2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting
|
|
- Alisha Barker
- 6 years ago
- Views:
Transcription
1 2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources Pre-Bid Meeting July 19, :00 PM MST 100 N. Stanton
2 Safety and Basics Emergency Escape Routes Facilities Sign-In list Recording of Presentation Submitting Questions 2
3 Safe Harbor Statement Certain matters discussed in this Pre-Bid Meeting presentation other than statements of historical information are "forward-looking statements" made pursuant to the safe harbor provisions of the Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Such statements are subject to a variety of risks, uncertainties and other factors, most of which are beyond El Paso Electric Company's ("EPE" or the "Company") control, and many of which could have a significant impact on the Company's operations, results of operations, and financial condition, and could cause actual results to differ materially from those anticipated. Additional information concerning factors that could cause actual results to differ materially from those expressed in forward-looking statements is contained in EPE's most recently filed periodic reports. Any such forward-looking statement is qualified by reference to these risks and factors. EPE cautions that these risks and factors are not exclusive. Management cautions against putting undue reliance on forward-looking statements or projecting any future assumptions based on such statements. Forward-looking statements speak only as of the date of this Pre-Bid Meeting Presentation, and EPE does not undertake to update any forward-looking statement contained herein. 3
4 Meeting Agenda Project Team Introduction El Paso Electric Overview RFP Overview Process Proposal Submittal Options Requirements Instructions Proposal Evaluation Criteria Open Question Forum 4
5 Introduction RFP Project Team and EPE Staff Resource Planning System Planning Environmental Land Management Independent Evaluator Review and monitor the competitive bidding process Ensure that self-build or affiliate options do not have any undue preferential treatment and to ensure the process is fair and transparent Identify and resolve any issues as they arise Oversee the evaluation and selection process Review all modeling results and analysis Monitor and participate in contract negotiation process, including all negotiation sessions with any affiliates 5
6 El Paso Electric Overview Engaged in the generation, transmission and distribution Approximately 10,000 square miles service territory 2,153 MW net in Generating Facilities Serve load via a mix of natural gas, nuclear and solar generation and purchase power Approximately 410,000 customers Retail principally in El Paso, Texas and in Las Cruces, New Mexico Operate in WECC Regulated by the Public Utility Commission of Texas ( PUCT ) and the New Mexico Public Regulation Commission ( NMPRC ). 6
7 El Paso Electric Overview 7
8 2017 All Source RFP Overview Timing of Capacity Need No earlier than May 1, 2022 and no later than May 1, MW in MW in 2023 EPE will consider proposals < 370 MW in combination with other proposals to aggregate 370 MW Shorter timelines for COD prior to May 1, 2022 may be submitted as secondary alternatives Operational requirements Preference for Summer peaking: May-Sep Firm Resource Guarantee a minimum generation output Proposals subject to state regulatory and board approval 8
9 RFP Process Mandatory Requirements Notice of Intent to Bid $2,500 Filing fee with up to 4 options. $500 Additional proposal 1 Hard Copy 2 Electronic Bids due on October 4, 2017 Maintaining bid open for 360 days following initial submittal and best and final RFP Important Milestones Notice of Intent to Bid: August 4, 2017: Final Submission of Questions: August 25, 2017 Response to Questions: September 13, 2017 Proposal and Proposal Fee due: October 4, 2017 Shortlist Notification: March 7, 2018 Tentative Individual Meetings with Shortlisted Bidders: March 19-23, 2018 Best and Final Proposal: April 4, 2018 Tentative Date for Execution of any Contract(s): July
10 RFP Process Submitting Questions Clarify general and Project specific Q/A process Submit in writing as Per Section 1.3 RFP Communication: s: EPE will prepare written responses to questions received and periodically post on: Doing Business with EPE Resource Planning 10
