Suriname PLAN OF OPERATIONS. I. Basic Data. Framework for the Implementation of the Secure Transactions Regime for Movable Assets in Suriname

Size: px
Start display at page:

Download "Suriname PLAN OF OPERATIONS. I. Basic Data. Framework for the Implementation of the Secure Transactions Regime for Movable Assets in Suriname"

Transcription

1 Suriname PLAN OF OPERATIONS I. Basic Data Project Name: Framework for the Implementation of the Secure Transactions Regime for Movable Assets in Suriname Project Number: Compete Caribbean Pillar: Business Climate and Competitiveness Enhancement Facility (BCCE) Compete Caribbean Focus Area: Business Climate and Competitiveness Enhancement Technical Cooperation Project Team: Target Beneficiaries: ANGANU, JAIWATTIE STEVENSON, CLAUDIA KARCHER, NICOLA ELLIOTT, WAYNE ANTONIO PEREIRA, STEFANO J. KAMAU, MUSHEER OLATUNJI PERSAUD, TARA LISA ROSHINI CASTILLO-RUIZ, PAZ MORRISON, PAUL CRAIG SCOTT, CHRISTINE ANN PARAHOO, ROY Private sector firms in Suriname, particularly SMEs. Team Leader Alternate Team Leader Operations Analyst Operations Analyst Project Development Officer Team Member Team Member Gender Specialist Environment Specialist M&E Specialist Procurement Specialist Counterpart Agency: MINISTRY OF FINANCE General Objective: The general objective is to improve the enabling environment for business development, trade, and integration. Specific Objectives: The specific objective is to streamline the mechanisms for SME access to credit in Suriname. Execution Period: 18 month(s) Financing plan: Compete Caribbean: Local Counterpart: Total: $400, $200, $600, Monday, February 02, /12

2 II. Background and Justification A. Problem Statement Suriname has experienced sustained economic growth over the last 10 years, but its economy is fragile because it depends strongly on the extraction of gold, oil and bauxite, and it is exposed to unpredictable swings in international prices of these exports (Fritz Krokow, et al. Suriname Toward Stability and Growth. International Monetary Fund. 2009). Except for mining, private investment needs improvement in other sectors. Cognizant of the risks associated with its economic structure, the authorities seek to engage in structural reforms that would facilitate a transformation from the current economic structure to a new economic model-one with a diversified production basket, and a less vulnerable economic base that fosters greater private sector investments. As Suriname needs to transition from a public driven economy to a more diversified economy driven by private sector, it faces the following challenges: (i) lack of an overall long term strategy to guide diversification and growth interventions; (ii) insufficiently modernized legal and institutional framework to promote private sector led growth, diversification and innovation; (iii) limited institutional capacity to coordinate, promote and implement private sector development policies; and (iv) lack of effective policies and programs to foster innovation and productivity in SMEs. The Government of Suriname's (GoS) Development Plan ( ) provides the development blueprint for the medium term and gives special consideration to good governance, social development, economic diversification, competitiveness and innovation, education for competitive skills and building a knowledge society, protecting natural resources, and managing the impact of climate change. Concerning the business climate in particular, the Development Plan concentrates on enhancing governance and competitiveness to help implement the Development Plan, GoS requested and received a grant from the Compete Caribbean Program (Support for Business Climate Reforms SU-CC2020) to establish and strengthen the Competitiveness Unit in Suriname (CUS) This unit is housed in the Vice President s Cabinet and has specific responsibility to coordinate the implementation of all Government related interventions to improve the business climate and enhance competitiveness in Suriname. The grant funds activities to improve institutional frameworks and implement reforms in the business environment to increase investment and innovation, and is subsequently nearing completion. To date, SU-CC2020 has supported the establishment and formalization of the Competitiveness Unit of Suriname (CUS) as a main mechanism for public-private dialogue on competitiveness in Suriname. The project designed the technical unit for the CUS, it s M&E System, and engaged technical staff for the period of the project. It also supported the development of various tools to help the CUS : a roadmap to address constraints facing SMEs; an action plan for the CUS to prioritize activities to foster private sector development, improve business climate and enhance competitiveness; a study on entrepreneurship in Suriname; workshops to build CUS capacity, the drafting and consultation of an Omnibus Law for improving business climate. Additionally, it financed study tours for the CUS and supported the implementation of a communications strategy. This current project takes the business climate reforms initiatives started under SU-CC2020 a step further by supporting the implementation of one of the main priority areas for action identified by the CUS. Limited access to finance and other financial services. According to World Bank's Enterprise Surveys and the World Economic Forum, access to credit remains a challenge in Suriname and the market is not highly effective in terms of providing the financing and other financial services needed by the private sector or households. Private sector credit is less than 30% of GDP in spite of rapid growth over the past five years fueled by stable macroeconomic conditions and robust economic growth. Similarly, markets are narrow, as financial markets offer only a limited range of financial instruments. Most business lending is centered on working capital needs and fixed assets (primarily real estate) are required as collateral for almost all credits. Maximum terms, apart from mortgage lending, are about five years. With almost a complete absence of capital markets, equity and bond financing are largely unavailable. In the World Economic Forum survey, Suriname is ranked 111th of 144 countries in terms of Financial Market Development (The Global Competitiveness Report , Table 6. Access and use of external finance is therefore limited and firms consider this limitation to be a major hindrance to growth and competitiveness (Suriname is ranked at 170 out of 185 in terms of Access to Credit in the Doing Business World Bank report). Finally, for communities outside of the urban areas along the coast, access to financial services is severely limited as there are no points of sale services, bank branches or Automated Teller Machines (ATMs). The Report Suriname: Improving Access to Finance for Small and Medium Enterprises by Drum 2012, recommends the development of a secured transaction legal framework. The Working Group on Access to Finance within the framework of the Caribbean Growth Forum, also recommended and emphasized the need for a developing a secured transactions framework (The creation of a secured transaction framework is also a condition for the Financial Sector Reform program which the Government of Suriname has with the IDB), and Cabinet has agreed with the creation of a secure transactions regime. The establishment of a secure transactions framework and registry in Suriname will enhance the security of loans, by making the pledging of movable property relatively simple and inexpensive. Lenders would be able to determine easily that assets are unencumbered and in the event of default, rapidly foreclose on the pledged assets, thereby reducing their risks of loss. Thus, a single and simple set of rules for creating security in movable property of any nature, that would allow any corporation or individual to give or take security in the form of movable property, would allow access to credit under much simpler and less costly circumstances to a broader spectrum of the population. Consultations were undertaken with a wide cross section of stakeholders (private sector, banks, fund operators) and there is agreement on the need for the proposed registry and that it will enhance access to credit in Suriname. The government has started work in synchronizing the Organization of American States (OAS) model law for civil law jurisdiction, to the Surinamese business environment. (The OAS has developed model laws for civil jurisdiction similar to Suriname and countries are encouraged in order of expediency and in an effort to harmonized these efforts, to use these laws with modification to local settings). This project will build on this initiative. The movable registry will provide a mechanism whereby SMEs can use their registered assets to access finance for business growth. Monday, February 02, /12

