Pawleys Island Nourishment Project

Size: px
Start display at page:

Download "Pawleys Island Nourishment Project"

Transcription

1 Pawleys Island Nourishment Project Town of Pawleys Island Owner Coastal Science & Engineering - Engineer 6/29/2018 1

2 Beach Condition Basics Beach profiles are a function of constructive and destructive forces (Waves, tides, gravity) and sand grain size. Sand moves alongshore and cross-shore. Profile changes with changes in wave size and direction, tide level, and sediment supply 2

3 Why beaches erode Lack of sediment supply Storms Sand trapping from structures or natural features Changes in inlets and deltas Seasonal trends Sea level changes 3

4 The Beach Cycle Tides & Storm Surges Control The Water Level - But Waves Do The Work! Photos Courtesy: U of Mass Coastal Research Group & U of South Carolina Coastal Research Division

5 Pawelys Island Beach Condition Volume deficit of ~600, ,000 cy along southern half of island. Accretional north of the pier. Relatively low erosion rates (~2 ft/yr). South end critically eroded. 5

6 Pawleys Island Beach Volume 6/29/2018 6

7 Volume Deficit 6/29/2018 7

8 July 1981 March th Avenue South February 1987 September 2001 May 2011

9 May th Avenue South (Continued) Before and After Hurricane Matthew April 2017

10

11 Beach Management Every beachfront community needs a long-term beach management plan and dedicated funding sources Proactive maintenance improves beach condition, habitat, property values, and storm protection Many communities initiate long-term strategies after crisis projects Monitoring before and after projects improves designs and aids in planning. Required for FEMA. 6/29/

12 Project Scope 6/29/

13 Project Scope Base Bid 700,000 cy over 13,900 ft (50.4 cy/ft avg) Reach 1 410,000 cy over 4,800 ft (avg fill 85 cy/ft) Reach 2 195,000 cy over 4,300 ft (avg fill 45 cy/ft) Reach 3 95,000 cy over 4,800 ft (avg fill 19.8 cy/ft) Alt Bid Up to 400,000 cy additional sand 205,000 cy in Reach 1 155,000 cy in Reach 2 40,000 cy in Reach 3 6/29/

14 Project Scope Berm at +6 ft Tolerance of 0.5 ft along berm Contractor shall protect existing groins No work under houses Fill template may be adjusted based on conditions at time of construction 6/29/

15 6/29/

16 6/29/

17 Present Conditions Reach 3 Reach 1 6/29/

18 Access Main access is at parking lot at south end of project area. Accesses at Hazard, Pritchard, 1 st or 2 nd, and north end are available, but would need to be repaired. Any damage to access points is contractor s responsibility 6/29/

19 Borrow Areas miles from center of fill Area P1 5 ft disturbance limit, 0.476mm, 24% fine shell Area P2 4 ft disturbance limit, mm, 20% fine shell Area P3 4.5 ft disturbance limit, 0.561mm, 25% fine shell 6/29/

20 Sand Quality Areas of mud or coarse material are present below allowed excavation limits Permit allows for excavations up to 7 ft Dredge will relocate if unsuitable material is encountered 6/29/

21 Expectations During Construction Work will occur 24/7 including holidays Staging on unvegetated beach areas or in parking area at south end No work on or under decks, patios, porches, or erosion control structures Beeping backup alarms will be heard 6/29/

22 Expectations of Nourished Beach Sand color and texture may change along the beach and over time Adjustment of the profile Escarpments Wind-blown sand accumulation Washover/ponding during king tides/storms 6/29/

23 Edisto Beach Nourishment /29/

24 Edisto Beach Nourishment /29/

25 Edisto Beach Nourishment /29/

26 Fill Adjustment 6/29/

27 BEACH RENOURISHMENT PROJECT 2018

28 PAST BEACH WORK 1949 TO 1990 STATE BUILT 23 GROINS & NORTH END JETTY FEDERAL GOVERNMENT FUNDED THE ADDITION OF 292K CUBIC YARDS OF SAND FOLLOWING HURRICANE HUGO 1998 TO 1999 GROINS WERE REBUILT AND 272K CUBIC YARDS OF SAND WERE ADDED TO 13,600 LINEAR FEET OF BEACH SAND TAKEN FROM VERY SOUTH END TOTAL COST OF PROJECT WAS $2 MILLION DOLLARS. $1.3 MILLION COVERED BY STATE AND THE REST WAS PAID FOR BY TOWN

29 PAST BEACH WORK 2013 TO 2018 HURRICANE SANDY CAUSED SIGNIFICANT EROSION. TOWN AUTHORIZED GROIN REPAIR PROJECT, BUT HURRICANE JOAQUIN HIT BEFORE WORK WAS DONE HURRICANE JOAQUIN REMOVED OVER 100K CY OF SAND HURRICANE MATTHEW REMOVED 88K CY OF SAND HURRICANE IRMA REMOVED 180K CY OF SAND SAND SCRAPING WAS DONE TO RESTORE PRIMARY DUNE FOLLOWING ALL THREE STORM EVENTS TOTAL COST TO PERFORM SAND SCRAPING $740K

30 USACE PROJECT 2004 TOWN REQUESTED USACE STUDY BEACHES AND DEVELOP A STORM DAMAGE PROTECTION PLAN STUDY RESULTED IN PROPOSED PLAN TO RENOURISH THE SOUTHERN THIRD OF THE ISLAND. PROJECT WAS FOR 664,400 CY COVERING 7,500 LINEAR FT TOTAL COST OF PROJECT $8,975,000 FEDERAL SHARE $5.8 MILLION TOWN SHARE $3.2 MILLION (SPLIT WITH STATE) PROJECT NEVER FUNDED BY CONGRESS

