Processes and Responsibilities. ERA ETCS Conference on Testing and Certification Lille March 29 th 2011

Size: px
Start display at page:

Download "Processes and Responsibilities. ERA ETCS Conference on Testing and Certification Lille March 29 th 2011"

Transcription

1 Processes and Responsibilities ERA ETCS Conference on Testing and Certification Lille March 29 th 2011

2 Overview The principles for authorisation The application of the principles How the CCS TSI supports the principles Lille, March 29 th

3 The principles for authorisation Interoperability Directive, art. 15/1 the MS shall ensure that the subsystems meet the essential requirements and in particular the technical compatibility of subsystems with the system and the safe integration Safety Directive, art. 4 MS shall ensure that railway safety is maintained (art. 4) risk evaluation whenever a change of operating conditions or new material imposes new risks (Annex III) Lille, March 29 th

4 The principles for authorisation The installation of ERTMS is normally a significant change in the meaning of the Safety Directive This means that both the Interoperability Directive and the Safety Directive shall be applied A problem or a help? The two Directives cooperate to define a complete reference framework for authorisation, but an appropriate mapping of the legal requirements of the two Directives on the development and certification process is necessary Lille, March 29 th

5 The application of the principles Let s start from the beginning (and consider the case of a track-side implementation) The Safety Directive requires a system based approach System What do we expect from ERTMS in the specific application? (headway, train speed, tunnels, shunting areas, legacy systems, etc.) Constraints from TSIs and Regulation 352/2009 (e.g., being able to accept a TSI compliant train) Constraints from TSIs (e.g., Interoperability Constituents) and other regulations Subsystem Product Which functions do we have to implement and how? Do we need 1 or 2? Do we need Shunting? Reversing? Transitions to/from legacy systems? etc. Which are the characteristics of the products we need? Lille, March 29 th

6 The application of the principles And now the complete cycle System Additional work to do? Safety Directive CSM for risk evaluation and assessment methods System Subsystem Duplication? Conflict? EC Declaration of Subsystem Verification Subsystem Product EC Declaration of Conformity Product TSIs (NNTRS) Lille, March 29 th

7 The application of the principles Let try to summarise Art 15 of the Interoperability Directive does not require that products are developed and assembled delegating only to a final set of tests the verification, whether the subsystems fits in the system and works well Technical compatibility and safe integration shall be taken into account at the beginning of the project (this is the only possibility to test them at the end) For a track-side implementation, technical compatibility and safe integration include the obligation to design the subsystem for the acceptance of any TSI compliant vehicle Lille, March 29 th

8 The application of the principles What is the final verification of technical compatibility and safe integration? DV 29, section 5.3: where relevant TSIs exist and apply, verification of technical compatibility is carried out by reference of TSIs ; safe integration is part of the essential requirements. Therefore it is covered, as a general rule, by TSIs or national rules Additional verifications (specific for a MS) are only required for aspects not (yet) covered by a TSI and shall be according to national rules Lille, March 29 th

9 How the CCS TSI supports the principles Coordination between CSM and CCS TSI TSI requires the application of CSM, with no exported requirements across the interface between on-board and track-side (this is a mirror requirement of art. 2/2 of the CSM regulation) TSI contains full mandatory specification of the onboard functions and performance and of the interface between on-board and track-side In the context of the EC subsystem verification it has to be checked that the functions required by the application are implemented in accordance with the TSI Lille, March 29 th

10 How the CCS TSI supports the principles Verifying technical compatibility and safe integration MSs are required to ensure that operational scenarios for the track-side ERTMS/ETCS implementation are made available Running such operational scenarios against certified on-board equipment will allow a progressive reduction of the risk that a track-side implementation is not compatible with authorised vehicles, going towards the target: Vehicles are authorised on the basis of compliance with rules authorisation of TSI compliant vehicles is valid in all MSs, without additional checks. Track-side is responsible of being interoperable Lille, March 29 th

Technical Position Paper

Technical Position Paper Technical Position Paper CCS TSI Recast January 4 th 2016 Banedanmark does not support this EIM position paper 1. Introduction The CCS TSI set out as annex to Commission Decision 2012/88/EU has been amended

More information

Guidance on the Application of the Control Command and Signalling TSI

Guidance on the Application of the Control Command and Signalling TSI Uncontrolled When Printed Rail Industry Guidance on the Application of the Control Command and Signalling TSI Synopsis This document provides guidance on the application of the CCS TSI. Copyright in the

More information

COMMISSION DIRECTIVE 2011/18/EU

COMMISSION DIRECTIVE 2011/18/EU 2.3.2011 Official Journal of the European Union L 57/21 DIRECTIVES COMMISSION DIRECTIVE 2011/18/EU of 1 March 2011 amending Annexes II, V and VI to Directive 2008/57/EC of the European Parliament and of

More information

Position Paper. ETCS On-board Subsystem Reliability Requirement for Operational Safety

Position Paper. ETCS On-board Subsystem Reliability Requirement for Operational Safety Position Paper ETCS On-board Subsystem Reliability Requirement for Operational Safety 06.10.2014 TABLE OF CONTENTS 1. Introduction... 3 1.1 Background... 3 1.2 Purpose... 4 1.3 Scope... 4 1.4 References...

