Florida s Design Build Program

Similar documents
2018 AMERICAN COUNCIL OF ENGINEERING COMPANIES OF FLORIDA (ACEC-FL) OUTSTANDING PROJECT AWARDS (OPA) PROGRAM

Design-Build Procurement Overview Manual. Alternative Project Delivery

Improvements to I-595 should support growth of economy, population

Safety Projects and the Local Agency Program (LAP)

Meeting Minutes. SCDOT/ACEC/AGC Design-Build Sub-Committee Meeting. 10:00 am

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

MEETING TYPE: Aesthetic Steering Committee (ASC) No. 7 ATTENDEES:

NLTAPA Region IV Meeting St. Augustine, FL May 13, 2014

May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc.

REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A CONTRACT FOR CLAIMS CONSULTING SERVICES FOR THE DULLES CORRIDOR METRORAIL PROJECT

Florida Department of Transportation (FDOT) Business Participation Plan FY 13/14

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017

VALUE ENGINEERING PROGRAM

CONTRACTING AND PURCHASING

Lessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District

FLORIDA DEPARTMENT OF TRANSPORTATION

Greater Orlando Aviation Authority Board Meeting. Wednesday, March 21, 2018

FDOT Support Services Programs. FDOT Supportive Services Programs

ADDENDUM No. 1. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Procurement Section 3800 Commonwealth Boulevard, MS#93 Tallahassee, Florida

STIP. Van Argabright November 9, 2017

North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle

Measuring and Improving Locally Administered Projects Performance. Robert Guercia, VDOT Russ Dudley, VDOT Lorenzo Casanova, FHWA October 24, 2012

Disadvantaged Business Enterprise Program Open House

Request for Qualifications. Parking Garage 50, Structural Repair - A/E RFQ-REDM17/ ADDENDUM #1

Public-Private Partnerships for Transportation

PENNSYLVANIA TURNPIKE COMMISSION

Performance and Production Review of the Florida Department of Transportation FY 2016/17

SELECTION PROCESS & QUESTION DEVELOPMENT

SUBCONTRACTING ON CDOT CONSTRUCTION PROJECTS Ramp Up Ridgway!

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS

Central Florida Commuter Rail Commission Technical Advisory Committee. Meeting Minutes

FDOT Support Services Programs

Central Florida Expressway Authority Multimodal Investment Assessment Status Report and Update

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

State of Florida Department of Transportation

- j / <-, rei BOARD OF AIRPORT COMMISSIONERS. e:t. Flin hief Executive Officer REPORT TO THE

Effects of the Federal Stimulus Package on Massachusetts Land Surveyors, Civil Engineers and Wetlands Scientists

REGIONAL TRANSIT ISSUE PAPER Page 1 of 3 Agenda Item No.

30 urban and three rural fixed-route public transit systems, including six fixed guide way systems

How To Do Business With Orange County Public Schools. Procurement Services 445 W. Amelia Street Orlando, FL

ADDENDUM # /JSW Professional Engineering Services to Test, Adjust, and Balance HVAC Systems

Whiteview Parkway Improvements

REQUEST FOR PROPOSALS

8, 2018 REQUEST FOR PROPOSALS (RFP): G

Frequently Asked Questions

Membrane Pre-Selection Request For Proposal

REPORT TO THE DULLES CORRIDOR COMMITTEE

Seminole Tribe of Florida Native Learning Center Request for Proposals (RFP) Call for Instructors Procedures. Deadline:

PRE PROPOSAL CONFERENCE. RFP 1 17 C127 Disaster Recovery Plan November 13, 2017

VTA s Capital Projects Program & BART Phase II Procurement Opportunities. VTA s Procurement Fair and Workshop. November 1, 2016

LANDSCAPE AND IRRIGATION MAINTENANCE SERVICES SYSTEMWIDE (EXCLUDING METRO ORANGE LINE)

FHWA - MODOT DESIGN BUILD PROGRAM AGREEMENT

Seminole Tribe of Florida Native Learning Center Request for Proposals (RFP) Call for Instructors Procedures

Design Build Phase II Service Center Project

PRE-SUBMITTAL CONFERENCE DESIGN/BUILD PARK & RIDE. RFQ No. LRT DBPNR September 1, 2009

RACE TO THE TOP ARRA

Contract No Project No C

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1

APPLICATION FOR CERTIFICATION AS A CONSULTANT TO PROVIDE PROFESSIONAL SERVICES IN ACCORDANCE WITH THE CONSULTANTS COMPETITIVE NEGOTIATIONS ACT