31 BEACH COMMITTEE COMMITTEE WAS MADE UP OF 11 PROPERTY OWNERS REPRESENTING ALL AREAS OF THE ISLAND MET 4 TIMES OVER THE COURSE OF 14 MONTHS PRESENTED WITH ALL HISTORICAL INFORMATION REGARDING PAST BEACH WORK & THE TOWN S OPTIONS MOVING FORWARD MADE RECCOMENDATIONS TO COUNCIL

32 BEACH COMMITTEE RECCOMENDATIONS APPLY FOR COST SHARING GRANT FUNDS FROM THE STATE OF SOUTH CAROLINA (PRT) AUTHORIZE CSE TO BEGIN WORK ON DESIGNING PROJECT & TO GET PROJECT BIDS ASAP PURSUE BORROWING UP TO $2 MILLION FOR THE PROJECT MOVE FORWARD WITH 725K CY BEACH RENOURISHMENT PROJECT

33 PROJECT DETAILS STATE AND FEDERAL PERMITS ARE FOR A 1.1 MILLION CY PROJECT FROM THE MOST SOUTHERN GROIN TO JUST NORTH OF THE PIER PERMIT APPLICATIONS WERE SUBMITTED IN DECEMBER 2016, BOTH PERMITS APPROVED AND ISSUED APRIL 2018 PROJECT WAS RELEASED FOR PUBLIC BID ON MAY 1, 2018

34 BID DETAILS BASE PROJECT OF 700K CUBIC YARDS OF SAND UNIT COST FOR EACH ADDITIONAL CY ABOVE THE BASE PROJECT OF 700K CY GIVES TOWN THE FLEXIBILITY TO TAKE ON A PROJECT ANYWHERE BETWEEN 700K 1.1MILLION CY SIZE OF PROJECT WILL DEPEND ON BID RESULTS 3 DREDGERS SUBMITTED BIDS TO COMPLETE PROJECT

35 BID RESULTS 700K CY MARINEX GREAT LAKES WEEKS MARINE SAND $8,106,000 $8,736,000 $9,275,000 MOBILIZATION $2,759,000 $5,375,000 $3,250,000 TOTAL CONSTRUCTION $10,865,000 $14,111,000 $12,525,000 ENGINEERING $600,000 $600,000 $600,000 TOTAL PROJECT COST $11,465,000 $14,711,000 $13,125,000

36 BID RESULTS 1.1 M CY MARINEX ($10.33) GREAT LAKES ($12.86) WEEKS ($11.75) SAND $8,106,000 $8,736,000 $9,275,000 MOBILIZATION $2,759,000 $5,375,000 $3,250,000 ADDITIONAL SAND (400K) $4,132,000 $5,144,000 $4,700,000 TOTAL CONSTRUCTION $14,997,000 $19,255,000 $17,225,000 ENGINEERING $600,000 $600,000 $600,000 TOTAL PROJECT COST $15,597,000 $19,855,000 $17,825,000

37 PLAN TO PAY FOR PROJECT BEACH FUND CREATED IN 1999 WHEN TOWN ADOPTED 3% LOCAL ACCOMMODATIONS TAX % OF REVENUE COLLECTED WENT TO BEACH FUND 2017-CURRENT 80% OF REVENUE COLLECTED GOES TO BEACH FUND BEACH FUND BALANCE WILL BE AROUND $6 MILLION WHEN WE START PROJECT

38 PRT GRANT FUNDS STATE WILL COVER 50% OF ELIGIBLE COSTS OF PROJECT AREA OF BEACH RECEIVING FUNDS MUST MEET THE STATE S DEFINITION OF ADEQUATE PUBLIC ACCESS TO BE ELIGIBLE FOR PROGRAM BEACH FUND BALANCE WILL BE AROUND $6 MILLION WHEN WE START PROJECT STATE DETERMINED ONLY 65% OF PROJECT AREA HAD ENOUGH PUBLIC ACCESS TOWN WAS ABLE TO INCREASE THIS TO 80.46%

39 LOAN TAKE ON DEBT AND BORROW THE REMAINING FUNDS DEBT TO BE PAID BACK BY FUTURE LOCAL ACCOMMODATIONS TAX COLLECTIONS

40 TOTAL DEBT? MINIMUM PROJECT FULL PROJECT CUBIC YARDS OF SAND 700,000 1,100,000 TOTAL PROJECT COST $11,465,000 $15,597,000 PRT COST SHARE (80.46% PUBLIC) $4,612,370 $6,274,673 COST TO THE TOWN $6,852,631 $9,322,327 BEACH FUND $5,700,000 $5,700,000 SHORT FOR CONSTRUCTION ($1,152,631) ($3,622,327)

41 796K CY PROJECT IS THE LARGEST PROJECT POSSIBLE WITHOUT AN ADDITIONAL SOURCE OF FUNDING + 96,000 cu yds CUBIC YARDS OF SAND 796,000 TOTAL PROJECT COST $12,456,680 PRT COST SHARE (80.46% PUBLIC) $5,011,322 COST TO THE TOWN $7,445,358 BEACH FUND $5,700,000 SHORT FOR CONSTRUCTION ($1,745,358) SAND $8,106,000 EXTRA SAND ($10.33 per cu yd) $991,680 MOBILIZATION $2,759,000 TOTAL CONSTRUCTION $11,856,680 ENGINEERING $600,000 TOTAL PROJECT COST $12,456,680