11 Proposal Submittal Options EPE will consider Supply-side and demand side alternatives including distributed generation Self-build option Proposal arrangement to include one or a combination of the proposal Transactions listed below: Power Purchase Agreement: Capacity and Energy Build Transfer for EPE Purchase - Solar, Energy Storage and Conventional Generation Tolling Power Purchase Agreement for conventional, gas-fired thermal generation Purchase or equity participation in the Bidder s existing generation facility Agreements for Load Management to supply energy efficiency or demand response programs Resource Types Conventional Intermediate Generation with cycling capability Renewable (Prefer ability to dispatch/curtail on an hourly basis) Energy Storage Load Management Resources 11
12 Proposal Submittal Requirements Location and Transmission Requirements Evidence to EPE of a feasible site(s) selected All capacity and energy must be delivered to the EPE transmission system to ultimately serve EPE s load center. Interest in general vicinity of EPE s Balancing Authority Area If the Bidder s project will not be directly interconnected to the EPE transmission system, the proposal must be accompanied by a demonstration that the Bidder has [or will] secure firm transmission capacity on third-party systems, from the location of the resource to the EPE transmission system. Interconnection Awarded projects will be required to secure Network Resource Interconnection Service laid out in the EPE Large Generator Interconnection Procedures, and sign a Generator Interconnection Agreement as specified in the EPE s OATT ( Capacity and Energy Limitations The Bidder must clearly define dispatch capabilities Must outline any and all capacity and energy limitations Communication All supply-side proposals will be required to establish real-time communications with EPE s Energy Management System in order to provide status information and also be able to receive control. Government Approvals Bidders are responsible for acquiring and maintaining all present and future federal, state and local approvals, licenses, permits or variances, and the specific requirements to construct and/or operate any generation facilities and associated interconnection facilities. 12
13 Proposal Submittal Instructions Section-1 All applicable forms RFP Section 9 Submittals RFP Excel Workbook EPE 2017 all Source RFP Table and Input Templates Section-2 Proposal Overview Section-3 O&M Plan Section-4 Fuel Supply and Fuel Transportation Section-5 Regulatory and Environmental Compliance Section-6 Project Schedule Section-7 Financial Capability Section-8 Capability and Experience 13
14 Proposal Evaluation Criteria Viability Threshold Evaluation EPE will initially review each proposal to determine whether it satisfies the threshold criteria of responsiveness, technical viability, and Bidder financial ability and capability. 1 st Stage Economic Evaluation Levelized Cost of Energy basis and will be compared to proposals within their resource type group Non-Economic Evaluation Development Feasibility and Completion Risk Financial and Operational Viability Operating Characteristics Other Factors EPE Financial Impact Determined Network Upgrade Costs 2nd Stage Short List Bidders Best and Final Proposals 14
15 Useful Links EPE System Expansion Plan Generator Interconnection Link to EPE Service Territory Transmission map Link to EPE s NM IRP Plan
16 Open Question Forum *Official responses will be in writing and posted on EPE website. 16
PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017
PacifiCorp 2017S SOLAR Request for Proposals Bidder s Conference Portland November 21, 2017 Workshop Date/Time November 21, 2017 Location Portland, Oregon 10:00 AM 12:00 PM Logistics PacifiCorp s Lloyd
More informationEl Paso Electric Company New Mexico Energy Efficiency and Load Management Programs
Company 2019 2021 New Mexico Energy Efficiency and Load Management Programs Request for Proposals RFP# EPE-50062135-MM Released on: October 9, 2017 Melissa Muñoz Contract Negotiator 100 N. Stanton, Loc.
More informationNon-Pipeline Solutions Pre-RFP Webinar. January 24, 2018
Non-Pipeline Solutions Pre-RFP Webinar January 24, 2018 Agenda Con Edison s Need for Non-Pipeline Solutions Con Edison s Smart Solutions for Natural Gas Customers initiative Con Edison s Non-Pipeline Solutions
More informationRequest for Proposals and Specifications for a Community Solar Project
Request for Proposals and Specifications for a Community Solar Project CPS Energy P.O. Box 1771 San Antonio, TX 78296-1771 October 9, 2014 PR # 10452716 INVITATION TO SUBMIT PROPOSALS 1. Introduction CPS
More informationCONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS SOLAR GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.
CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS SOLAR GENERATION PROJECTS Bids Due: July 28, 2017 12:00 noon EPT (Jackson, MI) Issued June 5, 2017 Web Address: https://www.consumersenergy.com/residential/renewable-energy/customergeneration/electricity-sales/electric-power-notices
More informationORANGE & ROCKLAND UTILITIES, INC. REQUEST FOR INFORMATION FOR ENTITIES WISHING TO SUBMIT DISTRIBUTED GENERATION PROPOSALS February 2003
ORANGE & ROCKLAND UTILITIES, INC. REQUEST FOR INFORMATION FOR ENTITIES WISHING TO SUBMIT DISTRIBUTED GENERATION PROPOSALS February 2003 Orange and Rockland Utilities, Inc. (ORU) will be soliciting bids
More information2012 Request for Proposals Solar On-site Renewable Energy Credits (REC)
U Issued Date: September 10, 2012 Proposal Submission Date: October 15, 2012 2012 Request for Proposals Solar On-site Renewable Energy Credits (REC) Xcel Energy Inc. is a major U.S. investor-owned electric
More informationSOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES
SOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES AUGUST 21, 2014 Page 1 of 10 1. Overview SOUTH CAROLINA ELECTRIC
More informationAUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES
AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES 1. PURPOSE A. Statement of Intent The City of Austin, Texas d/b/a Austin Energy
More informationEnergy. Request For Proposals for Renewable Power Supply Resources
Energy Request For Proposals for Renewable Power Supply Resources March, 2009 Request For Proposals for Renewable Power Supply Resources TABLE OF CONTENTS I. INTRODUCTION... 3 A. OBJECTIVES OF THE REQUEST
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Solar (Greater than 25 kw), Wind, Hydro and Anaerobic Digester
More informationRhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules
Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules I. Introduction and Overview 1.1 Purpose of the Enrollment The Narragansett Electric
More informationCITY OF PITTSFIELD COMMUNITY CHOICE POWER SUPPLY PROGRAM DRAFT AGGREGATION PLAN COLONIAL POWER GROUP, INC.
CITY OF PITTSFIELD COMMUNITY CHOICE POWER SUPPLY PROGRAM DRAFT AGGREGATION PLAN PREPARED BY COLONIAL POWER GROUP, INC. PURPOSE OF THE AGGREGATION PLAN The City of Pittsfield ( City ) developed this Aggregation
More informationMCE Feed-In Tariff for Distributed Renewable Generation
I. Applicability MCE Feed-In Tariff for Distributed Renewable Generation Revised and Effective as of March 2018 This Feed-in Tariff ( FIT ) Schedule ( Schedule FIT ) is available to qualifying Applicants
More informationATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet
ATTACHMENT B RFP RESPONSE PACKAGE Proposals should be developed to include all of the applicable information as detailed in Section 7 ( RFP Documentation/Forms in RFP Response Package ) of the Request
More informationCENTRAL MUNICIPAL POWER AGENCY/SERVICES
CENTRAL MUNICIPAL POWER AGENCY/SERVICES 2017 Request for Solar Proposals August 4, 2017 On Behalf of Springfield Public Utilities Contact: Kyle Haemig, Resource Planner/Economist kyleh@cmpasgroup.org 763-710-3934
More informationSouthern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.
Southern California Edison Original Cal. PUC Sheet No. 52964-E Schedule Re-MAT Sheet 1 A. APPLICABILITY The Renewable Market Adjusting Tariff schedule (Re-MAT or this Schedule) implements the renewable
More informationFlorida Power & Light Company s Firm Gas Transportation Request for Proposals Pre-Proposal Workshop. January 16, 2013
Florida Power & Light Company s Firm Gas Transportation Request for Proposals Pre-Proposal Workshop January 16, 2013 Important Dates Request for Proposals Q & A Agenda 2 FPL has established the following
More information2017 HeatSmart Massachusetts Pilot Table of Contents
2017 HeatSmart Massachusetts Pilot for Clean Heating & Cooling Technical Consultants RFP ID: MassCEC 2017-HSMP-02 Posting Date: July 24, 2017 Table of Contents 1. Opportunity Summary... 2 2. Program Description...
More informationTOWN OF STOUGHTON COMMUNITY CHOICE POWER SUPPLY PROGRAM AGGREGATION PLAN COLONIAL POWER GROUP, INC.
TOWN OF STOUGHTON COMMUNITY CHOICE POWER SUPPLY PROGRAM AGGREGATION PLAN PREPARED BY COLONIAL POWER GROUP, INC. PURPOSE OF THE AGGREGATION PLAN The Town of Stoughton ( Town ) developed this Aggregation
More informationPROCESSING OF SHORT TERM TRANSMISSION SERVICE REQUESTS
PROCESSING OF SHORT TERM TRANSMISSION SERVICE REQUESTS In this Section: Overview TSR Validation Duration Bid Price Processing of the 5 Minute Simultaneous Submission Window Requests (Midnight Bidding)
More informationFEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES
Ministry of Energy FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES 1 December, 2012 TABLE OF CONTENTS 1 INTRODUCTION 3 2 OVERVIEW OF THE FiT PROCEDURE 3 3 EXPRESSION OF INTEREST APPLICATION
More informationExpression of Interest. Gas for Gaza Legal Feasibility Study REF: EOI G4G. April 2016
Expression of Interest Gas for Gaza Legal Feasibility Study REF: EOI-2016-78 G4G April 2016 EMPLOYER: OFFICE OF THE QUARTET / UNITED NATIONS DEVELOPMENT PROGRAMME / PROGRAMME OF ASSISTANCE TO THE PALESTINIAN
More informationRefer to section 2.C. for more information on the evaluation criteria.
