proposals Title: Naming Rights for the Lexington Center Corporation, New Convention Center, Lexington Kentucky Issue Date: December
More informationPROJECT DASHBOARD BUDGET SCHEDULE SCOPE COMMUNITY
PROJECT DASHBOARD Monthly Rating BUDGET SCHEDULE SCOPE COMMUNITY JAN APR 2017 MILESTONES Education Specifications School Program Finalized School Tours MAY 2017 TARGET MILESTONES Path to Net Zero GO/NO
More informationDepartment of Military Affairs. Construction Facility Management Office PROFESSIONAL QUALIFICATIONS SUPPLEMENT (PQS)
Construction Facility Management Office PROFESSIONAL QUALIFICATIONS SUPPLEMENT (PQS) PURPOSE: The Professional Qualifications Supplement (PQS),, is to provide information regarding the qualifications of
More informationBuffalo Main Streets Initiative Program Requirements
Community Action Organization of Erie County, Inc. Alphonso Rafi Greene, Jr. -Masten Resource Center 1423 Fillmore Avenue Buffalo, New York 14211 (716) 332-3773 Fax (716) 332-1015 Buffalo Main Streets
More informationUniversity of California, Merced Central Plant/Telecommunications Reliability Upgrade
REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR EXECUTIVE ENGINEERING SERVICES University of California, Merced Central Plant/Telecommunications Project # 900310 TABLE OF CONTENTS PROJECT INFORMATION: Advertisement
More informationMONROVIA PUBLIC LIBRARY STRATEGIC PLAN
REQUEST FOR PROPOSAL (RFP) RFP ISSUANCE DATE Wednesday, May 11, 2016 RFP RESPONSE DUE DATE Monday, June 6, 2016 @ 5:00 p.m. DIRECT QUESTIONS Tina Cherry, Public Services Director E-mail: tcherry@ci.monrovia.ca.us
More informationCentralia Downtown Association Facade Improvement Grant Program
Centralia Downtown Association Facade Improvement Grant Program 1 P age Centralia Downtown Association Facade Improvement Grant Program INTRODUCTION & INSTRUCTIONS The Downtown Facade Grant is offered
More informationBoulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects
4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural
More informationProject Report: Achieving Value for Money Charles Jago Northern Sport Centre
Project Report: Achieving Value for Money Charles Jago Northern Sport Centre March 2007 Table of Contents Purpose of this Document...........................................i Executive Summary...............................................1
More informationPUBLIC ART PROJECT DESCRIPTION
CALL TO ARTISTS CITY OF SOUTHLAKE, TEXAS PUBLIC ART PROJECT OPPORTUNITY PUBLIC ART FOR FRANK EDGAR CORNISH, IV PARK SOUTHLAKE, TX RFQUAL1512C520CT150027 ------------------------------------------------------------------------------------------------------------------------------
More informationDowntown Memphis Sign Code and Design Guidelines Update
Downtown Memphis Sign Code and Design Guidelines Update REQUEST FOR QUALIFICATIONS (RFQ) Release Date: Friday, March 18, 2011 Deadline for Submission: Thursday, April 14, 2011 at 2 pm. CST Inquiries regarding
More informationRequest for Qualifications
Request for Qualifications Architectural Technical Predesign Services Performing Arts Center Ellensburg, Washington 98926 Response Title: Architectural Technical Predesign Services for Central Washington
More informationHISTORIC ARCHITECTURE ASSISTANCE FUND
HISTORIC ARCHITECTURE ASSISTANCE FUND Policies The Historic Architecture Assistance Fund provides the service of architects to the owners of historic buildings to address issues involved with the rehabilitation
More informationDowntown Storefront Improvement Grant City of Olathe, Kansas
Downtown Storefront Improvement Grant City of Olathe, Kansas The City of Olathe is dedicated to preserving, protecting, and enhancing the businesses and services provided in the Downtown area. Downtown
More informationWashington Community Survey and Stakeholder Focus Group
Washington Community Survey and Stakeholder Focus Group 1 Agenda Themes Survey Methodology and Respondents Profile of Part-Time Residents Comparison of Full-Time Versus Part-Time Residents Demographics
More informationDistrict Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016
REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECT/ENGINEER (A/E) PROFESSIONAL SERVICES For the At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 PART 1 GENERAL INTRODUCTION
More informationMay 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES
May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Clemmons Branch Library II. Goal Forsyth County seeks an innovative design team to create a
More informationRequest for Qualifications PIKE ROAD VOLUNTEER FIRE PROTECTION AUTHORITY
PIKE ROAD VOLUNTEER FIRE PROTECTION AUTHORITY What: Request for Qualifications for Architectural Services Time: 10:00 A.M., Friday, August 3rd, 2018 Place: Fire Station 1 3427 Wallahatchie RD Pike Road,
More informationJefferson Parish Economic Development Commission
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL PLANNING SERVICES FOR THE PLANNING OF THE JEFFERSON PARISH ECONOMIC DEVELOPMENT COMMISSION OFFICES AND TECHNOLOGY INCUBATOR JANUARY 8, 2007 Owner: (JEDCO) Issued:
More informationRequest for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17
Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17 Introduction: This Request for Proposals (RFP) solicitation is to provide to
