1 AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet

2 THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM 2014 Site Management Plan Amendment Eielson AFB 2/18/2014

3 Table of Contents Site Management Plan Amendment Table of Contents Acronym List... ii 1.0 Introduction Work Accomplished in Work Planned for Schedule of s... 4 Page i

4 Acronym List Site Management Plan Amendment Acronym List ADEC AFB AOC BRA BRS COC CSM Draft FFA FS FYR IC IRP IWMP LTM LUC MP OU PP PSG QAPP RI RD ROD RSA SER SMP SRI UIC VI Alaska Department of Environmental Conservation Air Force Base Area of Concern Baseline Risk Assessment Baseline Risk Screening Contaminant of Concern Conceptual Site Model Draft Federal Facility Agreement Feasibility Study Five-Year Review Institutional Control Installation Restoration Program Installation-Wide Monitoring Program Long Term Monitoring Land Use Controls Management Plan Operable Unit Proposed Plan Passive Soil Gas Quality Assurance Project Plan Remedial Investigation Remedial Design Record of Decision Risk Screening Assessment Source Evaluation Site Management Plan Supplemental Remedial Investigation Underground Injection Control Vapor Intrusion Page ii

5 1.0 Introduction This Site Management Plan (SMP) establishes milestones associated with the performance of work and submittal of documents as stipulated in the Federal Facility Agreement (FFA) for Eielson Air Force Base (AFB) and fulfills the requirements of Paragraph 5.4 of the Institutional Control / Land Use Control (IC/LUC) Settlement Agreement that was signed 4/16/2013. The SMP addresses the following Operable Units (OU) and Installation Restoration Program (IRP) Source Areas at Eielson AFB: OU 1: ST20, ST48, ST49, SS50, SS51, and SS52 OU 2: ST10/SS14, ST11, ST18, ST19, LF05, SS31, SS62, and ST13/DP26 OU 3: DP44, WP45/SS57, ST56, SS61 OU 4: DP25, ST27, WP33, SS35, SS36, SS37, SS39/SS63, SS64, and ST58 OU 5: LF02, LF03/FT09, LF04, LF06, OU 6: WP38 Sitewide OU: SS67 The grouping of sites into OUs was based on the presence of similar contaminants and environmental characteristics. As a result, sites within OUs can be expected to have comparable goals and management requirements. Site investigations were conducted and led to development of a series of RODs which correspond to the OUs. These included: OU1: OU1B ROD and OU1 ROD OU2: OU2 ROD OU3, OU4, and OU5: OU3,4,5 ROD OU6: OU6 ROD Sitewide OU: Sitewide ROD In addition to the existing IRP sites, a number of sites are currently undergoing evaluation through the Source Evaluation (SER) process. These sites are managed under the FFA requirements until the sites are either closed or transferred to management under Alaska Department of Environmental Conservation (ADEC) Contaminated Sites regulations. 2.0 Work Accomplished in 2013 The Air Force 2013 field season included data collection in support of Conceptual Site Models (CSMs) at a number of source areas, Supplemental Remedial Investigations (RIs) for SS67 and WP45/SS57, implementation of the Installation Wide Monitoring Program (IWMP), and completion of a Phase II Source Evaluation (SER) for SS86. Page 1

6 The IWMP consisted of installation-wide groundwater sampling, in both the spring and fall seasons, as well as selected source area vapor intrusion sampling during warm and cold temperatures. The IWMP represents a long term monitoring (LTM) program which is key for evaluating the protectiveness of remedies at the source areas and tracking individual site progress towards site closure goals. The Air Force completed the field work for Conceptual Site Model (CSM) updates for source areas SS35, ST48, ST20, ST10/SS14, ST13/DP26, SS37, and LF03/FT09. The CSM updates are intended to provide additional detail on plume stability and contaminant of concern (COC) fate and transport. submittals are planned for early The groundwater investigation needed to complete the supplemental RI for WP45/SS57 was completed during the 2013 field season. This included installation of additional shallow downgradient wells to complete the horizontal profile for the extent of contamination and installation of deep wells (+200 ft below land surface) to evaluate the vertical profile and extent of contamination. Sampling was also included to evaluate the vapor intrusion pathway. For SS67, both sediment and saturated soil profile sampling was conducted. Fish tissue samples from Garrison Slough continued to show polychlorinated biphenyls (PCBs) at levels above the Remedial Action Objectives (RAOs). The supplemental RI for SS67 was intended to evaluate the current distribution of PCBs within the source area as well as the effectiveness of prior sediment removal actions. Information collected during the field season will be submitted in 2014 as a supplemental RI report. Completed Draft s (Jan Dec 2013) No. Date Submitted Category 1 Submit Draft Building 1316 Heat Plant Site Phase 1 SER (due date agreed upon by 1/9/2013 Primary stakeholders at RPM meeting on 11/14/12) 2 4th Quarter /10/ Submit Draft Phase 1 SER 37 sites 1/11/2013 Primary 4 Submit Draft Building 1232 UIC Wells Site Phase 1 SER 1/23/2013 Primary 5 Submit Draft Innovative Technologies Evaluation 1/30/ LUC Annual 2 2/5/ Submit Draft SS083 - Bldg 3240 R11 Refueler Parking Site Phase 1 SER (due date agreed upon by stakeholders at RPM meeting on 11/14/12) 2/6/2013 Primary Page 2

7 No. Date Submitted Category 8 Submit Draft VI Addendum for IWMP QAPP (20- day extension from the due date of 1/25/13 was requested by AF and was approved) 2/14/2013 Primary 9 Submit Draft WP45/SS57 Letter 3/26/ Submit Draft SS67 Letter 3/26/ Submit 1st Quarter /10/ Submit Draft 2012 IWMP Groundwater 4/22/ Submit Draft Generic QAPP Addendum No. 2 (Accutest, for Soil Sampling under CSM 4/25/2013 Primary Updates) 14 Submit 1st Quarter FFA Progress, Add. No. 1 IC/LUC Update 5/1/ Submit Letter Work Plan for Ground Penetrating Radar, and Landfill Surveys and Landfill 5/13/2013 Inspections 16 Submit Draft FYR (initial date 5/17/13; 10 calendar day extension requested on 5/16/13 and approved by by both ADEC and EPA 5/28/2013 Primary on 5/17/13, due date was delayed by 11 days due to Memorial Day holiday) 17 Submit Draft Background Soil Study 6/3/2013 Secondary 18 Submit Draft LF03/FT09, ST10/SS14, ST13/DP26, SS37, CS081QAPP for CSM Update (combined) 6/3/2013 Primary 19 Submit Draft SS67 Supplement to QAPP 6/18/2013 Secondary 20 Submit 2nd Quarter 2013 (inclusive of IC/LUC Update) 7/10/ Submit Draft Land Use Control Implementation Plan 8/16/ Submit Revision 1 of DF FYR 8/28/2013 Primary 23 Submit Draft SMP 1 Amendment for /1/ rd Quarter (inclusive of IC/LUC Update) 10/10/ Prepare and Submit Draft Spring 2013 Groundwater Sampling Technical Memorandum 11/4/ Submit Draft SS35 CSM Update 11/4/ Prepare and Submit Draft Background Groundwater Study PSG, GPR, Landfill Survey and Landfill Inspection, and Monitoring Wells Maintenance and Repairs Technical Memorandum Prepare and Submit Draft IWMP VI Technical Memorandum (only warm weather data) Page 3 11/27/2013 Secondary 12/4/ /19/2013

