OBLIGATIONS OF THE GRANTEES AND NSF PROCEDURES. Gowry Moorthy Research Division
|
|
- Meryl Simon
- 5 years ago
- Views:
Transcription
1 OBLIGATIONS OF THE GRANTEES AND NSF PROCEDURES Gowry Moorthy Research Division 31 st August 2016
2 Once the Grant is awarded & the Contractual Agreement signed Obligations of the Grantee Obligations of the Grantees Operate the grant in accordance with the rules & regulations of the funding agency Read the documents (Contractual Agreement and conditions given in the Annexures) and familiarize with the rules & regulations
3
4 Fund transfer will commence on signing of the contractual agreement Installment basis (half yearly) 1st installment - Equipment, Consumables Personnel, Lab. services, Travel, Miscellaneous Reimbursement of Postgraduate Registration fee ** Procedures for disbursement of funds Disbursement of Funds
5 Reporting Progress Reporting progress, is an important activity of grant/project management is the responsibility of the Principal Investigator (PI) as well as Co-Investigators (CoIs) Reports: Progress reports Financial reports Final report
6 Reporting progress cont The Investigator should give due consideration to this important component of the project, much in advance, at project formulation stage itself. Thus the time-based work plan (Gantt Chart) and the Key Performance Indicators are essential parts of the project proposal.
7 Reporting progress cont Gantt chart: Activity Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Activity 1 Planned Progress Activity 2 Planned Progress Activity 3 Planned Progress Activity 4 Planned Progress Activity 5 Planned Progress
8 Responsible Reporting Timely submission of reports According to the Format Actual facts to be presented Problems encountered/ envisioned Accurate financial figures
9 Progress Reporting: NSF Procedures Progress reports should be submitted biannually (on or before 15th of June & 15th of December of the year) irrespective of the date of commencement of the project. according to the NSF format Signed by all the Investigators through the Head of the Department of the PI ** Progress report format
10 Progress Reporting: NSF Procedures cont Progress reports should provide following information Administrative details of the project Objectives and objectives achieved to date Description of research carried out during the period Results/outputs Gantt chart for work done Brief work plan for next 6 months Expenditure for the period/utilization of funds Problems/deviations, if any
11 Final Reporting: NSF Procedures Comprehensive Final Report should be submitted within 3 months of the completion of the project period two bound hard copies along with a soft copy according to the format given signed by all the Investigators through the Head of the Institution of PI copies of published papers should be submitted Copy of the thesis of RS Follow up of Research Outputs of the projects ** Final report format
12 Final Reporting: NSF Procedures cont Final report should provide following information Administrative details of the project Executive summary Detailed report (background, objectives, method, results, discussion, conclusion) Research Outputs Publications/communications Equipment purchased Summary statement of expenditure
13 Financial Reporting: NSF Procedures Financial monitoring: Done through biannual and final financial reports Interim financial statements - along with the progress report (every 6 months) Final financial statement - within 30 days Balance funds should be returned to the NSF Expenditure - within the approved amount in each vote Transfers within votes - NSF approval ** Financial report format
14 Common mistakes in progress reporting/ submitting final reports Not according to the format Not providing adequate information for reviewing progress of the project/success of the project Poor quality images/diagrams Not sending through proper channels Not signed by all the Investigators Not informing deviations, if any Not submitting soft copy of the FR Not submitting bound copies of FR