3 B. Coordination and Synergies Coordination with Country/Regional Priorities. With the prior support of Compete Caribbean grant SU-CC2020, the Competitiveness Unit of Suriname (CUS), which is responsible for competitiveness issues, has succeeded in drafting: (i) a slew of legislations which would modernize the incentive framework for private sector investment, (ii) a Competitiveness strategy that maps out major activities to increase growth, and (iii) an action plan for business climate reform. In addition the grant funded studies on (i) a private sector reform framework, (ii) legal institutions reform framework and (iii) a diagnostic study on the Ease of Doing Business in Suriname. The Competitiveness Unit of Suriname (CUS), reporting to the Vice President, would take the lead of this project, ensuring efficient use of resources and the harmonic implementation of a work program designed to improve private sector participation and investment. This project is consistent with the commitment of the Surinamese Government to continue the reform process started under SU-CC2020. The President and the Governor of the Central Bank have both signaled their continued support and commitment to strengthen and expand the private sector by requesting the support of the Bank in these areas. Coordination with Donors. Suriname became the 183rd member of the International Finance Cooperation (IFC) on September 2, The IFC has offered technical expert advice for the creation of the credit bureau in SU. To ensure that efforts are not duplicated and donor coordination is realized, the project team has been working closely with the IFC team to discuss potential areas for collaboration and partnership in the country. Coordination with IDB Initiatives. Through the Compete Caribbean Program, the IDB has undertaken several activities related to private sector development in Suriname. Amongst these are the Private Sector Assessment of Suriname and the Drum report on Access to Finance. This grant (SU-CC-2077) complements two other interventions; the Financial Sector Strengthening Policy based loan (last programmatic is to be approved in 2015), which started the dialogue and formulated the strategy for STR (the initial condition in the Financial Sector Loan called for a plan to be created for the establishment of the registry and the legal procedure needed. The Drum report on Improving Access to Finance for SMEs in Suriname, 2012, was undertaken as part of the plan), the new Competitiveness and Innovation program (SU L1043) in support of Government, which will consist of two policy based loans of $10 million each (to be approved in 2014 and 2016), one investment loan $5 million (to be approved in See Aide Memoire between the IDB and the Government of Suriname IDBDocs# ). This grant would take forward the work of the prior CC-SU2020 in supporting one of the key reforms for the CUS. This program will help to strengthen the financial sector in SU, improving access to credit and improved the overall business climate, while complementing the work of the other Policy Based loans in this area. This project will borrow from experiences in Honduras, which has similar civil law jurisdiction and also from more recent experiences in Jamaica in the implementation of a secured transaction registry. Coordination is also undertaken with colleagues from the IFC. III. Project Objectives and Description A. General Objectives The general objective is to improve the enabling environment for business development, trade, and integration. B. Specific Objectives The specific objective is to streamline the mechanisms for SME access to credit in Suriname. C. Expected Results The project will create the framework for a coherent financial system which facilitates the exchange of credit information among banks and other regulated financial institutions. It will enhance streamlining and transparency for businesses in accessing credit while providing business confidence by creating a secured transactions framework. The expected results from this project are: Project Outcomes: i. Secured Transactions legal framework established ii. Registry to improve SME access to credit through secured transactions operational Project Outputs: National Forum held to facilitate consultation on draft secured transaction legislation Draft Secured Transactions legislation submitted to National Assembly Action plan for the establishment of secured transactions registry completed Business plan for the operation of the registry completed Hardware, software and operating manuals for registry Personnel trained in use of registry Public awareness campaign to enlighten all stakeholders of the benefits and use of the registry Monday, February 02, /12

4 IV. Project Components Component Name 1: Support for Stakeholders Dialogue and Legal framework 2: Establishment of a Secured Transactions Registry 3: Public awareness campaign Description The goal of this component is to support the drafting, consultations and national dialogue on the key legislation related to the legal framework for secure transactions. This component will finance consultancy services to provide a Technical Expert who will (1) develop an action plan for the design and implementation of a movable assets registry, (2) include a business plan for the operation of the registry, (3) the design of the registry, including the development of its operating manuals, guides for end-users, other operation specific blue-prints hardware and software needs, Internet Service provider protocol, data centre services, IT maintenance, and office space requirements, and (4) develop the Request for Proposal for the most appropriate registry. This component will also finance: (1) the procurement of the registry with necessary software and limited hardware requirements to ensure the effective operation of the registry, and (2) training of the relevant personnel in the use of the electronic registry (both staff and end users). This component entails a public awareness campaign to build support in the use of the registry across the country. Monday, February 02, /12

5 V. Cost and Financing/Budget CC SU-MF Grand Total Cash Cash Kind 1 Support for Stakeholders Dialogue and Legal framework $80, $20, $0.00 $100, $80, $20, $0.00 $100, Establishment of a Secured Transactions Registry $300, $0.00 $0.00 $300, $300, $0.00 $0.00 $300, Public awareness campaign $0.00 $180, $0.00 $180, $0.00 $180, $0.00 $180, Final Evaluation Component $10, $0.00 $0.00 $10, $10, $0.00 $0.00 $10, Contingencies Component (2.56 %) $10, $10, $10, $10, Grand Total $400, $200, $0.00 $600, Monday, February 02, /12

