Scheme Evidence Update Chief Witness. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Similar documents
Response to Objector s Evidence: Mr Henry Church of CBRE and Mr Andrew Johnson of Marshalls plc (CPO Reference Plot 8/5)

THE SOCIAL CARE WALES (SPECIFICATION OF SOCIAL CARE WORKERS) (REGISTRATION) (AMENDMENT) REGULATIONS 2018

M4 Corridor around Newport Public Information Exhibitions Report

EIA CONSULTANT REGISTRATION SCHEME. EIA Consultation Workshop On Criteria & Training Curriculum 24 th May 2011

EXPOSURE DRAFT PROPOSED CHANGES TO THE AICPA STANDARDS FOR PERFORMING AND REPORTING ON PEER REVIEWS

EIA/VER-2/2008 EIA Consultant Registration Scheme Guidance Document

Agree to the submission of the LHS and the action plan to the Scottish Government in September 2017,

TOWN CENTRE REGENERATION EXECUTIVE COMMITTEE. 4 October Report by Corporate Transformation and Services Director 1 PURPOSE AND SUMMARY

Responses Due: Friday, August 14, 2015, 11 a.m.

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

ANEURIN BEVAN HEALTH BOARD CLINICAL FUTURES STRATEGY AND SPECIALIST CRITICAL CARE CENTRE: BRIEFING

Greater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital

The Welsh NHS Confederation s response to the inquiry into cross-border health arrangements between England and Wales.

Oregon John A. Kitzhaber, M.D., Governor

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY:

Data, analysis and evidence

LEADER Programme: How to complete an outline application form

Explanatory Memorandum to the Domiciliary Care Agencies (Wales) (Amendments) Regulations 2013

CCRTA MEETING 25 JANUARY 2018

CLIMATE CHANGE IMPACTS, ADAPTATION AND MITIGATION PROGRAMME IN TANZANIA SECOND CALL FOR CONCEPT NOTES ON

Office of Climate Change Guyana September, TRANSITIONING TO NATIONAL ENERGY SECURITY: Bartica as a Model Green Town TERMS OF REFERENCE

National Productivity Investment Fund for the Local Road Network Application Form

PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015

CCIG(17)02 - Draft Minutes

Contract Award Recommendation for NCL Direct Access Diagnostics Service Tim Deeprose/Leo Minnion

Hinkley Point C Experiences of the NSIP Regime. Andrew Goodchild MA BSc(hons) MRTPI Assistant Director Energy Infrastructure

Standards expected of a Registrant on the Life Science Industry Credentialing Register

BOROUGH OF POOLE COUNCIL. 15 December 2015

Transport NI York Street Interchange APPENDIX A PROJECT BRIEF

CARDIFF HEAT NETWORK: APPROVAL OF THE OUTLINE BUSINESS CASE FOR THE CARDIFF HEAT NETWORK

abcdefghijklmnopqrstu

The Caribbean s Outlook: Findings from the Worldwide Views on Climate & Energy

Revision of DoD Design Criteria Standard: Noise Limits (MIL-STD-1474) Award Winner: ARL Team

GOVERNING BODY REPORT

Part 150 Advisory Circular Update

A Monmouthshire that works for everyone MONMOUTHSHIRE MANIFESTO 2017

National Productivity Investment Fund for the Local Road Network Application Form

Funding for local transport: an overview

Manitoba Hydro is a coordinating member of the Midcontinent Independent System Operator (Midcontinent ISO or MISO).

NHS Governance Clinical Governance General Medical Council

IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

Open House Round 2. State Rail Plan. A Collaborative Vision for Transportation

Goals, Objectives and Recommendations

7 th May Paper Title Natural Resource Management - Partnership Project Funding Paper Reference: NRW B B 29.15

Implementing the Mental Health (Wales) Measure 2010

a guide to re-evaluation

Highways Asset Management Plan

WELSH AMBULANCE SERVICES NHS TRUST

Application for Registration Information Sheet

CT Scanner Replacement Nevill Hall Hospital Abergavenny. Business Justification

Transposition of Aviation Directive. Aviation in EU ETS Workshop 30 June 2009

DOD INSTRUCTION THE READINESS AND ENVIRONMENTAL PROTECTION INTEGRATION (REPI) PROGRAM AND ENCROACHMENT MANAGEMENT

IMHW-PWE 16 Aug 2016

Version 5 24 th August City Deal and Growth Deal Programme Board. Business Case Approval Form

FLORIDA KEYS ACSC. MOU Assumptions and variables

DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8

2014 to 2020 European Structural and Investment Funds Growth Programme. Call for Proposals European Social Fund. Priority Axis 2 : Skills for Growth