8 No. Date Submitted Category 33 Submit D CS082 Site Characterization (SER ) 12/19/ Submit D CS081 (SER ) Site Characterization 12/19/2013 Notes: 1 LUC Updates were included as part of the Quarterly s 2 This document is identified as an type of document by the LUC/IC Settlement Agreement 3.0 Field Work Planned for 2014 IWMP Spring and Fall groundwater sampling events IWMP warm and cold weather VI sampling event Partial removal of drums and debris from the pond/shore area adjacent to SS35 Data collected in 2011, 2012, and 2013 as part of the IWMP or other site investigation efforts was consistent with site expectations. There are no indications of any immediate threats to human health or the environment. A removal action is planned for SS35 for the 2014 field season. It is expected that more comprehensive removal actions for SS67 and SS35 will be planned for 2015 and 2016 respectively. No other interim remedial actions, time critical removal actions, or non-time critical removal actions are planned for Eielson AFB at this time. 4.0 Schedule of s The Eielson AFB FFA defines Primary and Secondary documents as well as their associated review cycles and comment periods. As a result, only draft documents are shown in the milestone schedule since the dates of subsequent documents (e.g., Draft Final, Final) are dependent on whether the stakeholders request an extension in review duration and whether the Air Force requests an extension in developing responses to comments and revising the document. In addition to the FFA recognized document categories of Primary and Secondary, a third category,, has been added to the milestone schedule. s assigned to the category do not fall within the Eielson AFB FFA definitions of documents which would be either Primary or Secondary ( 20.3 & 20.4). For purposes of long-term planning, documents assigned to the category are managed according to the review cycle for Secondary documents unless otherwise specified. NOTE: classification is established before a document is added to the SMP and requires concurrence from Air Force, EPA, and ADEC program managers. Page 4

9 Primary documents are always completed through production of an approved Final. Secondary and types of documents are only required to have a Draft with a formal response to regulator comments. These documents may never have corresponding stand-alone final versions. The expectation is that any changes identified in the RTCs would be addressed in the Primary document which incorporates the Secondary document (i.e., RI RTCs addressed in RI/FS Draft). The FFA s connection of Secondary documents to Primary documents is clearly established for the CERCLA process leading up to a ROD. The connection for post-rod documents, however, not as clearly defined in the FFA. As a result, clarification was provided in the IC/LUC Settlement Agreement, Paragraph which states: Requirements and/or recommendations of the FYR and recommendations from the Annual s, where appropriate, will be incorporated into applicable decision documents, via an amendment and/or an Explanation of Significant Differences (ESD). Further, the Air Force considers documents identified as Data Summaries, Technical Memorandum, or Conceptual Site Model Updates to be in support of evaluating source area progress towards achieving ROD goals. Findings and recommendations from these documents will also inform decision document action and, where appropriate, will lead to a ROD amendment and/or an ESD. No. 1 Quarterly - 4th Q 2013 (inclusive of IC/LUC Update) MILESTONE SCHEDULE Category 2 ST13/DP26 - Draft CSM Update Secondary 3 4 SS67 - Draft RI (does not include the BRA report) LF03/FT09 - Draft CSM Update (combined w/ss37 CSM Update ) 5 ST10/SS14 - Draft CSM Update 6 SS37 - Draft CSM Update (combined w/lf03/ft09 CSM Update ) Disputable Final FYR report / Decision Doc Due Date Date Context 1/10/2014 Target 1/14/2014 Target Secondary SS62 RI/FS 1/14/2014 Target Secondary FYR report / Decision Doc Secondary FYR report / Decision Doc Secondary FYR report / Decision Doc 1/30/2014 Target 1/30/2014 Target 1/30/2014 Target Page 5

10 No WP45/SS57 - Draft RI (inclusive of the BRA report) SS085 - Draft Phase 2 SER (aka - Building 3386 UIC Well) SS086 - Draft Phase 2 SER (aka - Taxiway Golf) Category Secondary Disputable FYR report / Decision Doc Due Date Date Context 1/31/2014 Target Primary 2/12/2014 Deadline Primary 2/12/2014 Deadline 10 SS084 - Draft Phase 2 SER (aka - AOC16) Primary 2/17/2014 Deadline WP45/SS57 - Draft QAPP Addendum No. 2 for VI IWMP - Draft QAPP Addendum No. 3 for 2014 Groundwater Monitoring 13 ST20 - Draft CSM Update 14 ST48 - Draft CSM Update IWMP - Draft 2013 Groundwater Monitoring (report contains data from both 2013 sampling events) Institutional Controls - Draft 2013 Annual (to include the field inspection report and per Section 5.3.9, IC/LUC database and Atlas) Primary 2/24/2014 Deadline Primary 3/3/2014 Deadline FYR report / Decision Doc FYR report / Decision Doc 3/9/2014 Target 3/12/2014 Target FYR 3/26/2014 Target 3/31/2014 Target 17 IWMP - Draft 2013 VI Assessment - contains data from both sampling events FYR 4/4/2014 Target Quarterly - 1st Q 2014 (inclusive of IC/LUC Update, to be continued based on section of the SA) Quarterly - 2nd Q 2014 (inclusive of IC/LUC Update, to be continued based on section of the SA) Final Final 4/10/2014 Target 7/10/2014 Target 20 SMP - Draft 2015 Amendment 10/1/2014 Target Page 6

