Distributed Multi-Nodal ATFM Operational Trial

Similar documents
Asia Key Economic and Financial Indicators 13-Sep-16

ASEAN Economic Community. Brunei Darussalam Cambodia Indonesia Lao PDR Malaysia Myanmar Philippines Singapore Thailand Viet Nam

Asia Key Economic and Financial Indicators 16-May-17

Modelling and Simulating Airport Surface Operations with Gate Conflicts

CLMV Project Supporting Equitable Economic Development in ASEAN

CURRENT SITUATION AND EMERGING TRENDS OF ICT DEVELOPMENT TOWARD NORTHEAST ASIAN ECONOMIC INTEGRATION

Progress Report in 2016

ASEAN Single Window Pilot Project : Electronic Phytosanitary Certificate

ASEAN PATENT EXAMINATION CO-OPERATION OPERATION (ASPEC)

Outputs of the ASEAN ESC Model Cities Programme

Framework and main outputs of the ESC Model Cities Programme in ASEAN

Good practices on Single Window Regional Integration Experience of ASEAN countries

OPTIMUM/12/2016 CORPORATE RATE PROGRAMME O PTIMUM. BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES. by langham

Engaging with the Internet Society An update on activities in the Asia-Pacific

IVD/MD Asian Working Group Emerging Market Research Report No.2

JICA Technical Cooperation Project: Activities and outcomes. Satoshi Iemoto

3. OBJECTIVES AND PRIORITIES:

ACHIEVING SDG AND INCLUSIVE DEVELOPMENT IN ASIA AND THE PACIFIC

Mr. Sena Peiris, Chairman, APRSCP Queen s Park Hotel 7 November 2013, 1 st 10 YFP Asia Pacific Regional Meeting, Bangkok Thailand

Operational Instruction

Updates on ASEAN SITS. Regional Seminar on International Trade Statistics 2-7 November 2014

( ) Page: 1/19 TECHNICAL COOPERATION ACTIVITIES: INFORMATION FROM MEMBERS JAPAN

Progress on ASEAN Citation Index (ACI) Database

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Regional Brief: ICP for Asia and the Pacific

Regional perspectives in ICT measurement

Guidelines for Completing the Grant Application Form

UNCLASSIFIED//FOR OFFICIAL USE ONLY

Scholarship Grant for Foreign Students. <YKK Leaders 21> Scholarship Guide. Contents. [1] Profile of Yoshida Scholarship Foundation

COBRA WINGED HORSE ORDER OF BATTLE. US Army Units Deployed Withdrawn Notes. Abbreviations: Inf = Infantry Bde = Brigade

Directions for Tourism Bureau, MOTC Incentives for the. Promotion of Foreign Incentive Tours to Taiwan

CWE Flow-based Market Coupling Project

UKTI DSO Military Support. Commander Tim Green Royal Navy Senior Military Adviser (Policy & Plans)

Phase 1: Project Orientation and Analysis

OVERVIEW: ICT CONNECTIVITY AND ASIA PACIFIC INFORMATION SUPERHIGHWAY (AP-IS)

Regional Update ASEAN PPWG

Overview of the ASEAN ESC Model Cities Programme Year 1 (2011/12)

Engaging with the Internet Society An update on activities in the Asia-Pacific

Waiting Times Report Strategic. Thematic Goals

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

Mainstreaming Low Carbon Path in the Transport Sector in the National and Local Levels

Missile Defense Agency SBIR/STTR Program

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

WASTEWATER MANAGEMENT AND SANITATION IN SOUTH-EAST ASIA

Summary of Country Reports Current Status of 12 FNCA Member States

ITU-D Regional Development Forum for the Asia Pacific Region. An overview of ITU-D Sector: Asia-Pacific Regional Initiatives and Activities

NSL LINCOLNSHIRE HEALTHWATCH PRESENTATION Ambulance NHS Trust Provision of Non- Emergency Patient Transport

