Public Review Documents Index Last Updated June 27th, 2018

Size: px
Start display at page:

Download "Public Review Documents Index Last Updated June 27th, 2018"

Transcription

1 Public Review Documents Index Last Updated June 27th, 2018 Public Review Documents are available at ARLIS during the hours when the Consortium Library building is open. The Public Review Documents are located in the Special Collections section of ARLIS, adjacent to the sign for the nearby Circulating Collection. Public Review Documents are not available for download. A Adak Draft Damage Assessment and Restoration Plan and Environmental Assessment for the January 11, 2010 Adak Petroleum Diesel Spill. ADEC Source Water Assessments (set shelved at the end of the Public Review Documents) Akutan Navigation Improvements, Draft Feasibility Report and Environmental Impact Statement Navigation Improvements, Appendices Proposed Plan for Akutan Naval Station Akutan Island, Alaska April, Akutan Naval Station Remedial Action Akutan Island - Final May 2007 Work Plan: Visual Inspection and Monitoring Final May 2007 Alaska Alaska Groundfish Fisheries: Draft Programmatic Supplemental Environmental Impact Statement Alaska Clean Seas Technical Manual. See Pipeline Contingency Plans (BP Exploration Alaska Greater Prudhoe Bay) Alaska Department of Environmental Conservation Source Water Assessments. See ADEC Source Water Assessments Alaska Pipeline. See Pipeline Contingency Plans and Trans-Alaska Pipeline Alaska Railroad Corporation. See Anchorage: Ship Creek Alaska Tanker Co. See Tanker Contingency Plans Alyeska Pipeline Service Co., See Pipeline Contingency Plans Alaska Stand Alone Pipeline Project Draft Supplemental Environmental Impact Statement Volumes 1-7 and CD- ROM June 2017 Updated on 6/27/2018 4:43 PM 1

2 Draft Supplemental Environmental Impact Statement Volumes 1-8 and CD-ROM June 208 Alaska Peninsula Alaska Peninsula Areawide 2018 Competitive Oil and Gas Lease Sale Alaska South Central Fact Sheets Alpine Satellite Development Project. See National Petroleum Reserve Alaska Amaknak and Unalaska Islands Appendix C: Site Safety and Health Plan Addendum: Site Investigation: Chernofski Harbor, Fort Glenn, Eider Point Umnak and Unalaska Island Appendix C: Site Safety and Health Plan Addendum: Dutch Harbor Formerly Unused Defense Sites: 2000 Field Activities Comprehensive Remedial Investigation Report Formerly Used Defense Sites Project Management Plan: 1999 Update Interim Removal Action Thermal Soil Treatment at the Pre-WW II Tank Farm 1998 SI/RI/IRA Report 1999 Report: Pre-World War II Tank Farm Interim Removal Action Addendum Pre-World War II Tank Farm Groundwater Monitoring Unalaska Navigation Improvements (2 vols.) Work Plan Addendum, 2005, Island-Wide, Amaknak, Unalaska Islands, Alaska Final Well Decommissioning and Repair Report Pre-World War Two Tank Farm FUDS NO. F10AK Amaknak Island, Alaska Final November 2006 Proposed Plan for Fort Learnard, Unalaska, Alaska November 2006 Little South America (LSA) Proposed Harbor Work Plan Remedial Action Pre-World War II Tank Farm Final August 2007 Site Inspection Report Former Fort Glenn, Umnak and Unalaska Islands Draft Final - September 2007 Remedial Action Report Pre-World War II Tank Farm Final May 2008 Work Plan Addendum Soil Sampling and Statistical Analysis for Background Concentrations and Alternative Cleanup Levels Final December 2008 Soil Sampling and Statistical Analysis for Background Concentrations and Alternative Cleanup Levels Final August 2009 Unalaska Airport Safety Improvements Draft Environmental Assessment and Draft Section 4(f) Individual Evaluation October 2014 Amchitka Island Amchitka (set 8 boxes of files on lower shelves) Engineering Evaluation? Cost Analysis, Amchitka Island, Alaska American River American River Information Repository Community Relations Plan Updated on 6/27/2018 4:43 PM 2

3 Final Engineering Evaluation and Cost Analysis Final Site Investigation Report Final Site Investigation Work Plan Investigation, Community Relations and Removal Design Removal Action 100 Percent Design Anchorage Anchorage International Airport Final Project Description: Preferred Alternative: New Jet Fuel Pipeline to Supply Anchorage International Airport Potential Construction and Operations Impact: Impact Analysis of Fuel Supply Alternatives for Anchorage International Airport Anchorage Terminal Reserve Draft RCRA Facility Assessment Report, Alaska Railroad Corporation, DCN: RZ3-SAI-R TR-00712, January 1996 (2 copies) RCRA Facility Assessment, Alaska Railroad Corporation, March 29, 2002 (2 copies) Map: Permits and Leases in Anchorage Reserve, May 15, 2003 Draft Administrative Order on Consent, May 17, 2004 Statement of Work, Anchorage Terminal Reserve, May 17, 2004 Environmental Fact Sheet, Public Comments Invited on an Environmental Agreement between EPA and the Alaska Railroad Corporation, May 2004 (2 copies) Newspaper Display Ad: Public Invited to Comment on an Environmental Agreement between EPA and Alaska Railroad Corporation (photocopy, May 20, 2004) Comment Period Extended for EPA and Alaska Railroad Environmental Agreement (text of display ad) Anchorage Daily News Article: EPA Denies Accord with Railroad, May 17, 2004 Anchorage Daily News Article: Alaska Railroad Agrees to Pollution Cleanup Plan, May 17, 2004 KTVA.com News Article: Ship Creek Under EPA s Microscope, May 17, 2004 Remedial Administrative Record, CD and Instructions Remedial Investigation, Alaska Railroad Corporation, Anchorage Terminal Reserve, U.S. EPA Docket No. CERCLA Revision 2, May 12, 2008 Vols. 1-5 Remedial Investigation/Feasibility Study Work Plan, Alaska Railroad Corporation, Revision 1 Vols. 1-2 Ship Creek Preliminary Habitat Survey, Alaska Railroad Corporation, Anchorage Terminal Reserve, U.S. EPA Docket No. CERCLA December 3, 2004 (rev. 7/1/2005) EPA Alaska Railroad Anchorage Terminal Reserve, Remedial Investigation/Feasibility Study (RI/FS) Fact Sheets Coastal Trail Planning Trails With Wildlife in Mind: A Handbook for Trail Planners Updated on 6/27/2018 4:43 PM 3

4 Potential Adverse Effects of the South Coastal Trail Extension and Associated Human Activity on Birds Nesting, Brood-rearing, and Staging in the Anchorage Coastal Wildlife Refuge: An Annotated Bibliography South Extension of the Coastal Trail Draft Environmental Impact Statement and Appendices South Extension of the Coastal Trail Key Map Defense Fuel Support Point Anchorage Fuel Support Point Risk Assessment: Defense Fuel Support Point Hazardous Waste Management Public Notice Documentation for the Alaska Industrial Super Critical Water Oxidation (iscwo) Treatment Storage & Disposal Facility (TSDF) June 8, 2007 Tier 1 Human Health Risk Assessment Prepared For: Pacific Environmental Corporation September 2007 Seward Highway Seward Highway Milepost 75 to 90 Road and Bridge Rehabilitation Project Environmental Assessment November 2016 Ship Creek Public Review Draft: Ship Creek Development Master Plan Standard Steel Standard Steel and Metals Explanation of Significant Difference (SSEAR) (Set 3 boxes of files on lower shelves) Standard Steel and Metals Deletion Docket (SSMDD) (1 box of files on lower shelf) Standard Steel Superfund Site UMED (University and Medical) Annette Island Annette Island Coordinated Cleanup (set) B Beaufort Sea Exploration Plan, McCovey #1 Well Beaufort Sea, North Slope, and North Slope Foothills Areawide 2012 Competitive Oil and Gas Lease Sales Public Notice, and Tract Maps. Beaufort Sea, North Slope, and North Slope Foothills Areawide 2014 Competitive Oil and Gas Lease Sales October 2014 (shelved under North Slope) Beaufort Sea, North Slope, and North Slope Foothills Areawide 2015 Competitive Oil and Gas Lease Sales September 2015 and November 2015 Supplemental Notice (shelved under North Slope) Decision on No Substantial New Information 2017 Beaufort Sea, North Slope, and North Slope Foothills Areawide Lease Sales Updated on 6/27/2018 4:43 PM 4