More information

Technical specifications for Interoperability (TSIs)

Technical specifications for Interoperability (TSIs) Technical specifications for Interoperability (TSIs) 1. Content and Scope 2. Major differences between a TSI and UIC leaflets / standards 3. When do they need to be applied? 9 March 2011 IPA project -

More information

ETCS Baselines, status, roadmap

ETCS Baselines, status, roadmap ETCS Baselines, status, roadmap ERTMS Conference CCRCC 2013 Lille, 12-13/11/2013 Hans Bierlein, ERA ERTMS Unit ERTMS - European determination ERTMS is a major European industrial project, started and supported

More information

Railway Interoperability and Safety Committee. Working document

Railway Interoperability and Safety Committee. Working document 08/57-ST12 RISC 62 Version EN01 Origin EN 06.10.2011 Status: NA Railway Interoperability and Safety Committee Working document Draft Commission Decision amending Commission Decisions 2006/679/EC and 2006/860/EC

More information

Return of Experience on the approval processes for projects of retro-fit and upgrade vehicles with an ETCS On Board subsystem

Return of Experience on the approval processes for projects of retro-fit and upgrade vehicles with an ETCS On Board subsystem Return of Experience on the approval processes for projects of retro-fit and upgrade vehicles with an ETCS On Board subsystem M.Peralta, L. Helleputte, 31/10/2013 Introduction The object of this presentation

More information

for European Commission regarding OPINION OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ERA/OPI/ specifications test

for European Commission regarding OPINION OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ERA/OPI/ specifications test ERAJOPI/2017-5 EUROPEAN UNION AGENCY FOR RAILWAYS Making the railway system work better for society. OPINION ERA/OPI/201 7-5 OF THE EUROPEAN UNION AGENCY FOR RAILWAYS for European Commission regarding

More information

INTEROPERABILITY UNIT

INTEROPERABILITY UNIT INTEROPERABILITY UNIT STUDIES: 1) MERGING OF HS AND CR TSIS AND 2) SPLITTING OF THE Reference: ERA/REP/13-2011/INT Document type: Report Annex 5 Version of Annex 3: Date of Annex 3: 1.0 31 January 2011

More information

DRAFT. Transition guide from former RIV/UIC regime to new TSI/GCU regime

DRAFT. Transition guide from former RIV/UIC regime to new TSI/GCU regime 01/16-DV60 TRANSITION Version EN02 Origin EN Status NA DRAFT Transition guide from former RIV/UIC regime to new TSI/GCU regime 1. INTRODUCTION There is a large scale reorganisation of EU railways. The

More information

Responsibility of NoBo & DeBo in the authorization process

Responsibility of NoBo & DeBo in the authorization process ERA NFM - BME EU Interoperability Conference Responsibility of NoBo & DeBo in the authorization process Tivadar Szabo Director ERTMS Expert Chairman NB-Rail CCS WG KTI Institute for Transport Sciences

More information

European Maritime Safety Agency. Training on Maritime Security October Obligations for. Maritime Administrations

European Maritime Safety Agency. Training on Maritime Security October Obligations for. Maritime Administrations European Maritime Safety Agency Training on Maritime Security 26-27 October 2010 1 Obligations for Maritime Administrations in respect of Ship Security Overview 1. EU Maritime Security Legislation 2. Role

More information

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular NOTICE OF CALL FOR PROPOSALS with a view to obtaining grants in the field of rail transport, in particular Telematics Applications for Passengers' services (TAP) DG MOVE/D2/SUB/446-2011 1. POLICY FRAMEWORK

More information

Stakeholder Consultation Workshop on the Draft Implementing Rule for Mode S Interrogator Code Allocation (MSI)

Stakeholder Consultation Workshop on the Draft Implementing Rule for Mode S Interrogator Code Allocation (MSI) Stakeholder Consultation Workshop on the Draft Implementing Rule for Mode S Interrogator Code Allocation (MSI) 25 th October 2007, Brussels, EUROCONTROL European 1 Organisation for the Safety of Air Navigation

More information

Biocidal product regulation the changes to come

Biocidal product regulation the changes to come Biocidal product regulation the changes to come The Biocidal Product Regulation, which came into force on 1 September 2013 is still changing. ECHA announced the evolutions of this changing regulation during