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Seminole Tribe of Florida Native Learning Center Request for Proposals (RFP) Call for Instructors Procedures

REQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for STREET CONSTRUCTION SERVICES. RFP STREET WIDENING and TRAFFIC SIGNAL INSTALLATION

Project Selection Advisory Council

NCDOT Roadside Environmental Operations. Brian Burch, P.E. Division 14 Engineer March 19, 2018

Meeting of the Operations and Oversight Committee Thursday, April 12, :00 a.m. 2nd Floor Board Room 509 E. 18 th Street, Norfolk, VA

SOURCE SELECTION AND BID PROTESTS: PRE- AND POST-AWARD CONSIDERATIONS. Daniel Forman Amy O Sullivan Olivia Lynch Robert Sneckenberg

August 2007 Thomas Bohuslav Texas Department of Transportation

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

REQUEST FOR PROPOSALS

INVITATION TO BID (ITB) RESIDENTIAL NOISE MITIGATION PROGRAM(P676A) ITB NO. H27-RNMP

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E.

One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA

Request for Qualifications. Continuing Contracts Mechanical/Electrical/Plumbing Engineering Services, Central Florida Region RFQ-REDM17/18-001

Construction Management (CM) Procedures

FLORIDA STATE UNIVERSITY PURCHASING DEPARTMENT A1400 UNIVERSITY CENTER TALLAHASSEE FL ADDENDUM ACKNOWLEDGMENT FORM. DATE: April 19, 2006

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

NON-INSTRUCTIONAL SERVICES: Purchasing

M/WBE PROGRAM OVERVIEW

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

REQUEST FOR PROPOSALS

PRE-PROPOSAL CONFERENCE

SOLICITATION NO. HGH-CUS

ADDENDUM #1 LRT SS SECURITY SERVICES

2015 FIDIC Awards Oregon Transportation Investment Act III State Bridge Delivery Program

North Metro Rail Line Quarterly Briefing. November 7, 2013

The following specific criteria will be evaluated and must be addressed in the proposal:

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

Request for Qualifications. North Broward Regional Service Center, Replace Columnade Roof Membrane RFQ-REDM17/ ADDENDUM #1

CITY OF MOBILE REQUEST FOR PROPOSAL TRANSIT MANAGEMENT SERVICES

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS

PEPS DIVISION. Presentation for TxDOT Alliance HUB Symposium August 18, Professional Engineering Procurement Services (PEPS)

GREEN BUILDING PROGRAM UPDATE

TxDOT Funding and Accelerated Construction Program

PRE-BID CONFERENCE FOR BID NO SOUTH MAIN STREET MILLING AND RESURFACING IMPROVEMENTS TOWN OF WINDERMERE, FLORIDA

Florida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014

ADDENDUM NO. 2. Request for Proposal No

The RTD FasTracks Plan

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

Transcription:

Florida s Design Build Program 2016 Transportation Short Course October 11 th, 2016 Larry Ritchie, Florida DOT Mike Spain, Lane Construction Phil Schwab, RS&H

Florida Design Build Documents and Procedures History and Background of DB Program Organizational Structure DB Documents DB Procurement

Evolution of Florida s Transportation D/B Program 1987 FL Legislature Authorizes $50M D/B Pilot Program Gov. Bush Announces Economic Stimulus Initiative 63 projects $668M Legislature Mandates that 20% of FDOT Budget Work Program be D/B FDOT Announces Plan to Accelerate $1.347B in Stimulus Funding Received from Feds. Majority of Projects are D/B 1987 1995 1996 2001 2003 2007 2009 1995 FL Legislature Authorizes FDOT to use D/B for Building Major Bridges, Rail, Corridor Projects 1996 Process Expanded to Include all Projects Innovative Practices package Legislature Authorizes Combination ROW Services, Design & Construction for Any Major Project 1995 2003 33 Projects Completed by FDOT at Cost of $137M ($162M budgeted) President Obama signs American Recovery & Reinvestment Act which includes $27.5B Accelerated Road & Bridge Funding

