ACTION ITEMS PERSON RESPONSIBLE DEADLINE

Similar documents
Presenta(on Overview. 1. What is Regional Flood Management Planning & Why do it Now?

CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review

Planning Modernization & WRRDA Implementation

Sabine Pass to Galveston Bay, Texas

PHOENIX LAKE IRWM PROJECT UPDATE Ross Town Council Meeting

REVIEW PLAN ORESTIMBA CREEK, CALIFORNIA FLOOD RISK MANAGEMENT FEASIBILITY STUDY SACRAMENTO DISTRICT

REVIEW PLAN MALIBU CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY MALIBU, CALIFORNIA LOS ANGELES DISTRICT

Regulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS

REQUEST FOR PROPOSALS FOR THE PROVISION OF DAM BREAK ANALYSES AND INUNDATION MAPPING SERVICES FOR SOUTH FEATHER WATER AND POWER AGENCY S

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

DELTA LTMS MULTIPLE TECHNICAL WORK GROUP MEETING. Department of Water Resources th Street, Room 435 Sacramento, CA MEETING MINUTES

New Orleans Hurricane and Storm Damage Risk Reduction System Update

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG

City of Dixon Emergency Operations Plan Flood and Tsunami Annex

BUTTE COUNTY DEPARTMENT OF WATER AND RESOURCE CONSERVATION REQUEST FOR PROPOSALS TO

New Draft Section 408 Policy Document EC

REVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study

CITY OF LAREDO Environmental Services Department

Leading Louisiana Baton Rouge G.I.S.

Project Management Plan (PMP) Park Ranger Community of Practice

Civil Works Process Overview

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Proposal for the Tulare/Kern Funding Area

Planning Bulletin : SMART Planning in the Reconnaissance Phase

Update on Climate Adaptation for Sierra Nevada, a CA LCC project:

6/9/2015. Jon Lebo, Ande Flower

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Attachment 1: Authorization and Eligibility Requirements

King County Flood Control District 2017 Work Program

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

Reclamation District 404 Boggs Tract. Emergency Operations Plan (California Water Code Section 9650)

PEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT

2004 Partners Forum. Agenda

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Innovative Solutions for Water and the Environment

Innovative Solutions for Water and the Environment

San Joaquin County Flood Control Zone 9 Emergency Operations Plan- Basic Plan

Santa Clara Valley Urban Runoff Pollution Prevention Program

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

Regional Participants Committee (RPC) Meeting No. 2 May 26, 2010; 1:30 pm to 3:45 pm Amador County Administration Building, Jackson California

DELTA LTMS MULTIPLE TECHNICAL WORK GROUPS MEETING. Department of Water Resources* th Street, Room 335 Sacramento, CA MEETING NOTES

Prosperity for Butte County

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

Master Environmental Servicing Plan & Secondary Plan

Deep Draft Navigation Planning Center of Expertise

Chicago District Industry Day

FOR INFORMATIONAL PURPOSES ONLY DO NOT SUBMIT

REQUEST FOR PROPOSAL

WELCOME. Lake Lanier Association Annual Membership Meeting Port Royale Marina March 19, 2016

Proposal Preparation and Evaluation Process

Performance Work Statement A History of Engineer Operations in World War I

Using Aircraft-based Radar for Monitoring Critical Water Infrastructure

LTC Joseph Davis District Contracting Chief Albuquerque District December 10, 2014

Department of the Army U.S. Army Corps of Engineers Washington, DC

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

3.1 Local Government Participation

Minutes. 1. Additions or Deletions from the Agenda Presenter: President Cehrs. 2. Public Presentations or Comments Presenter: President Cehrs

Marshes Mitigation Banking Pilot. CM Services Informational Session 10:00 AM 12:00 PM July 10, 2015

City of Jersey Village

TRCA Administrative Fee Schedule for ENVIRONMENTAL ASSESSMENT and INFRASTRUCTURE PERMITTING SERVICES February 1, 2018

6 Governance and Stakeholder Involvement

PLANNING COMMISSION REGULAR MEETING JULY 5, :00 P.M. Town Board Chambers 301 Walnut Street, Windsor, CO AGENDA

GROWING GREEN INFRASTRUCTURE IN DETROIT THROUGH A GI KNOWLEDGEBASE. Lesley Rivera

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

2:00 p.m. on Monday, August 11, 2014

Program Assessment and Work plan

David Kluesner, Public Affairs Specialist Alice Yeh, Project Manager, Lower Passaic River Restoration Project Eric Stern