11 No. 21 Quarterly - 3rd Q 2014 (inclusive of IC/LUC Update, to be continued based on section of the SA) Category Disputable Final Due Date Date Context 10/10/2014 Target IWMP - Draft Spring 2014 Groundwater Sampling TM Non OU Sites (20 compliance sites) - Draft RI/FS Management Plan SS67 ROD Implementation (sediment/soil removal) Draft Work Plan & QAPP Quarterly - 4th Q 2014 (inclusive of IC/LUC Update, to be continued based on section of the SA) OU3,4,&5 - Draft RI/FS Management Plan & QAPP IWMP - Draft 2014 Groundwater Monitoring (report contains data from both 2014 sampling events) Institutional Controls - Draft 2014 Annual (to include the field inspection report and and per Section 5.3.9, IC/LUC database and Atlas) FYR 11/2/2014 Target Primary 12/5/2014 Deadline Primary 1/5/2015 Deadline Final 1/10/2015 Target Primary 1/30/2015 Deadline FYR 2/4/2015 Deadline 3/31/2015 Target 29 WP45/SS57 - Draft Feasibility Study Secondary 30 WP45/SS57 - Draft VI Data WP45/SS57 - RI/FS WP45/SS57 - RI/FS 4/13/2015 Deadline 4/14/2015 Target 31 SMP - Draft 2016 Amendment 10/1/2015 Target 32 WP45/SS57 - Draft RI/FS Primary 11/23/2015 Deadline 33 OU2 - Draft RI/FS Management Plan Primary 12/7/2015 Deadline SS35 Draft EECA & Work Plan for Non Time Critical Removal Action (NTCRA) IWMP - Draft 2015 Groundwater Monitoring (report contains data from both 2015 sampling events) Page 7 Primary 1/4/2016 Deadline FYR 2/4/2016 Target

12 No Institutional Controls - Draft 2015 Annual SS67 ROD Implementation - Draft Completion Category 38 WP45/SS57 - Draft Proposed Plan Secondary Disputable Due Date Date Context 3/31/2016 Target Primary 5/3/2016 Deadline WP45/SS57 ROD 9/12/2016 Deadline 39 SMP - Draft 2017 Amendment 10/1/2016 Target 40 OU6 & OU1 - Draft RI/FS Management Plan Primary 12/19/2016 Deadline FYR Draft Performance Data WP & QAPP IWMP - Draft 2016 Groundwater Monitoring (report contains data from both 2016 sampling events) Primary 1/9/2017 Deadline FYR 2/4/2017 Target 43 OU3,4,&5 - Draft Supplemental RI Secondary OU3,4,&5 RI/FS 3/1/2017 Target 44 Institutional Controls - Draft 2016 Annual 3/31/2017 Target 45 Non OU Sites (20 compliance sites) - Draft RI (includes Risk Assessment) Secondary Non OU Sites - RI/FS 4/5/2017 Target 46 SS35 Draft NTCRA Completion Primary 5/2/2017 Deadline 47 WP45/SS57 - Draft ROD Amendment/Mod/ESD 48 OU3,4,&5 - Draft Feasibility Study Secondary 49 Non OU Sites (20 compliance sites) - Draft Feasibility Study Primary 7/17/2017 Deadline Secondary OU3,4,&5 RI/FS Non OU Sites - RI/FS 8/23/2017 Target 9/27/2017 Target 50 SMP - Draft 2018 Amendment 10/1/2017 Target 51 IWMP - Draft 2017 Groundwater Monitoring (report contains data from both 2017 sampling events) FYR 2/4/2018 Target Page 8

13 No. Category Disputable Due Date Date Context 52 OU3,4,&5 - Draft Supplemental RI/FS Primary 2/8/2018 Deadline OU2 - Draft Supplemental RI (includes Risk Assessment) Non OU Sites (20 compliance sites) - Draft Supplemental RI/FS Institutional Controls - Draft 2017 Annual Secondary OU2 RI/FS 2/22/2018 Target Primary 3/15/2018 Deadline 3/31/2018 Target 56 FYR Draft 5/1/2018 Target 57 OU6 & OU1 - Draft Supplemental RI (includes Risk Assessment) Secondary OU6 & OU1 RI/FS 5/7/2018 Target 58 SS62 - Draft RI/FS Management Plan Primary 7/2/2018 Deadline 59 OU2 - Draft Feasibility Study Secondary OU2 RI/FS 8/16/2018 Target 60 SMP - Draft 2019 Amendment 10/1/2018 Target 61 OU6 & OU1 - Draft Feasibility Study Secondary 62 OU3,4,&5 - Draft Proposed Plan Secondary Non OU Sites (20 compliance sites) - Draft Proposed Plan IWMP - Draft 2018 Groundwater Monitoring (report contains data from both 2018 sampling events) OU6 & OU1 RI/FS OU3,4,&5 ROD 10/29/2018 Target 11/16/2018 Target Primary 1/3/2019 Deadline FYR 2/4/2019 Target 65 OU2 - Draft Supplemental RI/FS Primary 2/14/2019 Deadline 66 Institutional Controls - Draft 2018 Annual 3/31/2019 Target 67 OU6 & OU1 - Draft Supplemental RI/FS Primary 4/16/2019 Deadline 68 OU3,4,&5 - Draft ROD Amendment/Mod Primary 9/20/2019 Deadline Page 9

14 No. Category Disputable Due Date Date Context 69 SMP - Draft 2020 Amendment 10/1/2019 Target 70 Non OU Sites (20 compliance sites) - Draft ROD Amendment/Mod Primary 11/7/2019 Deadline 71 OU2 - Draft Proposed Plan Secondary OU2 ROD 12/15/2019 Target 72 Chena Annex - Draft RI/FS Management Plan Primary 1/6/2020 Deadline 73 OU6 - Draft Proposed Plan Secondary OU6 ROD 2/4/2020 Target 74 OU1 - Draft Proposed Plan Secondary OU1 ROD 2/4/2020 Target IWMP - Draft 2019 Groundwater Monitoring Institutional Controls - Draft 2019 Annual FYR 2/4/2020 Target 3/31/2020 Target 77 SMP - Draft 2021 Amendment 10/1/2020 Target 78 OU2 - Draft ROD Amendment/Mod Primary 10/8/2020 Deadline 79 OU6 - Draft ROD Amendment/Mod Primary 12/8/2020 Deadline 80 OU1 - Draft ROD Amendment/Mod Primary 12/8/2020 Deadline 81 IWMP - Draft 2020 Groundwater Monitoring FYR 2/4/2021 Target 82 Institutional Controls - Draft 2020 Annual 3/31/2021 Target 83 SS62 - Draft RI (includes Risk Assessment) Secondary SS62 RI/FS 6/14/2021 Target 84 SMP - Draft 2022 Amendment 10/1/2021 Target 85 SS62 - Draft Feasibility Study Secondary SS62 RI/FS 12/6/2021 Target 86 FYR Draft Performance Data WP & QAPP Primary 12/16/2021 Deadline 87 IWMP - Draft 2021 Groundwater Monitoring FYR 2/4/2022 Deadline 88 Chena Annex - Draft RI (includes Risk Assessment) Secondary Chena Annex RI/FS 3/14/2022 Target 89 Institutional Controls - Draft 2021 Annual 3/31/2022 Target Page 10