42 BEACH FUND OVER 10 YEARS ,000, , , , , , ,729 1,014,984 1,457,118 1,920,926 2,407,229 BEACH FUND 6,000, , , , , ,584 2,407,229 1,920,926 1,457,118 1,014, ,

43 RECAP 796K CY PROJECT FROM MOST SOUTHERN GROIN TO SLIGHTLY NORTH OF THE PIER FUNDED BY BEACH FUND BALANCE BUILT UP OVER 19 YEARS, PRT GRANT FUNDS & $1.7 MILLION LOAN FUTURE REVENUE FROM LOCAL ACCOMMODATIONS TAX WILL BE USED TO PAY OFF DEBT BEACH FUND BALANCE WILL REMAIN LOW UNTIL DEBT IS REPAID AND FUND BALANCE CAN START TO REBUILD A LONG TERM PLAN FOR FUNDING FUTURE RENOURISHMENT WORK MUST BE EXPLORED SURVEY WILL BE ED MONDAY TO ALL PROPERTY OWNERS

44 QUESTIONS & COMMENTS WE WILL CALL ON EACH PERSON THAT SIGNED UP TO SPEAK, ONE AT A TIME. EACH INDIVIDUAL WILL BE GIVEN 5 MINUTES TO SPEAK AND ASK QUESTIONS. AMPLE TIME WILL BE GIVEN FOR A RESPONSE AND FOLLOW UP COMMENTS THOSE WISHING TO SPEAK ARE REQUESTED TO COMMENT ON THE PROJECT, NOT INDIVIDUALS, AND TO TREAT OTHERS WITH COURTESY AND RESPECT

45 Project Cost 6/29/

EXECUTIVE SUMMARY. OBJECTIVE: To award Bid No to for Naples Berm Restoration to Eastman Aggregate in the amount of $946,

EXECUTIVE SUMMARY. OBJECTIVE: To award Bid No to for Naples Berm Restoration to Eastman Aggregate in the amount of $946, 1 of 49 EXECUTIVE SUMMARY Recommendation to approve award of Bid No. 11-5637 for Naples Berm Restoration to Eastman Aggregate Enterprises, LLC as outlined in the attached proposal submitted on 1/12/2011

More information

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 15, 2015 Comment Deadline: February 16, 2015 Corps Action ID Number: SAW-2014-02202 The Wilmington District, Corps of Engineers

More information

Estero Island Restoration. The shoreline from R-176 through R-200, inclusive, has been designated as critically eroded by FDEP.

Estero Island Restoration. The shoreline from R-176 through R-200, inclusive, has been designated as critically eroded by FDEP. FY 2015/16 Local Government Funding Request Beach Management Projects Project Name Project Description Estero Island Restoration The project consists of the restoration and maintenance of approximately

More information

WINDSHIELD SURVEY REPORT

WINDSHIELD SURVEY REPORT Florida Department of Environmental Protection (DEP) Division of Water Resource Management Bureau of Beaches and Coastal Systems 3900 Commonwealth Boulevard, Mail Station 300 Tallahassee, Florida 32399-3000

More information

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA CESAD-RBT REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA 30303-8801 1 3 JUN 2013 MEMORANDUM FOR COMMANDER,

More information

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION WHEREAS the Department of Environmental Protection, in partnership with the Ponce DeLeon Port Authority, has conducted a

More information

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 23, 2015 Comment Deadline: February 23, 2015 Corps Action ID Number: SAW-2011-01241 The Wilmington District, Corps of Engineers

More information

DIVISION 15. ENVIRONMENTAL STANDARDS FOR BEACH AND DUNE PROTECTION*

DIVISION 15. ENVIRONMENTAL STANDARDS FOR BEACH AND DUNE PROTECTION* DIVISION 15. ENVIRONMENTAL STANDARDS FOR BEACH AND DUNE PROTECTION* *Editor's note: Section I of Ord. No. 92-18, adopted June 18, 1992, added art. XV, 1500--1510. Section III renumbered former art. XV

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 5H From: Date: Subject: Staff December 10, 2010 Council Meeting Intergovernmental Coordination and Review Log

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2015-00306 Of Engineers Date Issued: 14 January 2016 Galveston District Comments Due: 16 February 2016 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT

More information

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC 20310-0108 MAY t 1 201S MEMORANDUM FOR THE DEPUTY COMMANDING GENERAL FOR CIVIL AND EMERGENCY OPERATIONS

More information

Comprehensive Plan for Conservation, Management and Long-term Sustainability of North Carolina s Beaches and Inlets

Comprehensive Plan for Conservation, Management and Long-term Sustainability of North Carolina s Beaches and Inlets Comprehensive Plan for Conservation, Management and Long-term Sustainability of North Carolina s Beaches and Inlets Partnership between DCM and DWR Cape Hatteras Cape Lookout Cape Fear I It s About Freakin

More information

Kauai Regional Sediment Management Plan

Kauai Regional Sediment Management Plan Kauai Regional Sediment Management Plan Kim Garvey Moffatt & Nichol Kauai Regional Sediment Management Plan Study Regions Results from Technical Studies Potential RSM Projects Regulatory and Coordination

