ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK

Similar documents
NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

Appendix B Meeting Presentation. PowerPoint Presentation Informational Boards

WESTERN SLOPE CIP AND TIM FEE UPDATE

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

BMP Program Management Services

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP ("Applicant"),

National Environmental Policy Act/California Environmental Quality Act Scoping Meeting Summary

REQUEST FOR PROPOSALS FOR. ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus

Draft Community Outreach Plan for the Climate Action Plan Update

METHODOLOGY - Scope of Work

PRESENTATION ITEMS. 1. Furniture, Fixtures and Equipment (FF&E) Program

APPENDIX B.3 SCOPING SUMMARY REPORT

1 Introduction. 1.1 Specific Plan Background

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT

Our approach to project management education offers proven, results-focused learning.

REQUEST FOR PROPOSALS

CHAPTER 6 PUBLIC AND AGENCY OUTREACH

MEMORANDUM. July 7, 2016

a consensus planning success story?

Ordinances, Resolutions, Requests for Action XI. D. Meeting Date: June 24, To: Honorable Mayor and Councilmembers

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings

APP NVITAT ON LETTERS COOPERATING AGENCY - Agency Categories:

Presented by: James Moose Remy, Thomas, Moose and Manley, LLP. With: Stephen L. Jenkins, AICP Michael Brandman Associates

Relicensing Process Overview

CITY OF MERCED Planning & Permitting Division

Request for Proposals (RFP) for Professional Planning Services Burlington VT, Downtown/Waterfront Plan Transportation Study

Request for Qualifications (RFQ) Environmental and Permitting Services

Public Scoping Meeting for the Environmental Impact Report

Fresno County Little Bear Solar Project EIR SCOPING MEETING Thursday, September 14, :30 pm - 7:30 pm

SR-86/AVENUE 50 NEW INTERCHANGE PROJECT

Ascon Landfill Site Announcement of Scoping Meetings and Public Comment Period for Notice of Preparation for Draft Environmental Impact Report

VTA s BART Silicon Valley Extension BART Phase II Project Update

REQUEST FOR PROPOSALS

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

IRVINE UNIFIED SCHOOL DISTRICT RESPONSE TO COMMENTS FOR THE PLANNING AREA 6 NORTH ELEMENTARY SCHOOL

California Department of Forestry and Fire Protection CAL FIRE

REQUEST FOR PROPOSAL (RFP) PLANNING CONSULTING SERVICES FOR THE TOWN OF TOPSHAM S COMPREHENSIVE PLAN UPDATE

Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)

Request for Proposals Using Dry Ports to Support Nova Scotia s Tidal Energy

APPEND PARTICIPATING AGENCY - INVITATION LETTER. Sample Letter - Federal Sample Letter - Non-Federal

DISCUSSION ITEM EXECUTIVE SUMMARY

CITY OF DANA POINT AGENDA REPORT KYLE BUTTERWICK, DIRECTOR OF COMMUNITY DEVELOPMENT BRAD FOWLER, DIRECTOR OF PUBLIC WORKS DEPARTMENT

Public and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8

2.0 COMMENTS AND RESPONSES TO COMMENTS

ATTACHMENT A. Nova Homes Residential Project. Initial Study/Mitigated Negative Declaration City Council Resolution

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

The City of San Rafael is issuing this Request for Proposals (RFP) to solicit proposals from qualified consultants to provide:

Request for Proposals For General Plan Update

Meeting Minutes. Project: Subject: Date: Wednesday, December 16, 2015 Location: Attendees:

Guidelines for the Implementation of the California Environmental Quality Act of 1970 As Amended

Appendix H Invitation Letters

NOTICE TO CONSULTANTS REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES FOR GROUNDWATER MODELING AND INJECTION TESTING

State Project No. XXXXXX City Project No. c401807

UNMANNED AIRCRAFT SYSTEMS CORRIDOR STUDY

Transit-Oriented Development and Land Use Subarea Plan for Central Lake Forest Park

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

D E T AI L E D W O RK PLAN TASK 1 KICK-OFF MEETING WITH FRESNO COG, MONTHLY PROGRESS REPORTING AND CONTRACT MANAGEMENT

CITY OF ORANGE LOCAL CEQA GUIDELINES

TOWNSEND BOMBING RANGE MODERNIZATION

Downtown Oakland Specific Plan Frequently Asked Questions

Quality Assurance/Quality Control Procedures for Environmental Documents

Request for Proposals. Environmental Assessment

Request for Proposals (RFP) General Plan Update Town of Windsor Community Development Department

GREEN BUILDING PROGRAM UPDATE

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR A REGIONAL GREEN WASTE PROCESSING FACILITY

DRAFT. Finding of No Significant Impact. For Converting and Stationing an. Infantry Brigade Combat Team (IBCT) to an

