Anti-Ship Missile Defense

Size: px
Start display at page:

Download "Anti-Ship Missile Defense"

Transcription

1 Anti-Ship Missile Defense A New Approach Using Unmanned Systems to Save Time and Cost to Field an Effective System : The Next Generation of Intelligent, Automated Systems

2 About Us Unique Systems Engineering and Development Capability A distillation of over $2B in government R&D Addresses both people and technology Partnered with OSD, JFCOM, Team Orlando, the 4 services, SRI, Academia, and others CTO created MDA s analysis and training systems infrastructure as a gov t employee Solved world-class/grand challenge problems on F-35, CVN-21, healthcare IT, etc. 2

3 Navy s Anti-Ship Missile Challenges Critical Battlespace defense gap Interactions happening faster than humans can react Current Command and Control (C2) is not real-time, performance limited, and the only source of information Greatly affects real-time response for kinetic engagement capabilities 3

4 Anti-Ship Missile Defense Space Sensor CIWS SB UAS DF-21 Chinese Anti- Ship Missile USV Increase Response time for Fleet Simplify Installation, Maintenance, & Operation DDG

5 Increase Fleet Defense Interoperability of UxVs Manned platforms Sensors Fleet weapons, greater defense in depth Integrate sensors on UxVs Network UxVs robotic engagement platforms various C4ISR, weapons & fire control systems Fully integrated and interoperable with fleet and joint C4ISR and fire control Fast, Flexible Response 5

6 Fleet s Need for Speed A different architectural paradigm and C2 systems a new real-time engine Need a Missile Defense System on steroids Both Offense and Defense Combine characteristics of Missile Defense and Cyberspace systems Hyperfast networked decisionmaking in a complex environment 6

7 Proposed Solution Phase I: High-Fidelity Virtual Analysis of Sensors, Shooters, and Network Combinations (4 months) Builds off novel approach to Modeling and Simulation (M&S) Used to meet stringent government metrics in F-35 Permits source code integration of M&S code from different paradigms Next step in the science of M&S reuse Phase II: Build the System(14 months) Use Phase I software in Design & Engineering, Validation/T&E Utilize existing infrastructure and chart a course forward Phase III: Fleet Integration & Optimization(3 months) 7

8 ASMD Threat Perimeter SUW Threat Monitoring Perimeter ASW Threat Identification Perimeter 18 nmi Sea Base Perimeter SUW Threat Identification Perimeter 8

9 ASMD Threat Perimeter SUW Threat Monitoring Perimeter ASW Threat Identification Perimeter Sea Base Perimeter SUW Threat Identification Perimeter 9

10 Cloud of Slugs Each USVs Gun Creates a Cloud 10

11 New Fleet Capabilities Automated Fleet Systems Adaptive & composable Knowledge built into systems Emphasizes speed and flexibility Ability to fuse new information, knowledge, and structures rapidly Mesh networks and systems Example: Sensor net that automatically refocuses based on accurate real time fused information C2 and fire control moves from Fleet platforms to Network 11

12 Previous Results Increased system speed factor is over 100x in apples to apples infrastructure Performed novel, unique artificial intelligence, development, integration, & interoperability projects Every project is a unique challenge that involves integrating an expert team to solve a time critical problem Vetted by OSD (P&R, AT&L, PAE, DDR&E) & JFCOM 12

13 Provides Solution for greater defense in depth quickly A flexible, forward looking Architecture Easily accommodate upgrades Fast integration New sensors, shooters, and networks Ready incorporation of current Naval and Joint C4ISR and fire control architecture(s) Realistic ability to rapidly assemble the team and go 13

14 Initial Questions What is the munition cloud size & density? How dense are munitions in cloud/second? How many clouds? What is the resulting launch vector for Bullet on Bullet? How many smaller systems with CWIS are needed? Cost of CWIS Sensor/Shooter Fusion Linkage Algorithm Out of perimeter which system engages Speed of maneuverability determines minimum CWIS Using Dirigibles what sensors may be employed for downward looking detection? Right Sensor mix for RF and/or EO/IR Increase Sensor/Shooter angles What is the smallest surface platform using the smallest amount of power necessary to operate a CWIS and what is the smallest speed/least maneuverable to complete mission? 14

15 Summary Creation of Fleet ASMD Network Complex, Realistic, & Scalable Semi-/Fully Autonomous UxVs Practical agile, networked systems Fleet C4ISR and Weapons Systems Adaptation & Evolution Require Funding to begin High Fidelity M & S (Phase I) Build, Integrate & Network Systems (Phase II) Integrate, Optimize & Train Fleet (Phase III) 8

16 Backup Slides 16

17 Technology Approach M&S of High Fidelity Virtual Simulation Weapons, Sensors & Network combinations Next-generation middleware Component activation and synchronization Integration & Interoperability Knowledge representation and reasoning Conceptual graphs Problem solving module integration Complex context representation with integrated reasoning & problem solving 17