5 Bering Sea and Aleutian Islands Bering Sea Western Interior Resource Management Plan Newsletter #1 May 2014 Big Mountain Big Mountain Radio Play Relay Station (RRS) Remedial Investigation/ Feasibility Study (RI/FS) Final Community Relations Plan For Big Mountain Radio Relay Station Final Work Plans: Final Site Safety and Health Plan: Remedial Investigation /Feasibility Study BP Oil Shipping Co. See Tanker Contingency Plans Bristol Bay (area): See also Big Mountain, Egegik Bay Resource Management Plan C Camden Bay 2010 Outer Continental Shelf Lease Exploration Plan Camden Bay, AK June 2009 Chugach State Park Chugach State Park Access Inventory Analysis and Recommendations October 2002 (removed from Public Review for cataloging) Chukchi Sea Draft Supplemental Environmental Impact Statement for Chukchi Sea Lease Sale 193 CD-ROM Coastal Trail. See Anchorage Cold Bay Cold Bay Fact sheets/newsletters Colville River. See North Slope Cook Inlet Cook Inlet Area-Wide 2000 Competitive Oil and Gas Lease Sale Decision to Supplement Area-Wide Oil and Gas Lease Sale Draft Environment Impact Statement: Cook Inlet Planning Area Oil & Gas Lease Sales 191 and 199 Mt. Spurr & Augustine Island Proposed Geothermal Exploration Area Call For Applications and Comments- Cook Inlet Areawide 2018W Competitive Oil and Gas Lease Sale Cordova Newsletters Final Environmental Impacts Statement for the Cordova Oil Spill Response Facility. (Corrected drawings only, we do not have original ) Crooked Creek. See Donlin Gold Project D Davidson s Landing Chemical Contamination Report Updated on 6/27/2018 4:43 PM 5

6 Community Relations Plan Final Engineering Evaluation and Cost Analysis Final Field Investigation Report Final Remedial Action Report Removal Action 100 Percent Design Denali National Park and Preserve Environmental Assessment for the Geophysical Institute Seismic Station Upgrade and Repeater Installation at Several Locations in Denali National Park and Preserve, Alaska Environmental Assessment for the Hazardous Vegetative Fuel Treatment Plan in Denali National Park and Preserve, Alaska Dillingham Engineering Documentation Report Environmental Assessment and Finding of No Significant Impact City Shoreline Emergency Bank Stabilization, Dillingham, Alaska May 2009 Donlin Gold Project Draft Environmental Impact Statement (Executive Summary and 10 Vols. w/cd-rom) November 2015 Drury Gulch Post Field Work Technical Memorandum: June 1999 Site Investigation Technical Memorandum: 1999 Site Investigation E Egegik Environmental Assessment: Egegik Road Improvements Project: Priority 1A, Priority 2, Priority 3 Eider FOIA Documents on Steller s and Spectacled Eiders (set 3 boxes of files on lower shelves) Eielson Air Force Base (AFB) U.S. Air Force F-35A Operational Beddown Pacific Final Supplemental Environmental Impact Statement. + Executive Summary. September 2017 Elmendorf Air Force Base See Joint Base Elmendorf-Richardson Alaska (JBER) F Fairbanks Final Supplemental Programmatic Environmental Impact Statement Army Growth and Force Structure Realignment to Support Operations in the Pacific Theater July 2008 (Shelved with Fort Richardson Public Review Docs) Federal Government. See United States Fort Greely Updated on 6/27/2018 4:43 PM 6

7 Fort Richardson See Joint Base Elmendorf-Richardson Alaska (JBER) G Gambell. See Saint Lawrence Island. Glennallen, Alaska Natural Gas Development Authority, Pipeline to Palmer Greater Kurparuk Area Greens Creek Trailing Disposal Supplemental Environmental Assessment and Draft Finding of No Significant Impact H Hatcher Pass Hatcher Pass Management Plan Public Review Draft March 2010 Draft Environmental Impact Statement Hatcher Pass Recreational Area Access, Trails, and Transit Facilities + Appendices vol.1 & 2 May 2010 Final Environmental Impact Statement Hatcher Pass Recreational Area Access, Trails, and Transit Facilities + Appendices vol.1 & 2 November 2010 Homer Draft Environmental Assessment Homer Beluga Lake Floatplane Facilities Improvements January 2016 Hooper Bay Hooper Bay Airport Improvements Draft Environmental Assessment May 2014 Hawaii Final Supplemental Programmatic Environmental Impact Statement Army Growth and Force Structure Realignment to Support Operations in the Pacific Theater July 2008 (Shelved with Fort Richardson Public Review Docs) J Joint Base Elmendorf-Richardson Alaska (JBER) Environmental Restoration Program (set) Administrative Record USAF Elmendorf AFB DRM Facility Environmental Restoration Program (set) RCRA (Resource Conservation and Recovery Act) Part B Permit Renewal Application draft RCRA Hazardous Waste Permit Application (Vols. I & II) RCRA Hazardous Waste Storage Permit Spill Response Operations Plan 19-1 Environmental Assessment June, July (04) C-17 Beddown Updated on 6/27/2018 4:43 PM 7

8 Integrated Natural Resources Management Plan For Elmendorf Air Force Base Draft Management Action Plan Elmendorf AFB, AK December 2006 Public Health Assessment for Elmendorf Air Force Base Anchorage, Alaska December 21, 2006 Final Decision Plan for ST68 Environmental Restoration Program January 2007 Environmental Assessment (EA) for the Relocation of the Alaska Air National Guard 176 th Wing to Elmendorf Air Force Base (AFB) CD-ROM - October 2007 Site Inspection Report Susitna Gunnery Range South Central Alaska Draft Final - November 2007 Gravel Pit Expansion Environmental Assessment Draft February 2008 Zone 2 & Phase I Remedial Process Optimization Report Final (w/cd-rom) February 2008 Five Year Review Report Second Five-Year Review Report for Fort Richardson, Alaska February Also available at Zone 2 Management Area Annual Report Final March Zone 1 Field Activities Report with Remedial Process Optimization Final June 2008 CD ROM 2008 Zone 3 Management Area Work Plan Final May 2008 Final Supplemental Programmatic Environmental Impact Statement Army Growth and Force Structure Realignment to Support Operations in the Pacific Theater July 2008 Site SS83 Soil Cleanup and Zone 2 Treatment System (SD15 and ST32) Removal Work Plan (Hard Copy and CD-ROM) Final September 2008 Final Supplemental Comprehensive Site Evaluation (CSE) Phase 1 Findings Report Revision 02 (w/cd-rom) October 2008 Evaluation/Compilation of Groundwater Data at Site DP98 Final (CD-ROM) - October 2008 Charting of the Delta Military Operations Area Complex Environmental Assessment Draft November 2008 Charting of the Delta Military Operations Area Complex Environmental Assessment Executive Summary Draft November 2008 F-22 Infrastructure and Taxiway Time Critical Removal Action Work Plan Revision 1 CD-ROM - October 2008 Management Plan for the Remedial Investigation/Feasibility Study SS22 (Former DRMO Storage Yard) Final September Zone 1 Field Activities Report Final February 2009 Treatability Study for Enhanced Natural Attenuation at the Slammer Avenue Plume, Operable Unit 5 Final March 2009 Treatability Study for Enhanced Bioremediation at the Kenney Avenue Plume, Operable Unit 5 Final March 2009 Study Findings and Technical Report - Alaska Baseline Erosion Assessment March 2009 Updated on 6/27/2018 4:43 PM 8

9 Environmental Restoration Program Five-Year Review Third Five-Year Review Report Final December 2008, and April 2009 Five-Year Review Fact Sheet Findings (+CD-ROMS) SS83 Soil Cleanup Report (CD-ROM) Final April 2009 SD15 and ST32 Tank 2 Treatment System Removal (CD-ROM) Final April 2009 Final Work Plan MMRP CSE Phase II (Print and CD-ROM) March Zone 2 and Zone 3 Management Areas Work Plan Final - June 2009 Management Plan for the Remedial Investigation/Feasibility Study, SS22 (Former DRMO Storage Yard) Addendum Soil Gas Investigations Final May Zone 2 and Zone 3 Management Area Annual Report (Print and CD-ROM) Final July and August 2009 Joint Base Elmendorf-Richardson Interim Community Involvement Plan Draft Final November 2009 DP98 Remedial Action Report Final September 2009 Joint Base Elmendorf-Richardson Interim Community Involvement Plan Final January 2010 Draft Environmental Impact Statement for Resumption of Year-Round Firing Opportunities at Fort Richardson, Alaska January 2010 Zone 3 Management Area Wetland Remediation System Optimization Study Final March & July 2010 (Print and CD-ROM) Environmental Restoration Program Information Repository, Electronic Document Archive and User Interface DVD 31 March Zone 1 Field Activities Report Final May Zone 2 Management Area Annual Report Final June Zone 3 Management Area Annual Report Final May Zone 2 and Zone 3 Management Areas Work Plan Final May 2010 Hazardous Waste Management Permit Modification Request July 2010 Site LF59 Field Investigation and Conceptual Site Model Update Final Report July 2010 OT092 Fuel Pipeline and SS43/ST68 Bioventing Systems Decommissioning Final September Letter Report for the Excavation and Disposal of Contaminated Soil at Site SD15 (March 24, 2010) Final CSE Phase II Report (MMRP) Revision 3 June 2010 Environmental Assessment for Military Housing Privatization, Joint Base Elmendorf- Richardson, Alaska September Engineering Evaluation/Cost Analysis. F-22 Weapons Release Shop Draft February 2011 F-22 Plus-Up Environmental Assessment Joint Base Elmendorf-Richardson, AK Draft April & June Zone 2 & 3 Management Area Annual Report Final, dtd. March 2011 Letter Report for the Excavation and Disposal of Contaminated Soil at Site SD15 Final April 2011 Letter Report for the Treatment System Removal at SS43, ST32 Tank 7, and ST68 Final April 2011 OT092 Fuel Pipeline Decommissioning Report Final April 2011 Updated on 6/27/2018 4:43 PM 9