Terms of Reference (TOR) for Independent End of Project Evaluation

REQUEST FOR PROPOSAL

State Clearinghouse Handbook

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

NEWSWIRE B2H. Boardman to Hemingway. What s Inside. The upcoming release of BLM s DEIS. A newly proposed route variation in Morrow County

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

Chester County Vision Partnership Grant Program January 2017

ENVIRONMENTAL PRACTICE FORUM:

Central City Line Kick-off and Tour

ALLEGHENY COUNTY RESIDENTIAL FINANCE AUTHORITY REQUEST FOR PROPOSALS. Analysis of Housing Markets in Allegheny County

REQUEST FOR PROPOSALS

Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS

I. BACKGROUND. Goal of Berkeley Marina Area Specific Plan

Fort Ord Reuse: Economic Recovery Status

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT

ENVIRONMENTAL ASSESSMENTS. Classification & Documentation

Regional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft

YUROK TRIBE REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSALS Development of a Master Plan for Shoelace Park on the Bronx River Greenway

FORA ESCA RP: STATUS TO DATE AND PROGRAM HIGHLIGHTS. Stan Cook ESCA Program Manager FORA 1

Regulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS

Integrated Regional Conservation and Development. Avoid and Minimize Project Impacts

REQUEST FOR ARCHITECTURAL & ENGINEERING PRE-DESIGN SERVICES

Welcome Scoping Meeting U.S. Navy Environmental Impact Statement for the EA-18G Growler Airfield Operations at Naval Air Station (NAS) Whidbey Island

coordination and collaboration between St. Mary s College and the Town of Moraga

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.

SPECIFIC AND MASTER PLANS

COUNTY OF SACRAMENTO CALIFORNIA

Transcription:

6 Harris Court Monterey, CA 93940 831 649-5225 Fax 831 373-5065 ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK FORA has prepared this proposed scope of work to be used as a guide for consultants as they submit proposals for this Eastside Parkway Environmental Consultant Services Request for Proposals (RFP). Ten major tasks are outlined below to complete an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) in accordance with the National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) requirements. 1. PROJECT KICK-OFF/ SCOPE REFINEMENT The consultant is required to prepare for and attend a project kick-off meeting to facilitate timely completion of the EIS/EIR for FORA and to complete monthly progress reporting. In addition, this task includes scope refinement, project schedule, background information collection/review, monthly progress reporting, a Draft EIS/EIR outline, and communications procedures. 1.1 Kick-off Meeting The purpose of the kick-off meeting is to set the scope of work and deliverables, establish communication procedures, confirm the project schedule, and identify needed project information and background material. 1.2 Data Collection Consultant will obtain relevant background material from FORA and other sources. 1.3 Review Relevant Background Material Consultant will review and analyze relevant background material. This includes reviewing previous environmental documents such as the Fort Ord Reuse Plan EIR. The consultant will analyze the background material in terms of its usefulness in preparing the Administrative Draft EIS/EIR and pursue any needed additional background information. 1.4 Monthly Progress Reporting Consultant will provide monthly progress reports summarizing work accomplished, review status of draft documents, updates to schedule, and updates to action item assignments among consultant and FORA. 1.5 Draft EIS/EIR Outline Consultant will complete a draft EIS/EIR outline to guide completion of the Administrative Draft EIS/EIR. 1.6 Communications Procedures Consultant will set communications procedures for duration of their work. CIVIL ENGINEERING LAND SURVEYING PROJECT MANAGEMENT

Page 2 of 7 Job No.: 2146.00 1.1 Kick-off meeting minutes, draft scope of work and draft deliverables list, draft communication procedures, draft project schedule, and list of information needs. 1.2 No deliverable. 1.3 No deliverable. 1.4 Monthly progress reports summarizing work accomplished, review status of documents, updated schedule, and action item assignments. 1.5 Draft EIS/EIR Outline 2. PROJECT DESCRIPTION AND ALTERNATIVES 2.1 Project Goals and Objectives Consultant will recommend project goals and objectives with cited reference to relevant background materials. Consultant will prepare draft project goals and objectives for FORA s review. Relevant background material may include but is not limited to: 1997 Fort Ord Reuse Plan, the U.S. Army s 1993 Environmental Impact Statement (EIS), the 1997 Fort Ord Reuse Plan Final Environmental Impact Report (FEIR), and the 1996 Public Facilities Implementation Plan (PFIP). 2.2 Project Description Consultant will write a draft project description defining all aspects of the project, including, but not limited to, project background, location, goals and objectives, planning and engineering details, limits of construction, affected properties and phasing (if any), construction schedule and equipment, graphics that illustrate the project plans, and anticipated permitting and approval actions. The project description will be based on the review of the Preliminary Initial Study Checklist (January 2012) and preliminary design plans (September 2012). 2.3 Draft Conceptual Alternatives Consultant will work closely with FORA to develop draft conceptual alternatives descriptions as part of the EIS/EIR. The Project Alternatives Section of the EIS/EIR will identify and describe the proposed project, no project alternative, and two (2) additional alternatives that will be evaluated in the EIS/EIR. Other alternatives that were considered, but eliminated and therefore not evaluated, shall be identified and described. 2.1 Draft project goals and objectives. 2.2 Draft project description. 2.3 Draft conceptual alternatives.