SOLARIZE RALEIGH PILOT PROGRAM DRAFT Request for Proposals from Installers of Residential Solar Photovoltaic Systems Proposed Posting Date: February 4, 2014 I. OPPORTUNITY SUMMARY: The North Carolina Solar
More informationPROJECT CERTIFICATION CRITERIA AND PROCESS. BOARD DOCUMENT BD April 9, 2012
PROJECT CERTIFICATION CRITERIA AND PROCESS BOARD DOCUMENT BD 2012-7 April 9, 2012 TABLE OF CONTENTS Background 2 Basic Eligibility 3 Project Type 3 Project Location 4 Legal Authority 4 Project Development
More informationRequest for Proposal (RFP)
Consolidated Edison Company of New York, Inc. Request for Proposal (RFP) Non-Wires Alternatives to Provide Demand Side Management for Transmission and Distribution System Load Relief Columbus Circle Network
More informationNorth Pinellas County Solar Co-op RFP
1 October 11, 2017 Dear Installer, Thank you for your interest in our North Pinellas County solar co-op! We re excited to issue a Request For Proposal (RFP) on behalf of a group of homeowners in northern
More informationThe State of Interconnection in NYS:
The State of Interconnection in NYS: Understanding the Current Situation, Navigating the New Interconnection Requirements in NY, and What s Next Melissa Kemp, NYSEIA Policy Co-Chair About NYSEIA NYSEIA
More informationTender 1/2018 Request for Existing Plant Pre-Qualification for the Power 2022 Procurement Process
Tender 1/2018 Request for Existing Plant Pre-Qualification for the Power 2022 Procurement Process Oman Power and Water Procurement Company SAOC 3 September 2018 Addendum 1 to the REPPQ NERA Economic Consulting
More information2017 Solar*Rewards Large Request for Proposals Solar On-site Renewable Energy Credits (REC)
U 2017 Solar*Rewards Large Request for Proposals Solar On-site Renewable Energy Credits (REC) Issued Date: July 06, 2017 Proposal Submission Date: August 18, 2017 Xcel Energy Inc. is a major U.S. investor-owned
More informationRequest for Proposals and Qualifications for. Owner s Representative Services (RFP) August Farmington Public Schools. Farmington Town Hall
Request for Proposals and Qualifications for Owner s Representative Services (RFP) August 2016 Farmington Public Schools Farmington Town Hall 1 Monteith Drive Farmington, CT 06032 RFP Issued: 8/6/2016
More informationRequest for Proposal
Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief West 42 nd Street Load Transfer
More informationLADWP Feed-in Tariff (FiT) Program Workshop. LABC & Council District 14 Councilmember Jose Huizar November 12, 2014
LADWP Feed-in Tariff (FiT) Program Workshop LABC & Council District 14 Councilmember Jose Huizar November 12, 2014 Presentation Overview LADWP Power System Background FiT 100 Overview FiT 50 Overview FiT
More informationPROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR ELECTRIC EFFICIENCY PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Revised: February 6, 2018 {P1472575.1} CONTENTS
More informationCITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project
CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS RFP 78-18 Peirce Island Pool House Design Project Sealed Requests for Proposals, plainly marked RFP# 78-18 Construction Drawings and Bid Documents for
More informationImplementation of HB 2941, Section 3 Community Solar Program Design August 11, Reminder Please add your name to the sign in sheet.
Implementation of HB 2941, Section 3 Community Solar Program Design August 11, 2015 Reminder Please add your name to the sign in sheet. 8/11/2015 UM 1746 Workshop 1 1 Welcome and thank you for your participation.
