ReWa Capacity Approval Process Public Main Extension Project

Size: px
Start display at page:

Download "ReWa Capacity Approval Process Public Main Extension Project"

Transcription

1 ReWa Capacity Approval Process Public Main Extension Project April 13, 2016 For new development, service availability, and general development questions contact Angie Davis, Development Services Technician. There are two classifications of service that require ReWa approval - Service Lateral Connections and Public Main Extensions. A Service Lateral Connection refers to a single sewer line typically from a repurposed building, new commercial development, or new single building. Service laterals may connect to a Satellite Sewer Agency sewer line or directly to a ReWa manhole. A service lateral does not require permitting through SCDHEC, therefore once the capacity letter is issued by ReWa, the flow is officially allocated to the development. A Public Main Extension refers to a new collection system of sewer lines and manholes typically used for new subdivisions, apartments, townhomes, etc. The new collection system will need to be permitted through ReWa and SCDHEC. ReWa will not officially guarantee flow capacity until plans are approved (refer to Step 2 in the Public Main Extension process). Individual homes or buildings associated with a Public Main Extension do not go through ReWa s Service Lateral permitting process. General Inquiries / Pre-submittal Requirements 1) Prior to beginning the Capacity Approval Process any general inquiries shall be directed to ReWa s Development Services Technician (Contact Ms. Angie Davis; ph , ext. 272; angelad@re-wa.org ). 2) All development activities shall be coordinated between the developer and the applicable Satellite Sewer Agency serving the property prior to beginning Step 1 of the Capacity Approval Process. 3) Should the proposed development require potential connection directly to ReWa s infrastructure the Satellite Sewer Agency shall first discuss this option with ReWa Engineering before beginning the Step 1 application process. 4) If the proposed development is located on a property parcel that either contains or is adjacent to an existing ReWa sewer line easement the Satellite Sewer Agency shall first meet with ReWa Engineering to discuss project specifics before beginning this application process. Step 1 - Capacity Availability Request 1) The developer makes a formal request to ReWa Development Services Technician for capacity availability in ReWa collection lines and water resource recovery facilities. This request package includes, but is not limited to, information on the following items: a) Project name b) Tax Map Number(s) c) Type of development: residential, multi-family, industrial, etc. d) Flow calculations for requested capacity per SCDHEC Contributory Loadings (in gallons per day). Page 1 of 3

2 e) Proposed water resource recovery facility f) Include attached map with proposed connection point to the Satellite Sewer Agency(s) (1) Should the proposed development require potential connection directly to ReWa s infrastructure the Satellite Sewer Agency shall first discuss this option with ReWa Engineering. The Satellite Sewer Agency shall secure written approval for such a connection point prior to the submittal of the Capacity Availability Request package to ReWa. (2) For project work on parcels that either contain or are adjacent to an existing ReWa sewer line easement the Satellite Sewer Agency and/or Developer shall provide the additional information requested by ReWa resulting from the meeting discussions previously held as required in Item 4 above. g) Completed Public Main Extension Preliminary Capacity Request Form (1) If flow is conveyed through multiple Satellite Sewer Agencies then a signature from each agency must be obtained prior to submittal to ReWa Development Services. 2) All items requested must be provided in a complete package to ReWa Development Services Technician. a) Only documents from Step 1 will be accepted at this time. Step 2 documents will be sent back to the requester. b) ReWa Development Services Technician will provide status updates to all parties as may be applicable. c) The ReWa Development Services Technician will review the Step 1 package for completeness and coordinate with the Satellite Sewer Agency as may be necessary before a technical review of the package will begin. 3) For projects involving an additional phase of a previously approved subdivision/development the Developer will need to provide: a) A listing of the lot numbers planned for the submitted phase of construction b) A list of the lot numbers permitted, and related ReWa permit numbers, for previous phases c) A list of the lots built on and/or currently in construction for the previous phases d) A plan for completing the construction of open lots in the previous phases The package will not be considered complete and the technical review of the request will not begin until this information is provided to ReWa. 4) ReWa Engineering will begin a technical review on a completed package once it is received from ReWa Development Services. a) ReWa Engineering will respond to capacity availability request within 10 business days of their receipt of the complete package. If further information is required and/or a physical assessment/study is needed ReWa Engineering will request additional information from the developer or Satellite Sewer Agency. ReWa Engineering will resume review of the Capacity Availability Request once this information is received. 5) For any public main extension project, capacity is allocated on a first come first serve basis during the subsequent Capacity Approval Process (Step 2). Capacity is not guaranteed with the issuance of the Step 1 approved Public Main Extension Preliminary Capacity Form. ReWa strongly encourages the submittal of Step 2 information as quickly as possible. 6) Once item 4b above has occurred and prior to submitting information for Step 2, should the requested flow change for the proposed development a new Step 1 ReWa Capacity Availability Request will be required. Page 2 of 3

