FERNAN DEL OESTE EDIANEL #394 Col. R. Torralba Street Brgy.Apas Cebu City Contact Number: 32 417 2066, 0595227945 f_edianel@yahoo.com EDUCATIONAL ATTAINMENT COLLEGE: SECONDARY: PRIMARY: Bachelor of Science in Mechanical Engineering Cebu Institutes of Technology- University N. Bacalso Avenue, Cebu City Philippines 1997-2002 Camp Lapu-lapu National High School Brgy. Apas Cebu City, Philippines 1992-1997 M.H.Del Pilar Elementary School Pontevedra Negros Occedental, Philippines 1986-1992 PERSONAL DATA Gender : Male Date of Birth : August 10, 1980 Place of Birth : Cebu City Religion : Roman Catholic Civil Status : Single Height : 5 4 Weight : 140 lbs OTHER SKILLS Computer Literate (MS Windows, MS Excel and Power Point) Mechanical Aptitude and Driving Basic Auto CAD Basic Primavera 6
WORKING EXPERIENCE 1. Company : Faisal Electro Mechanical Co. Ltd. (FEMCO) Address : Dammam City Saudi Arabia Date : December 17, 2014 to up Present Position : Mechanical Engineer (Field Mechanical Engineer) Project : PC for Sea Water Pump Station : Royal Commission Project Jubail, Saudi Arabia PROJECT DESCRIPTION Procurement and Construction of a Seawater Cooling Pump Station that includes dredged channel and Intake, pump station with screening facilities, potable/fire water pump station, Hypochlorite Generation Building, Staff/control Building, Switchgear Building, Guard House, SEC Building and Workshop Building, Work also includes site work, roads and support infrastructure GENERAL DESCRIPTION OF JOB FUNCTION Under the direction of Mechanical Superintendent is to assist for the Implementing of Activities, Documentation, Programs and Evaluation of Project. DUTIES AND RESPONSIBILITIES 1. Ensure equipment and materials are delivered to job sites in timely and cost effective manner. 2. Review & Preparation of Technical Submittal for all Mechanical related materials to be used at site. 3. Coordinate & reports to Mechanical Superintendent, 4. Materials take off on all mechanical equipment s as per approved mechanical drawings. 5. Coordinates / deals directly with the Site Mechanical Personnel to identify deficiencies. 6. Verifies methods for testing, instrument calibration and evaluation for performing designated inspection and testing. 7. Ensures that the Mechanical documents / records (drawings, reports, submittals etc.) are kept in order and made readily accessible. 8. Maintains communication with the Mechanical personnel and consultant in order to ensure adequate process capability and information feedback. Ensures that work is carried out and executed as per drawings, specification and materials submittal sheets approved. 9. Establishes liaison with the Consultant s Representative on quality related matters and makes available, upon request, copies of documentation and tests performed.
10. Reports any work disagreement with the immediate superior and ensures that all materials and equipment s installed on site or fabricated off-site conforms to the contract specification. 11. Assist QC Mechanical to reviews test procedures, coordinates and agree with the Consultant on test date. 12. Ensure that the newly revised documents carry the latest revision number, date, status and that all superseded documents are kept separately for the future references. 13. Ensures that as-built information is recorded daily on the Mechanical Department copy of the drawings. 14. Initiates with the subcontractor, in coordination with Mechanical Superintendent and Consultant, the commissioning of equipment s and system. 15. Ensure that installation matches the approved drawings 16. Directly involved in the installation of all site works like potable water distribution, sanitary wastewater collection system, and storm water collection system using RTR pipes, upvc, FRP, and CS. 17. Attends Projects hand-over to Client representative and prepares reports and discuss pending issues to Mechanical Superintendent. 18. Prepare Method Statement prior for the installation of equipment. 2. Company : Al-Yamama Company Address : Dammam City Saudi Arabia Date : February 14, 2012 to May 31, 2014 Position : Mechanical Engineer (Maintenance Department) GENERAL DESCRIPTION OF JOB FUNCTION Under the direction of Maintenance Manager is to assist for the Implementing of Preventive Maintenance Activities, Documentation, Programs and Evaluation of Maintenance Works and Efficiency. RESPONSIBILITIES Responding immediately to equipment/machines breakdowns Assist Contractor in Performing Preventive Maintenance (Elevator, Fire Alarm and Fighting System and Sky Man Machine ) Organizing routine servicing schedules Order parts and maintain required documents. Assists in Monitoring the Maintenance staff in performing their job accurately and effectively. Assist in the Implementing and maintaining effectively the Preventive Maintenance activities, planning and programs. Recording of maintenance daily and Weekly activities/reports To monitor the good condition of all equipment/ machines Ensure the implementation of 5S activities and safety management policy in the working area.