National Response to (SARS): Canada. Presentation to WHO Global Meeting June 17, 2003 Paul R Gully Health Canada

Regional knowledge and cooperation initiatives for improved disaster risk reduction in Asia and the Pacific

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

ASIA PACIFIC INFORMATION SUPERHIGHWAY (AP-IS) Atsuko Okuda Chief, ICT and Development Section ICT and Disaster Risk Reduction Division ESCAP

UNCLASSIFIED ASEAN AIR FORCES

SUMMARY REPORT OF THE 17 th ACCSQ MDPWG MEETING

OPEN GOVERNMENT DATA TO MONITOR SDGS PROGRESS

Agenda Item 7 CX/ASIA 12/18/9

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO

National Trends Winter 2016

2018 NSC Field School

Asia-Pacific Telecommunity and its activities in 2018

CWE Flow-based Market Coupling Project. at EMART Energy 2012

Workshop of APEC Nearly /Net Zero Energy Building Roadmap responding to COP21

The New Funding Model

KINAC/INSA activities and views Nov. 29, 2016 Sung Soon Jang

Regional Update ASEAN PPWG

Agenda Item 3a. Capacity-building and technical assistance activities implemented

FORM 2-SITUATION UPDATE

Overview of the Workshop Objectives, Expected Outcomes and Impacts Mr. Hongpeng Liu, Chief, Energy Security & Water Resources Section Environment and

SEAMEO Regional Initiative on SEA-TVET Programme toward Harmonisation and Internationalisation

CORPORATE RATE PROGRAMME BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES

Progress in implementation of prevalence surveys in the 21 global focus countries: an overview of achievements, challenges and next steps

Chapter 2. Access to Support Services. March 2014

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

Workshop with SE Asian research agencies Goals and objectives

Noise Complaints and Information Service Statistics Report Sydney Airport June 2012

Stability Operations. Information Brief 28 November 2007

Webinar Control Panel

MET CALLS IN A METROPOLITAN PRIVATE HOSPITAL: A CROSS SECTIONAL STUDY

Concept Paper. I. Background

International Civil Aviation Organization. MID Region ATM Enhancement Programme Board MID IP NETWORK (COMMON AERONAUTICAL VPN NETWORK-CRV)

Change Management at Orbost Regional Health

Thailand as a Gateway to ASEAN

SSEAC Workshop Grant 2018 Sample Proposal form

Group Professionals Concept. Robbin Brugman MD Group Professionals Concept

ASEAN Open Innovation and Entrepreneurship Platform: Three Programs

During the 4 Years: December, December, 1994 * TOTAL INDUSTRY JOBS LOST (30,800) -1.9%

Towards a Regional Strategy and Action Plan for Forest and Landscape Restoration (FLR) in the Asia-Pacific

SEAMEO Initiatives: Promoting TVET Harmonisation and Internationalisation in Southeast Asia

ASEAN Strategic Action Plan for SME Development ( )

CWE FB MC project. PENTA SG1, April 8 th 2013, Brussels

2007 Daegu Initiative

Oregon Community Development Block Grant Program 2018 Annual Action Development September 22, 2017

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

Needs assessment survey to 10 ASEANSAI SAIs members on April 2012 have done on 12 April 2012

Consulting Opportunity to Support In-Country Capacity Building Workshops on Declaration of Origin under AANZFTA [AANZ-0077-ROO-12]

Track II Network of Asean Defence and Security institutions (NADI) Workshop on Aviation Security, 9 to 11 February 2012

Mark Stagen Founder/CEO Emerald Health Services

How to bridge the standardization gap

Strategic KPI Report Performance to December 2017

Military Service Awards. United Daughters of the Confederacy Summer Mini Workshop

Transcription:

Distributed Multi-Nodal ATFM Operational Trial 5 th May 2017

Distributed Multi-Nodal ATFM - Basic Concept The Needs for Cross-Border ATFM in APAC Domestic ATFM Cross-Border ATFM? Regional Central ATFM Unit? 3