15 Evaluation of Progress/Final Reports All the progress/final reports are evaluated by an independent Reviewer Collective recommendation will be taken by the Working Committee Members of the NSF Progress Review seminars and field visits to project sites are organized by the NSF to assess the progress Constructive comments/suggestions are made by the Reviewers and the Committee Members for improvement of the project
16 Evaluation of Progress/Final Reports cont. Based on the Reviewer's report and views of the Committee Members final report will be accepted and graded/revised and then graded Acceptance letter will be sent
17 Rewards NSF Research Awards Final Reports accepted with Very Good and Good ratings are considered for the awards
18 Problems faced on monitoring grants Audit queries on progress and financial monitoring No proper planning of the project and budget (extensions and fund transfers) Successful completion of the project NSF answerable to the Treasury on outputs/ outcomes of the project and impact on socioeconomic development
19 THANK YOU
JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)
AND CORRESPONDING DATES FOR JANUARY AND FEBRUARY 2018 JANUARY 2018 ( work days) Deadline* 12-27 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 Benefit Hold ** 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 1-11 Mailing
More informationEnlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):
Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune
More informationCorporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationBOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS
BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BE IT RESOLVED, by the Mayor and Borough Council of the Borough of Roselle,
More informationThe Toyota Foundation 2018 International Grant Program Application Form
The Toyota Foundation 2018 International Grant Program Application Form Notes: Please be sure to read the Program Guidelines before filling out this form. DO NOT alter the size of the text boxes. Altered
More informationPeraproposal for EWG Task
Peraproposal for EWG Task Attracting Hi Growth SMEs to National Programmes Andy Jones, Pera July 2014 Contents 1. Proposal to Taftie EWG 2. Hypothesis to research 3. Stakeholder benefits 4. Draft project
More informationCompliance Division Staff Report
Compliance Division Staff Report Polygraph Advisory Board Meeting Tuesday, September 26, 2017 Public Outreach Compliance Division routinely attends annual industry meetings held by TALEPI (Texas Association
More informationSTATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018
STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018 Main Findings March 2018: Critical Care Beds There were 4,064 adult critical care beds available
More informationSFI Research Centres Reporting Requirements
SFI Research Centres Reporting Requirements December 2017 Introduction SFI s Agenda 2020 1 strategy aims to position Ireland as a global knowledge leader. A key objective of Agenda 2020 is to develop a
More informationUNIVERSITY OF DAYTON DAYTON OH ACADEMIC CALENDAR FALL Incoming First Year students move into UD Housing
UNIVERSITY OF DAYTON DAYTON OH 2018-2019 ACADEMIC CALENDAR FALL 2018 Mon. Aug 6 TBD Thu, Aug 16 Fri, Aug 17 Sat, Aug 18-21 Sun, Aug 19 Tue, Aug 21 Tue, Aug 21 Wed, Aug 22 Tue, Aug 28 Mon, Sep 3 Fri, Sep
More informationQuality Management Report 2017 Q2
Quality Management Report 2017 Q2 Quality Management Program CMS STAR Ratings Member Satisfaction (CAHPS & HOS) HEDIS Risk Adjustment DHS Member Incident Reporting Member Satisfaction Surveys Pay for Performance
More informationSFI Research Centres Reporting Requirements
SFI Research Centres Reporting Requirements February 2017 Introduction SFI s Agenda 2020 1 strategy aims to position Ireland as a global knowledge leader. A key objective of Agenda 2020 is to develop a
More informationLoyola University Chicago ~ Archives and Special Collections
UA1980.04-.16, 1980.18-.23 Treasurer s Office Records - Ledgers Dates: 1904-1969 Creator: Loyola University (1870-) Extent: 124 volumes Level of description: Item Processor & date: John L. Daniels, June
