DEPARTMENT OF THE ARMY. Modernizing Army Test Range Infrastructure to Support Transformation

Size: px
Start display at page:

Download "DEPARTMENT OF THE ARMY. Modernizing Army Test Range Infrastructure to Support Transformation"

Transcription

1 DEPARTMENT OF THE ARMY Modernizing Army Test Range Infrastructure to Support Transformation PRESENTED BY: RAYMOND J. WAGNER, DEPUTY DIRECTOR RESOURCES TEST & EVALUATION MANAGEMENT AGENCY RM 2C139A, PENTAGON DSN: (703) FAX (703) PRESENTED TO: NDIA 2 OCTOBER 2002

2 Briefing Outline T&E Community Army Transformation T&E Investment Strategy Army Test Resources Master Plan (ATRMP) Keys to Supporting Future Combat Systems (FCS) Embedded Instrumentation OASIS Roadway Simulator Land & Sea Vulnerability Test Capability Transportable Range Augmentation and Control System Advanced Multi-Spectral Sensor & Subsystem Test Capabilities Versatile Information Systems Integrated On-Line Summary 2

3 Test and Evaluation Community UNDER SEC DEF (AT&L) SECDEF SECRETARY OF THE ARMY CHIEF OF STAFF OF THE ARMY Director, Operational Test & Evaluation Dep Under Sec Army (Operations Research) Army Materiel Command (AMC) VCSA Test Test & Evaln Evaln Mgmt Mgmt Agency Agency STRICOM ARL Instr, Tgts, & Threat Sim. (PM (PM ITTS) Surv. Leth. Analysis Directorate (SLAD) Army Mat. Syst Analysis Act. (AMSAA) Space & Msl Defense Cmd RRBMDTS (SMDC) Operational Test Command (OTC) Army Test & Evaluation Cmd (ATEC) Army Evaluation Center (AEC) Developmental Test Command (DTC) HELSTF Major Test Facilities White Sands Missile Range Dugway Proving Ground Yuma Proving Ground Aberdeen Test Center 3

4 Primary Test Range Locations Cold Regions Test Center Dugway Proving Ground MRTFBs Ronald Reagan Ballistic Missile Defense Test Site (Marshall Islands) Aberdeen Test Center Tropic Regions Test Center (Hawaii) Redstone Technical Test Center Yuma Proving Ground Electronic Proving Ground White Sands Missile Range Aviation Technical Test Center HELSTF 4

5 The Army Transformation INTEROPERABILITY NETWORK CENTRIC ENHANCED AREA AIR DEFENSE FUTURE COMBAT SYSTEM STRYKER MULTI-BAND INTEGRATED SATELLITE TERMINAL 5

6 The Army T&E Investment Strategy The strategy is captured in the Army Test Resources Master Plan (ATRMP). Updated annually to support the Army POM development. Based on the Army Modernization Plan and Army Science and Technology Master Plan. VISION: Shape the Army s T&E infrastructure by investing in capabilities which support the Army of the future, producing accurate, reliable, and cost effective information for use by decision makers at all levels. OBJECTIVES: Manpower Facilities, Ranges, Installations, Tools 21 st Century Range 6

7 Facilities, Ranges, Installations, and Tools: 21 st Century Range Legacy Capabilities New, Advanced, Objective Capabilities Legacy-to- Objective Capabilities Sustain or atrophy current capabilities (FPS-16, film cameras) Key to supporting FCS Improvement & Modernization, Upgrades Telemetry/ TSPI Mobile Range Operations Optical Imaging Synthetic Environments Electronic Imaging (Embedded Instrumentation, virtual targets) Networks Data Processing Target and Threat Representation (MAIS P3I, Instrumentation XXI) M&S Sensor Simulation & Stimulation Performance Instrumentation Directed Energy 21 st Century Range Digital & Distributed Network Centric Data Fusion Mission Visualization Scene Generation Live / Virtual / Constructive Seamless Integration 7

