United States Army Special Operations Aviation Command (USASOAC)

Size: px
Start display at page:

Download "United States Army Special Operations Aviation Command (USASOAC)"

Transcription

1 United States Army Special Operations Aviation Command (USASOAC) AAAA Aircraft Survivability Equipment Symposium BG John R. Evans, Jr. USASOAC Commanding General 14 November 2017 Overall Classification: //ORCON

2 Special Operations Aviation Special Operations Aviation Video Link

3 Technology Roadmap Fleet Configuration Signature Management Agenda Agenda Hostile Fire (IR/RF/Small Arms) CMWS/IRCM RF CM AOBPS/Weight savings Future ASE Development and Integration Multi-Spectral (UV, IR) Airborne Mission Networking Advanced Tactics, Education, and Training GAP Advanced Education and Training Concept

4 Technology Technology Roadmap Roadmap SIGNATURE MANAGEMENT Reduce Detection Radius, Disrupt Aiming THREAT DETECTION Detect/Defeat Threat Weapons, Disable Shooters DEGRADED VISUAL ENVIRONMENT SYSTEM Operate Safely in Brownout, Whiteout, and IMC INTEGRATED AIRBORNE NETWORKING SYSTEM Holistic Waveform Management Current Capability Exhaust Suppression (Infrared) Detect and counter guided munitions with expendables Flight Instruments, CAAS cueing Federated Rover 6 and PRC 117, PRC 152 PRC 154 (Carry On) TW 400, Case by case MANET Tech Path Reduction of visual signature Reduction of radar signature; agile and cooperative jamming Reduction of acoustic signature Detect unguided projectiles, geolocate source, slave sensors Detect aimed optics, rifle barrels; directed energy replaces expendables Dazzle shooters and potential shooters, disable RPG fuses prior to impact DAFCS, synthetic vision for increased control and cueing Fusion of DTED with imagery or EO, integrated cable warning and obstacle avoidance DTED, imagery, EO, RF, and laser image via HUD Integrated Waveforms & MANET Federated Link 16 Hybrid Optical/RF air to air links, Msn Planning, Airborne Mesh, Integrated Link 16 Software Programmable Radios supporting single integration multisolution set cross domain Objective Capability Active signature manipulation; electromagnetic spectrum exploited for feints, saturation and surprise Disable guided and fused weapons prior to launch; surface fire feeds AOR targeting systems Integrated Synthetic vision via HUD, expand portion of available of EM spectrum & data available to Crew Members Fully Displayable, Modular, Air vehicle OFP de synced Dynamic Tactical Airborne Network with Anti Cognitive Jamming Increased Effectiveness, Suitability, and Survivability Enroute and on the Objective

5 Current Current Fleet Fleet MH-60M SIRFC CMWS/ICMD AVR-2B SOA CAAS MH-47G All ASE systems integrated through Common Avionics Architecture System (CAAS) using a single Dedicated Electronic Warfare Display (DEWD)

6 MH47G: IES-47 SOF unique Fully fielded Infrared IR (IR) Suppression Suppression MH60M: UES Army common with UH-60M Reduce signatures to enhance CM effectiveness

7 Infrared Infrared Countermeasures (IRCM) (IRCM) Reduced Optical Signature Emissions Solution (ROSES) Low visibility flare Extensive captive seeker testing and modeling 2 x Flare solution fielded Ongoing work to improve solution Effectiveness with lower optical signature

8 Radio Frequency Countermeasures (RFCM) Suite of Integrated Radio Frequency Countermeasures (SIRFC) Fielding complete, continuing to upgrade capability Premier rotary wing Radar Warning Receiver (RWR) Premier rotary wing Radio Frequency Counter Measures (RFCM) Comprehensive RF solution (RWR and Countermeasure) Replaces four federated legacy systems APR 39, APR 44, ALQ 136, ALQ 162 Hosts CMWS, AAQ 24, and AVR-2B Interface, HFI correlation and sensor fusion Common ASE display Threat data System status The foundation of the 160th SOAR integrated ASE suite