More information

FY 2015/16 Local Government Funding Request Beach Management Projects

FY 2015/16 Local Government Funding Request Beach Management Projects FY 2015/16 Local Government Funding Request Beach Management Projects Project Name Blind Pass Ecozone Restoration Project Description The project consists of maintenance dredging Blind Pass and sand bypassing

More information

THE CORPS OF ENGINEERS AND SHORE PROTECTION

THE CORPS OF ENGINEERS AND SHORE PROTECTION U.S. Army Corps of Engineers THE CORPS OF ENGINEERS AND SHORE PROTECTION al Shor n e o n IWR Report 03-NSMS-1 ag u Ma dy e lin Nat i History Projects Costs t ement S May 2003 N A TIONAL S HORELINE M ANAGEMENT

More information

FIND Matching and Major Funding Requests. Mid Cycle Funding Requests

FIND Matching and Major Funding Requests. Mid Cycle Funding Requests ST. AUGUSTINE PORT, WATERWAY & BEACH DISTRICT APPLICATION FOR ASSISTANCE SCHEDULE FIND Matching and Major Funding Requests December 1 st January 2 nd Third Week of January Third Week of February Application

More information

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional experience in environmental permitting in California and

More information

Beach Segment III Coastal Dune Restoration Grant Program

Beach Segment III Coastal Dune Restoration Grant Program Beach Segment III Coastal Dune Restoration Grant Program I. OVERVIEW The beach and dune system are important coastal features providing critical habitat for native flora and fauna while supporting robust

More information

Are You Planning Work in a Waterway Or Wetland?

Are You Planning Work in a Waterway Or Wetland? Are You Planning Work in a Waterway Or Wetland? US Army Corps of Engineers New England District FIELD OFFICE U.S. Army Corps of Engineers Vermont Project Office 11 Lincoln Street, Room 210 Essex Junction,

More information

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: August 28, 2015 Comment Deadline: October 13, 2015 Corps Action ID Number: SAW-2011-01914 The Wilmington District, Corps of Engineers

More information

PUBLIC NOTICE. APPLICANT: Town of Holden Beach Attn: Mr. David Hewett, Town Manger 110 Rothschild Street Holden Beach, North Carolina 28462

PUBLIC NOTICE. APPLICANT: Town of Holden Beach Attn: Mr. David Hewett, Town Manger 110 Rothschild Street Holden Beach, North Carolina 28462 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: March 15, 2018 Comment Deadline: April 16, 2018 Corps Action ID Number: SAW-2011-01914 The Wilmington District, Corps of Engineers

More information

Marine Minerals Program

Marine Minerals Program Marine Minerals Program Restoring and Protecting Our Nation s Coasts through Stewardship of OCS Resources Doug Piatkowski Marine Biologist Bureau of Ocean Energy Management Office of Environmental Programs

More information

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana Harbor Location: Michigan City Harbor is located on the southwest shore of Lake Michigan in Michigan City, LaPorte County, Indiana approximately

More information

Alabama Coastal Area Management Program Strategic Plan

Alabama Coastal Area Management Program Strategic Plan Alabama Coastal Area Management Program Strategic Plan 2013-2018 January 2013 Lee Yokel, Dauphin Island Sea Lab Will Brantley, Carl Ferraro, Amy Gohres, Janis Helton, Phillip Hinesley, Amy King Alabama

More information

LOCAL FUNDING FOR BEACH PROJECTS

LOCAL FUNDING FOR BEACH PROJECTS LOCAL FUNDING FOR BEACH PROJECTS NCBIWAs Conference Pine Knolls Shores, NC April 23, 2018 Peter A. Ravella, Principal PAR Consulting, LLC PARC s Work Beach Nourishment and Shoreline Project Funding Navarre

More information

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana Harbor Location: Calumet Harbor is located on the southwest shore of Lake Michigan in Chicago, Cook County, Illinois and the approach

More information

Living Shorelines in the Gulf of Mexico

Living Shorelines in the Gulf of Mexico Living Shorelines in the Gulf of Mexico Scott L. Douglass University of South Alabama Civil Engineering Department Living Shorelines for Coastal Erosion Protection in a Changing World NY Sea Grant Douglass

More information

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting: CENAN-PP-H 12 March 2013 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting 1. The regularly scheduled monthly interagency coordination meeting was held on March 12 th at 10:00

More information

Infrastructure Projects: Case Studies and Strategies for Funding. 1 NYC Office of Management and Budget

Infrastructure Projects: Case Studies and Strategies for Funding. 1 NYC Office of Management and Budget Infrastructure Projects: Case Studies and Strategies for Funding 1 NYC Office of Management and Budget Best Practices Proactively inventory and geocode public infrastructure assets and centrally retain

More information

New Orleans Hurricane and Storm Damage Risk Reduction System Update

New Orleans Hurricane and Storm Damage Risk Reduction System Update New Orleans Hurricane and Storm Damage Risk Reduction System Update by Team New Orleans U.S. Army Corps of Engineers November 13, 2008 New Orleans Area Hurricane Storm Damage Risk Reduction System 5 Parishes

More information

URBAN & COMMUNITY FORESTRY HURRICANE KATRINA FINANCIAL ASSISTANCE PROGRAM

URBAN & COMMUNITY FORESTRY HURRICANE KATRINA FINANCIAL ASSISTANCE PROGRAM CALL FOR APPLICATIONS URBAN & COMMUNITY FORESTRY HURRICANE KATRINA FINANCIAL ASSISTANCE PROGRAM 1 ST ANNOUNCEMENT Postmarked Deadline: October 27, 2006 In accordance with Federal law and U.S. Department