More informationDistrict of 100 Mile House. Business Façade Improvement Program Guidelines
District of 100 Mile House Business Façade Improvement Program Guidelines - 2014 Business Façade Improvement Program Guide 2014 District of 100 Mile House Façade Improvement Program Guidelines Program
More informationRequest for Qualifications for the Development and Execution of a Comprehensive Marketing Plan for the Temple Independent School District (TISD)
Request for Qualifications for the Development and Execution of a Comprehensive Marketing Plan for the Temple Independent School District (TISD) 1. Introduction Temple Independent School District (TISD)
More informationREQUEST FOR PROPOSAL Community-Wide Survey
REQUEST FOR PROPOSAL Community-Wide Survey Issue Date: March 25, 2016 Due Date: April 22, 2016 Project Contact: Susan Banks Communications Manager 847-810-3672 or bankss@cityoflakeforest.com The City of
More informationBackground Project Description
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND ARCHITECTURAL PROGRAMMING COMMONS MALL AND BOOKSTORE RENOVATION & ENHANCEMENT DPP Introduction The University of California, Riverside
More informationDelmar Public Library Capital Campaign Renovation and Building Project (302)
Capital Campaign Renovation and Building Project (302) 846-9894 http://www.delmarpubliclibrary.org CASE STATEMENT Revised March 2016 TABLE OF CONTENTS PROJECT SUMMARY...3 MISSION STATEMENT...3 HISTORY
More informationPROPERTY IMPROVEMENT PROGRAM
Hollywood, Florida Community Redevelopment Agency PROPERTY IMPROVEMENT PROGRAM (PIP) December 2011 PROPERTY IMPROVEMENT PROGRAM (PIP) GUIDELINES PROGRAM PURPOSE AND BENEFITS: City of Hollywood, Florida
More informationJanuary 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES
January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES I. Project Forsyth County Courthouse & Administrative Building II. Goal Forsyth County requests responses from licensed
More informationHistoric Courthouse Construction Planning and Historic Jail Reuse Study Project
HOUSTON COUNTY, MINNESOTA REQUEST FOR PROPOSALS FOR PROFESSIONAL SERVICES 1. Introduction A. Purpose Historic Courthouse Construction Planning and Historic Jail Reuse Study Project This Request for Proposals
More informationRequest for Proposal. And Specifications For. Professional Design Services for. The New School of Business Administration WSU Project No.
Division of Finance and Business Operations Request for Proposal And Specifications For Professional Design Services for The New School of Business Administration WSU Project No. 999-270806 No part of
More informationDISTRICT OF KITIMAT. Business Façade Improvement Program 2017
DISTRICT OF KITIMAT Business Façade Improvement Program 2017 Program Purpose and Goals The District of Kitimat, in collaboration with the Kitimat Chamber of Commerce, aims to enhance economic development
More informationREQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES
REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES Owner s Representative: 541 East Garden Drive, Unit S Windsor, Colorado 80550 970-686-5695
More informationIncheon International Design Fair 2007(Competition) - Announcement and Guidelines for Submissions from Abroad -
Incheon International Design Fair 2007(Competition) - Announcement and Guidelines for Submissions from Abroad - Incheon International Design Fair 2007(Competition) - Announcement and Guidelines for Submissions
More informationREQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is
More informationFlorissant Valley. Spring 2018 Final Exam Schedule. class start time between
Spring 2018 Final Exam Schedule Florissant Valley class start time between 7 7:50 a.m. MWF Monday, May 7 7 8:50 a.m. 7 7:50 a.m. TR Tuesday, May 8 7 8:50 a.m. 7 8:50 a.m. F Friday, May 11 7 8:50 a.m. 8
More informationSALADO INDEPENDENT SCHOOL DISTRICT
SALADO INDEPENDENT SCHOOL DISTRICT Request for Qualifications The Salado Independent School District ( District ) is seeking Submissions in response to this Request for Qualifications ( RFQ ) for architectural
More information2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1)
2018 CDBG Application Workshop Downtown Revitalization Program Joe Bohlke, Project Manager Iowa Economic Development Authority Joseph.Bohlke@iowaeda.com 725-3011 Ed Basch, Project Manager Iowa Economic
More informationExecutive Summary. Account Name FY 11 Actual FY 12 Actual FY13 Actual FY 14 Voted FY 15 Requested FY 15 Voted
Executive Summary Account Name FY 11 Actual FY 12 Actual FY13 Actual FY 14 Voted FY 15 Requested FY 15 Voted Dollar Change (FY 14 to FY 15) Change % Insurance and Benefits MA Early Retirement Incentive
More informationOxford Downtown Development Authority Façade Grant Improvement Program
Oxford Downtown Development Authority Façade Grant Improvement Program The grant program has been developed to encourage property and business owners to improve the appearance of Oxford s commercial and
More informationFacade Improvement Application
Facade Improvement Application The Wilkinsburg Community Development Corporation (WCDC) is pleased to have funding available for façade improvements of commercial buildings. Applicants within Wilkinsburg
More informationBelmar Business Partnership Inc.