18 IT Competitor Comparison IBM Sun Oracle BEA RedHat II Web-based SOA Stack Heterogeneous Data Source Support Semantic Web Integration Cloud Integration Analog to Digital Interface Support Legacy System Support Does Not Require Global Data Model Rapidly Adaptable to Change Two Day Learning Curve Automated Interoperability Assessment Sub-Microsecond Latency Hard Real-Time Performance Support 1M Active System Components Capability is Operational

19 LSI Competitor Comparison LM NG Boeing GD Raytheon II Integration Middleware/Dev Env Heterogeneous Data Source Support Semantic Web Integration Cloud Integration Analog to Digital Interface Support Legacy System Support Does Not Require Global Data Model Rapidly Adaptable to Change Two Day Learning Curve Automated Interoperability Assessment Sub-Microsecond Latency Hard Real-Time Performance Support 1M Active System Components Capability is Operational

20 MIW Adaptive Mesh ASW IBGWN FY07 Status of UV Sentry SUW 20 Omitted Anti-ship Missile Defense

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

Navy Information Warfare Pavilion 19 February RADM Matthew Kohler, Naval Information Forces

Navy Information Warfare Pavilion 19 February RADM Matthew Kohler, Naval Information Forces Navy Information Warfare Pavilion 19 February 2016 1030 RADM Matthew Kohler, Naval Information Forces It s All About Warfighting 2 IDC Reserve Command July 2012 Information Dominance Forces TYCOM October

More information

The Integral TNO Approach to NAVY R&D

The Integral TNO Approach to NAVY R&D NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014

Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 DISTRIBUTION STATEMENT A. Approved for public release The Future of Mine Warfare Offboard unmanned systems

More information

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward 17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward Mr. Paul D. Mann (Acting) Principal Deputy Director Test Resource Management Center January 26, 2017 1 2 TRMC

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013

More information

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division UNCLASSIFIED //FOR FOR OFFICIAL OFFICIAL USE USE ONLY ONLY Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technology) 31 March 2016. Other

More information

Autonomous Systems: Challenges and Opportunities

Autonomous Systems: Challenges and Opportunities Autonomous Systems: Challenges and Opportunities Topic 9: C2 Architectures and Technologies Mr. José Carreño Mr. George Galdorisi Mr. Steven Koepenick Ms. Rachel Volner May 14, 2010 2 My view is that technology

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 2 - Applied Research 0602308A - Advanced Concepts and Simulation COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005

More information

Future of MIW from the LCS Platform

Future of MIW from the LCS Platform Future of MIW from the LCS Platform 24 October 2011 RDML Jim Murdoch, USN PEO LCS Distribution Statement A: Approved for Public Release; Distribution Unlimited. (11/16/2011). This Brief is provided for

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

Strike Group Defender: PMR-51 and MIT Lincoln Laboratory

Strike Group Defender: PMR-51 and MIT Lincoln Laboratory Strike Group Defender: PMR-51 and MIT Lincoln Laboratory MIT and ONR Objectives Office of Naval Research (ONR), PMR-51 Coordinates, executes, and promotes the S&T programs of the Navy and Marine Corps.

More information

Adaptable Autonomous Systems. Dr. Jason Stack

Adaptable Autonomous Systems. Dr. Jason Stack Adaptable Autonomous Systems Dr. Jason Stack Why Autonomy? Not enough people to Accomplish today s missions Dull, dirty, & dangerous The how Accomplish tomorrow s missions Persistent, pervasive, perceptive

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport

Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport DISTRIBUTION STATEMENT A Approved for public release; Distribution is unlimited. 1 What is ANTX? ANTX is an annual event created

More information

Tactical Technology Office

Tactical Technology Office Tactical Technology Office Dr. Bradford Tousley, Director DARPA Tactical Technology Office Briefing prepared for NDIA s 2017 Ground Robotics Capabilities Conference & Exhibition March 22, 2017 1 Breakthrough

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0603747N PROGRAM ELEMENT TITLE: UNDERSEA WARFARE ADVANCED TECHNOLOGY COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

Cybersecurity United States National Security Strategy President Barack Obama

Cybersecurity United States National Security Strategy President Barack Obama Cybersecurity As the birthplace of the Internet, the United States has a special responsibility to lead a networked world. Prosperity and security increasingly depend on an open, interoperable, secure,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

FFG(X) Update National Symposium - Surface Navy Association

FFG(X) Update National Symposium - Surface Navy Association FFG(X) Update National Symposium - Surface Navy Association Dr. Regan Campbell January 9, 2018 1 FFG(X) System Description Mission: Anti-Submarine Warfare, Surface Warfare, Electromagnetic Maneuver Warfare,