10 2010 Zone 1 Field Activities Report Final April 2011 Project Summary Report ST32 Pipeline Demolition CD-ROM Work Plan/Quality Assurance Program Plan and Health and Safety Plan for the SD15 Limited Site Assessment Final April 2011 Memorandum to the Site File Elmendorf Air Force Base Operable Unit 2 ST41 Joint Base Elmendorf-Richardson Community Environmental Board Meeting Agenda - Spring 2011 Engineering Evaluation/Cost Analysis Small Arms Range (MRA 2001/MRS SR001) and Suspected (sic) Skeet Range (MRA 2003/MRS TS003) Revised Draft Final March 2012 LF04 Debris Survey Database (Updated Fall 2010) Final Letter Work Plan Operable Unit 5 Engineered Wetland Remediation System Quarterly Monitoring, and Operation and Maintenance June 2011 Quality Program Plan for Evaluating Ship Creek Hydrology Near Site LF59 and Optimizing Early Warning/Sentry Well (+ CD-ROM) Final August 2011 Work Plan Environmental Remedial Action Operations and Long-Term Monitoring and Maintenance (+ CD-ROM) Final August 2011 Work Plan Addendum for a Field Verification Test of Enhanced Natural Attenuation at the DP98 Site (+ CD-ROM) August 2011 Joint Base Elmendorf-Richardson Community Involvement Plan Final September Drilling in the WP14 OU6MW-46 Plume Final October 2011 Site Closure Report ST69 (CD-ROM) Final March 2012 Nike Site Summit Remedial Field Investigation Report 3 Volumes May 2012 Five Year Review and Land-Use Control Compliance Reports Technical Memorandum 673d CES Environmental Restoration Program Sites Final June 2012 Preliminary Assessment/Site Investigation Report AT032 Airborne Training Facility (FTR255) Final April 2013 Site Closure Report TU046 Building 750 (FTRS-46) Final April 2013 Proposal to Relocate the 18 th Aggressor Squadron (18AGRS) from Eielson Air Force Base (EAFB), Alaska to Joint Base Elmendorf-Richardson (JBER), Alaska and to Right- Size the Remaining Wing Overhead/Base Operating Support at EAFB, Alaska Draft Environmental Impact Statement May 2013 SS047 Nike Site Summit Administrative Record and Proposed Plan for Remedial Action handouts July 2013 Third CERCLA Five-Year Review for JBER Elmendorf February 2013 Fourth CERCLA Five-Year Review for JBER Elmendorf March 2014 Five-Year Review Findings Environmental Restoration Program Joint Base Elmendorf- Richardson, Alaska June 2014 Military Munitions Response Program Site Closure Report JBER-Elmendorf MMRP Final March 2014 SS047 Nike Site Summit Supplemental Feasibility Study Draft February 2015 SS047 Nike Site Summit Supplemental Feasibility Study Final May 2015 Proposed Plan for SS090 Barracks Construction Dieldrin Spill Site, JBER CD-ROM July 2016 Updated on 6/27/2018 4:43 PM 10

11 Proposed Plan for Remedial Action Nike Site Summit (SS047) October 2016 Record of Decision SS047 (Nike Sit Summit) Joint Base Elmendorf-Richardson, Alaska Draft February 2017 Community Environmental Board & Nike Site Summit Public Meeting Transcript SS047 (Nike Site Summit) Final February 2017 Record of Decision SS047 (Nike Site Summit) Joint Base-Elmendorf-Richardson, Alaska Draft May 2017 Proposal to Improve F-22 Operational Efficiency at Joint Base Elmendorf-Richardson, Alaska Draft Environmental Impact Statement Executive Summary July 2017 Environmental Restoration Program Record of Decision SS090 Barracks Construction Dieldrin Spill Site Final April 2017 Environmental Restoration Program Interim Remedial Action Completion Report Site LF059 Final January 2017 Environmental Restoration Program AT035 Remedial Investigation / Feasibility Study Management Plan Final September 2017 Proposal to Improve F-22 Operational Efficiency at Joint Base Elmendorf-Richardson, Alaska Final Environmental Impact Statement February 2018 Executive Summary Environmental Restoration Program Explanation of Significant Differences SD025 Final March 2017 Decision Document SS047 (Nike Site Summit) Joint Base Elmendorf-Richardson, Alaska Final September 2017 Record of Decision SS047 (Nike Site Summit) Joint Base Elmendorf-Richardson, Alaska Final July 2017 Draft Final Supplemental Comprehensive Site Evaluation (CSE) Phase II Report Davis Range A (FR006), Anti-Aircraft Range TD (FR014), and Anti-Aircraft Range No. 1 (FR015) Munitions Response Areas May 2018 Joint Pacific Alaska Range Complex Joint Pacific Alaska Range Complex EIS. Vols. 1-2, Executive Summary, and CD- ROMS Draft March 2012 K Katmai National Park and Preserve Hunting Guide Concessions Environmental Assessment (to be removed from shelves July 24 th, 2012 ) Wildland Fire Management Plan Environmental Assessment November 2012 Kenai Peninsula Borough Sterling Highway Milepost Draft Supplemental Environmental Impact Statement and Draft Section 4(f) Evaluation Appendices Vols. 1-2 March 2015 Seward Highway Milepost 75 to 90 Road and Bridge Rehabilitation Project Environmental Assessment November 2016 (Shelved under Anchorage) Sterling Highway Milepost Final Environmental Impact Statement and Final Section 4(f) Evaluation March 2018 Updated on 6/27/2018 4:43 PM 11

12 King Cove King Salmon Air Station Fact Sheets/Newsletters Kodiak Area Plan for State Lands November 2003 See also Drury Gulch Koliganek Koliganek Airport Reconstruction Draft Environmental Assessment November 2012 Keystone Shipping Co., See Tanker Contingency Plans Knik Arm Knik Arm Bridge and Toll Authority Historic Preservation Plan August 2007 Knik Arm Crossing Final Environmental Impact Statement and Final Section 4(f) Evaluation (4 binder set of; Chapters CD-ROM, 4-8, and two volumes of appendices) December 18, 2007 Knik River Public Use Area Management Plan Public Review Draft March 2008 Kwigillingok Kwigillingok Airport Improvements Environmental Assessment - Draft October 2014 Kuskokwim River. See Donlin Gold Project M Marine Transport Lines, Inc., See Tanker Contingency plans Missile defense system. See United States Moses Point Chemical Contamination Report Draft Remedial Investigation Draft Remedial Investigation Report Addendum Final Remedial Investigation/Feasibility Study Final Work Plan Remedial Investigation Moses Point: A Summary of the 1999 Remedial Investigation Moses Point Environmental Updates N National Petroleum Reserve Alaska Alpine Satellite Development Project Public Notice Future Release of Exploration Data and Information (shelved under North Slope) Nelson Island Draft Environmental Assessment Tununak Airport Improvements June 2011 North Pole Area Updated on 6/27/2018 4:43 PM 12

13 Evaluation of Ground-Water Flooding Problems and Mitigation Alternatives for the North Pole Area of Alaska North Slope/ Outer Continental Shelf (OCS) Colville River Unit Satellite Development Environmental Evaluation Document OCS Preconstruction Air Quality Permit Package Beaufort Sea, North Slope, and North Slope Foothills Areawide 2014 Competitive Oil and Gas Lease Sales + Supplemental Public Notice Pursuant October 2014 Decision on No Substantial New Information 2017 Beaufort Sea, North Slope, and North Slope Foothills Areawide Lease Sales Public Notice Future Release of Exploration Data and Information Beaufort Sea Areawide 2017W, North Slope Areawide 2017W, and North Slope Foothills Areawide 2017 Competitive Oil and Gas Lease Sales Northwest Area Northwest Area Plan Public Review Draft April 2008 O Oberon Fisheries OPA Vessel Response Plan, See Tanker Contingency Plans Oplan See Elmendorf Air Force Base: Spill Response Operations Plan 19-1 Outer Continental Shelf (OCS). See also North Slope/Outer Continental Shelf (OCS) Outer Continental Shelf Oil and Gas Leasing Program Draft Programmatic Environmental Impact Statement November 2011 Vols CD-ROM P Pipeline Contingency Plans (set located at the end of the Public Review Documents Section) Alyeska Pipeline Service Co. o Trans-Alaska Pipeline System BP Exploration Alaska o Endicott Operations o Greater Prudhoe Bay (incl. Alaska Clean Seas Technical Manual) o Milne Point Operations o Northstar Operations See also Tanker Contingency Plans and Valdez Marine Terminal Plan Pogo Gold Mine Draft Environmental Impact Statement (DEIS) Reviewers [Note 60-day comment period. Remove from shelves May, 2003.] Point Thomson Point Thomson Project EIS - Draft Environmental Impact Statement Vols. 1-8, Executive Summary, and CD-ROM in 2 parts. November 2011 Poker Flat Draft Environmental Impact Statement Sounding Rockets Program at Poker Flat Research Range Vols. 1-2 September 2012 Updated on 6/27/2018 4:43 PM 13