Distributed Multi-Nodal ATFM - Basic Concept Distributed Multi-Nodal ATFM Network Bases: Common ATFM principles and guidance with harmonized protocols supported by agreed Common Operating Procedures (COP) Effective information sharing and dissemination framework Concept: Independent virtual ATFM nodes supported by interconnected information sharing framework Supplement: A-CDM Process 5

Distributed Multi-Nodal ATFM - Basic Concept Flight Operations Centre (FOC) ATS Units Pilot Flow Management Position (FMP) Flow Management Position (FMP) ATFM Information ATS Units MET Info A-CDM Airport Operator ARRIVAL ATFM NODE DEPARTURE ATFM NODE 6

Operational Trial Project Overview Phased Approach to the Operational Trial Phase 1 2015-2016 Ground Delay Program supporting Airport Congestions Phase 2 2017 - TBD Ground Delay Program supporting Airspace Congestion Interconnectivity among ATFM systems Phase X Vision Fully interconnected Global ATFM Service Integration with SWIM and 4D-Trajectory Management 7

Operational Trial Project Overview Tiered Participation Model Level 3 ATFM Nodes Generate, Distribute, Comply to CTOT China, Hong Kong China, Singapore, Thailand Level 2 ATFM Nodes Receive and Comply to CTOT Cambodia, Indonesia, Malaysia Level 1 ATFM Nodes Observers Lao PDR, Myanmar, Philippines, Viet Nam Advisory ATFM Node Australia 8

Phase 1: Concept and Overview Phase 1 Overview Stage Plan Phase 1 2015-2016 Ground Delay Program supporting Airport Congestions 10

Phase 1: Concept and Overview Phase 1 Overview Stage Plan Phase 1 DCB for Constrained Airports Stage 1 Stage 2 Stage 3 Communication Linkage and Protocols Dissemination of Information Demand Prediction Validation Local Table-Top Exercises Cross-Border ATFM Procedures Development and Validation (through demo flights) Phase 2 DCB for Constrained Airspace TBD Limited-Scope Operational Service 11

Phase 1 Stage 3: Limited-Scope Ops Service Operational Concept and Objective Key Objective: Effectiveness of ATFM in Live Situations To test ATFM Service under real environment; and To implement cross-border ATFM focusing on airport constraints progressively, ensuring readiness of stakeholders ATFM System Infrastructure and Internal Procedures (Readiness Checklist) Communication Infrastructure and Demand Prediction Capability (Stage 1 work) Associated Documents and Stakeholder Awareness (COP, AIP Supplement / AIC, Awareness Campaign) Harmonized and Validated ATFM Processes (Stage 2 work) 16

Phase 1 Stage 3: Limited-Scope Ops Service Stage 3 Activities in 2016 Aug Sep Oct Nov - Dec Singapore s National Day Royal Thai Air Force Air Show Five Power Defence Arrangement Exercise Northeast Monsoon Season Planned Events Semi-Ad Hoc Events 17

Phase 1 Stage 3: Limited-Scope Ops Service Singapore National Day Parade 2016 (WSSS) Event Detail Closure of WSSS for NDP 16 aerial flypast between 1035 1105 UTC 16, 23, 30 July and 9 August 2016 ATFM Measure Implemented GDP / CTOT for flights destination WSSS between 0930 1230 UTC on all dates Aug Sep Oct Nov - Dec Singapore s National Day Royal Thai Air Force Air Show Five Power Defence Arrangement Exercise Northeast Monsoon Season 18

Phase 1 Stage 3: Limited-Scope Ops Service Singapore National Day Parade 2016 (WSSS) CTOT Compliance Result Average CTOT compliance = 70% Program Result Average airborne delay reduction 6 minutes Shorter time required for recovery Aug Sep Oct Nov - Dec Singapore s National Day Royal Thai Air Force Air Show Five Power Defence Arrangement Exercise Northeast Monsoon Season 19