8 Key to Supporting FCS and the Objective Force Prime Power Pulsed Power Supply Multirole ETC Armament (Direct & Indirect Fire) Armature Projectile Conducting Rails Electromagnetic Gun New Ideas Direct Fire Indirect Fire C 2 on the Move FCS Mission Need Statement Wireless Comms & Sensors Air Defense Signature Management Troop Transport Active Protection Advanced Armor CKEM Reconnaissance Non- Lethal Fuel Cells Missile in a Box Directed Energy Robotics Multi-function Staring Sensor Pulse Power Pursuing Full Full Range of of Technology Options Thru Collaboration 86a

9 Hardened Subminiature Telemetry Sensor System - tactically Embedded Test Measurement (ETM) With a telemetry antenna connected to an Embedded HSTSS Transmitter & Data Acquisition Chipset (DAC) on a tactical GPS card, you need only ONE configuration for a munition s complete life cycle. DT/OT Fullfills - War reserve Training/Live Fire Per round telemetry Embedded Instrumentation makes the one round solution a viable option. All Rounds Can Have Embedded Instrumentation 9

10 OTC Analytic Simulation and Instrumentation Suite (OASIS) OASIS provides the wrap-around environment for testing the network-centric systems of tomorrow, providing the information needed for evaluations. OASIS funding provides the management to ensure future success. OASIS tools are individually funded, and drawn from all sources through a cohesive plan to provide robust test environments and accurate data collection. 10

11 Major OASIS Tools Simulation/Stimulation STORM - Designed for FBCB2 tests, provides Blue Situational Awareness to the Lower TI Simulation Training Operations Rehearsal Model IMASE - Designed to provide the threat based multi-spectral environment, provides ISR test capability platform to Corps Intelligence Modeling and Simulation for Evaluations ExCIS-FSA - Designed for fire support tests, emulates and stimulates Corps level indirect fires Extensible C4I Instrumentation System, Fire Support Application CEES/MFMS - Designed for ADA system tests C3I Engineering Evaluation System / Mobile Flight Mission Simulator C3 Driver - Designed for C3 interoperability tests, provides certain communications threads Command, Control, and Communications Driver Instrumentation MAIS - Provides RTCA, Position Location. Serves as the link between Simulations and Live players Mobile Automated Instrumentation System CVII - Plug and play suite of vehicular data recording instrumentation. AV, Data bus, etc. Common Vehicular Instrumentation Initiative ORTCAIS - Future initiative for laserless RTCA based on geometric pairing Objective Real Time Casualty Assessment Instrumentation System IFDC/MFDC/VFDC - Generational Field Data Collectors. Major component of CVII Improved, Mobile, and Vehicle Field Data Collectors 11

12 Roadway Simulator Roadway Simulator A precisely controlled, systematic test capability for military wheeled vehicle performance and safety testing. Will substantially strengthen the T&E community's ability to impact early design, reduce test costs, extend test envelopes, extend analysis, generate repeatable data, and avoid repeated testing. 12

13 Land Sea Vulnerability Test Capability (LSVTC) The objective of the Land Sea Vulnerability Test Capability (LSVTC) project is to provide a versatile and integrated complex of test ranges and instrumentation that will enable accurate measurement and analysis of the vulnerability of military systems, subsystems, and components to projected damage effects caused by threat weapons. It will also facilitate determining the lethality of certain high speed underwater munitions, various types of sea and land mines, and air- or ground-launched munitions against actual or surrogate threat targets. 13

14 Transportable Range Augmentation and Control System (TRACS) TRACS is a self contained transportable range control system supporting test mission planning, execution, real time data collection/processing, mission control, flight safety, data processing and post mission data analysis of ballistic missile testing. Primary sources for data include: radar, optics, telemetry, GPS, range safety parameters, target control & virtual environments. 14