14 Final Environmental Impact Statement Sounding Rockets Program at Poker Flat Research Range Vols. 1-2 July 2013 Polar Tankers, Inc., See Tanker Contingency Plans Port Etches. See Prince William Sound Pribilof Islands ADEC/NOAA Pribilof Restoration Project (set) Final Corrective Action Report, School UST Site (TPA 22-1) Final Field Investigation Report St. Paul Island, Alaska Pribilof Islands Environmental Restoration Project St. Paul Island, Alaska June 23, 2005 Final Field Investigation Report St. Paul Island, Alaska Appendix H Final Field Investigation Report St. George Island, Alaska June 23, 2005 Final Field Investigation Report St. George Island, Alaska Appendix E Final Corrective Action Report Site 33/TPA Site 12c Lukanin Bay PCS Site St. Paul Island, Alaska April 18, 2005 Final Site Characterization Plan Site 21, Two-Party Agreement Site 9f Cascade Building (Old Coal Shed) Cascade Building Interior Characterization St. Paul Island, Alaska August 11, 2004 Prince William Sound Prince William Sound Tanker Contingency Plan Review Process (ADEC) (Large set located after the Valdez Marine Terminal Plans) Port Etches Barge Documents Tanker Oil Discharge Prevention and Contingency Plan + SERVS Technical Manual SV Revision 2 November 2009 Tanker Oil Discharge Prevention and Contingency Plan + SERVS Technical Manual SV Revision 3-4 June 2011 Amendment 3 to the PWS Tanker ODPCP June 2011 Amendment 4 to the PWS Tanker ODPCP and Revised Update Packet August 2011 S Saint George Island. See Pribilof Islands Saint Lawrence Island Saint Lawrence Island Cleanup (set) St. Lawrence Island Tank Closure July 04 St. Lawrence Island Removal Action Report July 04 St. Lawrence Island Restoration Advisory Board Meeting Minutes January 25, 2006 July 2006 Groundwater Sampling Report Revision 1 December Gambell, Alaska August 2006 Groundwater Sampling Report - Revision 1 - March 2007 Gambell, Alaska August 2006 Groundwater Sampling Report Final July 2007 Soil and Debris Removal Action Report Draft-Final - March 2007 Soil and Debris Removal Action Report Final May 2007 Updated on 6/27/2018 4:43 PM 14

15 Soil and Debris Removal Action Report Revised Final September 2007 Northeast Cape FUDS Final Feasibility Study - Volume 1 March 2007 Response to Comments May 2007 Geophysical Survey Work Plan Northeast Cape FUDS June 2007 Proposed Plan Northeast Cape Air Force Station Formerly Used Defense Site July 2007 Meeting Minutes - Public Meeting Notes Geophysical Survey Northeast Cape FUDS #F10AK Draft Submittal October 2007 Northeast Cape Responsiveness Summary HTRW Proposed Plan February 2008 ADEC Comments on the Northeast Cape Proposed Plan October 2007 Northeast Cape Proposed Plan Comment Meeting Held September 19, 2007 in Savoonga, AK and September 19 & 20, 2007 in Gambell, Alaska Site 5 Decision Document FUDS Project#: F10AK September 2007 Technical Memorandum - FUDS, June 20 th and September 5 th 2008 Project Closeout Report Military Munitions Response Program (MMRP) June 2008 Project Closeout Report Hazardous, Toxic, and Radioactive Waste (HTRW) September 2008, January 2009 In-Situ Chemical Oxidation (Phase I) and Intrusive Drum Removal/Landfill Cap Sampling and Analysis Plan and Work Plan - Revision 1 July 2009 Responsiveness Summary for the Site 7 Cargo Beach Road Landfill Proposed Plan, Northeast Cape FUDS May 2008 Proposed Plan Northeast Cape Site 7 Cargo Beach Road Landfill May 2008 Decision Document - Site 7 Cargo Beach Road Landfill Contained Hazardous, Toxic, and Radioactive Waste (FUDS) June 2009 Site 7 Landfill Cap Construction Completion Report Final May 2010 Northwest Cape HTRW Remedial Actions Work Plan & Sampling and Analysis Plan Revision 1 June 2010 Main Operation Complex Area Phase I In-situ Chemical Oxidation Summary Report Final August 2010 Northeast Cape HTRW Remedial Actions Contract No. W911KB-06-D-0007 FUDS No. F10AK Work Plan Revision 0 May 2011 Northeast Cape HTRW Remedial Actions Final Report July 2011 Northeast Cape HTRW Remedial Actions Work Plan Revision 0-1 July 2011, July 2012 Northeast Cape HTRW Remedial Actions Site 28 Technical Memorandum Revisions 0, 1 October 2011, February 2012 Northeast Cape HTRW Remedial Actions Final Removal Action Report February 2012 & June 2012 Northeast Cape HTRW Remedial Actions Contract No. W911KB-12-C-0003 Work Plan Revision 0 May 2012 Trip Report Northeast Cape Formerly Used Defense Site December 12-14, 2011 Northeast Cape HTRW Remedial Actions Site 28 Phase I Sediment Removal Report Revision 0 December 2012 Northeast Cape HTRW Remedial Actions Draft Removal Action Report Revision 0 February 2013 Updated on 6/27/2018 4:43 PM 15

16 Northeast Cape HTRW Remedial Actions Work Plan Revision 0 March 2013 Final Site 28 Technical Memorandum Addendum Revision 1 January 2013 Northeast Cape HTRW Remedial Actions Site 28 Phase I Sediment Removal Report Revision 2 May 2013 Northeast Cape HTRW Remedial Actions Remedial Action Report Vols. 1-2 Revision 1 May 2013 Northeast Cape HTRW Remedial Actions Work Plan Vols. 1-2 Revision 1 June 2013 Revision 0 Northeast Cape HTRW Remedial Actions Report Vols.1-2 January 2014 Revision 0 Northeast Cape HTRW Remedial Actions Work Plan Vols. 1-2 March 2014 Revision 1 Northeast Cape HTRW Remedial Actions Work Plan December 2014 Revision 1 Northeast Cape HTRW Remedial Actions Report January 2015 First Five-Year Review Report Northeast Cape FUDS Final February 2015 First Periodic Review Report Site 7 Cargo Beach Road Landfill Northeast Cape FUDS Final February Remedial Action Report Revision 1 April 2015 Northeast Cape FUDS 2016 Groundwater Monitoring at the Main Operations Complex and Other Field Activities Work Plan Draft June 2016 Northeast Cape FUDS Long Term Management Plan Draft Final June 2016 Northeast Cape Re-Evaluation of Human Health Risk at Sites 21 and 28 Northwest Cape FUDS Final June Landfill Periodic Visual Inspection Report Final April Annual Groundwater Sampling Report Final April Remedial Action Report Final May Groundwater Monitoring at the Main Operations Complex and Other Field Activities Work Plan Final August 2016 Long-Term Management Plan Northeast Cape FUDS Final September Site 8 and Suqi River Surface Water and Sediment Sampling Report Draft April Monitored Natural Attenuation Groundwater Annual Sampling Report at the Main Operations Complex at Northeast Cape Draft April Monitored Natural Attenuation Groundwater Annual Sampling Report at the Main Operations Complex at Northeast Cape Final August Site 8 and Suqitughneq River Surface Water and Sediment Sampling Report Final September 2017 Saint Paul Island. See Pribilof Islands Sand Point Harbor Improvements: Final Interim Feasibility Report and Environmental Assessment SeaRiver Maritime, Inc., See Tanker Contingency Plans Seward Peninsula. See also American River, Davidson s Landing, Moses Point. Seward Peninsula Federal Subsistence Regional Advisory Council Meeting Materials March 9-10, 2010, Nome Source Water Assessments. See ADEC Source Water Assessments. Updated on 6/27/2018 4:43 PM 16

17 Spectacled eider. See Eider St. George Island. See Pribilof Islands St Lawrence Island. See Saint Lawrence Island Stony River Draft Environmental Assessment Stone River Airport Improvements Project No February 2003 (removed from Public Review for cataloging) St. Paul Island. See Pribilof Islands Standard Steel. See Anchorage Steller s eider. See Eider Susitna Area Southeast Susitna Area Plan (Revising the entire Willow Sub-Basin Area Plan and a Portion of the South Parks Highway Subregion of the Susitna Area Plan.) Public Review Draft January 2008 Site Inspection Report Susitna Gunnery Range (FUDS) Final March 2008 Munitions and Explosives of Concern (MEC Support During Hazardous, Toxic, and Radioactive Waste (HTRW) and Construction Activities August 2004 Former Susitna Gunnery Range Public Involvement Plan - South-Central Alaska Final December 2008 Susitna Gunnery Range FUDS Public Meeting Wasilla, Alaska February 18, 2010 Susitna Matanuska Area Plan Draft February 2010 Approved Revisions and Issue Response Summary Susitna Matanuska Area Plan Final Remedial Investigation Feasibility Study (RI/FS) Work Plans. Former Susitna Gunnery Range FUDS Project #: F10AK March 30, 2011 Remedial Investigation (RI) Report Former Susitna Gunnery Range FUDS July 12, 2012 Feasibility Study (FS) Report Former Susitna Gunnery Range FUDS Project Number: F10AK April 24, 2013 Draft Final Proposed Plan Former Susitna Gunnery Range FUDS Southcentral Alaska February 2014 Susitna Gunnery Range Public Meeting February 26, 2014 Proposed Plan Former Susitna Gunnery Range FUDS Southcentral Alaska March 24, 2014 T Tanker Contingency Plans (set located at the end of the Public Review Documents section). See also Pipeline Contingency Plans, Prince William Sound, Valdez Marine Terminal Plan Note: This set is currently unavailable (an astrix* indicates that the item is still on the shelf). Alaska Tanker Co. o Integrated Vessel Response Plan (Version 5) Update. o Integrated Vessel Response Plan (Version 4) Update o *Integrated Vessel Response Plan, Amendment Version 15 November, 2007 Updated on 6/27/2018 4:43 PM 17