Evolution of Florida s Transportation D/B Program 1987 FL Legislature Authorizes $50M D/B Pilot Program 1995 FL Legislature Authorizes FDOT to use D/B for Building Major Bridges, Rail, Corridor Projects Gov. Bush Announces Economic Stimulus Initiative 63 projects $668M 1996 Process Expanded to Include all Projects Innovative Practices package Legislature Authorizes Combination ROW Services, Design & value of $5.5 Billion Construction for Any Major Project 1995 2003 33 Projects Completed by FDOT at Cost of $137M ($162M budgeted) Legislature Mandates that 20% of FDOT Budget Work Program be D/B FDOT has Procured 475 Projects with a value of $13.5B 1987 1995 1996 2001 2003 2007 2009 With 70 Active projects with a FDOT Announces Plan to Accelerate $1.347B in Stimulus Funding Received from Feds. Majority of Projects are D/B President Obama signs American Recovery & Reinvestment Act which includes $27.5B Accelerated Road & Bridge Funding

STRUCTURE De-centralized 7 Districts Florida Turnpike Enterprise Central Office Work Program Policies, Procedures and Standards

DB DEVELOPMENT Organization (Roles and Responsibilities) Districts are responsible for Project Identification and Development Central Office provides policy and guidelines Central Office must approve the RFP and Addendums (including any changes to boilerplate documents) Districts are responsible for Procurement Planning and Schedules RFP Package Development All Communication and Interaction with Proposers Evaluations and Scoring Selection Recommendation for Award Negotiations/Contract Execution Central Office must also approve Design Exceptions that are processed

DB DOCUMENTS Florida Design Build Documents and tools RFP/Contract Boilerplates and Questionnaire Standard, Maximum Price, Push Button and Low Bid RFP Developer Questionnaire Division I Specifications- (General Requirements and Covenants) Boilerplate - Specific to DB and is an attachment to the RFP Pick List provided to tailor for a specific project needs Division II (Construction Details) & Division III (Materials) Standard Design and Construction Specifications for all projects Modified Special Provisions to make changes

DB DOCUMENTS

DB DOCUMENTS

DB DOCUMENTS

DOCUMENT REVISIONS Boilerplate RFP Updates *Alternative Contracting Task Team Steering Committee that is made up of FDOT central office, District offices, Contractors, Consultants both Design and CEI. comment Design Build Boilerplate RFP is published and used Statewide FDOT and Industry work together through the Steering Committee to resolve conflicts within the updates CO receives comments from Industry, Districts and Internal Offices on proposed updates to the Boilerplate RFP FDOT and Industry meet to review and discuss updates to the Boilerplate RFP at the *Alternative Contracting Task Team Steering Committee CO generates updates to the Boilerplate RFP and distributes internally for review and comment

DOCUMENT REVISIONS Policies, Procedures, Boilerplates Central Office develops and updates Policies and Procedures with heavy District input. Policy doesn t work if you can t use it. Design Build Boilerplate Specifications Division I Specs. attached to every RFP DB Specifications (Division I and Pick List Specs are updated like Standard Specifications Internal and Industry review prior to approval and publication Design Build Boilerplate RFP updates

RFP DEVELOPMENT

RFP DEVELOPMENT

RFP DEVELOPMENT Process Boilerplate must be redlined until you reach a Final RFP. We will typically provide a comparison document from one draft version to the next to help highlight the changes. Boilerplate RFP provides specific notes/guidance to developer Boilerplate Division I Specifications- Tailored for DB, also a Pick list is provided to help tailor to specific project needs Questionnaire provided to aid in the Development in the RFP

RFP DEVELOPMENT Concept Plans Development Typically developed to 30% levels (general in nature) Particular commitments may need to be developed in greater detail (Example-Aesthetic Requirements) Concept Plans should be thought of as one solution Some aspects will set the minimum requirements Poorly designed concept plans will have a negative affect on the final solution Concept Plans should be changed if the RFP is revised

DB Procurement Process» ELOI Evaluated/Scored» Announce LOI Scores» DB Firms declare if moving to Phase 2» "Page Turn" of Design-Build Firm's Technical Proposal» Q&A Session on Proposal» Price Proposals/Bid Submission» Public Meeting announcing Technical scores and bids» Final Selection Posting Advertisement & LOI LOI Evaluation/Short listing Technical Proposal Development and submittal Evaluations and Bid Submission (selection) 31 DAYS (cumulative) 68 DAYS 164 DAYS 220 DAYS» Industry Forum/meetings(prior to Ad)» Planned Ad (Draft RFP) 10 days prior to Ad» Advertisement» Expanded Letter of Interest(ELOI) due 3 weeks after Ad» Final RFP Issued» Pre-proposal meeting District Office» ATC Process(Min. 2 meetings)» Technical Proposal Submitted to District Office