More information

NEW YORK STATE ATTORNEY GENERAL INITIATIVE OVERVIEW

NEW YORK STATE ATTORNEY GENERAL INITIATIVE OVERVIEW NEW YORK STATE ATTORNEY GENERAL INITIATIVE OVERVIEW 12.11.12 An Introduction Although normally focused on clean water projects, Waves For Water, founded by former professional surfer Jon Rose, has coordinated

More information

Protecting Maine s Beaches for the Future: 2017 Report Update

Protecting Maine s Beaches for the Future: 2017 Report Update Protecting Maine s Beaches for the Future: 2017 Report Update Tina Zabierek, DEP Policy Director Robert Marvinney, DACF State Geologist Protecting Maine s Air, Land and Water History Over the years, the

More information

Frequently Asked Questions

Frequently Asked Questions The Strengthen Alabama Homes program at the Alabama Department of Insurance is pleased to provide for you responses to the frequently asked questions below. Please feel free to contact our program if you

More information

THE BROOKINGS INSTITUTION

THE BROOKINGS INSTITUTION THE BROOKINGS INSTITUTION Divi Metropolitan Policy Program 1775 Massachusetts Avenue, NW Washington, DC 20036-2103 Tel: 202-797-6000 Fax: 202-797-6004 www.brookings.edu/metro FEDERAL ALLOCATIONS IN RESPONSE

More information

Georgia Environmental Conference

Georgia Environmental Conference Georgia Environmental Conference August 23, 2017 Mr. Alvin B. Lee, Director of Programs US Army Corps of Engineers South Atlantic Division Trusted Partners Delivering Value Today for a Better Tomorrow

More information

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Hancock County Long Term Recovery CDBG Disaster Recovery Program

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Hancock County Long Term Recovery CDBG Disaster Recovery Program Mississippi Development Authority Katrina Supplemental CDBG Funds For Hancock County Long Term Recovery CDBG Disaster Recovery Program Amendment 7 Partial Action Plan Mississippi Development Authority

More information

Mount St. Helens Long-Term Sediment Management Plan

Mount St. Helens Long-Term Sediment Management Plan Mount St. Helens Long-Term Sediment Management Plan Revised Draft Supplemental Environmental Impact Statement September 2017 Sediment retention structure and upstream sediment plain on the North Fork Toutle

More information

BOROUGH OF STONE HARBOR CRS ACTIVITY 510. Progress Report on Hazard Mitigation Initiatives

BOROUGH OF STONE HARBOR CRS ACTIVITY 510. Progress Report on Hazard Mitigation Initiatives BOROUGH OF STONE HARBOR CRS ACTIVITY 510 Progress Report on Hazard Initiatives of Stone Harbor Hazard Plan Adopted: By Resolution 2016 S-125 3 Year CRS Expiration Date: A copy of the adopted plan can be

More information

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION HOMEPORT RESILIENCY PROJECTS PROFESSIONAL SERVICES CONSULTANT CONTRACT FOR THE PROVISION OF ENGINEERING, DESIGN AND RELATED CONSULTANT SERVICES NYCEDC CONTRACT NO. 62520001 PROJECT CODE NO. 6252 1 AGENDA

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017 DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 JANUARY 25, 2017 Regulatory Division SAS-2003-23580 PUBLIC NOTICE ISSUANCE OF PROGRAMMATIC

More information

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: September 4, 2018 Expires: September 24, 2018

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: September 4, 2018 Expires: September 24, 2018 US Army Corps of Engineers Detroit District Public Notice Applicant: John Green In Reply Refer To: Corps File No. LRE-2018-00194-16-S18 Date: September 4, 2018 Expires: September 24, 2018 Proposed Groin

More information

4/22/2015 Item #8B Page 1

4/22/2015 Item #8B Page 1 MEETING DATE: April 22, 2015 PREPARED BY: Katherine Weldon, Program Administrator DEPT. DIRECTOR: Glenn Pruim DEPARTMENT: Public Works CITY MANAGER: Lawrence A. Watt SUBJECT: AWARD OF A CALIFORNIA COASTAL

More information

U.S. Army Corps of Engineers Navigation Program Update

U.S. Army Corps of Engineers Navigation Program Update U.S. Army Corps of Engineers Navigation Program Update NAD/SAD/Western Dredging Association Eastern Chapter Annual Meeting Jeffrey A. McKee Chief, Navigation Branch US Army Corps of Engineers October 10,

More information

DEPARTMENT OF THE ARMY. U.S. Army Corps of Engineers, Los Angeles District. Regulatory Division

DEPARTMENT OF THE ARMY. U.S. Army Corps of Engineers, Los Angeles District. Regulatory Division l.. J- 1ft l DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers, Los Angeles District Regulatory Division Ventura Field Office 2151 Alessandro Drive, Suite 110 Ventura, California 93001 JUN 2 z:~ zona

More information

Your monthly newsletter from the Florida Shore and Beach Preservation Association. FSBPA Loses Two Long-time Friends

Your monthly newsletter from the Florida Shore and Beach Preservation Association. FSBPA Loses Two Long-time Friends Your monthly newsletter from the Florida Shore and Beach Preservation Association June 2008 Just to let you know... By Debbie Flack Director of Governmental Affairs The Governor formally received the budget

More information

CDBG-DR Overview. Community Development Block Grant Disaster Recovery. October 20, 2017