6 VI. Executing Arrangements The project will be executed by the Bank through IFD/CTI through the CC-Program Coordination Unit (PCU) established in Country Office Barbados with the support of Country Office Suriname (CSU). Project implementation will be carried out in close coordination with the Central Bank of Suriname and the Competitiveness Unit of Suriname (CUS) under the Vice-Presidents Cabinet office on behalf of the Government of Suriname. The Bank and Government of Suriname will sign a Letter of Agreement defining respective roles and responsibilities for the implementation of the project including the fact that both parties must consult the other prior to contracting consultants to undertake project activities. The CUS will be the main counterpart agency on behalf of the Government and will designate a project coordinator to act as the manager within the Government. This person will be the technical counterpart and contact person for the project team on all matters relating to the implementation of the project. While the Bank is the executing agency, the Government is expected to play a very involved role in implementation, including drafting, reviewing and approving Terms of Reference for relevant project activities; reviewing, providing feedback and approving consultancy outputs; and as necessary, supervising consultants and firms hired to undertake specific project activities. The period of execution is 18 months and the disbursement period will be 24 months. Procurement under this project using Compete Caribbean resources will be done by the CC-PCU according to the policies and procedures of the Inter- American Development Bank. Procurement of goods and services for the project shall be in accordance with the Bank s policies for the Procurement of Works and Goods (GN ) and the Policies for the selection and Contracting of Consultants (GN ) of March Contracting using Government of Suriname resources will be based on national procurement policies and guidelines, as long as Suriname adopts procedures that are in compliance with concepts stated in section 1.5 of the Bank s Policy Document GN and section 1.8 of Policy Document GN On completion of the project, the government will have full responsibility of financing the recurrent expenses of the registry. Sustainability is also enhanced by the training provided under the project for the staff of the registry. The success of the pilot reform(s) implemented under the project will build stakeholder support for further reforms to be implemented after the project ends. VII. Monitoring and Evaluation A. Monitoring Description The monitoring of the project will be based on the implementation of the Results Framework attached to this Plan of Operations. B. Technical and Basic Responsibility IFD/CTI will have the financial and administrative responsibility, which could be delegated in part to CC/PCU. Technical responsibility for the project will be coordinated by Navita Anganu (CMF/CJA), designated team leader of the project. The procurement plan is annexed and should be updated as necessary and at least every 6 months during project execution. C. Evaluations/Progress and Final Report The Government of Suriname through Competitiveness Unit of Suriname will store and provide access to all necessary information and documentation required to conduct the monitoring and evaluation of the project. The Project Coordinator from the Competitiveness Unit of Suriname will prepare and submit project status reports to the Project Team Leader and the CC- PCU within 30 days of the completion of the first year of project execution (effective the date of Signing of the Letter of Agreement) and a project completion report within three months of final disbursement. The project completion report should include, but not be limited to: (a) information about budget performance and the contributions from local counterpart funds; (b) progress made in meeting project objectives during the previous six months, referencing the performance indicators, including gender equality indicators; (c) discussion of factors contributing to variances between expected and actual results; (d) any required risk mitigation or problem solving actions employed throughout the project; (e) sustainability considerations and lessons learned. A template for the report will be provided to the Project Coordinator at the start of the project. Through the project, Compete Caribbean will finance a final evaluation to be conducted three months after the end of project execution of when 95% of Compete Caribbean s contribution to the project has been disbursed. The Terms of Reference will be jointly developed by the Compete Caribbean M&E Specialist and the Project Team Leader in consultation with the Government of Suriname. The final evaluation will include a special impact survey that allows an estimate of progress, including the effect on access to finance by women as a result of the project. VIII. Benefits and Risks A. Benefits and Impact The main benefit is the overall enhancement of the business climate and improvement of private sector development. The project is expected to increase access to credit available for businesses particularly SMEs through the creation of the movable assets registry. It will result in a reduction in cost of registering collateral interests, enabling greater access to sources of finance thus increasing the entrepreneurial activities by increasing SME s access to credit. Ultimately it will lead to an improvement in the Doing Business Rankings, particularly those related to getting credit. B. Risks and Mitigation Measures The national elections currently scheduled for May 2015 could possibly derail the project. The Government however is keen to get the Bill through Parliament before the end of the year (2014). The successful implementation of this project is dependent on the passing of the Secured Transactions Bill expected to be presented to the National Assembly in August The government is very keen to pass this legislation as part of a slew of other business reform pieces to create an enabling Monday, February 02, /12

7 Assembly in August The government is very keen to pass this legislation as part of a slew of other business reform pieces to create an enabling business climate in Suriname. Limited stakeholder buy-in is also a potential risk, although judging by the overwhelming public support and stakeholder interest under the existing Compete Caribbean project, SU-CC2020, this risk is limited. A strategic, well planned and properly executed awareness campaign will help to mitigate the risk of low interest by stakeholders. The public awareness campaign will be undertaken by the CUS. IX. Recommendation ANGANU, JAIWATTIE, Team Leader of the current Project, recommends the approval of the operation and the use of CC resources up to $400, X. Approval Approved By: HENNESSEY, MICHAEL P. Executive Director. COMPETE CARIBBEAN Date of Approval: 7/18/2014 Monday, February 02, /12

8 Annexes Annex I - Description of Project Components and Activities Component Name 1: Support for Stakeholders Dialogue and Legal framework 1.A: Legal Framework for Secured Transactions 1.A.1: Expert consultant 1.B: National Forum 1.B.1: Consultation workshop 1.C: Study Trip for Key stakeholders 1.C.1: Travel Costs 2: Establishment of a Secured Transactions Registry 2.A: Development of a secured transactions registry specifications for Suriname 2.A.1: International Expert 2.B: Implementation of secured transactions (collateral) registry 2.B.1: Purchase, installation and training on collateral registry 3: Public awareness campaign 3.A: Communications Services 4: Final Evaluation Component 4.A: Final Evaluation 5: Contingencies Component (2.56 %) 5.A: Contingencies (2.56 %) Description The goal of this component is to support the drafting, consultations and national dialogue on the key legislation related to the legal framework for secure transactions. This will finance a consultant to review and draft the legal framework for secured transactions in Suriname, including any draft legislation Consulting fees and travel This will finance support to the CUS to facilitate dialogue with stakeholders through a National Forum, around the design and implementation of the secured transactions framework. The Forum will provide a venue to share international best practices and support the consultation process on the draft legislation for secure transactions. Workshop costs including venue and logistics This will finance travel for key members of the the CUS and other critical stakeholders for secured transactions to visit similar jurisdictions in which secured transactions has been sucessfully implemented. Travel and per diem for study tour participants This component will finance consultancy services to provide a Technical Expert who will (1) develop an action plan for the design and implementation of a movable assets registry, (2) include a business plan for the operation of the registry, (3) the design of the registry, including the development of its operating manuals, guides for end-users, other operation specific blue-prints hardware and software needs, Internet Service provider protocol, data centre services, IT maintenance, and office space requirements, and (4) develop the Request for Proposal for the most appropriate registry. This component will also finance: (1) the procurement of the registry with necessary software and limited hardware requirements to ensure the effective operation of the registry, and (2) training of the relevant personnel in the use of the electronic registry (both staff and end users). This activity will finance consultancy services design, plan, purchase and implement the Collateral Registry for Suriname. Consulting fees and travel for (i) on-site design, specs and project plan, (ii) off site application develpoment, (iii) on-site application development This activity will finance: (1) the procurement of the registry with necessary software and limited hardware requirements to ensure the effective operation of the registry, and (2) training the relevant personnel in the use of the electronic registry (both staff and end users). Consulting fee, travel and per diem, manuals, training, etc. This component entails a public awareness campaign to build support in the use of the registry across the country. This component will be financed by the counterpart and entails the costs of advertising, publications, dissemination of information, etc. Project Final Evaluation Project Final Evaluation Project Contingencies Project Contingencies Monday, February 02, /12