3 7) The Preliminary Capacity Approval may be rescinded by ReWa if the Step 2 process has not been initiated within two years of the approval date for Step 1. Step 2 - Capacity Approval Process 1) The developer submits a complete package of items on the ReWa Capacity Approval Process Checklist to ReWa Development Services Technician. a) The ReWa Capacity Approval Process Checklist can be found on ReWa s website at 2) Incomplete packages will be returned to the requester. 3) All items should be in hard copy form. 4) The ReWa Development Services Technician will review the Step 2 Package for completeness and coordinate with the developer as may be necessary before a technical review of the package will begin. 5) ReWa Engineering will begin a technical review on a completed package once it is received from ReWa Development Services. a) ReWa Engineering will respond within 10 business days of their receipt of the complete package. If further information is required ReWa Engineering will request additional information from the developer or Satellite Sewer Agency. ReWa Engineering will resume review of the Capacity Approval Process once this information is received. b) ReWa Engineering will generate the Capacity Approval Letter for distribution to the Satellite Sewer Agency, Developer and ReWa Development Services. This letter allocates capacity in ReWa s system for service to the proposed project. 6) The Capacity Approval may be rescinded by ReWa if either of the following issues occur: a) A SCDHEC Construction Permit for the proposed project sewer infrastructure has not been issued within 120 days of the date of the Capacity Acceptance Approval letter. b) A SCDHEC Permit to Operate for the proposed project sewer infrastructure has not been issued within three years of the date of SCDHEC Construction Permit. Page 3 of 3

4 Public Main Extension Preliminary Capacity Request Form Form Revision 4/13/2016 Project Information Project Name: Engineer (Company): Engineer (Contact): Engineer Address: Developer (Company): Developer (Contact): Developer Address: Tax Map Numbers for Project: Proposed Water Resource Recovery Facility: Phone: Signature: Phone: Estimated Total Sewer Flow: gal/day. Attach Flow Calculations. (Average daily flow as calculated using SCDHEC Unit Contributory Loadings) Connection Type - Gravity Force Main Connection Point - Satellite Sewer MH ReWa MH Attach map identifying proposed connection point to existing collection/trunk sewer. Are Multiple Collection Agencies involved? Yes No If yes, both agencies will need to fill out the respective portions of the form below. Ownership, Operation & Maintenance of Collection System will be assigned to: Will there be a new Pump Station associated with this development? Yes No Primary Satellite Sewer Agency Preliminary Approval Agency Name: Does capacity appear to be available to serve this project? Yes No Approved Connection Point? Yes No Comments: Collection Agency Signature: Secondary (Transport) Sewer Agency Preliminary Approval Agency Name: Does capacity appear to be available to serve this project? Yes No Comments: Collection Agency Signature: ReWa Preliminary Approval ReWa has verified all affected agencies have completed review form. ReWa Project No: Does ReWa capacity appear to be available to serve this project? Yes No Approved Connection Point? Yes No Is project authorized to move to the Step 2 permitting process? Yes No ReWa Pretreatment form attached? Yes N/A Comments: ReWa Representative: This form does not constitute a permit to connect from ReWa or any sanitary sewer agency, nor is it to be used to obtain building permits from any regulatory agency. In cases where capacity appears available to serve a project, such capacity can neither be guaranteed nor reserved by this preliminary approval. Capacity is allocated on a first come first serve basis during the subsequent ReWa Capacity Approval Process (Step 2). Upon meeting all requirements (plan review and approval, payment of all applicable fees, etc.), ReWa will issue a separate letter for use in obtaining a SCDHEC Permit to Construct. The engineer shall contact the individual Satellite Sewer Agencies involved to determine their policies, procedures, and requirements. Note: Approval is valid for 24 months from the executed date of this document.

5 COMMERCIAL / FOOD SERVICE ESTABLISHMENT (FSE) / INDUSTRIAL FACILITY QUESTIONNAIRE (To Be Completed By Commercial, FSE or Industrial Facilities Requesting Sewer Service) 1. Company Name: 2. Mailing Address: Zip Code: 3. Premise Address: Zip Code: 4. Primary Contact (Name & Title): Phone No.: ( ) Fax No.: ( ) 5. Give a brief narrative description of the primary and ancillary manufacturing or service activities at premise address: 6. Will the facility discharge wastewater from any of the following sources/activities? [ ] Yes (check all that apply) [ ] No FSE/Restaurant/Food Preparation [ ] Dinning Facility Clean-up [ ] Manufacturing/Production [ ] Plant & Equipment Wash-down [ ] Contact Cooling Water [ ] Non-contact Cooling Water [ ] Boiler Blow-down [ ] Cooling Tower Blow-down [ ] Contaminated Stormwater [ ] Non-contaminated Stormwater [ ] Maintenance/Repair Shop [ ] Laboratory/QC Department [ ] Sanitary (Bathrooms, etc.) [ ] Other (specify) [ ] ************************************************************************************ I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Signature of Official (Seal if applicable) Title Date Please Return Completed Questionnaire to: RENEWABLE WATER RESOURCES Attention: Angela Davis, Development Services 561 Mauldin Road Greenville, SC angelad@re-wa.org For all pretreatment questions, please call: , ext. 222 Renewable Water Resources Commercial/FSE/Industrial Facility Questionnaire v Page 1 of 1