CDBG-DR Overview. Community Development Block Grant Disaster Recovery. October 20, 2017 Community Development Block Grant Disaster Recovery CDBG-DR Overview U.S. Department of Housing and Urban Development Community Planning and Development Funding and Management CDBG-DR Grant Portfolio 108

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: January 24, 2017 Expiration Date: February 22, 2017 US Army Corps of Engineers No: NWP-2007-5/2 Oregon Department of State Lands No: N/A Interested

More information

Department of Army Permit Evaluation Process

Department of Army Permit Evaluation Process Department of Army Permit Evaluation Process Felicity A. Dodson Regulatory Project Manager Regulatory Division Galveston District Stakeholder s Forum USACE Galveston District, Jadwin Building Galveston,

More information

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District REVIEW PLAN Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report Jacksonville District MSC Approval Date: 2/28/13 Last Revision Date: 8/2/13 REVIEW

More information

FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA

FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA GENERAL SCHEDULE: FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA MANDATORY PRE-BID MEETING AGENDA TIME ALLOTMENT SCHEDULE

More information

BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY

BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY 22618 Sean M. Duffy, Sr. Executive Director sean.duffy@bigrivercoalition.org MARITIME NATION ENGINEER S WEEK

More information

Community Forum #2 BIS COMMITTEE S FORUM WILL PRESENT OPPORTUNITIES FOR TOWN STORM PROTECTION SEPT. 16TH

Community Forum #2 BIS COMMITTEE S FORUM WILL PRESENT OPPORTUNITIES FOR TOWN STORM PROTECTION SEPT. 16TH BIS COMMITTEE S FORUM WILL PRESENT OPPORTUNITIES FOR TOWN STORM PROTECTION SEPT. 16TH Introducing last year s Spring 2016 issue, the Topsail Tides town crier announced the first BIS Community Forum, held

More information

SOUTHEAST TEXAS WATERWAYS ADVISORY COUNCIL. Meeting Minutes

SOUTHEAST TEXAS WATERWAYS ADVISORY COUNCIL. Meeting Minutes SOUTHEAST TEXAS WATERWAYS ADVISORY COUNCIL Meeting Minutes A meeting of the Southeast Texas Waterways Advisory Council was held on April 25, 2013 at the Coast Guard Marine Safety Unit Port Arthur, TX.

More information

Sabine Pass to Galveston Bay, Texas

Sabine Pass to Galveston Bay, Texas Sabine Pass to Galveston Bay, Texas Project Review Plan Independent Technical Review and External Peer Review 1. PURPOSE Pursuant to Engineering Circular (EC) 1105-2-408, Peer Review of Decision Documents,

More information

Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas

Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas Elaine Darby, P.E.; Dan Opdyke, P.E., Ph.D.; and Leah Bray April 25, 2016 1 Beneficial Use

More information

Charleston District Program Summary

Charleston District Program Summary Charleston District Program Summary SAME Charleston Post Industry Day LTC Edward P. Chamberlayne, P.E. Commander and District Engineer Charleston District, US Army Corps of Engineers 9 May 2013 US Army

More information

NYS Emergency Management Training Program. Emergency Management in New York State

NYS Emergency Management Training Program. Emergency Management in New York State NYS Emergency Management Training Program Emergency Management in New York State NYS Emergency Management Training Program What is Emergency Management? Emergency management protects communities by coordinating

More information

CDR Overview. The Texas General Land Office Community Development and Revitalization Division (GLO-CDR)

CDR Overview. The Texas General Land Office Community Development and Revitalization Division (GLO-CDR) Overview The Texas General Land Office Community Development and Revitalization Division (GLO-) We work to rebuild communities, to put Texans back in their homes, and to help businesses recover after the

More information

INDIAN RIVER LAGOON NATIONAL ESUARY PROGRAM FY WORK PLAN REQUEST FOR PROPOSAL

INDIAN RIVER LAGOON NATIONAL ESUARY PROGRAM FY WORK PLAN REQUEST FOR PROPOSAL EXECUTIVE SUMMARY: INDIAN RIVER LAGOON NATIONAL ESUARY PROGRAM FY 2017-18 WORK PLAN REQUEST FOR PROPOSAL Project Title: Foot Island Merrill Barber Bridge Stabilization Project Applicant and Partners :

More information

Small Business Disaster Continuity Planning

Small Business Disaster Continuity Planning Before, During and After a Disaster Small Business Disaster Continuity Planning Carl Hadden CME Assistant Director Florida SBDC at USF Impact of a Disaster on Small Business FEMA estimates that almost

More information

2005 Hurricane Response

2005 Hurricane Response 2005 Hurricane Response Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Jim McGlone 2005 Hurricane Response Timeline Hurricane impacts to energy infrastructure DOE s emergency

More information

Invitation for Bid 3/30/2016 Town of Pawleys Island Creative and Website development

Invitation for Bid 3/30/2016 Town of Pawleys Island Creative and Website development Invitation for Bid 3/30/2016 Town of Pawleys Island Creative and Website development Pawleys Island ATAX Advisory Committee c/o Georgetown County Chamber of Commerce 531 Front Street Georgetown, SC 29440

