CF-35 Lightning II Canada s Next Generation Fighter

Size: px
Start display at page:

Download "CF-35 Lightning II Canada s Next Generation Fighter"

Transcription

1 CF-35 Lightning II Canada s Next Generation Fighter

2 Defining the Future The F-35 Lightning II brings together stealth, agility, and lethality to deliver 5th generation capabilities to Canada and its allies for decades to come. Tomorrow s Air Defence a Reality Today Innovative Production, Unparalleled Performance The F-35 s common manufacturing processes and parts and advanced digital design tools and assembly methods help achieve goals of affordability, quality, and production efficiency. 2

3 As an F-35 Partner, Canada Shapes and Influences Future Capabilities The F-35 Is a Maturing, Proven Design and Available Now More than 75 aircraft flying today More than 50 aircraft delivered More than 4,000 flights More than 6,500 flying hours F-35 operating at Edwards AFB Patuxent NAS Nellis AFB Yuma MCAS Eglin AFB 235 Delivered / On Order Completed In Assembly On Order SDD (19 A/C) Lot 1 (2 A/C) Lot 2 (12 A/C) Lot 3 (17 A/C) Lot 4 (32 A/C) Lot 5 (32 A/C) Lot 6 (36 A/C) Lot 7 (37 A/C) Lot 8 (48 A/C) Aircraft Quantity F-35A CTOL Price SAR 2011 CTOL U.S. International With Engine FY12$ 250 $250 50% Decrease in Cost From Lot 1 to Lot $ $ $ $50 0 $ Lot Lot Lot Lot Lot Lot Lot Lot 8 F-35 unit recurring flyaway costs have been going down with each successive lot of aircraft. Lockheed Martin and Pratt & Whitney have track records for delivering the airframe and engine below government SAR estimates and we expect this trend to continue in the future. Joint Strike Fighter Program Office 2015 Lot 9 Aircraft Price With Engine $75M (FY12$) 2016 Lot Lot Lot Lot Lot Lot 15 Average Aircraft Price FY12$M F-35 Designed for 30+ Years of Capability Growth 3

4 F-35 s Stealth Design Provides Unmatched Capability F-35 Significantly Improves Effectiveness Air-to-Air Surveillance Air Defence Survivability Relative Loss Exchange Ratio Relative Area Searched per Sortie Targets Reached With No Exposure Advanced F-35 Advanced F-35 Advanced F-35 Electronic Attack Anti-Ship Strike Relative Power at Threat Relative Major Surface Combatants Engaged Relative Kills Advanced F-35 Advanced F-35 Advanced F-35 Protecting Canada Greater than 700 nm mission radius in both air-to-air and air-tosurface low observable combat configurations Over 18,500 pounds of internal fuel capacity Over 18,000 pounds of ordnance capability (internal/external) Internally built-in and integrated CNI, RWR, RF, IR, and EO sensors 4

5 Decisive Operational Advantage Embedded, networkenabled capability allows information gathered by F-35 sensors to be shared with commanders at sea, in the air, or on the ground. Battlefield Management VMF Radio Link-16 Launch Detection MADL Close Air Support Standoff ISR Maritime Surveillance and Patrol Multi-Spectral Sensing/ Electronic Attack The F-35 s shape, embedded antennas, aligned edges, internal weapons and fuel, and special coatings all contribute to Very Low Observable (VLO) stealth. Providing Canada Unparalleled Interoperability CF-35 Supports All Canadian Missions Maritime surveillance and patrol Protection of natural resources Air interdiction Net-enabled for participation in expeditionary missions Intelligence, Surveillance, and Reconnaissance Superior Interoperability Common capabilities Common infrastructure and logistics Common net-enabled operations Secure multinational information exchange Interoperable with legacy systems, weapons, and other defence networks Strengthened Security Alliances Increased capability in defence of Canada Increased Canadian joint training and exercises Increased Canadian capability with NATO and NORAD allies Joint Force Multiplier and Enabler 5