Phase 1 Stage 3: Limited-Scope Ops Service Stage 3 Activities in 2017 Jan Mar Multi-Nodal/13 Apr Thailand s Children Day Air Display VTBS Runway 19L Maintenance Bangkok, Thailand Continuation of Implementation Semi-Ad Hoc Events Ad-Hoc Implementation 26

Phase 1 Stage 3: Limited-Scope Ops Service Summary of Contributions in Phase 1 Validated cross-border ATFM procedure for airport constraints Demonstration of ATFM programs in live operations Increasing readiness level of stakeholders, with some able to support ad-hoc ATFM measures Incorporation of Multi-Nodal concept into ICAO Doc 9971 (3 rd edition, in print) Representation in CANSO Best Practice Guide on ATFM Implementation (in development) 30

Phase 1 - Forward to Implementation Forward Plan Level 3 ATFM Nodes moving toward Operationally-Ready ATFM Service Singapore: 1 Apr 2017 Thailand: 1 Apr 2017 Combined ATFM measure deployed as needed Strengthened Post-Ops Analysis Framework Increased involvement of Level 2 ATFM Nodes Analysis process closer to actual operations time Strengthened Tiered Participation Model Parallel development of Phase 2 31

Phase 1 - Forward Plan to Implementation Post-Ops Analysis Framework (1/5) Objective: To harmonize Post-Ops Analysis for GDP/CTOT programs Possibility: inclusion in Regional Framework document Focus: 2-sided Post-Ops Analysis Departure ANSP GDP Impact Departure Compliance Departure Situation Feedback on Process Arrival ANSP GDP Impact Departure and Arrival Compliance GDP Effectiveness 24 Mar 2017 Multi-Nodal/13 32

Phase 1 - Forward Plan to Implementation Post-Ops Analysis Framework (2/5) Proposed KPI: Arrival ANSP GDP Impact Data ATFM Delay Statistics Total, Average, Maximum Flight Breakdown By type (Int l vs Dom) By ADEP, airlines By project participation Data Source ATFM System, FPL ATFM System 24 Mar 2017 Multi-Nodal/13 33

Phase 1 - Forward Plan to Implementation Post-Ops Analysis Framework (3/5) Proposed KPI: Arrival ANSP Compliance Data CTOT Compliance Statistics Compliance ratio Distribution of diff(atot, CTOT) CTO / CLDT Compliance Statistics Compliance ratio Distribution of diff(ato/aldt, CTO/CLDT) Compliance Breakdown By type (Int l vs Dom) By ADEP, airlines By project participation 24 Mar 2017 Multi-Nodal/13 Data Source ATFM System, DEP Messages ATFM System, DEP Messages ATFM System, DEP Messages 34

Phase 1 - Forward Plan to Implementation Post-Ops Analysis Framework (4/5) Proposed KPI: Arrival ANSP GDP Effectiveness Data Delay Attribution Overall system (ground + airborne) delay Ratio ground delay : airborne delay Difference in delay between compliant and non-compliant flights Operational Effectiveness Expected flow vs achieved flow Data Source ATFM System ARR Messages / Radar track 24 Mar 2017 Multi-Nodal/13 35

Phase 1 - Forward Plan to Implementation Post-Ops Analysis Framework (5/5) Proposed KPI: Departure ANSP Departure Compliance Data CTOT Compliance Statistics Compliance ratio Departure Time Distribution Statistics on diff(atot, CTOT) Distribution of diff(atot, CTOT) Compliance Breakdown By airlines Commentary on departure facilitation Feedback on process and information distribution Data Source ATFM System, DEP Messages ATFM System, DEP Messages ATFM System, DEP Messages 24 Mar 2017 Multi-Nodal/13 36

Project Phase 1 Participation - Forward to Implementation Multi-Nodal ATFM Network Tiered Participation 24 Mar 2017 Multi-Nodal/13 37