15 No. Category Disputable Due Date Date Context 90 SS62 - Draft Supplemental RI/FS Primary 5/24/2022 Deadline 91 Chena Annex - Draft Feasibility Study Secondary Chena Annex RI/FS 9/5/2022 Target 92 SMP - Draft 2023 Amendment 10/1/2022 Target IWMP - Draft 2022 Groundwater Monitoring Chena Annex - Draft Supplemental RI/FS FYR 2/4/2023 Target Primary 2/21/2023 Deadline 95 SS62 - Draft Proposed Plan Secondary SS62 ROD 3/14/2023 Target 96 Institutional Controls - Draft 2022 Annual 3/31/2023 Target 97 FYR Draft 5/1/2023 Target 98 SMP - Draft 2024 Amendment 10/1/2023 Target 99 Chena Annex - Draft Proposed Plan Secondary Chena Annex ROD 11/29/2023 Target 100 SS62 - Draft ROD Amendment/Mod Primary 1/16/2024 Deadline IWMP - Draft 2023 Groundwater Monitoring Institutional Controls - Draft 2023 Annual FYR 2/4/2024 Target 3/31/2024 Target 103 SMP - Draft 2025 Amendment 10/1/2024 Target 104 Chena Annex - Draft ROD Primary 10/2/2024 Deadline Notes The SMP is identified as a requirement in the LUC/IC Settlement Agreement. The first SMP is required within 30 days of the signed Settlement Agreement and at least annually thereafter. Future SMPs are planned for after the end of the field season. The FYR document is identified as an document by the LUC/IC Settlement Agreement. However, a late submission of this document is subject to the stipulated penalties under 23.1 of the FFA. The Due Date Context for the FYR is driven by both CERCLA 121(c) and the Eielson AFB FFA under 19.1 Page 11

16 LUC Updates will be provided as part of the Quarterly s. The Installation-wide is provided under the terms of the applicable RODs and subject to the terms of the SMP. A late submission of this document is subject to the stipulated penalties under 23.1 of the FFA. LUC Annual s are included for 2014 and 2015, but continue for subsequent years. LUC s to be followed by an Annual Meeting within 30 days of report submittal. Page 12

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES: AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM FINAL Site Management Plan Eielson AFB 8/30/2013 Table of Contents

More information

FY2016 SIEVERS-SANDBERG USARC

FY2016 SIEVERS-SANDBERG USARC FY2016 SIEVERS-SANDBERG USARC Army Defense Environmental Restoration Program Installation Action Plan Printed 30 August 2016 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

FY2013 LTA - MARION ENGR DEPOT EAST

FY2013 LTA - MARION ENGR DEPOT EAST FY2013 LTA - MARION ENGR DEPOT EAST Army Defense Environmental Restoration Program Installation Action Plan Printed 27 August 2013 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico. Status Report for the Vieques Restoration Advisory Board. Through December 2008

Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico. Status Report for the Vieques Restoration Advisory Board. Through December 2008 Naval Facilities Engineering Command - Atlantic Vieques, Puerto Rico Status Report for the Vieques Restoration Advisory Board Through December 2008 This report provides the Restoration Advisory Board (RAB)

More information

MMRP Sites (Final RIP/RC): Five-Year Review Status:

MMRP Sites (Final RIP/RC): Five-Year Review Status: Aberdeen Proving Ground Edgewood Area and Michaelsville Landfill NPL/BRAC 2005 Realignment MD321382135500 Surface Water, Sediment, Soil, Groundwater Edgewood and Aberdeen, Maryland (72,516 acres) $ 606.2

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER 673D AIR BASE WING (PACAF) 673D AIR BASE WING INSTRUCTION 32-7003 30 JUNE 2011 Certified Current On 11 June 2015 Civil Engineering LAND USE CONTROL MANAGEMENT COMPLIANCE WITH

More information

MMRP Sites (Final RIP/RC): Five-Year Review Status:

MMRP Sites (Final RIP/RC): Five-Year Review Status: Aberdeen Proving Ground Edgewood Area and Michaelsville Landfill NPL/BRAC 2005 Realignment MD321382135500 Edgewood and Aberdeen, Maryland (72,516 acres) $ 592.9 million Develop and test equipment and provide

More information

Final. Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation

Final. Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation Final Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation Ravenna Army Ammunition Plant Ravenna, Ohio September 18, 2008 Contract

More information

Association of State and Territorial Solid Waste Management Officials State Federal Coordination Focus Group and Removal Action Focus Group

Association of State and Territorial Solid Waste Management Officials State Federal Coordination Focus Group and Removal Action Focus Group Association of State and Territorial Solid Waste Management Officials State Federal Coordination Focus Group and Removal Action Focus Group FINAL Removal Actions at Federal Facilities ASTSWMO 444 North

More information

JAG COVER SHEET. FILE NAME : CampPend.pdf CAMP PENDLETON MARINE CORPS BASE. Title : DoD, Navy, Marines, California, CA. Author :

JAG COVER SHEET. FILE NAME : CampPend.pdf CAMP PENDLETON MARINE CORPS BASE. Title : DoD, Navy, Marines, California, CA. Author : JAG COVER SHEET FILE NAME : CampPend.pdf Title : Subject : Author : Keywords : CAMP PENDLETON MARINE CORPS BASE Region 9, IX DoD, Navy, Marines, California, CA 9/28/90,1990, FY90 UNITED STATES ENVIRONMENTAL

More information

U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013

U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013 U.S. Army Fort Monmouth Restoration Advisory Board (RAB) Meeting Minutes February 7, 2013 The Quarterly RAB meeting was held at Building 455 at Fort Monmouth, Oceanport Avenue, Oceanport, New Jersey. At

More information

FY2016 PARKS RESERVE FORCES TRAINING AREA

FY2016 PARKS RESERVE FORCES TRAINING AREA FY2016 PARKS RESERVE FORCES TRAINING AREA Army Defense Environmental Restoration Program Installation Action Plan Printed 27 September 2016 Table of Contents Statement Of Purpose... Acronyms... Installation

More information

1 San Diego, CA One Corps Serving The Army and The Nation

1 San Diego, CA One Corps Serving The Army and The Nation FUDS MMRP Site Inspections Overview Briefing 1 San Diego, CA Mar. 12, 2008 US A C Agenda FUDS Program Overview Intro to Military Munitions Response Program Site Inspections FUDS MMRP Site Inspection Phase

More information

EXPLANATION OF SIGNIFICANT DIFFERENCES LAND USE CONTROLS TO RESTRICT USE OF GROUNDWATER. For

EXPLANATION OF SIGNIFICANT DIFFERENCES LAND USE CONTROLS TO RESTRICT USE OF GROUNDWATER. For 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 EXPLANATION OF SIGNIFICANT DIFFERENCES LAND USE CONTROLS TO RESTRICT USE OF GROUNDWATER For SHEPLEY'S HILL

More information

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet AR No. IR No. EIELSON AFB ALASKA Administrative Record Cover Sheet Restoration Advisory Board (RAB) Meeting Minutes Eielson Air Force Base (AFB), Alaska 20 October 2011 1. The RAB met on 20 October 2011