9 Aircraft Armor Armor Aircraft Occupant Ballistic Protection System (AOBPS) Fielding complete Provides focused protection Almost half the weight of steel, equivalent protection, 1366 lb savings with MH-47 crew and pax set installed Fielded to all 3 airframes MH-60 MITAS Multi-hit Transparent Armor System (MITAS) Fielding complete (Fielded only to the MH- 60M fleet) A/MH-6 MH-60 MH-47G Improved protection while providing improved visibility Protect our crews and customers

10 Future ASE Development and Integration Multi-Spectral (UV, IR) Maximize the use of existing sensors and processors Minimize weight penalty Integrate into SIRFC for crew interface, real time reporting small arms, RPG, and AAA with no impact to MWS Ultimate goal is to provide a countermeasure and geo-location ASE Joint Urgent Operational Need Statement (JUONS) Airborne Mission Networking Airborne Mission Networking Networked Common Operating Picture (COP) Networked ASE Data A/MH-6M Solution(s) Networked DVE Data Degraded Visual Environment Pilotage System (DVEPS) Expedite Situational Awareness 10

11 Advanced Tactics Education and Training Gap GAP Special Operations Aviation lacks the capability to conduct Advanced Tactical Education and Training. No SOF Peculiar Aviation Mission Survivability Officer (AMSO) Course No Aviation Advanced Tactics Course (Academic / Simulation / Flight) Requirement Strategic level demand for and advanced aviation support capability in an Anti Access Area Denial (A2AD) environment. Recent missions, ongoing and future requirements Denied areas are expanding and trend towards layered, networked, and technologically advanced enemy. 11

12 Advanced Tactics, Education, and Training Concept Formalize Advanced Training and SOP Develop SOF Peculiar AMSO POI (Academic / Simulation) Advanced Develop SOA Tactics POI (Academic / Simulation / Flight) Graduate A2AD Focus Denied Area Planning Denied Area Execution Personnel Recovery The Aviation Mission Survivability Team is a tactically sound, mission focused group, designated by the command as the denied area planning specialists, comprised of Aviation Mission Survivability (AMS) and Electronic Warfare (EW) subject matter experts. 160 th SOAMS TEAM CONCEPT Transition from we own the night to we own the spectrum Integrate Intel support and Electronic Warfare (EW) SOF Aviation peculiar education and training into SOA Special Operations Aviation Mission Survivability (SOAMS) Team Intelligence personnel trained to support requirements for A2/AD planning EW personnel cross trained in rotor wing (RW) planning methods and ASE capabilities Aviation Mission Survivability personnel cross trained in EW IOT integrate in the EW plan

13 Questions

COL John Vannoy Program Executive Officer

COL John Vannoy Program Executive Officer COL John Vannoy Program Executive Officer ROTARY WING DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE Schedule of Presentations Day 1 Wednesday 25 May 2016 Day 2 Thursday 26 May 2016 11:30-12:30 PEO RW Strategic

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research,, Test & Evaluation, Army / BA 5: System & Demonstration (SDD) COST ($ in Millions) # FY 2016 FY 2017 FY 2018 FY 2019

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

COL David Phillips Program Executive Officer ROTARY WING

COL David Phillips Program Executive Officer ROTARY WING SPECIAL OPERATIONS FORCES INDUSTRY CONFERENCE Win Transform People COL David Phillips Program Executive Officer ROTARY WING DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE Schedule of Presentations Day 1 Wednesday

More information

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT.

SPS-TA THALES AIRBORNE SYSTEMS INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT. THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE SYSTEMS SPS-TA INTEGRATED SELF-PROTECTION SYSTEM FOR TRANSPORT AND WIDE-BODY AIRCRAFT www.thales-airbornesystems.com THALES AIRBORNE SYSTEMS ELECTRONIC WARFARE

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 13.134 13.87 13.942-13.942 13.82 14.48 14.827

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

COL John Vannoy Program Executive Officer

COL John Vannoy Program Executive Officer COL John Vannoy Program Executive Officer ROTARY WING SCHEDULE OF PRESENTATIONS Day 1 Wednesday - 21 May (11:15-12:15 and 2:30-3:30) PEO RW Strategic Overview COL Vannoy Requirements & Technology Development