6 F-35 Partnership Provides More Than 30 Years of Industrial Benefits Industrial Benefits As the F-35 transitions into full-rate production, opportunities for Canadian industry will evolve and endure throughout the life cycle of the F-35 program. Canadian industry has the opportunity to produce and sustain components and systems to a fleet that is expected to grow to more than 3,000 aircraft. CTOL Horizontal Tail Magellan-Bristol Electro-Hydraulic Actuation System Components Ben Machine CV Wing Fold Actuation System Northstar CV Outboard Wing and Machining Avcorp Outer Fuselage Panels Composites Atlantic Center Fuselage Composite Parts Composites Atlantic Wing/Aft Major Bulkhead Asco Aerospace Power and Thermal Management System Controller Honeywell Engines Systems & Services Machined Parts Centra, Magellan, Héroux-Devtek External Lighting Printed Circuit Board ITL Inlet Lip Castings Howmet Laval Circuit Cards FTG Engine and Off-Aircraft Industry Partners Advanced Integration Pratt & Whitney Technology (AIT) FAG NGRAIN Magellan Handling Specialty Montreal Carbide Nikon Metrology PWC MXI Technologies Univ. Quebec AMIL Nav-Aids CaseBank Technologies Cross Manufacturing Celestica Curtiss-Wright Samuel Novatronics Excel Precision Machining Alcoa Forged and Cast Products Howmet Laval MDS Kennametal Stellite GasTOPS Mindready Solutions Xantrex More Than $450M Contracted Today and $10B in Opportunities 6

7 F-35 Supports Canada s Mission Requirements F-35 Canada Program Year Ongoing F-35 Production Block 3 Software Complete Canada Aircraft Production First Canadian Delivery Canadian Deliveries Pilot/MX Training F-35 Cumulative Production Deliveries Operations in Canada ,117 3,197 The F-35 is ready to support Canada s 2020 Next Generation fighter requirements with first aircraft delivery in Electro-Optical Targeting System Components 5N Plus Radar Single- Board Computer Dy4 Systems F-35 Delivery Growth vs. Decline A B C D Capacity for New Foreign Military Sales Customers 100 F-35 Production U.S. and Partners 50 Electro-Optical Targeting System Connectors Amphenol Enduring Opportunities for Canadian Industry 7

8 A B001

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond F-35 Lightning II 5 th Generation True Stealth for Korea From 2016 and Beyond A11-33765B_1 The Evolving Threat... SA-10 SA-12 SA-20 HQ-9 Shipborne SAM Double Digit Surface-to-Air Missiles SD-10/PL-12 AA-11

More information

Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014

Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014 F-35 Lightning II The Centerpiece for 21 st Century Global Security Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014 2014 Lockheed

More information

F-35 Lightning II A New Generation of Fighter

F-35 Lightning II A New Generation of Fighter F-35 Lightning II A New Generation of Fighter 1 The Next Generation in Fighter Aircraft A Quantum Leap in Capability LO Treatments Advanced Avionics Guided Weapons First Jets Supersonic First Radar Multirole

More information

Terma and F-35 Global supplier to the Joint Strike Fighter program

Terma and F-35 Global supplier to the Joint Strike Fighter program Terma and F-35 Global supplier to the Joint Strike Fighter program The world s largest defense industrial project The F-35 project is headed by Lockheed Martin, with Northrop Grumman and BAE Systems as

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

Advanced Manufacturing and the F-35 Lightning II

Advanced Manufacturing and the F-35 Lightning II F-35 Lightning II The Centerpiece for 21 st Century Global Security Advanced Manufacturing and the F-35 Lightning II Dr. Don Kinard, LM Senior Fellow A&D Forum November 2016 2015 Lockheed Martin Corporation

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

F-35 Lightning II Program Status June 2017

F-35 Lightning II Program Status June 2017 F-35 Lightning II Program Status June 2017 The F-35 Program is a global effort. The U.S. works with eight partner nations to design and develop the F-35. Each partner nation has contributed funding to

More information

DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE

DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE NOT FOR PUBLICATION UNTIL RELEASED BY SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE SUBJECT: Joint

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

Global Vigilance, Global Reach, Global Power for America

Global Vigilance, Global Reach, Global Power for America Global Vigilance, Global Reach, Global Power for America The World s Greatest Air Force Powered by Airmen, Fueled by Innovation Gen Mark A. Welsh III, USAF The Air Force has been certainly among the most