More information

LETTER REGARDING THE TRANSMITTAL OF THE THIRD QUARTERLY REPORT FOR REPORTING PERIOD JULY THROUGH SEPTEMBER 2009 NWS EARLE NJ 10/26/2009 TETRA TECH

LETTER REGARDING THE TRANSMITTAL OF THE THIRD QUARTERLY REPORT FOR REPORTING PERIOD JULY THROUGH SEPTEMBER 2009 NWS EARLE NJ 10/26/2009 TETRA TECH N60478.AR.000952 NWS EARLE 5090.3a LETTER REGARDING THE TRANSMITTAL OF THE THIRD QUARTERLY REPORT FOR REPORTING PERIOD JULY THROUGH SEPTEMBER 2009 NWS EARLE NJ 10/26/2009 TETRA TECH TETRA TECH PHIL-23288

More information

Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC

Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC Defense Environmental Restoration Program/Formerly Used Defense Sites Program, NC CONGRESSIONAL DISTRICT: NC 1, 3, 6, 8, 9, and 12 DATE: 23 February 2015 BACKGROUND: The U.S. Army Corps of Engineers, Savannah

More information

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

FINAL COMMUNITY INVOLVEMENT PLAN FORT GEORGE G. MEADE FORT MEADE, MARYLAND. Prepared Under:

FINAL COMMUNITY INVOLVEMENT PLAN FORT GEORGE G. MEADE FORT MEADE, MARYLAND. Prepared Under: FINAL COMMUNITY INVOLVEMENT PLAN FORT GEORGE G. MEADE FORT MEADE, MARYLAND Prepared Under: U.S. Army Environmental Command 2450 Connell Road, Building 2264, Rm 125 Fort Sam Houston, Texas 78234 Contract

More information

FY2013 TRIPLER ARMY MEDICAL CENTER

FY2013 TRIPLER ARMY MEDICAL CENTER FY2013 TRIPLER ARMY MEDICAL CENTER Army Defense Environmental Restoration Program Installation Action Plan Printed 18 October 2013 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

NAVFAC Headquarters Announces 2010 Drum-E Award Winners

NAVFAC Headquarters Announces 2010 Drum-E Award Winners NAVFAC Headquarters Announces 2010 Drum-E Award Winners Awards Recognize Excellence in Environmental Restoration THE BATTLE EFFECTIVENESS or Battle E Award has long recognized Navy ships or units that

More information

NAVAL STATION NEWPORT Newport, Rhode Island FINAL COMMUNITY INVOLVEMENT PLAN NAVSTA NEWPORT. Version: 1. Prepared for:

NAVAL STATION NEWPORT Newport, Rhode Island FINAL COMMUNITY INVOLVEMENT PLAN NAVSTA NEWPORT. Version: 1. Prepared for: NAVAL STATION NEWPORT Newport, Rhode Island FINAL COMMUNITY INVOLVEMENT PLAN NAVSTA NEWPORT Version: 1 Prepared for: Department of the Navy Naval Facilities Engineering Command, Mid-Atlantic 9742 Maryland

More information

DoD Post Remedy In Place Status

DoD Post Remedy In Place Status Beyond Response Complete (RC) at DoD Sites Ms. Deborah Morefield Environmental Management Directorate Office of the Deputy Under Secretary of Defense (Installations and Environment) March 10, 2010 DoD

More information

CLEAN II TRANSMITTAL/DELIVERABLE RECEIPT Contract No. N D-4670 Document Control No. CTO-0059/ File Code: 0208

CLEAN II TRANSMITTAL/DELIVERABLE RECEIPT Contract No. N D-4670 Document Control No. CTO-0059/ File Code: 0208 Wlb_OO_'O. 0 (g 1'?...gl M60050.001251 BECHTEL NATIONAL INC. MC^S EL TORO SS1C # 5090.3 CLEAN II TRANSMITTAL/DELIVERABLE RECEIPT Contract No. N-68711-92-D-4670 Document Control No. /000158 File Code: 0208

More information

FY2016 MILITARY OCEAN TERMINAL CONCORD

FY2016 MILITARY OCEAN TERMINAL CONCORD FY206 MILITARY OCEAN TERMINAL CONCORD Army Defense Environmental Restoration Program Installation Action Plan Printed 06 October 206 Table of Contents Statement Of Purpose... Acronyms... Acronym Translation

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY. June 2, 1997

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY. June 2, 1997 MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY INTEROFFICE COMMUNICATION REVISED OPERATIONAL MEMO 115-9 (641-9) TO: FROM: SUBJECT: All Waste Management Division Supervisors Jim Sygo, Chief, Waste Management

More information

DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S

DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S DEPARTMENT OF THE ARMY HUNTSVILLE CENTER, CORPS OF ENGINEERS P.O. BOX 1600 HUNTSVILLE. ALABAMA 3S807-4301 REPLY TO ATTENTION OF, CEHNC-CX-MM APR.1 8 m MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Explosives

More information

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No.

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. Page 1 of 8 Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. 582-11-13000 Quarter no. 15 From 3/1/2015 Through 5/31/2015.

More information

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No.

Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. Page 1 of 8 Texas AgriLife Research Texas Water Resources Institute Colorado River Alluvium Segment 1428 Case Study FY 11 CWA 319(h) TCEQ Project No. 582-11-13000 Quarter no. 14 From 12/1/2014 Through

More information

Secretary of Defense Environmental Award Fiscal Year 2013

Secretary of Defense Environmental Award Fiscal Year 2013 Environmental Restoration Team Secretary of Defense Environmental Award Fiscal Year 2013 Joint Expeditionary Base Little Creek-Fort Story, Virginia Beach, Virginia Environmental Restoration Individual/Team

More information

ENVIRONMENTAL COMPLIANCE AND PROTECTION PROGRAM

ENVIRONMENTAL COMPLIANCE AND PROTECTION PROGRAM Volume 10 VOLUME 10 ENVIRONMENTAL RESTORATION (ER) PROGRAM SUMMARY OF VOLUME 10 CHANGES Hyperlinks are denoted by bold, italic, blue and underlined font. The original publication date of this Marine Corps

More information

Army Environmental Cleanup Strategic Plan

Army Environmental Cleanup Strategic Plan Army Environmental Cleanup Strategic Plan Headquarters, Department of the Army OACSIM, Installations Service Directorate Army Environmental Division May 2009 Report Documentation Page Form Approved OMB

More information

FY2016 AFRC FORT WADSWORTH

FY2016 AFRC FORT WADSWORTH FY2016 AFRC FORT WADSWORTH Army Defense Environmental Restoration Program Installation Action Plan Printed 30 August 2016 Table of Contents Statement Of Purpose... Acronyms... Installation Information...