More information

Single Integrated Ground Picture

Single Integrated Ground Picture Single Integrated Ground Picture 2003 Interoperability and System Integration Presented by: Anthony Lisuzzo Director, Intelligence and Information Directorate US ARMY CECOM 732-532-5557 Email: anthony.lisuzzo@mail1.monmouth.army.mil

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

9 th Annual Disruptive Technologies Conference

9 th Annual Disruptive Technologies Conference 9 th Annual Disruptive Conference Navy IAMD Distribution Statement A: Approved for Public Release; Distribution Unlimited. (12/05/2012). This Brief is provided for Information Only and does not constitute

More information

SSC Pacific is making its mark as

SSC Pacific is making its mark as 5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in

More information

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS Professor of Practice Jeff Kline, Operations Research Captain, USN (ret) Naval Postgraduate School

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction

Synthetic Training Environment (STE) White Paper. Combined Arms Center - Training (CAC-T) Introduction Synthetic Training Environment (STE) White Paper Combined Arms Center - Training (CAC-T) The Army s future training capability is the Synthetic Training Environment (STE). The Synthetic Training Environment

More information

AUSA BACKGROUND BRIEF

AUSA BACKGROUND BRIEF AUSA BACKGROUND BRIEF No. 46 January 1993 FORCE PROJECTION ARMY COMMAND AND CONTROL C2) Recently, the AUSA Institute of Land Watfare staff was briefed on the Army's command and control modernization plans.

More information

Air and Missile Defense Radar (AMDR)

Air and Missile Defense Radar (AMDR) DISTRIBUTION STATEMENT A: Approved for public release; Distribution Unlimited Air and Missile Defense Radar (AMDR) Sea Power to the Hands of Our Sailors Presented by: CAPT Seiko Okano Major Program Manager

More information

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012 U.S. NAVY Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned 14-15 November 2012 Jimmy Johnson Lockheed Martin Senior Fellow Lockheed Martin Mission Systems & Sensors

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support

More information

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support APPROPRIATION/BUDGET ACTIVITY RDTEN/BA 6 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION R-1 ITEM NOMENCLATURE 0605866N/Space and Electronic Warfare (SEW) Support COST (In Millions) Total PE Cost 0706 / EMC

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

FFG UPGRADE Brochure Delivering tag integrated line warfare solutions.

FFG UPGRADE Brochure Delivering tag integrated line warfare solutions. Brochure Delivering tag integrated line warfare solutions www.thalesgroup.com.au FFG UPGRADE Delivering Integrated Warfare Solutions Overview UPGRADE PROGRAM Thales Australia has developed a comprehensive

More information

Future Force Capabilities

Future Force Capabilities Future Force Capabilities Presented by: Mr. Rickey Smith US Army Training and Doctrine Command Win in a Complex World Unified Land Operations Seize, retain, and exploit the initiative throughout the range

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 35.208 38.447

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

Expeditionary Maneuver Warfare Department ONR Code 30 Dr. John Pazik Department Head

Expeditionary Maneuver Warfare Department ONR Code 30 Dr. John Pazik Department Head DCN #: 43-2882-17 Expeditionary Maneuver Warfare Department ONR Code 30 Dr. John Pazik Department Head 2 ONR 30: Expeditionary Maneuver Warfare N091 Principal Deputy for P&R NRL ONRG Chief of Naval Research

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text Challenges and opportunities Trends to address New concepts for: Offensive sea control Sea based AAW Weapons development Increasing offensive sea control capacity Addressing defensive and constabulary

More information

Technology Anonymous

Technology Anonymous Technology Anonymous How the COCOMs Services view see themselves Services COCOMs How the Services see themselves Who We Both Is Right? Are How the COCOMs see themselves How the COCOMs view the Services

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

2017 Annual Missile Defense Small Business Programs Conference

2017 Annual Missile Defense Small Business Programs Conference 2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution

More information

INTRODUCTION. Chapter One

INTRODUCTION. Chapter One Chapter One INTRODUCTION Traditional measures of effectiveness (MOEs) usually ignore the effects of information and decisionmaking on combat outcomes. In the past, command, control, communications, computers,

More information

First Announcement/Call For Papers

First Announcement/Call For Papers AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE 0603766E, R-1 #50 COST (In Millions) 2002 2003 2004 2005 2006 2007 2008 2009 Total Program Element (PE) Cost 0.000 0.000 95.654 151.966 205.382 183.796 200.335 203.073 Joint Warfare Systems NET-01 0.000

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION Joe Pelino ARDEC Director of Technology 18 April 2018 UNPARALLELED COMMITMENT &SOLUTIONS Act like someone s life depends on what we do.