18 BP Oil Shipping Co. Keystone Shipping Co. Marine Transport Lines, Inc. OPA Vessel Response Plan Polar Tankers, Inc. o *Conoco Philips Marine Vessel Response Plan/Shipboard Pollution Emergency Plan (3 Volumes) *Vessel Response Plan & Shipboard Oil Pollution Emergency Plan Revisions 22-25, with CD-ROMs o *Vol. 1 & 2 Vessel Response Plan Updates o *Vol. 1 & 2 Vessel & Shoreside Personnel o Field Digest of Vessel Response Plan and Pre-fire Plan Revisions 32, Seariver Maritime, Inc. Tesoro Alaska Petroleum Co. Tesoro Alaska Petroleum Co., See Tanker Contingency Plans Tony Knowles Coastal Trail. See Anchorage Trans-Alaska Pipeline. See also Pipeline Contingency Plans (Alyeska Pipeline Service Co.) Trans-Alaska Pipeline System (TAPS) Right-of-Way Renewal Documents, Environmental Impact Statement, and Newsletter (set) Trans-Alaska Pipeline System: A Comprehensive Monitoring Program Report Examining Grand and Lease Compliance Joint Pipeline Office Comprehensive Monitoring Program: Taps Maintenance & Sustained Useful Life January 2001-May 2002 Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan Region 5 PLMP to PLMP CP-35-1 Region 5 Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan CP-35-1 Edition 1 Revision 0 Vols.1-4 Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan CP-35-1 Edition 1 Revision 4 December 2007 Gulkana Areas of Opportunity Amendment to the TAPS Pipeline Oil Discharge and Prevention Plan Copper River Areas Amendment to the TAPS Pipeline Oil Discharge and Prevention Plan Pump Station 03 Post SR Amendment to the TAPS Pipeline Oil Discharge and Prevention Plan. Field Digest of Vessel Response Plan March 2008 Oil Spill Response Exercise Program for the Trans Alaska Pipeline System January 1, December 31, 2011 Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan CP-35-1 Public Review Draft 2011 Vols. 1-4 Oil Spill Response Exercise Program for the Trans Alaska Pipeline System January 1, 2012 to December 31, 2016 Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan CP-35-1 Request for Additional Information Response to Public Review Draft - #1 & #2 October and September 2011 Updated on 6/27/2018 4:43 PM 18

19 Field Digest of Vessel Response Plan and Pre-Fire Plan December 2011 CP-35-2 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan Edition 5, Revision 4 (July 13, 2012) Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan Draft B Vols. 1-3 (March 2013), and SERVS Technical Manual (November 2012) Trans Alaska Pipeline System Pipeline Oil Discharge Prevention and Contingency Plan CP-35-1, Public Review Draft 2016 (CD-ROM) Proposed amendment to CP-35-1, Trans Alaska Pipeline System Oil Discharge Prevention and Contingency Plan, State Contingency Plan Number 11-CP-4071 November/December 2016 U Umiat Nuiqsuit Restoration Advisory Board (RAB) Meeting Notes and Presentation July 9, 2002 Restoration Advisory Board (RAB) Meeting Notes and Presentation April 8, 2003 Umiat Cleanup (Set) Umnak Island Public Involvement Plan Remedial Investigation/Feasibility Study - Former Fort Glenn, Umnak Island, AK FUDS#: F10AK Final (Redacted) - April 2011 Work Plan Remedial Investigation/Feasibility Study - Former Fort Glenn, Umnak Island, AK FUDS#: F10AK Final (Redacted) - May 2011 Remedial Investigation of OB/OD Area. Former Fort Glenn. Final March 2012 Feasibility Study of OB/OD Area. Former Fort Glenn. Final March 2012 Fort Glenn Formerly Used Defense Site Military Munitions Site Prioritization Protocol September 2013 Feasibility Study of OB/OD Area at the Former Fort Glenn January 2014 Proposed Plan OB/OD (MRS-04) Area and Remaining OB/OD Area (MRS-14) Military Munitions Response Program, Former Fort Glenn April 2014 Unalaska Island. See Amaknak and Unalaska Islands United States Emergency Watershed Protection Program: Draft Programmatic Environmental Impact Statement Ground-based Midcourse Defense Validation of Operational Concept Supplemental Environmental Assessment National Missile Defense Deployment Non-Stockpile Chemical Material Information Repository Products North Pacific Targets Program: Environmental Assessment Transportable Treatment Systems for Non-Stockpile Chemical Warfare Material United States Air Force: Elmendorf Air force Base. See Joint Base Elmendorf-Richardson. United States Army, Alaska Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Draft April 2009 United States Army: Fort Richardson. See Fort Richardson Updated on 6/27/2018 4:43 PM 19

20 V Valdez Valdez Marine Terminal Plan (1997) (large set located after the Tanker Contingency Plans) Valdez Marine Terminal Plan (1999) (Located after the Tanker Contingency Plans) Valdez Marine Terminal Plan (2001) (Located after the Tanker Contingency Plans) Valdez Marine Terminal Plan (2007) (Located after the Tanker Contingency Plans) Valdez Marine Terminal Plan - Oil Discharge Prevention and Contingency Plan CP th Edition. May 2008 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan CP-35-2 Edition 4, Revision 14 (amendment) Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan CP-35-2 RFAI Response #2 February 2008 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan CP-35-2 Update for Edition 5, Revisions: 1 (July 16, 2008), 2 (February 24, 2010), 3 (June 13, 2011) Valdez Maritime Terminal Settlement Pond Tactical Guide (October 2001) Navigation Improvements Valdez, Alaska January 2010 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan CP-35-2 Draft C Revision 0 Vols. 1-3 (Redline and Clean Copy for each volume), RFAI Responses & CD- ROM - July 2014 Valdez Marine Terminal Oil Discharge Prevention and Contingency Plan (ODPCP) ADEC Plan Number 14-AP-4057 Amendment July 2015 Port Valdez Sensitive Areas Tactical Guide (September 2002) Y Yukon Proposed Land Exchange Yukon Flats National Wildlife Refuge Draft Environmental Impact Statement CD-ROM - DOI DES January 2008 Yukon Tanana Area Plan Public Review Draft July 2012 Updated on 6/27/2018 4:43 PM 20

Building and Preserving Alaska s Future

Building and Preserving Alaska s Future Building and Preserving Alaska s Future Civil Works in Alaska Bruce R Sexauer P.E. Chief Civil Works, Alaska District U.S. Army Corps of Engineers April 13, 2016 US Army Corps of Engineers WHERE WE ARE

More information

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES: AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM FINAL Site Management Plan Eielson AFB 8/30/2013 Table of Contents

More information

Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC

Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC CONGRESSIONAL DISTRICT: NC 1, 3, 6, 8, 9, and 12 DATE: 23 February 2015 BACKGROUND: The U.S. Army Corps of Engineers, Savannah

More information

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES: AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM 2014 Site Management Plan Amendment Eielson AFB 2/18/2014 Table of

More information

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Final Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Prepared for U.S. Army Alaska August 2009 How to Read This Environmental Impact Statement

More information

Appendix C: Public Participation

Appendix C: Public Participation Appendix C: Public Participation TABLE OF CONTENTS APPENDIX C PUBLIC PARTICIPATION... C-1 C.1 PROJECT WEBSITE... C-1 C.2 GENERAL SUMMARY OF THE SCOPING PERIOD... C-1 C.2.1 TRIBAL NOTIFICATION LETTERS...

More information

We are pleased that you are choosing a career in engineering and we wish you the best of luck as you pursue your degree!

We are pleased that you are choosing a career in engineering and we wish you the best of luck as you pursue your degree! [Type text] Ms. Deborah Allen, PE AEEF Executive Director 9641 Grover Drive Anchorage, AK 99507 (907) 947-6855 execdir@alaskaeef.org Dear Applicant, Thank you for your interest in the Alaska Engineering

More information

PER DIEM, TRAVEL AND TRANSPORTATION ALLOWANCE COMMITTEE HOFFMAN BUILDING 1, ROOM EISENHOWER AVENUE, ALEXANDRIA, VA

PER DIEM, TRAVEL AND TRANSPORTATION ALLOWANCE COMMITTEE HOFFMAN BUILDING 1, ROOM EISENHOWER AVENUE, ALEXANDRIA, VA PER DIEM, TRAVEL AND TRANSPORTATION ALLOWANCE COMMITTEE HOFFMAN BUILDING 1, ROOM 836 2461 EISENHOWER AVENUE, ALEXANDRIA, VA 22331-1300 PDTATAC/E&S/Travel April 25, 2002 MEMORANDUM FOR OSD FEDERAL REGISTER

More information

Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico. Status Report for the Vieques Restoration Advisory Board. Through December 2008

Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico. Status Report for the Vieques Restoration Advisory Board. Through December 2008 Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico Status Report for the Vieques Restoration Advisory Board Through December 2008 This report provides the Restoration Advisory Board (RAB)