15 Advanced Multi-Spectral Sensor & Subsystem Test Capabilities (AMSSTC) Element II: MMW Range Characterization Virtual Range currently replicates IR and visible spectrums, AMSSTC will add the MMW spectrum Element I: Multi-Spectral Facility A Multi-Spectral test capability will be developed to test seeker and AUR level MMW/IR/Laser Sensors in a HWIL environment velocity (30 m/sec) Depression Angle Slant Range (1000 meters) Altitude (350 meters) Ground Range Range Swath (200 meters) TA-3 DREN 4500 TSMO 5400 STAF TA-1 TA Multi- Spectral 8975 Element III: Distributed Testing/Networking Distributed testing of subsystems will be enhanced to link the AMSSTC capabilities, existing RTTC capabilities, and other agency capabilities 15

16 Advanced Multi-Spectral Sensor & Subsystem Test Capabilities (AMSSTC) Element IV: EO Sensor Lab Testing Dynamic combined environmental effects testing will be developed with links to subsystem HWIL capabilities Element V: Combined Environments Electro-Optics subsystem testing will be enhanced for LWIR, MWIR, Visible, and ELRF applications Precipitation Smoke 0 0 Vegetation 16

17 Versatile Information Systems Integrated On-line (VISION) The primary goal of VISION is to collect and integrate data across test centers, and provide a common web- based user interface. 17

18 SUMMARY The World and the Threats we face will continually evolve. ATRMP Vision and Strategy Supports Test Range Modernization and the Transformation Campaign (FCS). 21st Century Range Operations: Network Centric/system of systems testing/joint Interoperability/ Data Fusion/Mission Visualization/Scene Generation & Live/Virtual/Constructive Seamless Integration. Our Test Range Infrastructure resources are targeted to support tomorrow s dynamic military force--one that is: Responsive, Deployable, Agile, Versatile, Lethal, Survivable, Sustainable. 18

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Army Technical Test Instrumentation and Targets. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Army Technical Test Instrumentation and Targets. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0605602A Army Technical Test Instrumentation and Targets ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY

More information

ATEC Testing In Support of the War

ATEC Testing In Support of the War ATEC Testing In Support of the War James B. Johnson U.S. Army Developmental Test Command 6 Feb 07 1 Understand Who We Are Full Spectrum Testing All phases of testing; developmental, operational & evaluation

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

Test and Evaluation of Highly Complex Systems

Test and Evaluation of Highly Complex Systems Guest Editorial ITEA Journal 2009; 30: 3 6 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation of Highly Complex Systems James J. Streilein, Ph.D. U.S. Army Test and

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-6 0604759N Major T & E Investment Prior Total COST ($

More information

Technology Sharing in the New World: The Integration of Army Test and Training Requirements with Civilian Law Enforcement

Technology Sharing in the New World: The Integration of Army Test and Training Requirements with Civilian Law Enforcement Technology Sharing in the New World: The Integration of Army Test and Training Requirements with Civilian Law Enforcement David P. Grow Assistant PM for Test, Training and Technology Integration Office

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) Total Program Element (PE) Cost 64312 68659 71079 72540 77725 77145 78389 Continuing Continuing DV02 ATEC Activities 40286 43109 44425 46678 47910 47007

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

Prepared for Milestone A Decision

Prepared for Milestone A Decision Test and Evaluation Master Plan For the Self-Propelled Artillery Weapon (SPAW) Prepared for Milestone A Decision Approval Authority: ATEC, TACOM, DASD(DT&E), DOT&E Milestone Decision Authority: US Army

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION Joe Pelino ARDEC Director of Technology 18 April 2018 UNPARALLELED COMMITMENT &SOLUTIONS Act like someone s life depends on what we do.

More information

ATEC Overview and the AEC Logistics Mission

ATEC Overview and the AEC Logistics Mission ATEC Overview and the AEC Logistics Mission Brian M. Simmons Director, US Army Center 23 January 2008 Presentation to SOLE Aberdeen Proving Ground MD Agenda ATEC Mission & Roles in Acquisition Army Center

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9 Exhibit R-2, RDT&E Project Justification February 2006 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX CENTRAL TEST AND EVALUATION INVESTMENT PROGRAM ELEMENT (PE) 0604940D8Z Cost ($

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Data Collection & Field Exercises: Lessons from History. John McCarthy