9 Project Detailed Budget CC SU-MF Grand Total Cash Cash Kind 1 Support for Stakeholders Dialogue and Legal framework $80, $20, $0.00 $100, $80, $20, $0.00 $100, A Legal Framework for Secured Transactions $20, $0.00 $0.00 $20, A.1 Expert consultant $20, $0.00 $0.00 $20, B National Forum $40, $20, $0.00 $60, B.1 Consultation workshop $40, $20, $0.00 $60, C Study Trip for Key stakeholders $20, $0.00 $0.00 $20, C.1 Travel Costs $20, $0.00 $0.00 $20, Establishment of a Secured Transactions Registry $300, $0.00 $0.00 $300, $300, $0.00 $0.00 $300, A Development of a secured transactions registry specifications for Suriname $100, $0.00 $0.00 $100, A.1 International Expert $100, $0.00 $0.00 $100, B Implementation of secured transactions (collateral) registry $200, $0.00 $0.00 $200, B.1 Purchase, installation and training on collateral registry $200, $0.00 $0.00 $200, Public awareness campaign $0.00 $180, $0.00 $180, $0.00 $180, $0.00 $180, A Communications Services $0.00 $180, $0.00 $180, $0.00 $180, $0.00 $180, Final Evaluation Component $10, $0.00 $0.00 $10, $10, $0.00 $0.00 $10, A Final Evaluation $10, $0.00 $0.00 $10, $10, $0.00 $0.00 $10, Contingencies Component (2.56 %) $10, $10, $10, $10, A Contingencies (2.56 %) $10, $10, $10, $10, Grand Total $400, $200, $0.00 $600, Monday, February 02, /12

10 Annex III - Results Framework General and Specific Objectives: The general objective is to improve the enabling environment for business development, trade, and integration. The specific objective is to streamline the mechanisms for SME access to credit in Suriname. Indicator Unit of Measure Baseline Goal Means of Verification Comments Impact - Enhanced competitiveness in Suriname Improvement in Financial market development ranking of the Global Competitiveness Index Ranking /Score (2014) (2017) World Economic Forum- Global Competitiveness Report It is not expected that the project will significantly affect the rankings until after the project is com-pleted.there are no goal values set as this is difficult to determine; however it is expected that the score and ranking will improve Improvement in the Ease of Doing Business Rankings Ranking (2014) (2017) World Bank Ease of Doing Business Report It is not expected that the project will significantly affect the rankings until after the project is com-pleted.there are no goal values set as this is difficult to determine; however it is expected that the score and ranking will improve Improvement in access to Credit Ease of Getting Credit Ranking (2017) World Bank Ease of Doing Business Report It is not expected that the project will significantly affect the rankings until after the project is com-pleted.there are no goal values set as this is difficult to determine; however it is expected that the score and ranking will improve Improved Access to credit Depth of credit information index score N/A (2017) World Bank Ease of Doing Business Report Economy Profile: Suriname Outcome 1 - Secured Transactions legal framework established Secured Transaction Bill Passed Legislation passed Gazette of Government of Suriname Outcome 2 - Registry to improve SME access to credit through secured transactions operational Centralized Electronic registry established Registry Government of Suriname URL verification. Verified by End of Project evalua-tions Registry is being used # institutional users/ # entries 5.00 (2016) Report of the Registry. Verified by end of project evaluation. Registry being used # entries (2015) Report of the Registry. Verified by end of project evaluation. gender disaggregated if possible Output Indicators 1 Support for Stakeholders Dialogue and Legal framework Draft legislation for Secured Transactions Document National Forum Event 2 Establishment of a Secured Transactions Registry Monday, February 02, /12

11 Technical specifications for Secured Transactions Registry Document Technical specifications for Secured Transactions Registry Hardware/software Action plan for implementation of the Registry Document Business Plan for operation of the Registry Dcoument Staff trained # persons 3 Public awareness campaign Public Awareness Campaign Campaign Monday, February 02, /12

12 Annex IV - Procurement Plan Activity Description Estimated Contract Cost Procurement Method CC Financing Prequalification Counterpart Financing Estimated Notice Month Estimated Completion Month Comments 1 Support for Stakeholders Dialogue and Legal framework Legal Framework for Secured Transactions $20, QCII % 0.00% No National Forum $60, DC 66.67% 33.33% No Study Trip for Key stakeholders $20, DC % 0.00% No through Letters of Agreement with the Bank 2 Establishment of a Secured Transactions Registry Development of a secured transactions registry specifications for Suriname $100, CQS % 0.00% No Implementation of secured transactions (collateral) registry $200, QBS % 0.00% No Annex V - Supporting Documentation Document Name Link Other: Supervision Plan: Gender Equality Strategy: Environmental Sustainability Strategy: - TOR Collateral Registry Service Provider ( ) Execution Plan ( ) Gender Equality Strategy ( ) _Environmental_Sustainability_Strategy ( ) Monday, February 02, /12

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

REGIONAL I. BACKGROUND

REGIONAL I. BACKGROUND Page 1 of 13 REGIONAL BROADBAND INFRASTRUCTURE INVENTORY AND PUBLIC AWARENESS IN THE CARIBBEAN (RG-T2212) TERMS OF REFERENCE I. BACKGROUND 1.1 Justification. There is ample literature, experiences and

More information

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) Hashemite Kingdom of Jordan Reporting Period: From 08/01/2016 to 01/31/2017 Report Date: 02/20/2016

More information

A Roadmap for SDG Implementation in Trinidad and Tobago. UNCT MAPS Mission Team 25 April 2017

A Roadmap for SDG Implementation in Trinidad and Tobago. UNCT MAPS Mission Team 25 April 2017 A Roadmap for SDG Implementation in Trinidad and Tobago UNCT MAPS Mission Team 25 April 2017 A ROADMAP TOWARDS SDG IMPLEMENTATION I. Alignment: The Rapid Integrated Assessment II. From planning to action:

More information

Myanmar Country Partnership Framework (CPF) Background Material

Myanmar Country Partnership Framework (CPF) Background Material Myanmar Country Partnership Framework (CPF) Background Material June 2014 The World Bank Group What is the World Bank Group? The World Bank is a vital source of financial and technical assistance to developing