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844

More information

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION F-22 RAPTOR (ATF) Air Force ACAT ID Program Prime Contractor Total Number of Systems: 339 Lockheed Martin, Boeing, Pratt &Whitney Total Program Cost (TY$): $62.5B Average Flyaway Cost (TY$): $97.9M Full-rate

More information

The Integral TNO Approach to NAVY R&D

The Integral TNO Approach to NAVY R&D NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 2865 Manufacturing Technology 55,694 44,381 39,396 40,112 39,505 40,157 40,787 41,336

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0604800N, F-35 JOINT STRIKE FIGHTER (JSF) PROGRAM COST

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

Strong. Secure. Engaged: Canada s New Defence Policy

Strong. Secure. Engaged: Canada s New Defence Policy Strong. Secure. Engaged: Canada s New Defence Policy Putting People First Long-term Capability Investments Spending Growth and Financial Transparency Bold New Vision 2 Putting People First People are the

More information

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

More information

Public Affairs Guidance

Public Affairs Guidance For Official Use Only Not for Public Release Public Affairs Guidance F-35A 1. PURPOSE: Provide guidance to Airmen on the F-35A in order to: 1) Articulate the capabilities of the aircraft and explain it

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

Trusted Partner in guided weapons

Trusted Partner in guided weapons Trusted Partner in guided weapons Raytheon Missile Systems Naval and Area Mission Defense (NAMD) product line offers a complete suite of mission solutions for customers around the world. With proven products,

More information

MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy

MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy MQ-8B FIRE SCOUT AEROSPACE SYSTEMS Ver tical Takeof f and Landing Tactical Unmanned Aerial Vehicle System MQ-8B Fire Scout Air Vehicle Specifications United States Navy Air Vehicle Fuselage Length (with

More information

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment F-35 Sustainment 2017 Lockheed Martin Corporation A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network. THOMAS

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family

Own the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base

More information

Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN. Director Business Development, Global Sustainment. Lockheed Martin Aeronautics Company

Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN. Director Business Development, Global Sustainment. Lockheed Martin Aeronautics Company Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN Director Business Development, Global Sustainment Lockheed Martin Aeronautics Company Scott Ogden Director, F-35 Global Sustainment Customer

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total

More information

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit CLEARED PENDING FOR PUBLIC RELEASE TM1409-0107-1 Fixed Wing Programs Passive Attack and Survivability Programs Infrared

More information

F-35 Weapon System Overview

F-35 Weapon System Overview F-35 Weapon System Overview Doug Hayward Deputy Director F-35 Vehicle Systems Lockheed Martin Aeronautics 2010 Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A: A. Approved for public release;

More information

Facts on the Bilateral Cooperation Program between Thailand and Sweden by the Swedish Government

Facts on the Bilateral Cooperation Program between Thailand and Sweden by the Swedish Government Facts on the Bilateral Cooperation Program between Thailand and Sweden by the Swedish Government Preamble In January 2004 Swedish Prime Minister and Swedish delegates paid a visit to Thailand. During the

More information

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross NAVAIR Overview PRESENTED TO: Radford University 30 November 2016 PRESENTED BY: David DeMauro / John Ross NAVAIR NOV 2016 Mission NAVAIR's mission is to provide full life-cycle support of naval aviation

More information

F-35 Lightning II Program Status and Fast Facts January 30, 2017

F-35 Lightning II Program Status and Fast Facts January 30, 2017 F-35 Lightning II Program Status and Fast Facts January 30, 2017 Highlights of the Last Three Months o USN receives its first F-35Cs at NAS Lemoore, California. Reinstated VFA-125 Rough Raiders become

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16

More information

Armed Unmanned Systems

Armed Unmanned Systems Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time

More information

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review Increment I (SDB I) Precision Strike Association Annual Program Review 19 April 2006 Col Dick Justice Commander, Miniature Munitions Systems Group richard.justice@eglin.af.mil 1 2 SDB Increment I GBU 39/B,

More information

AMRDEC. Core Technical Competencies (CTC)

AMRDEC. Core Technical Competencies (CTC) AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development