More information

Progress, Opportunities and Issues

Progress, Opportunities and Issues Ports and Harbors: Progress, Opportunities and Issues Alaska Regional Ports Conference Anchorage, AK November 18, 2010 Frank Richards, P.E. Deputy Commissioner Department of Transportation & Public Facilities

More information

LETTER OF PROMULGATION

LETTER OF PROMULGATION ALASKA DEPT OF ENVIRONMENTAL CONSERVATION U.S. COAST GUARD MARINE SAFETY UNIT VALDEZ US EPA (REGION X) ALASKA OPERATIONS OFFICE [Insert Date Here] LETTER OF PROMULGATION 1. The Prince William Sound Subarea

More information

Alaska Fish and Wildlife Fund

Alaska Fish and Wildlife Fund Alaska Fish and Wildlife Fund Request for Proposals 2015 Pre-proposal Due Date: Full proposal Due Date: June 11, 2015 11:59 PM Eastern time August 06, 2015 11:59 PM Eastern time OVERVIEW The National Fish

More information

ASTSWMO Annual Meeting October 25, 2006

ASTSWMO Annual Meeting October 25, 2006 ASTSWMO Annual Meeting October 25, 2006 Formerly Used Defense Sites (FUDS) Military Munitions Response Program (MMRP) Preliminary Assessment and Site Inspection We just want to do this thing better than

More information

MMRP Site Inspections at FUDS Challenges, Status, and Lessons Learned

MMRP Site Inspections at FUDS Challenges, Status, and Lessons Learned MMRP Site Inspections at Challenges, Status, and Lessons Learned 1 Denver, CO June 20, 2007 Program Overview Formerly Used Defense Sites are properties that were formerly owned, leased, possessed by, or

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER 673D AIR BASE WING (PACAF) 673D AIR BASE WING INSTRUCTION 32-7003 30 JUNE 2011 Certified Current On 11 June 2015 Civil Engineering LAND USE CONTROL MANAGEMENT COMPLIANCE WITH

More information

State Perspective of DoD MMRP PA/SI Program

State Perspective of DoD MMRP PA/SI Program State Perspective of DoD MMRP PA/SI Program Military Munitions PA/SI: Presentation Objectives Provide overview of Colorado s perspective Describe Colorado s expectations Show examples of success Highlight

More information

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress November 2013 Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics The estimated cost of report

More information

6.2 TRIBAL COORDINATION AND GOVERNMENT-TO-GOVERNMENT CONSULTATION 1

6.2 TRIBAL COORDINATION AND GOVERNMENT-TO-GOVERNMENT CONSULTATION 1 CHAPTER 6: CONSULTATION AND COORDINATION 61 INTRODUCTION This section summarizes the consultation and coordination with agencies and the public involvement opportunities for the Environmental Impact Statement

More information

A Trip Down Memory Lane: Federal Facilities Site Assessment Milestones

A Trip Down Memory Lane: Federal Facilities Site Assessment Milestones 2007 National Site Assessment Symposium Denver, Colorado June 19-21, 2007 A Trip Down Memory Lane: Federal Facilities Site Assessment Milestones Presented by Monica Iindeman SA Manager, SA Data Manager,

More information

Defense Environmental Funding

Defense Environmental Funding 1 Defense Environmental Funding The Department of Defense (DoD) funds its environmental programs through effective planning, programming, budgeting, and execution processes that allocate financial resources

More information

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress November 2012 Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics Preparation of this report/study

More information

FOSC Prince William Sound January 31, CDR Michael. R. Franklin CG Marine Safety Unit Valdez

FOSC Prince William Sound January 31, CDR Michael. R. Franklin CG Marine Safety Unit Valdez FOSC Prince William Sound January 31, 2018 CDR Michael. R. Franklin CG Marine Safety Unit Valdez FOSC Prince William Sound September 2017 January 2018 Incident Summary Total Incidents: 10 incidents Amount

More information

Cleanup Successes and Challenges. James D. Werner Director, Air & Waste Management Division

Cleanup Successes and Challenges. James D. Werner Director, Air & Waste Management Division Cleanup Successes and Challenges James D. Werner Director, Air & Waste Management Division 26 October 2007 Dover AFB ERP Acceleration Initiative Committed cooperation between Air Force, EPA, and State

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: January 24, 2017 Expiration Date: February 22, 2017 US Army Corps of Engineers No: NWP-2007-5/2 Oregon Department of State Lands No: N/A Interested

More information

Drill Monitoring Annual Report. Prepared By: Roy Robertson Prince William Sound Regional Citizens Advisory Council

Drill Monitoring Annual Report. Prepared By: Roy Robertson Prince William Sound Regional Citizens Advisory Council Drill Monitoring Annual Report 2011 Prepared By: Roy Robertson Prince William Sound Regional Citizens Advisory Council 2011 Drill Report Index Date Report Number Drill Description April 14 752.431.110414

More information

FORA ESCA RP: STATUS TO DATE AND PROGRAM HIGHLIGHTS. Stan Cook ESCA Program Manager FORA 1

FORA ESCA RP: STATUS TO DATE AND PROGRAM HIGHLIGHTS. Stan Cook ESCA Program Manager FORA 1 FORA ESCA RP: STATUS TO DATE AND PROGRAM HIGHLIGHTS 1 Stan Cook ESCA Program Manager FORA 1 P THE ESCA RP GROUPS MONTEREY COUNTY MARINA CSUMB Off-Campus County North Parker Flats Future East Garrison SAND

More information

CRS Report for Congress

CRS Report for Congress Order Code RL32533 CRS Report for Congress Received through the CRS Web Vieques and Culebra Islands: An Analysis of Environmental Cleanup Issues August 18, 2004 David M. Bearden and Linda G. Luther Analysts

More information

MMRP Sites (Final RIP/RC): Five-Year Review Status:

MMRP Sites (Final RIP/RC): Five-Year Review Status: Aberdeen Proving Ground Edgewood Area and Michaelsville Landfill NPL/BRAC 2005 Realignment MD321382135500 Surface Water, Sediment, Soil, Groundwater Edgewood and Aberdeen, Maryland (72,516 acres) $ 606.2

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA 31707 REPLY TO ATTENTION OF SEPT 1ER 1 1 2815 Regulatory Division SAS-2013-00942 JOINT

More information

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 15, 2015 Comment Deadline: February 16, 2015 Corps Action ID Number: SAW-2014-02202 The Wilmington District, Corps of Engineers

More information

Environmental Restoration Program

Environmental Restoration Program July 29, 2004 July 2007 http://www.bracpmo.navy.mil/brac2005/bracbases/ca/concord/default.aspx Introduction This fact sheet provides an update on the environmental restoration activities in the Inland

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2015-00306 Of Engineers Date Issued: 14 January 2016 Galveston District Comments Due: 16 February 2016 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

FY2013 LTA - MARION ENGR DEPOT EAST

FY2013 LTA - MARION ENGR DEPOT EAST FY2013 LTA - MARION ENGR DEPOT EAST Army Defense Environmental Restoration Program Installation Action Plan Printed 27 August 2013 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

[FWS R4 ES 2018 N015; FVHC XXX FF04G01000] Notice of Availability; Florida Trustee Implementation Group Deepwater Horizon

[FWS R4 ES 2018 N015; FVHC XXX FF04G01000] Notice of Availability; Florida Trustee Implementation Group Deepwater Horizon This document is scheduled to be published in the Federal Register on 03/15/2018 and available online at https://federalregister.gov/d/2018-05137, and on FDsys.gov Billing Code 4333 15 DEPARTMENT OF THE

More information

FY2016 SIEVERS-SANDBERG USARC

FY2016 SIEVERS-SANDBERG USARC FY2016 SIEVERS-SANDBERG USARC Army Defense Environmental Restoration Program Installation Action Plan Printed 30 August 2016 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

Information Repository--UMore East

Information Repository--UMore East UMP000001 - UMP000167 Response to MPCA's Request for Information and the Production of Documents September-84 UMP020006 - UMP020152 Final Report to the Rosemount Groundwater Protection Task Force, Volume

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2012-00381 Of Engineers Date Issued: April 27, 2016 Galveston District Comments Due: May 30, 2017 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment)

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment) April 2003 Army Environmental Cleanup Strategy Foreword I am pleased to present the Army s Environmental Cleanup Strategy. The Strategy provides a roadmap to guide the Army in attaining its environmental

More information

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION An Act S.1438 One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION To authorize appropriations for fiscal year 2002 for military activities of the Department of Defense, for

More information

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: March 1, 2018 Comment Deadline: April 2, 2018 Corps Action ID Number: SAW-2011-02228 The Wilmington District, Corps of Engineers

More information

Unexploded Ordnance (UXO)

Unexploded Ordnance (UXO) BRAC Environmental Fact Sheet SPRING 1999 OFFICE OF THE DEPUTY UNDER SECRETARY OF DEFENSE (ENVIRONMENTAL SECURITY) Unexploded Ordnance (UXO) The Department of Defense (DoD) defines military munitions/explosive

More information

CHAPTER 2 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES

CHAPTER 2 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES CHAPTER 2 DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES 2.1 PROPOSED ACTION....................................... 2-2 2.2 DETAILED DESCRIPTION OF THE ALTERNATIVES............ 2-5 2.3 SUMMARY OF TRANSFORMATION

More information

Army. Environmental. Cleanup. Strategy

Army. Environmental. Cleanup. Strategy Army Environmental Cleanup Strategy April 2003 28 April 2003 Army Environmental Cleanup Strategy Foreword I am pleased to present the Army s Environmental Cleanup Strategy. The Strategy provides a roadmap

More information

ATTORNEY GENERAL Environmental Protection Division. An Inventory of Its Twin Cities Army Ammunition Plant Files

ATTORNEY GENERAL Environmental Protection Division. An Inventory of Its Twin Cities Army Ammunition Plant Files MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ATTORNEY GENERAL Environmental Protection Division An Inventory of Its Twin Cities Army Ammunition Plant Files OVERVIEW OF THE RECORDS Agency: Minnesota.