More informationRFP No. FY2017-ACES-02: Advancing Commonwealth Energy Storage Program Consultant
Massachusetts Clean Energy Center Request for Proposals (RFP): Advancing Commonwealth Energy Storage Program Consultant 1. PROGRAM SUMMARY AND GOALS RFP FY2017-ACES-02 Release Date: June 1, 2017 Applications
More informationRequest for Proposals Architectural Services Re: Fremont High School (RFP No date advertised July 17, 2014) ADDENDUM No. 2 (AUGUST 7, 2014)
Request for Proposals Architectural Services Re: Fremont High School (RFP No. 13158 date advertised July 17, 2014) ADDENDUM No. 2 (AUGUST 7, 2014) The following changes, additions, modifications and corrections
More informationSTATE OF WASHINGTON Request for Quotes and Qualifications
Acquisition Title: Expected Results: Response Due Date: RFQQ Coordinator Information: Bid Submittal: Vendor Eligibility: RFQQ Components: RFQQ #03712 Lean Consultant Services Department of Enterprise Services
More informationRequest for Proposals
Request for Proposals Branding Services Contents Introduction... 2 Background on WECC... 2 Background on the WECC Brand... 3 Scope of Work... 3 Proposal Requirements... 3 Proposal Evaluation... 4 Contract
More informationProject Application Webinar
Green Infrastructure Phase II Emerging Renewable Power Program Project Application Webinar March 9, 2018 2 Contents Background Applicant Guide Overview: Eligibility and funding Application process Project
More informationRequest for Proposal
Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief Newtown Substation Project
More informationPROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM
PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON Opening: July 1, 2017 Closing: June 30, 2018 Updated: July 1, 2017 CONTENTS SECTION 1:
More informationNon-Pipeline Solutions RFP
Non-Pipeline Solutions RFP Frequently-Asked Questions Updated February 19, 2018 Capitalized terms used below have the meanings specified in the Non-Pipeline Solutions RFP and its attachments and appendices.
More informationREQUEST FOR PROPOSAL FOR PAY FOR SUCCESS CONSULTANT SERVICES
REQUEST FOR PROPOSAL FOR PAY FOR SUCCESS CONSULTANT SERVICES Description of Project Local Initiatives Support Corporation (LISC) is dedicated to helping community residents transform distressed neighborhoods
More informationAMENDMENT NO.: III INVITATION FOR MULTI-STEP BID NO.: GPA FOR
March 15, 2018 AMENDMENT NO.: III TO INVITATION FOR MULTI-STEP BID NO.: GPA-034-18 FOR BUILD, OPERATE & TRANSFER CONTRACT FOR 120-180MW OF NEW GENERATION CAPACITY STEP 1 REQUEST FOR QUALIFICATIONS Prospective
More informationFiji Electricity Authority. MR 323/2017 Feasibility Study of Pumped Storage Hydropower at Monasavu Request for Prices
Fiji Electricity Authority MR 323/2017 Feasibility Study of Pumped Storage Hydropower at Monasavu Request for Prices November 2017 Fiji Electricity Authority Private Bag Suva Fiji Tel: 679-3311133 Fax:
More informationRoadmap for Implementation of Renewable Energy Certificate Mechanism for India. Guidelines and Operating Rules for Monitoring Institution(s)
Roadmap for Implementation of Renewable Energy Certificate Mechanism for India REPORT-10 (ACTIVITY 2798) Guidelines and Operating Rules for Monitoring Institution(s) SUBMITTED TO Renewable Energy and Energy
More informationTHE CITY OF SEATTLE CITY LIGHT DEPARTMENT 2012 REQUEST FOR PROPOSALS. Long-Term Renewable Resources And/or Renewable Energy Certificates
THE CITY OF SEATTLE CITY LIGHT DEPARTMENT 2012 REQUEST FOR PROPOSALS Long-Term Renewable Resources And/or Renewable Energy Certificates Issued September 12, 2012 1 - Introduction The City of Seattle, City
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS PLATTE RIVER POWER AUTHORITY 2018 RENEWABLE ENERGY SUPPLY PHOTOVOLTAIC SOLAR GENERATION or PHOTOVOLTAIC SOLAR GENERATION with STORAGE COMPLEMENT FORT COLLINS, CO SPECIFICATION NUMBER:
More informationCOUNTY OF SANTA BARBARA
COUNTY OF SANTA BARBARA REQUEST FOR PROPOSALS FOR STRATEGIC ENERGY PLANNING SERVICES Question Deadline: Contact Person: Submittal Deadline: Submittal Location: Friday, January 19, 2018, 5 pm PST Jennifer
More informationRequest for Qualifications DRPA Solar Photovoltaic Systems
Request for Qualifications DRPA Solar Photovoltaic Systems To Finance, Design, Construct, Install, Operate, and Maintain New Rooftop, Ground, and Canopy-Mounted Solar Generation at Facilities Owned and
More informationPilot Program Framework Proposal
Pilot Program Framework Proposal Brian Yung Market Design Specialist Market Issues Working Group June 21, 2017, 10 Krey Blvd, Rensselaer, NY 12144 Background Date Working Group Discussion points and links
More informationREQUEST FOR PROPOSAL (RFP) PROJECT DESIGN AND CONTRACT DOCUMENT PREPARATION CEDAR BAND TRAVEL PLAZA ENTERPRISE
REQUEST FOR PROPOSAL (RFP) PROJECT DESIGN AND CONTRACT DOCUMENT PREPARATION CEDAR BAND TRAVEL PLAZA ENTERPRISE PAIUTE INDIAN TRIBE OF UTAH 440 NORTH PAIUTE DRIVE CEDAR CITY, UT, 84721 JANUARY 30, 2018