More information

DOD INSTRUCTION DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS

DOD INSTRUCTION DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS DOD INSTRUCTION 4151.24 DEPOT SOURCE OF REPAIR (DSOR) DETERMINATION PROCESS Originating Component: Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics Effective: October

More information

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification. Learning Mobility of Individuals

Erasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification. Learning Mobility of Individuals A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit and about

More information

PART A. In order to achieve its objectives, this Code embodies a number of functional requirements. These include, but are not limited to:

PART A. In order to achieve its objectives, this Code embodies a number of functional requirements. These include, but are not limited to: PART A MANDATORY REQUIREMENTS REGARDING THE PROVISIONS OF CHAPTER XI-2 OF THE INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, AS AMENDED 1 GENERAL 1.1 Introduction This part of the International

More information

IS-700.a National Incident Management System (NIMS) An Introduction Final Exam

IS-700.a National Incident Management System (NIMS) An Introduction Final Exam 1. Homeland Security Presidential Directive 5 (HSPD-5) requires all Federal departments and agencies to: a. Establish a panel that will evaluate activities at the State, tribal, and local levels to ensure

More information

"ERA-NET Plus Actions"

ERA-NET Plus Actions "ERA-NET Plus Actions" PROVISIONS FOR THE PREPARATION OF ERA-NET PLUS ACTIONS AND THEIR PRACTICAL IMPLEMENTATION A draft issue paper serving as background document 1 RTD B.1 Coordination of national research

More information

STUDY TO EXAMINE JOB PROFILE AND TASKS OF TRAIN CREW MEMBERS NOT DRIVING TRAINS BUT PERFORMING OTHER SAFETY CRITICAL TASKS ON BOARD OF TRAINS

STUDY TO EXAMINE JOB PROFILE AND TASKS OF TRAIN CREW MEMBERS NOT DRIVING TRAINS BUT PERFORMING OTHER SAFETY CRITICAL TASKS ON BOARD OF TRAINS STUDY TO EXAMINE JOB PROFILE AND TASKS OF TRAIN EW MEMBERS NOT DRIVING TRAINS BUT PERFORMING OTHER SAFETY ITICAL TASKS ON BOARD OF TRAINS Authors Final Report Marta Carvajal, Nuria del Barrio, Sara Trenas,

More information

NABH-PA PRE-ASSESSMENT GUIDELINES AND FORMS FOR HOSPITALS/ SHCO. Issue No. 5 Issue Date: 05/ 15 Page 1 of 9

NABH-PA PRE-ASSESSMENT GUIDELINES AND FORMS FOR HOSPITALS/ SHCO. Issue No. 5 Issue Date: 05/ 15 Page 1 of 9 NABH-PA PRE-ASSESSMENT GUIDELINES AND FORMS FOR HOSPITALS/ SHCO Issue No. 5 Issue Date: 05/ 15 Page 1 of 9 CONTENTS Sl. Title Page Nos. Content 2 1. Guide to use Pre-Assessment Forms & Checklist 3 5 2.

More information

Application Form Call: Learning Mobility of Individuals. Programme and Partner Countries. Mobility of Learners and Staff

Application Form Call: Learning Mobility of Individuals. Programme and Partner Countries. Mobility of Learners and Staff General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit and about the

More information

GRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s)

GRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s) Grant Agreement number «NO_REF» MONO BENEFICIARY GRANT AGREEMENT MARCH 2013 Education, Audiovisual and Culture Executive Agency Erasmus Mundus and External Cooperation GRANT AGREEMENT FOR AN ACTION ACTION

More information

CEF TRANSPORT 2016 CALL FOR PROPOSALS. Guide for Applicants

CEF TRANSPORT 2016 CALL FOR PROPOSALS. Guide for Applicants CEF TRANSPORT 2016 CALL FOR PROPOSALS Guide for Applicants 1. Introduction 3 2. Funding under the CEF Transport 5 3. Proposal Evaluation and Selection Process 7 3.1. OVERVIEW OF THE EVALUATION AND SELECTION

More information

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 21/01/2016 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2016)

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 21/01/2016 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2016) CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2016) 1 Contents 1. SPECIFIC TRAININGS BASED ON THE CORE CURRICULA (ON REQUEST)... 3 Specific inspection training based on the EFCA Core Curricula:... 3

More information

GUIDELINES FOR IMPLEMENTING A VOLUNTARY STUDENT FEE PLEDGE SYSTEM

GUIDELINES FOR IMPLEMENTING A VOLUNTARY STUDENT FEE PLEDGE SYSTEM Page 1 of 5 ENCLOSURE 1 University of California Office of the President December 28, 1992 GUIDELINES FOR IMPLEMENTING A VOLUNTARY STUDENT FEE PLEDGE SYSTEM Introduction A voluntary student fee in support