More informationOverview of a new study to assess the impact of hospice led interventions on acute use. Jonathan Ellis, Director of Policy & Advocacy
Overview of a new study to assess the impact of hospice led interventions on acute use Jonathan Ellis, Director of Policy & Advocacy The problem Almost 600,000 people die each year Half will die in a hospital
More informationEmbedded Physician-Scholar Program
Page 1 James R. & Helen D. Russell Institute for Research & Innovation Advocate Lutheran General Hospital Embedded Physician-Scholar Program Purpose of the program is to: Strengthen and expand the hospital
More informationChange Management at Orbost Regional Health
Change Management at Orbost Regional Health Our change management journey 1 Medication Change System Meds at Beds 2 The slightly exaggerated before process 3 Project Goals The purpose of the Meds at Beds
More informationYear. Figure 5.2
3 1997 2 1998 1 Time (Year) 1999 2 1 21 2 22 3 23 14E 16E 18 16W 14W 12W 1W 8W Figure 5.1 Copyright 211 John Wiley & Sons, Inc. 4 3 Niño 3 Index Niño 4 Index 2 Deg C 1 1 2 3 195 1955 196 1965 197 1975
More informationALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results
ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results Fall 1 Section D Data Presentation Site NC3: Hwy :3 Lazy S -15 -.5.5 15 LEGEND Initial 1 Sep 1 Sep -75-37.5 37.5
More informationGETTING FUNDED Writing a Successful Grant Proposal
GETTING FUNDED Writing a Successful Grant Proposal Department of Otolaryngology Grand Rounds Toronto General Hospital April 22, 2016 Della Saunders, MSc, PhD Research Projects & Program Development Manager
More informationSCIENCE ADVISORY COMMITTEE TERMS OF REFERENCE
SCIENCE ADVISORY COMMITTEE TERMS OF REFERENCE FINAL Version 30 April 2012 Updates: 15 June 2012 29 July 2013 22 Aug 2013 20 Sep 2013 Marine Planning Partnership for the North Pacific Coast SCIENCE ADVISORY
More informationPatient Safety in Ambulatory Care: Why Reporting Counts. August 11, 2010 Diane Schultz, RPh and Sheila Yates, MPH
Patient Safety in Ambulatory Care: Why Reporting Counts August 11, 2010 Diane Schultz, RPh and Sheila Yates, MPH Group Health Group Health provides medical coverage and care to more than 628,000 residents
More informationCatalog. Community and Societal Pediatrics - Jacksonville. Prerequisites. Course Description. Course Faculty and Staff
2018-2019 Catalog Community and Societal Pediatrics - Jacksonville PED E 31J 4th Year Elective Pediatrics Clinical Science Prerequisites 4th Year Elective Course Description This rotation allows the medical
More informationIntergovernmental Working Group of Experts on International Standards of Accounting and Reporting (ISAR) Sustainability Reporting
Intergovernmental Working Group of Experts on International Standards of Accounting and Reporting (ISAR) 29th SESSION 31 October 2 November 2012 Room XIX, Palais des Nations, Geneva Friday, 2 November
More informationColorado Medical-Dental Integration Project (CO MDI)
Colorado Medical-Dental Integration Project (CO MDI) Allison Cusick, MPA, CHES National Oral Health Conference April 2016 Colorado Medical-Dental Integration CO MDI Five-Year Initiative Launched in 2014
More informationNational Trends Winter 2016
National Trends Winter 216 About the National Trends data This report presents a unique and real-time view of trends within temporary nursing including bank and agency usage. The data used has been drawn
More informationOperational Excellence: Lean
Operational Excellence: Better Service By Working Smarter Lean Lean is a production practice that considers the expenditure of resources for any goal other than the creation of value for the end customer
More informationCHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.
PPC1: ACCESS AND COMMUNICATION Element B: Access and Communication Results Item 1: Visits with assigned PCP Continuity data is reviewed each month at our Office Redesign Committee (ORDC). The data is collected
More informationWhat happened before MMC?