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

BACKGROUND INFORMATION

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Performance Evaluation Report Gwynedd Council Social Services

1.0 EXECUTIVE SUMMARY

Guide for Funding and Financing Energy Efficiency Projects in Nova Scotia s Not-For- Profit Organizations

The following tables define the impact and likelihood scoring options and the resulting score: - Risk score. Category

Edithvale and Bonbeach Level Crossing removal project. Report of Business Impact Assessment

EMS / Operations Battalion Chief Announcement

IDEA II PROJECT A WALK-THROUGH

Personal Budgets and Direct Payments

Overview of REDD Project Cycle Richard McNally Pro Poor REDD Project Launch Pro Poor REDD, Dalat 12/01/2010

1 - PROJECT DETAILS 1.1 PROMOTER S INFORMATION. Title and full name of main contact: Position: Investment and Economic Initiatives Manager

A Maternity Network for Wales

BOARD OF DIRECTORS. Sue Watkinson Chief Operating Officer

HOUSE BILL 44 PRIMARY CARE RATE INCREASE AND ADDITIONAL PROVISIONS:

INVESTIGATION UNDER SECTION 17 OF THE WELSH LANGUAGE ACT Betsi Cadwaladr University Local Health Board

Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended

Climate Challenge Fund Content and images for websites, newsletters and social media

Site Safety Plus. Site Management Safety Training Scheme Refresher (SMSTS-R) Course appendix H

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

Explanatory Memorandum to the Mental Health (Secondary Mental Health Services) (Wales) Order 2012

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

ADULT MENTAL HEALTH NHS MANAGEMENT ARRANGEMENTS. To approve. This paper supports the standards

Adult and Community Services Overview Committee

Trust Board Meeting : Wednesday 11 March 2015 TB

EUROPEAN STRUCTURAL INVESTMENT FUNDS (ESIF) ESF SEaMLESS Programme

1 st Call for Bridge Proof of Concept proposals

2012 No. (W. ) MENTAL HEALTH, WALES

WMCA Board. Date 8 December Report title Midland Metro Wednesbury to Brierley Hill Extension - Submission of Transport and Works Act Order

(Committee Chair) Chair) Interim Board Secretary (MHSA/16/25 onwards) Head of CAMHS and Childrens Learning Disability (MHSA/16/24 only)

CARDIFF CAPITAL REGION JOINT CABINET JOINT CABINET MEETING 15 JANUARY 2018

Seafish Wales Advisory Committee meeting

HOW VIDEO GAME COMPANIES CAN GET THE MOST OUT OF RESEARCH AND DEVELOPMENT TAX INCENTIVES (R&DTI)

Explanatory Memorandum to the Safeguarding Vulnerable Groups Act 2006 (Prescribed Period and Appropriate Officer) (Wales) Regulations 2010

SHERIFF S COMMANDER. 1. Plans, implements, coordinates and directs team, program, unit, division or station law enforcement operations.

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TABLETOP HURRICANE-PREPAREDNESS EXERCISE March 30, John Kelly Ronda Scales Linda Ware Linda Even Debra Dowd

Summary note of the meeting on 9 November 2017

UNIVERSITY OF YORK. Senate RESEARCH COMMITTEE. Minutes of the meeting held on 15 June 2016

TIM S FARM AND FORESTRY REQUEST FOR LETTERS OF INTEREST US 421 INTERCHANGE AND ACCESS ROAD

Chairman of Environment Committee. Summary

Eventual Capacity. Eastern Expansion Area Primary School 2

Transcription:

Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Chief Witness document WG 1.1.1. It contains a scheme evidence update following the recent Department for Transport announcement that tolls on the Severn Crossings will be removed by the 31 st December 2018. Scheme Evidence Update Matthew Jones BEng (Hons), CEng, MICE Welsh Government, Chief Witness Document Reference: WG 1.1.7 December 2017 Page 1

Author 3 Scope and Purpose of this Proof of evidence 4 3 SCHEME EVIDENCE UPDATE 5 3.1 Severn Crossing Tolls 5 3.2 Value for Money 5 4 Conclusions 7 December 2017 Page 2

AUTHOR 1.1 I am Matthew Richard Jones. Since 2013 I have been responsible for managing strategic consideration of a solution to the problems associated with the M4 around Newport and subsequently managing the preparation and publication of the draft Orders, the Environmental Statement and associated reporting for the M4 Corridor around Newport project. My professional qualifications are set out in my main Proof of Evidence and are not repeated here. 1.2 The evidence, which I have prepared and provided in this Scheme Evidence Update, has been prepared and is given in accordance with the guidance of my professional institution and I confirm that the opinions expressed are my true and professional opinions. December 2017 Page 3