More information

MMRP Site Inspections at FUDS Challenges, Status, and Lessons Learned

MMRP Site Inspections at FUDS Challenges, Status, and Lessons Learned MMRP Site Inspections at Challenges, Status, and Lessons Learned 1 Denver, CO June 20, 2007 Program Overview Formerly Used Defense Sites are properties that were formerly owned, leased, possessed by, or

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 MONITORING AND MAINTENANCE 2 3.1 Final Cover Maintenance 2 3.2 Groundwater Monitoring System 2 4.0 POST-CLOSURE CONTACT 2

More information

EPA Brownfields Cleanup Grant Requirements

EPA Brownfields Cleanup Grant Requirements EPA Brownfields Cleanup Grant Requirements Leah Yasenchak Brownfield Redevelopment Solutions, Inc. New Jersey Institute of Technology Technical Assistance for Brownfields July 22, 2009 10:00 AM to 2:00

More information

PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP

PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP PUBLIC INVOLVEMENT PLAN FOR ENVIRONMENTAL CLEANUP Former Southern Pacific Rail Yard Ashland, Oregon updated April 13, 2006 Greg Aitken, Project Manager Cleanup Program Oregon Department of Environmental

More information

Environmental Baseline Survey for Naval Weapons Station Concord

Environmental Baseline Survey for Naval Weapons Station Concord Environmental Baseline Survey for Naval Weapons Station Concord As a subcontractor to CH2M Hill, GAIA is participated in the preparation of an Environmental Baseline Survey for the Naval Weapons Station

More information

Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care. Douglas Day

Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care. Douglas Day Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care Douglas Day What We ll Discuss Background. Lessons learned: Construction Post-closure care Land management Summary. Land of 10,000

More information

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT Request for Proposal (RFP) Request for Proposals for Public Well Sealing Grant Grant application proposals will be accepted until 4:30 p.m. on Monday, October 16, 2017. September 15, 2017 Minnesota Department

More information

Cleanup Successes and Challenges. James D. Werner Director, Air & Waste Management Division

Cleanup Successes and Challenges. James D. Werner Director, Air & Waste Management Division Cleanup Successes and Challenges James D. Werner Director, Air & Waste Management Division 26 October 2007 Dover AFB ERP Acceleration Initiative Committed cooperation between Air Force, EPA, and State

More information

ASSESSMENT OF PUBLIC COMMENTS - SUMMARY. Draft 6 NYCRR Part 375 ENVIRONMENTAL REMEDIATION PROGRAMS

ASSESSMENT OF PUBLIC COMMENTS - SUMMARY. Draft 6 NYCRR Part 375 ENVIRONMENTAL REMEDIATION PROGRAMS ASSESSMENT OF PUBLIC COMMENTS - SUMMARY Draft 6 NYCRR Part 375 ENVIRONMENTAL REMEDIATION PROGRAMS New York State, in furtherance of its commitment to environmental protection and economic revitalization

More information

ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES

ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES ASTSWMO POSTION PAPER ON PERFORMANCE-BASED CONTRACTING AT FEDERAL FACILITIES I. INTRODUCTION Performance-based contracting (PBC) is frequently used for implementing environmental cleanup work at federal

More information

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement

Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Final Stationing and Training of Increased Aviation Assets within U.S. Army Alaska Environmental Impact Statement Prepared for U.S. Army Alaska August 2009 How to Read This Environmental Impact Statement

More information

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Introduction Cannon Air Force Base (AFB) is home to the 27th Special Operations Wing (SOW), whose primary

More information

SUBCHAPTER III INDOOR RADON ABATEMENT

SUBCHAPTER III INDOOR RADON ABATEMENT 15 U.S.C. United States Code, 2013 Edition Title 15 - COMMERCE AND TRADE CHAPTER 53 - TOXIC SUBSTANCES CONTROL SUBCHAPTER III - INDOOR RADON ABATEMENT From the U.S. Government Printing Office, www.gpo.gov

More information

City of Painesville, Ohio

City of Painesville, Ohio , Ohio U.S. Environmental Protection Agency Work Plan For Brownfields Grants (Hazardous Substances and Petroleum Substances) Project Contact: Cathy Bieterman, Director of Economic Development 7 Richmond

More information

BROWNFIELDS ASSESSMENT COOPERATIVE AGREEMENT. APRIL 2014 Agreement Closeout Report

BROWNFIELDS ASSESSMENT COOPERATIVE AGREEMENT. APRIL 2014 Agreement Closeout Report 75 Lake Street St. Albans, VT 05478-1850 (802) 524-5958 (800) 564-5958 Fax (802) 527-2948 BROWNFIELDS ASSESSMENT COOPERATIVE AGREEMENT APRIL 2014 Agreement Closeout Report Cooperative Agreement Number:

More information

FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) LAND USE CONTROLS FORT BLISS, TX MILITARY MUNITIONS RESPONSE PROGRAM

FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) LAND USE CONTROLS FORT BLISS, TX MILITARY MUNITIONS RESPONSE PROGRAM FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) LAND USE CONTROLS FORT BLISS, TX MILITARY MUNITIONS RESPONSE PROGRAM January 2013 Prepared for U.S. Army Corps of Engineers 10 South Howard Street Baltimore,

More information

Army. Environmental. Cleanup. Strategy

Army. Environmental. Cleanup. Strategy Army Environmental Cleanup Strategy April 2003 28 April 2003 Army Environmental Cleanup Strategy Foreword I am pleased to present the Army s Environmental Cleanup Strategy. The Strategy provides a roadmap

More information

Cleanup Standards Scientific Advisory Board Meeting Minutes RCSOB Room 105 June 28, 2017 CSSAB Members Present:

Cleanup Standards Scientific Advisory Board Meeting Minutes RCSOB Room 105 June 28, 2017 CSSAB Members Present: Cleanup Standards Scientific Advisory Board Meeting Minutes RCSOB Room 105 June 28, 2017 (meeting minutes revised and approved at September 7, 2017 CSSAB meeting) CSSAB Members Present: Ronald Buchanan,

More information

Brownfield Redevelopment Grant Program

Brownfield Redevelopment Grant Program THE WAY WE GREEN Brownfield Redevelopment Grant Program In Effect June 28, 2017-1 - Contents Introduction... 1 Eligibility Criteria for All Grant Phases... 1 Application Process... 2 Phase I: Historical

More information

Table of Contents. October 2016 i

Table of Contents. October 2016 i October 2016 i 1663066 Table of Contents 1.0 INTRODUCTION... 1 2.0 POST-CLOSURE PLAN... 2 2.1 Inspection... 2 2.2 Maintenance... 2 2.3 Monitoring... 3 2.4 Contact Information... 3 2.5 Planned Uses... 3

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Defense Enterprise Accounting and Management System-Increment 1 (DEAMS Inc 1) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED

More information

City of Norwood, Ohio

City of Norwood, Ohio , Ohio U.S. Environmental Protection Agency Work Plan For Brownfields Assessment Grants (Hazardous Substances and Petroleum Substances) Project Contact: Gerry Stoker, Economic Development Director 4645