More information

Presentation 8 UNITED STATES COAST GUARD RADM STEVEN H. RATTI, COMMANDER, FIFTH COAST GUARD DISTRICT

Presentation 8 UNITED STATES COAST GUARD RADM STEVEN H. RATTI, COMMANDER, FIFTH COAST GUARD DISTRICT Presentation 8 UNITED STATES COAST GUARD RADM STEVEN H. RATTI, COMMANDER, FIFTH COAST GUARD DISTRICT U.S. Coast Guard Hurricane SANDY Preparation, Operations, and the HMS Bounty rescue RADM Steven H. Ratti

More information

CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT

CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT SCOPING MEETING

More information

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, NASHVLLE DISTRICT PROGRAMMATIC GENERAL PERMIT (18-PGP-01) FOR

More information

2018 Progress Report

2018 Progress Report Hurricane Matthew After Action ----------------- 2018 Progress Report Flagler County Board of County Commissioners Flagler County, Florida Page 0 Presented to the Board of County Commissioners From Left

More information

Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida

Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Tallahassee, Florida 32399-3000 Charlie Crist Governor Jeff Kottkamp Lt. Governor Michael W.

More information

Although the final report and decision document has not been released by the Corps, we now have a clear picture of the effort needed to complete the repairs, and the time frame that can be achieved if

More information

Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012

Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012 Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012 Agenda Intro to Hazard Mitigation Assistance Purpose Who can apply? (HM Plans) What does it fund/how much? HMA

More information

Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here

Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here Talking Points for MG Riley American Association of Port Authorities 24 March 2009 Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here These are exciting times for the

More information

OPEN SESSION. 2. Public Affairs Update Clayton Somers, Vice Chancellor for Public Affairs & Secretary of the University

OPEN SESSION. 2. Public Affairs Update Clayton Somers, Vice Chancellor for Public Affairs & Secretary of the University EXTERNAL RELATIONS COMMITTEE July 18, 2018, 3:20PM Chancellor s Ballroom West, Carolina Inn FOR INFORMATION ONLY (No formal action is requested at this time) OPEN SESSION 1. Coastal Resilience Center and

More information

COMPLETE STATEMENT OF. Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS

COMPLETE STATEMENT OF. Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS COMPLETE STATEMENT OF Richard P. Wagenaar, Colonel Commander and District Engineer NEW ORLEANS DISTRICT U.S. ARMY CORPS OF ENGINEERS DEPARTMENT OF THE ARMY Introduction BEFORE THE Committee on Homeland

More information

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader April 10, 2018 The views, opinions and findings

More information

Corps Regulatory Program Update

Corps Regulatory Program Update Corps Regulatory Program Update Presentation for the National Association of Flood and Stormwater Management Agencies David Olson Headquarters, U.S. Army Corps of Engineers August 25, 2016 1 BUILDING STRONG

More information

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data United States Government Accountability Office Report to the Chairman, Subcommittee on Transportation and Infrastructure, Committee on Environment and Public Works, U.S. Senate September 2015 ARMY CORPS

More information

NORTH CAROLINA REGISTER

NORTH CAROLINA REGISTER NORTH CAROLINA REGISTER VOLUME 28 ISSUE 14 Pages 1613-1698 January 15, 2014 I. IN ADDITION DENR Public Notice... 1613 NC Rate Bureau Public Notice... 1614 II. PROPOSED RULES Administrative Hearings, Office

More information

DEPARTMENT OF THE ARMY GENERAL PERMIT

DEPARTMENT OF THE ARMY GENERAL PERMIT DEPARTMENT OF THE ARMY Wilmington District, Corps of Engineers 69 Darlington A venue Wilmington, North Carolina 28403-1343 http://www.saw.usace.army.mil/wetlands/index.html General Permit No. 198000291

More information

Old Island Restoration Foundation

Old Island Restoration Foundation Old Island Restoration Foundation P.O. Box 689, Key West, FL 33041 Tel. 305-294-9501 Fax 305-294-4509 www.oirf.org Grant Application Form 2017-18 General Guidelines: The historic preservation grant program

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR January 2017 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

BOARD OF COUNTY COMMISSIONERS State of the County

BOARD OF COUNTY COMMISSIONERS State of the County BOARD OF COUNTY COMMISSIONERS 2018 State of the County The state of the county is good. Quick Facts Population J u ly, 20 17 686,483 Annual Growth Rate 1.6% I- 4 Corridor 29.4 % of Florida s population

More information

[ CDBG-DR & FEMA Key Personnel ] Nearly 400 combined years of experience in disaster recovery

[ CDBG-DR & FEMA Key Personnel ] Nearly 400 combined years of experience in disaster recovery [ CDBG-DR & FEMA Key Personnel ] Nearly 400 combined years of experience in disaster recovery BLAKE RATCLIFF Director Mr. Ratcliff has more than 10 years of experience providing management oversight to

More information

Mitigate FL. 3 rd Quarter Meeting. Audio Information Number: Passcode:

Mitigate FL. 3 rd Quarter Meeting. Audio Information Number: Passcode: Mitigate FL 3 rd Quarter Meeting Tuesday, October 10, 2017 Kelley Training Room 1:00-2:00 pm Audio Information Number: 1-888-670-3525 Passcode: 18886032254 Introductions Name Agency For Our Friends on

More information

CDW GOES ABOVE AND BEYOND.. TO ASSIST WHEN.. GLOBAL DISASTERS STRIKE..