More information

NABH-AYUSH-PA PRE-ASSESSMENT GUIDELINES AND FORMS. Issue No. 1 Issue Date: 01/ 10 Page 1 of 9

NABH-AYUSH-PA PRE-ASSESSMENT GUIDELINES AND FORMS. Issue No. 1 Issue Date: 01/ 10 Page 1 of 9 NABH-AYUSH-PA PRE-ASSESSMENT GUIDELINES AND FORMS Issue No. 1 Issue Date: 01/ 10 Page 1 of 9 CONTENTS Sl. Title Page Nos. Content 2 1. Guide to use Pre-Assessment Forms & Checklist 3 5 2. Checklist For

More information

EuroRec Seal Preparing a certification session

EuroRec Seal Preparing a certification session EuroRec Seal Preparing a certification session Morten Bruun-Rasmussen mbr@mediq.dk Vilnius, Lithuania. 26 th January, 2012 Guideline for running a test Introduce a uniform and transparent methodology for

More information

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 2017 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2017)

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 2017 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2017) CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2017) 1 Contents How to deliver a training based on the EFCA Core Curriculum for fisheries inspectors... 3 Inspection at sea/port inspection... 4 Introduction

More information

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr Education, Audiovisual and Culture Executive Agency Creative Europe: Culture GRANT DECISION FOR AN ACTION Decision Nr of the Education, Audiovisual and Culture Executive Agency on the award of a grant

More information

Learning Legacy Document STRATEGIC PROJECTS. Innovation Management Procedure. Document Number: CRL1-XRL-Z-GPD-CR

Learning Legacy Document STRATEGIC PROJECTS. Innovation Management Procedure. Document Number: CRL1-XRL-Z-GPD-CR Current Document History: Revision: Effective Date: STRATEGIC PROJECTS Innovation Management Procedure Document Number: CRL1-XRL-Z-GPD-CR001-50023 Author(s) Reviewed by: Approved by: Reason for Issue:

More information

DRAFT OPINION. EN United in diversity EN. European Parliament 2018/0018(COD) of the Committee on Industry, Research and Energy

DRAFT OPINION. EN United in diversity EN. European Parliament 2018/0018(COD) of the Committee on Industry, Research and Energy European Parliament 2014-2019 Committee on Industry, Research and Energy 2018/0018(COD) 13.4.2018 DRAFT OPINION of the Committee on Industry, Research and Energy for the Committee on the Environment, Public

More information

Procedure for handling applications for authorisation and review reports under REACH

Procedure for handling applications for authorisation and review reports under REACH Procedure for handling applications for authorisation and review reports under REACH 1. Purpose This procedure describes how to handle applications for authorisation (AfA) as established by the REACH Regulation

More information

Annex. Provisions on auditing notified conformity assessment bodies in the framework of Article 34 3 of the Agency Regulation 1

Annex. Provisions on auditing notified conformity assessment bodies in the framework of Article 34 3 of the Agency Regulation 1 Making the railway system work better for society. in the framework of Article 34 3 of the Agency Regulation 1 1. Introduction This details the audits performed by the Agency in the framework of the monitoring

More information

Commission Guidelines for the implementation of the Clinical Trials Regulation NTA Ethics Oslo

Commission Guidelines for the implementation of the Clinical Trials Regulation NTA Ethics Oslo Commission Guidelines for the implementation of the Clinical Trials Regulation NTA Ethics 30.1.2017 Oslo 3.2.2017 O. Konttinen 1 Background Based on directive 2001/20/EC of the clinical trials on medicinal

More information

Recommendation on duplicate applications in mutual recognition and decentralised procedures

Recommendation on duplicate applications in mutual recognition and decentralised procedures EMA/CMDv/210123/2010 CMDv/GUI-010 Recommendation on duplicate applications in mutual recognition and decentralised procedures Edition number: 1 Edition date: 11 April 2014 Implementation date: 16 January

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross

More information

Sub-granting. 1. Background

Sub-granting. 1. Background Sub-granting 1. Background The European Commission (EC) re-introduced in May 2007 the option of sub-granting in its grant contracts 1. Sub-granting is an indirect financial contribution through an EC grant

More information

Introduction. Information on the respondent

Introduction. Information on the respondent Introduction In order to prepare for the forthcoming Workshop on Electronic Exchange of SPS certificates for Better Trade Control and Facilitation in Wuhan, China on 21-22 October, you are kindly requested

More information

M2 Section Six Local Program Tree Structure Creating the APC

M2 Section Six Local Program Tree Structure Creating the APC M2 Section Six Local Program Tree Structure Creating the APC Setting Up a Local Program The Local Program tree structure is created with an Agency, Program, County, and the Grant developing the APC. After