More information

aselsan EW SPECTRUM MANAGEMENT

aselsan EW SPECTRUM MANAGEMENT EW SPECTRUM MANAGEMENT November 2014 CONTENTS What Is The Problem? Common Picture? (EW Spectrum) Area of Interest Preemptive Operations EW Spectrum Management Steps For EW Spectrum Management Planning,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

Fundamentals of Electro-Optics and Infrared Sensors

Fundamentals of Electro-Optics and Infrared Sensors Fundamentals of Electro-Optics and Infrared Sensors Make Your Career Soar WELCOME MESSAGE Welcome Thank you very much for your interest in White Eagle Aerospace. Since our founding in 2006, we have become

More information

Rotary Aviation Challenges in the Future Operational Environment

Rotary Aviation Challenges in the Future Operational Environment The Overall Classification of this briefing UNCLASSIFIED Rotary Aviation Challenges in the Future Operational Environment TRADOC G-2 UNCLASSIFIED http://www.tradoc.army.mil/ FOR OFFICIAL USE ONLY Near

More information

AMPS - Airborne Missile Protection System

AMPS - Airborne Missile Protection System AMPS - Airborne Missile Protection System AMPS Where Innovation Meets Performance The Threat Military aircraft, VIP aircraft and commercial airliners are all exposed to the growing threat of Surface to

More information

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS:

GOOD MORNING I D LIKE TO UNDERSCORE THREE OF ITS KEY POINTS: Keynote by Dr. Thomas A. Kennedy Chairman and CEO of Raytheon Association of Old Crows Symposium Marriott Marquis Hotel Washington, D.C. 12.2.15 AS DELIVERED GOOD MORNING THANK YOU, GENERAL ISRAEL FOR

More information

Aviation Branch Update

Aviation Branch Update 2017 AAAA Cribbins Aviation Support Symposiun Aviation Branch Update COL Tom O Connor Deputy Commander US Army Aviation Center of Excellence 16 Nov 17 1 Aviation Commitments Modernization & HS Training

More information

Product Manager Air Warrior Update AAAA ASE Symposium

Product Manager Air Warrior Update AAAA ASE Symposium Project Manager Soldier Warrior Our Strength and Purpose Product Manager Air Warrior Update to the 2017 AAAA ASE Symposium Jim Isaacs Deputy Product Manager Air Warrior james.r.isaacs.civ@mail.mil Slide

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

AFCEA Mission Command Industry Engagement Symposium

AFCEA Mission Command Industry Engagement Symposium UNCLASSIFIED/ AFCEA Mission Command Industry Engagement Symposium MG Pete Gallagher Director, Network CFT 3 April 2018 Network CFT Collaboration, Fusion & Transparency WARFIGHTING REQUIREMENTS Army Warfighters

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 35.208 38.447

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADPO10951 TITLE: Mission Planning Technology DISTRIBUTION: Approved for public release, distribution unlimited This paper is part

More information

LTC AL Niles PM-SOF Training Systems. CPT Luke Leininger. APM SOF Training Systems UNCLASSIFIED UNCLASSIFIED

LTC AL Niles PM-SOF Training Systems. CPT Luke Leininger. APM SOF Training Systems UNCLASSIFIED UNCLASSIFIED LTC AL Niles PM-SOF Training Systems CPT Luke Leininger APM SOF Training Systems Agenda PM Special Forces Training Systems (PM STS) Mission Training Systems PM STS Universe Rotary Wing Network SOF Aviation

More information

Counter-Man-Portable Air Defense Systems. James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology

Counter-Man-Portable Air Defense Systems. James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology Counter-Man-Portable Air Defense Systems James Tuttle Program Manager U.S. Department of Homeland Security Science & Technology Threat Background C-MANPADS National Strategy Program Overview Briefing Outline

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program Element

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training

ISR Full Crew Mission Simulator. Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission Training Intelligence, Surveillance and Reconnaissance Capabilities for Airborne and Maritime Live Mission

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

AGENCY: Defense Security Cooperation Agency, Department of Defense.