6 ReWa Capacity Approval Process Checklist (Public Main Extension) DISCLAIMER NOTICE: All information provided prior to issuance of the flow acceptance letter is for information purposes only and does not constitute a contract or guarantee that the project flow will be approved. No submittal shall be considered complete until the following information is received and all the requirements of this section are met as determined by ReWa. Incomplete packages will be returned. Receipt of Preliminary Capacity Request Form signed by appropriate Satellite Sewer Agency and ReWa Receipt of County or City Planning Agency Approval Letter Signed SCDHEC Construction Permit Application Copy of ACOG 208 Water Quality Certification Receipt of Satellite Sewer Agency Ownership, Operations & Maintenance letter endorsing and approving the project. The Satellite Sewer Agency must own, operate & maintain the system according to ReWa s Sewer Use Regulation (specifically Section 2.1). Receipt of Review Fee ($220.00) Receipt of Final Development Plans (1 Copy) and PDF No submittal of development plans shall be considered complete until the following information is received and all the requirements of this section are met as determined by ReWa. A complete package must be submitted and the plans signed and dated by an engineer registered in SC. 1. One (1) set of folded plans on 24" X 36" sheets and One (1) set submitted electronically in PDF format. Individual plan sets that exceed 20 pages may be rolled and stapled. The following information shall be included: a. Vicinity map sufficient in scope to locate the proposed development. b. For multi-phase projects, an overall map showing the limits of each phase and the corresponding lot numbers, including a listing of lot numbers per phase. This includes the lot numbers for the phase that is being reviewed. c. Clear, readable plan and profile views of all proposed sanitary sewer lines shall be provided. The plan and profile drawings shall meet the requirements outlined below, or as otherwise approved by ReWa. For projects connecting to ReWa s infrastructure, all plans must comply with ReWa s standard details and specifications. If the design Engineer anticipates that any of the requirements will not be met due to the configuration of the proposed development, the design Engineer is advised to meet with ReWa staff to gain approval for the deviation prior to submittal. d. Sanitary sewer plan and profile information presented on separate sheets from the storm and surface water plan and profile information. e. Plan and profile views displayed one over the other on the sheet. 1

7 ReWa Capacity Approval Process Checklist (Public Main Extension) f. Public and private lines and facilities clearly marked on both the plan and profile view. g. Existing sanitary manholes labeled with the designated ReWa or City/Satellite Sewer Agency number. h. The distance from the nearest existing manhole where a new manhole structure is constructed over an existing line, or where a main line connection is made to a trunk line. i. Existing and proposed utilities shown on the plan view and utility crossings shown on the profile. Utilities other than sanitary and storm sewer shall be ghosted. j. A plan view scale no smaller than 1"= 50', and the profile view scale no smaller than 1"= 50' horizontal and 1"=10' vertical. Architectural scales shall not be used. k. North arrow. l. All existing and proposed easements including the distance from the mainline to easement line. No permanent structures can be located within a ReWa sewer easement. ReWa must maintain appropriate access to our sewer line and will be reviewed on a case-by-case basis. m. Drainage hazard areas and FEMA designated 100 year floodplains and floodways. n. The stationing of each new main line section beginning at 0+00 or other even station (e.g., 1+00, 10+00, etc.) at the downstream terminus. In phased developments, previous stationing may be continued. o. One (1) copy of the appropriate design calculations including flow and pump station calculations with a copy of the pump curve. The flow calculations should be based on the unit loadings given in DHEC Regulation 61-67, Appendix A. Variances from the values in DHEC Regulation must be justified. Ownership and operation of these facilities must also comply with ReWa s Sewer Use Regulation (specifically Section 2.1). p. One (1) copy of an overall layout sheet of the wastewater system separate from the plans. This layout must show the proposed sewer systems and their sizes and include existing streets and sewer systems, as a reference point. The proposed sewer systems must be highlighted to be easily identified. q. If applicable, any revised plan sheets shall be appropriately dated on the revision log. 2. Calculations for sizing of the sanitary system must be submitted in a separate document. ReWa may at its discretion limit permitted wastewater flow to an amount which represents a 2- year build out. If the ultimate project size requires permitting of flow greater than the 2-year build out, the project should be phased in over time. Upon successful completion, submission, and approval of all of the above, and the payment of the appropriate review fees, ReWa will provide a flow acceptance letter to the Satellite Sewer Agency approving the project. Additionally, ReWa s new account fee must be paid. The fee is based on the size of the water meter serving the project. Payment of ReWa s new account fee is also required in order to obtain a building permit. For additional information please contact ReWa s Customer Service Department at (864)

Subdivision Presubmittal Conference Submittal Package Cover Page

Subdivision Presubmittal Conference Submittal Package Cover Page Subdivision Presubmittal Conference Submittal Package Cover Page The Hillsborough County Development Services Department is pleased to offer a Presubmittal Conference to anyone seeking help in determining

More information

Regulatory Services Division Industrial Discharge Control Section

Regulatory Services Division Industrial Discharge Control Section Regulatory Services Division Industrial Discharge Control Section I. GENERAL INFORMATION Business or Agency Name: Site Address: Mailing Address: n Business or Agency Contact: INDUSTRIAL WASTEWATER SURVEY

More information

EXCAVATION & FILL PROCEDURE 1

EXCAVATION & FILL PROCEDURE 1 EXCAVATION & FILL PROCEDURE 1 This handout is intended to provide guidance on putting together and submitting an application to excavate or fill areas in excess of the allowed exemptions outlined by Minnetrista

More information

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13 CHAPTER 13 13.1 INTRODUCTION A Stormwater Pollution Prevention (SWPPP) is a required component of the General Virginia Pollutant Discharge Elimination System Permit for Discharges of Stormwater from Construction

More information

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities Please complete this form in accordance with the general permit (DEP-PERD- GP-015)