Modernising Medical Careers: Foundation Programme Application Process Dr (Insert Name) (insert title) What happened before MMC? PRHO (F1) and SHO (F2) Applications all year round Multiple applications
More informationReference Number: Form ALCRG APPLICATION FOR A MUHD ARIFF AHMAD RESEARCH GRANT FORM (ALCRG1) First Request for Proposals: 15 Dec 2014
APPLICATION FOR A MUHD ARIFF AHMAD RESEARCH GRANT FORM (ALCRG1) First Request for Proposals: 15 Dec 2014 Closing Date: 15 Feb 2015 Note: This application form (ALCRG1) should be submitted together with
More informationGrant Reporting for Faculty Grant Expense Detail
Grant Reporting for Faculty Grant Expense Detail This report provides line item detail expenses for a user-specified Sponsored Program. The report allows faculty and department administrators to more easily
More informationVPAC Productions. Managing the Venice Performing Arts Center. Maximizing cultural and educational return on investment
VPAC Productions Managing the Venice Performing Arts Center Maximizing cultural and educational return on investment 4/10/15 VPAC Joint Management Advisory Board 1 Serving several segments of our community
More informationKentucky Sepsis Summit. August 2016
1 Kentucky Sepsis Summit August 2016 St. Elizabeth Healthcare About Us: - 7 facilities & over 1200 licensed beds - Serving the NKY/Cincinnati Region in: - Orthopedic Care - Heart and Vascular Institute
More informationTina Nelson, MBA, BSN Lisa Stepp, BSN, RN Rebecca Fyffe, BSN, RN Jessica Coughenour, LPN
Establishing a Conservative Approach to the Prevention of Pressure Ulcers with the Utilization of Data Analytics to Monitor Effectiveness of Quality Efforts and Best Practice Models Tina Nelson, MBA, BSN
More informationNorthern Health - Acute Services. Evidence Based Practice Venous Thromboembolism Prevention
Northern Health - Acute Services Evidence Based Practice Venous Thromboembolism Prevention (VTE) Jeannette Kamar Christine Lamotte, Liam Carter Improving Patient Safety Preventing and Managing Venous Thromboembolism
More informationBelmont University Academic Year
Belmont University Academic Year 208 209 FALL SEMESTER 208 Jul 208 ~ August 208 ~ Sep 208 4 New Faculty Orientation 2 New Faculty Orientation 3 New Faculty Orientation 5 6 7 Last Day of Classes for Full
More informationCase Study BACKGROUND. Recovering Ambulance Linen. Larry J Haddad, CLLM Textile Management Consultant. Midwest Region
Title: Facility: Author: Recovering Ambulance Linen Midwest Region Larry J Haddad, CLLM Textile Management Consultant Midwest Region BACKGROUND A 294-bed, not-for-profit community hospital in the Midwest
More informationWorkflow. Optimisation. hereweare.org.uk. hereweare.org.uk
Workflow Optimisation Dr. Paul Deffley & Jaivir Pall Clinical Lead & Commercial Lead About Here Not-for-profit social enterprise Membership organisation (our members are local GPs, Practice Managers, Practice
More informationOregon Community Development Block Grant Program 2018 Annual Action Development September 22, 2017
Oregon Community Development Block Grant Program 2018 Annual Action Development September 22, 2017 Becky Baxter and Fumi Schaadt Program Policy Coordinator Economic Development Division Updates Topic of
More informationEnsuring Patient Safety and Quality Measures for RRT in AKI 2. Eileen Lischer MA, BSN, RN, CNN University of California, San Diego
Ensuring Patient Safety and Quality Measures for RRT in AKI 2 Eileen Lischer MA, BSN, RN, CNN University of California, San Diego Today we may be doing what we can, but tomorrow we can improve Hughes,
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, August 2016
Report Contents: PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, August By: Terry Dentoni, MSN, RN, CNL, SFGH Chief Nursing Officer 1. Professional Nursing..1 2. Emergency Department
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, November 2017
Report Contents: PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, November By: Terry Dentoni, MSN, RN, CNL - ZSFG Chief Nursing Officer 1. Professional Nursing.....1 2. Emergency
More informationMaternity and Family Education
2014 Maternity and Family Education Phone: 980-487-3983 email: crmcmaternityandfamilyeducation@carolinashealthcare.org 1 2 Maternity and Family Education Programs When it comes to having a baby, you can
More information1. November RN VACANCY RATE: Overall 2320 RN vacancy rate for areas reported is 12.5%
PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, December 2013 Terry Dentoni, RN, MSN, CNL, Interim Chief Nursing Officer 1. November 2013-2320 RN VACANCY RATE: Overall 2320 RN
More informationPERFORMANCE MANAGEMENT MEETING. Health Department:
PERFORMANCE MANAGEMENT MEETING Health Department: 5.20.14 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr EXHIBIT 1: Health Service Request Volume Month
More informationEgypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014
84 Million $ Estimated Cost US$ Selection Method ToR Request for Expressions of Interest Short List Conclude RfP Wb No-objection to RfP Invitation to submit proposals Proposals due date losure Authorized
More informationPROJECTS. FOR THE MONTHS OF October-November 2017
PROJECTS FOR THE MONTHS OF October-November 2017 Foundation Marketing 2017 Foundation Websites - Web Usage Report (Jan - Oct 2017) * ** ** ** Column R Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
More informationAvoiding the Cap Trap What Every Hospice Needs to Know. Matthew Gordon, CPA Principal Consultant / Founder Cap Doctor Associates, Inc.