More information

REGIONAL CONSULTANCY TO PREPARE PROJECT COMPLETION REPORT TERMS OF REFERENCE I. BACKGROUND

REGIONAL CONSULTANCY TO PREPARE PROJECT COMPLETION REPORT TERMS OF REFERENCE I. BACKGROUND REGIONAL COMPETE CARIBBEAN PROGRAM (RG-X1044) SUPPORT TO CLUSTERING INITIATIVES (SCI) ENTERPRISE INNOVATION CHALLENGE FUND CONSULTANCY TO PREPARE PROJECT COMPLETION REPORT GY-CC3002 CATCH AND RELEASE SPORT

More information

DOING BUSINESS in the g

DOING BUSINESS in the g DOING BUSINESS in the g7+ 2013 Smarter Regulations for Small and Medium-sized Enterprises Pierre Guislain Director, Investment Climate Department and co-lead, IFC s Fragile and Conflict Situations Program

More information

Agreed outcome pursuant to the Bali Action Plan

Agreed outcome pursuant to the Bali Action Plan Decision 1/CP.18 Agreed outcome pursuant to the Bali Action Plan The Conference of the Parties, Recalling decisions 1/CP.13 (Bali Action Plan), 1/CP.15, 1/CP.16 and 2/CP.17, Acknowledging the significant

More information

The World Bank Group, Solomon Islands Portfolio Overview

The World Bank Group, Solomon Islands Portfolio Overview The World Bank Group, Solomon Islands Portfolio Overview The World Bank Group works to assist the Government and people of Solomon Islands by supporting projects aimed at improving prospects for economic

More information

PL National Export Development Strategy

PL National Export Development Strategy PL01.01.06 National Export Development Strategy 1. Basic Information 1.1. Désirée Number: PL01.01.06 Twinning number: PL/IB/2001/EC/02 1.2. Title: National Export Development Strategy 1.3. Sector: Private

More information

Microfinance for Rural Piped Water Services in Kenya

Microfinance for Rural Piped Water Services in Kenya Policy Note No.1 Microfinance for Rural Piped Water Services in Kenya Using an Output-based Aid Approach for Leveraging and Increasing Sustainability by Meera Mehta and Kameel Virjee The water sector in

More information

SMALL BuSiNESS AdMiNiSTRATiON

SMALL BuSiNESS AdMiNiSTRATiON 2010 SMALL BuSiNESS AdMiNiSTRATiON Funding Highlights: Provides $28 billion in loan guarantees to expand credit availability for small businesses. Supports disaster recovery for homeowners, renters, and

More information

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks READINESS AND PREPARATORY SUPPORT PAGE 1 OF 14 ver. 19 August 2016 Readiness and Preparatory

More information

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC)

Terms of Reference. Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) Terms of Reference Consultancy to support the Institutional Strengthening of the Frontier Counties Development Council (FCDC) 1. Introduction August 2016 to August 2018 1. Supporting Kenya s devolution

More information

Key development issues and rationale for Bank involvement

Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB424 Project Name E-Lanka Development Region SOUTH ASIA Sector Information technology (70%);General industry and trade sector (30%) Project

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 25-May-2017 ISR27984 Implementing Agencies: National Bank

More information

ECONOMIC DEVELOPMENT PROGRAMS

ECONOMIC DEVELOPMENT PROGRAMS ECONOMIC DEVELOPMENT PROGRAMS K ENTUCKY CABINET FOR ECONOMIC DEVELOPMENT: (502) 564-7670 - The Cabinet is the primary state agency in Kentucky responsible for creating new jobs and new investment in the

More information

21 22 May 2014 United Nations Headquarters, New York

21 22 May 2014 United Nations Headquarters, New York Summary of the key messages of the High-Level Event of the General Assembly on the Contributions of North-South, South- South, Triangular Cooperation, and ICT for Development to the implementation of the

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Finance & Markets Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 06-Dec-2017 ISR30229 Implementing Agencies: National Bank

More information

Terms of Reference. 1. Introduction. 2. Background

Terms of Reference. 1. Introduction. 2. Background Terms of Reference Consultancy Services for the GEF project Strategic Platform to Promote Sustainable Energy Technology Innovation, Industrial Development and Entrepreneurship in Barbados 1. Introduction

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information

SMEs in developing countries with special emphasis on OIC Member States, and policy options to increase the competitiveness of SMES

SMEs in developing countries with special emphasis on OIC Member States, and policy options to increase the competitiveness of SMES The Standing Committee for Economic and Commercial Cooperation of the Organization of the Islamic Cooperation (COMCEC) October 10th, 2012 SMEs in developing countries with special emphasis on OIC Member

More information

ASEAN Strategic Action Plan for SME Development ( )

ASEAN Strategic Action Plan for SME Development ( ) 1. Introduction ASEAN Strategic Action Plan for SME Development ( 2015) At the 14 th ASEAN Summit, the AEC Council was tasked to develop an ASEAN Action Plan to enhance SMEs competitiveness and resilience.

More information

Public Policies to Promote SMEs Exports

Public Policies to Promote SMEs Exports Public Policies to Promote SMEs Exports Derrick Cummings, Ministry of Tourism and Trade of Guyana Intra-Regional Relations Workshop on Internationalization and Promotion of Caribbean SMEs Consortiums Santo

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor

More information

Transformation through Tourism: Harnessing Tourism for Growth and Improved Livelihoods

Transformation through Tourism: Harnessing Tourism for Growth and Improved Livelihoods Transformation through Tourism: Harnessing Tourism for Growth and Improved Livelihoods Africa has experienced unprecedented economic growth over the last five years. Africa is on the Move Africa is poised

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Business Incubator Initiatives in the Caribbean Region

Business Incubator Initiatives in the Caribbean Region Business Incubator Initiatives in the Caribbean Region By Roshan Seebaluck Team Leader Business Incubation Expert IBM /Integra November 26, 2007 Agenda 1 European Union SFA 2005 2 Technology Innovation

More information

Appendix A: Portfolio Review Methodology

Appendix A: Portfolio Review Methodology Appendix A: Portfolio Review Methodology The Independent Evaluation Group s (IEG) literature review and interviews with key staff knowledgeable on the World Bank Group s support to small and mediumsized

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name Leveraging

More information

ICT-enabled Business Incubation Program:

ICT-enabled Business Incubation Program: ICT-enabled Business Incubation Program: Strengthening Innovation at the Grassroots June 2009 infodev ICT-enabled Business Incubation Program 1 Program Summary Objective infodev s Innovation and Entrepreneurship

More information

Instructions for completing the CFC Application Form

Instructions for completing the CFC Application Form THE COMMON FUND FOR COMMODITIES 8 TH OPEN CALL FOR PROPOSALS Instructions for completing the CFC Application Form CFC does not charge any fees during the application procedure. However, on approval of