More information

EXPLOSIVES SAFETY SUBMISSION

EXPLOSIVES SAFETY SUBMISSION 28 Mar 2003 SAFETY EXPLOSIVES SAFETY SUBMISSION ENGINEER PAMPHLET Approved for public release; distribution is unlimited. AVAILABILITY Electronic copies of this and other U.S. Army Corps of Engineers publications

More information

Hazardous Discharge Site Remediation Fund 2013Annual Report

Hazardous Discharge Site Remediation Fund 2013Annual Report Introduction Hazardous Discharge Site Remediation Fund 2013Annual Report The Hazardous Discharge Site Remediation Fund (HDSRF), administered by the New Jersey Economic Development Authority (EDA) and the

More information

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9094.1C N96 OPNAV INSTRUCTION 9094.1C From: Chief of Naval Operations Subj: FULL POWER

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-13-5 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE CHAPTER 335-13-5 PROCEDURES FOR OBTAINING PERMITS TABLE

More information

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION An Act S.1438 One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION To authorize appropriations for fiscal year 2002 for military activities of the Department of Defense, for

More information

Unexploded Ordnance (UXO)

Unexploded Ordnance (UXO) BRAC Environmental Fact Sheet SPRING 1999 OFFICE OF THE DEPUTY UNDER SECRETARY OF DEFENSE (ENVIRONMENTAL SECURITY) Unexploded Ordnance (UXO) The Department of Defense (DoD) defines military munitions/explosive

More information

Technical Guidance Overview

Technical Guidance Overview Technical Guidance Overview George Nicholas Chairperson - DEP Technical Guidance Development NJDEP - Site Remediation Program george.nicholas@dep.state.nj.us 1 Presentation Overview Technical Guidance

More information

Prepared for: U.S. Army Environmental Command and U.S. Army Corps of Engineers Baltimore District. Printed on recycled paper

Prepared for: U.S. Army Environmental Command and U.S. Army Corps of Engineers Baltimore District. Printed on recycled paper FINAL Operational Range Assessment Program Phase I Qualitative Assessment Report U.S. Army Operational Range Assessment Program Qualitative Operational Range Assessments Prepared for: U.S. Army Environmental

More information

Standard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area

Standard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area Standard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area Central Florida Water Initiative Minimum Flows and Levels and Reservations

More information

INFRASTRUCTURE GRANT PROGRAM (IGP)

INFRASTRUCTURE GRANT PROGRAM (IGP) INFRASTRUCTURE GRANT PROGRAM (IGP) GUIDELINES Hardee County Economic Development Authority c/o County Manager s Office 412 W. Orange Street, Room 103 Wauchula, FL 33873 Voice (863) 773-9430 Fax (863) 773-0958

More information

COMMANDER, NAVY REGION SOUTHWEST 2003 SECNAV ENVIRONMENTAL RESTORATION INDIVIDUAL NOMINATION THERESA MORLEY

COMMANDER, NAVY REGION SOUTHWEST 2003 SECNAV ENVIRONMENTAL RESTORATION INDIVIDUAL NOMINATION THERESA MORLEY COMMANDER, NAVY REGION SOUTHWEST 2003 SECNAV ENVIRONMENTAL RESTORATION INDIVIDUAL NOMINATION THERESA MORLEY BACKGROUND: Theresa Morley, Environmental Engineer, Commander, Navy Region Southwest POSITION

More information

Information Repository--UMore East

Information Repository--UMore East UMP000001 - UMP000167 Response to MPCA's Request for Information and the Production of Documents September-84 UMP020006 - UMP020152 Final Report to the Rosemount Groundwater Protection Task Force, Volume

More information

ATTORNEY GENERAL Environmental Protection Division. An Inventory of Its Twin Cities Army Ammunition Plant Files

ATTORNEY GENERAL Environmental Protection Division. An Inventory of Its Twin Cities Army Ammunition Plant Files MINNESOTA HISTORICAL SOCIETY Minnesota State Archives ATTORNEY GENERAL Environmental Protection Division An Inventory of Its Twin Cities Army Ammunition Plant Files OVERVIEW OF THE RECORDS Agency: Minnesota.

More information

REPORT DOCUMENTATION PAGE

REPORT DOCUMENTATION PAGE REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions,

More information

TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS

TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS TOWN OF PLAINVILLE REQUEST FOR QUALIFICATIONS AND PROPOSALS Department of Economic & Community Development Brownfield Assessment Grant One and Sixty-Three West Main Street, Plainville, CT 1. PURPOSE The

More information

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING Primary Agency: Chatham County Department of Public Works Support Agencies: Chatham Emergency Management Agency Chatham County Engineering

More information

PROCEDURE FOR THE PREPARATION AND FOLLOW-UP OF AN AGENCY FOR TOXIC SUBSTANCES AND DISEASE REGISTRY (ATSDR) PUBLIC HEALTH ASSESSMENT

PROCEDURE FOR THE PREPARATION AND FOLLOW-UP OF AN AGENCY FOR TOXIC SUBSTANCES AND DISEASE REGISTRY (ATSDR) PUBLIC HEALTH ASSESSMENT PROCEDURE FOR THE PREPARATION AND FOLLOW-UP OF AN AGENCY FOR TOXIC SUBSTANCES AND DISEASE REGISTRY (ATSDR) PUBLIC HEALTH ASSESSMENT David F. McConaughy, MPH Navy and Marine Corps Public Health Center,

More information

Project No.: August 13, 2014

Project No.: August 13, 2014 MEMORANDUM Project No.: 050067-012 August 13, 2014 To: Ed Jones, Department of Ecology, NWRO cc: Blaser Die-Casting, Inc. and Pacific Groundwater Group Burlington Environmental, LLC and Pacific Crest Consulting,

More information

Final Environmental Restoration Program Recordkeeping Manual

Final Environmental Restoration Program Recordkeeping Manual Naval Facilities Engineering Command Washington, DC 20374-5065 Final Environmental Restoration Program Recordkeeping Manual February 2017 Approved for public release; distribution is unlimited Preface

More information

FY 2018 Watershed-Based Funding Pilot Program Policy

FY 2018 Watershed-Based Funding Pilot Program Policy FY 2018 Watershed-Based Funding Pilot Program Policy From the Board of Water and Soil Resources, State of Minnesota Version: FY2018 Effective Date: 12/20/2017 Approval: Board Resolution #17-94 Policy Statement

More information

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance Construction Site TPDES Inspector Workshop Erik Hobson EPSIII/Resource Protection and Compliance Page 1 Topics Changes to TXR150000 Inspections Edwards Aquifer Program Changes to the Permit Page 2 Revisions

More information

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment)

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment) April 2003 Army Environmental Cleanup Strategy Foreword I am pleased to present the Army s Environmental Cleanup Strategy. The Strategy provides a roadmap to guide the Army in attaining its environmental

More information

This Power Point presentation may be used by any person for educational or information purposes.