Innovative Solutions for Water and the Environment

Appendix G Peer Review Plan

VISAKHAPATNAM PORT TRUST VISAKHAPATNAM PORT TRUST. TENDER DOCUMENT AMENDMENT (One) SUBJECT :

Comprehensive Plan Amendment Process

OREGON EMERGENCY MANAGEMENT ASSOCIATION

Final Alameda LAFCo Annual Work Plan, FY

SONOMA COUNTY FIRE CHIEFS ASSOCIATION & SONOMA COUNTY VOLUNTEER FIRE COMPANIES ASSOCIATION & Widow and Orphans Fund Special Meeting

SOUTH CHEQUEST CREEK WATERSHED

Transcribed by Kaitlin Meese

Otter Tail County Limited Area Star Lake Comprehensive Plan PMT Meeting #1

Overview and Status of MRF Recycling Study Phase 2. October 16, 2013

Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)

Reclamation District 1608 Lincoln Village West. Emergency Operations Plan (California Water Code Section 9650)

ATTORNEY GENERAL Environmental Protection Division. An Inventory of Its Twin Cities Army Ammunition Plant Files

Board of Directors Meeting Minutes

Business Accelerator Operator Request for Proposals. Release Date: March 14, 2017

SCOPE OF WORK/WORK PLAN

MEMORANDUM. July 7, 2016

Coachella Valley Integrated Regional Water Management Program, Disadvantaged Community (DAC) Outreach Demonstration Project

SAN JOSE CAPITAL OF SILICON VALLEY

University of North Texas Libraries

City of Huntsville Michelle Gilliam Jordan, AICP Planning Director Scott Erwin Planner II Ashley Nichols Planner III

Committee Members Present: Commers, Chavez, Elkins, Letofsky, Munt, Wulff

READINESS & HOMELAND SECURITY STREAMER SUBMITTAL

REVIEW OF DECISION DOCUMENTS

Wabash River Corridor Enhancement Project History

Preparing for your Community Rating System (CRS) Verification Visit

Managing Range Condition Assessments: The Army s Operational Range Qualitative Assessment Program

BASINGSTOKE AND NORTH HAMPSHIRE HOSPITALS NHS FOUNDATION TRUST

Lower Mississippi Valley Joint Venture. Progress Assessment of Communications Plan. Year 1

U.S. Army Corps of Engineers Disaster Response Missions, Roles & Readiness

2018 Annual Conference. Still Flooding After All These Years

Panel Decision & Report. SRP MAPC Plymouth County, MA

Transcription:

LSJR PDT Meeting RECORDED MINUTES FEBRUARY 17, 2011 9:00 AM-10:30 AM USACE, SACRAMENTO ROOM 950 MEETING CALLED BY TYPE OF MEETING FACILITATOR NOTE TAKER ATTENDEES Corps / SJAFCA / DWR / SJCFCWCD Minutes: PDT Meeting M. Williams M. Williams Roger Churchwell, Juan Neira, Marlo Duncan, Robert Scarborough, MaryAnn, John Maguire, Sameer Sharideh, Steve, David Peterson, Stacy Samuelson, Art Ceballos, Casey, Wayne, Gary Bedker, John Jordan, Mike, Doug Edwards, Bryan Guevin IMPORTANT UPCOMING DATES / SCHEDULE February 17 Management Meeting (Cost Share, PM WIK) March 17 Project Delivery Team Meeting HYDROLOGY HOLSTROM / PETERSON 1) Delay in A-E Ford schedule New Hogan now mid-april 2) Per 26 January management meeting must use NOAA Atlas 14 for F3 report, delay to schedule currently insignificant expecting report NLT end of February SJAFCA / PBI Update: Establish memorandum of procedures for meshing of hydrology Add R&U component to scope and schedule for hydrology HYDRAULICS LIN / PETERSON 1) Working to establish downstream boundary conditions for tributaries and mainstem. Sub work includes incorporating levee breach parameters into HEC-RAS. Research logic for establishing levee breach parameters, found engineering concept based on minimal energy / critical depth, will likely use this approach for LSJRFS. Historical data is available will post on FTP site. May need to add activity to the schedule to update tide stage frequency curve for LSJR mainstem to establish downstream boundary conditions SJAFCA / PBI Update: 1) Drafting WIK scope for calibrating trib models Post historical data for levee breach parameters on FTP Site Evaluate seperability of area #2 from French camp & LSJR Corps work should include revision to hydraulic models for LSJR mainstem (trib French Camp to mainstem) need confirm that this work is in the schedule Add develop levee breach assumptions to project schedule for completion in February