More information

The African Development Bank Group: A Partner of Choice. GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014

The African Development Bank Group: A Partner of Choice. GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014 The African Development Bank Group: A Partner of Choice GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014 1 AFRICAN AFRICAN DEVELOPMENT DEVELOPMENT BANK BANK GROUP GROUP PRIVATE SECTOR OPERATIONS

More information

Multilateral Development Banks

Multilateral Development Banks Multilateral Development Banks Working together for more effective development cooperation African Development Bank Asian Development Bank European Bank for Reconstruction and Development Inter-American

More information

Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Production of Concept Manual and Implementation of Public Awareness and Education Campaigns, Bartica, Guyana, Contract # 31/2017/Italian Government/CCCCC. Office of Climate Change (OCC) in the Ministry

More information

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017 TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR A) General Background Information 19 October 2017 Appendix 1 The United Nations Industrial Development Organization

More information

STRATEGY GUIDELINES OF BUSINESS & INVESTMENT DEVELOPMENT ( )

STRATEGY GUIDELINES OF BUSINESS & INVESTMENT DEVELOPMENT ( ) STRATEGY GUIDELINES OF BUSINESS & INVESTMENT DEVELOPMENT (2013-2020) 2020) Tirana, May 29, 2012 Current situation Vision, policies and policy s aim Policy objectives and products Costs and financial resources

More information

APEC Telecommunications and Information Working Group Strategic Action Plan PREAMBLE

APEC Telecommunications and Information Working Group Strategic Action Plan PREAMBLE PREAMBLE We stand at a unique point in history, when Information and Communications Technologies (ICTs) are transforming our economies, our societies, and our lives. These new technologies have connected

More information

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A THIRD GLOBAL CALL FOR PROPOSALS PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 TO PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A Voice from Ring One: Citizen Monitoring and Engagement for Transparency

More information

Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager

Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager I. ASSIGNMENT BACKGROUND 1. The Innovative Startups Fund Company (ISSF Company) aims to increase early stage equity

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information

INNOVATION POLICY FOR INCLUSIVE SUSTAINABLE DEVELOPMENT IN THE ARAB REGION

INNOVATION POLICY FOR INCLUSIVE SUSTAINABLE DEVELOPMENT IN THE ARAB REGION INNOVATION POLICY FOR INCLUSIVE SUSTAINABLE DEVELOPMENT IN THE ARAB REGION Economic And Social Commission For Western Asia Dr. Nibal Idlebi Chief Innovation Section Rationale (I) Arab countries are currently

More information

FREQUENTLY ASKED QUESTIONS FOR THE DIRECT ASSISTANCE GRANT SCHEME

FREQUENTLY ASKED QUESTIONS FOR THE DIRECT ASSISTANCE GRANT SCHEME FREQUENTLY ASKED QUESTIONS FOR THE DIRECT ASSISTANCE GRANT SCHEME Q1: How does one apply for funds under the Direct Assistance Scheme? A1: Applications are available from Caribbean Export s website at

More information

Indonesia SME Strategy

Indonesia SME Strategy Indonesia SME Strategy I WAYAN DIPTA Deputy Minister for Production and Marketing Ministry of Cooperatives and SMEs ILO/OECD Workshop for Policy Makers on Productivity and Working Conditions in SMEs Jakarta,

More information

Funding Programs Guide. Aquaculture Sector

Funding Programs Guide. Aquaculture Sector Funding Programs Guide Aquaculture Sector December 2017 A Commitment to Grow Aquaculture As part of The Way Forward, the Newfoundland Aquaculture Industry Association and the Government of Newfoundland

More information

DIRECT ASSISTANCE GRANT SCHEME APPLICATION PROCESS. Promoting Trade and Investment Globally

DIRECT ASSISTANCE GRANT SCHEME APPLICATION PROCESS. Promoting Trade and Investment Globally DIRECT ASSISTANCE GRANT SCHEME APPLICATION PROCESS Promoting Trade and Investment Globally KEY DATES AND POINTS TO NOTE Publication date- April 23, 2018 Deadline for applications- June 4, 2018 @ 4:30 p.m.

More information

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT United Nations Development Programme Country: Armenia PROJECT DOCUMENT Project Title: De-Risking and Scaling-up Investment in Energy Efficient Building Retrofits Brief Description The project objective

More information

SME DEVELOPMENT IN JORDAN

SME DEVELOPMENT IN JORDAN SME DEVELOPMENT IN JORDAN SME s Definition and Features All over the world, there is growing evidence that SME's play an important role in the national economic development of any country. SME's provide

More information

Economic and Social Council

Economic and Social Council United Nations E/CN.3/2016/12 Economic and Social Council Distr.: General 9 December 2015 Original: English Statistical Commission Forty-seventh session 8-11 March 2016 Item 3 (h) of the provisional agenda*

More information

Annex Template for the call for input

Annex Template for the call for input Submission by Asian Development Bank on Actions undertaken by accredited observer organizations relevant to the in performing its functions 30 July 2012 (TEC) at it third Session made a decision to call

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) 1. SUMMARY INFORMATION Implementing Country/Technical Partner: PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) South Africa. Reporting Period: From 1/10/2017 to 30/09/2018 Report Date: 4 October 2018 Implementing

More information

Somalia Growth, Enterprise, Employment & Livelihoods (GEEL) Project

Somalia Growth, Enterprise, Employment & Livelihoods (GEEL) Project Annual Program Statement (APS) Call for Applications to Participate in Economic Growth and Employment Partnerships Gums and Resins and Natural Products sector Growth, Enterprise, Employment & Livelihoods

More information

AFRICAN UNION UNION AFRICAINE

AFRICAN UNION UNION AFRICAINE AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA Specialized Technical Committee on Finance, Monetary Affairs, Economic Planning and Integration Experts Meeting 23-25 October 2017 Addis Ababa, Ethiopia Eco/STC/MAEPI/EXP/12

More information

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support READINESS AND PREPARATORY SUPPORT PAGE 1 OF 11 ver. 19 August 2016 Readiness and Preparatory Support Proposal

More information

(SME s) Access to Finance, Going Forward Strategy

(SME s) Access to Finance, Going Forward Strategy (SME s) Access to Finance, Going Forward Strategy Manal Farhan Ibrahim/Shkoukani Ministry of National Economy 23 rd March 2016 1 The Importance of MSMEs for the Economy MSMEs are a vital means to develop