This Power Point presentation may be used by any person for educational or information purposes. This Power Point presentation is part of an outreach effort intended to educate the public, the regulated community and environmental professionals about the ongoing transformation from the traditional

More information

Environmental & Munitions Center of Expertise (EM CX) Information Fact Sheet US Army Corps of Engineers

Environmental & Munitions Center of Expertise (EM CX) Information Fact Sheet US Army Corps of Engineers Environmental & Munitions Center of Expertise (EM CX) Information Fact Sheet US Army Corps of Engineers EM CX Regulatory Fact Sheet FY05-05 Title: Department of Transportation (DOT) and Department of Defense

More information

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) Remediation of the three plumes in the Northern Downtown Orlando Site (NDOS) project

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) Remediation of the three plumes in the Northern Downtown Orlando Site (NDOS) project DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776) AGENCY TITLE Florida Department of Environmental Protection Remediation of the three plumes in the Northern Downtown Orlando Site (NDOS) project

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 8.7.2016 COM(2016) 449 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on implementation of Regulation (EC) No 453/2008 of the European Parliament

More information

Military Munitions Response Program Site Inspection Camp Bullis, Texas. Courtney M.S. Ingersoll

Military Munitions Response Program Site Inspection Camp Bullis, Texas. Courtney M.S. Ingersoll Military Munitions Response Program Site Inspection Camp Bullis, Texas Courtney M.S. Ingersoll 757.643.7886 cingersoll@e2m.net Talking Points History of Camp Bullis Regulatory Guidance RFA Goals & Process

More information

Soil & Water Conservation in Texas

Soil & Water Conservation in Texas in Texas NRCS/SWCD/TSSWCB What is the Difference? NRCS NRCS, formerly the Soil Service (SCS) was most visible to the public due to having full-time staff assigned to a conservation district. NRCS was also

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

Environmental Restoration Program

Environmental Restoration Program July 29, 2004 July 2007 http://www.bracpmo.navy.mil/brac2005/bracbases/ca/concord/default.aspx Introduction This fact sheet provides an update on the environmental restoration activities in the Inland

More information

IACS History File + TB

IACS History File + TB IACS History File + TB Part A UR L4 Closure of Chain Lockers Part A. Revision History Version no. Approval date Implementation date when applicable Corr.1 (Aug 2011) 23 August 2011 - Rev.3 (Mar 2011) 22

More information

PUBLIC PARTICIPATION IN THE DEFENSE ENVIRONMENTAL RESTORATION PROGRAM (DERP) FOR FORMERLY USED DEFENSE SITES (FUDS)

PUBLIC PARTICIPATION IN THE DEFENSE ENVIRONMENTAL RESTORATION PROGRAM (DERP) FOR FORMERLY USED DEFENSE SITES (FUDS) 9 April 2004 ENGINEERING AND DESIGN PUBLIC PARTICIPATION IN THE DEFENSE ENVIRONMENTAL RESTORATION PROGRAM (DERP) FOR FORMERLY USED DEFENSE SITES (FUDS) ENGINEER PAMPHLET "Approved for public release; distribution

More information

DoD and EPA Management Principles for Implementing Response Actions at Closed, Transferring, and Transferred (CTT) Ranges

DoD and EPA Management Principles for Implementing Response Actions at Closed, Transferring, and Transferred (CTT) Ranges DoD and EPA Management Principles for Implementing Response Actions at Closed, Transferring, and Transferred (CTT) Ranges Preamble Many closed, transferring, and transferred (CTT) military ranges are now

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Office of Oil and Gas Management Standard Operating Procedure (SOP) for Erosion and Sediment Control General Permit (ESCGP-1 and ESCGP-2) Review of Notices of Intent (NOIs) by Department Staff Only This

More information

SEPTEMBER Prepared for: US Army Corp of Engineers New England District Concord, Massachusetts

SEPTEMBER Prepared for: US Army Corp of Engineers New England District Concord, Massachusetts FINAL RECORD OF DECISION FOR PLOW SHOP POND (AOC 72) -RED COVE AND FORMER RAILROAD ROUND HOUSE (SA 71) FORMER FORT DEVENS ARMY INSTALLATION,DEVENS,MA SEPTEMBER 2015 Prepared for: US Army Corp of Engineers

More information

Introduction to ARCADIS Tim Llewellyn Project Manager. Imagine the result

Introduction to ARCADIS Tim Llewellyn Project Manager. Imagine the result Introduction to ARCADIS Tim Llewellyn Project Manager Imagine the result Questions Who is ARCADIS? What is ARCADIS experience with Army Installations and groundwater studies? What will ARCADIS be doing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Strategic Environmental Research and Development Program (SERDP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Strategic Environmental Research and Development Program (SERDP) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Office of Secretary Of Defense DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete

More information

Technical Information Paper

Technical Information Paper FORA ESCA RP Technical Information Paper Review comments provided by Judy Huang of EPA, dated November 20, 2012 1 General The Fort Ord Reuse Authority (FORA) Environmental Services Cooperative Agreement

More information

REQUEST FOR PROPOSALS Town of Brattleboro, VT

REQUEST FOR PROPOSALS Town of Brattleboro, VT REQUEST FOR PROPOSALS Town of Brattleboro, VT June 22, 2010 BACKGROUND: The Town of Brattleboro has conducted an extensive planning process for the reconstruction of the Putney Road (US Route 5) corridor

More information

The New York City Council Page 1 of 5

The New York City Council Page 1 of 5 The New York City Council City Hall New York, NY 10007 Legislation Text File #: Int 0126-2014, Version: A Int. No. 126-A By Council Members Cabrera, Barron, Chin, Cohen, Constantinides, Eugene, Ferreras,

More information

Community Relations Plan

Community Relations Plan Community Relations Plan for the Niagara Falls Storage Site Formerly Utilized Sites Remedial Action Program Lewiston, New York July 2014 U.S. Army Corps of Engineers, Buffalo District 1776 Niagara Street

More information

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Office of Oil and Gas Management Standard Operating Procedure (SOP) for Erosion and Sediment Control General Permit (ESCGP-1 and ESCGP-2) Review of Notices of Intent (NOIs) by Department Staff Only This

More information

Military Munitions Support Services

Military Munitions Support Services 29 April 2016 Engineering and Design Military Munitions Support Services Roles and Responsibilities ENGINEER REGULATION AVAILABILITY Electronic copies of this and other U.S. Army Corps of Engineers (USACE)

More information

Draft. Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation

Draft. Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation Draft Quality Assurance Surveillance Plan for the 2008 Performance-Based Acquisition of Environmental Investigation and Remediation Ravenna Army Ammunition Plant Ravenna, Ohio August 14, 2008 GSA Contract