Page 3 of 7 Job No.: 2146.00 3. Notice of Intent/Notice of Preparation (NOI/NOP), Scoping Meeting, and Summary of Comments The general purpose of the NOI under NEPA and NOP under CEQA is to solicit guidance from appropriate regulatory agencies and interested parties concerning the scope and content of the environmental analysis contained in the EIS/EIR. 3.1 NOI/NOP Consultant will prepare a draft NOI/NOP using available background material as references. Consultant will submit the draft NOI/NOP to FORA for review and comment prior to public distribution. The NOI/NOP will include a brief project description and identification of potential environmental impacts in accordance with CEQA and NEPA. 3.2 Scoping Meeting Consultant will attend and facilitate one (1) public scoping meeting during the 30-day NOI/NOP public comment period. Consultant will prepare scoping meeting materials, including a PowerPoint presentation, agenda, comment cards, and other materials that may be required. Consultant will present information on the scoping meeting purpose, the general requirements of NEPA and CEQA and the environmental process overview, and anticipated project impacts. 3.3 Summary of Comments After the public comment period, consultant will prepare a summary of NOI/NOP comments in table format, listing the environmental topics and issues specified in each comment letter. 3.1 Draft and final NOI/NOP. 3.2 Attend and facilitate public scoping meeting. Scoping meeting materials including a presentation, agenda, comment cards, and other materials. 3.3 NOI/NOP comments summary in table format organized by environmental topics.

Page 4 of 7 Job No.: 2146.00 4. Administrative Draft EIS/EIR 4. Prepare Administrative Draft EIS/EIR Consultant will prepare an Administrative Draft EIS/EIR for review by FORA. Consultant will assure that the EIS/EIR complies with local, state, and federal environmental requirements. A general outline of the Administrative Draft EIS/EIR sections include the following: 1.1 Introduction 1.2 Description of Proposed Project and Alternatives 1.3 Affected Environment 1.4 Environmental Consequences 1.5 Other Required NEPA and CEQA Analyses 1.6 Consultation and Coordination 1.7 List of Preparers 1.8 EIS/EIR Distribution and Noticing 1.9 Acronyms, Abbreviations, and Glossary 1.10 References This scope of work assumes that the existing geotechnical and hydrology reports are sufficient for the EIS/EIR analysis. Consultant shall include an update to the January 2012 Biological Resources Report. Traffic and Circulation Report and Civil Engineering support will be provided by Whitson Engineers. Remaining technical studies and/or updates to existing technical studies that would be part of Consultant s scope of work include: Air Quality and Greenhouse Gas Emissions, Cultural Resources, Forest Resources, and Noise and Ground Borne Vibration. 4. Electronic version (in.docx and.pdf format) of the Administrative Draft EIS/EIR and its appendices (including technical studies) to FORA. Consultant will schedule one round of comments on significant concerns regarding content and structure on the Administrative Draft EIS/EIR. 5. Screencheck Draft EIS/EIR 5. Prepare Screencheck Draft EIS/EIR Consultant will revise the Administrative Draft EIS/EIR based on comments received from FORA. After revisions, consultant will distribute the Screencheck Draft EIS/EIR to FORA for review. Screencheck Draft means that the document review is primarily focused on clarity, grammar, spelling, and minor issues.