More information

HIGHLIGHTS OF THE 60 DAY NATIONAL ACTION PLAN ON EASE OF DOING BUSINESS IN NIGERIA

HIGHLIGHTS OF THE 60 DAY NATIONAL ACTION PLAN ON EASE OF DOING BUSINESS IN NIGERIA HIGHLIGHTS OF THE 60 DAY NATIONAL ACTION PLAN ON EASE OF DOING BUSINESS IN NIGERIA BACKGROUND For many years, Nigeria has fared poorly in the global rankings for both ease of doing business and economic

More information

CITEL/RES. 79 (VII-18) 1 STRATEGIC PLAN OF CITEL FOR

CITEL/RES. 79 (VII-18) 1 STRATEGIC PLAN OF CITEL FOR CITEL/RES. 79 (VII-18) 1 STRATEGIC PLAN OF CITEL FOR 2018-2022 The Seventh Regular Meeting of the Assembly of the Inter-American Telecommunication Commission (CITEL), CONSIDERING: a) That, by means of

More information

Support for regional and local communities to prevent drug addiction on the local level - continuation

Support for regional and local communities to prevent drug addiction on the local level - continuation - continuation 1. Basic information 1.1. CRIS Number: 2006/018-180.05-04 Twinning No: PL/06/IB/JH/04/TL 1.2. Title: Support for regional and local communities to prevent drug addiction on the local level

More information

FEDERAL REPUBLIC OF NIGERIA

FEDERAL REPUBLIC OF NIGERIA Supplemental Letter No. 1 (Lagos Urban Transport Project) Section 9.02 of the General Conditions Financial and Economic Data In connection with the above Credit to the Republic of Nigeria for the Lagos

More information

Chapter The Importance of ICT in Development The Global IT Sector

Chapter The Importance of ICT in Development The Global IT Sector Chapter 2 IT Sector: Alternate Development Models 2.1. The Importance of ICT in Development The contribution of the Information and Communication Technology (ICT) sector to socioeconomic development is

More information

Fiduciary Arrangements for Grant Recipients

Fiduciary Arrangements for Grant Recipients Table of Contents 1. Introduction 2. Overview 3. Roles and Responsibilities 4. Selection of Principal Recipients and Minimum Requirements 5. Assessment of Principal Recipients 6. The Grant Agreement: Intended

More information

TERMS OF REFERENCE MICROFINANCE PROJECT MANAGER FULL TIME EXPERT MAY 2018 APRIL 2020

TERMS OF REFERENCE MICROFINANCE PROJECT MANAGER FULL TIME EXPERT MAY 2018 APRIL 2020 TERMS OF REFERENCE MICROFINANCE PROJECT MANAGER FULL TIME EXPERT MAY 2018 APRIL 2020 BACKGROUND Description of the Assignment Expertise France is the French public international cooperation agency. It

More information

CLUSTERS 10 and 11 Briefing to Working Party. 4 September 2017

CLUSTERS 10 and 11 Briefing to Working Party. 4 September 2017 CLUSTERS 10 and 11 Briefing to Working Party 4 September 2017 The two Clusters, 10 and 11, managed by the Division on Globalization & Development Strategies contribute to the achievement of Subprogramme

More information

AFRICA REGION TOURISM STRATEGY: Transformation through Tourism

AFRICA REGION TOURISM STRATEGY: Transformation through Tourism AFRICA REGION TOURISM STRATEGY: Transformation through Tourism Africa is on the move Africa is poised for a growth takeoff, much as India was 20 years ago and China was 30 years ago. Africa has experienced

More information

Terms of Reference. Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA)

Terms of Reference. Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA) Terms of Reference Consultancy for Third Party Monitor for the Aga Khan Development Network Health Action Plan for Afghanistan (HAPA) I. Purpose and Objectives of the Assignment Aga Khan Foundation Canada

More information

FINANCING FOR DEVELOPMENT Session 4

FINANCING FOR DEVELOPMENT Session 4 FINANCING FOR DEVELOPMENT Session 4 CASE OF ARMENIA Finance for SMEs and Attracting Investments in Sustainable Cities Mr. Armenak Darbinyan, Board Member, Central Bank of Armenia LOCAL AND INTERNATIONAL

More information

Implementing Economic Policy for Innovation and Entrepreneurship: The Mexican Case. Lorenza Martinez April, 2012

Implementing Economic Policy for Innovation and Entrepreneurship: The Mexican Case. Lorenza Martinez April, 2012 Implementing Economic Policy for Innovation and Entrepreneurship: The Mexican Case Lorenza Martinez April, 2012 1 Mexican economic development strategy based on fostering productivity 1 The projections

More information

Social Enterprise Sector Strategy Page 1

Social Enterprise Sector Strategy Page 1 Page 1 This strategy has been made possible by the significant efforts of social enterprise sector stakeholders from across the province, and senior government leaders from many provincial and federal

More information

Driving Innovation in MSME s

Driving Innovation in MSME s Driving Innovation in MSME s Ms. Deepali Shahane Lecturer, I.M.E.D. Bharati Vidyapeeth, Pune email: shahanedeepali@gmail.com Mr. Dhananjay Shahane Principal Designer, Aakruti consultants email: dshahane@aakruticonsultants.com

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 10 December 2001 E/CN.3/2002/19 Original: English Statistical Commission Thirty-third session 5-8 March 2002 Item 6 of the provisional agenda*

More information

The World Bank Group is comprised of five organizations:

The World Bank Group is comprised of five organizations: What is the World Bank Group? The World Bank Group (WBG) is the world s largest development institution, offering loans, grants, advice, and knowledge to help countries reduce poverty and promote shared

More information

TANZANIA FOREST FUND. Call of Project Proposals. Introduction:

TANZANIA FOREST FUND. Call of Project Proposals. Introduction: TANZANIA FOREST FUND Call of Project Proposals Introduction: Tanzania Forest Fund was established in 2002 under the Forest Act [Cap. 323 R.E. 2002] as a mechanism to provide long term, reliable and sustainable

More information

Incentive Guidelines Network Support Scheme (Assistance for collaboration)

Incentive Guidelines Network Support Scheme (Assistance for collaboration) Incentive Guidelines Network Support Scheme (Assistance for collaboration) Issue Date: 5th April 2011 Version: 1.4 Updated: 20 th March 2014 http://support.maltaenterprise.com Contents Incentive Guidelines

More information

GUIDELINES OF ENTREPRENEURSHIP FOR INDIAN YOUTH

GUIDELINES OF ENTREPRENEURSHIP FOR INDIAN YOUTH GUIDELINES OF ENTREPRENEURSHIP FOR INDIAN YOUTH OBJECTIVES There are approximately 100 million unemployed and underemployed young people aged 16 to 30 years in our country. At least 20% of these young

More information

ED 2259/18. 4 January 2018 Original: English. Common Fund for Commodities. 12 th Open Call for Proposals