SCOPE AND PURPOSE OF THIS PROOF OF EVIDENCE 2.1 This Scheme Evidence Update provides updated evidence for the Welsh Government s Scheme regarding the impact of the removal of the Severn Crossing tolls. 2.2 The following sections of my main evidence are updated by this evidence: Matthew Jones Proof of Evidence (WG 1.1.1) Sections 8.18 and 8.19 Matthew Jones Summary Proof of Evidence (WG 1.1.2) Section 17 2.3 Aspects of my evidence interface with the evidence of other witnesses including: a) Mr Stephen Bussell (Economics) b) Mr Ben Sibert (Engineering) c) Mr Bryan Whittaker (Traffic) d) Dr Michael Bull (Air Quality) e) Mr Phillip Evans (Noise and Vibration) f) Mr Jon Davies (Ecology and Nature Conservation) g) Mr Tim Chapman (Carbon) 2.4 My evidence is presented in the following structure, with a detailed contents provided at the start of the document. 1. Author 2. Scope and Purpose of this Proof of Evidence 3. Scheme Evidence Update 4. Conclusions December 2017 Page 4

3 SCHEME EVIDENCE UPDATE 3.1 Severn Crossing Tolls 3.1.1 The final outcome and government response to the Severn crossing tolls consultation was released on 15 th September 2017. The outcomes were that the Severn crossings will be given over to public control on 8 th January 2018 and the tolls will be abolished on 31 st December 2018 1. 3.1.2 The traffic forecasting for the Scheme, which was published in December 2016 Revised Traffic Forecasting Report (WG 2.4.13), explains that the M4CaN transport model assumes, under the core scenario, a half toll scenario. Due to the recent announcement regarding the removal of the Severn crossing it is now proposed that the core scenario in the transport model is a no toll scenario. 3.1.3 Mr Bryan Whittaker, Mr Ben Sibert, Mr Tim Chapman, Dr Michael Bull, Mr Phillip Evans, and Mr Jon Davies will provide an update on any changes to the traffic forecast, engineering proposals, carbon, air quality, noise and ecological aspects which result from the announcement that the tolls will be removed before the proposed scheme opening date in their respective Scheme Evidence Updates. 3.1.4 The Scheme Evidence Updates are supported by the information contained within the October 2017 Environmental Statement Supplement (No. 6). 3.2 Value for Money 3.2.1 Mr Stephen Bussell has previously provided a sensitivity analysis for the removal of the Severn crossing tolls in his June 2017 Scheme Evidence Update (WG 1.3.5). The Initial BCR (direct transport benefits which exclude the Wider Impacts) for the Scheme and the Adjusted BCR (when Wider Impacts are included) for the half toll and no toll scenarios are provided in Table 1 below. 1 Refer to Public Inquiry Document (PID) 141 December 2017 Page 5

Table 1: Half toll and No toll BCR summary Benefit Half toll No toll scenario scenario Direct Transport Economic Benefits (Initial 1.66 1.87 BCR) Direct and Wider Economic Benefits (Adjusted BCR) 2.27 2.52 3.2.2 The economic appraisal demonstrates that the benefits of the Scheme with a no toll scenario would substantially outweigh its costs and therefore the Scheme represents value for money. 3.2.3 Mr Stephen Bussell also discusses the implications for the economy if the Severn crossing tolls were reduced in combination with improving the M4 around Newport, in PIQ029 (refer to paragraphs 2.13 to 2.15). December 2017 Page 6

4 CONCLUSIONS 4.1 Overall, the recent announcement that the Severn crossing tolls will be abolished on 31 st December 2018 does not change the conclusions stated within my main Proof of Evidence (WG 1.1.1). However, with the removal of the Severn crossing tolls and the proposed change to the core scenario, the economic and traffic case for the Scheme is strengthened. 4.2 The October 2017 Environmental Statement Supplement (No.6) discusses the effects associated with the change in predicted traffic flows, due to removal of the Severn crossing tolls, in terms of air quality, noise, carbon and ecology. These effects are also discussed in the Scheme Evidence Updates of the respective Welsh Government witnesses. In summary, the changes in effects, when compared to the assessments contained within the previous Environmental Statement Supplements, are considered to be insignificant. 4.3 The Welsh Government is in continued discussions with ABP with regards to mitigation measures at Newport Docks. The scope of mitigation measures may have implications on economic or other evidence which will be updated in due course, if necessary. December 2017 Page 7