More information

Forum Syd s General Conditions Programme Support

Forum Syd s General Conditions Programme Support Forum Syd s General Conditions Programme Support Decided by: Claudia, Head of Impact and Quality Assurance Decided on: 2018-03-08 Updated: 2018-04-20 Period of validity: Until further notice 1 Contents

More information

SOFTWARE REQUIREMENTS SPECIFICATION Hospital Management System

SOFTWARE REQUIREMENTS SPECIFICATION Hospital Management System Introduction: SOFTWARE REQUIREMENTS SPECIFICATION Hospital Management System This is a Software Requirements Specification (SRS) for the Hospital Management System. It describes the functions, goals and

More information

CLOUDFLOW OPEN CALL 1

CLOUDFLOW OPEN CALL 1 CLOUDFLOW OPEN CALL 1 Guide for Applicants (GfA) Call identifier: CloudFlow-1 Submission Deadline: 30 th September 2014, at 17:00 h (Brussels local time) Expected duration of participation: 1 st January

More information

COMMISSION IMPLEMENTING DECISION. of

COMMISSION IMPLEMENTING DECISION. of EUROPEAN COMMISSION Brussels, 16.10.2014 C(2014) 7489 final COMMISSION IMPLEMENTING DECISION of 16.10.2014 laying down rules for the implementation of Decision No 1313/2013/EU of the European Parliament

More information

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July RÉPUBLIQUE FRANÇAISE Decision No. 2013-DC-0437 by the French Nuclear Safety Authority of 7 May 2013 setting out requirements to be met by Électricité de France Société anonyme (EDF SA) at Flamanville nuclear

More information

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan ICT, FET Open LIFT ICT-FP7-255951 Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan Contractual Date of Delivery: 31.03.2011 Actual Date of Delivery:

More information

Intro to - IS700 National Incident Management System Aka - NIMS

Intro to - IS700 National Incident Management System Aka - NIMS Intro to - IS700 National Incident Management System Aka - NIMS What is N.I.M.S.? N.I.M.S is a comprehensive, national approach to incident management that is applicable at all jurisdictional levels. Its

More information

Questions and answers on the procedure of PIP compliance verification at EMA, and on paediatric rewards

Questions and answers on the procedure of PIP compliance verification at EMA, and on paediatric rewards 15 December 2014 EMA/PDCO/179892/2011 Rev. 2 Product Development Scientific Support Paediatric Medicines Questions and answers on the procedure of PIP compliance verification at EMA, and on paediatric

More information

Safe to Practise Health Assessment Form

Safe to Practise Health Assessment Form Faculty of Education Professional Experience Safe to Practise Health Assessment Form In accordance with the University s Safe to Practise Policy and Work, Health and Safety Policy, all students required

More information

Contents A. INTRODUCTION... 2 A1. Purpose, scope and other addressees of the report... 2 A2. Significant organisational changes affecting the NSA...

Contents A. INTRODUCTION... 2 A1. Purpose, scope and other addressees of the report... 2 A2. Significant organisational changes affecting the NSA... Contents A. INTRODUCTION... 2 A1. Purpose, scope and other addressees of the report... 2 A2. Significant organisational changes affecting the NSA... 2 B. OVERALL SAFETY PERFORMANCE AND STRATEGY... 3 B.1

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) L 253/8 Official Journal of the European Union 25.9.2013 COMMISSION IMPLEMENTING REGULATION (EU) No 920/2013 of 24 September 2013 on the designation and the supervision of notified bodies under Council

More information

CONSULTATION PAPER BY DG INTERNAL MARKET AND SERVICES ON THE PROFESSIONAL QUALIFICATIONS DIRECTIVE 15 March 2011

CONSULTATION PAPER BY DG INTERNAL MARKET AND SERVICES ON THE PROFESSIONAL QUALIFICATIONS DIRECTIVE 15 March 2011 EUROPEAN UNION OF GENERAL PRACTITIONERS / FAMILY PHYSICIANS UNION EUROPEENNE DES MEDECINS OMNIPRATICIENS / MEDECINS DE FAMILLE PRESIDENT: VICE-PRESIDENT: VICE-PRESIDENT: VICE-PRESIDENT: VICE-PRESIDENT:

More information

Continuing Professional Development. FAQs

Continuing Professional Development. FAQs 4 May, 2010. Continuing Professional Development FAQs Q1. What is Continuing Professional Development (CPD)? A. Continuing professional development is the means by which members of the profession maintain,

More information

PRE-ASSESSMENT GUIDELINES AND FORMS FOR PHC/CHC

PRE-ASSESSMENT GUIDELINES AND FORMS FOR PHC/CHC NABH-PHC/CHC-PA PRE-ASSESSMENT GUIDELINES AND FORMS FOR PHC/CHC Issue No. 2 Issue Date: 06/12 Page 1 of 9 CONTENTS Sl. Title Page Nos. Content 2 1. Guide to use Pre-Assessment Forms & Checklist 3 5 2.