More informationMay 6, 2002 Revision 2
Self-Generation Incentive Program Handbook May 6, 2002 Revision 2 Table of Contents 1. Introduction...5 1.1 Program Summary...5 1.2 Program Background...5 2. Program Eligibility Criteria and Requirements...6
More informationGLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES
GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )
More informationRequest for Expressions of Interest
Request for Expressions of Interest Business & Financial Services Department DESIGN, BUILD, FINANCE, AND OPERATE A DISTRICT ENERGY UTILITY AT RIVER GREEN IN RICHMOND, BC 1. Introduction 1.1. The City of
More informationRequest for Proposal. to provide. A Comprehensive Campus Renewable Energy Feasibility Study. for. The University of Vermont s Clean Energy Fund
Capital Planning and Management Request for Proposal to provide for The University of Vermont s Clean Energy Fund Requested By: The University of Vermont and State Agricultural College Burlington, VT 05405
More informationThe Commission met on Wednesday, February 20, 2013, with Chair Jones Heydinger, and Commissioners Boyd, Reha, O Brien, and Wergin present.
The Commission met on Wednesday, February 20, 2013, with Chair Jones Heydinger, and Commissioners Boyd, Reha, O Brien, and Wergin present. The following matters were taken up by the Commission: ENERGY
More informationSmall and Large Generator Interconnection Procedures
Small and Large Generator Interconnection Procedures Generator Interconnection Procedures Team Stakeholder Meeting July 27, 2010 CAISO Stakeholder Process We are here 1 2 3 Project is triggered Issue ID
More informationJuly 1, 2006 Revision 2
Self-Generation Incentive Program Modification Guideline (PMG) July 1, 2006 Revision 2 TABLE OF CONTENTS TABLE OF CONTENTS...i 1. GUIDELINE BACKGROUND & PURPOSE...1 1.1. Background...1 1.2. Purpose...1
More informationApproved Project Sponsor s Participating TO Application Process Clean-Up. Proposal and Tariff
Approved Project Sponsor s Participating TO Application Process Clean-Up Proposal and Tariff September 30, 2015 M&ID Page 1 Table of Contents 1 Executive Summary... 3 2 Stakeholder Process Next Steps...
More informationCommunity Solar for Low-Income Benefits and Barriers. Laurel Passera, CCSA Policy Team, EQ Research
Community Solar for Low-Income Benefits and Barriers Laurel Passera, CCSA Policy Team, EQ Research CCSA members include 40+ community solar providers, business service professionals and customers Who is
More informationTEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)
TEXAS GENERAL LAND OFFICE COMMUNITY DEVELOPMENT & REVITALIZATION PROCUREMENT GUIDANCE FOR SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES) The Texas General Land Office Community Development & Revitalization
More informationGuidance Notes for Applying for a Licence to Generate Electricity
An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Guidance Notes for Applying for a Licence to Generate Electricity Information Paper Reference: Date Published: January 2018 www.cru.ie
More informationRenewable Energy Feed-in-Tariff Stakeholder Workshop Objectives
Renewable Energy Feed-in-Tariff Stakeholder Workshop Objectives Lusaka, Zambia September 22, 2015 Venue: Taj Pamodzi Hotel Presented by: Energy Regulation Board Alfred M. Mwila Director Economic Regulation
More informationRegional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor. June 18, 2018
Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor June 18, 2018 PROPOSAL DUE DATE: July 23, 2018, 5:00 p.m. Eastern Daylight Time The Regional Greenhouse
More informationNOTICE OF REQUEST FOR PROPOSALS
NOTICE OF REQUEST FOR PROPOSALS Competitive sealed proposals for professional services will be received by the Contracting Agency, Guadalupe County, New Mexico, for RFP No. 2014-005. The Contracting Agency
More informationTerm of Contract 15-year term, from 1 October 2018 to 31 December 2033
CLP Power Hong Kong Ltd Overview of the Scheme of Control Agreement (SCA) for 2018-2033 Overview Permitted Rate of 8% on Average Net Fixed Assets Return Term of Contract 15-year term, from 1 October 2018
More informationThe Narragansett Electric Company d/b/a National Grid
The Narragansett Electric Company d/b/a National Grid Rhode Island Renewable Energy Growth Program Solicitation and Enrollment Process Rules for Small Scale Solar Projects Effective Date: April 1, 2018
More informationIntegrated Leadership for Hospitals and Health Systems: Principles for Success
Integrated Leadership for Hospitals and Health Systems: Principles for Success In the current healthcare environment, there are many forces, both internal and external, that require some physicians and
More informationCONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS WIND GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.
CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS WIND GENERATION PROJECTS Bids Due: July 28, 2017 12:00 noon EPT (Jackson, MI) Issued June 5, 2017 Web Address: https://www.consumersenergy.com/residential/renewable-energy/customergeneration/electricity-sales/electric-power-notices
More informationApplication form for Commissioning Generation Facility Registration by a Market Participant. including explanatory notes
Application form for Commissioning Generation Facility Registration by a Market Participant including explanatory notes IMPORTANT: Please read this carefully before completing this form. Italicised words
More informationRequest for Proposal. Study on Economic Impact of Calgary s Post-Secondary Sector. Reference Number:
Study on Economic Impact of Calgary s Post-Secondary Sector Reference Number: 1605-02 Issued: May 31, 2016 Responses Due: June 10, 2016 Calgary Economic Development Ltd. 731 1 st Street SE Calgary, AB
More informationRequest for Proposals ( RFP ) Under the SREC-Based Financing ( SREC-II ) Program
Request for Proposals ( RFP ) Under the SREC-Based Financing ( SREC-II ) Program ROUND 8 OF 9 For New Eligible Residential/Small-Commercial Solar Photovoltaic Projects (up to 50 kw); Commercial Solar Photovoltaic
More informationREQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT CEDAR BAND TRAVEL PLAZA ENTERPRISE
REQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT CEDAR BAND TRAVEL PLAZA ENTERPRISE PAIUTE INDIAN TRIBE OF UTAH 440 NORTH PAIUTE DRIVE CEDAR CITY, UT 84721 OCTOBER 18, 2017 TABLE OF CONTENTS 1. SUMMARY AND
More informationREQUEST FOR PROPOSAL For East Bay Community Energy Technical Energy Evaluation Services
REQUEST FOR PROPOSAL For East Bay Community Energy Technical Energy Evaluation Services RESPONSE DUE by 5:00 p.m. on April 24, 2018 For complete information regarding this project, see RFP posted at ebce.org
More informationIllinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?
Illinois Power Agency Long-Term Renewable Resources Procurement Plan What s Next? Anthony Star Director Illinois Power Agency Institute for Regulatory Policy Studies Spring 2018 Conference Long-Term Renewable
More informationFederal and State Incentives for Wind Development
Chapter 12 Federal and State Incentives for Wind Development The federal government and many state governments now offer various incentives for wind energy development. Many of these incentives are specifically
More informationNovember 16, 2015 I. INTRODUCTION
REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL SERVICES FOR A NEEDS ASSESSMENT AND CONCEPTUAL DESIGN OF A NEW ANIMAL SHELTER FACILITY FOR THE CITY OF MARSHALL, TEXAS November 16, 2015 I. INTRODUCTION The
More informationProject Implementation: From RFP to Project Closeout
FEDERAL ENERGY MANAGEMENT PROGRAM Project Implementation: From RFP to Project Closeout February 2011 5 FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Course Overview Course is part of the FEMP renewable
More informationScaling Solar: An Update. Mr. Dana R. Younger Chief Renewable Energy Specialist Global Infrastructure & Natural Resources Department March 5, 2018
Scaling Solar: An Update Mr. Dana R. Younger Chief Renewable Energy Specialist Global Infrastructure & Natural Resources Department March 5, 2018 What is Scaling Solar? Scaling Solar is a one stop shop
More informationRequest for Proposal For Fitness Equipment for the Clyde Recreation Center
Request for Proposal For Fitness Equipment for the Clyde Recreation Center RFP #2017-08 Springville Recreation 443 S 200 E Springville, Utah, 84663 Phone: 801-491-7881 palmoney@springville.org Springville
More informationREQUEST FOR PROPOSALS (RFP): COMMERCIAL LEASE BROKER
A. Introduction and Purpose REQUEST FOR PROPOSALS (RFP): COMMERCIAL LEASE BROKER The Public Health Institute (PHI) is a global leader in public health, dedicated to promoting health, wellbeing, and quality
More informationSponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017
REQUEST FOR PROPOSALS Xcel Energy Renewable Development Fund MnSCU Block Grant Award Type Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016