Need interpretation from Lea on interim levee design criteria Need to define wind / wave run up Request legal release in advance for hydraulic models w/ Yugo Adams / / Williams Report Out LSJR Collaborative Meetings / Peterson GEOTECHNICAL SMITH 1) DWR / Klienfelder Non-urban study moving forward 2) Need to determine usable information from NULE and ULE, State vs. Corps fragility curves future meetings scheduled 3) SJAFCA is seeking WIK for the upcoming work on Bear Creek and Upper Calaveras, will submit scope for review Revise geotechnical budget to reflect NULE & ULE products and coordination costs Determine, products, schedule and acceptability of NULE & ULE products, coordination and release requirements Submit SOW for consideration as WIK for upcoming work on Bear Creek and Upper Calaveras Update Schedule for NULE & ULE coordination Revise Draft SOW for F3 Geotech contract ECONOMICS Neira JORDAN/ BEDKER 1) Discussion future without project conditions will include approved development SJAFCA will provide economic analysis for Canal project Neira COMPLETE Jordan ENVIRONMENTAL EDWARDS 1) Central Valley Flood Protection Plan released regional management measures 2) Delta Stewardship Council pre-released Delta Plan on 14 Feb, final plan released by end of year Assist in developing project fact sheets Edwards PLANNING SAMUELSON 1) Introduced Art Ceballos as Stacy Samuelson s replacement for lead planner. Stacy will be supporting during transition. 2) Need GIS support to develop fact sheets, need update project description and maps Schedule planning meeting to develop project materials Ceballos COMPLETE Need to talk to Michelle Kuhl about Dave Peterson attending the next Stockton Metro meeting. Provide input on planning schedule to Michelle

Develop project fact sheets / materials Request Draft F3 documents TRSS on Division/District Radar Samuelson HOLD GIS YOUNG Distribute Geospatial Data Management Plan Update map of proposed index points, as defined by team once preliminary geotechnical data is received. Develop project fact sheets / materials PROJECT MANAGEMENT 1) Preliminary analysis terminated per 26 January LSJRFS management meeting, with exception of preliminary geotechnical report and economic valuation of areas 1& 2 2) Budget revision delayed for 1 yr or until cost estimates are more firm, per 26 January management meeting 3) Revised schedule indicating 2017 end date for feasibility and 2014 F3 reviewed with no contest at 26 January management meeting, 4) Discussion held on recurring vs. as needed PDT meetings, team decided to continue recurring monthly meetings 5) Discussed SJAFCA application for Section 211 for the Canal project, PDT will need to develop scope and schedule for review work 6) Discussed SJAFCA levee system evaluation recertification, SJAFCA is developing scope for recertification of diverting canal Upper Calaveras, Bear Creek Patty and Wheaton area; PDT will need to determine what review work is required Finalize budget revisions ALL HOLD Finalize schedule revisions ALL Develop tracking mechanism for budget and task completion Williams Investigate proposed FCSA amendment #2 to add clause for acceleration of spending by Non-Fed and establish 4 party agreement Revise PMP Update PDT Contact List SJAFCA Williams ALL ALL Williams COMPLETE CHURCHWELL / GIOTTINI 1) Introduced new PM Juan Neira as primary POC for SJAFCA and Marlo Duncan as supporting PM for budget related issues 2) SJAFCA using Kim Floyd for outreach and public involvement efforts associated with ongoing projects. There may be useful information available to LSJRFS Provide copies of previously submitted WIK for the PAL work on Calaveras Respond to memo of recommendations for shared responsibilities among Corps and Non-Fed Project Managers Neira Churchwell SJCFCWCD SHARIDEH / CONNELLY

1) Introduced new John Maguire as Mark Connelly s replacement DWR Respond to memo of recommendations for shared responsibilities among Corps and Non-Fed Project Managers Schedule LSJRFS for Quarterly Status Report to the CVFPB C. Williams C. Williams (NON-AGENDA ITEMS) CULTURAL RESOURCES SULLO 1) No current activities REAL ESTATE HOLLIS 1) No current activities CIVIL DESIGN CATARELLA No current activities Upon approval, provide SOW for proposed Design WIK to Tom Catarella for review Peterson HOLD

COST ENGINEERING VRCHOTICKY 1) No current Activities