BID TABULATION FORM 10:00 a.m. December 21, 2017 Summer 2018 REPLACEMENT OF ROOFING AT VARIOUS SITES FOR PLAINFIELD COMMUNITY CONSOLIDATED SCHOOL DISTRICT NO. 202 PLAINFIELD, WILL COUNTY, ILLINOIS NAME OF BIDDER BID BOND CERT. Adde n #1 Adde n #2 BASE BID #1 PACKAGE Creekside BASE BID #2 PACKAGE Lakewood Falls BASE BID #3 PACKAGE Plainfield Central High School - Freshmen Center BASE BID #4 PACKAGE Administrative Center Exterior wall repair ALT #1 PACKAGE Plainfield Central High School - Freshman Center New curb & flashing @ HVAC Replacement of broken drain flashing collar Replacement of drain head, including plumbing connection Replacement of damaged or rotted 2"X10" wood nailers UNIT PRICES Replacement of wet or Replacement of damaged 2" wet or damaged polyisocyanurate 1/2" wood fiber insulation cover board Replacement of wet or damaged 2.5" polyisocyanurate insulation Replacement of OSB on steep slope roof area A-1 Roofing Co. 1425 Chase Avenue Elk Grove Village, IL Aaron's Construction NO BID $/drain collar $/drain $/board ft. $/sq ft. $/sq ft. $/sq ft. $/sq ft. Adler Roofing and Sheet Metal 779 Joyce Street Joliet, Illinois 60436 All American Exteriors Solutions NO BID $648,070.00* $82,050.00 $531,575.00 NB $3,840.00 $300.00 $2,200.00 $8.00 $3.20 $2.20 $5.00 $11.00 $683,400.00 NB NB NB NB $350.00 $3,000.00 $6.00 $4.00 $2.50 $5.00 $6.00 Bennett & Brosseau 1316 Marquette Drive Romeoville, Illinois 60446 Crowther Roofing & Sheet Metal 18958 Airport Road Joliet, Illinois 60441 DCG Roofing Solutions, Inc. 1285 Rand Road Des Plaines, Illinois 60016 NB $92,250.00 $606,150.00 NB $4,100.00 $100.00 $3,000.00 $8.00 $4.65 $3.00 $5.00 $12.00 Elens & Maichin Roofing & Sheet Metal 1621 Manhatten Road Joliet, Illinois 60432 $653,620.00 $81,320.00* $522,750.00* $87,480.00 $4,860.00 $200.00 $2,500.00 $4.25 $5.50 $3.50 $6.00 $7.50 F&G Roofing Company 4234 West 124th Place Alsip, Illinois 60803 $936,500.00 $115,800.00 $767,900.00 $62,600.00* $4,000.00 $400.00 $2,500.00 $11.00 $3.00 $2.00 $3.50 $7.50 Filotto Roofing 2111 Oakland Avenue Crest Hill, IL 60403 Knickerbocker 16851 Lathrop Avenue Harvey, Illinois 60426 $692,000.00 $117,000.00 $581,000.00 NB $3,900.00 $250.00 $1,800.00 $8.00 $3.00 $2.50 $3.50 $7.00 L. Marshall Roofing 2100 Lehigh Rd. Glenview, Illinois 60025 $732,365.00 $134,000.00 $630,000.00 NB $6,500.00 $250.00 $2,000.00 $9.00 $3.00 $3.00 $4.00 $8.00 Riddiford Roofing 2333 Hamilton Rd. Arlington Heights, Illinois 60005 NB $108,370.00 $516,956.00 $65,000.00 $6,000.00 $250.00 $2,400.00 $8.00 $6.00 $3.00 $6.00 NB R.B. Crowther Co. NO BID NO BID NO BID NO BID Weatherguard Roofing NO BID
PLAINFIELD COMMUNITY CONSOLIDATED SCHOOL DISTRICT NO. 202 Plainfield, Illinois December 2017 Invitation to Bid - Summer 2018 REPLACEMENT OF ROOFING Plainfield Community Consolidated School District No. 202 is receiving bids for Summer of 2018 REPLACEMENT OF ROOFING. Bids are due Thursday, December 21, 2017 at 10:00 a.m. at which time they will be publicly opened and read aloud. A mandatory pre-bid meeting for the purpose of obtaining pertinent information in regards to the Summer of 2018 REPACEMENT OF ROOFING is required. The mandatory pre-bid meeting will be held on Wednesday, December 13, 2017 at 9:00 a.m. at the District Operations Facility at 14812 S. Eastern Avenue, Plainfield, Illinois 60544. Bids are to be submitted to: Plainfield Community Consolidated School District No. 202 Attention: Paul Gonzalez 14812 S. Eastern Avenue, Plainfield, Illinois 60544 Bids must be clearly marked: REPLACEMENT OF ROOFING. The bid opening will take place in the offices of the Plainfield Community Consolidated School District 202 Richard Eldred Operations Facility, at 14812 S. Eastern Avenue, Plainfield, Illinois 60544, at the time stated above. The Board of Education reserves the right to reject any and all bids, to accept bids in whole or in part and/or to waive any irregularities or defects in the proposal, when, in its opinion, such action will serve the best interests of the Board of Education of School District No. 202. Attached are the following: 1. Instructions and Conditions 2. Specifications 3. Certifications 4. Contractor References 5. Bid Form 1665728.3
ADDENDUM #2 REROOFING WORK This addendum shall be considered as part of the bidding documents, as applicable, and shall govern insofar as it changes, deletes from or adds to the original Bidding Documents, as applicable. The Bidding Documents, as applicable, shall be modified to incorporate the following changes and clarifications: Central High School Freshman Center: A. Insulation Layers: 1) The written Spec 07552 (Pg 6) and the new construction illustration shown on drawing RP-4 are inconsistent. The following scope summarizes the correct specified replacement construction configuration (bottom to top): a. Structural metal deck b. 2.5 iso in Low-rise Foam (reuse existing) c. 2.5 iso in Low-rise Foam (new) d. 1 wfb in Low-rise Foam (new) e. 2-Type VI base plies in hot asphalt f. 1-SBS smooth MB in Hot-melt adhesive g. Flood and gravel in hot asphalt Note: The existing ½ wood fiber is removed as part of the tear-off. Approved: December 19, 2017 By: Paul D. Gonzalez, Director of Facilities