More information

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_ PHASE II MS4 ANNUAL REPORT for Permit Year : 1 2 3 4 5 Other: Instructions for completing this form: Complete Sections I through V and submit to the Department to fulfill the annual reporting requirement

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

FOR CONSULTING SERVICES FOR DISASTER RESPONSE, ENGINEERING, AND GRANT MANAGEMENT SUPPORT

FOR CONSULTING SERVICES FOR DISASTER RESPONSE, ENGINEERING, AND GRANT MANAGEMENT SUPPORT BRUNSWICK GLYNN COUNTY JOINT WATER & SEWER COMMISION REQUEST FOR PROPOSAL FOR CONSULTING SERVICES FOR DISASTER RESPONSE, ENGINEERING, AND GRANT MANAGEMENT SUPPORT Date Advertised Friday, November 17, 2017

More information

2018 Developer Handbook

2018 Developer Handbook 2018 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

REQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES 1. REQUEST FOR STATEMENT OF QUALIFICATIONS: The City of Hondo, hereinafter referred to as the City, is soliciting Statement of Qualifications

More information

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 TABLE OF CONTENTS SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4 SCHEDULE OF COMPLIANCE... 5 ADMINISTRATIVE PENALTIES...

More information

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8 Guide to Rezoning Introduction The Douglas County (DCD) is committed to providing an open, transparent application process to the public. This Guide has been developed to assist anyone with interest in

More information

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S))

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S)) REGULATED INDUSTRIAL WASTEWATER DISCHARGE PERMIT PERMIT NO. In compliance with the existing provisions of the City of Columbia Code of Ordinances, the Federal Clean Water Act (PL 95-217) and the General

More information

2017 Developer Handbook

2017 Developer Handbook 2017 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

STATE WATER RESOURCES CONTROL BOARD

STATE WATER RESOURCES CONTROL BOARD STATE WATER RESOURCES CONTROL BOARD MONITORING AND REPORTING PROGRAM NO. 2006-0003 STATEWIDE GENERAL WASTE DISCHARGE REQUIREMENTS FOR SANITARY SEWER SYSTEMS This Monitoring and Reporting Program (MRP)

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE Environmental Management Chapter 335-7-4 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-7-4 PERMIT REQUIREMENTS AND PROCEDURES TABLE

More information

ANNUAL STANDARDS AND SPECIFICATIONS

ANNUAL STANDARDS AND SPECIFICATIONS ANNUAL STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT Submitted: September 2011 Revised: October 2011 Subject: GEORGE MASON UNIVERSITY ANNUAL STANDARDS AND SPECIFICATIONS

More information

STANDARD DRAWINGS INDEX

STANDARD DRAWINGS INDEX STANDARD DRAWINGS INDEX DESCRIPTION GENERAL DRAWING NO. Typical Layout for Improvement Plans... 1 City of Stockton Standard Border and Title Block for 8.5 x 11 Sheet.. 1A City of Stockton Standard Map

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM Environmental Management Chapter 335-13-14 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM CHAPTER 335-13-14 COMPOSITING FACILITIES TABLE OF CONTENTS 335-13-14-.01 Purpose

More information

Planning Board Submission Process and Instructions

Planning Board Submission Process and Instructions City Planning Board Department of Planning and Community Development City Hall - Roosevelt Square Mount Vernon, New York 10550-2060 (914) 699-7230 FAX (914) 699-1435 Ernest D. Davis Mayor William Holmes

More information

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY REQUEST FOR QUALIFICATIONS FOR CONSULTING ENGINEERING SERVICES 18-401-02 LLANO COUNTY LLANO COUNTY 1447 E. State Highway 71, Unit B Llano, TX 78643 325-247-3783 1 TABLE OF CONTENTS Page Introduction 3

More information

VFD and Pump Incentive Application for Business Customers

VFD and Pump Incentive Application for Business Customers 2017 VFD and Pump Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Bureau of Clean Water Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance MS4 Individual NPDES Permit Applications SOP No. BCW-PMT-004 Final, November 9, 2012 Version 1.7 This

More information

Updated August Metro State Aid Payment Guide

Updated August Metro State Aid Payment Guide Updated August 2016 Metro State Aid Payment Guide Table of Contents First Partial State Aid Payment Request........ 2 Subsequent Partial State Aid Payment Requests....2 Final State Aid Payment Request.....2

More information

Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only.

Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only. Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only October 18, 2012 This SOP describes the procedures and work flow for the review, and

More information

INDUSTRIAL PRETREATMENT PERMIT

INDUSTRIAL PRETREATMENT PERMIT INDUSTRIAL PRETREATMENT PERMIT Ames Permit # 1234-56 Date of Issuance 07/24/2015 Date of Expiration 07/31/2020 Permit Type Non-Significant Name and Mailing Address of Permittee Identity of Physical Location

More information

Table of Contents. introduction permit fact sheet completeness checklist. Introduction

Table of Contents. introduction permit fact sheet completeness checklist. Introduction Instructions and Supporting Materials Table of Contents introduction permit fact sheet completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are

More information

4:00 p.m. on May 6, 2016

4:00 p.m. on May 6, 2016 Request for Qualifications On-Call General Engineering Services Public Works Department City of Daly City 333 90 th Street Daly City, CA 94015 April 4, 2016 The City of Daly City is accepting proposals

More information

DIRECTIONS: Industrial Stormwater Permit: Anyone seeking coverage under the ARR General Permit must perform the following:

DIRECTIONS: Industrial Stormwater Permit: Anyone seeking coverage under the ARR General Permit must perform the following: NOTICE OF INTENT (NOI) FOR DISCHARGES OF STORMWATER (EXCEPT FROM CONSTRUCTION ACTIVITY) The enclosed form may be used to obtain coverage under NPDES general permit ARR000000 for discharges of stormwater

More information

Single Site Permanent Supportive Housing Project

Single Site Permanent Supportive Housing Project City of Albuquerque Request for Proposals (RFP) RFP-DFCS-CD-18-02 Single Site Permanent Supportive Housing Project Offered by: Department of Family and Community Services Submittal Due Date: June 4, 2018

More information

REQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S)

REQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S) REQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S) January 29, 2013 METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI 1081 Woodrow Street, Room 106 Cincinnati,

More information

City of Somersworth, New Hampshire OFFICE OF THE FINANCE DIRECTOR

City of Somersworth, New Hampshire OFFICE OF THE FINANCE DIRECTOR Scott A. Smith Finance Director sasmith@somersworth.com (603) 692-9504 One Government Way Somersworth, New Hampshire 03878 (603) 692-4262 www.somersworth.com City of Somersworth, New Hampshire OFFICE OF

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10) Catskill Watershed Corporation PO Box 569 Margaretville, NY 12455 (845) 586-1400 Approved by the Board of Directors October 28, 2003 Revised August 2, 2016

More information

Request for Expressions of Interest

Request for Expressions of Interest Request for Expressions of Interest Business & Financial Services Department DESIGN, BUILD, FINANCE, AND OPERATE A DISTRICT ENERGY UTILITY AT RIVER GREEN IN RICHMOND, BC 1. Introduction 1.1. The City of

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN *** IMPORTANT INFORMATION ~ Please

More information

City of Jersey Village

City of Jersey Village City of Jersey Village Long-Term Flood Recovery Consultant Request for Qualifications A. INTRODUCTION The City of Jersey Village is seeking consultant services for the development of a Long- Term Flood

More information

j Water Utility Authority

j Water Utility Authority A Albuquerque Bernalillo County j Water Utility Authority PO Box 568 Albuquerque, NM 87103 505 768 2500 www.abcwua.org FEDERAL EXPRESS Chair Art De La Cruz Commissioner, District 2 Vice Chair Rey Garduho

More information

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA FAX

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA FAX BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA 19533-9710 610-372-4657 FAX 610-478-7058 www.berkscd.com PROJECT APPLICATION APPLICATION TYPE(check all that apply) New

More information

DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE

DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE City of Dothan, Alabama DOTHAN CLEAN WATERS PROGRAM CITY COMMISSION UPDATE PRESENTED : February 19, 2013 Program Overview MOM Programs Capacity Assurance Program Information Management System Omussee WWTP

More information

Request for Proposal Engineering Consultant for City of Ingleside

Request for Proposal Engineering Consultant for City of Ingleside Request for Proposal Engineering Consultant for Public Works and Building Services Departments Melissa Byrne Vossmer City Manager August 21, 2017 MAYOR AND CITY COUNCIL Luis Lamas, Mayor Oscar Adame, Mayor

More information

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services City of Waterloo, Wisconsin Request for Proposals Municipal Engineering Services Submission Date: December 1, 2011 @ 4:00 p.m. Issued by: Mo Hansen, Clerk/Treasurer City of Waterloo 136 N. Monroe Street

More information

ADMINISTRATIVE VARIANCE APPLICATION PACKET

ADMINISTRATIVE VARIANCE APPLICATION PACKET ADMINISTRATIVE VARIANCE APPLICATION PACKET Relief from strict compliance with the following regulations of the UDO may be reviewed and approved by the Development Director: (1) Front yard or street side

More information

Request for Proposals (RFP) RFP NO. E&CD GRANT WRITING AND ADMINISTRATION SERVICES

Request for Proposals (RFP) RFP NO. E&CD GRANT WRITING AND ADMINISTRATION SERVICES Request for Proposals (RFP) RFP NO. E&CD 2018-009 GRANT WRITING AND ADMINISTRATION SERVICES The City of Brunswick, hereinafter referred to as the City, is soliciting proposals to retain a Consultant(s)

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Jonathan

More information

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR:

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: REQUEST FOR QUALIFICATIONS DESIGN PROFESSIONAL SERVICES DATE ISSUED: January 12, 2018 THE ARIZONA BOARD OF REGENTS for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: ASU PROJECT

More information

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES -

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES - BUCKSKIN SANITARY DISTRICT Parker, Arizona PUBLIC NOTICE FOR PROFESSIONAL ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES - PHASE 5&6 WASTEWATER CONVEYANCE SYSTEM Chairman

More information

REQUEST FOR PROPOSALS Town of Brattleboro, VT

REQUEST FOR PROPOSALS Town of Brattleboro, VT REQUEST FOR PROPOSALS Town of Brattleboro, VT June 22, 2010 BACKGROUND: The Town of Brattleboro has conducted an extensive planning process for the reconstruction of the Putney Road (US Route 5) corridor

More information

REQUEST FOR PROPOSAL After Hours Answering Services

REQUEST FOR PROPOSAL After Hours Answering Services REQUEST FOR PROPOSAL 2018-027-1300005 After Hours Answering Services INSTRUCTIONS TO OFFERORS This is a Loudoun Water Request for Proposal to establish a contract through competitive negotiations for the