More information

DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S

DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S807-4301 REPLY TO ATTENTION OF, CEHNC-CX-MM APR.1 8 m MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Explosives

More information

PACIFIC STATES BRITISH COLUMBIA OIL SPILL TASK FORCE

PACIFIC STATES BRITISH COLUMBIA OIL SPILL TASK FORCE PACIFIC STATES BRITISH COLUMBIA OIL SPILL TASK FORCE 2009-2012 STRATEGIC PLAN PUBLIC COMMENT DRAFT STATEMENT OF AUTHORITY This document represents a consensus of the 2009 Pacific States/British Columbia

More information

University of Alaska Overview

University of Alaska Overview University of Alaska Overview UA Mission Statement System Highlights Three separately accredited universities 12 Community campuses 30,496 students 4,600 graduates in 2016 Alaska s #1 higher education

More information

1 San Diego, CA One Corps Serving The Army and The Nation

1 San Diego, CA One Corps Serving The Army and The Nation FUDS MMRP Site Inspections Overview Briefing 1 San Diego, CA Mar. 12, 2008 US A C Agenda FUDS Program Overview Intro to Military Munitions Response Program Site Inspections FUDS MMRP Site Inspection Phase

More information

DEPARTMENT OF DEFENSE BASE REALIGNMENT AND CLOSURE ARMY. Fiscal Year (FY) 2013 Budget Estimates JUSTIFICATION DATA SUBMITTED TO CONGRESS

DEPARTMENT OF DEFENSE BASE REALIGNMENT AND CLOSURE ARMY. Fiscal Year (FY) 2013 Budget Estimates JUSTIFICATION DATA SUBMITTED TO CONGRESS DEPARTMENT OF DEFENSE BASE REALIGNMENT AND CLOSURE ARMY Fiscal Year (FY) 2013 Budget Estimates JUSTIFICATION DATA SUBMITTED TO CONGRESS FEBRUARY 2012 BRAC 1995 DEPARTMENT OF DEFENSE BASE REALIGNMENT AND

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Title Inspectability of Piping at Valdez Marine Terminal LRFP Number 5590.14.01 Project Manager Tom Kuckertz Submittal Deadline January 15, 2014 Award Announcement January 31, 2014

More information

STATE OF ALASKA ANNUAL REPORT ACTIVITIES UNDER TITLE III WATER RESOURCES PLANNING ACT PL 89-80

STATE OF ALASKA ANNUAL REPORT ACTIVITIES UNDER TITLE III WATER RESOURCES PLANNING ACT PL 89-80 STATE OF ALASKA ANNUAL REPORT ACTIVITIES UNDER TITLE III WATER RESOURCES PLANNING ACT PL 89-80 Report Period - October 1~ 1979 - March 31, 1981, Federal FY 80. Water resources planning in Alaska received

More information

NAVFAC Headquarters Announces 2010 Drum-E Award Winners

NAVFAC Headquarters Announces 2010 Drum-E Award Winners NAVFAC Headquarters Announces 2010 Drum-E Award Winners Awards Recognize Excellence in Environmental Restoration THE BATTLE EFFECTIVENESS or Battle E Award has long recognized Navy ships or units that

More information

U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013

U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013 U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013 The Quarterly RAB meeting was held at Building 455 at Fort Monmouth, Oceanport Avenue, Oceanport, New Jersey. At

More information

ENVIRONMENTAL COMPLIANCE AND PROTECTION PROGRAM

ENVIRONMENTAL COMPLIANCE AND PROTECTION PROGRAM Volume 10 VOLUME 10 ENVIRONMENTAL RESTORATION (ER) PROGRAM SUMMARY OF VOLUME 10 CHANGES Hyperlinks are denoted by bold, italic, blue and underlined font. The original publication date of this Marine Corps

More information

Country profile Namibia

Country profile Namibia Country profile Namibia 1- General information Full name of the country Capital city Official language(s) Namibia Windhoek English Main ports Walvis Bay Luderitz Coastline (km) 1570 2- Competent National

More information

ANNEX 3-34 ENGINEER OPERATIONS APPENDIX A: PRIME BEEF AND RED HORSE CAPABILITIES

ANNEX 3-34 ENGINEER OPERATIONS APPENDIX A: PRIME BEEF AND RED HORSE CAPABILITIES ANNEX 3-34 ENGINEER OPERATIONS APPENDIX A: PRIME BEEF AND RED HORSE CAPABILITIES Last Updated: 15 August 2017 This appendix describes capabilities that Prime Base Engineer Emergency Force (BEEF) and RED

More information

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Hurricane Sandy Coastal Resiliency Competitive Grants Program Hurricane Sandy Coastal Resiliency Competitive Grants Program Request for Proposals Proposal Due Date: Friday, January 31, 2014 On behalf of the Department of the Interior, the National Fish and Wildlife

More information

The attached is updated text for incorporation into the subject document. Replace current text pages with the change text pages as described below:

The attached is updated text for incorporation into the subject document. Replace current text pages with the change text pages as described below: Change 2 Munitions Response Site (MRS) Security Program (formerly Ordnance and Explosives (OE) Site Security 2002 Program Summary) Former Fort Ord, California, 2005 The attached is updated text for incorporation

More information

CESAJ-PM (Cong) March 2015

CESAJ-PM (Cong) March 2015 CESAJ-PM (Cong) March 2015 1. DESCRIPTION FACT SHEET DERP-FUDS Culebra, Puerto Rico Defense Environmental Restoration Program (DERP) Programs and projects are appropriated under Environmental Restoration

More information

OPNAVINST N46 24 Apr Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL FACILITIES ENGINEERING COMMAND

OPNAVINST N46 24 Apr Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL FACILITIES ENGINEERING COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.348 N46 OPNAV INSTRUCTION 5450.348 From: Chief of Naval Operations Subj: MISSION,

More information

2016 Standard Application Packet for Concord Community Preservation Act Funding

2016 Standard Application Packet for Concord Community Preservation Act Funding 2016 Standard Application Packet for Concord Community Preservation Act Funding The following materials are excerpted from Pages 31-36 of the 2016 Concord Community Preservation Plan. The Community Preservation

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW 2013-51 HOUSE BILL 484 AN ACT TO ESTABLISH A PERMITTING PROGRAM FOR THE SITING AND OPERATION OF WIND ENERGY FACILITIES. The General Assembly

More information

King County Flood Control District 2017 Work Program

King County Flood Control District 2017 Work Program Attachment A 2017 Budget Work Program November 7, 2016 FCD2016-20 Attach A King County Flood Control District 2017 Work Program The District work program is comprised of three categories: district oversight

More information

Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is con

Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is con Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is considered to be the appropriate document for this review

More information

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING Primary Agency: Chatham County Department of Public Works Support Agencies: Chatham Emergency Management Agency Chatham County Engineering

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: April 19, 2016 Expiration Date: May 19, 2016 US Army Corps of Engineers No: NWP-2014-37/2 Oregon Department of State Lands No: 56882-RF Interested

More information

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana JOINT PUBLIC NOTICE July 16, 2018 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Water Permits Division 7400 Leake Avenue

More information

or Austin Love PWSRCAC Project Manager Prince William Sound Regional Citizens Advisory Council P.O. Box 3089 Valdez, AK 99686

or Austin Love PWSRCAC Project Manager Prince William Sound Regional Citizens Advisory Council P.O. Box 3089 Valdez, AK 99686 REQUEST FOR PROPOSALS Title Rapidly Deployable Boom Technology LRFP Number 5700.17.01 Project Manager Austin Love Submittal Deadline Tuesday, March 7, 2017 Award Announcement Monday, April 3, 2017 Submit

More information

STEWARDSHIP EXCELLENCE

STEWARDSHIP EXCELLENCE RESPECT INTEGRITY ANNUAL REPORT 2017 STEWARDSHIP EXCELLENCE TABLE OF CONTENTS President s Message...2 What We Do...3 2017 Highlights...4 Advancing Alaska: The Network Years in Review...6 Raising the Bar...8

More information

General EMS and Environmental Awareness Training for Contractors/Vendors at Marine Corps Air Station (MCAS) Cherry Point, NC

General EMS and Environmental Awareness Training for Contractors/Vendors at Marine Corps Air Station (MCAS) Cherry Point, NC Training for Contractors/Vendors at Marine Corps Air Station (MCAS) Cherry Point, NC I. Purpose Guide for Contracting Offices and Representatives In accordance with Department of Defense (DoD) instructions

More information

Contingency Planning, Emergency Management & Marine Transportation Policy Leader

Contingency Planning, Emergency Management & Marine Transportation Policy Leader Contingency Planning, Emergency Management & Marine Transportation Policy Leader Transitioning Coast Guard leader that collaborates with diverse internal and external stakeholders to deliver results in