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya

DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya DRAFT vea Target: 15 min, simultaneous translation Littoral OpTech East VADM Aucoin Keynote Address 1 Dec 2015 Grand Hotel Ichigaya Good morning and thank you for giving me the opportunity to speak with

More information

NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION

NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION PRESENTED TO: NAVAIR SMALL BUSINESS AVIATION TECHNOLOGY CONFERENCE 1 RDML STEVE EASTBURG ASSISTANT

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160404BB Special Operations (SO) Tactical

More information

Gun and Missile Systems An Integrated Warfare Perspective

Gun and Missile Systems An Integrated Warfare Perspective Gun and Missile Systems An Integrated Warfare Perspective Mr. Christopher Deegan Executive Director PEO Integrated Warfare Systems Distribution Statement A: Approved for public release; distribution is

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO COST ($ in Millions) Prior Years FY 2014 FY 2015 FY 2016 Base FY 2016 OCO FY 2016 Total FY 2017 FY 2018 FY 2019 FY 2020 Cost To Complete Total Program Element - 146.789 129.723 185.043-185.043 193.011

More information

AMRDEC. Core Technical Competencies (CTC)

AMRDEC. Core Technical Competencies (CTC) AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development

More information

Kill Vehicle Work Breakdown Structure

Kill Vehicle Work Breakdown Structure Kill Vehicle Work Breakdown Structure Approved for Public Release 14-MDA-7774 (9 April 14) Jennifer Tarin, Ph.D. Paul Tetrault Christian Smart, Ph.D. MDA/DO 1 Agenda Purpose Background Overview and Comparison

More information

SBIR/Prime Opportunities: A Rapidly Changing Landscape How Do We Move Forward?

SBIR/Prime Opportunities: A Rapidly Changing Landscape How Do We Move Forward? SBIR/Prime Opportunities: A Rapidly Changing Landscape How Do We Move Forward? a presentation to National Small Business Conference by John Williams, Director Navy SBIR Program williajr@onr.navy.mil June

More information

Test and Evaluation Strategies for Network-Enabled Systems

Test and Evaluation Strategies for Network-Enabled Systems ITEA Journal 2009; 30: 111 116 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation Strategies for Network-Enabled Systems Stephen F. Conley U.S. Army Evaluation Center,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete

More information

Centre for Healthcare Assistive & Robotics Technology Charting Future Healthcare Delivery

Centre for Healthcare Assistive & Robotics Technology Charting Future Healthcare Delivery Centre for Healthcare Assistive & Robotics Technology Charting Future Healthcare Delivery Rapidly Aging Population in Singapore Rapidly aging population of Singapore 3 Meeting the Challenges i. Enabling

More information

The Verification for Mission Planning System

The Verification for Mission Planning System 2016 International Conference on Artificial Intelligence: Techniques and Applications (AITA 2016) ISBN: 978-1-60595-389-2 The Verification for Mission Planning System Lin ZHANG *, Wei-Ming CHENG and Hua-yun

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) Briefing for the SAS Panel Workshop on SMART Cooperation in Operational Analysis Simulations and Models 13 October 2015 Release of

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

Sea Air Space Symposium

Sea Air Space Symposium Sea Air Space Symposium Howard Berkof Deputy Program Manager PMS406 03 April 2017 PEO LCS Portfolio LCS 1 LCS 2 IN SERVICE SUPPORT (SHIPS & MISSION PACKAGES) PMS 501 XLUUV / AUP RMMV AQS-20 LCS TRAINING

More information

Strategic Vision. Rapidly Delivering Cyber Warfighting Capability From Seabed to Space. Space and Naval Warfare Systems Command

Strategic Vision. Rapidly Delivering Cyber Warfighting Capability From Seabed to Space. Space and Naval Warfare Systems Command Space and Naval Warfare Systems Command Strategic Vision 2018 2027 Space and Naval Warfare Systems Command 4301 Pacific Highway San Diego, CA 92110-3127 www.spawar.navy.mil DISTRIBUTION STATEMENT A: Approved

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

Cloud Computing and Startups

Cloud Computing and Startups 2 Cloud Computing and Startups Åke Edlund and Ilja Livenson PDC, KTH Royal Institute of Technology, Stockholm, Sweden SICS Startup Accelerator, Stockholm, Sweden CONTENTS 2.1 Introduction... 31 2.2 Time

More information

Joint Warfare System (JWARS)

Joint Warfare System (JWARS) Joint Warfare System (JWARS) Update to DMSO Industry Days June 4, 1999 Jim Metzger JWARS Office Web Site: http://www.dtic.mil/jwars/ e-mail: jwars@osd.pentagon.mil 6/4/99 slide 1 Agenda Background Development

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived

More information

Air Force Research Laboratory

Air Force Research Laboratory Air Force Research Laboratory Airbase Technologies Division Tyndall Air Force Base, Florida Distribution A: Approved for Public Release AFRL Research Sites 2 Force Protection Technology Research Areas

More information