OTHER TASK Perform Maintenance Supervisor Activities once the Maintenance Supervisor is absent. Report to the Maintenance Manager for any damaged of Equipment. Monitor the performance of the maintenance staff. Perform other task as required by Maintenance Manager. Such as Troubleshooting/Dismantle/ Assemble /Repair: a. Chiller b. Air Handling Unit and Air Condition c. Compressors, Pump and Motor d. Diagnose and Analyze system troubles for HVAC e. Troubleshooting,Preventive Maintenance Servicing of equipment f. Start-up & Commissioning g. Oversee installation, repair& maintenance 3. Company : Cenapro Chemical Corporation. Address : Position 1. Fluidized Oven Operator (February 1, 2005 - December 2005) 2. Rotary Kiln Operator (December 2005- April 2006) 3. Crusher Operator (April 2006- July 2006) 4. Quality Management Team (Maintenance Department) (July 2006- December 31, 2011) GENERAL DESCRIPTION OF JOB FUNCTION Under the direction of Assistant Plant Manager, Maintenance Manager and Quality Management Representative is to assist for planning and implementing Preventive Maintenance Activities and Programs and Evaluation of Maintenance Works and Efficiency. RESPONSIBILITIES Ensure to follow strictly the company rules and regulation. Ensure that Maintenance Department complies with the requirement of ISO 9001-2000 Assists in monitoring the maintenance staff in performing their job accurately and effectively. Assist in the implementing and maintaining effectively the Preventive Maintenance activities, planning and programs. Recording of maintenance activities. Ensure the implementation of 5S activities and safety management policy in the working area.
AUTHORITIES Authorized to evaluate work performance of maintenance staff. Authorized to report to QMR if the MaM did not comply with the ISO 9001-2000 standard. Authorize to check all document of the Maintenance Department. Authorized to conduct internal Quality Audit Authorized to assign tasks to all maintenance personnel OTHER TASK Operate Boiler and Softener if required Perform Maintenance Manager Activities once the Maintenance Manager is absent. Report to the PM or APM for any damaged of Equipment. Monitor the performance of the maintenance staff. Check and record daily kerosene and power consumption daily. Perform other task as required by Maintenance Manager. Such as Troubleshooting/Dismantle/ Assemble /Repair: 1. Blowers 2. Compressors 3. Pumps 4. Rotary Valve 5. Rotary Sifter 6. Roll Mill 7. Motors 8. Bucket Elevator 9. Screw Feeders and Conveyors 10. Rotary Valve RECOGNITION, SEMINARS AND TRAININGS ATTENDED Sept 28 Oct 4, 2009 : Basic Safety Training : Personal Survival Techniques : Fire Prevention and Fire Fighting : Elementary First Aid : Personal Safety and Social Responsibility University of Cebu Maritime Education Training Center Alumnos, Mambaling, Cebu City November 30, 2008 : Vigilance and Alertness March 18, 2008 : Fire Prevention and Safety Consciousness September 07, 2007 : 5S Seminar/Workshop & installation CENAPRO Chemical Corpora ration
May 22-23, 2007 : Integrated Productivity (THRU ISTIV) Course for Supervisor & Manager March 02, 2007 : Energy Saving in Pneumatic Systems SMC Corporation Rajah Park Hotel, Fuente Osmena, Cebu City August 11, 2006 : Softener-Boiler-Cooling Water System Moly and MTG Marketing Industrial Corporation August 11, 2006 : Water Treatment Chemicals Moly Marketing Industrial Corporation March 01, 2001 : Basic Air Conditioning and It s Technological Breakthrough Daikin-Alen Air Conditioning Incorporated REFERENCE 1. Jaypee Mirandilla Vega Executive Assistant to the University Rector At Prince Mohammad bin Fahd University Khobar Saudi Arabia Tel No. 8499255 2. Mr. Norman Cruz. Mechanical Superintendent Faisal Electro-Mechanical Co, LTD PC for Sea Water Pump Station Royal Commission Jubail Phone No. +966 53-844-6424