Avoiding the Cap Trap What Every Hospice Needs to Know Matthew Gordon, CPA Principal Consultant / Founder Cap Doctor Associates, Inc. Overview 11% of hospices exceeded the cap in 2012 with an average overage
More informationEmergency Department Waiting Times
Publication Report Emergency Department Waiting Times (formerly Accident & Emergency Waiting Times) Quarter ending 30 June 2011 Publication date 30 August 2011 A National Statistics Publication for Scotland
More informationWelcome and Introductions
Fiscal Matters: An Overview of Annual Head Start and Early Head Start Grant Requirements U.S. Department of Health and Human Services, Welcome and Introductions Staff Grantee Representatives 1 Goals for
More informationImproving the Chemotherapy Appointment Experience at the BC Cancer Agency
Improving the Chemotherapy Appointment Experience at the BC Cancer Agency Ruben Aristizabal Martin Puterman Pablo Santibáñez Kevin Huang Vincent Chow www.orincancercare.org/cihrteam Acknowledgements BC
More informationSPSP Medicines. Prepared by: NHS Ayrshire and Arran
SPSP Medicines Prepared by: NHS Ayrshire and Arran Medication Reconciliation: Story so far MR happening in primary care, acute adult, paediatrics and mental health Started in acute then mental health,
More informationNSL LINCOLNSHIRE HEALTHWATCH PRESENTATION Ambulance NHS Trust Provision of Non- Emergency Patient Transport
NSL LINCOLNSHIRE HEALTHWATCH PRESENTATION Ambulance NHS Trust Provision of Non- Emergency Patient Transport Agenda An introduction to NSL Lincolnshire Contractual Service KPI s & Current Performance Eligibility
More informationDIME-GAFSP First Quarterly Progress Report
DIME-GAFSP First Quarterly Progress Report Feburary 24, 2012 The World Bank s Development Impact Evaluation Initiative (DIME) has been contracted to lead in-depth impact evaluations on a subset of GAFSP
More informationPatient Experience: Good to Great!
Patient Experience: Good to Great! April, 2016 Angela Kramer & Nancy Burden FSASC Quality & Risk Management Conference April 2016 Renaissance Orlando at SeaWorld OBJECTIVES Upon completion of this presentation
More informationIntroduction SightFirst Program Goals
LIONS CLUBS INTERNATIONAL FOUNDATION SIGHTFIRST GRANT APPLICATION Introduction The mission of the Lions Clubs International Foundation s SightFirst program is to build eye care systems to fight blindness
More informationLeveraging the Accountable Care Unit Model to create a culture of Shared Accountability
Leveraging the Accountable Care Unit Model to create a culture of Shared Accountability How we improved Patient Safety and Quality Outcomes at Northwest Hospital Our Journey to Shared Accountability Implementation
More informationTraining Schedule for 2017/2018 CERTIFIED COURSES
S I N G A P O R E Q U A L I T Y I N S T I T U T E Website: www.sqi.org.sg / Email: enquiries@sqi.org.sg Training Schedule for 2017/2018 CERTIFIED COURSES Course Day / Hour Commencement Date (Inclusive
More informationElaine Andrews, Assistant Director of Nursing & Safety and Caroline Booton Quality Analyst Jill Asbury, Acting Director of Nursing
Report to: Board of Directors Date of Meeting: 26 th October 2016 Report Title: Inpatient Falls Report Status: Mark relevant box with X Prepared by: Executive Sponsor (presenting): For information x Discussion
More informationPSYCHIATRY SERVICES UPDATE
PSYCHIATRY SERVICES UPDATE Mark Leary MD, Interim Chief Kathy Ballou RN, Director of Nursing Anton Nigusse Bland MD, PES Medical Director Emily Lee MD, Inpatient Psychiatry Medical Director TRUE NORTH
More informationNational Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism
National Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism DHS Standards Program Review August 29, 2006 Name - DA Schauer