Data Collection & Field Exercises: Lessons from History. John McCarthy Data Collection & Field Exercises: Lessons from History John McCarthy jmccarthy@aberdeen.srs.com Testing and Training Objectives Testing Training Prepare for Combat Understand Critical Issues Analyst/Evaluator

More information

M&S for OT&E - Examples

M&S for OT&E - Examples Example 1 Aircraft OT&E Example 3.4.1. Modeling & Simulation. The F-100 fighter aircraft will use the Aerial Combat Simulation (ACS) to support evaluations of F-100 operational effectiveness in air-to-air

More information

LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4. Tactical Wheeled Vehicles 27 January 2003

LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4. Tactical Wheeled Vehicles 27 January 2003 LTG Charles S. Mahan Jr. United States Army Deputy Chief of Staff, G-4 Tactical Wheeled Vehicles 27 January 2003 TRUCK HISTORY LESSON The first motor truck was built in 1896 by Gottlieb Daimler Pre-WWI

More information

The Armed Forces Communications and Electronics Association (AFCEA)

The Armed Forces Communications and Electronics Association (AFCEA) U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

The Integral TNO Approach to NAVY R&D

The Integral TNO Approach to NAVY R&D NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,

More information

Purpose: Provide NDIA Symposium An Overview Of U.S. Army, PEO STRI, PM ITTS TMO Activities

Purpose: Provide NDIA Symposium An Overview Of U.S. Army, PEO STRI, PM ITTS TMO Activities Purpose: Provide NDIA Symposium An Overview Of U.S. Army, PEO STRI, PM ITTS TMO Activities Briefed by: Mr. Al Brown TMO Director, PM ITTS, PEO STRI 256-876-4077 DSN: 746-4077 e-mail: alvin.brown@us.army.mil

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 13.134 13.87 13.942-13.942 13.82 14.48 14.827

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98 COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 8 R-1 Line #98 Cost To Complete Total Program Element - 33.968

More information

STATEMENT BY DR. A. MICHAEL ANDREWS II DEPUTY ASSISTANT SECRETARY OF THE ARMY FOR RESEARCH AND TECHNOLOGY AND CHIEF SCIENTIST BEFORE THE

STATEMENT BY DR. A. MICHAEL ANDREWS II DEPUTY ASSISTANT SECRETARY OF THE ARMY FOR RESEARCH AND TECHNOLOGY AND CHIEF SCIENTIST BEFORE THE RECORD VERSION STATEMENT BY DR. A. MICHAEL ANDREWS II DEPUTY ASSISTANT SECRETARY OF THE ARMY FOR RESEARCH AND TECHNOLOGY AND CHIEF SCIENTIST BEFORE THE SUBCOMMITTEE ON EMERGING THREATS AND CAPABILITIES

More information

Test and Evaluation Strategies for Network-Enabled Systems

Test and Evaluation Strategies for Network-Enabled Systems ITEA Journal 2009; 30: 111 116 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation Strategies for Network-Enabled Systems Stephen F. Conley U.S. Army Evaluation Center,

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

Paper is most relevant to: Live, Virtual, and Constructive (LVC) capabilities

Paper is most relevant to: Live, Virtual, and Constructive (LVC) capabilities Operational Test Command (OTC) Analytic Simulation and Instrumentation Suite (OASIS) Brings Live Players to the Modeling Architecture for Technology, Research, and EXperimentation (MATREX) and Other Benefits

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research,, Test & Evaluation, Army / BA 5: System & Demonstration (SDD) COST ($ in Millions) Years FY 2014 FY 2015 FY 2017

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Future Force Capabilities

Future Force Capabilities Future Force Capabilities Presented by: Mr. Rickey Smith US Army Training and Doctrine Command Win in a Complex World Unified Land Operations Seize, retain, and exploit the initiative throughout the range

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward 17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward Mr. Paul D. Mann (Acting) Principal Deputy Director Test Resource Management Center January 26, 2017 1 2 TRMC

More information

DoD Analysis Update: Support to T&E in a Net-Centric World

DoD Analysis Update: Support to T&E in a Net-Centric World Session C: Past and Present T&E Lessons Learned 40 Years of Excellence in Analysis DoD Analysis Update: Support to T&E in a Net-Centric World 2 March 2010 Dr. Wm. Forrest Crain Director, U.S. Army Materiel