More information

RST Standards Committee 22 July 2016 Record of Decisions of Meeting

RST Standards Committee 22 July 2016 Record of Decisions of Meeting RST Standards Committee 22 July 2016 Record of ecisions of Meeting Minute o. General 16/RST/07/197 Extract of RIB report 12/2016 Passenger trapped and dragged by a train at Hayes and Harlington station

More information

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures

Department of Defense DIRECTIVE. SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures Department of Defense DIRECTIVE NUMBER 3222.4 July 31, 1992 Incorporating Through Change 2, January 28, 1994 SUBJECT: Electronic Warfare (EW) and Command and Control Warfare (C2W) Countermeasures USD(A)

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities for the objective of optimising the integration and interconnection of transport modes and enhancing the interoperability of transport services, while ensuring

More information

The Accreditation and Verification Regulation - Quick guide on the role of the verifier and the CA

The Accreditation and Verification Regulation - Quick guide on the role of the verifier and the CA EUROPEAN COMMISSION DIRECTORATE-GENERAL CLIMATE ACTION Directorate C - Climate Strategy, Governance and Emissions from non-trading sectors CLIMA.C.2 - Governance and Effort Sharing Guidance Document The

More information

Education, Audiovisual and Culture Executive Agency

Education, Audiovisual and Culture Executive Agency Education, Audiovisual and Culture Executive Agency Creative Europe - MEDIA CREATIVE EUROPE MEDIA Sub-programme Established by Regulation N 1295/2013 of the European Parliament and of the Council of 11

More information

ANNEX. to the COMMISSION DECISION

ANNEX. to the COMMISSION DECISION EUROPEAN COMMISSION Brussels, 15.12.2017 C(2017) 8510 final ANNEX 1 ANNEX to the COMMISSION DECISION on the adoption of a financing decision for 2017 and 2018 for the pilot project "Pilot project - Environmental

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 4.5.2013 Official Journal of the European Union L 123/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 409/2013 of 3 May 2013 on the definition of common projects, the

More information

Different dimensions of the ONCE-ONLY principle

Different dimensions of the ONCE-ONLY principle Different dimensions of the ONCE-ONLY principle SEMIC 2015 Conference Riga - 5 May 2015 Mechthild Rohen European Commission, DG CONNECT Unit H3 - Public Services The Once-Only Principle (OOP) What are

More information

Patient Unified Lookup System for Emergencies (PULSE) System Requirements

Patient Unified Lookup System for Emergencies (PULSE) System Requirements Patient Unified Lookup System for Emergencies (PULSE) System Requirements Submitted on: 14 July 2017 Version 1.2 Submitted to: Submitted by: California Emergency Medical Services Authority California Association

More information

DOD MANUAL ACCESSIBILITY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT)

DOD MANUAL ACCESSIBILITY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) DOD MANUAL 8400.01 ACCESSIBILITY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) Originating Component: Office of the Chief Information Officer of the Department of Defense Effective: November 14, 2017

More information

Governance and Sustainability of EOSC Ambitions, Challenges and Opportunities

Governance and Sustainability of EOSC Ambitions, Challenges and Opportunities Governance and Sustainability of EOSC Ambitions, Challenges and Opportunities Matthew Dovey, (matthew.dovey@jisc.ac.uk) EOSC Stakeholder Forum, 29 th November 2017 EOSCPilot s vision on EOSC governance

More information

CORRIGENDUM no.1 to Guidelines

CORRIGENDUM no.1 to Guidelines Contracting Authority: Agency for Vocational Education and Training, Department for Financing and Contracting of IPA Programme Regional network of local learning institutions CORRIGENDUM no.1 to Guidelines

More information

U.S. DoD Insensitive Munitions Program. Anthony J. Melita

U.S. DoD Insensitive Munitions Program. Anthony J. Melita U.S. DoD Insensitive Munitions Program Anthony J. Melita Deputy Director, Defense Systems, Land Warfare and Munitions OUSD (AT&L) / DS, LW & M Room 3B1060 3090 Defense Pentagon Washington, DC 20301-3090

More information

Maintenance Review Board PR.MRB

Maintenance Review Board PR.MRB Name Validation Date Prepared by: Caroline RUGA Validated 08/06/2010 Verified by: Francis JOUVARD Validated 08/06/2010 Reviewed by: Véronique MAGNIER Validated 08/06/2010 Approved by: Evan NIELSEN Validated