More informationProject # LI
Boston Public Health Commission Request for Proposals (RFP) March 14, 2018 November 30, 2021 Lease of 1 Acre of organic farming land Long Island Campus Boston Harbor Islands Project # LI-010-1821 Prepared
More informationLocal Energy Challenge Fund
Guidance for applicants to the Local Energy Challenge Fund Managed by Local Energy Scotland as part of the Scottish Government s CARES programme Version 1 15th August 2014 Local Energy Challenge Fund Guidance
More informationWe Energies Renewable Energy Workforce and Economic Development Grant Program
We Energies Renewable Energy Workforce and Economic Development Grant Program - 2011 Introduction During the 2011 program year, We Energies will offer grants and financial assistance under its Workforce
More informationSEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services
Department of Forests, Parks & Recreation 1 National Life Drive, Davis 2 Montpelier, VT 05620-3801 www.vtfpr.org Agency of Natural Resources SEALED PROPOSAL REQUEST FOR PROPOSAL Professional Archaelogical
More informationOVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015
OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia Jakarta, 3 rd February 2015 Disclaimer This presentation is to facilitate the Q&A by providing an overview
More informationRequest for Qualifications Gulf Environmental Benefit Fund Support Services
Request for Qualifications Gulf Environmental Benefit Fund Support Services Submission Deadline: Deadline extended to February 12, 2014 Overview The National Fish and Wildlife Foundation (NFWF) invites
More informationFeed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers
Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers Document type: Guidance Document Ref: 61/10 Date of publication: 14 May 2010 Target audience: All GB licensed electricity suppliers and
More informationRequest for Qualifications Construction Manager at Risk Contract
Request for Qualifications Construction Manager at Risk Contract Project Owner: The MetroHealth System Project Name: Hybrid Operating Room (OR) CM 15.17 and OR Renovation Upgrade CM 16.06 Project Location:
More informationMay 25, Request for Proposals No Offsite Virtual Net Metering
May 25, 2018 Request for Proposals No. 28017 Offsite Virtual Net Metering I. Introduction The Rhode Island Airport Corporation (RIAC) seeks proposals from qualified enterprises to provide offsite virtual
More informationREQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016
MAYOR GARY O. PHILLIPS VICE MAYOR KATE COLIN COUNCILMEMBER MARIBETH BUSHEY COUNCILMEMBER JOHN GAMBLIN COUNCILMEMBER ANDREW CUYUGAN MCCULLOUGH PUBLIC WORKS DEPARTMENT: (415)485-3355 FAX: (415)485-3334 Bill
More informationEFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM
EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM-010-2018 Date Issued: April 19, 2018 Closing Date: July 12, 2018, 3:00 pm
More informationEnergy Trust Background
REQUEST FOR QUALIFICATIONS (RFQ) FOR PLANNING AND EVALUATION TASKS Energy Trust of Oregon, Inc. (Energy Trust), an Oregon non-profit, 501(c)(3) corporation, seeks qualifications from energy efficiency
More informationRural Electrification Strategy and Implementation Plan of the Federal Republic of Nigeria. prepared for the
Rural Electrification Strategy and Implementation Plan of the Federal Republic of Nigeria prepared for the Power Sector Reform Team Bureau of Public Enterprises Econ One Research, Inc. in association with
More informationOntario College of Trades
Ontario College of Trades This document is a Request fo r Proposal (RFP) for Roster of vendors to facilitate: Ontario College of Trades 2018 Strategic Planning Initiative (planning, facilitating and reporting
More informationREQUEST FOR PROPOSAL FOR BUILDING LEASE
REQUEST FOR PROPOSAL FOR BUILDING LEASE Notice is hereby given that the City of Carroll, will accept written proposals until Monday, October 2, 2017 at 1:00 pm. Proposals are to be sent or delivered to
More information