More information

F-22 RAPTOR (ATF) BACKGROUND INFORMATION

F-22 RAPTOR (ATF) BACKGROUND INFORMATION F-22 RAPTOR (ATF) The F-22 is an air superiority fighter designed to dominate the most severe battle environments projected during the first quarter of the 21 st Century. Key features of the F-22 include

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

Apache Fire Control LM MFC Supplier Summit TM

Apache Fire Control LM MFC Supplier Summit TM Apache Fire Control 2015 LM MFC Supplier Summit LOCKHEED CLEARED MARTIN FOR PROPRIETARY PUBLIC RELEASE INFORMATION TM1409-0107-1 Apache Fire Control Programs LONGBOW Fire Control Radar (FCR) Mast Mounted

More information

THE AIR FORCE DEVELOPMENT TEAM

THE AIR FORCE DEVELOPMENT TEAM THE AIR FORCE DEVELOPMENT TEAM Commander RCAF LGen Hood CFAWC Col Elder Deputy Comd RCAF MGen Frawley D Air SP Col Lefebvre DG Air FD BGen lalumière DG Space BGen Whale DG FCO MGen pelletier S&T + DRDC

More information

Innovation Across Industry Panel

Innovation Across Industry Panel Innovation Across Industry Panel AFLCMC Providing the Warfighter s Edge Panel Members: Ms. Kathy Watern Ms. Lynda Rutledge Mr. Jeffrey Jeff Stanley Mr. Jack Blackhurst Moderator: Lt Col Kirt Cassell Organization:

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard UAV s And Homeland Defense Now More Critical Than Ever LCDR Troy Beshears UAV Platform Manager United States Coast Guard Common Maritime Threats Counter- Terrorism Maritime Food Supply (Fish) Mass Migration

More information

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program Air Armament Symposium 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program FOR OFFICIAL USE DISTRIBUTION ONLY // REL TO USA, STATEMENT GBR MOD, A. ITA Approved MOD, NLD

More information

Luke AFB, Ariz., is the future home of 144 F-35A Lightning IIs. Some have already arrived.

Luke AFB, Ariz., is the future home of 144 F-35A Lightning IIs. Some have already arrived. Luke AFB, Ariz., is the future home of 1 F-35A Lightning IIs. Some have already arrived. 0 AIR FORCE Magazine / June 2015 Photography by Jim Haseltine Text by Gideon Grudo The Arizona skies, long home

More information

Sustaining Systems Engineering: The A-10 Example

Sustaining Systems Engineering: The A-10 Example Sustaining Systems Engineering: The A-10 Example (Based on A-10 Systems Engineering Case Study) 23 Oct 08 David Jacques Air Force Institute of Technology (david.jacques@afit.edu) Overview Systems Engineering

More information

SSC Pacific is making its mark as

SSC Pacific is making its mark as 5.3 FEATURE FROM THE SPAWAR SYSTEMS CENTER PACIFIC INTERNAL NEWSLETTER SSC Pacific C4I scoring direct hit for shore-based ballistic missile defense SSC Pacific is making its mark as a valued partner in

More information

Unmanned Systems. Northrop Grumman Today Annual Conference

Unmanned Systems. Northrop Grumman Today Annual Conference Unmanned Aircraft Builders Conference, Inc 2008 Annual Conference 21-23 September 2008 Doug Fronius Director, Tactical Unmanned IPT Program Manager, VTUAV Navy Fire Scout Northrop Grumman Corporation Northrop

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 94.303 174.316 149.804-149.804

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

Air Defense System Solutions.

Air Defense System Solutions. Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit LOCKHEED CLEARED MARTIN FOR PROPRIETARY PUBLIC RELEASE INFORMATION TM1409-0107-1 F-35 Lightning II Electro-Optical

More information

EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE LIMITS

EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE LIMITS This document and the information contained herein is the property of Saab AB and must not be used, disclosed or altered without Saab AB prior consent. EXPERIENCE A NEW PERSPECTIVE PUSHING PERFORMANCE

More information

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013

More information

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE

More information

UNITED STATES SPECIAL OPERATIONS COMMAND. Proposal Submission

UNITED STATES SPECIAL OPERATIONS COMMAND. Proposal Submission UNITED STATES SPECIAL OPERATIONS COMMAND Proposal Submission The United States Special Operations Command's (USSOCOM) missions include developing and acquiring unique special operations forces (SOF) equipment,

More information

U.S. Air Force Electronic Systems Center

U.S. Air Force Electronic Systems Center U.S. Air Force Electronic Systems Center A Leader in Command and Control Systems By Kevin Gilmartin Electronic Systems Center The Electronic Systems Center (ESC) is a world leader in developing and fielding

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost

More information

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP) Air Force ACAT IC Program Prime Contractor Total Number of Systems: 93 Boeing North American Aviation Total Program Cost (TY$): $2,599M Average Unit Cost

More information

C4I System Solutions.