More information

AGENDA ARMY DEVELOPMENTAL AND OPERATIONAL TEST PLAN REVIEW PROCESS. How Does ATEC FIT IN? Developmental Testing What:

AGENDA ARMY DEVELOPMENTAL AND OPERATIONAL TEST PLAN REVIEW PROCESS. How Does ATEC FIT IN? Developmental Testing What: AGENDA ARMY DEVELOPMENTAL AND OPERATIONAL TEST PLAN REVIEW PROCESS Dal M. Nett Safety Director US Army Test and Evaluation Command (ATEC) 27 June 08 ATEC/DTC/OTC DT 101 What is Developmental Testing? Why

More information

Gerry Christeson Test Resource Management Center 20 October 2010

Gerry Christeson Test Resource Management Center 20 October 2010 Building Next Generation Range Capabilities Central Test and Evaluation Investment Program (CTEIP) Gerry Christeson Test Resource Management Center 20 October 2010 1 Test Resource Management Center (TRMC)

More information

Future Combat Systems Industry Day Briefing

Future Combat Systems Industry Day Briefing Future Future Industry Day Briefing MG Joseph L. Yakovac Program Executive Officer, Ground 11 February 2003 Program Manager s Intent: Field FCS-Equipped Units of Action With Threshold Objective Force Capability

More information

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability U.S. Army Research, Development and Engineering Command Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability NDIA Systems Engineering Conference

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 2 - Applied Research 0602308A - Advanced Concepts and Simulation COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) ARMY COMMON GROUND STATION (CGS) (TIARA) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

First Announcement/Call For Papers

First Announcement/Call For Papers AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California

More information

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost

More information

Fire Support Systems.

Fire Support Systems. Fire Support Systems www.aselsan.com.tr AFSAS FIRE SUPPORT SYSTEM FIRE SUPPORT SYSTEMS ASELSAN Fire Support System (AFSAS) is a system of systems which provides the automation of planning and execution

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013

More information

F-35 Lightning II A New Generation of Fighter

F-35 Lightning II A New Generation of Fighter F-35 Lightning II A New Generation of Fighter 1 The Next Generation in Fighter Aircraft A Quantum Leap in Capability LO Treatments Advanced Avionics Guided Weapons First Jets Supersonic First Radar Multirole

More information

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II Army ACAT ID Program Total Number of BATs: (3,487 BAT + 8,478 P3I BAT) Total Number of Missiles: Total Program Cost (TY$): Average Unit Cost (TY$): Full-rate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

Fire Control Systems.

Fire Control Systems. Fire Control Systems www.aselsan.com.tr ARTILLERY FIRE CONTROL SYSTEMS FIRE CONTROL SYSTEMS ASELSAN Fire Control Systems developed for Self Propelled/Towed Howitzers, Mortars and Multiple Launch Rocket

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346

Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October February 2016 Battle Lab Report # 346 Army Expeditionary Warrior Experiment 2016 Automatic Injury Detection Technology Assessment 05 October 2015 19 February 2016 Battle Lab Report # 346 DESTRUCTION NOTICE For classified documents, follow

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR

More information

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR

FCS Update & Testing. Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR FCS Update & Testing Bud Irish SAIC Vice President FCS Integrated Phases, Simulation & Test Deputy IPT MGR 3/13/2009 10:36:11 AM 1 Army Leadership s View Future Combat Systems is the core of our modernization

More information

2017 Annual Missile Defense Small Business Programs Conference

2017 Annual Missile Defense Small Business Programs Conference 2017 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

Test and Evaluation:

Test and Evaluation: Test and Evaluation: How Well Your Equipment Performs Mr. James C. Cooke, Director Deputy Under Secretary of the Army Test and Evaluation Office 25 June 2009 1 Unclassified Support the Warfighter to accomplish

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0604759F PE TITLE: Major T&E Investment Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 06 RDT&E Management Support 0604759F Major T&E Investment Cost ($ in