Page 5 of 7 Job No.: 2146.00 5. Electronic version (in.docx and.pdf format) of the Screencheck Draft EIS/EIR and its appendices (including technical studies) to FORA. Consultant will schedule one round of comments on the Screencheck Draft EIS/EIR. 6. Public Draft EIS/EIR 6.1 Prepare Public Draft EIS/EIR Consultant will revise the Screencheck Draft EIS/EIR after receiving comments from FORA. Upon completing revisions, consultant will provide ten (10) hard copies of the Public Draft EIS/EIR and thirty (30) compact discs (CDs) for public distribution. FORA will circulate the Public Draft EIS/EIR to the distribution list. Consultant will complete NEPA/CEQA notices, filing, and postings. The Notice of Availability will include the scheduled public meeting time and location. FORA will assist consultant in posting requirements by routing the notice to local publications. 6.2 Public Meeting During the public review period for the Public Draft EIS/EIR, consultant will prepare for and attend a public meeting facilitated by FORA. Consultant will prepare documentation of the public meeting and Public Draft EIS/EIR circulation, including the Record of Public Meeting and Record of Draft EIS/EIR Circulation. Consultant will prepare public meeting materials, including PowerPoint presentation and maps. 6.1 Ten (10) hard copies and thirty (30) CDs (.pdf and.html format) of the Public Draft EIS/EIR, CEQA/NEPA required notices, filings, and postings. Powerpoint of Presentation Material. 6.2 Attendance at the scheduled public meeting. Documentation of the public meeting and Public Draft EIS/EIR circulation. Public meeting materials, including PowerPoint presentation and maps. 7. Responses to Comments and Administrative Draft Final EIS/EIR 7. Administrative Draft Final EIS/EIR When the Public Draft EIS/EIR comment period has closed, consultant will review comments with FORA. Consultant will draft responses to public comments. Due to the potential of a high degree of public interest, consultant should plan to review and respond to extensive public comments for this task. Consultant will revise the Public Draft EIS/EIR regarding content and structure and provide an electronic Administrative Draft Final EIS/EIR (in.docx and.pdf format) to FORA. Revised Draft shall track changes, and consultant shall provide a list of changes identifying the specific change and location.

Page 6 of 7 Job No.: 2146.00 7. Electronic version (in.docx and.pdf format) of the Administrative Draft Final EIS to FORA. Consultant will schedule one round of comments on the Administrative Draft Final EIS/EIR, track changes, and provide an Executive Summary of the changes to FORA. 8. Draft Mitigation Monitoring and Reporting Program and Screencheck Draft Final EIS/EIR 8.1 Draft Mitigation Monitoring and Reporting Program Consultant will complete a Draft Mitigation Monitoring and Reporting Program (MMRP) in compliance with NEPA and CEQA. Consultant will distribute the Draft MMRP to FORA for review. 8.2 Screencheck Draft Final EIS/EIR Consultant will revise the Administrative Draft Final EIS/EIR based on comments received from FORA. After revisions, consultant will distribute the Screencheck Draft Final EIS/EIR to FORA for review. Revised Screencheck Draft shall track changes, and consultant shall provide a list of changes identifying the specific change and location. 8.1 Electronic version (in.docx and.pdf format) of the Draft MMRP to FORA. Consultant will schedule one round of comments on the Draft MMRP. 8.2 Electronic version (in.docx and.pdf format) of the Screencheck Draft Final EIS/EIR. Consultant will schedule one round of comments on the Screencheck Draft Final EIS/EIR. Consultant shall provide Executive Summary of Changes in Powerpoint format. 9. Final EIS/EIR 9.1 Prepare Final EIS/EIR Consultant will revise the Screencheck Draft Final EIS/EIR after receiving comments from FORA. Upon completing revisions, consultant will provide ten (10) hard copies of the Final EIS/EIR and thirty (30) compact discs (CDs) for public distribution. (FORA will circulate the Final EIS/EIR to the distribution list and complete required filings and postings.) 9.2 NEPA/CEQA process review and advice Consultant will provide up to thirty (30) hours of support services to FORA as it finalizes the NEPA/CEQA process. These services will include review of a staff report, draft resolution, and other items as identified by FORA such as a Notice of Determination (NOD).

Page 7 of 7 Job No.: 2146.00 9.3 FORA Board Meetings Consultant will prepare materials for and participate in up to two (2) FORA Board meetings. Consultant will review and/or prepare materials in support of the presentation. FORA staff will present the Final EIS/EIR item to the Board. However, consultant will be prepared to address questions from the Board of Directors and members of the public upon request. 9.1 Ten (10) hard copies and thirty (30) CDs (.pdf and.html format) of the Final EIS/EIR. 9.2 Up to thirty (30) hours of support services to FORA s NEPA/CEQA process. 9.3 Review of material and/or prepare materials in support of up to two (2) presentations to the FORA Board. Participation in up to two (2) presentation to the FORA Board. 10. Additional Meetings As directed by FORA, consultant will provide up to one hundred and sixty (160) staff hours of meetings and/or meeting preparation to facilitate completion of this work. FORA will draft meeting agendas and keep track of follow-up assignments in a task list table. Consultant, will review agendas and task list tables before and after meetings. 10. One hundred and sixty (160) staff hours of meetings or meeting preparation to further completion of the scope of work.