More information

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No. Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, NY 10019 Tel: 646-664-2700 Addendum 2 April 15, 2015 Architectural

More information

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO: ORDINANCE NO. 640 AN ORDINANCE OF THE CITY OF FRUITLAND, IDAHO, AMENDING TITLE 9, CHAPTER 3, SECTION 2, DRAINAGE STANDARDS; AMENDING TITLE 10, CHAPTER 7A, SECTION 19, STORM DRAINAGE; AMENDING TITLE 10,

More information

Request for Qualifications Professional Engineering Services

Request for Qualifications Professional Engineering Services Page 1 of 7 Combined Sewage Storage Tunnel Preparation of Preliminary Design, Detailed Design, Tender Documents and Services during Construction Requirement: The City of Ottawa, hereinafter referred to

More information

REQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN

REQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN REQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN Proposals due: Thursday, September 17 th, 2015 No later than 10:00 a.m. Deliver to: James Roach, City Administrator 101 Court St. Jackson, Missouri 63755

More information

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF CLEAN WATER LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS The Department of Environmental Protection

More information

CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL

CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL CITY OF NAPERVILLE TRANSPORTATION, ENGINEERING, AND DEVELOPMENT BUSINESS GROUP APPLICATION FOR ENGINEERING APPROVAL February 2017 1 TRANSPORTATION, ENGINEERING, & DEVELOPMENT (TED) BUSINESS GROUP Use this

More information

Industry Cluster Grants Program Implementation Grant Application Materials

Industry Cluster Grants Program Implementation Grant Application Materials Industry Cluster Grants Program Implementation Grant Application Materials Industry Cluster Grants Program details can be found at: http://commerceri.com/services/taxes-incentives/ Rhode Island Industry

More information

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012 Bureau of Waterways Engineering and Wetlands Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit This SOP describes the procedures and work flows

More information

1. Select the proper auth type code. For renewals, ensure the auth type code matches the primary facility (PF) fee category.

1. Select the proper auth type code. For renewals, ensure the auth type code matches the primary facility (PF) fee category. Bureau of Clean Water Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance PAG-13 NOIs (Stormwater Discharges from Regulated Small MS4s) SOP No. BCW-PMT-019 Final, November 9,

More information

Storefront Cannabis Retailer Rezoning Information and Application

Storefront Cannabis Retailer Rezoning Information and Application T 250.361.0283 E DevelopmentServices@victoria.ca Rezoning Information and Application This package contains information for rezoning applications within the City of Victoria: Frequently Asked Questions

More information

WarmWise Business Custom Rebates Program Manual

WarmWise Business Custom Rebates Program Manual WarmWise Business Custom Rebates Program Manual January, 2015 Contents CONTENTS... 1 SECTION 1 INTRODUCTION... 2 1.1 PROGRAM OVERVIEW... 2 SECTION 2 ELIGIBILITY REQUIREMENTS... 3 2.1 QUALIFYING CUSTOMERS...

More information

- 1 - Bureau of Point and Non-Point Source Management

- 1 - Bureau of Point and Non-Point Source Management Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program Review of Sewage Facilities Planning Module Component 3s SOP No. BPNPSM-PLNG-006 Final, June

More information

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES CITY OF CASTLE HILLS TEXAS REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES PROPOSED AWARD SCHEDULE December 6, 2017 December 20, 2017 January 16, 2018 January 23, 2018 January 30, 2018 February

More information

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS Date: May 1, 2018 Subject: Z18-009 BELLWOOD LAKE & LOOP 323 LLLP (178.05 ACRE TRACT) Request that the Planning and Zoning Commission consider

More information

MARIJUANA BUSINESS NEW LICENSE APPLICATION

MARIJUANA BUSINESS NEW LICENSE APPLICATION MARIJUANA BUSINESS NEW LICENSE APPLICATION Date: Applicant Name: Trade Name of Business (d/b/a): Physical Address of Business: Address/City/State/Zip Code Mailing Address of Business: Address/City/State/Zip

More information

Georgia FOG Alliance Awards Program Inspection Form

Georgia FOG Alliance Awards Program Inspection Form Georgia FOG Alliance Awards Program Inspection Form A. Administration 1 Is there a copy of the Sewer Use Ordinance available? 0 1 2 3 4 ( Written 2, Web 3, Downloadable 4 ) 2 Does the program have a written

More information

Voluntary Remediation Program (VRP) Application

Voluntary Remediation Program (VRP) Application Voluntary Remediation Program (VRP) Application The information provided in this application will be used to determine the eligibility of the Volunteer and the property for the Wyoming Department of Environmental

More information

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form Instructions for completing this form: ARR040000 requires that this form be used when submitting annual reports. You may request approval

More information

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, August 28, 2018, 2:15 p.m.

AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING. MEETING PLACE: 200 Commerce Street. Tuesday, August 28, 2018, 2:15 p.m. AGENDA SPARTANBURG SANITARY SEWER DISTRICT COMMISSION REGULAR MEETING MEETING PLACE: 200 Commerce Street, 2:15 p.m. This is a regular meeting of the Spartanburg Sanitary Sewer District Commission. Written

More information

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610)

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610) BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA 19533-0520 (610) 372-4657 FAX (610) 478-7058 www.berkscd.com PROJECT APPLICATION APPLICATION TYPE(check all that apply)

More information

Application for Pre-Qualification as a Professional Consultant CCNA

Application for Pre-Qualification as a Professional Consultant CCNA Application for Pre-Qualification as a Professional Consultant CCNA City of West Palm Beach Procurement Department 401 Clematis Street, 3rd Floor West Palm Beach, FL 33402 Phone: 561-822-2100 Fax: 561-822-1564

More information

Smart Energy New Homes Program

Smart Energy New Homes Program Smart Energy New Homes Program 2014 Certification Guidelines TM Program Overview...Page 3 How To Participate...Page 4 FAQs...Page 5 2013 Participation Application & Agreement...Page 8 2013 Rebate Reservation

More information

MOBILE FOOD UNIT FOOD CART (TYPE I)

MOBILE FOOD UNIT FOOD CART (TYPE I) MOBILE FOOD UNIT FOOD CART (TYPE I) Why does the City need to review a Mobile Food Unit Application? It allows the City to clearly review the proposal and ensure compatibility between the proposed use

More information

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES 2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I PROCESS VFD PROGRAM. We look forward to working with you. If you have questions after reading this application,

More information

Re: ASSOCIATION FOR WOMEN IN ARCHITECTURE FOUNDATION 2018 PROFESSIONAL DEVELOPMENT FELLOWSHIP AWARD NOTIFICATION

Re: ASSOCIATION FOR WOMEN IN ARCHITECTURE FOUNDATION 2018 PROFESSIONAL DEVELOPMENT FELLOWSHIP AWARD NOTIFICATION January 2018 Re: ASSOCIATION FOR WOMEN IN ARCHITECTURE FOUNDATION 2018 PROFESSIONAL DEVELOPMENT FELLOWSHIP AWARD NOTIFICATION The Association for Women in Architecture Foundation is pleased to announce

More information

SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3

SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3 SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3 BIBB COUNTY SCHOOL DISTRICT 484 Mulberry Street Macon, Georgia 31201 July 18, 2014 TIMELINE RFP

More information

APPLICATION. St. Louis-Jefferson Solid Waste Management District. Waste Reduction and Recycling Grant Program

APPLICATION. St. Louis-Jefferson Solid Waste Management District. Waste Reduction and Recycling Grant Program St. Louis-Jefferson Solid Waste Management District Waste Reduction and Recycling Grant Program APPLICATION St. Louis-Jefferson SWMD 7525 Sussex Avenue St. Louis, MO 63143 314-645-6753 www.swmd.net 2018

More information

CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT: CIVIL ENGINEERING SURVEYING, ENVIRONMENTAL AND FIELD SERVICES

CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT: CIVIL ENGINEERING SURVEYING, ENVIRONMENTAL AND FIELD SERVICES CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT: CIVIL ENGINEERING SURVEYING, ENVIRONMENTAL AND FIELD SERVICES ISSUED: September 15, 2006 NOTICE CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT

More information

IMPORTANT! If your company does not meet these three conditions, please return to our website to select a different application type.

IMPORTANT! If your company does not meet these three conditions, please return to our website to select a different application type. IMPORTANT! Please read carefully before beginning your Re-Verification application. 1. Please make sure you have selected the correct application type. The Re-Verification Application is for all suppliers

More information

ADVERTISEMENT OF PUBLIC NOTICE

ADVERTISEMENT OF PUBLIC NOTICE ADVERTISEMENT OF PUBLIC NOTICE Request for Proposals Notice is hereby given that pursuant to the New Jersey Public School Contracts Law competitive contracting process, N.J.S.A. 18A:4.1 through 4.5, sealed

More information

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION ORDER NO. R

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION ORDER NO. R CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SANTA ANA REGION ORDER NO. R8-2002-0014 GENERAL WASTE DISCHARGE REQUIREMENTS For SEWAGE COLLECTION AGENCIES IN ORANGE COUNTY WITHIN THE SANTA ANA REGION

More information

Bureau of Point and Non-Point Source Management

Bureau of Point and Non-Point Source Management Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance Individual Site Permit Applications for Beneficial Use of Biosolids SOP No.

More information

Program Details

Program Details Program Details - 2016 OVERVIEW The Port Royal Pride Program provides grant funds to help finance exterior improvements to an owner or tenant s commercial property that will be aesthetically pleasing and

More information

The DRC Outside Agency Review/Approval Checklist is also available for your convenience.

The DRC Outside Agency Review/Approval Checklist is also available for your convenience. Updated: 4/25/06 DEVELOPMENT REVIEW COMMITTEE OUTSIDE AGENCY CONTACT INFORMATION This following list of permitting requirements and contact information was created to assist developers and design professionals

More information

CUSTOM INCENTIVE GUIDE

CUSTOM INCENTIVE GUIDE 2017 CUSTOM INCENTIVE GUIDE NEED HELP? CALL 800.762.7077 HOW TO APPLY Custom incentives provide opportunities to upgrade equipment and receive incentives for technologies not available prescriptively.

More information

RULE DEFINITIONS RULE WATER CONSERVATION REBATES A. QUALIFYING DEVICES

RULE DEFINITIONS RULE WATER CONSERVATION REBATES A. QUALIFYING DEVICES RULE 141 - DEFINITIONS Definitions relocated from Rule 141 to Rule 11 by Ordinance No. 71 (12/20/93) RULE 141 - WATER CONSERVATION REBATES A. QUALIFYING DEVICES Rebates are available for purchase 1 of

More information

WITNESS Please submit a separate personal statement if applying for multiple internships.