Phase 1 - Forward to Implementation Current Participation Rate 35-50% Target : 70% Building the Momentum to further enhance Multi-Nodal ATFM in Phase 1 Level 2 ANSPs 16 Airports Level 3 ANSPs 16 Airports Total Airports in the Multi-Nodal ATFM Network 32 39

Phase 2: Concept and Overview Beyond Phase 1 of the Operational Trial Phase 1 2015-2016 Distributed Ground Delay Program Airport Arrival Constraints (short-term & medium-term) e.g. weather, runway outage Phase 2 Ground Delay Program supporting Airspace Congestion & Capacity Planning Explore interconnectivity among ATFM systems Phase X Vision Fully interconnected Global ATFM Service Integration with SWIM and 4D-Trajectory Management 40

Phase 2: Concept and Overview Phase 2 Key Objective Key Objective: Distributed ATFM Programs to Support Airspace Constraints To develop ATFM procedure for constrained airspace To validate the procedure and pave way for implementation ATFM System Infrastructure and Internal Procedures Local procedure to support ATFM programs ATFM System-to-System Information Sharing Associated Documents and Stakeholder Awareness (COP, AIP Supplement / AIC, Awareness Campaign) Harmonized and Validated ATFM Processes 41

Part 7 Phase 2: Concept and Overview Initial Activities Jan Feb Mar Multi-Nodal /13 Thailand s Children Day Air Display Cobra Gold 2017 Joint Military Exercise Cope Tiger 2017 Joint Military Exercise Bangkok, Thailand Planned Events Activity Review 42

Phase 2: Concept and Overview Cope Tiger 2017 Joint Military Exercise (BKK FIR) Event Detail Annual large-scale joint military exercise taking up part of BKK FIR; congestion increase on alternate routings 20 31 March 2017 ATFM Measure Planned GDP / CTOT for flights destination VTBS, VTBD via TL, RAMEI, PAKRI Jan Feb Mar Multi-Nodal /13 Thailand s Children Day Air Display Cobra Gold 2017 Joint Military Exercise Cope Tiger 2017 Joint Military Exercise Bangkok, Thailand 45

Phase 2: Concept and Overview Cope Tiger 2017 Joint Military Exercise (BKK FIR) CTOT Compliance Result High compliance ratio, 90+% Program Result Smoothened inbound traffic into BKK TMA Reduced congestion around route converging waypoints Jan Feb Mar Multi-Nodal /13 Thailand s Children Day Air Display Cobra Gold 2017 Joint Military Exercise Cope Tiger 2017 Joint Military Exercise Bangkok, Thailand 46

Phase 2: Concept and Overview Phase 2 Key Items Airspace (dynamic) Capacity Assessment GDP/CTOT for Airspace Constraints Multi-Constraints ATFM Measure(s) ATFM System Information Linkage 48

Phase 2: Concept and Overview Phase 2 Stage Plan Phase 1 Continued Implementation Phase 2 DCB for Airspace Constraints Stage 1 Stage 2 Stage 3 Airspace Capacity Assessment Demand Monitoring and Prediction Demand and Flight Trajectory Accuracy Assessment Single-Constraint DCB Combined ATFM Measures ATFM System-to-System Information Linkage Stakeholder Engagement Multi-Constraint DCB (Layered ATFM Measures) 49

Technical Subgroup Allow information sharing Achieve certain degree of synchronization between ATFM Systems Harmonizing data format and infrastructure (possibly FIXM & SWIM Technology) For effective ATFM Operation TSG s objective Need for information sharing between ATFM Systems TSG established to achieve ATFM to ATFM systems interconnection Progress of TSG - Identified Basic Ops Use Cases - Identified Requires Data Fields - Mapped Data Fields to Existing Standards, ie FIXM Next Steps - Testing of sharing of CTOTs information between two ATFM system - Drafting of ICD 50

Q uestions & D i s cuss ions