More information

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA INTRODUCTION Continuing Professional Development (referred to as CPD ) is a mandatory requirement for all legal practitioners in each

More information

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA INTRODUCTION Continuing Professional Development (referred to as CPD ) is a mandatory requirement for all legal practitioners in each

More information

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following. Note: Bank solar home systems projects receiving grant funds from the Global Environment Facility (GEF) are normally required to have their records and accounts audited by an independent entity each fiscal

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 4.1.2017 L 1/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMTING REGULATION (EU) 2017/1 of 3 January 2017 on procedures for watercraft identification under Directive 2013/53/EU of the European

More information

NOTE TO THE HEADS OF NATIONAL AGENCIES

NOTE TO THE HEADS OF NATIONAL AGENCIES * 4 ** * ír ťr ** it* EUROPEAN COMMISSION Directorate-General for Education and Culture Youth, Sport And Citizenship "Youth in action" Brussels, 11-12- 2009 D2/GGM/VR/PLE/SF Ares(2009)^49// NOTE TO THE

More information

Context paper CWE Intraday

Context paper CWE Intraday Continuous Improvement Process of Intraday Capacity Calculation after FBMC go live Version 1.0 Date 05-11-2015 Status Draft Final Version 1.0 Date 05-11-2015 Page 1 of 12 Contents 1 General information

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5101.14 June 11, 2007 Incorporating Change 1, July 12, 2012 Certified Current Through June 11, 2014 D, JIEDDO SUBJECT: DoD Executive Agent and Single Manager for

More information

EQUAL EMPLOYMENT ADVISORY COUNCIL

EQUAL EMPLOYMENT ADVISORY COUNCIL EQUAL EMPLOYMENT ADVISORY COUNCIL SUITE 1200 1015 FIFTEENTH STREET, NW WASHINGTON, DC 20005 TEL 202/789-8650 FAX 202/789-2291 VIA E-MAIL AND REGULAR MAIL Norman G. Lance Chief, Division of Investigations

More information

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA

CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA CONTINUING PROFESSIONAL DEVELOPMENT: LEGAL PRACTITIONERS IN AUSTRALIA INTRODUCTION Continuing Professional Development (referred to as CPD ) is a mandatory requirement for all legal practitioners in each

More information

Securing Excellence in Child Health Information Services IT operating model

Securing Excellence in Child Health Information Services IT operating model Securing Excellence in Child Health Information Services IT operating model Key facts March 2013 Introduction 1. Primary Care Trusts (PCTs) have led on commissioning provision of Child Health Information

More information

The Shifting Sands of Government IP. John McCarthy Karen Hermann Jon Baker

The Shifting Sands of Government IP. John McCarthy Karen Hermann Jon Baker The Shifting Sands of Government IP John McCarthy Karen Hermann Jon Baker Overview What is MOSA, and why do I care? Proposed changes to the Bayh- Dole regulations Government intellectual property considerations

More information

Brussels, 12 June 2014 COUNCIL OF THE EUROPEAN UNION 10855/14. Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD)

Brussels, 12 June 2014 COUNCIL OF THE EUROPEAN UNION 10855/14. Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD) COUNCIL OF THE EUROPEAN UNION Brussels, 12 June 2014 Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD) 10855/14 PHARM 44 SAN 232 MI 492 COMPET 405 CODEC 1471 NOTE from: General Secretariat of the

More information

Copyright Scottsdale Institute All Rights Reserved.

Copyright Scottsdale Institute All Rights Reserved. Copyright Scottsdale Institute 2017. All Rights Reserved. No part of this document may be reproduced or shared with anyone outside of your organization without prior written consent from the author(s).

More information

The Law, Decrees and Technical Regulations on space operations of France

The Law, Decrees and Technical Regulations on space operations of France The Law, Decrees and Technical Regulations on space operations of France Julien Mariez CNES Legal Department julien.mariez@cnes.fr UN COPUOS Legal Subcommittee Vienna, 26 March 2010 1 The French Space

More information

COMMERCIAL ITEM DESCRIPTION SPECIFICATION SHEET CIRCUIT BREAKER, 28 VOLTS (V) DC, AUTOMATIC RESET, NONWATERPROOF, 10 AMPERES (A) TO 35 A

COMMERCIAL ITEM DESCRIPTION SPECIFICATION SHEET CIRCUIT BREAKER, 28 VOLTS (V) DC, AUTOMATIC RESET, NONWATERPROOF, 10 AMPERES (A) TO 35 A [INCH-POUND] A-A-55571/5F 11 December 2014 SUPERSEDING A-A-55571/5E 7 May 2009 COMMERCIAL ITEM DESCRIPTION SPECIFICATION SHEET CIRCUIT BREAKER, 28 VOLTS (V) DC, AUTOMATIC RESET, NONWATERPROOF, 10 AMPERES

More information

Reporting, Monitoring & SESAM tool

Reporting, Monitoring & SESAM tool Reporting, Monitoring & SESAM tool Slide 1 Via evaluation of Reports Progress report Periodic report Final report Via Mid-term Review procedure Mid-term progress report Mid-term assessment questionnaires

More information

5 Telecommunication Standardization Sector (ITU-T)

5 Telecommunication Standardization Sector (ITU-T) 5 Telecommunication Standardization Sector (ITU-T) 5.1 Situational analysis 5.1.1 ITU-T operates in a competitive, complex and rapidly evolving environment and ecosystem. 5.1.2 There is a need for high-quality,

More information

1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1).