More information

Alaska Marine Ecosystem Forum MEMORANDUM OF UNDERSTANDING

Alaska Marine Ecosystem Forum MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING Memorum of Understing MEMORANDUM OF UNDERSTANDING Between U.S. DEPARTMENT OF COMMERCE NATIONAL MARINE FISHERIES SERVICE THE NORTH PACIFIC FISHERY MANAGEMENT COUNCIL U.S. DEPARTMENT

More information

Meeting Minutes April 26, Project: Former Camp Butner Restoration Advisory Board (RAB)

Meeting Minutes April 26, Project: Former Camp Butner Restoration Advisory Board (RAB) Meeting Minutes April 26, 2012 Project: Former Camp Butner Restoration Advisory Board (RAB) Date: April 26, 2012, 4:00 5:30 PM Place: Butner Town Hall 415 Central Avenue Butner, North Carolina 27509 Attendees:

More information

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson SUMMARY Under current law, every city and county must adopt a general plan with seven mandatory elements:

More information

Name, title, and address of authorized agent if different from item 1 (include zip code) Jim Gill, COO Bitterroot Trails, LLC

Name, title, and address of authorized agent if different from item 1 (include zip code) Jim Gill, COO Bitterroot Trails, LLC STANDARD FORM 299 (6/99) Prescribed by DOI/USDA/DOT P.L. 96-487 and Federal Register Notice 5-22-95 APPLICATION FOR TRANSPORTATION AND UTILITY SYSTEMS AND FACILITIES ON FEDERAL LANDS NOTE: Before completing

More information

Army Corps Begins. Scoping Meetings. Newsletter. February 2013 Toksook Bay, Hooper Bay, Emmonak & Saint Mary s. March 2013 Holy Cross & McGrath

Army Corps Begins. Scoping Meetings. Newsletter. February 2013 Toksook Bay, Hooper Bay, Emmonak & Saint Mary s. March 2013 Holy Cross & McGrath Newsletter January 2013 Public Scoping Meetings In January, public input meetings were held by the Corps in the following communities: Bethel Aniak Crooked Creek Anchorage Nunapitchuk Akiak meetings in

More information

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 July 5, 2018 Regulatory Branch SAS-2015-00235 JOINT PUBLIC NOTICE Savannah District/State

More information

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Introduction Cannon Air Force Base (AFB) is home to the 27th Special Operations Wing (SOW), whose primary

More information

Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care. Douglas Day

Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care. Douglas Day Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care Douglas Day What We ll Discuss Background. Lessons learned: Construction Post-closure care Land management Summary. Land of 10,000

More information

FINAL PUBLIC INVOLVEMENT PLAN REMEDIAL INVESTIGATION AT THE GAS INSTRUCTION AREA FORMER SCHILLING AIR FORCE BASE SALINE COUNTY, KANSAS

FINAL PUBLIC INVOLVEMENT PLAN REMEDIAL INVESTIGATION AT THE GAS INSTRUCTION AREA FORMER SCHILLING AIR FORCE BASE SALINE COUNTY, KANSAS FINAL PUBLIC INVOLVEMENT PLAN REMEDIAL INVESTIGATION AT THE GAS INSTRUCTION AREA FORMER SCHILLING AIR FORCE BASE SALINE COUNTY, KANSAS FUDS Project No. B07KS025607 Prepared for U.S. Army Corps of Engineers

More information

FOSC-R Training. Outline Part I

FOSC-R Training. Outline Part I US Coast Guard Federal On-Scene Coordinator Representative: Coordinate Response Resources & Planning & Temporary Storage Devices 1 FOSC-R Training 1.0 Identify Coast Guard Jurisdiction Authority 2.0 Conduct

More information

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies:

Emergency Support Function #3 Public Works and Engineering Annex. ESF Coordinator: Support Agencies: Emergency Support Function #3 Public Works and Engineering Annex ESF Coordinator: Department of Defense/U.S. Army Corps of Engineers Primary Agencies: Department of Defense/U.S. Army Corps of Engineers

More information

Record of Decision for the Stationing and Training of Increased Aviation Assets within U.S. Army Alaska

Record of Decision for the Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Record of Decision for the Stationing and Training of Increased Aviation Assets within U.S. Army Alaska U.S. Army Alaska OCTOBER 2009 Record of Decision (ROD) for the Stationing and Training of Increased

More information

Defense Environmental Programs Annual Report to Congress for FY 2015

Defense Environmental Programs Annual Report to Congress for FY 2015 Defense Environmental Programs Annual Report to Congress for JULY 2016 Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics The estimated cost of this report or study for

More information

Alternative Planning Criteria (APC) Plans in Alaska

Alternative Planning Criteria (APC) Plans in Alaska Implementation of Alaska Tanker and Nontank Vessel APC s in Alaska The Alaska Maritime Prevention and Response Network is a non-profit organization established to implement alternative spill response and

More information

Appendix D: Restoration Budget Overview

Appendix D: Restoration Budget Overview Appendix D: Restoration Overview Over the past 0 years, the Department of Defense (DoD) has invested over $0 billion in restoration efforts through the Defense Environmental Restoration Program (DERP).

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 FEB O 2 2018 Regulatory Branch SAS-2002-03090 JOINT PUBLIC NOTICE Savannah

More information

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012 Pennsylvania s Act 13 of 2012 SRBC Water Quality Advisory Committee Meeting May 21, 2012 Roadmap Statutory and Regulatory Framework Marcellus Shale Advisory Commission Act 13/2012 Oil and Gas Act Questions

More information

Navy Expeditionary Combat Command Executing Navy s Maritime Strategy

Navy Expeditionary Combat Command Executing Navy s Maritime Strategy Navy Expeditionary Combat Command Executing Navy s Maritime Strategy RADM Mark Handley NDIA 15 th Annual Expeditionary Warfare Conference 6 OCT 2010 THIS BRIEF CLASSIFIED: UNCLASS Overview Riverine Maritime

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Strategic Environmental Research and Development Program (SERDP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Strategic Environmental Research and Development Program (SERDP) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Office of Secretary Of Defense DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete

More information

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana Harbor Location: Calumet Harbor is located on the southwest shore of Lake Michigan in Chicago, Cook County, Illinois and the approach

More information

EXPLOSIVES SAFETY SUBMISSION

EXPLOSIVES SAFETY SUBMISSION 28 Mar 2003 SAFETY EXPLOSIVES SAFETY SUBMISSION ENGINEER PAMPHLET Approved for public release; distribution is unlimited. AVAILABILITY Electronic copies of this and other U.S. Army Corps of Engineers publications

More information

Overview of USCG Response Program EPA OSC Conference 2012 LCDR Shaun Edwards

Overview of USCG Response Program EPA OSC Conference 2012 LCDR Shaun Edwards Overview of USCG Response Program EPA OSC Conference 2012 LCDR Shaun Edwards 1 USCG- Local Level Field Unit- Local Level 35 Sectors: Sector CDR- COTP, FOSC, SMC, OCMI, FMSC Response Department: Law Enforcement,

More information

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION Page 1 of 19 NWP 1 - Aids to Navigation. No additional CZM conditions. NWP 1 - No PCN requirements. NWP 2 - Structures in Artificial Canals. Prior to commencement of activities that would NWP 2 - No PCN

More information

Billing Code P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. PF ] Notice of Intent to Prepare an

Billing Code P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. PF ] Notice of Intent to Prepare an This document is scheduled to be published in the Federal Register on 07/29/2014 and available online at http://federalregister.gov/a/2014-17756, and on FDsys.gov Billing Code 6717-01-P DEPARTMENT OF ENERGY

More information

DEPARTMENT OF THE ARMY GENERAL PERMIT

DEPARTMENT OF THE ARMY GENERAL PERMIT DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington A venue Wilmington, North Carolina 28403-1343 http://www.saw.usace.army.mil/wetlands/index.html General Permit No. 198000291

More information

Final Environmental Restoration Program Recordkeeping Manual

Final Environmental Restoration Program Recordkeeping Manual Naval Facilities Engineering Command Washington, DC 20374-5065 Final Environmental Restoration Program Recordkeeping Manual February 2017 Approved for public release; distribution is unlimited Preface

More information

Office of the Deputy Assistant Secretary of the Army (ODASA) for Environment, Safety and Occupational Health (ESOH) NAOC.

Office of the Deputy Assistant Secretary of the Army (ODASA) for Environment, Safety and Occupational Health (ESOH) NAOC. Office of the Deputy Assistant Secretary of the Army (ODASA) for Environment, Safety and Occupational Health (ESOH) NAOC 7 December 2016 Deputy Assistant Secretary of the Army (Installations, Energy &

More information

Ordnance Holdings, Inc. (OHI)

Ordnance Holdings, Inc. (OHI) Ordnance Holdings, Inc. (OHI) Managing UXO/MEC During Dredging Projects Presentation: Western Dredging Association Conference October 2016 Jonathan Sperka Technical Director, OHI Ordnance Holdings, Inc.

More information

Army Environmental Cleanup Strategic Plan

Army Environmental Cleanup Strategic Plan Army Environmental Cleanup Strategic Plan Headquarters, Department of the Army OACSIM, Installations Service Directorate Army Environmental Division May 2009 Report Documentation Page Form Approved OMB

More information