Belmar Business Partnership Inc. Business Development Committee New Business Fit Out Grant Program 2017 Encouragement for new retail and food businesses to locate in Belmar and expanding or relocating
More informationMorgan Hill Unified School District
Facilities Department 15600 Concord Circle, Morgan Hill, CA 95037 Phone: (408) 201-6087 Fax (408) 776-0175 REQUEST FOR ARCHITECTURAL SERVICES PROPOSALS for a New Britton MS Campus and Site Master Plan
More informationCal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC
Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is
More informationCity of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center
City of Provo, Utah Parks and Recreation Department Request for Proposal (RFP) Architectural Services for a New Community Recreation Center RFP No. 14065 I. GENERAL OVERVIEW AND DESCRIPTION OF PROJECT
More informationRevised January 6, The Park Master Planning Process
Revised January 6, 2004 Resolution (2003) 735 A RESOLUTION TO REVISE THE PROCESS FOR APPROVAL OF MASTER PLANS FOR PARK AND RELATED PROJECTS PURPOSE: To develop a total program for a park which will best
More informationWeatherford General Plan Quality of Life. Photo credit: Lance Winter, Weatherford Star-Telegram 10. QUALITY OF LIFE 10-1
Weatherford General Plan Quality of Life Photo credit: Lance Winter, Weatherford Star-Telegram 10. QUALITY OF LIFE 10-1 CHAPTER 10: QUALITY OF LIFE ELEMENT I N T R O D U C T I O N TO QUALITY OF LIFE People
More information2015 OFFICIAL RULES AND CATEGORIES
2015 OFFICIAL RULES AND CATEGORIES Deadline for submissions is February 15, 2015. $295 per entry. Winners to be selected by a jury of student housing industry executives and announced in special SHB Awards
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name BGSU Ice Arena Space Study Response Deadline
More informationOCEAN BREEZE GOLF COURSE ARCHITECT REQUEST FOR PROPOSAL AND RESPONSES TO RFI S
OCEAN BREEZE GOLF COURSE ARCHITECT REQUEST FOR PROPOSAL AND RESPONSES TO RFI S 1. We have received the RFI link and 7-page document outlining the project. Is there additional information to receive? There
More informationnow 22% INCREASE IN THE LAST 15 YEARS VOTE NOVEMBER 7, 2017 OUR Ki DS. OUR COMMUNiTY. future is DISTRICT-WIDE GROWTH
REFERENDUM 2017 LONG-TERM, DISTRICT-WIDE, FACILITY SOLUTION OUr future is now VOTE NOVEMBER 7, 2017 OUR Ki DS. OUR COMMUNiTY. DISTRICT-WIDE GROWTH #STUDENTS 3600 3500 3400 3300 3,353 3200 14/15 15/16 16/17
More informationCUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT
CUYAHOGA COMMUNITY COLLEGE CAPITAL AND CONSTRUCTION DEPARTMENT REQUEST FOR QUALIFICATIONS FOR PROJECT MANAGEMENT SERVICES COLLEGE-WIDE PROJECT NUMBER C20171130 BACKGROUND College Mission to provide high
More informationOur report to the community
Our report to the community At American General, our goal of helping people live the lives they ve imagined doesn t stop at the end of the workday, or at the workplace. For the thousands of caring and
More informationFOUNDING DIRECTOR POSITION PROFILE. Institute for Health and Wellness
Institute for Health and Wellness FOUNDING DIRECTOR POSITION PROFILE Monmouth University invites nominations and applications for the position of founding Director for the Institute for Health and Wellness
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS PRE-DEVELOPMENT MANAGEMENT SERVICES THE STITCH: CAPPING THE I-75/85 CONNECTOR DOWNTOWN ATLANTA Introduction Central Atlanta Progress, Inc. (CAP) and the Atlanta Downtown Improvement
More informationREQUEST FOR QUALIFICATIONS
FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / FPC110 TAMPA, FL 33620-7550 EDITION: NOVEMBER 5, 2015 PHONE: (813) 974-0843 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS FOR ARCHITECT/ENGINEER SERVICES
More informationREQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT
REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT For the TORREY PINES CENTER SOUTH (TPCS) FACILITY UNIVERSITY OF CALIFORNIA, SAN DIEGO OFFICES OF FACILITIES DESIGN & CONSTRUCTION Issue
More informationMandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)
Request for Proposal for Construction Management (CM) Services for the Shelburne Community Center and Public Library Shelburne, Vermont. Request for Proposal Issued: Friday, Mandatory Site Visit: Thursday,
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced
REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:
More informationThe Williams African American Business Resource Group of Williams Seeks Applications for the Cuba Wadlington, Jr. and Michael P. Johnson Scholarship
The Williams African American Business Resource Group of Williams Seeks Applications for the Cuba Wadlington, Jr. and Michael P. Johnson Scholarship The Williams African American Business Resource Group
More informationREQUEST FOR PROPOSALS FOR. ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus
REQUEST FOR PROPOSALS FOR ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus RFP Issue Date: October 2, 2017 RFP Due Date: October 27, 2017 I. Introduction The San Francisco
More informationAUTHORITY: Sections (3)(p), , F. S. Rules 6C , 6C , and 6C , F.A.C.
July 2003 MEMORANDUM UCF-06.03-07/03 TO: Members, Council of Presidents FROM: SUBJECT: Architect/Engineer Selection Process AUTHORITY: Sections 240.209(3)(p), 287.055, F. S. Rules 6C-14.004, 6C-14.005,
More informationREQUEST FOR QUALIFICATIONS AND PROPOSALS
REQUEST FOR QUALIFICATIONS AND PROPOSALS FOR CONTRACT MANAGEMENT SERVICES associated with the Downtown Gastonia Conference Center and Multi-Level Parking Deck in Gastonia, North Carolina February 18, 2015
More informationREQUEST FOR QUALIFICATIONS MASTER ARCHITECT CAMPUS GATEWAY COMPLEX UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No. 5148
REQUEST FOR QUALIFICATIONS MASTER ARCHITECT FOR DESIGN/BUILD PROGRAMMING FOR THE CAMPUS GATEWAY COMPLEX CPM Project No. 5148 Proposals due TUESDAY, JULY 25, 2017 Issue Date July 10, 2017 I. INTRODUCTION
More informationCITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project
CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS RFP 78-18 Peirce Island Pool House Design Project Sealed Requests for Proposals, plainly marked RFP# 78-18 Construction Drawings and Bid Documents for
More informationREQUEST FOR PROPOSAL #B STRATEGIC PLANNING STUDY OF BERLIN ELEMENTARY SCHOOLS
REQUEST FOR PROPOSAL #B2018-1 STRATEGIC PLANNING STUDY OF BERLIN ELEMENTARY SCHOOLS Town of Berlin Berlin Public Schools Ms. Eva Gallupe Director of Business Operations 238 Kensington Road Berlin, Connecticut
More informationGreen Building Incentive Program Guidelines & Procedures
Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,
More informationRequest for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project
Request for Qualifications No. 7-1718 Architectural & Engineering Services for LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Submittal Deadline: November 10, 2017, 2:00 P.M. Spokane Public Schools
More informationANDREW BROWN PARKS EAST AND WEST REDEVELOPMENT
REQUEST FOR QUALIFICATIONS PROFESSIONAL SERVICES CONTRACT INSTRUCTIONS SPECIFICATIONS BID SHEET(S) FOR ANDREW BROWN PARKS EAST AND WEST REDEVELOPMENT PER THE CITY OF COPPELL SPECIFICATIONS AT THE CITY
More information