AGENCY: Defense Security Cooperation Agency, Department of Defense. This document is scheduled to be published in the Federal Register on 11/14/2017 and available online at https://federalregister.gov/d/2017-24622, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 06 Exhibit R, RDT&E Budget Item Justification: PB 07 00: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) R Program Element (Number/Name)

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

MC Network Modernization Implementation Plan

MC Network Modernization Implementation Plan MC Network Modernization Implementation Plan Mission Command Center of Excellence 1 Principles (Why) Warfighting Requirements CSA s Mission, Principles, Characteristics of the Network & Requirements Network

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #32 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Comprehensive 360 Situational Awareness for the Crew Served Weapons Leader

Comprehensive 360 Situational Awareness for the Crew Served Weapons Leader Comprehensive 360 Situational Awareness for the Crew Served Weapons Leader May 16, 2012 Tim Eagleson- L-3 KEO 0 Situation Threat: Multitude of asymmetric threats across full spectrum of operations, to

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 12 R-1 Line #147

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 12 R-1 Line #147 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013 FY 2014 FY

More information

SOF Future Vertical Lift (FVL) COL Ramsey Bentley

SOF Future Vertical Lift (FVL) COL Ramsey Bentley SOF Future Vertical Lift (FVL) COL Ramsey Bentley SOCOM J8, FVL JCOC Bottom Line Up Front The Current Fleet Of DoD Rotorcraft Cannot Continue To Be Incrementally Improved To Meet Future Operational Requirements.

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION Joe Pelino ARDEC Director of Technology 18 April 2018 UNPARALLELED COMMITMENT &SOLUTIONS Act like someone s life depends on what we do.

More information

3 rd Annual Electromagnetic Spectrum Operations Summit

3 rd Annual Electromagnetic Spectrum Operations Summit Defense Strategies Institute professional educational forum: 3 rd Annual Electromagnetic Spectrum Operations Summit ~ Delivering EW and Cyber Capabilities for Multi-Domain Operations ~ June 20-21, 2017

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-6 0604759N Major T & E Investment Prior Total COST ($

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete

UNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2004 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 3 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160402BB Special Operations (SO) Advanced

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy : March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

The Integral TNO Approach to NAVY R&D

The Integral TNO Approach to NAVY R&D NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,

More information

A r m y S c i e n c e & Te c h n o l o g y

A r m y S c i e n c e & Te c h n o l o g y A r m y S c i e n c e & Te c h n o l o g y C3I Portfolio Overview Mr. Kris Gardner Director C3I Portfolio Office of the Deputy Assistant to the Secretary of the Army for Research and Technology Command,

More information

UNITED STATES SPECIAL OPERATIONS COMMAND. Proposal Submission

UNITED STATES SPECIAL OPERATIONS COMMAND. Proposal Submission UNITED STATES SPECIAL OPERATIONS COMMAND Proposal Submission The United States Special Operations Command's (USSOCOM) missions include developing and acquiring unique special operations forces (SOF) equipment,

More information

SM Agent Technology For Human Operator Modelling

SM Agent Technology For Human Operator Modelling SM Agent Technology For Human Operator Modelling Mario Selvestrel 1 ; Evan Harris 1 ; Gokhan Ibal 2 1 KESEM International Mario.Selvestrel@kesem.com.au; Evan.Harris@kesem.com.au 2 Air Operations Division,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

Electronic Warfare I 127

Electronic Warfare I 127 Electronic Warfare H.04 Miniature Air-Launched Decoy Program ACTD H.05 Large-Aircraft Infrared Countermeasures ATD H.07 Enhanced Situation Awareness Demonstrations H.08 Onboard Electronic Countermeasures

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 71-8-3510 Task Title: Plan for a Electronic Attack (Brigade - Corps) Distribution Restriction: for public release; distribution is unlimited. Destruction

More information

CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission. Elements of Intelligence Support. Signals Intelligence (SIGINT) Electronic Warfare (EW)

CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission. Elements of Intelligence Support. Signals Intelligence (SIGINT) Electronic Warfare (EW) CHAPTER 4 MILITARY INTELLIGENCE UNIT CAPABILITIES Mission The IEW support mission at all echelons is to provide intelligence, EW, and CI support to help you accomplish your mission. Elements of Intelligence