1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1). Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 91-103 11 FEBRUARY 1994 Safety AIR FORCE NUCLEAR SAFETY CERTIFICATION PROGRAM COMPLIANCE WITH THIS

More information

The French Space Operation Act

The French Space Operation Act The French Space Operation Act 1 The French Space Operation Act (SOA) was adopted by French Senate on 22nd May 2008. Signed and dated on June 3 rd, it was published in the «French Republic Official Journal»

More information

AUDIT REPORT. Audit of Offi cial Controls in Local Authority Supervised Establishments Cork County Council

AUDIT REPORT. Audit of Offi cial Controls in Local Authority Supervised Establishments Cork County Council AUDIT REPORT Audit of Offi cial Controls in Local Authority Supervised Establishments Cork County Council AUDIT REPORT Audit of Official Controls in Local Authority Supervised Establishments Cork County

More information

3. The requirements for taking part in the ES are as follows:

3. The requirements for taking part in the ES are as follows: Enhanced Service Specification Learning disabilities health check scheme Background and purpose 1. This enhanced service (ES) is designed to encourage practices to identify all patients aged 14 and over

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR FORCE WEATHER AGENCY AIR FORCE WEATHER AGENCY INSTRUCTION 63-1 7 MAY 2010 Acquisition CONFIGURATION CONTROL COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE PROGRAMMING PERIOD

FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE PROGRAMMING PERIOD Regional Development Unit Guidance Note: REV 1 13.8.2010 3357/570/2008 FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE 2007-2013 PROGRAMMING PERIOD 1. Background

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C C2I 15 Jun 89

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO C C2I 15 Jun 89 DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MCO 3093.1C C2I MARINE CORPS ORDER 3093.1C From: Commandant of the Marine Corps To: Distribution List Subj: INTRAOPERABILITY

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 8320.05 August 18, 2011 Incorporating Change 1, November 22, 2017 ASD(NII)/DoD CIO DoD CIO SUBJECT: Electromagnetic Spectrum Data Sharing References: See Enclosure

More information

Specific Accreditation Criteria Human Pathology. NATA/RCPA accreditation surveillance model for Human Pathology

Specific Accreditation Criteria Human Pathology. NATA/RCPA accreditation surveillance model for Human Pathology Specific Accreditation Criteria Human Pathology NATA/RCPA accreditation surveillance model for Human Pathology January 2018 Copyright National Association of Testing Authorities, Australia 2014 This publication

More information

University of Iowa Hospitals and Clinics (UIHC) DEPARTMENT OF NURSING SERVICES AND PATIENT CARE QUALITY PLAN Office of Nursing Quality

University of Iowa Hospitals and Clinics (UIHC) DEPARTMENT OF NURSING SERVICES AND PATIENT CARE QUALITY PLAN Office of Nursing Quality University of Iowa Hospitals and Clinics (UIHC) DEPARTMENT OF NURSING SERVICES AND PATIENT CARE QUALITY PLAN 2013-2014 Office of Nursing Quality Philosophy The Department of Nursing Services and Patient

More information

SUBPART ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (Revised December 29, 2010)

SUBPART ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (Revised December 29, 2010) SUBPART 209.5 ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (Revised December 29, 2010) 209.570 Limitations on contractors acting as lead system integrators. 209.570-1 Definitions. Lead system integrator,

More information

Quality Management Plan

Quality Management Plan for Submitted to U.S. Environmental Protection Agency Region 6 1445 Ross Avenue, Suite 1200 Dallas, Texas 75202-2733 April 2, 2009 TABLE OF CONTENTS Section Heading Page Table of Contents Approval Page

More information

OA08 ACCREDITED BODIES' REPORTING. Table of contents

OA08 ACCREDITED BODIES' REPORTING. Table of contents ACCREDITED BODIES' REPORTING Table of contents 1 PURPOSE AND SCOPE... 2 2 GENERAL... 2 3 LABORATORY'S REPORTING... 4 3.1 Test reports... 4 3.2 Calibration certificates... 5 4 INSPECTION BODY'S REPORTING...

More information