WITNESS Please submit a separate personal statement if applying for multiple internships. Name: University of Connecticut Human Rights Institute Undergraduate Human Rights Internships Cover Sheet Application deadline: March 1 Application Checklist: Application Form Personal Statement Budget

More information

PHILADELPHIA ENERGY AUTHORITY

PHILADELPHIA ENERGY AUTHORITY PHILADELPHIA ENERGY AUTHORITY REQUEST FOR QUALIFICATIONS for A Heating, Cooling and Power Supplier for the Public Safety Services Campus 2015 Issued by: Philadelphia Energy Authority Philadelphia Energy

More information

2017 PARKLET APPLICATION

2017 PARKLET APPLICATION FOR OFFICIAL USE ONLY UPON APPLICATION SUBMITTAL, INSERT RECEIVED DATE STAMP HERE 2017 PARKLET APPLICATION NOTICE: 1. It is required that the applicant, or a representative, meet with a Planner prior to

More information

CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater

CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater PROJECT DESCRIPTION CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater Cecil County Department of Public Works is seeking

More information

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application CUSTOM COMMERCIAL & INDUSTRIAL (C&I) ENERGY IS PRECIOUS. LET S NOT WASTE IT. TABLE OF CONTENTS TERMS AND CONDITIONS... 2 CUSTOM C&I PROJECT SPECIFICATIONS... 3 STEPS FOR SUBMITTING YOUR APPLICATION...

More information

requirement to be eligible for tax abatement under the CIITAP program, a 2.) Project Density Requirement - In order to meet the minimum density

requirement to be eligible for tax abatement under the CIITAP program, a 2.) Project Density Requirement - In order to meet the minimum density 9 The Community Investment Incentive Tax Abatement Program (CIITAP) is a property tax abatement program that allows property owners to apply for abatement for a portion of their property taxes for a period

More information

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Section F: Committee of Adjustment: Minor Variance and Consent Applications Executive Summary Introduction The Development Review Process STAR Process Pre-application Consultation Submission of "Complete" Applications STAR Application Streams Section A: Official Plan and Zoning

More information

TOWN OF GREENWICH Annual Department Operational Plan (FY )

TOWN OF GREENWICH Annual Department Operational Plan (FY ) TOWN OF GREENWICH Annual Department Operational Plan (FY 2012 2013) 1. Department: Inland Wetlands and Watercourses Agency 2. Divisions: N/A 3. Department Mission Statement: The Inland Wetlands and Watercourses

More information

PRIORITIZATION MODEL RESULTS SANITARY Prioritization Project Prioritization Rank Name Score 1 Facilities Renovation Offset Mitigation 58.

PRIORITIZATION MODEL RESULTS SANITARY Prioritization Project Prioritization Rank Name Score 1 Facilities Renovation Offset Mitigation 58. PRIORITIZATION MODEL RESULTS SANITARY itization Project itization Rank Name Score 1 Facilities Renovation 80.77 2 Offset Mitigation 58.60 3 Sanitary Sewer Lining Projects 53.97 4 Sanitary Sewer Collection

More information

AQUATIC HEALTH PROGRAM PLAN REVIEW SUBMISSION INSTRUCTIONS FOR MINOR REMODEL

AQUATIC HEALTH PROGRAM PLAN REVIEW SUBMISSION INSTRUCTIONS FOR MINOR REMODEL l AQUATIC HEALTH PROGRAM PLAN REVIEW SUBMISSION INSTRUCTIONS FOR MINOR REMODEL Nevada State Law, NRS 444.080, requires that properly prepared plans and specification be submitted to the Health Authority

More information

Revision #: 0 Prepared By: Beth Eckert, Industrial Chemist Revision Date: 1/10/00 Approved By: Larry Cummings, Asst. Superintendent of WWTD

Revision #: 0 Prepared By: Beth Eckert, Industrial Chemist Revision Date: 1/10/00 Approved By: Larry Cummings, Asst. Superintendent of WWTD City of Gastonia Wastewater Treatment Mayor, City Council, and City Manager Director of Public Work/Utilities and Assistant Director of Utilities Wastewater Treatment Division Superintendent EMS Document

More information

MINUTES. Spartanburg Sanitary Sewer District Commission, Regular Meeting, held at 200 Commerce Street, Spartanburg, SC, June 24, 2014, at 2:15 p.m.

MINUTES. Spartanburg Sanitary Sewer District Commission, Regular Meeting, held at 200 Commerce Street, Spartanburg, SC, June 24, 2014, at 2:15 p.m. MINUTES Spartanburg Sanitary Sewer District Commission, Regular Meeting, held at 200 Commerce Street, Spartanburg, SC,, at 2:15 p.m. Copies of the agenda were forwarded to the following news media: Spartanburg

More information

SL Report (Your Department Name) Iredell County Health Department pursuant to Session Law , Section 29.(b).

SL Report (Your Department Name) Iredell County Health Department pursuant to Session Law , Section 29.(b). Iredell County Health Department pursuant to Session Law 2014-120, Section 29.(b). Page 1 of 8 Part 1A: On-site Water Protection: Standardize Certain Regulatory Review Procedures Reference Session Law

More information