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 2 Page 1 of 9 Exhibit R-2, RDT&E Project Justification February 2006 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX CENTRAL TEST AND EVALUATION INVESTMENT PROGRAM ELEMENT (PE) 0604940D8Z Cost ($

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

Col Alan Pratt, USMC Commander. Distribution Statement A Approved for Public Release. Mr. Matthew Craig Acting Technical Director

Col Alan Pratt, USMC Commander. Distribution Statement A Approved for Public Release. Mr. Matthew Craig Acting Technical Director 1 Col Alan Pratt, USMC Commander Mr. Matthew Craig Acting Technical Director 2 TEAM Crane 3 rd Largest Naval Installation in the World (100 Square Miles) TEAM Crane $2.24 B FY 11 Business Base 4,372+ Govt.

More information

Headquarters U.S. Air Force

Headquarters U.S. Air Force Headquarters U.S. Air Force Presented to the National Defense Industrial Association (DoD Technology Exposition) Mr. Jim Engle Deputy Assistant Secretary (Science, Technology & Engineering) 6 March 2003

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

STATEMENT OF BRUCE W. CLINGAN, USN DIRECTOR, AIR WARFARE BEFORE THE SUBCOMMITTEE ON AIR AND LAND FORCES OF THE HOUSE ARMED SERVICES COMMITTEE

STATEMENT OF BRUCE W. CLINGAN, USN DIRECTOR, AIR WARFARE BEFORE THE SUBCOMMITTEE ON AIR AND LAND FORCES OF THE HOUSE ARMED SERVICES COMMITTEE NOT FOR PUBLICATION UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE AIR AND LAND FORCES SUBCOMMITTEE STATEMENT OF BRUCE W. CLINGAN, USN DIRECTOR, AIR WARFARE BEFORE THE SUBCOMMITTEE ON AIR AND LAND

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM COST ($ in Millions) FY 2006 FY 2007

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

The Western UAS Symposium

The Western UAS Symposium The Western UAS Symposium http://www.ttcus/com @Techtrain Linkedin/Groups: Technology Training Corporation MARINE AVIATION USMC Future UAS Programs and Weapons LtCol James Tuck Compton HQMC Aviation, Deputy

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

Multi-Mission Maritime Aircraft Survivability in Modern Maritime Patrol and Reconnaissance Missions

Multi-Mission Maritime Aircraft Survivability in Modern Maritime Patrol and Reconnaissance Missions J. M. GARBER AND A. C. WILLIAMSON Multi-Mission Maritime Aircraft Survivability in Modern Maritime Patrol and Reconnaissance Missions Jean M. Garber and Arthur C. Williamson The Multi-mission Maritime

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

F-35 Lightning II A New Generation of Fighter

F-35 Lightning II A New Generation of Fighter F-35 Lightning II A New Generation of Fighter 1 The Next Generation in Fighter Aircraft A Quantum Leap in Capability LO Treatments Advanced Avionics Guided Weapons First Jets Supersonic First Radar Multirole

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE FOR OFFICIAL USE ONLY UNTIL RELEASE BY THE COMMITTEE ON ARMED SERVICES U.S. SENATE STATEMENT BY J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 Program Element 16.104 48.666 19.004-19.004 19.950 31.056 31.181 31.730 Continuing Continuing 633150: Advanced Optics

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

Software Reprogramming for Cyber Electromagnetic Activities

Software Reprogramming for Cyber Electromagnetic Activities Army Regulation 525 15 Military Operations Software Reprogramming for Cyber Electromagnetic Activities Headquarters Department of the Army Washington, DC 19 February 2016 UNCLASSIFIED SUMMARY of CHANGE

More information

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype 1.0 Purpose Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype This Request for Solutions is seeking a demonstratable system that balances computer processing for modeling and

More information

18. WARHEADS AND GUIDANCE SYSTEMS

18. WARHEADS AND GUIDANCE SYSTEMS Briefing 1. A wide range of weapons is capable of firing projectiles with warheads. Many of these weapons can fire more than one type of warhead. Most warheads combine a powerful attack factor with an

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information