More informationCollaboration Between Radiology and Utilization Management to Reduce Inappropriate MRI Orders and Patient Wait Times. Problem/Goal
Collaboration Between Radiology and Utilization Management to Reduce Inappropriate MRI Orders and Patient Wait Times A. Chang, C. Hyun, N. Mehta, S. Kim, M. Grube, M. Blair, A. Yi VA Loma Linda Healthcare
More informationUser Group Meeting. December 2, 2011
User Group Meeting December 2, 2011 1 Agenda 12:00 Welcome Christine Lavoie 12:05 Session Objectives Christine Lavoie 12:10 USC s Research Administration System Christine Lavoie 12:20 Project Overview
More informationCLMV Project Supporting Equitable Economic Development in ASEAN
Research and Capacity Building Program in Cambodia, Lao PDR, Myanmar, Viet Nam CLMV Project Supporting Equitable Economic Development in ASEAN The views expressed in this presentation are the views of
More informationPROJECTS. FOR THE MONTHS OF December 2017 and January 2018
PROJECTS FOR THE MONTHS OF December 2017 and January 2018 Foundation Marketing 2017 Foundation Websites - Web Usage Report (Jan - Dec 2017) * ** ** ** Column R Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
More informationCAUTI Reduction A Clinton Memorial Presentation
CAUTI Reduction 2016 A Clinton Memorial Presentation Clinton Memorial Statistics Rurally situated in a primarily agricultural community with a population of 42,000 The hospital is licensed for 165 beds
More informationHPV Vaccination Quality Improvement: Physician Perspective
HPV Vaccination Quality Improvement: Physician Perspective Discussion of efforts to raise HPV vaccine coverage using quality improvement from a physician s perspective Alix Casler, M.D., F.A.A.P. Chief
More informationThe New Clinical Research Landscape Incentives, Opportunities and Support Offered by the NIHR
The New Clinical Research Landscape Incentives, Opportunities and Support Offered by the NIHR 1 September 2011 Dr Jonathan Gower Assistant Director CCRN The National Institute of Health Research - A real
More informationWater Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program. City of Dallas Water Utilities February 13, 2012
Water Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program City of Dallas Water Utilities February 13, 2012 Briefing Purpose To provide background on implementation of additional
More informationAttachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT
Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT PURPOSE Overview The Maryland Environmental Service ( MES ) and the Board of County Commissioners of Washington County, Maryland
More informationHospitals and the Economy. Anne McLeod Vice President, Finance Policy California Hospital Association
Anne McLeod Vice President, Finance Policy California Hospital Association American hospitals are financially challenged and the trends in revenues and expenses will put and even greater burden on the
More informationSmithsonian Institution
Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific
More informationInfluence of Patient Flow on Quality Care
Influence of Patient Flow on Quality Care Patients Waiting on Trolleys for an Inpatient Bed Patients who are Medically Fit to be discharged and cared for at Home with Support or in a Nursing Home or District
More informationOhioHealth s Mission: To Improve the Health of Those We Serve
Enhancing SAFE SKIN Through Computer Utilization OhioHealth s Mission: To Improve the Health of Those We Serve 2 1 3 Grant Medical Center 21,000 patient discharges/year Average daily census of 260 Magnet
More informationOPTIMUM/12/2016 CORPORATE RATE PROGRAMME O PTIMUM. BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES. by langham
OPTIMUM/12/2016 O PTIMUM by langham CORPORATE RATE PROGRAMME BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES JOIN LANGHAM S OPTIMUM PROGRAMME TO ENJOY YEAR ROUND PRIVILEGES AT OUR PORTFOLIO WORLDWIDE.