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division

Mission Command. Lisa Heidelberg. Osie David. Chief, Mission Command Capabilities Division. Chief Engineer, Mission Command Capabilities Division UNCLASSIFIED //FOR FOR OFFICIAL OFFICIAL USE USE ONLY ONLY Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors (Critical Technology) 31 March 2016. Other

More information

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC) Briefing for the SAS Panel Workshop on SMART Cooperation in Operational Analysis Simulations and Models 13 October 2015 Release of

More information

Flight Controlled Mortar FCMortar

Flight Controlled Mortar FCMortar FCMortar NDIA Guns & Missile Systems Conference 6-10 April 2009 Luke Steelman, Program Manager Naval Surface Warfare Center, Dahlgren Division Precision & Advanced Systems Branch, Code G33 (540) 653-4984

More information

An Overview of Army Test and Evaluation. Published by: The Army Test and Evaluation Management Agency

An Overview of Army Test and Evaluation. Published by: The Army Test and Evaluation Management Agency An Overview of Army Test and Evaluation Published by: The Army Test and Evaluation Management Agency September 2007 Table of Contents Topic Page Introduction 1 I Test and Evaluation Mandate 1 II The Army

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 6464F PE TITLE: Submunitions Exhibit R-2, RDT&E Budget Item Justification February 28 5 System Development and Demonstration (SDD) 6464F Submunitions ($ in Millions) Actual 8.34 1.73 FY 21 1.837

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0602712A Countermine Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element (PE) Cost 26267 29171 22088 21965

More information

Department of Defense DIRECTIVE. SUBJECT: DoD Electromagnetic Environmental Effects (E3) Program

Department of Defense DIRECTIVE. SUBJECT: DoD Electromagnetic Environmental Effects (E3) Program Department of Defense DIRECTIVE NUMBER 3222.3 September 8, 2004 SUBJECT: DoD Electromagnetic Environmental Effects (E3) Program ASD(NII) References: (a) DoD Directive 3222.3, "Department of Defense Electromagnetic

More information

United States Army Special Operations Aviation Command (USASOAC)

United States Army Special Operations Aviation Command (USASOAC) United States Army Special Operations Aviation Command (USASOAC) AAAA Aircraft Survivability Equipment Symposium BG John R. Evans, Jr. USASOAC Commanding General 14 November 2017 Overall Classification:

More information

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3 Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3 30 May 2001 R. John Bernard Angela M. Alban United Defense, L.P. Orlando, Florida Report Documentation Page Report Date 29May2001 Report

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) - COST (In Thousands) INTERIM ARMORED VEHICLE (IAV) FAMILY FY 2010 FY 2011 FY 2012 FY 2013 to 8391 143568 108012

More information

System Simulation, Software & Integration Directorate Realignment

System Simulation, Software & Integration Directorate Realignment Presented to: Huntsville Area Marketing Association System Simulation, Software & Integration Directorate Realignment DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited. 20

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Army Test and Evaluation Command Scheduling Process Perspective

Army Test and Evaluation Command Scheduling Process Perspective Army Test and Evaluation Command Scheduling Process Perspective 32nd Annual National Defense Industry Association Test and Evaluation Conference Prepared by Darrin K Loken White Sands Missile Range darrin.k.loken.civ@mail.mil

More information

AUSA BACKGROUND BRIEF

AUSA BACKGROUND BRIEF AUSA BACKGROUND BRIEF No. 46 January 1993 FORCE PROJECTION ARMY COMMAND AND CONTROL C2) Recently, the AUSA Institute of Land Watfare staff was briefed on the Army's command and control modernization plans.

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE Communications Technology COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 4 Page 1 of 6

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 4 Page 1 of 6 Exhibit R-2, RDT&E Project Justification February 2007 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX LIVE FIRE TEST AND EVALUATION (LFT&E) PROGRAM ELEMENT (PE) 0605131OTE Cost ($

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) 114 812 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 to Total COST (In Thousands) Actual Estimate

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE Sensor Tech COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost

More information