C4I System Solutions. www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,

More information

Fighter/ Attack Inventory

Fighter/ Attack Inventory Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited.

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited. NAWCWD Long Range Acquisition Forecast (LRAF) Requirements Distribution Statement A - Approved for public release, distribution is unlimited. 1 Weapons Systems Integration and Software Support (WSISS)

More information

Anti-Access/Area Denial Challenges

Anti-Access/Area Denial Challenges Headquarters U.S. Air Force Anti-Access/Area Denial Challenges Maj Gen Dave Scott AF/A5R 6 Oct 10 1 Flight Path What is A2/AD? Requirements and Challenges Munitions Investment Strategy Planning for Future

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

COL John Vannoy Program Executive Officer

COL John Vannoy Program Executive Officer COL John Vannoy Program Executive Officer ROTARY WING DISTRIBUTION A: APPROVED FOR PUBLIC RELEASE Schedule of Presentations Day 1 Wednesday 25 May 2016 Day 2 Thursday 26 May 2016 11:30-12:30 PEO RW Strategic

More information

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY

More information

PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE

PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE PRB 02-07E THE JOINT STRIKE FIGHTER PROJECT Michel Rossignol Political and Social Affairs Division 15 July 2002 Revised 19 February 2003 PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total Program Element - 9.967 8.117-8.117 50.084 104.866 132.174 229.912 Continuing Continuing 675346:

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program

More information

The Western UAS Symposium

The Western UAS Symposium The Western UAS Symposium http://www.ttcus/com @Techtrain Linkedin/Groups: Technology Training Corporation MARINE AVIATION USMC Future UAS Programs and Weapons LtCol James Tuck Compton HQMC Aviation, Deputy

More information

PROVIDING THE WARFIGHTER S EDGE

PROVIDING THE WARFIGHTER S EDGE MISSION OVERVIEW BRIEF Brig Gen Michael Schmidt PEO, Fighters and Bombers PROVIDING THE WARFIGHTER S EDGE Current as of 5 Apr 16 Air Force Materiel Command Center Mission Areas Continue to Strengthen AFMC

More information

Canadian Industrial Participation in the F-35 Joint Strike Fighter Program. Fall 2014

Canadian Industrial Participation in the F-35 Joint Strike Fighter Program. Fall 2014 Canadian Industrial Participation in the F-35 Joint Strike Fighter Program Fall 2014 Table of Contents Minister s Message 3 Canadian Industrial Participation in the F-35 Joint Strike Fighter (JSF) Program

More information

DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE

DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE NOT FOR PUBLICATION UNTIL RELEASED BY SENATE ARMED SERVICES COMMITTEE SUBCOMMITTEE ON AIR LAND FORCES UNITED STATES SENATE DEPARTMENT OF THE AIR FORCE WRITTEN TESTIMONY FOR THE SENATE ARMED SERVICES COMMITTEE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

GAO TACTICAL AIRCRAFT. Comparison of F-22A and Legacy Fighter Modernization Programs

GAO TACTICAL AIRCRAFT. Comparison of F-22A and Legacy Fighter Modernization Programs GAO United States Government Accountability Office Report to the Subcommittee on Defense, Committee on Appropriations, U.S. Senate April 2012 TACTICAL AIRCRAFT Comparison of F-22A and Legacy Fighter Modernization

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010

More information

Commonwealth of Australia 2016

Commonwealth of Australia 2016 Commonwealth of Australia 2016 ISBN: 978-0-9941680-6-1 This work is copyright. Apart from any use as permitted under the Copyright Act 1968 (Cwth), no part may be reproduced by any process without prior

More information