More informationA Multi-Pronged Approach to Improve Provider Satisfaction
A Multi-Pronged Approach to Improve Provider Satisfaction Session 149, March 7, 2018 1-2 p.m. Thomas Selva, MD, CMIO, MU Health Care Bryan Bliven, CIO, MU Health Care 1 Conflict of Interest Thomas Selva,
More informationSUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 January Q. New Year s Day Holiday CTC Term 3 On-Site College Classes Begins
JANUARY 2014 KEY DANTES DATES FOR USEUCOM 1 January Q 2 Q 3 Q 4 Q Term 3 [2013-2014] Classes Begins New Year s Day CTC Term 3 On-Site UO Term 3 On-Site 5 Q closes today. Mail, fax or scan quarterly inventories.
More informationApproaches to reducing DNA and CNA
Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance Approaches to reducing DNA and CNA Lesley White, National Improvement Advisor, QuEST Mike Henderson, Consultant
More information1. March RN VACANCY RATE: Overall 2320 RN vacancy rate for areas reported is 13.8%
PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, April 2014 Terry Dentoni, RN, MSN, CNL, Interim Chief Nursing Officer 1. March 2014-2320 RN VACANCY RATE: Overall 2320 RN vacancy
More informationTraining Schedule for 2017/2018 CERTIFIED COURSES
S I N G A P O R E Q U A L I T Y I N S T I T U T E Website: www.sqi.org.sg / Email: enquiries@sqi.org.sg Training Schedule for 2017/2018 CERTIFIED COURSES Course Day / Hour Commencement Date MEMBER FEE
More informationGRANTS.GOV Updates Federal Demonstration Partnership Meeting. Presented by Grants.gov September 7, 2017
GRANTS.GOV Updates Federal Demonstration Partnership Meeting Presented by Grants.gov September 7, 2017 RELEASE UPDATE 09/06/2017 GRANTS.GOV Updates Federal Demonstration Partnership JAD Meeting Slide 2
More informationNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA ADMINISTRATIVE ORDER SERIES TABLE OF CONTENTS. as of December 8, 2008
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA ADMINISTRATIVE ORDER SERIES TABLE OF CONTENTS as of December 8, 2008 Attached is a revision to the Table of Contents for the NOAA Administrative Order
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, February 2013 Terry Dentoni, RN, MSN, CNL, Interim Chief Nursing Officer
PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, February 2013 Terry Dentoni, RN, MSN, CNL, Interim Chief Nursing Officer 1. 2320 RN Vacancy Rates for the Month of January 2013
More information2017 HIMSS DAVIES APPLICANT
2017 HIMSS DAVIES APPLICANT Introduction of NOMS Team Members Melissa Thomas IT Project Director Joshua Frederick, CPA, MT Chief Executive Officer Jennifer Hohman, MD Executive Vice President, NOMS Healthcare
More informationService Transformation Report. Resource and Performance
SUMMARY REPORT Meeting Date: 31 May 2018 Agenda Item: 9.1 Enclosure Number: 9 Meeting: Trust Board (Part 1) Title: Author: Accountable Director: Other meetings presented to or previously agreed at: Service
More informationUS Lodging Industry Overview. Jan D. Freitag Senior Vice President
US Lodging Industry Overview Jan D. Freitag Senior Vice President 1 www.hotelnewsnow.com Click on Hotel Data Presentations 2 Agenda Total US Review Chain Scale Review Segmentation Review Group & Transient
More informationUnemployment and Changes in the Rate of Unemployment
Unemployment and Changes in the Rate of Unemployment 1. Introduction Information is the key to marketing success. The more relevant information you have about people the more successful you are likely
More informationNorth Carolina Division of Medical Assistance
North Carolina Division of Medical Assistance Medicaid Clinical Policy and Programs Update on Medicaid In-Home Personal Care Services (PCS) Presented Larry Nason, Ed.D. Chief, Medicaid Facility by: and
More informationSPRU DPhil Day : Postdoctoral Fellowships & Funding. David Rose Research & Enterprise
SPRU DPhil Day : Postdoctoral Fellowships & Funding David Rose Research & Enterprise D.A.Rose@sussex.ac.uk 27 th May 2010 Applying for Postdoctoral Fellowships & Funding What central support is available?