CDW GOES ABOVE AND BEYOND.. TO ASSIST WHEN.. GLOBAL DISASTERS STRIKE.. CDW GOES ABOVE AND BEYOND.. TO ASSIST WHEN.. GLOBAL DISASTERS STRIKE.. 2004 INDIAN OCEAN EARTHQUAKE AND TSUNAMI.. The earthquake and tsunami that struck on Dec. 26, 2004 just off the coast of Indonesia

More information

Two Years After Katrina. Progress Report on Recovery, Rebuilding and Renewal

Two Years After Katrina. Progress Report on Recovery, Rebuilding and Renewal Two Years After Katrina Progress Report on Recovery, Rebuilding and Renewal Table of Contents Message from Governor Haley Barbour............3 Introduction.................................4 Year One: Setting

More information

REGIONAL PERMIT. Effective Date: August 14, 2013 Expiration Date: August 14, 2018

REGIONAL PERMIT. Effective Date: August 14, 2013 Expiration Date: August 14, 2018 U.S. Army Corps Of Engineers Norfolk District Fort Norfolk, 803 Front Street Norfolk, Virginia 23510-1096 CENAO-REG 13-RP-19 REGIONAL PERMIT Effective Date: August 14, 2013 Expiration Date: August 14,

More information

Outreach and Adaptive Strategies for Climate Change: The Role of NOAA Sea Grant Extension in Engaging Coastal Residents and Communities

Outreach and Adaptive Strategies for Climate Change: The Role of NOAA Sea Grant Extension in Engaging Coastal Residents and Communities Outreach and Adaptive Strategies for Climate Change: The Role of NOAA Sea Grant Extension in Engaging Coastal Residents and Communities Introduction Outreach and Adaptive Strategies for Climate Change:

More information

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality RESTORE ACT Direct Component Multiyear Plan Matrix Department of the Treasury OMB Approval No. 1505-0250 Applicant Name:

More information

Company Profile Phillips & Jordan, Inc. Key Markets

Company Profile Phillips & Jordan, Inc. Key Markets Company Profile Phillips & Jordan, Inc. Key Markets Oil & Gas Power Water Resources Industrial & Commercial Solid Waste (Green Group Holdings) Disaster Management 1 APWA-NC Solid Waste Division Annual

More information

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Hurricane Sandy Coastal Resiliency Competitive Grants Program Hurricane Sandy Coastal Resiliency Competitive Grants Program Request for Proposals Proposal Due Date: Friday, January 31, 2014 On behalf of the Department of the Interior, the National Fish and Wildlife

More information

FEMA CONGRESSIONAL ADVISORY November 14, 2016

FEMA CONGRESSIONAL ADVISORY November 14, 2016 U.S. Department of Homeland Security Federal Emergency Management Agency DR-4286-SC Congressional Affairs Telephone 202-445-8820 FEMA CONGRESSIONAL ADVISORY November 14, 2016 Contents Key messages Disaster

More information

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality Texas STATE EXPENDITURE PLAN Submitted Pursuant to the Spill Impact Component of the RESTORE Act 33 U.S.C 1321(T)(3) Table

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-E Engineer Regulation 1110-2-401 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design OPERATION, MAINTENANCE, REPAIR, REPLACEMENT, AND REHABILITATION

More information

The recent support NGA has

The recent support NGA has NGA Hurricane Response SETS PRECEDENT By Lynne Puetz, Director, Office of Americas The recent support NGA has provided to our nation in the wake of two historic hurricanes has been unprecedented and viewed

More information

GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action.

GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. 1 of 13 EXECUTIVE SUMMARY Recommendation to approve an Out-of-Cycle Fund 195 Category D Grant Application from the City of Naples for an Additional Funding Request for the Naples Pier Rebuild for a not

More information

PUBLIC NOTICE.

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: January 19, 2017 Comment Deadline: February 17, 2017 Corps Action ID Number: SAW-2011-01243 The Wilmington District, Corps of Engineers

More information

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Hancock County Long Term Recovery CDBG Disaster Recovery Program

Mississippi Development Authority. Katrina Supplemental CDBG Funds. For. Hancock County Long Term Recovery CDBG Disaster Recovery Program Katrina Supplemental CDBG Funds For Hancock County Long Term Recovery CDBG Disaster Recovery Program Amendment 7 Partial Action Plan Amendment 7 Partial Action Plan For Hancock County Long Term Recovery

More information

NSA Annapolis & U.S.N.A. Climate Change, Sea Level Rise & Environmental Considerations

NSA Annapolis & U.S.N.A. Climate Change, Sea Level Rise & Environmental Considerations Public Works Department Annapolis NSA Annapolis & U.S.N.A. Climate Change, Sea Level Rise & Environmental Considerations (May 16, 2017) Topics - Agenda NSA Annapolis USNA Overview Installation Perspective

More information

Pinellas. (ollnt OFFICE OF THE COUNTY ADMINISTRATOR MEMORANDUM

Pinellas. (ollnt OFFICE OF THE COUNTY ADMINISTRATOR MEMORANDUM Pinellas (ollnt WORK SESSION AGENDA J.J~.IO ~ J OFFICE OF THE COUNTY ADMINISTRATOR MEMORANDUM TO: Honorable Chair and Members 0 h Board of County Commissioners FROM: Robert S LaSala, County Adm' I tor

More information

City of Deerfield Beach MARINE ADVISORY BOARD MINUTES March 17, 2016

City of Deerfield Beach MARINE ADVISORY BOARD MINUTES March 17, 2016 City of Deerfield Beach MARINE ADVISORY BOARD MINUTES March 17, 2016 CITY COMMISSION CHAMBERS 150 NE 2 nd Avenue The meeting was called to order on the above date by Chair Hendrickson at 6:00 p.m. The

More information