ED 2259/18. 4 January 2018 Original: English. Common Fund for Commodities. 12 th Open Call for Proposals ED 2259/18 4 January 2018 Original: English E Common Fund for Commodities 12 th Open Call for Proposals 1. The Executive Director presents his compliments and, for the information of Members, attaches

More information

UNIDO and the strategies to invest in Myanmar

UNIDO and the strategies to invest in Myanmar UNIDO and the strategies to invest in Myanmar Gerardo Patacconi Director of the Agro-Business Development Department, UNIDO Vienna Michele Boario Chief Technical Advisor, UNIDO MSME development in Myanmar

More information

Financial Assistance to Business

Financial Assistance to Business Summary Introduction The Province offers a significant number of programs that provide direct financial assistance to businesses. Direct financial assistance can be provided by way of Government grants,

More information

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam

Developing Cross-Border Economic Zones between the People's Republic of China and Viet Nam Technical Assistance Report Project Number: 43077-01 Regional Policy and Advisory Technical Assistance (R-PATA) September 2009 Developing Cross-Border Economic Zones between the People's Republic of China

More information

British Council - Study Tour to the UK Terms of Reference

British Council - Study Tour to the UK Terms of Reference British Council - Study Tour to the UK Terms of Reference The British Council The British Council was founded to create a friendly knowledge and understanding between the people of the UK and the wider

More information

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME 2001-2002 EUROPEAN AGENCY FOR SAFETY AND HEALTH AT WORK EXECUTIVE SUMMARY IDOM Ingeniería y Consultoría S.A.

More information

COMMISSION OF THE EUROPEAN COMMUNITIES

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 8.10.2007 COM(2007) 379 final COMMUNICATION FROM THE COMMISSION TO THE COUNCIL, THE EUROPEAN PARLIAMENT, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND

More information

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT * * * * * 1. Short Title: Operational Guidelines for activities under State Initiatives for Micro & Small Enterprises

More information

SPECIFIC TERMS OF REFERENCE SUPPORT TO THE IMPLEMENTATION OF THE ACTIONS PROPOSED BY THE PUBLIC PRIVATE PARTNERSHIP SURINAME BUSINESS FORUM PROJECT

SPECIFIC TERMS OF REFERENCE SUPPORT TO THE IMPLEMENTATION OF THE ACTIONS PROPOSED BY THE PUBLIC PRIVATE PARTNERSHIP SURINAME BUSINESS FORUM PROJECT SPECIFIC TERMS OF REFERENCE SUPPORT TO THE IMPLEMENTATION OF THE ACTIONS PROPOSED BY THE PUBLIC PRIVATE PARTNERSHIP SURINAME BUSINESS FORUM PROJECT FWC BENEFICIARIES 2009 LOT 10 : Trade Standards and Private

More information

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Republic of Indonesia: Water Supply and Sanitation Sector Development Project Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed

More information

10 th Anniversary African Union Private Sector Forum. Draft Concept Note

10 th Anniversary African Union Private Sector Forum. Draft Concept Note 10 th Anniversary African Union Private Sector Forum Draft Concept Note 10 th African Union Private Sector Forum 9-11May 2018 Cairo, Egypt Theme: Made in Africa towards realizing Africa's economic Transformation

More information

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA European Union/Council of Europe Programmatic Cooperation Framework (PCF) for Armenia, Azerbaijan, Georgia, Moldova, Ukraine

More information

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE Office of Climate Change Guyana September, 2017 TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE ENERGY AUDIT OF PUBLIC INSTITUTIONS, FACILITIES AND STREET LIGHTING

More information

AID-FOR-TRADE CASE STORY

AID-FOR-TRADE CASE STORY AID-FOR-TRADE CASE STORY CANADA PROGRAM FOR BUILDING AFRICAN CAPACITY FOR TRADE Co-sponsored by the Government of Canada, Trade Facilitation Office Canada (TFOC), and International Trade Centre (ITC),

More information

DEVELOPMENT COMMITTEE

DEVELOPMENT COMMITTEE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DEVELOPMENT COMMITTEE (Joint Ministerial Committee of the Boards of Governors of the

More information

Unlocking the potential

Unlocking the potential Opportunity for All Promoting Growth Jobs and Inclusiveness in the Arab World Marrakesh January 29-0, 208 # Opportunity4MENA Unlocking the potential of people in MENA 70% 5% think governments are not doing

More information

Terms of Reference for end of project evaluation

Terms of Reference for end of project evaluation Terms of Reference for end of project evaluation Young Entrepreneurs Program in the Eastern Caribbean (YEPEC), 2012 2015 Youth Business International (YBI) seeks the services of a skilled evaluation consultant

More information

THE WORLD BANK EXPERIENCE ON RESEARCH & INNOVATION IN THE WESTERN BALKANS

THE WORLD BANK EXPERIENCE ON RESEARCH & INNOVATION IN THE WESTERN BALKANS THE WORLD BANK EXPERIENCE ON RESEARCH & INNOVATION IN THE WESTERN BALKANS Paulo Correa Practice Manager Financial Instruments Supporting Innovation Workshop March 1 st - 2 nd, 2017, Belgrade, Serbia TABLE

More information

The spirit of Trinidad and Tobago s Connectivity Agenda is captured in the following values:

The spirit of Trinidad and Tobago s Connectivity Agenda is captured in the following values: EXECUTIVE SUMMARY Trinidad and Tobago s National Information and Communication Technology (ICT) Strategy is a comprehensive plan that leverages the power of people, innovation, education, information technology

More information

Northern California Community Loan Fund

Northern California Community Loan Fund Northern California Community Loan Fund REAL ESTATE READINESS FOR NONPROFIT ORGANIZATIONS (Where financial managers meet real estate developers) Presenters: Andrea Papanastassiou Stephaney Kipple Real

More information

Local Business Council Initiation Seminar. 28 November 2014

Local Business Council Initiation Seminar. 28 November 2014 Local Business Council Initiation Seminar 28 November 2014 Content Introduction Alignment of Council with other initiatives Bapo ba Mogale Investments Strategy Proposed Bapo Business Council Strategy Tools

More information

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia Introduction Ethiopia is the second most populous country in Africa after Nigeria with over 85 million

More information

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria

THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria THE GLOBAL FUND to Fight AIDS, Tuberculosis and Malaria Guidelines for Performance-Based Funding Table of Contents 1. Introduction 2. Overview 3. The Grant Agreement: Intended Program Results and Budget

More information

P4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC

P4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC Public Disclosure Authorized The World Bank DOCUMENT OF THE WORLD BANK REPORT NO.: RES29928 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING

More information