More informationIncreasing the Complexity of Emergency Preparedness Exercises to Satisfy Regulatory Requirements
Increasing the Complexity of Emergency Preparedness Exercises to Satisfy Regulatory Requirements CHCANYS Statewide Conference & Clinical Forum Wednesday, October 24 th, 2012 Jean Paul Roggiero MPA, CEM
More information2016 Nominating Committee. ICANN55 9 March 2016
2016 Nominating Committee ICANN55 9 March 2016 Agenda 1 2 3 Introduction Stéphane Van Gelder Chair, 2016 NomCom Key Leadership Positions to be filled How to APPLY 4 5 6 NomCom Selection Process and Timeline
More informationPatient safety in the NHS in England and the development of the Healthcare Safety Investigation Branch (HSIB)
Patient safety in the NHS in England and the development of the Healthcare Safety Investigation Branch (HSIB) Dr Mike Durkin NHS National Director of Patient Safety 11 May 2016 The NHS is big! Great potential
More informationFP7 Post-Grant Open Access Pilot: Sixth Progress Report One Year into the Initiative
FP7 Post-Grant Open Access Pilot: Sixth Progress Report One Year into the Initiative This is the sixth progress report for the FP7 Post-Grant Open Access Pilot one year since its launch on May 30 th, 2015.
More informationPlease place your phone line on mute.
We will begin the MaRISS Coordinator Call shortly Please place your phone line on mute. 8/26/2016 2 Overview Missing data Correct dates on Baseline NIHSS Form 24 hour window for consent CRF Forms What
More informationCOURSE LISTING. Courses Listed. Training for Database & Technology with Technologieberater in Associate OS DB Migration. Last updated on: 05 Oct 2018
Training for Database & Technology with Technologieberater in Associate OS DB Migration Courses Listed Fortgeschrittene TADM70 - SAP System: Operating System and Database Migration Zertifizierung C_TADM70_74
More informationDischarge and Follow-Up Planning. Presented by the Clinical and Quality Team
Discharge and Follow-Up Planning Presented by the Clinical and Quality Team After today s training you will be able to: Identify and summarize important information about discharge planning Have adequate
More informationCalendar of Key Deadlines for Apportionments July 18, 2016
Mary Jane Burke Marin County Superintendent of Schools Business Services Department Business Bulletin 17 04 Calendar of Key Deadlines for 2016 2017 Apportionments July 18, 2016 Please find the Calendars
More informationRemote Allocation in a Centralized Transfusion Service
Remote Allocation in a Centralized Transfusion Service Sandy Linauts, MT(ASCP) SBB Executive Vice President Puget Sound Blood Center HAABB September 28, 2011 A Centralized Transfusion Service How We Got
More informationLessons Learned from MLTSS Implementation in Florida Where Have We Been and Where Are We Going?
Lessons Learned from MLTSS Implementation in Florida Where Have We Been and Where Are We Going? David Rogers Assistant Deputy Secretary for Medicaid Operations Agency for Health Care Administration 2016
More informationImplementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P49721) Operation Name: Agricultural Competitiveness
More informationLet Hospital Workforce Data Talk
Let Hospital Workforce Data Talk A Data Visualisation Exercise Health & Biosecurity Yang Xie yang.xie@csiro.au HIC, 08-Aug-2017 THE AUSTRALIAN E-HEALTH RESEARCH CENTRE Healthcare Marketplace: the big picture
More information